Please enter the search related information in the fields below. Partial information works, e.g. "SP-21" in the "tdoc" field lists all TSG SA documents from 2021. Regular expressions mostly work in all fields (e.g. "2[34].501" in the "Spec" field lists all documents related to 23.501 and 24.501. Capitalization is disregarded, i.e. "3GPP" gives the same results as "3gpp".
Download results in JSON format
| tdoc | Title | Type / Revs | Source | Spec / CR | S/WID | Release | Meeting | Status | Links |
|---|---|---|---|---|---|---|---|---|---|
| R2-10+E5543724 | Discussion on CC specific PHR handling | other | ZTE | R2-70 | - | [WTS] [JSN] | |||
| R2-103485 | Proposed agenda for RAN2 #70bis, Stockholm, Sweden, 28.06.-02.07.2010 | other | Samsung (RAN2 chairman) | R2-70 | - | [WTS] [JSN] | |||
| R2-103486 | Draft report of RAN2 #70, Montreal, Canada, 10.05.-14.05.2010 | other | ETSI MCC | R2-70 | - | [WTS] [JSN] | |||
| R2-103487 | LS on Handling of Hybrid cells (NSN) | other | GERAN | R2-70 | - | [WTS] [JSN] | |||
| R2-103488 | LS to RAN2 on association between PDCCH with CIF and PDSCH / PUSCH (ALU) | other | RAN1 | R2-70 | - | [WTS] [JSN] | |||
| R2-103489 | LS reply on Primary Component Carrier and Semi Persistent Scheduling (R2-102654) (Huawei) | other | RAN1 | R2-70 | - | [WTS] [JSN] | |||
| R2-103490 | LS response on simultaneous PUSCH and PUCCH and clustered SC-FDMA (ALU) | other | RAN1 | R2-70 | - | [WTS] [JSN] | |||
| R2-103491 | LS on agreements on HS-DPCCH design for 4C-HSDPA (Qualcomm) | other | RAN1 | R2-70 | - | [WTS] [JSN] | |||
| R2-103492 | LS on ANRF for UTRAN (ZTE) | other | RAN3 | R2-70 | - | [WTS] [JSN] | |||
| R2-103493 | Reply LS on UE transmitter structure and power in MC-HSUPA for 1.28Mcps TDD (CATT) | other | RAN4 | R2-70 | - | [WTS] [JSN] | |||
| R2-103494 | Reply LS on pathloss measurements in CA scenarios (NTT DOCOMO) | other | RAN4 | R2-70 | - | [WTS] [JSN] | |||
| R2-103495 | LS on in-device coexistence interference (CMCC) | other | RAN4 | R2-70 | - | [WTS] [JSN] | |||
| R2-103496 | LS on CSG reselection requirements and testing (NTT DOCOMO) | other | RAN | R2-70 | - | [WTS] [JSN] | |||
| R2-103497 | LS on Access Control for CSFB (NTT DOCOMO) | other | SA1 | R2-70 | - | [WTS] [JSN] | |||
| R2-103498 | LS on progress of enhanced vocoder work (Orange) | other | SA2 | R2-70 | - | [WTS] [JSN] | |||
| R2-103499 | Reply LS on indication of support of priority-based cell reselection from GERAN to UTRAN (Ericsson) | other | SA2 | R2-70 | - | [WTS] [JSN] | |||
| R2-103500 | LS on support for Priority for terminating sessions for MPS (Telcordia) | other | SA2 | R2-70 | - | [WTS] [JSN] | |||
| R2-103501 | Reply LS on Use cases for cell change indication from MME to E-SMLC (Ove) | other | SA3 LI | R2-70 | - | [WTS] [JSN] | |||
| R2-103502 | LS on updated WID Enabling Coder Selection and Rate Adaptation for UTRAN and E-UTRAN (Ericsson) | other | SA4 | R2-70 | - | [WTS] [JSN] | |||
| R2-103503 | LS on the Usage of MBR and GBR bearers in MTSI (Samsung) | other | SA4 | R2-70 | - | [WTS] [JSN] | |||
| R2-103504 | LS reply to R2-102666 on UE selection for MDT (Nokia Siemens Networks) | other | SA5 | R2-70 | - | [WTS] [JSN] | |||
| R2-103505 | Consideration on renaming PCell as serving cell | other | Nokia Corporation, Nokia Siemens Networks | R2-70 | - | [WTS] [JSN] | |||
| R2-103506 | Configuration of SCell based measurement events | other | Nokia Corporation, Nokia Siemens Networks | R2-70 | - | [WTS] [JSN] | |||
| R2-103507 | Considerations on S-measure usage in CA scenarios | other | Nokia Corporation, Nokia Siemens Networks | R2-70 | - | [WTS] [JSN] | |||
| R2-103508 | UE complexity with logged MDT reporting | other | Nokia Corporation, Nokia Siemens Networks | R2-70 | - | [WTS] [JSN] | |||
| R2-103509 | RLF report for MDT | other | Nokia Corporation, Nokia Siemens Networks | R2-70 | - | [WTS] [JSN] | |||
| R2-103510 | Open issues of idle mode logging | other | Nokia Corporation, Nokia Siemens Networks | R2-70 | - | [WTS] [JSN] | |||
| R2-103511 | Log reporting considerations | other | Nokia Corporation, Nokia Siemens Networks | R2-70 | - | [WTS] [JSN] | |||
| R2-103512 | RLF reporting in UMTS | other | Nokia Corporation, Nokia Siemens Networks | R2-70 | - | [WTS] [JSN] | |||
| R2-103513 | Comparison of CC Management Strategies | other | Nokia Corporation, Nokia Siemens Networks | R2-70 | - | [WTS] [JSN] | |||
| R2-103514 | Contention Resolution on PCell vs. SCell | other | Nokia Corporation, Nokia Siemens Networks | R2-70 | - | [WTS] [JSN] | |||
| R2-103515 | Parameters for SCell Configuration | other | Nokia Siemens Networks, Nokia Corporation | R2-70 | - | [WTS] [JSN] | |||
| R2-103516 | UE categories for 4C-HSDPA | other | Orange, Vodafone | R2-70 | - | [WTS] [JSN] | |||
| R2-103517 | RACH of RN in Un connected mode | other | Nokia Siemens Networks, Nokia Corporation | R2-70 | - | [WTS] [JSN] | |||
| R2-103518 | Complexity of Two Header Compression | other | Nokia Siemens Networks, Nokia Corporation | R2-70 | - | [WTS] [JSN] | |||
| R2-103519 | The number of bearers on Un Interface | other | Nokia Siemens Networks. Nokia Corporation | R2-70 | - | [WTS] [JSN] | |||
| R2-103520 | The necessity of SPS over Un link | other | Nokia Siemens Networks, Nokia Corporation | R2-70 | - | [WTS] [JSN] | |||
| R2-103521 | Frame and SFN timing in CA | other | CATT, Huawei | R2-70 | - | [WTS] [JSN] | |||
| R2-103522 | TAT expiry in CA | other | CATT, Nokia Siemens Networks, Nokia Corporation | R2-70 | - | [WTS] [JSN] | |||
| R2-103523 | Consideration on two type PHRs and MPR | other | CATT | R2-70 | - | [WTS] [JSN] | |||
| R2-103524 | Padding BSR in CA | other | CATT | R2-70 | - | [WTS] [JSN] | |||
| R2-103525 | SPS in CA | other | CATT | R2-70 | - | [WTS] [JSN] | |||
| R2-103526 | Pcell and Scell candidate sets | other | CATT | R2-70 | - | [WTS] [JSN] | |||
| R2-103527 | Additional measurement reporting | other | CATT | R2-70 | - | [WTS] [JSN] | |||
| R2-103528 | Common information for Pcell and Scell | other | CATT | R2-70 | - | [WTS] [JSN] | |||
| R2-103529 | Dedicated information for Pcell and Scell | other | CATT | R2-70 | - | [WTS] [JSN] | |||
| R2-103530 | Cell Index in CA | other | CATT, CMCC | R2-70 | - | [WTS] [JSN] | |||
| R2-103531 | Delta signalling in CA | other | CATT | R2-70 | - | [WTS] [JSN] | |||
| R2-103532 | Details of deactivation timer | other | CATT | R2-70 | - | [WTS] [JSN] | |||
| R2-103533 | RACH access outside RLF | other | NEC | R2-70 | - | [WTS] [JSN] | |||
| R2-103534 | Priority for terminating sessions for MPS | other | Telcordia | R2-70 | - | [WTS] [JSN] | |||
| R2-103535 | Activation & Deactivation of SCells | other | Nokia Corporation, Nokia Siemens Networks | R2-70 | - | [WTS] [JSN] | |||
| R2-103536 | Uplink Activation & Deactivation of SCells | other | Nokia Corporation, Nokia Siemens Networks | R2-70 | - | [WTS] [JSN] | |||
| R2-103537 | HARQ related DRX timers for CA | other | Nokia Corporation, Nokia Siemens Networks | R2-70 | - | [WTS] [JSN] | |||
| R2-103538 | Activation Timing and Transient Period | other | Nokia Siemens Networks, Nokia Corporation | R2-70 | - | [WTS] [JSN] | |||
| R2-103539 | TP on Extended BSR | other | Nokia Siemens Networks, Nokia Corporation | R2-70 | - | [WTS] [JSN] | |||
| R2-103540 | TP on Activation/Deactivation | other | Nokia Corporation, Nokia Siemens Networks | R2-70 | - | [WTS] [JSN] | |||
| R2-103541 | UL Pathloss Reference | other | Nokia Corporation, Nokia Siemens Networks | R2-70 | - | [WTS] [JSN] | |||
| R2-103542 | UE status information for MDT UE selection | other | NEC | R2-70 | - | [WTS] [JSN] | |||
| R2-103543 | Accuracy of location information in MDT | other | NEC | R2-70 | - | [WTS] [JSN] | |||
| R2-103544 | Summary of Remaining PHR Handling Related Issues | other | Pantech | R2-70 | - | [WTS] [JSN] | |||
| R2-103545 | Considerations on the Enhancement of Power Saving without Activation / Deactivation | other | Pantech | R2-70 | - | [WTS] [JSN] | |||
| R2-103546 | handover considerations in CA | other | Pantech | R2-70 | - | [WTS] [JSN] | |||
| R2-103547 | TP for DL-SCH and UL-SCH data transfer in CA | other | HTC | R2-70 | - | [WTS] [JSN] | |||
| R2-103548 | RAN signaling congestion aspect | other | Samsung | R2-70 | - | [WTS] [JSN] | |||
| R2-103549 | On the necessity of DRX enhancement | other | Samsung | R2-70 | - | [WTS] [JSN] | |||
| R2-103550 | Transmission Power & PHR handing in CA | other | Samsung | R2-70 | - | [WTS] [JSN] | |||
| R2-103551 | Discussion on Type 2 PHR | other | Samsung | R2-70 | - | [WTS] [JSN] | |||
| R2-103552 | UE behaviour upon TAT expiry and D-SR failure | other | Samsung | R2-70 | - | [WTS] [JSN] | |||
| R2-103553 | Discussion on BS table | other | Samsung | R2-70 | - | [WTS] [JSN] | |||
| R2-103554 | UE battery drain due to blind scheduling | other | Samsung | R2-70 | - | [WTS] [JSN] | |||
| R2-103555 | MAC operation in addition of a SCell | other | HTC | R2-70 | - | [WTS] [JSN] | |||
| R2-103556 | CR to 36.331 on clarification for MBMS PTM RBs | other | ASUSTeK | R2-70 | - | [WTS] [JSN] | |||
| R2-103557 | Radio frame boundary and SFN alignment | other | Nokia Siemens Networks, Nokia Corporation | R2-70 | - | [WTS] [JSN] | |||
| R2-103558 | Details of PHR for carrier aggregation | other | Nokia Siemens Networks, Nokia Corporation | R2-70 | - | [WTS] [JSN] | |||
| R2-103559 | Details of BSR for Carrier Aggregation | other | Nokia Siemens Networks, Nokia Corporation | R2-70 | - | [WTS] [JSN] | |||
| R2-103560 | Implicit release for SPS | other | HTC | R2-70 | - | [WTS] [JSN] | |||
| R2-103561 | Clarification on RAR grant and dynamic grant in one TTI | other | HTC | R2-70 | - | [WTS] [JSN] | |||
| R2-103562 | UE categories for 4C-HSDPA | other | Samsung | R2-70 | - | [WTS] [JSN] | |||
| R2-103563 | Discussion on dynamic SPS overriding in CA | other | New Postcom | R2-70 | - | [WTS] [JSN] | |||
| R2-103564 | SCell reconfiguration and handling | other | Sharp | R2-70 | - | [WTS] [JSN] | |||
| R2-103565 | Specification impacts and complexity analysis for two header compression proposals | other | Institute for Information Industry (III), Coiler Corporation | R2-70 | - | [WTS] [JSN] | |||
| R2-103566 | CC linking for pathloss estimation | other | Qualcomm Incorporated | R2-70 | - | [WTS] [JSN] | |||
| R2-103567 | SCell selection at CA handover | other | Qualcomm Incorporated | R2-70 | - | [WTS] [JSN] | |||
| R2-103568 | S-measure in Carrier Aggregation | other | Qualcomm Incorporated | R2-70 | - | [WTS] [JSN] | |||
| R2-103569 | Details of BSR Handling for CA | other | Ericsson, ST-Ericsson | R2-70 | - | [WTS] [JSN] | |||
| R2-103570 | Details of PHR Handling for CA | other | Ericsson, ST-Ericsson | R2-70 | - | [WTS] [JSN] | |||
| R2-103571 | Analysis on MAC procedures for relay | other | NTT DOCOMO, INC. | R2-70 | - | [WTS] [JSN] | |||
