Please enter the search related information in the fields below. Partial information works, e.g. "SP-21" in the "tdoc" field lists all TSG SA documents from 2021. Regular expressions mostly work in all fields (e.g. "2[34].501" in the "Spec" field lists all documents related to 23.501 and 24.501. Capitalization is disregarded, i.e. "3GPP" gives the same results as "3gpp".

Download results in JSON format

tdoc Title Type / Revs Source Spec / CR S/WID Release Meeting Status Links
R2-084940 Proposed agenda for RAN2 #63bis, Prague, Czech Republic, 29.09.-03.10.2008 other Samsung (RAN2 chairman) R2-63 - [WTS] [JSN]
R2-084941 Draft report of RAN2 #63, Jeju, Korea, 18.08.-22.08.2008 other ETSI MCC R2-63 - [WTS] [JSN]
R2-084942 LS on Terminology alignment for Home Node B and Home eNode B (S1-082397; to: GERAN, RAN, CT; cc: -; contact: T-Mobile) other SA1 R2-63 - [WTS] [JSN]
R2-084943 Reply LS to R2-083785 on additional RSRP trigger for ICIC (R1-083272; to: RAN2; cc: RAN3; contact: Ericsson) other RAN1 R2-63 - [WTS] [JSN]
R2-084944 LS on TBS table and UL TTI bundling adjustments (R1-083273; to: RAN2; cc: RAN4; contact: Ericsson) other RAN1 R2-63 - [WTS] [JSN]
R2-084945 LS on Consequence analysis of Low/ Medium features in LTE Rel-8 (R1-083364; to: RAN2, RAN5; cc: RAN4; contact: NTT DOCOMO) other RAN1 R2-63 - [WTS] [JSN]
R2-084946 LS on PRACH power control (R1-083365; to: RAN2; cc: RAN4; contact: LG) other RAN1 R2-63 - [WTS] [JSN]
R2-084947 LS on E-UTRA RRM Main Open Issues in RAN5 (R5-083801; to: RAN4, RAN2; cc: -; contact: Motorola) other RAN5 R2-63 - [WTS] [JSN]
R2-084948 LS on access control for CSG cells (C1-083429; to: SA2, CT4; cc: RAN2, RAN3; contact: Qualcomm) other CT1 R2-63 - [WTS] [JSN]
R2-084949 LS on Identifiers for HeNB (C1-083612; to: RAN2, RAN3, SA2; cc: -; contact: Vodafone) other CT1 R2-63 - [WTS] [JSN]
R2-084950 Reply LS to R2-083786 on ETWS (C1-083623; to: RAN2, RAN3; cc: SA1, SA2; contact: NTT DOCOMO) other CT1 R2-63 - [WTS] [JSN]
R2-084951 Reply LS to S1-082341 = R2-084521 on HNB/HeNB Open Access Mode (C1-083625; to: SA1; cc: RAN2; contact: Telecom Italia) other CT1 R2-63 - [WTS] [JSN]
R2-084952 LS on NAS message concatenation and multiple EPS bearer setup (C1-083626; to: RAN2, RAN3; cc: CT4; contact: Qualcomm) other CT1 R2-63 - [WTS] [JSN]
R2-084953 LS on Protocol Decision on GTP User Plane (C4-082382; to: SA2, RAN2, RAN3; cc: CT1, CT3; contact: Ericsson) other CT4 R2-63 - [WTS] [JSN]
R2-084954 LS on Definition of Globally Unique Temporary UE Identity (C4-082513; to: SA2, SA1, SA3, RAN2, RAN3, CT1, CT3; cc: -; contact: Alcatel-Lucent) other CT4 R2-63 - [WTS] [JSN]
R2-084955 Reply LS to S1-080769 = R2-083082 on CSG related mobility (stage 2 text) (GP-081307; to: SA1; cc: SA2, RAN2, RAN3, RAN4, RAN1; contact: Huawei) other GERAN R2-63 - [WTS] [JSN]
R2-084956 LS on ETWS (GP-081310; to: SA1, SA2, SA3, CT1; cc: RAN2, RAN3; contact: Ericsson) other GERAN R2-63 - [WTS] [JSN]
R2-084957 LS on reporting E-UTRAN measurements (GP-081347; to: RAN4; cc: RAN2; contact: NSN) other GERAN R2-63 - [WTS] [JSN]
R2-084958 LS on SRVCC target cell selection (GP-081425; to: SA2; cc: RAN2; contact: NSN) other GERAN R2-63 - [WTS] [JSN]
R2-084959 Response to 3GPP to C4-081019 = R2-082067 on Messaging Support for Network Based Location Technologies on User Plane (OMA-LS_751; to: CT4, SA2; cc: RAN2, RAN3; contact: Sprint) other LOCATION WG of OMA R2-63 - [WTS] [JSN]
R2-084960 LS on PDCCH DCI format 1C (R1-083416; to: RAN2; cc: -; contact: LG) other RAN1 R2-63 - [WTS] [JSN]
R2-084961 LS on CSG cell identification (R1-083424; to: RAN2, RAN4; cc: RAN3; contact: Qualcomm) other RAN1 R2-63 - [WTS] [JSN]
R2-084962 LS reply to R2-084764 on considerations on transport block sizes for VoIP (R1-083429; to: RAN2; cc: RAN4; contact: Ericsson) other RAN1 R2-63 - [WTS] [JSN]
R2-084963 LS Reply to R2-083779 on Uplink grant format in Random Access Response (R1-083431; to: RAN2; cc: -; contact: Qualcomm) other RAN1 R2-63 - [WTS] [JSN]
R2-084964 LS Response to LS R2-082893 on information about new PDCCH Format 1C and LS on SI Scheduling (R1-083432; to: RAN2; cc: -; contact: Motorola) other RAN1 R2-63 - [WTS] [JSN]
R2-084965 LS on Improved EUL power control at UE power limitation (R1-083440; to: RAN2, RAN3; cc: -; contact: Ericsson) other RAN1 R2-63 - [WTS] [JSN]
R2-084966 LS on UL SRI Parameters Configuration (R1-083450; to: RAN2; cc: -; contact: CATT) other RAN1 R2-63 - [WTS] [JSN]
R2-084967 LS on timing adjustment (R1-083452; to: RAN2, RAN4; cc: -; contact: LG) other RAN1 R2-63 - [WTS] [JSN]
R2-084968 LS on measurement gap (R1-083454; to: RAN2; cc: RAN4; contact: Panasonic) other RAN1 R2-63 - [WTS] [JSN]
R2-084969 LS on support of TDD ACK/NACK multiplexing in Rel-8 (R1-083465; to: RAN2; cc: RAN4; contact: Texas Instruments) other RAN1 R2-63 - [WTS] [JSN]
R2-084970 LS on Coding of Global Cell id and Global eNB ID (R3-082363; to: RAN2, SA2; cc: -; contact: Alcatel-Lucent) other RAN3 R2-63 - [WTS] [JSN]
R2-084971 LS on SAE Bearer/ E-RAB definition for E-UTRAN specification (R3-082366; to: SA2, RAN2, CT1, CT4; cc: -; contact: Alcatel-Lucent) other RAN3 R2-63 - [WTS] [JSN]
R2-084972 LS on E-UTRAN security related issues (R3-082373; to: SA3; cc: RAN2; contact: Qualcomm) other RAN3 R2-63 - [WTS] [JSN]
R2-084973 LS reply to R1-082762 = R2-083821 on CSG cell identification (R4-082190; to: RAN1, RAN2; cc: -; contact: Motorola) other RAN4 R2-63 - [WTS] [JSN]
R2-084974 LS on Special Conformance Testing functions for UE (TS 36.509) (R5-083665; to: RAN2; cc: RAN; contact: Rohde & Schwarz) other RAN5 R2-63 - [WTS] [JSN]
R2-084975 LS on the addition of CS voice over HSPA radio bearer combinations to TS 34.108 (R5-083690; to: RAN1, RAN2; cc: -; contact: Nokia) other RAN5 R2-63 - [WTS] [JSN]
R2-084976 Response LS to R2-084823 on HSPA Rel-8 Feature Dependencies (RP-080748; to: RAN2; cc: -; contact: Nokia) other RAN R2-63 - [WTS] [JSN]
R2-084977 Reply LS to R2-084902 on Paging UE Identity for CS Fallback (S2-086147; to: RAN2; cc: CT1, RAN3; contact: Huawei) other SA2 R2-63 - [WTS] [JSN]
R2-084978 Response LS to R2-082895 and C1-082800 = R2-083672 on Connection recovery by NAS (S2-086378; to: CT1, RAN2, RAN3; cc: RAN1; contact: Vodafone) other SA2 R2-63 - [WTS] [JSN]
R2-084979 Reply LS to R3-081607 = R2-083072 on Load balancing signalling on QCI (S2-086388; to: RAN3; cc: RAN2; contact: Ericsson) other SA2 R2-63 - [WTS] [JSN]
R2-084980 Reply LS to R2-083781 on AMBR Enforcement (S2-086390; to: RAN2; cc: RAN3, CT1; contact: Qualcomm) other SA2 R2-63 - [WTS] [JSN]
R2-084981 Reply-LS to G2-080228 = R2-082024 and R2-082884 on Applicability of “subscriber type” indication for UTRAN & GERAN (S2-086392; to: GERAN2; cc: RAN2, RAN3; contact: Huawei) other SA2 R2-63 - [WTS] [JSN]
R2-084982 Reply LS to C4-082513 = R2-084954 on Definition of Globally Unique Temporary UE Identity (S2-086397; to: CT4, CT; cc: SA1, SA3, RAN2, RAN3, CT1, CT3; contact: Alcatel-Lucent) other SA2 R2-63 - [WTS] [JSN]
R2-084983 LS on Guidance for ARP Values (S2-086405; to: SA1; cc: RAN2, RAN3; contact: Motorola) other SA2 R2-63 - [WTS] [JSN]
R2-084984 LS on UE Radio Capabilities (S2-086410; to: RAN; cc: SA, RAN2; contact: Vodafone) other SA2 R2-63 - [WTS] [JSN]
R2-084985 LS reply to R2-082899 on CSG cell identification (R4-082191; to: RAN2, RAN1; cc: -; contact: Motorola) other RAN4 R2-63 - [WTS] [JSN]
R2-084986 Void other - R2-63 - [WTS] [JSN]
R2-084987 Void other - R2-63 - [WTS] [JSN]
R2-084988 Updated report of RAN2 #63, Jeju, Korea, 18.08.-22.08.2008 other ETSI MCC R2-63 - [WTS] [JSN]
R2-084989 RAN WG2 compendium v1.0 other ETSI MCC R2-63 - [WTS] [JSN]
R2-084990 Active Time Clarifications other Nokia Corporation, Nokia Siemens Networks R2-63 - [WTS] [JSN]
R2-084991 Proposed CR to 36.321 on Active Time Clarifications other Nokia Corporation, Nokia Siemens Networks, Panasonic, Qualcomm Europe, Sunplus mMobile Inc. R2-63 - [WTS] [JSN]
R2-084992 Proposed CR to 36.300 on Contention Resolution other Nokia Siemens Networks (Rapporteur) R2-63 - [WTS] [JSN]
R2-084993 Proposed CR to 36.300 on ETWS SIB other Nokia Siemens Networks (Rapporteur) R2-63 - [WTS] [JSN]
R2-084994 Proposed CR to 36.300 on Security Overview other Nokia Siemens Networks (Rapporteur) R2-63 - [WTS] [JSN]
R2-084995 Uplink HARQ Operation and Measurement Gaps other Nokia Corporation, Nokia Siemens Networks R2-63 - [WTS] [JSN]
R2-084996 Proposed CR to 36.321 on UL HARQ and Measurement Gaps other Nokia Corporation, Nokia Siemens Networks R2-63 - [WTS] [JSN]
R2-084997 NDI Handling other Nokia Corporation, Nokia Siemens Networks, Samsung R2-63 - [WTS] [JSN]
R2-084998 HARQ processes for TTI bundling in TDD other Nokia Corporation, Nokia Siemens Networks, Samsung R2-63 - [WTS] [JSN]
R2-084999 Proposed CR to 36.321 on Message 3 Definition other Nokia Corporation, Nokia Siemens Networks, Samsung R2-63 - [WTS] [JSN]
R2-085000 Proposed CR to 36.321 on PHR and BSR Periodic Timer Start other Nokia Corporation, Nokia Siemens Networks R2-63 - [WTS] [JSN]
R2-085001 Proposed CR to 36.321 on Reference to PHR calculation other Nokia Corporation, Nokia Siemens Networks, Samsung R2-63 - [WTS] [JSN]
R2-085002 Proposed CR to 36.321 on SR Clarifications other Nokia Corporation, Nokia Siemens Networks, Ericsson R2-63 - [WTS] [JSN]
R2-085003 Proposed CR to 36.321 on Usage of RRC Parameters other Nokia Corporation, Nokia Siemens Networks R2-63 - [WTS] [JSN]
R2-085004 Proposed CR to 36.321 on Timer Definitions other Nokia Corporation, Nokia Siemens Networks R2-63 - [WTS] [JSN]
R2-085005 Proposed CR to 36.321 on TAT and RACH Procedure other Nokia Corporation, Nokia Siemens Networks R2-63 - [WTS] [JSN]
R2-085006 CQI Reporting and PDCCH Reception During Active Time other interdigital R2-63 - [WTS] [JSN]
R2-085007 Counting PDU/PDU Segment Retransmissions other interdigital R2-63 - [WTS] [JSN]
R2-085008 Corrections to RadioResourceConfigDedicated other Qasara R2-63 - [WTS] [JSN]
R2-085009 Corrections to RadioResourceConfigDedicated other Qasara R2-63 - [WTS] [JSN]
R2-085010 Limitations on PDCP/RLC SDU into MAC TB processing other NXP, Infineon R2-63 - [WTS] [JSN]
R2-085011 Allowing time for HARQ on RRCConnectionReject other Qasara R2-63 - [WTS] [JSN]
R2-085012 Issues regarding LogicalChannelConfig other Qasara R2-63 - [WTS] [JSN]
R2-085013 RRCTransactionId in UL/DL InfoTransfer messages other Qasara R2-63 - [WTS] [JSN]
R2-085014 Limitations on PDCP/RLC SDU into MAC TB processing other NXP, Infineon R2-63 - [WTS] [JSN]
R2-085015 Limitations on PDCP/RLC SDU into MAC TB processing other NXP, Infineon R2-63 - [WTS] [JSN]
R2-085016 Required SIBs prior to RRC connection establishment other NTT DOCOMO R2-63 - [WTS] [JSN]
R2-085017 Required SIBs prior to RRC connection establishment other NTT DOCOMO R2-63 - [WTS] [JSN]
R2-085018 Measurement Gaps and Semi-persistent Scheduling other Alcatel-Lucent, Alcatel Shanghai Bell R2-63 - [WTS] [JSN]
R2-085019 Measurement Gaps and Semi-persistent Scheduling other Alcatel-Lucent, Alcatel Shanghai Bell R2-63 - [WTS] [JSN]
R2-085020 Measurement Gaps and Semi-persistent Scheduling other Alcatel-Lucent, Alcatel Shanghai Bell R2-63 - [WTS] [JSN]
R2-085021 Measurement Gaps and Semi-persistent Scheduling other Alcatel-Lucent, Alcatel Shanghai Bell R2-63 - [WTS] [JSN]
R2-085022 Measurement Gaps and Semi-persistent Scheduling other Alcatel-Lucent, Alcatel Shanghai Bell R2-63 - [WTS] [JSN]
R2-085023 CR on Timing Advance MAC Control Element other Alcatel-Lucent, Alcatel Shanghai Bell R2-63 - [WTS] [JSN]
R2-085024 CR on MAC payload for Random Access Response other Alcatel-Lucent, Alcatel Shanghai Bell R2-63 - [WTS] [JSN]
R2-085025 Correction and Clarification on TTI Bundling other ASUSTeK R2-63 - [WTS] [JSN]
R2-085026 Interactions between measurement gap and Msg3 transmission other ASUSTeK R2-63 - [WTS] [JSN]
R2-085027 Handling SPS resources at TA timer expiry other ASUSTeK R2-63 - [WTS] [JSN]
R2-085028 PAGING Enhancement for ETWS on UMTS other NTT DOCOMO R2-63 - [WTS] [JSN]
R2-085029 Proposed CR to 36.321 on UL Transmission with Empty Buffer other Nokia Corporation, Nokia Siemens Networks R2-63 - [WTS] [JSN]
R2-085030 Proposed modification to the value range of PollPDU other Nokia Corporation, Nokia Siemens Networks, Samsung R2-63 - [WTS] [JSN]
R2-085031 Proposed CR for aligning the construction of partial Status PDUs with intended operation other Nokia Corporation, Nokia Siemens Networks, NTT DOCOMO, Inc., Samsung R2-63 - [WTS] [JSN]
R2-085032 Proposed CR on starting T_status_prohibit after sending a partial Status PDU other Nokia Corporation, Nokia Siemens Networks R2-63 - [WTS] [JSN]
R2-085033 Fixing radio-frame over-allocation for MBSFN other Nokia Corporation, Nokia Siemens Networks, ZTE R2-63 - [WTS] [JSN]
R2-085034 Changes to 36.300 on security part other Orange R2-63 - [WTS] [JSN]
R2-085035 Restriction to indicated RAT at redirection from UTRAN other Orange R2-63 - [WTS] [JSN]
R2-085036 Proposed CR to 36.321 on PHR Reporting Values other Nokia Corporation, Nokia Siemens Networks R2-63 - [WTS] [JSN]
R2-085037 PDCP entity establishment other Nokia Corporation, Nokia Siemens Networks R2-63 - [WTS] [JSN]
R2-085038 Discussion on addition of UE categories for dual cell HSDPA other Nokia, Nokia Siemens Networks R2-63 - [WTS] [JSN]
R2-085039 Discussion on addition of UE categories for dual cell HSDPA other Nokia, Nokia Siemens Networks R2-63 - [WTS] [JSN]
R2-085040 Discussion on addition of UE categories for dual cell HSDPA other Nokia, Nokia Siemens Networks R2-63 - [WTS] [JSN]
R2-085041 MAC Architecture Model other ETRI R2-63 - [WTS] [JSN]
R2-085042 MAC Architecture Model other ETRI R2-63 - [WTS] [JSN]
R2-085043 MAC Architecture Model other ETRI R2-63 - [WTS] [JSN]
R2-085044 Proposed CR to 36.321 on Timing Advance Values other Nokia Corporation, Nokia Siemens Networks R2-63 - [WTS] [JSN]
R2-085045 Discussion on addition of UE categories for dual cell HSDPA other Nokia, Nokia Siemens Networks R2-63 - [WTS] [JSN]
R2-085046 Discussion on addition of UE categories for dual cell HSDPA other Nokia, Nokia Siemens Networks R2-63 - [WTS] [JSN]
R2-085047 Proposed CR 25.305: Support for additional navigation satellite systems in UTRAN other Qualcomm Europe R2-63 - [WTS] [JSN]
R2-085048 Proposed CR 25.331: Support for additional navigation satellite systems in RRC other Qualcomm Europe R2-63 - [WTS] [JSN]
R2-085049 Proposed CR 25.306: UE positioning capabilities for support of additional navigation satellite systems other Qualcomm Europe R2-63 - [WTS] [JSN]
R2-085050 Addition of UE categories for dual cell HSDPA other Nokia Corporation, Nokia Siemens Networks R2-63 - [WTS] [JSN]
R2-085051 Corrections related to the cell update wait timer T320 other Infineon R2-63 - [WTS] [JSN]
R2-085052 UE Aggregate Maximum Bit Rate for UTRAN other Vodafone R2-63 - [WTS] [JSN]
R2-085053 HARQ operation after completion of RA procedure other ASUSTeK R2-63 - [WTS] [JSN]
R2-085054 HARQ operation for SPS other ASUSTeK R2-63 - [WTS] [JSN]
R2-085055 UE specific paging DRX handling other Nokia Corporation, Nokia Siemens Networks R2-63 - [WTS] [JSN]
R2-085056 Clarifications on connection establishment other Nokia Corporation, Nokia Siemens Networks R2-63 - [WTS] [JSN]
R2-085057 Clarifications on connection release other Nokia Corporation, Nokia Siemens Networks R2-63 - [WTS] [JSN]
R2-085058 Inter-RAT HO failure timer handling other Nokia Corporation, Nokia Siemens Networks R2-63 - [WTS] [JSN]
R2-085059 Clarification on system information value tag handling other Nokia Corporation, Nokia Siemens Networks R2-63 - [WTS] [JSN]
R2-085060 PDCP SDU limitation other Nokia Corporation, Nokia Siemens Networks R2-63 - [WTS] [JSN]
R2-085061 Email report on RLF monitoring other Nokia R2-63 - [WTS] [JSN]
R2-085062 PDCP state variables other Alcatel-Lucent R2-63 - [WTS] [JSN]
R2-085063 Time To Trigger and DRX co-operation in EUTRAN other Nokia Corporation, Nokia Siemens Networks R2-63 - [WTS] [JSN]
R2-085064 Correction of the target eNB initial HFNs and SNs values other Alcatel-Lucent R2-63 - [WTS] [JSN]
R2-085065 Clarification with regards to the PDCP state variables other Alcatel-Lucent R2-63 - [WTS] [JSN]
R2-085066 Miscellaneous Clarifications on Security other Alcatel-Lucent, Samsung R2-63 - [WTS] [JSN]
R2-085067 Removal of the reference to E-TFCI threshold other Infineon R2-63 - [WTS] [JSN]
R2-085068 Proposed modification for disabling HS-SCCH less operation other Infineon R2-63 - [WTS] [JSN]
R2-085069 Naming conventions in ASN.1 other Nokia Corporation, Nokia Siemens Networks R2-63 - [WTS] [JSN]
R2-085070 Missing details semi-persistent scheduling for UL other Nokia Corporation, Nokia Siemens Networks R2-63 - [WTS] [JSN]
R2-085071 Open issues for semi-persistent scheduling for DL other Nokia Corporation, Nokia Siemens Networks R2-63 - [WTS] [JSN]
R2-085072 Configuration of Multiple Periodicity Patterns for SPS in TDD other Nokia Corporation, Nokia Siemens Networks R2-63 - [WTS] [JSN]
R2-085073 CR to 36.321 on HARQ for Msg3 transmission other Sharp R2-63 - [WTS] [JSN]