| R2-103572 | Analysis on RRC procedures for relay | other | NTT DOCOMO, INC. | R2-70 | - | [WTS] [JSN] | |||
| R2-103573 | Clarification on the HARQ operation in enhanced CELL_FACH state (R7) | other | Huawei | R2-70 | - | [WTS] [JSN] | |||
| R2-103574 | Clarification on the HARQ operation in enhanced CELL_FACH state (R8) | other | Huawei | R2-70 | - | [WTS] [JSN] | |||
| R2-103575 | Clarification on the HARQ operation in enhanced CELL_FACH state (R9) | other | Huawei | R2-70 | - | [WTS] [JSN] | |||
| R2-103576 | Correction to VAS updating (R8) | other | Huawei | R2-70 | - | [WTS] [JSN] | |||
| R2-103577 | Correction to VAS updating (R9) | other | Huawei | R2-70 | - | [WTS] [JSN] | |||
| R2-103578 | Clarification on the DTX operation for DC-HSUPA | other | Huawei | R2-70 | - | [WTS] [JSN] | |||
| R2-103579 | Activation state of the secondary uplink frequency | other | Huawei | R2-70 | - | [WTS] [JSN] | |||
| R2-103580 | Summary of e-mail discussion [70#15] LTE CA: PHR Handling | other | Ericsson, ST-Ericsson | R2-70 | - | [WTS] [JSN] | |||
| R2-103581 | Corrections to the activation state of the secondary uplink frequency | other | Huawei | R2-70 | - | [WTS] [JSN] | |||
| R2-103582 | Logged MDT data survival | other | Nokia Siemens Networks, Nokia Corporation | R2-70 | - | [WTS] [JSN] | |||
| R2-103583 | Discussion on Inter-frequency CSG Virtual Active Set management | other | Huawei | R2-70 | - | [WTS] [JSN] | |||
| R2-103584 | Supporting event triggered reporting for CSG inter-frequency inbound mobility | other | Huawei | R2-70 | - | [WTS] [JSN] | |||
| R2-103585 | Introduction of 4C-HSDPA in 25.321 | other | Huawei | R2-70 | - | [WTS] [JSN] | |||
| R2-103586 | UE categories for 4C-HSDPA | other | Huawei | R2-70 | - | [WTS] [JSN] | |||
| R2-103587 | On the signalling of UE band capability report for 4C-HSDPA | other | Huawei | R2-70 | - | [WTS] [JSN] | |||
| R2-103588 | On the signalling of UE measurement capability report for 4C-HSDPA | other | Huawei | R2-70 | - | [WTS] [JSN] | |||
| R2-103589 | On the signalling of configuration for 4C-HSDPA | other | Huawei | R2-70 | - | [WTS] [JSN] | |||
| R2-103590 | Discussion on UTRAN ANR | other | Huawei | R2-70 | - | [WTS] [JSN] | |||
| R2-103591 | Clarification of the TCTF field encoding for 3.84 Mcps TDD IMB MBSFN (Rel-8) | other | IPWireless Inc. | R2-70 | - | [WTS] [JSN] | |||
| R2-103592 | Clarification of the TCTF field encoding for 3.84 Mcps TDD IMB MBSFN (Rel-9) | other | IPWireless Inc. | R2-70 | - | [WTS] [JSN] | |||
| R2-103593 | RACH Handling on Un | other | CATT | R2-70 | - | [WTS] [JSN] | |||
| R2-103594 | Clarification of UE Mode for RN | other | CATT | R2-70 | - | [WTS] [JSN] | |||
| R2-103595 | Comparison of Header Compression schemes over Un | other | CATT | R2-70 | - | [WTS] [JSN] | |||
| R2-103596 | Number of Data Bearers on Un | other | CATT | R2-70 | - | [WTS] [JSN] | |||
| R2-103597 | Functionality of Un RRC Connection Reconfiguration Procedure | other | CATT | R2-70 | - | [WTS] [JSN] | |||
| R2-103598 | Candidate Scell List and Additional Measurement Results in CA | other | Panasonic | R2-70 | - | [WTS] [JSN] | |||
| R2-103599 | RACH message 4 linking | other | Panasonic | R2-70 | - | [WTS] [JSN] | |||
| R2-103600 | Details of cross-carrier power headroom reports | other | Panasonic | R2-70 | - | [WTS] [JSN] | |||
| R2-103601 | Overriding of SPS resource for carrier aggregation | other | Panasonic | R2-70 | - | [WTS] [JSN] | |||
| R2-103602 | UE-specific Power headroom report | other | Panasonic | R2-70 | - | [WTS] [JSN] | |||
| R2-103603 | Cell Selection on Redirection from EUTRAN | other | Vodafone, Research in Motion UK Ltd | R2-70 | - | [WTS] [JSN] | |||
| R2-103604 | efficient deactivation of Scells | other | Panasonic | R2-70 | - | [WTS] [JSN] | |||
| R2-103605 | Uplink activation and details on MAC CE for CC management | other | Panasonic | R2-70 | - | [WTS] [JSN] | |||
| R2-103606 | Analyses of the SA2 Solutions for Access Restriction | other | Panasonic | R2-70 | - | [WTS] [JSN] | |||
| R2-103607 | Clarification on Applicable GERAN Cell Selection procedure at Redirection from EUTRA | other | Vodafone, Research in Motion UK Ltd | R2-70 | - | [WTS] [JSN] | |||
| R2-103608 | Report of email discussion on [70#13] LTE CA: Smeas handling"" | other | Panasonic | R2-70 | - | [WTS] [JSN] | |||
| R2-103609 | Pcell and Scell common information | other | Panasonic | R2-70 | - | [WTS] [JSN] | |||
| R2-103610 | Clarification on Applicable GERAN Cell Selection procedure at Redirection from EUTRA | other | Vodafone, Research in Motion UK Ltd | R2-70 | - | [WTS] [JSN] | |||
| R2-103611 | What is a Rel-8/9 backward compatible Carrier? | other | Samsung | R2-70 | - | [WTS] [JSN] | |||
| R2-103612 | Pcell and Scell dedicated information | other | Panasonic | R2-70 | - | [WTS] [JSN] | |||
| R2-103613 | Message Structure of Pcell/Scell configuration in CA | other | Panasonic | R2-70 | - | [WTS] [JSN] | |||
| R2-103614 | Clarification on Applicable GERAN Cell Selection procedure at Redirection from EUTRA (Rel-9 CR) | other | Vodafone, Research in Motion UK Ltd | R2-70 | - | [WTS] [JSN] | |||
| R2-103615 | Draft proposed LS to GERAN on fast cell selection at Redirection | other | Vodafone, Research in Motion UK Ltd | R2-70 | - | [WTS] [JSN] | |||
| R2-103616 | CC activation and deactivation message | other | Ericsson, ST-Ericsson | R2-70 | - | [WTS] [JSN] | |||
| R2-103617 | Properties of a Cell Index | other | Ericsson, ST-Ericsson | R2-70 | - | [WTS] [JSN] | |||
| R2-103618 | Comparisons on RACH control schemes for MTC | other | Institute for Information Industry (III), Coiler Corporation | R2-70 | - | [WTS] [JSN] | |||
| R2-103619 | Load Analysis for MTC Devices in Idle Mode or Detached State | other | Institute for Information Industry (III), Coiler Corporation | R2-70 | - | [WTS] [JSN] | |||
| R2-103620 | Clarification for UE in URA_PCH state when supporting HS-DSCH reception | other | Ericsson, ST-Ericsson | R2-70 | - | [WTS] [JSN] | |||
| R2-103621 | Correction for IE Downlink Secondary Cell Info FDD handling | other | Ericsson, ST-Ericsson | R2-70 | - | [WTS] [JSN] | |||
| R2-103622 | RRC connection release in CELL_PCH state | other | Ericsson, ST-Ericsson | R2-70 | - | [WTS] [JSN] | |||
| R2-103623 | Speed dependent scaling rules in HCS environment | other | Ericsson, ST-Ericsson, Nokia Corporation, Nokia Siemens Networks | R2-70 | - | [WTS] [JSN] | |||
| R2-103624 | RF pattern matching in UMTS | other | Polaris Wireless, Thales Alenia | R2-70 | - | [WTS] [JSN] | |||
| R2-103625 | Signaling of supported carrier configurations for 4C-HSDPA | other | Ericsson, ST-Ericsson | R2-70 | - | [WTS] [JSN] | |||
| R2-103626 | UE RRC Procedure Performance for UMTS | other | Ericsson, ST-Ericsson | R2-70 | - | [WTS] [JSN] | |||
| R2-103627 | Stage 2 TP for cross carrier scheduling | other | MediaTek | R2-70 | - | [WTS] [JSN] | |||
| R2-103628 | Discussion on Activation/Deactivation | other | MediaTek | R2-70 | - | [WTS] [JSN] | |||
| R2-103629 | Discussion on Timing Relationship between Scell Activation/Deactivation and MAC CE | other | MediaTek | R2-70 | - | [WTS] [JSN] | |||
| R2-103630 | Discussion on Cell Management | other | MediaTek | R2-70 | - | [WTS] [JSN] | |||
| R2-103631 | Information Forwarding for Scell Selection in CA Handover | other | MediaTek | R2-70 | - | [WTS] [JSN] | |||
| R2-103632 | s-Measure Handling for Mobility and CC Management | other | MediaTek | R2-70 | - | [WTS] [JSN] | |||
| R2-103633 | MDT measurement area configuration details | other | Deutsche Telekom, CMCC, Huawei, NTT DOCOMO, Orange, Telecom Italia | R2-70 | - | [WTS] [JSN] | |||
| R2-103634 | Per UE PHR for carrier aggregation | other | MediaTek | R2-70 | - | [WTS] [JSN] | |||
| R2-103635 | Impacts of Power scaling | other | MediaTek | R2-70 | - | [WTS] [JSN] | |||
| R2-103636 | Enhancements for RLF reporting | other | Deutsche Telekom, NTT DOCOMO, Nokia Corporation, Nokia Siemens Networks | R2-70 | - | [WTS] [JSN] | |||
| R2-103637 | Void | other | MediaTek | R2-70 | - | [WTS] [JSN] | |||
| R2-103638 | New UE power class for Rel-10 | other | MediaTek | R2-70 | - | [WTS] [JSN] | |||
| R2-103639 | Discussion on RRC Modeling | other | MediaTek | R2-70 | - | [WTS] [JSN] | |||
| R2-103640 | Void | other | Deutsche Telekom | R2-70 | - | [WTS] [JSN] | |||
| R2-103641 | Need for idle mode distribution with LTA-A carrier aggregation | other | Deutsche Telekom | R2-70 | - | [WTS] [JSN] | |||
| R2-103642 | Analysis on Common information in CA | other | MediaTek | R2-70 | - | [WTS] [JSN] | |||
| R2-103643 | Discussion on RRC Reconfiguration Message Structure | other | MediaTek | R2-70 | - | [WTS] [JSN] | |||
| R2-103644 | Discussion on In-device Coexistence Interference Avoidance | other | MediaTek | R2-70 | - | [WTS] [JSN] | |||
| R2-103645 | Incorrect inconsisitency check on MAC-ehs reordering queue | other | Panasonic | R2-70 | - | [WTS] [JSN] | |||
| R2-103646 | Correction on the information element of the E-RUCCH information 1.28 Mcps TDD | other | TD Tech | R2-70 | - | [WTS] [JSN] | |||
| R2-103647 | Incorrect inconsisitency check on MAC-ehs reordering queue | other | Panasonic | R2-70 | - | [WTS] [JSN] | |||
| R2-103648 | Correction on the information element of the E-RUCCH information 1.28 Mcps TDD | other | TD Tech | R2-70 | - | [WTS] [JSN] | |||
| R2-103649 | Incorrect inconsisitency check on MAC-ehs reordering queue | other | Panasonic | R2-70 | - | [WTS] [JSN] | |||
| R2-103650 | Clarifications regarding fullConfiguration | other | Samsung | R2-70 | - | [WTS] [JSN] | |||
| R2-103651 | RLC Status reporting in CA | other | Samsung | R2-70 | - | [WTS] [JSN] | |||
| R2-103652 | Introduction of CA to the MAC specification | other | Ericsson, ST-Ericsson | R2-70 | - | [WTS] [JSN] | |||
| R2-103653 | Radio Frame and SFN Synchronization | other | Samsung | R2-70 | - | [WTS] [JSN] | |||
| R2-103654 | Cell index for cell management in CA | other | Panasonic | R2-70 | - | [WTS] [JSN] | |||
| R2-103655 | Decoupling UEs' L1 and L2 DL capabilities | other | Nokia Corporation, Nokia Siemens Networks | R2-70 | - | [WTS] [JSN] | |||
| R2-103656 | Correction to 3GPP2 reference for interworking with cdma2000 1x | other | Motorola, QUALCOMM Incorporated | R2-70 | - | [WTS] [JSN] | |||
| R2-103657 | Correction to 3GPP2 reference for interworking with cdma2000 1x | other | Motorola, QUALCOMM Incorporated | R2-70 | - | [WTS] [JSN] | |||
| R2-103658 | Clarification of when to clear IE Precoding weight set restriction" from MIMO_PARAMS" | other | Alcatel-Lucent | R2-70 | - | [WTS] [JSN] | |||
| R2-103659 | Clarification of when to clear IE Precoding weight set restriction" from MIMO_PARAMS" | other | Alcatel-Lucent | R2-70 | - | [WTS] [JSN] | |||
| R2-103660 | Clarification of when to clear IE Precoding weight set restriction" from MIMO_PARAMS" | other | Alcatel-Lucent | R2-70 | - | [WTS] [JSN] | |||