R2-085074 CR to 36.321 on Active time procedure other Sharp R2-63 - [WTS] [JSN]
R2-085075 Buffer Status Field Table other Philips, NXP Semiconductors R2-63 - [WTS] [JSN]
R2-085076 Buffer Status Field Table other Philips, NXP Semiconductors R2-63 - [WTS] [JSN]
R2-085077 Improving the robustness of Buffer Status Reporting other Philips, NXP Semiconductors R2-63 - [WTS] [JSN]
R2-085078 Signalling of SIB7 information to speed up RACH access other Philips R2-63 - [WTS] [JSN]
R2-085079 UE Capabilities for Dual-Cell HSDPA Operation other Philips R2-63 - [WTS] [JSN]
R2-085080 PRACH resource selection other Nokia Corporation, Nokia Siemens Networks R2-63 - [WTS] [JSN]
R2-085081 Correction on PRACH resource selection other Nokia Corporation, Nokia Siemens Networks R2-63 - [WTS] [JSN]
R2-085082 PRACH assignment for dedicated preambles other Nokia Corporation, Nokia Siemens Networks R2-63 - [WTS] [JSN]
R2-085083 RACH partition message size other Nokia Corporation, Nokia Siemens Networks R2-63 - [WTS] [JSN]
R2-085084 Representation of BCCH and PCCH other Nokia Corporation, Nokia Siemens Networks R2-63 - [WTS] [JSN]
R2-085085 Corrections relating to BCCH and PCCH reception other Nokia corporation, Nokia Siemens Networks R2-63 - [WTS] [JSN]
R2-085086 MBSFN-SubframeConfiguration - Subframes excluded from possible allocation other IPWireless R2-63 - [WTS] [JSN]
R2-085087 RACH editorial corrections other Nokia Corporation, Nokia Siemens Networks R2-63 - [WTS] [JSN]
R2-085088 Definition of Global Cell Identities and related IEs other IPWireless R2-63 - [WTS] [JSN]
R2-085089 Correction relating to equal priorities other Nokia Corporation, Nokia Siemens Networks R2-63 - [WTS] [JSN]
R2-085090 System information change handling during on-going procduere other Panasonic R2-63 - [WTS] [JSN]
R2-085091 Remaining issues relating to ETWS other Nokia Corporation, Nokia Siemens Networks R2-63 - [WTS] [JSN]
R2-085092 timer handling for inter-RAT handover from E-UTRA other Panasonic R2-63 - [WTS] [JSN]
R2-085093 Explicit release of semi-persistent resources other Panasonic R2-63 - [WTS] [JSN]
R2-085094 Uplink behaviour relating to active time and DRX other Panasonic R2-63 - [WTS] [JSN]
R2-085095 Analysis of ETWS primary notification mechanism other Panasonic R2-63 - [WTS] [JSN]
R2-085096 Clarification on connected UE behaviour for handling system information other Panasonic R2-63 - [WTS] [JSN]
R2-085097 Correction on ASN.1 fields of SIB1 other Panasonic R2-63 - [WTS] [JSN]
R2-085098 Email report on 'Inter-freq/Inter-RAT measurement continuation at handover' other Panasonic R2-63 - [WTS] [JSN]
R2-085099 User plane handling for inter-RAT handover from E-UTRAN other Panasonic R2-63 - [WTS] [JSN]
R2-085100 Maximum PDCP SDU size other Panasonic R2-63 - [WTS] [JSN]
R2-085101 SRB for NAS message during RRC connection re-establishment other Panasonic R2-63 - [WTS] [JSN]
R2-085102 Measurement Gap Activation other Panasonic R2-63 - [WTS] [JSN]
R2-085103 Handling of Measurement Configuration other Panasonic R2-63 - [WTS] [JSN]
R2-085104 Reporting of Serving Cell Measured Result other Panasonic R2-63 - [WTS] [JSN]
R2-085105 Various clarifications/corrections to TS36.321 other Panasonic R2-63 - [WTS] [JSN]
R2-085106 Priority of MAC Control elements other Panasonic R2-63 - [WTS] [JSN]
R2-085107 Problems associated with using a constant CSG offset when performing reselection ranking other Sharp R2-63 - [WTS] [JSN]
R2-085108 Processing of Contention resolution message other Panasonic R2-63 - [WTS] [JSN]
R2-085109 Processing of Contention resolution message other Panasonic R2-63 - [WTS] [JSN]
R2-085110 Problems associated with using a constant CSG offset when performing reselection ranking other Sharp R2-63 - [WTS] [JSN]
R2-085111 Acquisition of SI-messages in TDD other IPWireless, NextWave Wireless R2-63 - [WTS] [JSN]
R2-085112 HARQ protocol issues for CQI-only"" other Panasonic R2-63 - [WTS] [JSN]
R2-085113 Determination of next random access occasion and PRACH selection other IPWireless, NextWave Wireless R2-63 - [WTS] [JSN]
R2-085114 RAN1/2 specification alignment on HARQ operation other Panasonic R2-63 - [WTS] [JSN]
R2-085115 Correction on determination of next available RACH occasion and PRACH selection other IPWireless, NextWave Wireless R2-63 - [WTS] [JSN]
R2-085116 Presence of multiple PRACHs and PRACH selection other IPWireless, NextWave Wireless R2-63 - [WTS] [JSN]
R2-085117 DL HARQ operation without TBsize information other Panasonic R2-63 - [WTS] [JSN]
R2-085118 Correction on presence of multiple PRACHs and PRACH selection other IPWireless, NextWave Wireless R2-63 - [WTS] [JSN]
R2-085119 Transmission of scheduling request while in DRX other IPWireless, NextWave Wireless R2-63 - [WTS] [JSN]
R2-085120 Correction on transmission of scheduling request while in DRX-solution1 other IPWireless, NextWave Wireless R2-63 - [WTS] [JSN]
R2-085121 Correction on transmission of scheduling request while in DRX-solution2 other IPWireless, NextWave Wireless R2-63 - [WTS] [JSN]
R2-085122 Correction on DL assignment reception other IPWireless, NextWave Wireless R2-63 - [WTS] [JSN]
R2-085123 Correction on UL grant reception other IPWireless, NextWave Wireless R2-63 - [WTS] [JSN]
R2-085124 Comparisons of methods on obtaining CSG Qoffset(s) other Sharp R2-63 - [WTS] [JSN]
R2-085125 RRC Updates on CGI reading and reporting other Nortel R2-63 - [WTS] [JSN]
R2-085126 Editorial correction to the table on structure of Segmentation Status other InterDigital R2-63 - [WTS] [JSN]
R2-085127 Resource release after contention resolution failure other InterDigital R2-63 - [WTS] [JSN]
R2-085128 Happy bit setting with Improved L2 for UL other InterDigital, Nokia Corporation, Nokia Siemens Networks, Ericsson R2-63 - [WTS] [JSN]
R2-085129 Happy bit setting with MAC-i/is other InterDigital R2-63 - [WTS] [JSN]
R2-085130 SchedulingInformation aspects of SIB1 other Qasara R2-63 - [WTS] [JSN]
R2-085131 PDCP Behaviour at Reestablishment for RLC UM other interdigital R2-63 - [WTS] [JSN]
R2-085132 Empty BSR and DRX Inactivity Timer handling other Research In Motion R2-63 - [WTS] [JSN]
R2-085133 Clarification on Regular BSR for restoring time alignment other Research In Motion R2-63 - [WTS] [JSN]
R2-085134 Fast Dormancy: A way forward other Research In Motion, AT&T R2-63 - [WTS] [JSN]
R2-085135 MAC Architecture Model other ETRI R2-63 - [WTS] [JSN]
R2-085136 MAC Architecture Model other ETRI R2-63 - [WTS] [JSN]
R2-085137 Ack/Nak feedback in Cell_FACH other InterDigital R2-63 - [WTS] [JSN]
R2-085138 HS-DPCCH feedback in Cell_FACH other InterDigital R2-63 - [WTS] [JSN]
R2-085139 Issues regarding Access barred alleviation other VIA Technologies Inc R2-63 - [WTS] [JSN]
R2-085140 MAC Architecture Model in Section 4.2 other ETRI R2-63 - [WTS] [JSN]
R2-085141 APN-AMBR support in UE other Qualcomm Europe R2-63 - [WTS] [JSN]
R2-085142 BSR Reliability other Qualcomm Europe R2-63 - [WTS] [JSN]
R2-085143 Bucket Size Parameter other Qualcomm Europe R2-63 - [WTS] [JSN]
R2-085144 PDCP In-sequence Delivery Always On other Qualcomm Europe R2-63 - [WTS] [JSN]
R2-085145 [63_LTE_B03] Flush Timer email report other Qualcomm Europe R2-63 - [WTS] [JSN]
R2-085146 Local NACKing Optionality other Qualcomm Europe R2-63 - [WTS] [JSN]
R2-085147 Max number of MAC SDUs other Qualcomm Europe R2-63 - [WTS] [JSN]
R2-085148 Bucket Size Parameter other Qualcomm Europe R2-63 - [WTS] [JSN]
R2-085149 CR to Remove UE History Information other Vodafone R2-63 - [WTS] [JSN]
R2-085150 Removal of UE History Information in TS 36.331 other Vodafone R2-63 - [WTS] [JSN]
R2-085151 Seamless RRC State transition from Enhanced CELL_FACH to CELL_DCH other Huawei R2-63 - [WTS] [JSN]
R2-085152 Seamless RRC State transition from Enhanced CELL_FACH to CELL_DCH other Huawei R2-63 - [WTS] [JSN]
R2-085153 Clarification for LI size decision for UM RLC uplink other Huawei R2-63 - [WTS] [JSN]
R2-085154 correct the description of UE behaviour during HS-DSCH Reception in CELL_PCH-R7 other Huawei R2-63 - [WTS] [JSN]
R2-085155 correct the description of UE behaviour during HS-DSCH Reception in CELL_PCH-R8 other Huawei R2-63 - [WTS] [JSN]
R2-085156 happy bit setting with L2 improved for UL other Huawei R2-63 - [WTS] [JSN]
R2-085157 Introduction of the UE behavior on PPAC parameter other Huawei R2-63 - [WTS] [JSN]
R2-085158 Some corrections for Enhanced UE DRX other Huawei R2-63 - [WTS] [JSN]
R2-085159 Remove FFS from the figure for MAC-e details other Huawei R2-63 - [WTS] [JSN]