| R2-103661 | Clarification of when to clear IE Precoding weight set restriction" from MIMO_PARAMS" | other | Alcatel-Lucent | R2-70 | - | [WTS] [JSN] | |||
| R2-103662 | Clarification of cell reselection based on E-UTRA RSRQ measurements | other | Alcatel-Lucent, NTT DOCOMO | R2-70 | - | [WTS] [JSN] | |||
| R2-103663 | Structure of Scheduling Information for MC-HSUPA | other | New Postcom | R2-70 | - | [WTS] [JSN] | |||
| R2-103664 | Correction to L2 re-establishment order for handover | other | New Postcom | R2-70 | - | [WTS] [JSN] | |||
| R2-103665 | Analysis on the open issues of PHR for carrier aggregation | other | New Postcom | R2-70 | - | [WTS] [JSN] | |||
| R2-103666 | Group triggering and reporting of PHR for carrier aggregation | other | New Postcom | R2-70 | - | [WTS] [JSN] | |||
| R2-103667 | The procedure selection for NAS recovery | other | New Postcom | R2-70 | - | [WTS] [JSN] | |||
| R2-103668 | Measurement object swapping at handover and re-establishment | other | New Postcom | R2-70 | - | [WTS] [JSN] | |||
| R2-103669 | Decision of MBMS service activation & deactivation | other | New Postcom | R2-70 | - | [WTS] [JSN] | |||
| R2-103670 | Logged MDT – indication of data available | other | Alcatel-Lucent | R2-70 | - | [WTS] [JSN] | |||
| R2-103671 | Considerations for UTRA ANR | other | Alcatel-Lucent | R2-70 | - | [WTS] [JSN] | |||
| R2-103672 | Void | other | Potevio | R2-70 | - | [WTS] [JSN] | |||
| R2-103673 | Text proposal relating to logical channel prioritisation | other | Nokia Corporation, Nokia Siemens Networks | R2-70 | - | [WTS] [JSN] | |||
| R2-103674 | Text proposal relating to BSR transmission | other | Nokia Corporation, Nokia Siemens Networks | R2-70 | - | [WTS] [JSN] | |||
| R2-103675 | NAS recovery procedure from RLF for RN | other | Potevio | R2-70 | - | [WTS] [JSN] | |||
| R2-103676 | Priority levels for MTC devices | other | Nokia Corporation, Nokia Siemens Networks | R2-70 | - | [WTS] [JSN] | |||
| R2-103677 | BSR reporting in Carrier Aggregation | other | Alcatel-Lucent | R2-70 | - | [WTS] [JSN] | |||
| R2-103678 | MAC PHR CE format design for LTE-A CA scenario | other | Alcatel-Lucent | R2-70 | - | [WTS] [JSN] | |||
| R2-103679 | SPS overriding in LTE-A | other | Alcatel-Lucent | R2-70 | - | [WTS] [JSN] | |||
| R2-103680 | Stage-2 description of relay types | other | Alcatel-Lucent | R2-70 | - | [WTS] [JSN] | |||
| R2-103681 | How to capture RN specific procedures | other | Alcatel-Lucent | R2-70 | - | [WTS] [JSN] | |||
| R2-103682 | Radio link failure handling by RN | other | Alcatel-Lucent | R2-70 | - | [WTS] [JSN] | |||
| R2-103683 | Discussion on SR failure over Un | other | Alcatel-Lucent | R2-70 | - | [WTS] [JSN] | |||
| R2-103684 | Intra-cell handover by RN | other | Alcatel-Lucent | R2-70 | - | [WTS] [JSN] | |||
| R2-103685 | signalling of relay type to DeNB | other | Alcatel-Lucent | R2-70 | - | [WTS] [JSN] | |||
| R2-103686 | Discuss on the UE MBMS reception status report | other | Alcatel-Lucent | R2-70 | - | [WTS] [JSN] | |||
| R2-103687 | Discuss on achieving statistical multiplexing gain | other | Alcatel-Lucent | R2-70 | - | [WTS] [JSN] | |||
| R2-103688 | Consideration on uplink rate control for Un interface | other | Alcatel-Lucent | R2-70 | - | [WTS] [JSN] | |||
| R2-103689 | Void | other | CATT | R2-70 | - | [WTS] [JSN] | |||
| R2-103690 | Void | other | CATT | R2-70 | - | [WTS] [JSN] | |||
| R2-103691 | Text Proposal for TR 37.868 on RACH Analysis | other | CATT | R2-70 | - | [WTS] [JSN] | |||
| R2-103692 | Primary Analysis on RACH Capacity for LCR TDD | other | CATT | R2-70 | - | [WTS] [JSN] | |||
| R2-103693 | MTC induced overload and Access Class Barring | other | Sharp Corporation | R2-70 | - | [WTS] [JSN] | |||
| R2-103694 | New Triggers for PHR | other | Qualcomm Incorporated | R2-70 | - | [WTS] [JSN] | |||
| R2-103695 | Header Stripping | other | Qualcomm Incorporated | R2-70 | - | [WTS] [JSN] | |||
| R2-103696 | Handling of MBR | other | Qualcomm Incorporated | R2-70 | - | [WTS] [JSN] | |||
| R2-103697 | LTE-A UE Cateogry Assumptions | other | Qualcomm Incorporated | R2-70 | - | [WTS] [JSN] | |||
| R2-103698 | Contents of MBMS reception status | other | LG Electronics Inc. | R2-70 | - | [WTS] [JSN] | |||
| R2-103699 | Mechanism to enable the network to know the MBMS reception status of UEs | other | LG Electronics Inc. | R2-70 | - | [WTS] [JSN] | |||
| R2-103700 | Extension of paging cycle for MTC | other | LG Electronics Inc. | R2-70 | - | [WTS] [JSN] | |||
| R2-103701 | PWS-like Broadcast for MTC | other | LG Electronics Inc. | R2-70 | - | [WTS] [JSN] | |||
| R2-103702 | RRC Connection Release for MTC Devices | other | LG Electronics Inc. | R2-70 | - | [WTS] [JSN] | |||
| R2-103703 | Reception of PWS messages for UE supporting CA | other | LG Electronics Inc. | R2-70 | - | [WTS] [JSN] | |||
| R2-103704 | Efficient RN Power Consumption | other | LG Electronics Inc. | R2-70 | - | [WTS] [JSN] | |||
| R2-103705 | RRC Connection Release on Un Interface | other | LG Electronics Inc. | R2-70 | - | [WTS] [JSN] | |||
| R2-103706 | RACH Access Issues on Un Link | other | Huawei | R2-70 | - | [WTS] [JSN] | |||
| R2-103707 | On the Selection of RN's MME | other | Huawei, CATT | R2-70 | - | [WTS] [JSN] | |||
| R2-103708 | Performance analysis of secondary carrier activation vs. configuration | other | Qualcomm Incorporated | R2-70 | - | [WTS] [JSN] | |||
| R2-103709 | Priority and paging | other | Qualcomm Incorporated | R2-70 | - | [WTS] [JSN] | |||
| R2-103710 | Proposed reply to SA2 on priority paging | other | Qualcomm Incorporated | R2-70 | - | [WTS] [JSN] | |||
| R2-103711 | Speed Dependent Scaling in CA | other | CATT | R2-70 | - | [WTS] [JSN] | |||
| R2-103712 | Proposed Corrections and Clarifications to LPP for Rel-9 | other | Qualcomm Incorporated | R2-70 | - | [WTS] [JSN] | |||
| R2-103713 | Introduction of SRS mask | other | CATT, Panasonic | R2-70 | - | [WTS] [JSN] | |||
| R2-103714 | Various corrections and clarifications to LPP | other | Qualcomm Incorporated | R2-70 | - | [WTS] [JSN] | |||
| R2-103715 | Proposed Corrections to the PeriodicalReportingCriteria in LPP | other | Qualcomm Incorporated | R2-70 | - | [WTS] [JSN] | |||
| R2-103716 | Addition of an EPDU to an LPP Error and LPP Abort | other | Qualcomm Incorporated | R2-70 | - | [WTS] [JSN] | |||
| R2-103717 | Proposed Corrections to LPP Reliable Transport | other | Qualcomm Incorporated | R2-70 | - | [WTS] [JSN] | |||
| R2-103718 | Discussion on BSR for Carrier Aggregation | other | HT mMobile Inc. | R2-70 | - | [WTS] [JSN] | |||
| R2-103719 | Discussion on activation and deactivation | other | ZTE | R2-70 | - | [WTS] [JSN] | |||
| R2-103720 | Email summary of [70#10] LTE CA: Information provided to target eNB | other | ZTE | R2-70 | - | [WTS] [JSN] | |||
| R2-103721 | Discussion on s-measure configuration | other | ZTE | R2-70 | - | [WTS] [JSN] | |||
| R2-103722 | Clean-up of non-applicable measurements | other | ZTE | R2-70 | - | [WTS] [JSN] | |||
| R2-103723 | A4-leave for CC management | other | ZTE | R2-70 | - | [WTS] [JSN] | |||
| R2-103724 | other | R2-70 | - | [WTS] [JSN] | |||||
| R2-103725 | Discussion on parallel transmission of type1/2 PHR | other | ZTE | R2-70 | - | [WTS] [JSN] | |||
| R2-103726 | CA measurements terminolog | other | ZTE | R2-70 | - | [WTS] [JSN] | |||
| R2-103727 | BSR reporting based on two tables | other | ZTE | R2-70 | - | [WTS] [JSN] | |||
| R2-103728 | Design on MAC CE for act/deact command | other | ZTE | R2-70 | - | [WTS] [JSN] | |||
| R2-103729 | Clarification on Release 10 MBMS WID | other | ZTE | R2-70 | - | [WTS] [JSN] | |||
| R2-103730 | Trigger Mechanism for MBMS Uplink Feedback | other | ZTE | R2-70 | - | [WTS] [JSN] | |||
| R2-103731 | Uplink Feedback Approaches for MBMS | other | ZTE | R2-70 | - | [WTS] [JSN] | |||
| R2-103732 | A mechanism for reducing R-DPCCH signalling overhead | other | ZTE | R2-70 | - | [WTS] [JSN] | |||
| R2-103733 | Considerations on Other Re-establishment Causes for Relay | other | ZTE | R2-70 | - | [WTS] [JSN] | |||
| R2-103734 | D-SR failure handling over Un interface | other | ZTE | R2-70 | - | [WTS] [JSN] | |||
| R2-103735 | Issue on Un-Uu uplink rate control | other | ZTE | R2-70 | - | [WTS] [JSN] | |||
| R2-103736 | Clarification of primary uplink frequency and secondary uplink frequency | other | ZTE | R2-70 | - | [WTS] [JSN] | |||
| R2-103737 | Clarification of primary uplink frequency and secondary uplink frequency | other | ZTE | R2-70 | - | [WTS] [JSN] | |||
| R2-103738 | Band combination signalling for 4C-HSDPA | other | ZTE | R2-70 | - | [WTS] [JSN] | |||
| R2-103739 | Considerations on ANR for UTRAN | other | ZTE | R2-70 | - | [WTS] [JSN] | |||
| R2-103740 | Rach congestion cases | other | ZTE | R2-70 | - | [WTS] [JSN] | |||
| R2-103741 | access priority of MTC | other | ZTE | R2-70 | - | [WTS] [JSN] | |||
| R2-103742 | evaluation of Rach congestion solutions | other | ZTE | R2-70 | - | [WTS] [JSN] | |||
| R2-103743 | backoff based solution for Rach congestion | other | ZTE | R2-70 | - | [WTS] [JSN] | |||
| R2-103744 | Clarification on RLC length indicator size for SRB0 | other | CATT | R2-70 | - | [WTS] [JSN] | |||
| R2-103745 | Clarification on RLC length indicator size for SRB0 | other | CATT | R2-70 | - | [WTS] [JSN] | |||
| R2-103746 | Clarification on RLC length indicator size for SRB0 | other | CATT | R2-70 | - | [WTS] [JSN] | |||
| R2-103747 | Clarification on RLC length indicator size for SRB0 | other | CATT | R2-70 | - | [WTS] [JSN] | |||
| R2-103748 | Clarification on RLC length indicator size for SRB0 | other | CATT | R2-70 | - | [WTS] [JSN] | |||
| R2-103749 | Clarification on RLC length indicator size for SRB0 | other | CATT | R2-70 | - | [WTS] [JSN] | |||
| R2-103750 | Discussion on E-TFC selection in MC-HSUPA | other | CATT | R2-70 | - | [WTS] [JSN] | |||
| R2-103751 | Consideration on E-RUCCH transmission in MC-HSUPA | other | CATT | R2-70 | - | [WTS] [JSN] | |||
| R2-103752 | Consideration on SI reporting in MC-HSUPA | other | CATT | R2-70 | - | [WTS] [JSN] | |||
| R2-103753 | Discussion on RLC PDU generation scheme in MC-HSUPA | other | CATT | R2-70 | - | [WTS] [JSN] | |||
| R2-103754 | Logged MDT reporting indication in mobility | other | HTC | R2-70 | - | [WTS] [JSN] | |||
| R2-103755 | Buffer Size Table for CA | other | Huawei | R2-70 | - | [WTS] [JSN] | |||
| R2-103756 | Buffer Status Reporting Procedure for CA | other | Huawei | R2-70 | - | [WTS] [JSN] | |||
| R2-103757 | Transmission and power efficiency for M2M | other | Huawei | R2-70 | - | [WTS] [JSN] | |||
| R2-103758 | Idle Traffic Distribution for Multi-Carrier deployments with Carrier Aggregation | other | Alcatel-Lucent, Deutsche Telekom | R2-70 | - | [WTS] [JSN] | |||
| R2-103759 | Load distribution for MTC devices | other | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | R2-70 | - | [WTS] [JSN] | |||
| R2-103760 | Support of RF Pattern Matching in UTRAN | other | Ericsson, ST-Ericsson | R2-70 | - | [WTS] [JSN] | |||
| R2-103761 | UE categories for 4-Carrier HSDPA | other | Ericsson, ST-Ericsson | R2-70 | - | [WTS] [JSN] | |||
| R2-103762 | Handling of the Log When Crossing RATs | other | CATT | R2-70 | - | [WTS] [JSN] | |||
| R2-103763 | Enhancement and simplification for UE RLF reporting | other | CATT | R2-70 | - | [WTS] [JSN] | |||
| R2-103764 | Immediate MDT Measurement Handling during handover | other | CATT | R2-70 | - | [WTS] [JSN] | |||
| R2-103765 | Handling radioResourceConfigCommon after successful handover | other | Research In Motion UK Limited | R2-70 | - | [WTS] [JSN] | |||
| R2-103766 | Reading of radioResourceConfigCommon | other | Research In Motion UK Limited | R2-70 | - | [WTS] [JSN] | |||
| R2-103767 | Correction to time alignment timer procedure | other | Research In Motion UK Limited | R2-70 | - | [WTS] [JSN] | |||
| R2-103768 | UL PHR for PUCCH and PUSCH | other | Research In Motion UK Limited | R2-70 | - | [WTS] [JSN] | |||
| R2-103769 | Logged MDT measurement configurations | other | Research In Motion UK Limited | R2-70 | - | [WTS] [JSN] | |||
| R2-103770 | Inform the cause of MBMS E-RABs release | other | CATT | R2-70 | - | [WTS] [JSN] | |||
| R2-103771 | Legacy impacts on Enhanced Security Mode procedure handling | other | Research In Motion UK Limited | R2-70 | - | [WTS] [JSN] | |||
| R2-103772 | Enhanced Security Mode procedure handling in case of delayed L2 ACK | other | Research In Motion UK Limited | R2-70 | - | [WTS] [JSN] | |||
| R2-103773 | Separate Scell (de)activation | other | InterDigital | R2-70 | - | [WTS] [JSN] | |||
| R2-103774 | UE Actions at TAT Expiration | other | InterDigital | R2-70 | - | [WTS] [JSN] | |||
| R2-103775 | Un Radio Bearers | other | InterDigital | R2-70 | - | [WTS] [JSN] | |||
| R2-103776 | Separate backoff scheme for MTC | other | ETRI | R2-70 | - | [WTS] [JSN] | |||
| R2-103777 | Details of CC addition in relation to SI change | other | ETRI | R2-70 | - | [WTS] [JSN] | |||
| R2-103778 | MDT location control and correlation | other | huawei | R2-70 | - | [WTS] [JSN] | |||
| R2-103779 | UE RLF report | other | Huawei, Deutsche Telekom | R2-70 | - | [WTS] [JSN] | |||
| R2-103780 | UE RACH failure report | other | Huawei | R2-70 | - | [WTS] [JSN] | |||
| R2-103781 | The time stamp and area scope definition for idle mode logged MDT | other | Huawei | R2-70 | - | [WTS] [JSN] | |||
| R2-103782 | Immediate MDT Stage3 CR | other | Huawei | R2-70 | - | [WTS] [JSN] | |||
| R2-103783 | Mapping Uu bearers to Un bearers | other | Qualcomm Incorporated | R2-70 | - | [WTS] [JSN] | |||
| R2-103784 | Bearer structure for X2 and S1 control messages | other | Qualcomm Incorporated | R2-70 | - | [WTS] [JSN] | |||
| R2-103785 | RRM analysis for in-device coesistence | other | Qualcomm Incorporated | R2-70 | - | [WTS] [JSN] | |||
| R2-103786 | On the need for SPS for Un | other | Motorola | R2-70 | - | [WTS] [JSN] | |||
| R2-103787 | RLF Measurement results report in UMTS | other | Huawei | R2-70 | - | [WTS] [JSN] | |||
| R2-103788 | Common and dedicated configuration for Pcell_Scell | other | Huawei | R2-70 | - | [WTS] [JSN] | |||
| R2-103789 | RRC reconfiguration message structure for CA | other | Huawei | R2-70 | - | [WTS] [JSN] | |||
| R2-103790 | Idle mode MDT measurements | other | Samsung | R2-70 | - | [WTS] [JSN] | |||
| R2-103791 | Introduction of late corrections container for E-UTRA UE capabilities | other | Samsung, Panasonic | R2-70 | - | [WTS] [JSN] | |||
| R2-103792 | Renaming of containers for late non-critical extensions | other | Samsung | R2-70 | - | [WTS] [JSN] | |||
| R2-103793 | Small corrections on Carrier Aggregation | other | Samsung | R2-70 | - | [WTS] [JSN] | |||
| R2-103794 | Radio resource configuration changes for CA, cell specific | other | Samsung | R2-70 | - | [WTS] [JSN] | |||
| R2-103795 | Radio resource configuration changes for CA, UE specific | other | Samsung | R2-70 | - | [WTS] [JSN] | |||
| R2-103796 | Delta signalling for CA | other | Huawei | R2-70 | - | [WTS] [JSN] | |||
| R2-103797 | CA terminology in TS 36.331 | other | Samsung | R2-70 | - | [WTS] [JSN] | |||
| R2-103798 | CA configuration information structure | other | Samsung | R2-70 | - | [WTS] [JSN] | |||
| R2-103799 | RRC TP on CA changes regarding Measurements | other | Samsung | R2-70 | - | [WTS] [JSN] | |||
| R2-103800 | RRC TP on on CA changes regarding System information | other | Samsung | R2-70 | - | [WTS] [JSN] | |||
| R2-103801 | Terminology alignment among serving cell and Pcell/Scell | other | Huawei | R2-70 | - | [WTS] [JSN] | |||
| R2-103802 | RRC TP on on CA changes regarding Connection control | other | Samsung | R2-70 | - | [WTS] [JSN] | |||
| R2-103803 | Discussion on DL CC Activation/Deactivation | other | ETRI | R2-70 | - | [WTS] [JSN] | |||
| R2-103804 | 25.331 CR Introduction of 4C-HSDPA | other | Qualcomm Incorporated | R2-70 | - | [WTS] [JSN] | |||
| R2-103805 | Correction to default configuration #23 | other | Nokia Siemens Networks, Nokia Corporation, NTT DOCOMO | R2-70 | - | [WTS] [JSN] | |||
| R2-103806 | 4C-HSDPA Tabular Discussion | other | Qualcomm Incorporated | R2-70 | - | [WTS] [JSN] | |||
| R2-103807 | Report of email discussion [70#17] on UMTS: Measurement capabilities for 4C-HSDPA | other | Qualcomm Incorporated | R2-70 | - | [WTS] [JSN] | |||
| R2-103808 | Signaling UE search capability in 4C-HSDPA | other | Qualcomm Incorporated | R2-70 | - | [WTS] [JSN] | |||
| R2-103809 | Correction to default configuration #23 | other | Nokia Siemens Networks, Nokia Corporation, NTT DOCOMO | R2-70 | - | [WTS] [JSN] | |||
| R2-103810 | Signaling and support of band combinations for 4C-HSDPA | other | Qualcomm Incorporated | R2-70 | - | [WTS] [JSN] | |||
| R2-103811 | Correction to default configuration #23 | other | Nokia Siemens Networks, Nokia Corporation, NTT DOCOMO | R2-70 | - | [WTS] [JSN] | |||
| R2-103812 | UE Categories for 4C-HSDPA | other | Qualcomm Incorporated | R2-70 | - | [WTS] [JSN] | |||
| R2-103813 | Correction to MIMO_STATUS and SECONDARY_CELL_MIMO_STATUS setting for Single Stream MIMO | other | Nokia Siemens Networks, Nokia Corporation | R2-70 | - | [WTS] [JSN] | |||
| R2-103814 | Correction to MIMO_STATUS and SECONDARY_CELL_MIMO_STATUS setting for Single Stream MIMO | other | Nokia Siemens Networks, Nokia Corporation | R2-70 | - | [WTS] [JSN] | |||
| R2-103815 | InterRAT MDT handling | other | Qualcomm Incorporated | R2-70 | - | [WTS] [JSN] | |||
| R2-103816 | UE supported Frequency band indicator for redirection in RRC CONNECTION REQUEST | other | Nokia Siemens Networks, Nokia Corporation, NTT DOCOMO | R2-70 | - | [WTS] [JSN] | |||
| R2-103817 | Applicability of MDT to different RRC States in UMTS | other | Qualcomm Incorporated | R2-70 | - | [WTS] [JSN] | |||
| R2-103818 | Status of the secondary carrier upon anchor and secondary switch | other | Qualcomm Incorporated | R2-70 | - | [WTS] [JSN] | |||
| R2-103819 | Use special value of HE field causing RLC Reset | other | Qualcomm Incorporated | R2-70 | - | [WTS] [JSN] | |||
| R2-103820 | Use special value of HE field causing RLC Reset | other | Qualcomm Incorporated | R2-70 | - | [WTS] [JSN] | |||
| R2-103821 | Use special value of HE field causing RLC Reset | other | Qualcomm Incorporated | R2-70 | - | [WTS] [JSN] | |||
| R2-103822 | Use special value of HE field causing RLC Reset | other | Qualcomm Incorporated | R2-70 | - | [WTS] [JSN] | |||
| R2-103823 | Ciphering issue for SRBs at flexible to fixed or RLC size change | other | Qualcomm Incorporated | R2-70 | - | [WTS] [JSN] | |||
| R2-103824 | Ciphering issue for SRBs at flexible to fixed or RLC size change | other | Qualcomm Incorporated | R2-70 | - | [WTS] [JSN] | |||
| R2-103825 | Ciphering issue for SRBs at flexible to fixed or RLC size change | other | Qualcomm Incorporated | R2-70 | - | [WTS] [JSN] | |||
| R2-103826 | Ciphering issue for SRBs at flexible to fixed or RLC size change | other | Qualcomm Incorporated | R2-70 | - | [WTS] [JSN] | |||
| R2-103827 | Ciphering issue for SRBs at flexible to fixed or RLC size change | other | Qualcomm Incorporated | R2-70 | - | [WTS] [JSN] | |||
| R2-103828 | Enhanced Security Mode procedure handling in case of delayed L2 ACK | other | Qualcomm Incorporated | R2-70 | - | [WTS] [JSN] | |||
| R2-103829 | HARQ Buffer upon H-RNTI switch in Enhanced CELL_FACH | other | Qualcomm Incorporated | R2-70 | - | [WTS] [JSN] | |||
| R2-103830 | HARQ Buffer upon H-RNTI switch in Enhanced CELL_FACH | other | Qualcomm Incorporated | R2-70 | - | [WTS] [JSN] | |||
| R2-103831 | HARQ Buffer upon H-RNTI switch in Enhanced CELL_FACH | other | Qualcomm Incorporated | R2-70 | - | [WTS] [JSN] | |||
| R2-103832 | Proposed Way Forward on RF Pattern Matching | other | Qualcomm Incorporated | R2-70 | - | [WTS] [JSN] | |||
| R2-103833 | LI size for CCCH(SRB0) in enhanced CELL_FACH operation | other | Qualcomm Incorporated | R2-70 | - | [WTS] [JSN] | |||
| R2-103834 | LI size for CCCH(SRB0) in enhanced CELL_FACH operation | other | Qualcomm Incorporated | R2-70 | - | [WTS] [JSN] | |||
| R2-103835 | A solution for event triggered CSG inter-frequency measurements | other | Qualcomm Incorporated | R2-70 | - | [WTS] [JSN] | |||
| R2-103836 | LI size for CCCH(SRB0) in enhanced CELL_FACH operation | other | Qualcomm Incorporated | R2-70 | - | [WTS] [JSN] | |||
| R2-103837 | Band/carrier combination signaling for 4C-HSDPA | other | Nokia Siemens Networks, Nokia | R2-70 | - | [WTS] [JSN] | |||
| R2-103838 | Secondary carrier configuration for 4C-HSDPA | other | Nokia Siemens Networks, Nokia | R2-70 | - | [WTS] [JSN] | |||
| R2-103839 | Header Compression over Un | other | CATR | R2-70 | - | [WTS] [JSN] | |||
| R2-103840 | RN operation in case of re-establishment failure over Un | other | Alcatel-Lucent Shanghai Bell, Alcatel-Lucent | R2-70 | - | [WTS] [JSN] | |||
| R2-103841 | Discussion on RN P-GWs | other | Alcatel-Lucent | R2-70 | - | [WTS] [JSN] | |||
| R2-103842 | Correction of GTP for S1-AP and X2-AP | other | Alcatel-Lucent | R2-70 | - | [WTS] [JSN] | |||
| R2-103843 | [Draft] LS response on support for Priority for terminating sessions for MPS | other | Alcatel-Lucent | R2-70 | - | [WTS] [JSN] | |||
| R2-103844 | Status of and proposal for supporting UEs in limited service mode in shared networks | other | IMS Emergency call WI Rapporteur (Alcatel-Lucent) | R2-70 | - | [WTS] [JSN] | |||
| R2-103845 | Specification of RN behaviour | other | Ericsson, ST-Ericsson | R2-70 | - | [WTS] [JSN] | |||
| R2-103846 | Tentative RS transmission prohibition | other | Fujitsu | R2-70 | - | [WTS] [JSN] | |||
| R2-103847 | TAT expiry and CC deactivation | other | Fujitsu | R2-70 | - | [WTS] [JSN] | |||
| R2-103848 | Msg4 and PDCCH reception | other | Fujitsu | R2-70 | - | [WTS] [JSN] | |||