R2-085160 Add MAC-i PDU in the description of HARQ entity other Huawei R2-63 - [WTS] [JSN]
R2-085161 Correction to measurement behaviour for CELL_FACH UE other Huawei R2-63 - [WTS] [JSN]
R2-085162 Correction to measurement behaviour for CELL_FACH UE other Huawei R2-63 - [WTS] [JSN]
R2-085163 Discussion on ETWS primary notification transmission other Huawei R2-63 - [WTS] [JSN]
R2-085164 Clarification on DTX impact on internal measurement other Huawei R2-63 - [WTS] [JSN]
R2-085165 UE capability reporting for enhanced DRX other Huawei R2-63 - [WTS] [JSN]
R2-085166 Transaction ID in HS-DSCH serving cell change procedure other Huawei R2-63 - [WTS] [JSN]
R2-085167 Interaction between HS-DSCH serving cell change and CPC other Huawei R2-63 - [WTS] [JSN]
R2-085168 Discussion on mobility procedures for Dual Cell operation other Huawei R2-63 - [WTS] [JSN]
R2-085169 Measurement optimazation on DC-HSDPA operation other Huawei R2-63 - [WTS] [JSN]
R2-085170 On the need for compressed mode for secondary carrier search in DC-HSDPA other Qualcomm Europe R2-63 - [WTS] [JSN]
R2-085171 On the need for compressed mode for secondary carrier search in DC-HSDPA other Qualcomm Europe R2-63 - [WTS] [JSN]
R2-085172 Clarification of non-used frequency definition for secondary carrier in DC-HSDPA other Qualcomm Europe R2-63 - [WTS] [JSN]
R2-085173 Miscellaneous corrections to 36.300 other Huawei R2-63 - [WTS] [JSN]
R2-085174 Miscellaneous corrections to 36.300 other Huawei R2-63 - [WTS] [JSN]
R2-085175 Miscellaneous corrections to 36.300 other Huawei R2-63 - [WTS] [JSN]
R2-085176 CR on PCH in case of SI change other Huawei R2-63 - [WTS] [JSN]
R2-085177 CR on UL TA other Huawei R2-63 - [WTS] [JSN]
R2-085178 Correction to Random UL HARQ Process for the transmission of Msg3 other Huawei R2-63 - [WTS] [JSN]
R2-085179 Further considerations on validity pattern for dedicated preambles other Huawei R2-63 - [WTS] [JSN]
R2-085180 Handling of RRC Timer T312 other Huawei R2-63 - [WTS] [JSN]
R2-085181 Corrections to Random Access Procedure other Huawei R2-63 - [WTS] [JSN]
R2-085182 Pictures of Random access model other Huawei R2-63 - [WTS] [JSN]
R2-085183 max HARQ transmission number of TTI bundling other Huawei R2-63 - [WTS] [JSN]
R2-085184 CR on max HARQ transmission number of TTI bundling other Huawei R2-63 - [WTS] [JSN]
R2-085185 Preventing UL HARQ transmissions without MCS information other Huawei R2-63 - [WTS] [JSN]
R2-085186 Correction to DRX Active time other Huawei R2-63 - [WTS] [JSN]
R2-085187 Corrections to MAC PDU format other Huawei R2-63 - [WTS] [JSN]
R2-085188 Correction to PHR other Huawei R2-63 - [WTS] [JSN]
R2-085189 Corrections to SPS activation failure other Huawei R2-63 - [WTS] [JSN]
R2-085190 Correction to RLC SDU reassembly during RLC re-establishment other Huawei R2-63 - [WTS] [JSN]
R2-085191 Correction to PDCP functional view other Huawei R2-63 - [WTS] [JSN]
R2-085192 Corrections to PDCP procedure for SRB and DRB other Huawei R2-63 - [WTS] [JSN]
R2-085193 Removal of the redundant description for BSR cancellation other HTC Corporation R2-63 - [WTS] [JSN]
R2-085194 ETWS transmission and reception other HTC Corporation R2-63 - [WTS] [JSN]
R2-085195 Removal of the redundant description for BSR cancellation other HTC Corporation R2-63 - [WTS] [JSN]
R2-085196 Clarification on BSR triggering other HTC Corporation R2-63 - [WTS] [JSN]
R2-085197 Remaining Issues in HNB other InterDigital R2-63 - [WTS] [JSN]
R2-085198 Remaining Issues in HNB other InterDigital R2-63 - [WTS] [JSN]
R2-085199 Resumption of PUCCH and SRS transmission other HTC Corporation R2-63 - [WTS] [JSN]
R2-085200 Clarification on Semi-Persistent Scheduling other HTC Corporation R2-63 - [WTS] [JSN]
R2-085201 BSR Triggering with SPS other HTC Corporation R2-63 - [WTS] [JSN]
R2-085202 Remaining Issues in HNB other InterDigital R2-63 - [WTS] [JSN]
R2-085203 Pending SR with SPS other HTC Corporation R2-63 - [WTS] [JSN]
R2-085204 Correction on data available for transmission other HTC Corporation R2-63 - [WTS] [JSN]
R2-085205 Clarification of Key Derivation other CATT R2-63 - [WTS] [JSN]
R2-085206 Use of GCI for MAC-I calculation other CATT R2-63 - [WTS] [JSN]
R2-085207 Some Small Corrections to TS 36.300 other CATT R2-63 - [WTS] [JSN]
R2-085208 Reporting content for supporting SON-ANR other CATT R2-63 - [WTS] [JSN]
R2-085209 Establishment of PDCP entity other CATT R2-63 - [WTS] [JSN]
R2-085210 NAS involved DRB handling other CATT R2-63 - [WTS] [JSN]
R2-085211 Consideration on Inter-node Message other CATT R2-63 - [WTS] [JSN]
R2-085212 Action of VarMeasurementReports after measurement configuration change other CATT R2-63 - [WTS] [JSN]
R2-085213 Introduction of UE Measurement Capability for DC-HSDPA other Qualcomm Europe R2-63 - [WTS] [JSN]
R2-085214 Handling of VarMeasurementReports after reporting complete other CATT R2-63 - [WTS] [JSN]
R2-085215 Proposal about Frequency and Bandwidth Information in TDD other CATT R2-63 - [WTS] [JSN]
R2-085216 Content of Global Cell ID for E-UTRA other CATT R2-63 - [WTS] [JSN]
R2-085217 Clarification of NAS Message Transfer other CATT R2-63 - [WTS] [JSN]
R2-085218 Clarification of Cell Reselection Priority other CATT R2-63 - [WTS] [JSN]
R2-085219 Remaining Issues in HNB other InterDigital R2-63 - [WTS] [JSN]
R2-085220 PDCP receive window re-wording, using a modulus base other Infineon R2-63 - [WTS] [JSN]
R2-085221 PDCP reordering function removal other Infineon R2-63 - [WTS] [JSN]
R2-085222 Text Proposal for Cell Change Order/NACC other Nokia Siement Networks, Nokia Corporation, Ericsson R2-63 - [WTS] [JSN]
R2-085223 RRC Container definition and Work split between RAN2 and RAN3 other Nokia Siemens Networks, Nokia Corporation R2-63 - [WTS] [JSN]
R2-085224 Removal of Security Context from RRC Container other Nokia Siemens Networks, Nokia Corporation R2-63 - [WTS] [JSN]
R2-085225 Text proposal to clean up Paging other Nokia Siemens Networks, Nokia Corporation R2-63 - [WTS] [JSN]
R2-085226 Clarification on radioResourceConfigDedicated other Nokia Siemens Networks, Nokia Corporation R2-63 - [WTS] [JSN]
R2-085227 Definition of UL and DL PRB usage per traffic class other Nokia Siemens Networks, Nokia Corporation R2-63 - [WTS] [JSN]
R2-085228 EUTRA coexistence with GPS other Qualcomm Europe R2-63 - [WTS] [JSN]
R2-085229 RAPID encoding other Qualcomm Europe, Nokia Siemens Networks R2-63 - [WTS] [JSN]
R2-085230 Update to MeasResultListCDMA2000 other Motorola R2-63 - [WTS] [JSN]
R2-085231 UL HARQ for Message 3 other Qualcomm Europe R2-63 - [WTS] [JSN]
R2-085232 Random Acces Response padding other Qualcomm Europe R2-63 - [WTS] [JSN]
R2-085233 Rules for SPS HARQ process sharing other Qualcomm Europe R2-63 - [WTS] [JSN]
R2-085234 36.321 CR with rules for SPS HARQ process sharing other Qualcomm Europe R2-63 - [WTS] [JSN]
R2-085235 Measurement gaps and SPS other Qualcomm Europe R2-63 - [WTS] [JSN]
R2-085236 Correction to RACH Procedure other LG Electronics Inc. R2-63 - [WTS] [JSN]
R2-085237 MAC RAR extension mechanism other LG Electronics Inc. R2-63 - [WTS] [JSN]
R2-085238 MAC RAR Padding other LG Electronics Inc. R2-63 - [WTS] [JSN]
R2-085239 Proposed CR to 36.321 [Rel-8] Correction to MAC RAR other LG Electronics Inc. R2-63 - [WTS] [JSN]
R2-085240 MAC BCCH Reception Procedure other LG Electronics Inc. R2-63 - [WTS] [JSN]
R2-085241 Proposed CR to 36.321 Rel-8 Correction to BCCH Reception procedure other LG Electronics Inc. R2-63 - [WTS] [JSN]
R2-085242 RRC Re-establishment and BSR other LG Electronics Inc. R2-63 - [WTS] [JSN]
R2-085243 Proposed CR to 36.321 [Rel-8] MAC BSR Triggering other LG Electronics Inc. R2-63 - [WTS] [JSN]
R2-085244 Issue on multiple BSRs other LG Electronics Inc. R2-63 - [WTS] [JSN]
R2-085245 Proposed CR to 36.321 Correction to multiple BSRs other LG Electronics Inc. R2-63 - [WTS] [JSN]
R2-085246 Proposed CR to 36.321 [Rel-8] Correction to PDU format other LG Electronics Inc. R2-63 - [WTS] [JSN]
R2-085247 Proposed CR to 36.321 [Rel-8] Correction to Multiplexing for BSR other LG Electronics Inc. R2-63 - [WTS] [JSN]
R2-085248 Error Handling in MAC other LG Electronics Inc. R2-63 - [WTS] [JSN]
R2-085249 MAC Reset and RRC Interaction other LG Electronics Inc. R2-63 - [WTS] [JSN]
R2-085250 Proposed CR to 36.321 [Rel-8] MAC Reset other LG Electronics Inc. R2-63 - [WTS] [JSN]
R2-085251 Proposed CR to 36.321 [Rel-8] Correction to cell change other LG Electronics Inc. R2-63 - [WTS] [JSN]
R2-085252 Proposed CR to 36.322 [Rel-8] Correction to RB Suspension other LG Electronics Inc. R2-63 - [WTS] [JSN]