| R2-103849 | CIF inclusion in PDCCH order | other | Fujitsu | R2-70 | - | [WTS] [JSN] | |||
| R2-103850 | BSR tables design | other | Fujitsu | R2-70 | - | [WTS] [JSN] | |||
| R2-103851 | Tentative RS transmission prohibition | other | Fujitsu | R2-70 | - | [WTS] [JSN] | |||
| R2-103852 | RRC Connection Reconfiguration message structure for CA | other | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | R2-70 | - | [WTS] [JSN] | |||
| R2-103853 | Mechanisms of UL Activation and Deactivation | other | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | R2-70 | - | [WTS] [JSN] | |||
| R2-103854 | Delta Configuration for handover and re-establishment | other | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | R2-70 | - | [WTS] [JSN] | |||
| R2-103855 | Usage of Cell Index for CC Management | other | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | R2-70 | - | [WTS] [JSN] | |||
| R2-103856 | Timer based implicit deactivation | other | Alcatel-Lucent, LG Electronics Inc., Qualcomm Incorporated, Panasonic | R2-70 | - | [WTS] [JSN] | |||
| R2-103857 | Activation and Deactivation MAC CE format | other | Alcatel-Lucent Shanghai Bell, Alcatel-Lucent | R2-70 | - | [WTS] [JSN] | |||
| R2-103858 | Draft proposed reply LS to GERAN on Hybrid Cell Handling | other | Vodafone | R2-70 | - | [WTS] [JSN] | |||
| R2-103859 | Timse stamp Information for Logged MDT | other | Vodafone | R2-70 | - | [WTS] [JSN] | |||
| R2-103860 | Un Interface Reconfiguration | other | Fujitsu | R2-70 | - | [WTS] [JSN] | |||
| R2-103861 | Outband Relay Operation | other | Fujitsu | R2-70 | - | [WTS] [JSN] | |||
| R2-103862 | System Information Handling for Scell | other | Fujitsu | R2-70 | - | [WTS] [JSN] | |||
| R2-103863 | Cross-RAT logged data Retrieval & MDT Configuration | other | Kyocera | R2-70 | - | [WTS] [JSN] | |||
| R2-103864 | Area configuration for MDT reporting | other | Ericsson, ST-Ericsson | R2-70 | - | [WTS] [JSN] | |||
| R2-103865 | Counting for MBMS Rel-10 | other | Ericsson, ST-Ericsson | R2-70 | - | [WTS] [JSN] | |||
| R2-103866 | AC-Barring for Mobile Originating CSFB calls | other | NTT DOCOMO, Inc. | R2-70 | - | [WTS] [JSN] | |||
| R2-103867 | AC-Barring for Mobile Originating CSFB calls | other | NTT DOCOMO, Inc. | R2-70 | - | [WTS] [JSN] | |||
| R2-103868 | MDT configuration and log deletion avoidance | other | NTT DOCOMO, Inc. | R2-70 | - | [WTS] [JSN] | |||
| R2-103869 | Logged MDT measurement contents and model | other | NTT DOCOMO, Inc. | R2-70 | - | [WTS] [JSN] | |||
| R2-103870 | On the complexity of Un header compression | other | Ericsson, ST-Ericsson | R2-70 | - | [WTS] [JSN] | |||
| R2-103871 | On GNSS location information for MDT measurement report | other | NTT DOCOMO, Inc. | R2-70 | - | [WTS] [JSN] | |||
| R2-103872 | Positioning session as trigger for MDT measurement collection | other | NTT DOCOMO, Inc. | R2-70 | - | [WTS] [JSN] | |||
| R2-103873 | MDT support for roaming and network sharing | other | NTT DOCOMO, Inc. | R2-70 | - | [WTS] [JSN] | |||
| R2-103874 | Details of MBSFN configuration aspects for Un | other | Ericsson, ST-Ericsson | R2-70 | - | [WTS] [JSN] | |||
| R2-103875 | Connection to SA5 trace function | other | Ericsson, ST-Ericsson | R2-70 | - | [WTS] [JSN] | |||
| R2-103876 | Multi-RAT and mobility handling | other | Ericsson, ST-Ericsson | R2-70 | - | [WTS] [JSN] | |||
| R2-103877 | Power headroom Reporting for CA | other | Huawei | R2-70 | - | [WTS] [JSN] | |||
| R2-103878 | Summary of email discussion [70#14] LTE CA: Removal of Activation/Deactivation from Rel-10? | other | Ericsson | R2-70 | - | [WTS] [JSN] | |||
| R2-103879 | Pathloss Linking for CA | other | Ericsson, ST-Ericsson | R2-70 | - | [WTS] [JSN] | |||
| R2-103880 | Activation/Deactivation Timing | other | Ericsson, ST-Ericsson | R2-70 | - | [WTS] [JSN] | |||
| R2-103881 | Restricting Msg4 to the PCell | other | Ericsson, ST-Ericsson | R2-70 | - | [WTS] [JSN] | |||
| R2-103882 | Modelling of the Pcell vs. Serving cell | other | Ericsson, ST-Ericsson | R2-70 | - | [WTS] [JSN] | |||
| R2-103883 | Common information for Pcell/Scells | other | Ericsson, ST-Ericsson | R2-70 | - | [WTS] [JSN] | |||
| R2-103884 | Radio frame timing and SFN timing | other | Ericsson, ST-Ericsson | R2-70 | - | [WTS] [JSN] | |||
| R2-103885 | Dedicated information of Pcell/Scells | other | Ericsson, ST-Ericsson | R2-70 | - | [WTS] [JSN] | |||
| R2-103886 | Avoiding glitches upon Activation/Deactivation | other | Ericsson, ST-Ericsson | R2-70 | - | [WTS] [JSN] | |||
| R2-103887 | Message structure for carrier aggregation | other | Ericsson, ST-Ericsson | R2-70 | - | [WTS] [JSN] | |||
| R2-103888 | Reporting for Logged MDT | other | Telecom Italia | R2-70 | - | [WTS] [JSN] | |||
| R2-103889 | Further Details on Random Access Procedure on Un | other | Ericsson, ST-Ericsson | R2-70 | - | [WTS] [JSN] | |||
| R2-103890 | Inter-frequency CSG virtual active set handling configuration | other | Nokia Corporation, Nokia Siemens Networks, Ericsson, ST-Ericsson | R2-70 | - | [WTS] [JSN] | |||
| R2-103891 | Number of DRBs for Un | other | Ericsson, ST-Ericsson | R2-70 | - | [WTS] [JSN] | |||
| R2-103892 | Update of virtual active set handling for inter-frequency CSG measurements | other | Nokia Corporation, Nokia Siemens Networks, Ericsson, ST-Ericsson | R2-70 | - | [WTS] [JSN] | |||
| R2-103893 | Update of virtual active set handling for inter-frequency CSG measurements | other | Nokia Corporation, Nokia Siemens Networks, Ericsson, ST-Ericsson | R2-70 | - | [WTS] [JSN] | |||
| R2-103894 | Optimisation of RACH signalling | other | Nokia Corporation, Nokia Siemens Networks | R2-70 | - | [WTS] [JSN] | |||
| R2-103895 | Paging for priority services | other | Ericsson, ST-Ericsson | R2-70 | - | [WTS] [JSN] | |||
| R2-103896 | Addition of optimised RACH message types | other | Nokia Corporation, Nokia Siemens Networks | R2-70 | - | [WTS] [JSN] | |||
| R2-103897 | Changing parameters on the fly for network energy savings | other | Ericsson, ST-Ericsson | R2-70 | - | [WTS] [JSN] | |||
| R2-103898 | Specification impact from CA on 36.321 | other | Ericsson, ST-Ericsson | R2-70 | - | [WTS] [JSN] | |||
| R2-103899 | Practical solutions for ANR for UTRAN | other | Nokia Corporation, Nokia Siemens Networks | R2-70 | - | [WTS] [JSN] | |||
| R2-103900 | Methods for WLAN/Bluetooth in-device coexistence interference avoidance | other | Ericsson, ST-Ericsson | R2-70 | - | [WTS] [JSN] | |||
| R2-103901 | Re-direct indication in UTRA access | other | Ericsson, ST-Ericsson | R2-70 | - | [WTS] [JSN] | |||
| R2-103902 | Time stamp mechanism for Logged MDT | other | Ericsson, ST-Ericsson | R2-70 | - | [WTS] [JSN] | |||
| R2-103903 | Time stamp mechanism for Logged MDT | other | Ericsson, ST-Ericsson | R2-70 | - | [WTS] [JSN] | |||
| R2-103904 | Introduction of maximum number of segmentations per RLC PDU | other | Nokia Corporation, Nokia Siemens Networks | R2-70 | - | [WTS] [JSN] | |||
| R2-103905 | Introduction of Rel-10 access stratum release indicator | other | Ericsson, ST-Ericsson | R2-70 | - | [WTS] [JSN] | |||
| R2-103906 | RACH evaluation for MTC in LTE | other | Ericsson, ST-Ericsson | R2-70 | - | [WTS] [JSN] | |||
| R2-103907 | Solutions for RACH overload | other | Ericsson, ST-Ericsson | R2-70 | - | [WTS] [JSN] | |||
| R2-103908 | Solution for the delayed L2 Ack during security mode command procedure | other | Nokia Corporation, Nokia Siemens Networks | R2-70 | - | [WTS] [JSN] | |||
| R2-103909 | Relative Grants by non-serving cells | other | Ericsson, ST-Ericsson | R2-70 | - | [WTS] [JSN] | |||
| R2-103910 | Discussion of SecurityModeCommand delayed L2 Ack problem | other | Nokia Corporation, Nokia Siemens Networks | R2-70 | - | [WTS] [JSN] | |||
| R2-103911 | Discussion of UM RLC ciphering error detection and recovery for VoIP | other | Nokia Corporation, Nokia Siemens Networks | R2-70 | - | [WTS] [JSN] | |||
| R2-103912 | [70#11] LTE CA: S-cell activation status after handover | other | Motorola | R2-70 | - | [WTS] [JSN] | |||
| R2-103913 | Transfer of Information at handover | other | Motorola | R2-70 | - | [WTS] [JSN] | |||
| R2-103914 | Further considerations on s-Measure | other | Motorola | R2-70 | - | [WTS] [JSN] | |||
| R2-103915 | Activation of uplink CCs | other | Motorola | R2-70 | - | [WTS] [JSN] | |||
| R2-103916 | Obtaining location information for immediate MDT reporting | other | Motorola | R2-70 | - | [WTS] [JSN] | |||
| R2-103917 | Introduction of 4C-HSDPA categories | other | Nokia Corporation, Nokia Siemens Networks | R2-70 | - | [WTS] [JSN] | |||
| R2-103918 | Discussion on UE categories for 4-carrier HSDPA and L2 buffer sizes | other | Nokia Corporation, Nokia Siemens Networks | R2-70 | - | [WTS] [JSN] | |||
| R2-103919 | On the need of a Validity Timer for MDT Log | other | Vodafone | R2-70 | - | [WTS] [JSN] | |||
| R2-103920 | On the need of a Validity Timer for MDT Log | other | Vodafone | R2-70 | - | [WTS] [JSN] | |||
| R2-103921 | Additions to Stage-2 description of relaying | other | Ericsson, ST-Ericsson | R2-70 | - | [WTS] [JSN] | |||
| R2-103922 | Dynamic capability signalling for multi-transceiver UEs | other | Philips | R2-70 | - | [WTS] [JSN] | |||
| R2-103923 | Clarification on mobility from E-UTRA failure | other | HTC | R2-70 | - | [WTS] [JSN] | |||
| R2-103924 | Handling coverage hole case for logged MDT | other | Samsung | R2-70 | - | [WTS] [JSN] | |||
| R2-103925 | Clarification on mobility from E-UTRA failure | other | HTC | R2-70 | - | [WTS] [JSN] | |||
| R2-103926 | On the RLF report enhancement | other | Samsung | R2-70 | - | [WTS] [JSN] | |||
| R2-103927 | Clarification on UL handover preparation transfer | other | HTC | R2-70 | - | [WTS] [JSN] | |||
| R2-103928 | Clarification on mobility to E-UTRA | other | HTC | R2-70 | - | [WTS] [JSN] | |||
| R2-103929 | Clarification on mobility to E-UTRA | other | HTC | R2-70 | - | [WTS] [JSN] | |||
| R2-103930 | Linking for Msg4 | other | LG Electronics Inc. | R2-70 | - | [WTS] [JSN] | |||
| R2-103931 | Clarification on HandoverFromEUTRAPreparationRequest message | other | HTC | R2-70 | - | [WTS] [JSN] | |||
| R2-103932 | RA procedure by PDCCH order | other | LG Electronics Inc. | R2-70 | - | [WTS] [JSN] | |||
| R2-103933 | SPS resources overridden by dynamic resources | other | LG Electronics Inc. | R2-70 | - | [WTS] [JSN] | |||
| R2-103934 | MAC CE Format for Scell Activation Deactivation | other | LG Electronics Inc. | R2-70 | - | [WTS] [JSN] | |||
| R2-103935 | Number of MAC PDUs for Relay Operation | other | LG Electronics Inc., Texas Instruments | R2-70 | - | [WTS] [JSN] | |||
| R2-103936 | User awareness of MDT measurement | other | LG Electronics Inc. | R2-70 | - | [WTS] [JSN] | |||
| R2-103937 | PHR format for CA | other | LG Electronics Inc. | R2-70 | - | [WTS] [JSN] | |||
| R2-103938 | BSR format for CA | other | LG Electronics Inc. | R2-70 | - | [WTS] [JSN] | |||
| R2-103939 | Measurement reporting in CA | other | Huawei | R2-70 | - | [WTS] [JSN] | |||
| R2-103940 | Clarification to the CELL_DCH measurement occasion in MAC for 1.28Mcps TDD | other | ZTE | R2-70 | - | [WTS] [JSN] | |||
| R2-103941 | Additional Information for the Scell Decision in the target eNB | other | Huawei | R2-70 | - | [WTS] [JSN] | |||
| R2-103942 | Summary of Email Discussion [70#12]: Measurement Object Swapping | other | Huawei | R2-70 | - | [WTS] [JSN] | |||
| R2-103943 | Correction to re-establishment procedure | other | ASUSTeK | R2-70 | - | [WTS] [JSN] | |||
| R2-103944 | Miscellaneous corrections to RLC | other | ASUSTeK | R2-70 | - | [WTS] [JSN] | |||
| R2-103945 | Void | other | ASUSTeK | R2-70 | - | [WTS] [JSN] | |||
| R2-103946 | Void | other | ASUSTeK | R2-70 | - | [WTS] [JSN] | |||
| R2-103947 | Considerations on E-TFC selection for LCR MC-HSUPA | other | TD Tech | R2-70 | - | [WTS] [JSN] | |||
| R2-103948 | Receiver Impact on Measurement | other | Huawei | R2-70 | - | [WTS] [JSN] | |||
| R2-103949 | Kickoff for SI on interference avoidance for in-device coexistence | other | CMCC | R2-70 | - | [WTS] [JSN] | |||
| R2-103950 | RN/eNB selection for coverage-overlapped UEs generating session requests from idle mode | other | LG Electronics | R2-70 | - | [WTS] [JSN] | |||
| R2-103951 | Corrections to TS36.331 on MeasConfig IE | other | Huawei | R2-70 | - | [WTS] [JSN] | |||
| R2-103952 | Consideration on E-RUCCH configuration for LCR MC-HSUPA | other | TD Tech | R2-70 | - | [WTS] [JSN] | |||
| R2-103953 | RLF timers and constants handling during reconfiguration involving fullConfiguration | other | Huawei | R2-70 | - | [WTS] [JSN] | |||
| R2-103954 | Skeleton TR for SI on interference avoidance for in-device coexistence | other | CMCC | R2-70 | - | [WTS] [JSN] | |||
| R2-103955 | Support of Scell (de)activation | other | Huawei | R2-70 | - | [WTS] [JSN] | |||
| R2-103956 | On intra-eNB energy saving | other | CMCC | R2-70 | - | [WTS] [JSN] | |||
| R2-103957 | SFN and subframe/slot number alignment for CA | other | NTT DOCOMO, INC. | R2-70 | - | [WTS] [JSN] | |||
| R2-103958 | Cell index usage in CA | other | Huawei | R2-70 | - | [WTS] [JSN] | |||
| R2-103959 | Consideration on periodic triggers for LCR TDD MC-HSUPA | other | TD Tech | R2-70 | - | [WTS] [JSN] | |||
| R2-103960 | Considerations on deployment of both relay and eMBMS | other | CMCC | R2-70 | - | [WTS] [JSN] | |||
| R2-103961 | No cross scheduling for PDCCH order | other | Huawei | R2-70 | - | [WTS] [JSN] | |||
| R2-103962 | DL SCell activation/deactivation without glitches | other | NTT DOCOMO, INC. | R2-70 | - | [WTS] [JSN] | |||
| R2-103963 | UL SCell activation/deactivation | other | NTT DOCOMO, INC. | R2-70 | - | [WTS] [JSN] | |||
| R2-103964 | Clarifications on reception status reporting in R10 MBMS | other | CMCC | R2-70 | - | [WTS] [JSN] | |||
| R2-103965 | Optimized BSR Triggering for MTC Applications | other | VIA Telecom | R2-70 | - | [WTS] [JSN] | |||
| R2-103966 | Discussion on UE autonomously removing MDT logs | other | CMCC | R2-70 | - | [WTS] [JSN] | |||
| R2-103967 | RAN overload control solutions | other | Huawei | R2-70 | - | [WTS] [JSN] | |||
| R2-103968 | Access Procedure Enhancement for MTC Applications | other | VIA Telecom | R2-70 | - | [WTS] [JSN] | |||
| R2-103969 | Discussion on SI format for LCR MC-HSUPA | other | TD Tech | R2-70 | - | [WTS] [JSN] | |||
| R2-103970 | Pathloss reference for CA | other | NTT DOCOMO, INC. | R2-70 | - | [WTS] [JSN] | |||
| R2-103971 | Traffic characteristic analysis for Smart grid | other | Huawei | R2-70 | - | [WTS] [JSN] | |||
| R2-103972 | Consideration on the impact of application level distribution on MTC | other | Huawei | R2-70 | - | [WTS] [JSN] | |||
| R2-103973 | RACH collision probability analysis | other | Huawei | R2-70 | - | [WTS] [JSN] | |||
| R2-103974 | RACH capacity simulation for 1.28Mcps TDD 4.3.2.2 | other | TD Tech | R2-70 | - | [WTS] [JSN] | |||
| R2-103975 | Void | other | TD Tech | R2-70 | - | [WTS] [JSN] | |||
| R2-103976 | Use of UE specific Cell Index for CA | other | NTT DOCOMO, INC. | R2-70 | - | [WTS] [JSN] | |||
| R2-103977 | New Logical Channel for MTC Applications | other | VIA Telecom | R2-70 | - | [WTS] [JSN] | |||
| R2-103978 | MBMS reception status reporting | other | Huawei | R2-70 | - | [WTS] [JSN] | |||
| R2-103979 | Discussion on UE physical categories for LCR TDD MC-HSUPA | other | TD Tech | R2-70 | - | [WTS] [JSN] | |||
| R2-103980 | Discussion on SI structure for 1.28M TDD MC-HSUPA | other | ZTE | R2-70 | - | [WTS] [JSN] | |||
| R2-103981 | Reporting of neighboring cell results for logged MDT in IDLE | other | CMCC | R2-70 | - | [WTS] [JSN] | |||
| R2-103982 | Discussion about Removal of Activation/Deactivation Concept from Rel-10 | other | ITRI | R2-70 | - | [WTS] [JSN] | |||
| R2-103983 | Discussion on UE measurement Capabilities | other | InterDigital | R2-70 | - | [WTS] [JSN] | |||
| R2-103984 | Consideration on PHR Type | other | ITRI | R2-70 | - | [WTS] [JSN] | |||
| R2-103985 | Identification of MTC devices | other | CMCC | R2-70 | - | [WTS] [JSN] | |||
| R2-103986 | UE categories for 4C-HSDPA | other | InterDigital | R2-70 | - | [WTS] [JSN] | |||
| R2-103987 | Further consideration on pathloss reference in CA | other | ITRI | R2-70 | - | [WTS] [JSN] | |||
| R2-103988 | Clarification of slotNumberOffset for OTDOA | other | Nokia corporation, Nokia Siemens Networks | R2-70 | - | [WTS] [JSN] | |||
| R2-103989 | The details of Scell (de)activation MAC CE | other | Huawei, CATT | R2-70 | - | [WTS] [JSN] | |||
| R2-103990 | Signalling and procedures for area scope MDT measurements | other | NTT DOCOMO, INC. | R2-70 | - | [WTS] [JSN] | |||
| R2-103991 | Stage-2 update TS 37.320 v0.5.1 | other | Rapporteur (Nokia Siemens Networks) | R2-70 | - | [WTS] [JSN] | |||
| R2-103992 | RRC procedures for Logged MDT | other | Nokia Siemens Networks, Nokia Corporation | R2-70 | - | [WTS] [JSN] | |||
| R2-103993 | Division of LPP into Separate ASN.1 Modules with a Global Identifier | other | Qualcomm Incorporated | R2-70 | - | [WTS] [JSN] | |||
| R2-103994 | CIF configuration for Pcell and Scell | other | Samsung | R2-70 | - | [WTS] [JSN] | |||
| R2-103995 | Correction on the table of conditionally mandatory Release 9 features | other | NTT DOCOMO INC, | R2-70 | - | [WTS] [JSN] | |||
| R2-103996 | Ambiguity issue in CIF operation | other | Samsung | R2-70 | - | [WTS] [JSN] | |||
| R2-103997 | S-measure in CA | other | Huawei | R2-70 | - | [WTS] [JSN] | |||
| R2-103998 | Use special value of HE field causing RLC Reset | other | Qualcomm Incorporated | R2-70 | - | [WTS] [JSN] | |||
| R2-103999 | RLF handling for DB-HSDPA | other | Samsung | R2-70 | - | [WTS] [JSN] | |||
| R2-104000 | Stopping timer T313 on change of serving HS-DSCH cell | other | Samsung | R2-70 | - | [WTS] [JSN] | |||
| R2-104001 | SPS Scheduling for SID VoIP Packets | other | Motorola | R2-70 | - | [WTS] [JSN] | |||
| R2-104002 | External PDU Identifier Allocations | other | Nokia Siemens Networks, Nokia Corporation | R2-70 | - | [WTS] [JSN] | |||
| R2-104003 | Validity of MDT log after logging duration timer expiry | other | LG Electronics Inc. | R2-70 | - | [WTS] [JSN] | |||
| R2-104004 | Group paging for MTC devices | other | LG Electronics Inc. | R2-70 | - | [WTS] [JSN] | |||
| R2-104005 | RLF reporting enhancements | other | LG Electronics Inc. | R2-70 | - | [WTS] [JSN] | |||
| R2-104006 | Void | other | LG Electronics Inc. | R2-70 | - | [WTS] [JSN] | |||
| R2-104007 | PULL vs PUSH approach for MTC | other | Ericsson, ST-Ericsson | R2-70 | - | [WTS] [JSN] | |||
| R2-104008 | Method for ANR support in UTRA | other | Ericsson, ST-Ericsson | R2-70 | - | [WTS] [JSN] | |||
| R2-104009 | Void | other | Ericsson, ST-Ericsson | R2-70 | - | [WTS] [JSN] | |||
| R2-104010 | Void | other | Ericsson, ST-Ericsson | R2-70 | - | [WTS] [JSN] | |||
| R2-104011 | Delta signaling for Scells after re-establishment | other | LG Electronics Inc. | R2-70 | - | [WTS] [JSN] | |||
| R2-104012 | Details of Cell Index | other | LG Electronics Inc. | R2-70 | - | [WTS] [JSN] | |||
| R2-104013 | Message structure for rrcConnectionReconfiguration IE | other | LG Electronics Inc | R2-70 | - | [WTS] [JSN] | |||
| R2-104014 | Power saving enhancement for MTC | other | Samsung | R2-70 | - | [WTS] [JSN] | |||
| R2-104015 | Random access design for MTC | other | Samsung | R2-70 | - | [WTS] [JSN] | |||
| R2-104016 | DRX period extension for dual radio UE | other | Samsung | R2-70 | - | [WTS] [JSN] | |||
| R2-104017 | Mobility support to pico cells in the co-channel HetNet deployment | other | Samsung | R2-70 | - | [WTS] [JSN] | |||
| R2-104018 | Clarifications on autonomous search function | other | NTT DOCOMO,INC. | R2-70 | - | [WTS] [JSN] | |||
| R2-104019 | Corrections on LPP transport reliability | other | HTC | R2-70 | - | [WTS] [JSN] | |||
| R2-104020 | Configuration of timing/pathloss reference cell for carrier aggregation | other | Intel Corporation (UK) Ltd. | R2-70 | - | [WTS] [JSN] | |||
| R2-104021 | MDT handling across inter-RAT | other | LG Electronics Inc. | R2-70 | - | [WTS] [JSN] | |||
| R2-104022 | Corrections on LPP session identifier in Stage 2 | other | HTC | R2-70 | - | [WTS] [JSN] | |||
| R2-104023 | Serving cell reporting | other | LG Electronics Inc. | R2-70 | - | [WTS] [JSN] | |||
| R2-104024 | Introduction of FGI bit for SRB only handover | other | NTT DOCOMO, INC. | R2-70 | - | [WTS] [JSN] | |||
| R2-104025 | CA modelling: single or multiple serving cells | other | LG Electronics Inc. | R2-70 | - | [WTS] [JSN] | |||
| R2-104026 | Configuration of timing/pathloss reference cell for carrier aggregation | other | Intel Corporation (UK) Ltd. | R2-70 | - | [WTS] [JSN] | |||
| R2-104027 | Scell activation/deactivation MAC Control Element | other | Intel Corporation (UK) Ltd. | R2-70 | - | [WTS] [JSN] | |||
| R2-104028 | On the need of s-measure enhancement | other | LG Electronics Inc. | R2-70 | - | [WTS] [JSN] | |||
| R2-104029 | Corrections on LPP session identifier in Stage 2 | other | HTC | R2-70 | - | [WTS] [JSN] | |||
| R2-104030 | Clarifications on cell configurations parameters | other | Intel Corporation (UK) Ltd. | R2-70 | - | [WTS] [JSN] | |||
| R2-104031 | Small correction on in LPP stage 3 | other | HTC | R2-70 | - | [WTS] [JSN] | |||
| R2-104032 | Prioritised handling of MPS sessions in RRC | other | NTT DOCOMO, INC. | R2-70 | - | [WTS] [JSN] | |||
| R2-104033 | Small correction on LPP stage 3 | other | HTC | R2-70 | - | [WTS] [JSN] | |||
| R2-104034 | Usage of cell index in carrier aggregation | other | Intel Corporation (UK) Ltd. | R2-70 | - | [WTS] [JSN] | |||
| R2-104035 | Corrections on Carrier Aggregation Stage 2 | other | HTC | R2-70 | - | [WTS] [JSN] | |||