R2-085253 Proposed CR to 36.323 [Rel-8] Correction to RB Suspension other LG Electronics Inc. R2-63 - [WTS] [JSN]
R2-085254 Clarifications to Maintenance of Uplink Time Alignment other Nortel, Alcatel-Lucent R2-63 - [WTS] [JSN]
R2-085255 Clarification/correction of the Inter-RAT Mobility Procedure other Nortel, Nokia Siemens Networks R2-63 - [WTS] [JSN]
R2-085256 Corrections to CDMA System Information and Measurement IE definitions other Nortel, Alcatel-Lucent, Verizon R2-63 - [WTS] [JSN]
R2-085257 Complete the Actions upon reception of SIB8 Procedure other Nortel, Nokia Siemens Networks R2-63 - [WTS] [JSN]
R2-085258 Add Hysteresis to the ReportConfigInterRAT IE other Nortel, Nokia Siemens Networks R2-63 - [WTS] [JSN]
R2-085259 CGI for CDMA2000 other Nortel, Verizon R2-63 - [WTS] [JSN]
R2-085260 Dedicated Preamble Assignment other Ericsson R2-63 - [WTS] [JSN]
R2-085261 Text Proposal for Dedicated Preamble Assignment other Ericsson R2-63 - [WTS] [JSN]
R2-085262 UE support of single radio voice call continuity to 1xRTT other Ericsson R2-63 - [WTS] [JSN]
R2-085263 Scheduling of ETWS Notifications other Ericsson R2-63 - [WTS] [JSN]
R2-085264 CS Fallback at Mobility from EUTRA other Ericsson R2-63 - [WTS] [JSN]
R2-085265 Handling of DRBs at Mobility from EUTRA other Ericsson R2-63 - [WTS] [JSN]
R2-085266 UE State Change at Mobility from EUTRA other Ericsson R2-63 - [WTS] [JSN]
R2-085267 Need of PDSCH-ConfigDedicated in PhysicalConfigDedicated other Ericsson R2-63 - [WTS] [JSN]
R2-085268 Activation of CQI reporting, Sounding and Scheduling Request other Ericsson R2-63 - [WTS] [JSN]
R2-085269 Configuration of Semi-Persistent Scheduling other Ericsson R2-63 - [WTS] [JSN]
R2-085270 MBSFN subframe micro-allocation other Ericsson R2-63 - [WTS] [JSN]
R2-085271 Location of the Uplink EARFCN parameter other Ericsson R2-63 - [WTS] [JSN]
R2-085272 Offsetting system information other Ericsson R2-63 - [WTS] [JSN]
R2-085273 Paging procedure clarifications other Ericsson R2-63 - [WTS] [JSN]
R2-085274 Value range for the default paging cycle other Ericsson R2-63 - [WTS] [JSN]
R2-085275 Re-entry of service area upon connection re-establishment other Ericsson R2-63 - [WTS] [JSN]
R2-085276 Update of stage 2 description for Enhanced Uplink for CELL_FACH State and Idle mode in FDD other Infineon R2-63 - [WTS] [JSN]
R2-085277 Introduction of support of “Enhanced Uplink for CELL_FACH State in FDD” and “Improved L2 for uplink” other Infineon R2-63 - [WTS] [JSN]
R2-085278 Removal of UE History Information in TS 36.331 other Vodafone R2-63 - [WTS] [JSN]
R2-085279 Removal of UE History Information in TS 36.331 other Vodafone R2-63 - [WTS] [JSN]
R2-085280 Support of Open Access and Semi Open Access for UTRA HNB other Vodafone R2-63 - [WTS] [JSN]
R2-085281 IP Address Discovery to Support ANR SON Function other Vodafone R2-63 - [WTS] [JSN]
R2-085282 Clarification on Padding value other Fujitsu R2-63 - [WTS] [JSN]
R2-085283 Clarification on Padding value other Fujitsu R2-63 - [WTS] [JSN]
R2-085284 Clarification on Padding value other Fujitsu R2-63 - [WTS] [JSN]
R2-085285 Paging Capacity for Low Bandwidth Systems other Vodafone R2-63 - [WTS] [JSN]
R2-085286 Clarification on Padding value other Fujitsu R2-63 - [WTS] [JSN]
R2-085287 Clarification on Padding value other Fujitsu R2-63 - [WTS] [JSN]
R2-085288 Clarification on Padding value other Fujitsu R2-63 - [WTS] [JSN]
R2-085289 Clarification on Logical Channel Prioritization other Fujitsu R2-63 - [WTS] [JSN]
R2-085290 Void other - R2-63 - [WTS] [JSN]
R2-085291 Void other - R2-63 - [WTS] [JSN]
R2-085292 Setting the short MAC-I other Fujitsu R2-63 - [WTS] [JSN]
R2-085293 E-UTRAN cell detection in idle mode other Telecom Italia R2-63 - [WTS] [JSN]
R2-085294 Typo in IE 'Domain Specific Access Restriction' other Ericsson R2-63 - [WTS] [JSN]
R2-085295 Typo in IE 'Domain Specific Access Restriction' other Ericsson R2-63 - [WTS] [JSN]
R2-085296 Typo in IE 'Domain Specific Access Restriction' other Ericsson R2-63 - [WTS] [JSN]
R2-085297 Misplaced IEs in RADIO BEARER RECONFIGURATION other Ericsson R2-63 - [WTS] [JSN]
R2-085298 Misplaced IEs in RADIO BEARER RECONFIGURATION other Ericsson R2-63 - [WTS] [JSN]
R2-085299 Planning of the Rel-8 RRC message and ASN.1 review for UTRA other Ericsson R2-63 - [WTS] [JSN]
R2-085300 Priority based cell (re-)selection in UTRA other Ericsson R2-63 - [WTS] [JSN]
R2-085301 Harmonisation of certain RRC protocol elements in EUTRA and UTRA other Ericsson R2-63 - [WTS] [JSN]
R2-085302 Improved EUL power control at UE power limitation other Ericsson R2-63 - [WTS] [JSN]
R2-085303 Discussion on ETWS primary notification other Ericsson R2-63 - [WTS] [JSN]
R2-085304 Replacement of E-AICH in 25.302 other Nokia Corporation, Nokia Siemens Networks, Alcatel-Lucent R2-63 - [WTS] [JSN]
R2-085305 Replacement of E-AICH in 25.321 other Nokia Corporation, Nokia Siemens Networks, Alcatel-Lucent R2-63 - [WTS] [JSN]
R2-085306 Replacement of E-AICH in 25.321 other Nokia Corporation, Nokia Siemens Networks, Alcatel-Lucent R2-63 - [WTS] [JSN]
R2-085307 Replacement of E-AICH in 25.331 other Nokia Corporation, Nokia Siemens Networks, Alcatel-Lucent R2-63 - [WTS] [JSN]
R2-085308 Reseting the periodic cell update timer T305 after autonomous state transition to CELL_FACH other InterDigital, Nokia Corporation, Nokia Siemens Networks R2-63 - [WTS] [JSN]
R2-085309 Reseting the periodic cell update timer T305 after autonomous state transition to CELL_FACH other InterDigital, Nokia Corporation, Nokia Siemens Networks R2-63 - [WTS] [JSN]
R2-085310 Reseting the periodic cell update timer T305 after autonomous state transition to CELL_FACH other InterDigital, Nokia Corporation, Nokia Siemens Networks R2-63 - [WTS] [JSN]
R2-085311 Clarification of common E-DCH resource usage in 25.319 other Nokia Corporation, Nokia Siemens Networks R2-63 - [WTS] [JSN]
R2-085312 Clarification of common E-DCH resource use in 25.321 other Nokia Corporation, Nokia Siemens Networks R2-63 - [WTS] [JSN]
R2-085313 Clarification on common E-DCH resource usage in 25.331 other Nokia Corporation, Nokia Siemens Networks R2-63 - [WTS] [JSN]
R2-085314 Corrections for Enhanced Uplink in CELL_FACH in 25.331 other Nokia Corporation, Nokia Siemens Networks R2-63 - [WTS] [JSN]
R2-085315 Inclusion of UE historical information in SRNC RELOCATION INFO other Nokia Corporation, Nokia Siemens Networks R2-63 - [WTS] [JSN]
R2-085316 SIB7 reading time with Enhanced Uplink for CELL_FACH state other Nokia Corporation, Nokia Siemens Networks R2-63 - [WTS] [JSN]
R2-085317 MBSFN subframe allocation other CATT R2-63 - [WTS] [JSN]
R2-085318 Miscellaneous corrections to 36.331 other CATT R2-63 - [WTS] [JSN]
R2-085319 TP to update long DRX cycle in 36.331 other CATT R2-63 - [WTS] [JSN]
R2-085320 Dedicated PRACH indication in handover other CATT R2-63 - [WTS] [JSN]
R2-085321 TTI bundling for TDD other CATT R2-63 - [WTS] [JSN]
R2-085322 DRX and measurement gap other CATT R2-63 - [WTS] [JSN]
R2-085323 Discussion on DRX offset configuration other CATT R2-63 - [WTS] [JSN]
R2-085324 Completion of the RA procedure initialization other CATT R2-63 - [WTS] [JSN]
R2-085325 RAR Window Size for TDD other CATT R2-63 - [WTS] [JSN]
R2-085326 Consideration on PHR other CATT R2-63 - [WTS] [JSN]
R2-085327 Correction to PHR other CATT R2-63 - [WTS] [JSN]
R2-085328 Clarification of MAC PDU other CATT R2-63 - [WTS] [JSN]
R2-085329 Configuration for two-intervals-SPS other CATT R2-63 - [WTS] [JSN]
R2-085330 Two-intervals-SPS configuration in MAC other CATT R2-63 - [WTS] [JSN]
R2-085331 Clarification of Triggering Conditions for T_reordering other CATT R2-63 - [WTS] [JSN]
R2-085332 Correction to Triggering Conditions for T_reordering other CATT R2-63 - [WTS] [JSN]
R2-085333 SDU Discarding other CATT R2-63 - [WTS] [JSN]
R2-085334 Uplink transmission scheme in CPC for LCR TDD other CATT R2-63 - [WTS] [JSN]
R2-085335 Detail of the uplink synchronization procedure in enhanced CELL_FACH for LCR TDD other CATT R2-63 - [WTS] [JSN]
R2-085336 Further discussion on CCCH transmission in enhanced CELL_FACH state for LCR TDD other CATT R2-63 - [WTS] [JSN]
R2-085337 Cell reselection in enhanced CELL_FACH state for LCR TDD other CATT R2-63 - [WTS] [JSN]
R2-085338 SPS and TTI bundling other ZTE R2-63 - [WTS] [JSN]
R2-085339 The mechanism in enhanced PCH state for LCR TDD other CATT R2-63 - [WTS] [JSN]
R2-085340 State transition from enhanced PCH to FACH for LCR TDD other CATT R2-63 - [WTS] [JSN]
R2-085341 Clarification of adaptive retransmission other ZTE R2-63 - [WTS] [JSN]