| R2-104036 | Dependency between UL and DL (de)activation | other | CMCC | R2-70 | - | [WTS] [JSN] | |||
| R2-104037 | email discussion on SI open issues for MC-HSUPA WI | other | TD Tech | R2-70 | - | [WTS] [JSN] | |||
| R2-104038 | LI size for CCCH(SRB0) in enhanced CELL_FACH operation | other | Qualcomm Incorporated | R2-70 | - | [WTS] [JSN] | |||
| R2-104039 | Clarifications on autonomous search function | other | NTT DOCOMO,INC | R2-70 | - | [WTS] [JSN] | |||
| R2-104040 | Dedicated information for Scell configuration | other | LG Electronics Inc. | R2-70 | - | [WTS] [JSN] | |||
| R2-104041 | Common information for Scell configuration | other | LG Electronics Inc. | R2-70 | - | [WTS] [JSN] | |||
| R2-104042 | RRC overhead comparison of loose and tight CC management policies | other | NTT DOCOMO, INC. | R2-70 | - | [WTS] [JSN] | |||
| R2-104043 | User throughput performance of different CA policies | other | NTT DOCOMO, INC. | R2-70 | - | [WTS] [JSN] | |||
| R2-104044 | Measurement enhancements to support CA operation | other | NTT DOCOMO, INC. | R2-70 | - | [WTS] [JSN] | |||
| R2-104045 | RRC message structure for CA signalling | other | NTT DOCOMO, INC. | R2-70 | - | [WTS] [JSN] | |||
| R2-104046 | The impacts of additional header compression on 3GPP specifications | other | LG Electronics Inc. | R2-70 | - | [WTS] [JSN] | |||
| R2-104047 | Correction on behaviour on reception of EMM causes | other | NEC | R2-70 | - | [WTS] [JSN] | |||
| R2-104048 | Correction on behaviour on reception of MM causes | other | NEC | R2-70 | - | [WTS] [JSN] | |||
| R2-104049 | Discussion on the inhibition of the Allowed CSG list and manual CSG selection | other | NEC | R2-70 | - | [WTS] [JSN] | |||
| R2-104050 | Setting of Maximum Bit Rate (MBR) to be greater than the Guaranteed Bit Rate (GBR) over E-UTRA: MBR enforcement at radio side | other | Orange SA, Deutsche Telekom | R2-70 | - | [WTS] [JSN] | |||
| R2-104051 | Introduction of 4C-HSDPA categories | other | Nokia Corporation, Nokia Siemens Networks | R2-70 | - | [WTS] [JSN] | |||
| R2-104052 | Priority for terminating sessions for MPS | other | Telcordia Technologies, AT&T, NCS | R2-70 | - | [WTS] [JSN] | |||
| R2-104053 | Various corrections and clarifications to LPP | other | Qualcomm Incorporated | R2-70 | - | [WTS] [JSN] | |||
| R2-104054 | Proposal of improving end users’ satisfaction in LTE Rel-10 | other | KDDI Corporation | R2-70 | - | [WTS] [JSN] | |||
| R2-104055 | UE supported Frequency band indicator for redirection in RRC CONNECTION REQUEST | other | Nokia Siemens Networks, Nokia Corporation, NTT DOCOMO, Deutsche Telekom | R2-70 | - | [WTS] [JSN] | |||
| R2-104056 | Delta signaling for Scells after re-establishment | other | LG Electronics Inc. | R2-70 | - | [WTS] [JSN] | |||
| R2-104057 | Summary of Email Discussion [70#12]: Measurement Object Swapping | other | Huawei | R2-70 | - | [WTS] [JSN] | |||
| R2-104058 | Small correction on LPP stage 3 | other | HTC | R2-70 | - | [WTS] [JSN] | |||
| R2-104059 | Use cases and discussions related to UE status report | other | Orange SA | R2-70 | - | [WTS] [JSN] | |||
| R2-104060 | Email summary of [70#10] LTE CA: Information provided to target eNB | other | ZTE | R2-70 | - | [WTS] [JSN] | |||
| R2-104061 | Message Structure of Pcell/Scell configuration in CA | other | Panasonic | R2-70 | - | [WTS] [JSN] | |||
| R2-104062 | Cell index for cell management in CA | other | Panasonic | R2-70 | - | [WTS] [JSN] | |||
| R2-104063 | Clarifications on CSG autonomous search | other | NTT DOCOMO,INC., Telecom Italia | R2-70 | - | [WTS] [JSN] | |||
| R2-104064 | Clarifications on autonomous search function | other | NTT DOCOMO,INC | R2-70 | - | [WTS] [JSN] | |||
| R2-104065 | Draft proposed reply LS to GERAN on Hybrid Cell Handling | other | Vodafone | R2-70 | - | [WTS] [JSN] | |||
| R2-104066 | Draft reply LS to S1-101239 = R2-103497 on Access Control for CSFB (to: SA1; cc: -; NTT DOCOMO) | other | NTT DOCOMO | R2-70 | - | [WTS] [JSN] | |||
| R2-104067 | Draft reply LS to S2-103098 = R2-103500 on support for Priority for terminating sessions for MPS (to: SA2; contact: Alcatel-Lucent) | other | Alcatel-Lucent | R2-70 | - | [WTS] [JSN] | |||
| R2-104068 | Clarifications on CSG autonomous search | other | NTT DOCOMO,INC., Telecom Italia | R2-70 | - | [WTS] [JSN] | |||
| R2-104069 | Clarifications on autonomous search function | other | NTT DOCOMO,INC | R2-70 | - | [WTS] [JSN] | |||
| R2-104070 | Draft LS on CSG autonomous search (to: RAN4, RAN5; cc: -; contact: NTT DOCOMO) | other | NTT DOCOMO,INC | R2-70 | - | [WTS] [JSN] | |||
| R2-104071 | Introduction of SRB only handover capability | other | NTT DOCOMO,INC | R2-70 | - | [WTS] [JSN] | |||
| R2-104072 | Draft LS on SRB only handover | other | NSN | R2-70 | - | [WTS] [JSN] | |||
| R2-104073 | Stage-2 update TS 37.320 v0.6.0 | other | Rapporteur (Nokia Siemens Networks) | R2-70 | - | [WTS] [JSN] | |||
| R2-104074 | TS 37.320 v0.6.1 with MDT agreements of RAN2 #70bis | other | Rapporteur (Nokia Siemens Networks) | R2-70 | - | [WTS] [JSN] | |||
| R2-104075 | Clarification of the TCTF field encoding for 3.84 Mcps TDD IMB MBSFN (Rel-8) | other | IPWireless Inc. | R2-70 | - | [WTS] [JSN] | |||
| R2-104076 | Clarification of the TCTF field encoding for 3.84 Mcps TDD IMB MBSFN (Rel-9) | other | IPWireless Inc. | R2-70 | - | [WTS] [JSN] | |||
| R2-104077 | Draft LS on Validity of MDT log after logging duration timer expiry (to: SA3; cc: -; contact: Vodafone) | other | Vodafone | R2-70 | - | [WTS] [JSN] | |||
| R2-104078 | Corrections on LPP session identifier in Stage 2 | other | HTC | R2-70 | - | [WTS] [JSN] | |||
| R2-104079 | TP to 37.868 on different MTC approaches | other | Huawei | R2-70 | - | [WTS] [JSN] | |||
| R2-104080 | TR 37.868 v0.4.1 on MTC | other | Huawei | R2-70 | - | [WTS] [JSN] | |||
| R2-104081 | Considerations on E-TFC selection for LCR MC-HSUPA | other | TD Tech | R2-70 | - | [WTS] [JSN] | |||
| R2-104082 | Incorrect inconsisitency check on MAC-ehs reordering queue | other | Panasonic | R2-70 | - | [WTS] [JSN] | |||
| R2-104083 | Incorrect inconsisitency check on MAC-ehs reordering queue | other | Panasonic | R2-70 | - | [WTS] [JSN] | |||
| R2-104084 | Incorrect inconsisitency check on MAC-ehs reordering queue | other | Panasonic | R2-70 | - | [WTS] [JSN] | |||
| R2-104085 | Correction to VAS updating (R8) | other | Huawei | R2-70 | - | [WTS] [JSN] | |||
| R2-104086 | Correction to VAS updating (R9) | other | Huawei | R2-70 | - | [WTS] [JSN] | |||
| R2-104087 | Clarification on the DTX operation for DC-HSUPA | other | Huawei | R2-70 | - | [WTS] [JSN] | |||
| R2-104088 | Clarification of primary uplink frequency and secondary uplink frequency | other | ZTE | R2-70 | - | [WTS] [JSN] | |||
| R2-104089 | Clarification of primary uplink frequency and secondary uplink frequency | other | ZTE | R2-70 | - | [WTS] [JSN] | |||
| R2-104090 | Use special value of HE field causing RLC Reset | other | Qualcomm Incorporated | R2-70 | - | [WTS] [JSN] | |||
| R2-104091 | Clarification to the CELL_DCH measurement occasion in MAC for 1.28Mcps TDD | other | ZTE | R2-70 | - | [WTS] [JSN] | |||
| R2-104092 | Update of virtual active set handling for inter-frequency CSG measurements | other | Nokia Corporation, Nokia Siemens Networks, Ericsson, ST-Ericsson | R2-70 | - | [WTS] [JSN] | |||
| R2-104093 | Update of virtual active set handling for inter-frequency CSG measurements | other | Nokia Corporation, Nokia Siemens Networks, Ericsson, ST-Ericsson | R2-70 | - | [WTS] [JSN] | |||
| R2-104094 | Introduction of 4C-HSDPA in 25.321 | other | Huawei | R2-70 | - | [WTS] [JSN] | |||
| R2-104095 | LS reply to RAN1 on 4C-HSDPA | other | Qualcomm Incorporated | R2-70 | - | [WTS] [JSN] | |||
| R2-104096 | Addition of optimised RACH message types | other | Nokia Corporation, Nokia Siemens Networks | R2-70 | - | [WTS] [JSN] | |||
| R2-104097 | LS to RAN3 on RAN2 progress on TDD MC-HSUPA | other | CATT | R2-70 | - | [WTS] [JSN] | |||
| R2-104098 | LS to RAN4 on UE measurement capabilities | other | Huawei | R2-70 | - | [WTS] [JSN] | |||
| R2-104099 | RF pattern matching in UMTS | other | Polaris Wireless, Thales Alenia | R2-70 | - | [WTS] [JSN] | |||
| R2-104100 | LS to RAN4 on RAN2 agreements on 4C-HSDPA | other | Qualcomm Incorporated | R2-70 | - | [WTS] [JSN] | |||
| R2-104101 | LS to RAN3 on RAN2 progress on TDD MC-HSUPA | other | CATT | R2-70 | - | [WTS] [JSN] | |||
| R2-104102 | LS to RAN4 on performance impact of having different power per carrier | other | TD Tech | R2-70 | - | [WTS] [JSN] | |||
| R2-104103 | Way forward on tabular for 4C-HSDPA band combination signaling | other | Qualcomm Incorporated | R2-70 | - | [WTS] [JSN] | |||
| R2-104104 | Clarification of primary uplink frequency and secondary uplink frequency | other | ZTE | R2-70 | - | [WTS] [JSN] | |||
| R2-104105 | Clarification of primary uplink frequency and secondary uplink frequency | other | ZTE | R2-70 | - | [WTS] [JSN] | |||
| R2-104106 | LI size for CCCH(SRB0) in enhanced CELL_FACH operation | other | Qualcomm Incorporated, CATT, Infineon | R2-70 | - | [WTS] [JSN] | |||
| R2-104107 | LI size for CCCH(SRB0) in enhanced CELL_FACH operation | other | Qualcomm Incorporated, CATT, Infineon | R2-70 | - | [WTS] [JSN] | |||
| R2-104108 | LS to RAN3 on ANR | other | Nokia | R2-70 | - | [WTS] [JSN] | |||
| R2-104109 | LS to RAN3 on RAN2 progress on TDD MC-HSUPA | other | CATT | R2-70 | - | [WTS] [JSN] | |||
| R2-104110 | LS to RAN4 on performance impact of having different power per carrier | other | TD Tech | R2-70 | - | [WTS] [JSN] | |||
| R2-104111 | LS on RAN2 progress on TDD MC-HSUPA (to: RAN3; cc: RAN1; contact: CATT) | LS out | RAN2 | R2-70 | - | [WTS] [JSN] | |||
| R2-104112 | Reply LS to R1-102576 = R2-102673 on Secondary Serving HS-DSCH Cell Indication in 4C-HSDPA (to: RAN1; cc:RAN3; contact: Qualcomm) | LS out | RAN2 | R2-70 | - | [WTS] [JSN] | |||
| R2-104113 | LS to RAN4 on RAN2 agreements on 4C-HSDPA | other | Qualcomm Incorporated | R2-70 | - | [WTS] [JSN] | |||
| R2-104114 | State transition upon HS-DSCH reception in CELL_PCH state | other | Huawei | R2-70 | - | [WTS] [JSN] | |||
| R2-104115 | HARQ Buffer upon H-RNTI switch in Enhanced CELL_FACH | other | Qualcomm Incorporated | R2-70 | - | [WTS] [JSN] | |||
| R2-104116 | Speed dependent scaling rules in HCS environment | other | Ericsson, ST-Ericsson, Nokia Corporation, Nokia Siemens Networks | R2-70 | - | [WTS] [JSN] | |||
| R2-104117 | LS on performance impact of having different power per carrier in MC-HSUPA for 1.28Mcps TDD (to: RAN4; cc: -; contact: TD Tech) | LS out | RAN2 | R2-70 | - | [WTS] [JSN] | |||
| R2-104118 | Clarification on the DTX operation for DC-HSUPA | other | Huawei | R2-70 | - | [WTS] [JSN] | |||
| R2-104119 | LS to RAN3 on ANR | other | Nokia | R2-70 | - | [WTS] [JSN] | |||