R2-085342 Clarification of adaptive retransmission other ZTE R2-63 - [WTS] [JSN]
R2-085343 Timers for DRX in enhanced CELL_FACH state for LCR TDD other CATT R2-63 - [WTS] [JSN]
R2-085344 Dedicated preamble transmission and measurement gap other ZTE R2-63 - [WTS] [JSN]
R2-085345 Removing of end-time for dedicated preamble other ZTE R2-63 - [WTS] [JSN]
R2-085346 TDD ACK NACK feedback modes in RRC other ZTE R2-63 - [WTS] [JSN]
R2-085347 PRACH resource pattern for TDD other ZTE R2-63 - [WTS] [JSN]
R2-085348 Clarification of uplink power control with DCI format 3/3A other ZTE R2-63 - [WTS] [JSN]
R2-085349 How to notify UE in connected of primary notification other ZTE R2-63 - [WTS] [JSN]
R2-085350 Transmission of ETWS primary notification other ZTE R2-63 - [WTS] [JSN]
R2-085351 Update of ETWS secondary notification other ZTE R2-63 - [WTS] [JSN]
R2-085352 Serveral clarification for cell reselection other ZTE R2-63 - [WTS] [JSN]
R2-085353 ETWS primary notification on paging information other ZTE R2-63 - [WTS] [JSN]
R2-085354 IRAT ANR Stage 3 functionality other NEC R2-63 - [WTS] [JSN]
R2-085355 Size constraints on UE band capabilities other Nokia Corporation, Nokia Siemens Networks R2-63 - [WTS] [JSN]
R2-085356 Correction to Introduction of HS-DSCH DRX in CELL_FACH other Nokia Corporation, Nokia Siemens Networks R2-63 - [WTS] [JSN]
R2-085357 TAC and PLMN list for SON ANR other Alcatel-Lucent R2-63 - [WTS] [JSN]
R2-085358 Cell Global Identity and TAC definitions other Alcatel-Lucent R2-63 - [WTS] [JSN]
R2-085359 Measurements for ICIC other Alcatel-Lucent R2-63 - [WTS] [JSN]
R2-085360 Paging and MBSFN subframes other Motorola R2-63 - [WTS] [JSN]
R2-085361 Paging and MBSFN subframes other Motorola R2-63 - [WTS] [JSN]
R2-085362 Report of Email discussion on use of Need other Alcatel-Lucent (Rapporteur) R2-63 - [WTS] [JSN]
R2-085363 ASN.1 corrections on Need other Alcatel-Lucent R2-63 - [WTS] [JSN]
R2-085364 Miscellaneous minor corrections and updates to ASN.1 other Alcatel-Lucent R2-63 - [WTS] [JSN]
R2-085365 Issues Related to Measurements other Motorola R2-63 - [WTS] [JSN]
R2-085366 Discussion on parameters for HO to 1xRTT other Alcatel-Lucent R2-63 - [WTS] [JSN]
R2-085367 TP for inclusion of some parameters for HO to 1xRTT other Alcatel-Lucent R2-63 - [WTS] [JSN]
R2-085368 C-RNTI in RRC Connection Reconfiguration other Motorola R2-63 - [WTS] [JSN]
R2-085369 Alignment of 36.300 with stage 3 on 1xRTT CSfallback other Alcatel-Lucent R2-63 - [WTS] [JSN]
R2-085370 Radio Link Failure Monitoring other Motorola R2-63 - [WTS] [JSN]
R2-085371 Data handling in UE during Inter-RAT mobility other Alcatel-Lucent R2-63 - [WTS] [JSN]
R2-085372 NAS information for bearer establishment other Alcatel-Lucent R2-63 - [WTS] [JSN]
R2-085373 Data available for transmission after HO other Motorola R2-63 - [WTS] [JSN]
R2-085374 Draft LS response to SA2 LS on NAS trigger for RLF other Alcatel-Lucent R2-63 - [WTS] [JSN]
R2-085375 Removal of a leftover note on autonomous search other Qualcomm Europe R2-63 - [WTS] [JSN]
R2-085376 Removal of a leftover note on autonomous search other Qualcomm Europe R2-63 - [WTS] [JSN]
R2-085377 Removal of a leftover note on autonomous search other Qualcomm Europe R2-63 - [WTS] [JSN]
R2-085378 Removal of a leftover note on autonomous search other Qualcomm Europe R2-63 - [WTS] [JSN]
R2-085379 Allocation of CSG IDs other Qualcomm Europe R2-63 - [WTS] [JSN]
R2-085380 UE Assisted Heuristic Collision Detection other Qualcomm Europe R2-63 - [WTS] [JSN]
R2-085381 Qoffsets for CSG Cells other Qualcomm Europe R2-63 - [WTS] [JSN]
R2-085382 Treselection modifications for CSG cells other Qualcomm Europe R2-63 - [WTS] [JSN]
R2-085383 Intra-frequency reselection indicator for CSG Cells other Qualcomm Europe R2-63 - [WTS] [JSN]
R2-085384 Introduction of DC-HSDPA support in 25.331 - Stage 3 CR other Qualcomm Europe R2-63 - [WTS] [JSN]
R2-085385 Interaction of DC-HSDPA and Enhanced Serving Cell Change in 25.331 messages - Stage 3 CR other Qualcomm Europe R2-63 - [WTS] [JSN]
R2-085386 Robustness of Buffer Status Reporting other Ericsson, Nokia Siemens Networks, Nortel R2-63 - [WTS] [JSN]
R2-085387 Configuration of DRX Start Offset other Ericsson R2-63 - [WTS] [JSN]
R2-085388 D-SR failure handling other Ericsson, Nokia Siemens Networks R2-63 - [WTS] [JSN]
R2-085389 D-SR failure handling other Ericsson, LG Electronics Inc. R2-63 - [WTS] [JSN]
R2-085390 Discussion on MAC reset and reconfiguration other Ericsson R2-63 - [WTS] [JSN]
R2-085391 Text for MAC reset and reconfiguration other Ericsson R2-63 - [WTS] [JSN]
R2-085392 Freeing of reserved RNTIs other Ericsson R2-63 - [WTS] [JSN]
R2-085393 HARQ RTT Timer other Ericsson R2-63 - [WTS] [JSN]
R2-085394 Text for Multiplexing and Demultiplexing Sections other Ericsson, Nokia Corporation, Nokia Siemens Networks R2-63 - [WTS] [JSN]
R2-085395 TTI Bundling Configuration other Ericsson R2-63 - [WTS] [JSN]
R2-085396 Details of UL power headroom report other Ericsson R2-63 - [WTS] [JSN]
R2-085397 Remaining issues in Semi Persistent Scheduling other Ericsson R2-63 - [WTS] [JSN]
R2-085398 Contention Resolution Timer other Ericsson R2-63 - [WTS] [JSN]
R2-085399 Corrections to MAC-MainConfiguration other Ericsson R2-63 - [WTS] [JSN]
R2-085400 Correction to Starting of TA timer other Ericsson R2-63 - [WTS] [JSN]
R2-085401 Number of HARQ processes for MIMO other Ericsson R2-63 - [WTS] [JSN]
R2-085402 Summary of the email discussion on the PDCP re-establishment procedure other Ericsson R2-63 - [WTS] [JSN]
R2-085403 PDCP re-establishment procedure other Ericsson R2-63 - [WTS] [JSN]
R2-085404 Spares for T-statusprohibit and T-pollretransmit other Ericsson R2-63 - [WTS] [JSN]
R2-085405 L2 UE capability limitations other Ericsson R2-63 - [WTS] [JSN]
R2-085406 Status report of the email discussion on the LTE Rel-8 features dependency other Ericsson R2-63 - [WTS] [JSN]
R2-085407 Mapping of the RNTIs to different transport channels other Ericsson R2-63 - [WTS] [JSN]
R2-085408 Range Encoding Proposal for Physical Cell Identities other Ericsson R2-63 - [WTS] [JSN]
R2-085409 cdma2000 System Time information change should not change Value Tag other Ericsson R2-63 - [WTS] [JSN]
R2-085410 Value ranges for physical layer parameters other Ericsson R2-63 - [WTS] [JSN]
R2-085411 pdcp-configuration IE and PDCP reconfiguration other Ericsson R2-63 - [WTS] [JSN]
R2-085412 Default values for parameters in Uplink Power Control other Ericsson R2-63 - [WTS] [JSN]
R2-085413 Definition of parameters in PCCH-Configuration other Ericsson R2-63 - [WTS] [JSN]
R2-085414 Measurement event b1 and b2 threshold value ranges other Ericsson R2-63 - [WTS] [JSN]
R2-085415 Network support to ensure UE autonomous CSG discovery after change other T-Mobile R2-63 - [WTS] [JSN]
R2-085416 Cleanup of measurement chapters in TS 36.331 other Ericsson R2-63 - [WTS] [JSN]
R2-085417 Clarification of EUTRAN Measurement report triggering other Ericsson R2-63 - [WTS] [JSN]
R2-085418 Including serving cell in measurement report other Ericsson R2-63 - [WTS] [JSN]
R2-085419 Value ranges of parameters for intra LTE events other Ericsson R2-63 - [WTS] [JSN]
R2-085420 NAS level retransmission other Ericsson R2-63 - [WTS] [JSN]
R2-085421 Multiplicity and type constraints values other Ericsson R2-63 - [WTS] [JSN]
R2-085422 Planning of the Rel-8 ASN.1 review for LTE other Ericsson R2-63 - [WTS] [JSN]
R2-085423 Corrections on radio resource configuration other Ericsson R2-63 - [WTS] [JSN]
R2-085424 Removal of T312 other Ericsson R2-63 - [WTS] [JSN]
R2-085425 Handling of optional information elements in system information other Ericsson R2-63 - [WTS] [JSN]
R2-085426 Defining PRB measurements for concatenated packets other Ericsson R2-63 - [WTS] [JSN]
R2-085427 Optionality of RAI reporting for ANR other Ericsson R2-63 - [WTS] [JSN]
R2-085428 Setting of NDI after MIMO to non-MIMO configuration other Ericsson R2-63 - [WTS] [JSN]
R2-085429 Cell Change Order to E-UTRAN other NEC R2-63 - [WTS] [JSN]
R2-085430 Open issues for Dual Cell HSDPA operation other Ericsson R2-63 - [WTS] [JSN]
R2-085431 Introduction of Dual Cell HSDPA operation other Ericsson R2-63 - [WTS] [JSN]
R2-085432 Introduction of Dual Cell HSDPA operation other Ericsson R2-63 - [WTS] [JSN]
R2-085433 Introduction of Dual Cell HSDPA operation other Ericsson R2-63 - [WTS] [JSN]
R2-085434 Smaller value ranges for DRX burst length other Ericsson R2-63 - [WTS] [JSN]
R2-085435 Number of reserved HARQ processes for DL SPS and related signalling aspects other Research In Motion R2-63 - [WTS] [JSN]
R2-085436 Reference for path loss other Qualcomm Europe R2-63 - [WTS] [JSN]
R2-085437 Open Issues HS-DSCH Serving Cell Change Enhancements other Ericsson R2-63 - [WTS] [JSN]
R2-085438 Detection Time of SPS Activation/Reconfiguration Signalling other Research In Motion R2-63 - [WTS] [JSN]
R2-085439 HARQ process ID at SFN roll over in TDD other Qualcomm Europe R2-63 - [WTS] [JSN]
R2-085440 Introduction of HS-DSCH cell change enhancements other Ericsson R2-63 - [WTS] [JSN]
R2-085441 TB Size signalling for the SPS other Research In Motion R2-63 - [WTS] [JSN]
R2-085442 Addition of CSG indicator bit to the definition of ECI other Qualcomm Europe R2-63 - [WTS] [JSN]
R2-085443 E-TFC minimum set and power limitation with DCH configured other Ericsson R2-63 - [WTS] [JSN]
R2-085444 SPS Activation and Reconfiguration Packet Handling during DRX other Research In Motion Limited, Sunplus mMobile Inc. R2-63 - [WTS] [JSN]
R2-085445 Incorporation of CSG indicator bit into CellIdentity other Qualcomm Europe R2-63 - [WTS] [JSN]
R2-085446 HNB remaining Issues other InterDigital R2-63 - [WTS] [JSN]
R2-085447 Correcting E-TFC minimum set behaviour when DCH is configured other Ericsson R2-63 - [WTS] [JSN]
R2-085448 Correcting E-TFC minimum set behaviour when DCH is configured other Ericsson R2-63 - [WTS] [JSN]
R2-085449 Robustness of Buffer Status Reporting other Ericsson R2-63 - [WTS] [JSN]
R2-085450 Enforcement of APN-AMBR other NEC R2-63 - [WTS] [JSN]
R2-085451 Clarification of AS-NAS concatenation - Stage 2 other NEC, Alcatel-Lucent R2-63 - [WTS] [JSN]
R2-085452 Corrections to 36.331 for ETWS Notifications other LG Electronics Inc. R2-63 - [WTS] [JSN]
R2-085453 Corrections to 36.331 for ETWS Notifications other LG Electronics Inc. R2-63 - [WTS] [JSN]
R2-085454 Clarification of AS-NAS concatenation - Stage 3 other NEC, Alcatel-Lucent R2-63 - [WTS] [JSN]
R2-085455 Discussion on emergency calls and CS Fallback other NEC R2-63 - [WTS] [JSN]
R2-085456 Handling of SIB10/11 Change other LG Electronics Inc. R2-63 - [WTS] [JSN]
R2-085457 Corrections to 36.331 for Change of MIB other LG Electronics Inc. R2-63 - [WTS] [JSN]
R2-085458 Terminology issue with the HANDOVER COMMAND other NEC R2-63 - [WTS] [JSN]
R2-085459 Handling of S-measure for ANR other Ericsson R2-63 - [WTS] [JSN]
R2-085460 Simplification of the transparent container in the HANDOVER COMMAND other NEC R2-63 - [WTS] [JSN]
R2-085461 Conditional presence of some PDCP parameters in RRC messages other NEC R2-63 - [WTS] [JSN]
R2-085462 MAC Time Alignment Timer definition other NEC, Alcatel-Lucent R2-63 - [WTS] [JSN]
R2-085463 Clarification to the scope of Uplink DPCCH slot format 4 feature other Nokia Corporation, Nokia Siemens Networks R2-63 - [WTS] [JSN]
R2-085464 Corrections to absolute priority reselection and redirection to EUTRA procedures and parameters other Nokia Corporation, Nokia Siemens Networks R2-63 - [WTS] [JSN]
R2-085465 Correction to absolute priority reselection procedure other Nokia Corporation, Nokia Siemens Networks R2-63 - [WTS] [JSN]
R2-085466 Offset parameter in PRACH power control other LG Electronics Inc. R2-63 - [WTS] [JSN]
R2-085467 Measurement and measurement reporting of E-UTRA cells - open issues other Nokia Corporation, Nokia Siemens Networks R2-63 - [WTS] [JSN]
R2-085468 Consideration on Measurement results other LG Electronics Inc. R2-63 - [WTS] [JSN]
R2-085469 Update of references to TS 34.108 CS voice over HSPA RAB combinations other Nokia Corporation, Nokia Siemens Networks R2-63 - [WTS] [JSN]
R2-085470 Email discussion [63_LTE_C03] Can redirection info in connection release be removed? other Huawei R2-63 - [WTS] [JSN]
R2-085471 Email discussion [63_LTE_C03] Can redirection info in connection release be removed? other Huawei R2-63 - [WTS] [JSN]
R2-085472 Email discussion [63_LTE_C03] Can redirection info in connection release be removed? other Huawei R2-63 - [WTS] [JSN]
R2-085473 Email discussion [63_LTE_C03] Can redirection info in connection release be removed? other Huawei R2-63 - [WTS] [JSN]
R2-085474 Email discussion [63_LTE_C03] Can redirection info in connection release be removed? other Huawei R2-63 - [WTS] [JSN]
R2-085475 H(e)NB PCI/PSC and Frequency Identification other Qualcomm Europe R2-63 - [WTS] [JSN]
R2-085476 Proposed Structure for Stage 2 TS on Home NodeB Support other Qualcomm Europe R2-63 - [WTS] [JSN]
R2-085477 Text proposals capturing RAN2 agreements for Home NodeB other Qualcomm Europe R2-63 - [WTS] [JSN]
R2-085478 Correction on UL HARQ transmission other ETRI R2-63 - [WTS] [JSN]
R2-085479 Open Issues in Enhanced Serving Cell Change other Qualcomm Europe R2-63 - [WTS] [JSN]
R2-085480 Proposed Reply LS to R1-082763 on UE Reconfiguration Timing and HS-SCCH Order other Qualcomm Europe R2-63 - [WTS] [JSN]
R2-085481 Robust BSR other LG Electronics Inc. R2-63 - [WTS] [JSN]
R2-085482 Proposed CR to 36.321 [Rel-8] reliabilty of BSR other LG Electronics Inc. R2-63 - [WTS] [JSN]
R2-085483 Modification to UE DRX to include support for PRACH other Qualcomm Europe R2-63 - [WTS] [JSN]
R2-085484 NDI and Msg4 Carrying Contention Resolution ID other LG Electronics Inc. R2-63 - [WTS] [JSN]
R2-085485 Proposed CR to NDI and Msg4 Carrying Contention Resolution ID other LG Electronics Inc. R2-63 - [WTS] [JSN]
R2-085486 PCH reception other LG Electronics Inc. R2-63 - [WTS] [JSN]
R2-085487 DRX with PCH, BCH and DL-SCH mapped on BCCH other LG Electronics Inc. R2-63 - [WTS] [JSN]
R2-085488 Proposed CR to DRX with PCH, BCH and DL-SCH mapped on BCCH other LG Electronics Inc. R2-63 - [WTS] [JSN]
R2-085489 RACH Triggering other LG Electronics Inc. R2-63 - [WTS] [JSN]
R2-085490 Proposed CR to RACH Triggering other LG Electronics Inc. R2-63 - [WTS] [JSN]
R2-085491 Reflection of RAN1 LS on timing adjustment other LG Electronics Inc. R2-63 - [WTS] [JSN]
R2-085492 Correction to E field for MAC PDU other LG Electronics Inc. R2-63 - [WTS] [JSN]
R2-085493 Small corrections to MAC other LG Electronics Inc. R2-63 - [WTS] [JSN]
R2-085494 UE simultaneous physical channels combinations related to DC-HSPA other LG Electronics Inc. R2-63 - [WTS] [JSN]
R2-085495 MAC BSR trigger CR other Motorola R2-63 - [WTS] [JSN]
R2-085496 MAC BSR Coding other Motorola R2-63 - [WTS] [JSN]
R2-085497 Void other - R2-63 - [WTS] [JSN]
R2-085498 Discussion on Handling of a Poll in a duplicated PDU other LG Electronics Inc. R2-63 - [WTS] [JSN]
R2-085499 Logical Channel Prioritization CR other Motorola R2-63 - [WTS] [JSN]
R2-085500 MAC PDU text update in 36.321 other Motorola R2-63 - [WTS] [JSN]
R2-085501 Additional BSR trigger other Motorola R2-63 - [WTS] [JSN]
R2-085502 Proposed CR to 36.322 on Handling of a Poll in a duplicated PDU other LG Electronics Inc. R2-63 - [WTS] [JSN]
R2-085503 Proposed CR to 36.323 on Processing of PDCP SDU received from upper layer other LG Electronics Inc. R2-63 - [WTS] [JSN]
R2-085504 Proposed CR to 36.323 on Delivery of PDCP SDU after header decompression other LG Electronics Inc. R2-63 - [WTS] [JSN]
R2-085505 Introduction of additional UE categories for 1.28Mcps TDD 64QAM DL other ZTE Corporation R2-63 - [WTS] [JSN]
R2-085506 Introduction of additional UE categories for 1.28Mcps TDD 64QAM DL other ZTE Corporation R2-63 - [WTS] [JSN]
R2-085507 Report of E-mail activities on PDCP modular operation other Rapporteur (LG Electronics Inc.) R2-63 - [WTS] [JSN]
R2-085508 Introduction of additional UE categories for 1.28Mcps TDD 64QAM DL other ZTE Corporation R2-63 - [WTS] [JSN]
R2-085509 Introduction of additional UE categories for 1.28Mcps TDD 64QAM DL other ZTE Corporation R2-63 - [WTS] [JSN]
R2-085510 Detailed operation on the HS-DSCH transmission in PCH state other ZTE Corporation R2-63 - [WTS] [JSN]
R2-085511 Proposed CR to 36.323 on Introduction of PDCP modular oepration other LG Electronics Inc. R2-63 - [WTS] [JSN]
R2-085512 Some clarifications for enhanced CELL_FACH state other ZTE Corporation R2-63 - [WTS] [JSN]
R2-085513 Proposal on Uplink data transmission in enhanced CELL_FACH state other ZTE Corporation R2-63 - [WTS] [JSN]
R2-085514 Implicit analysis between MBSFN subframe and Paging subframe other ZTE R2-63 - [WTS] [JSN]
R2-085515 Consideration of SFN Rollling Over in SPS other CATT R2-63 - [WTS] [JSN]
R2-085516 PRB measurements other Huawei R2-63 - [WTS] [JSN]
R2-085517 Correction to the Co-exist of SPS-RNTI and SI-RNTI or RA-RNTI other CATT R2-63 - [WTS] [JSN]
R2-085518 Clarification about Restarting the Periodic BSR Timer other CATT R2-63 - [WTS] [JSN]