| R2-104120 | LS on RAN2 progress on UTRA ANR (to: RAN3; cc: -; contact: Nokia) | LS out | RAN2 | R2-70 | - | [WTS] [JSN] | |||
| R2-104121 | LS on RAN2#70bis 4C-HSDPA agreements (to: RAN1, RAN3, RAN4; cc: -; contact: Qualcomm) | LS out | RAN2 | R2-70 | - | [WTS] [JSN] | |||
| R2-104122 | Update of virtual active set handling for inter-frequency CSG measurements | other | Nokia Corporation, Nokia Siemens Networks, Ericsson, ST-Ericsson | R2-70 | - | [WTS] [JSN] | |||
| R2-104123 | Update of virtual active set handling for inter-frequency CSG measurements | other | Nokia Corporation, Nokia Siemens Networks, Ericsson, ST-Ericsson | R2-70 | - | [WTS] [JSN] | |||
| R2-104124 | LS on CSG autonomous search function (to: RAN4, RAN5; cc: GERAN; contact: NTT DOCOMO) | LS out | RAN2 | R2-70 | - | [WTS] [JSN] | |||
| R2-104125 | Reply LS to GP-101089 = R2-103487 on Handling of Hybrid Cells (to: GERAN; cc: SA1; contact: Vodafone) | LS out | RAN2 | R2-70 | - | [WTS] [JSN] | |||
| R2-104126 | Draft LS on Cell Index for CA (to: RAN1; cc: -; contact: Qualcomm) | other | Qualcomm Incorporated | R2-70 | - | [WTS] [JSN] | |||
| R2-104127 | Reply LS to S1-101239 = R2-103497 on Access Control for CSFB (to: SA1; cc: CT1; NTT DOCOMO) | LS out | RAN2 | R2-70 | - | [WTS] [JSN] | |||
| R2-104128 | Void | other | - | R2-70 | - | [WTS] [JSN] | |||
| R2-104129 | Void | other | - | R2-70 | - | [WTS] [JSN] | |||
| R2-104130 | Void | other | - | R2-70 | - | [WTS] [JSN] | |||
| R2-104131 | Void | other | - | R2-70 | - | [WTS] [JSN] | |||
| R2-104132 | Void | other | - | R2-70 | - | [WTS] [JSN] | |||
| R2-104133 | Void | other | - | R2-70 | - | [WTS] [JSN] | |||
| R2-104134 | Void | other | - | R2-70 | - | [WTS] [JSN] | |||
| R2-104135 | Void | other | - | R2-70 | - | [WTS] [JSN] | |||
| R2-104136 | Void | other | - | R2-70 | - | [WTS] [JSN] | |||
| R2-104137 | Void | other | - | R2-70 | - | [WTS] [JSN] | |||
| R2-104138 | Void | other | - | R2-70 | - | [WTS] [JSN] | |||
| R2-104139 | Void | other | - | R2-70 | - | [WTS] [JSN] | |||
| R2-104140 | Void | other | - | R2-70 | - | [WTS] [JSN] | |||
| R2-104141 | Void | other | - | R2-70 | - | [WTS] [JSN] | |||
| R2-104142 | Void | other | - | R2-70 | - | [WTS] [JSN] | |||
| R2-104143 | Void | other | - | R2-70 | - | [WTS] [JSN] | |||
| R2-104144 | Void | other | - | R2-70 | - | [WTS] [JSN] | |||
| R2-104145 | Void | other | - | R2-70 | - | [WTS] [JSN] | |||
| R2-104146 | Void | other | - | R2-70 | - | [WTS] [JSN] | |||
| R2-104147 | Void | other | - | R2-70 | - | [WTS] [JSN] | |||
| R2-104148 | Void | other | - | R2-70 | - | [WTS] [JSN] | |||
| R2-104149 | Void | other | - | R2-70 | - | [WTS] [JSN] | |||
| R2-104150 | Void | other | - | R2-70 | - | [WTS] [JSN] | |||
| R2-104151 | Void | other | - | R2-70 | - | [WTS] [JSN] | |||
| R2-104152 | Void | other | - | R2-70 | - | [WTS] [JSN] | |||
| R2-104153 | Void | other | - | R2-70 | - | [WTS] [JSN] | |||
| R2-104154 | Void | other | - | R2-70 | - | [WTS] [JSN] | |||
| R2-104155 | Void | other | - | R2-70 | - | [WTS] [JSN] | |||
| R2-104156 | Void | other | - | R2-70 | - | [WTS] [JSN] | |||
| R2-104157 | Void | other | - | R2-70 | - | [WTS] [JSN] | |||
| R2-104158 | Void | other | - | R2-70 | - | [WTS] [JSN] | |||
| R2-104159 | Void | other | - | R2-70 | - | [WTS] [JSN] | |||
| R2-104160 | Void | other | - | R2-70 | - | [WTS] [JSN] | |||
| R2-104161 | Correction to 3GPP2 reference for interworking with cdma2000 1x | other | Motorola, QUALCOMM Incorporated | R2-70 | - | [WTS] [JSN] | |||
| R2-104162 | Correction to 3GPP2 reference for interworking with cdma2000 1x | other | Motorola, QUALCOMM Incorporated | R2-70 | - | [WTS] [JSN] | |||
| R2-104163 | Proposed Corrections to the PeriodicalReportingCriteria in LPP | other | Qualcomm Incorporated | R2-70 | - | [WTS] [JSN] | |||
| R2-104164 | Various corrections and clarifications to LPP | other | Qualcomm Incorporated | R2-70 | - | [WTS] [JSN] | |||
| R2-104165 | Proposed Corrections to LPP Reliable Transport | other | Qualcomm Incorporated | R2-70 | - | [WTS] [JSN] | |||
| R2-104166 | LS on the description of multi-user MIMO in feature group indicator (Panasonic) | other | RAN1 | R2-70 | - | [WTS] [JSN] | |||
| R2-104167 | Addition of an EPDU to an LPP Error and LPP Abort | other | Qualcomm Incorporated | R2-70 | - | [WTS] [JSN] | |||
| R2-104168 | Division of LPP into Separate ASN.1 Modules with a Global Identifier | other | Qualcomm Incorporated | R2-70 | - | [WTS] [JSN] | |||
| R2-104169 | Clarification of slotNumberOffset for OTDOA | other | Nokia corporation, Nokia Siemens Networks | R2-70 | - | [WTS] [JSN] | |||
| R2-104170 | CR to 36.331 on clarification for MBMS PTM RBs | other | ASUSTeK | R2-70 | - | [WTS] [JSN] | |||
| R2-104171 | Miscellaneous corrections to RLC | other | ASUSTeK | R2-70 | - | [WTS] [JSN] | |||
| R2-104172 | Correction to 3GPP2 reference for interworking with cdma2000 1x | other | Motorola, QUALCOMM Incorporated | R2-70 | - | [WTS] [JSN] | |||
| R2-104173 | Clarification on UL handover preparation transfer | other | HTC | R2-70 | - | [WTS] [JSN] | |||
| R2-104174 | Clarifications regarding fullConfiguration | other | Samsung | R2-70 | - | [WTS] [JSN] | |||
| R2-104175 | Clarifications regarding handover to E-UTRAN | other | Samsung, HTC | R2-70 | - | [WTS] [JSN] | |||
| R2-104176 | RLF timers and constants handling during reconfiguration involving fullConfiguration | other | Huawei | R2-70 | - | [WTS] [JSN] | |||
| R2-104177 | Introduction of late corrections container for E-UTRA UE capabilities | other | Samsung, Panasonic | R2-70 | - | [WTS] [JSN] | |||
| R2-104178 | 36.300 CR collecting all Carrier Aggregation agreements of RAN2 #70bis | other | Nokia Siemens Networks | R2-70 | - | [WTS] [JSN] | |||
| R2-104179 | Draft LS on SCell activation/deactivation (to: RAN4; cc: RAN1; contact: NTT DOCOMO) | other | NTT DOCOMO | R2-70 | - | [WTS] [JSN] | |||
| R2-104180 | LS on SCell activation/deactivation (to: RAN4; cc: RAN1; contact: NTT DOCOMO) | other | NTT DOCOMO | R2-70 | - | [WTS] [JSN] | |||
| R2-104181 | LS on SCell activation/deactivation (to: RAN4; cc: RAN1; contact: NTT DOCOMO) | LS out | RAN2 | R2-70 | - | [WTS] [JSN] | |||
| R2-104182 | Proposed Corrections to the PeriodicalReportingCriteria in LPP | other | Qualcomm Incorporated | R2-70 | - | [WTS] [JSN] | |||
| R2-104183 | Overview of common information parameters for carrier aggregation | other | Samsung | R2-70 | - | [WTS] [JSN] | |||
| R2-104184 | Overview of dedicated information parameters for carrier aggregation | other | Samsung | R2-70 | - | [WTS] [JSN] | |||
| R2-104185 | Report of LTE Carrier Aggregation user plane session (agenda item 7.1.3) | other | Nokia Siemens Networks (vice chairman) | R2-70 | - | [WTS] [JSN] | |||
| R2-104186 | 36.300 CR for stage 2 RAN #70bis agreements of relaying | other | Ericsson, ST-Ericsson | R2-70 | - | [WTS] [JSN] | |||
| R2-104187 | Offline discussion summary on MDT in inter-RAT case | other | CATT | R2-70 | - | [WTS] [JSN] | |||
| R2-104188 | LS on OAM security and OAM connection issues of RN (Huawei) | other | RAN3 | R2-70 | - | [WTS] [JSN] | |||
| R2-104189 | RACH evaluation for MTC in LTE | other | Ericsson, ST-Ericsson | R2-70 | - | [WTS] [JSN] | |||
| R2-104190 | Draft LS on status of RAN2 decisions on CA (to: RAN1; cc: -; contact: Alcatel-Lucent) | other | Alcatel-Lucent | R2-70 | - | [WTS] [JSN] | |||
| R2-104191 | Setting of Maximum Bit Rate (MBR) to be greater than the Guaranteed Bit Rate (GBR) over E-UTRA: MBR enforcement at radio side | other | Orange SA, Deutsche Telekom | R2-70 | - | [WTS] [JSN] | |||
| R2-104192 | Draft LS on Cell Index for CA (to: RAN1; cc: -; contact: Qualcomm) | other | Qualcomm Incorporated | R2-70 | - | [WTS] [JSN] | |||
| R2-104193 | Introduction of SRB only handover capability | other | NTT DOCOMO INC, | R2-70 | - | [WTS] [JSN] | |||
| R2-104194 | Draft LS on PHR for carrier aggregation (to: RAN1, RAN4; cc: ; contact: MediaTek) | other | MediaTek | R2-70 | - | [WTS] [JSN] | |||
| R2-104195 | 36.300 CR collecting all Carrier Aggregation agreements of RAN2 #70bis | other | Nokia Siemens Networks | R2-70 | - | [WTS] [JSN] | |||
| R2-104196 | Proposed Corrections to LPP Reliable Transport | other | Qualcomm Incorporated | R2-70 | - | [WTS] [JSN] | |||
| R2-104197 | Concerning LTE Positioning Protocol | other | OMA LOC WG | R2-70 | - | [WTS] [JSN] | |||
| R2-104198 | Draft LS on on Network Energy Saving for E-UTRAN (to: RAN1; cc: -; contact: CMCC) | other | CMCC | R2-70 | - | [WTS] [JSN] | |||
| R2-104199 | Report of RAN2 #70, Montreal, Canada, 10.05.-14.05.2010 | other | ETSI MCC | R2-70 | - | [WTS] [JSN] | |||
| R2-104200 | Draft LS on PHR for carrier aggregation (to: RAN1, RAN4; cc: ; contact: MediaTek) | other | MediaTek | R2-70 | - | [WTS] [JSN] | |||
| R2-104201 | LS on status of RAN2 decisions on carrier aggregation (CA) (to: RAN1; cc: RAN4; contact: Alcatel-Lucent) | LS out | RAN2 | R2-70 | - | [WTS] [JSN] | |||
| R2-104202 | Reply LS to S2-103098 = R2-103500 on support for Priority for terminating sessions for MPS (to: SA2; cc: RAN3; contact: Alcatel-Lucent) | LS out | RAN2 | R2-70 | - | [WTS] [JSN] | |||
| R2-104203 | Introduction of SRB only handover capability | other | NTT DOCOMO,INC | R2-70 | - | [WTS] [JSN] | |||
| R2-104204 | Introduction of SRB only handover capability | other | NTT DOCOMO INC, | R2-70 | - | [WTS] [JSN] | |||
| R2-104205 | LS on Per UE PHR related questions (to: RAN1, RAN4; cc: -; contact: MediaTek) | LS out | RAN2 | R2-70 | - | [WTS] [JSN] | |||
| R2-104206 | TS 37.320 v0.6.2 with MDT agreements of RAN2 #70bis | other | Rapporteur (Nokia Siemens Networks) | R2-70 | - | [WTS] [JSN] | |||
| R2-104207 | TR 37.868 v0.5.0 on MTC | other | Huawei | R2-70 | - | [WTS] [JSN] | |||
| R2-104208 | Miscellaneous corrections to RLC | other | ASUSTeK | R2-70 | - | [WTS] [JSN] | |||
| R2-104209 | LS on Carrier Indicator Field (CIF) values (to: RAN1; cc: -; contact: Qualcomm) | LS out | RAN2 | R2-70 | - | [WTS] [JSN] | |||
| R2-104210 | LS on Security Issues with Logged MDT (to: SA3; cc: SA5; contact: Vodafone) | LS out | RAN2 | R2-70 | - | [WTS] [JSN] | |||
| R2-104211 | LS on on Network Energy Saving for E-UTRAN (to: RAN1; cc: -; contact: CMCC) | other | RAN2 | R2-70 | - | [WTS] [JSN] | |||
| R2-104212 | TS 37.320 v0.7.0 with MDT agreements of RAN2 #70bis | other | Rapporteur (Nokia Siemens Networks) | R2-70 | - | [WTS] [JSN] | |||
| R2-104213 | 36.300 CR for stage 2 RAN #70bis agreements of relaying | other | Ericsson, ST-Ericsson | R2-70 | - | [WTS] [JSN] | |||
| R2-104214 | LS on intra-eNB energy saving solutions (to: RAN1, RAN4; cc: -; contact: CMCC) | LS out | RAN2 | R2-70 | - | [WTS] [JSN] | |||
| R2-104215 | Clarification of slotNumberOffset for OTDOA | other | Nokia Siemens Networks | R2-70 | - | [WTS] [JSN] | |||
| R2-104216 | ASN.1 for Four carrier HSDPA | other | Ericsson | R2-70 | - | [WTS] [JSN] |
733 documents (1.2312288284302 seconds)