R2-085519 Discussion on reestablishment procedure other Huawei R2-63 - [WTS] [JSN]
R2-085520 MAC Open Issues list other Ericsson (Rapporteur) R2-63 - [WTS] [JSN]
R2-085521 Some issues about Access Class Barring other Huawei R2-63 - [WTS] [JSN]
R2-085522 Configuration of the Time Alignment Timer other Ericsson R2-63 - [WTS] [JSN]
R2-085523 Correction to reception of assignments and grants other Ericsson R2-63 - [WTS] [JSN]
R2-085524 Moving from E-UTRA other Huawei R2-63 - [WTS] [JSN]
R2-085525 NCC and KSI details other Ericsson R2-63 - [WTS] [JSN]
R2-085526 system information change of ETWS PN for RRC_CONNECTED UE other Huawei R2-63 - [WTS] [JSN]
R2-085527 CR to 36.304 on black listed cells other Huawei R2-63 - [WTS] [JSN]
R2-085528 CR to 36.304 on Speed dependent scaling factor for CDMA2000 other Huawei R2-63 - [WTS] [JSN]
R2-085529 Priority of Power Headroom Report other ASUSTeK R2-63 - [WTS] [JSN]
R2-085530 Cell reselection towards to CDMA2000 other Huawei R2-63 - [WTS] [JSN]
R2-085531 CR to 36.300 on intra E-UTRAN HO other Huawei R2-63 - [WTS] [JSN]
R2-085532 EUTRA measurement result other Huawei R2-63 - [WTS] [JSN]
R2-085533 Misc small corrections 36.331 other Huawei R2-63 - [WTS] [JSN]
R2-085534 RB Identity other Motorola R2-63 - [WTS] [JSN]
R2-085535 Multiple Cell preparation at Handover other Huawei R2-63 - [WTS] [JSN]
R2-085536 Discussion on the usage of KSI ASME other Huawei R2-63 - [WTS] [JSN]
R2-085537 Time to trigger configuration and DRX other Huawei R2-63 - [WTS] [JSN]
R2-085538 Further VoIP uplink scheduling discussion in CPC for 1.28 Mcps TDD other TD Tech R2-63 - [WTS] [JSN]
R2-085539 Further VoIP uplink scheduling discussion in CPC for 1.28 Mcps TDD other TD Tech R2-63 - [WTS] [JSN]
R2-085540 Keeping C-RNTI in RRCConnectionReestablishment message other Motorola R2-63 - [WTS] [JSN]
R2-085541 Keeping C-RNTI in RRCConnectionReestablishment message other Motorola R2-63 - [WTS] [JSN]
R2-085542 VoIP downlink scheduling in CPC for 1.28 Mcps TDD other TD Tech R2-63 - [WTS] [JSN]
R2-085543 Measurement event for ICIC other Huawei R2-63 - [WTS] [JSN]
R2-085544 Proposal to cipher the SecurityModeComplete message other Motorola R2-63 - [WTS] [JSN]
R2-085545 Correction to Definition of homePLMN other Huawei R2-63 - [WTS] [JSN]
R2-085546 Consideration on Mobility from E-UTRA procedure other Huawei R2-63 - [WTS] [JSN]
R2-085547 Battery saving for receiving ETWS other Huawei R2-63 - [WTS] [JSN]
R2-085548 Proposal to remove RRCConnectionReestablishmentReject message other Motorola R2-63 - [WTS] [JSN]
R2-085549 Multiple KeNB* and shortMAC-I forwarding at handover other NTT DOCOMO R2-63 - [WTS] [JSN]
R2-085550 Correction on SR trigger condition other Fujitsu R2-63 - [WTS] [JSN]
R2-085551 Max allowed Tx power in E-UTRAN other NTT DOCOMO R2-63 - [WTS] [JSN]
R2-085552 Correction on padding subheader other Fujitsu R2-63 - [WTS] [JSN]
R2-085553 Clarifications on E-CGI other Huawei R2-63 - [WTS] [JSN]
R2-085554 Clarification of E-RUCCH transmission in 25.321 for R7 other TD Tech R2-63 - [WTS] [JSN]
R2-085555 Access class barring handling for emergency calls other NTT DOCOMO R2-63 - [WTS] [JSN]
R2-085556 Error handling in PDCP other Motorola R2-63 - [WTS] [JSN]
R2-085557 Radio problem detection other Huawei R2-63 - [WTS] [JSN]
R2-085558 Measurement handling at inter-frequency handover other NTT DOCOMO R2-63 - [WTS] [JSN]
R2-085559 Pre-registration in EUTRAN and CDMA interworking other Huawei R2-63 - [WTS] [JSN]
R2-085560 introduce Intra-SecondaryFrequency Indicator for LCR TDD other ZTE CORPORATION R2-63 - [WTS] [JSN]
R2-085561 The process for TTI Bundling at handover other ZTE Corporation R2-63 - [WTS] [JSN]
R2-085562 introduce Intra-SecondaryFrequency Indicator for LCR TDD other ZTE CORPORATION R2-63 - [WTS] [JSN]
R2-085563 PDCP modeling updates for section 4.2.1 other Motorola R2-63 - [WTS] [JSN]
R2-085564 The start time for TTI Bundling other ZTE Corporation R2-63 - [WTS] [JSN]
R2-085565 MBSFN subframe signalling interaction with paging subframe other Huawei R2-63 - [WTS] [JSN]
R2-085566 PDCP modeling updates for section 4.2.2 other Motorola R2-63 - [WTS] [JSN]
R2-085567 TP for HNBID (36.331) other Huawei R2-63 - [WTS] [JSN]
R2-085568 clarification of E-RUCCH transmission in 25.321 for R8 other TD tech R2-63 - [WTS] [JSN]
R2-085569 CR for CSG definitions (36.304) other Huawei R2-63 - [WTS] [JSN]
R2-085570 Editorial Corrections other Motorola R2-63 - [WTS] [JSN]
R2-085571 Discussions on outbound mobility for UTRA hNB other Huawei R2-63 - [WTS] [JSN]
R2-085572 Discussions on idle mobility between UTRA hNBs other Huawei R2-63 - [WTS] [JSN]
R2-085573 Clarification of T-RUCCH startup condition for R7 other TD Tech R2-63 - [WTS] [JSN]
R2-085574 CR for CSG selection (36.304) other Huawei R2-63 - [WTS] [JSN]
R2-085575 CR for CSG Intro (25.304) other Huawei R2-63 - [WTS] [JSN]
R2-085576 Correction of the Description of FS2 and Downlink Reference Signal other CATT R2-63 - [WTS] [JSN]
R2-085577 CR on hNB ID String other Huawei R2-63 - [WTS] [JSN]
R2-085578 UL SPS collision in TDD other Huawei R2-63 - [WTS] [JSN]
R2-085579 Correction on Contention Resolution other Samsung, Nokia Siemens Networks, Nokia Corporation R2-63 - [WTS] [JSN]
R2-085580 TTI Bundling: Overlap with Measurement Gap other Samsung R2-63 - [WTS] [JSN]
R2-085581 S-measure handling for SON-ANR other Qualcomm Europe R2-63 - [WTS] [JSN]
R2-085582 Full vs Delta configuration in case of connection re-establishment other Qualcomm Europe R2-63 - [WTS] [JSN]
R2-085583 Clarification on change of bearer mapping at reconfiguration other Qualcomm Europe R2-63 - [WTS] [JSN]
R2-085584 Introduction of signalling connection release indication other Qualcomm Europe R2-63 - [WTS] [JSN]
R2-085585 Delta configuration in case of handover other Qualcomm Europe R2-63 - [WTS] [JSN]
R2-085586 Text proposal on concatenation of NAS PDUs other Qualcomm Europe R2-63 - [WTS] [JSN]
R2-085587 Granularity of information at SIB modification other Qualcomm Europe R2-63 - [WTS] [JSN]
R2-085588 Further considerations on ETWS mechanisms other Qualcomm Europe R2-63 - [WTS] [JSN]
R2-085589 Further considerations on ETWS mechanisms other Qualcomm Europe R2-63 - [WTS] [JSN]
R2-085590 SIB2 Offset Considered Harmful other Qualcomm Europe R2-63 - [WTS] [JSN]
R2-085591 Clarification of definition of SnonServingCell,x for CDMA2000 RATs other Qualcomm Europe R2-63 - [WTS] [JSN]
R2-085592 Report on Generic error handling email discussion other NSN R2-63 - [WTS] [JSN]
R2-085593 Clarification on required system information for UEs in on-going procedure other LG Electronics Inc. R2-63 - [WTS] [JSN]
R2-085594 Value range of reportAmount, and relevant clarifications other LG Electronics Inc. R2-63 - [WTS] [JSN]
R2-085595 Clarification on required system information for UEs in on-going procedure other LG Electronics Inc. R2-63 - [WTS] [JSN]
R2-085596 Summary of email discussion on TDD specific value ranges for MAC parameters other CATT R2-63 - [WTS] [JSN]
R2-085597 Some field descriptions for L1 information other Samsung R2-63 - [WTS] [JSN]
R2-085598 Adding the indication for SDU discarding for RLC UM other CATT R2-63 - [WTS] [JSN]
R2-085599 Correction on System Information Acquisition other LG Electronics Inc. R2-63 - [WTS] [JSN]
R2-085600 Missing L1 information other Samsung R2-63 - [WTS] [JSN]
R2-085601 On replay protection other Samsung R2-63 - [WTS] [JSN]
R2-085602 UP handling during inter-RAT HO other Samsung R2-63 - [WTS] [JSN]
R2-085603 Correction on cell reselection candidates cells of inter-RAT other LG Electronics Inc. R2-63 - [WTS] [JSN]
R2-085604 On HARQ suspension other Samsung R2-63 - [WTS] [JSN]
R2-085605 Discussion and TP for Missing L1 parameters (CQI related) other Texas Instruments Inc R2-63 - [WTS] [JSN]
R2-085606 L1 Information for PRACH other Samsung R2-63 - [WTS] [JSN]
R2-085607 Capture two-intervals-SPS into Stage 2 other CATT R2-63 - [WTS] [JSN]
R2-085608 Correction on UE behaviour to HARQ suspension other Samsung R2-63 - [WTS] [JSN]
R2-085609 NDI handling in the uplink other Samsung R2-63 - [WTS] [JSN]
R2-085610 Considerations on PRB usage measurements other CMCC R2-63 - [WTS] [JSN]
R2-085611 Tie SPS Resource to SFN other CATT R2-63 - [WTS] [JSN]
R2-085612 Message 3 transmission interrupted by the adaptive retransmission command other Samsung R2-63 - [WTS] [JSN]
R2-085613 Correction to prevent message 3 transmission being interrupted by adaptive retransmission command other Samsung R2-63 - [WTS] [JSN]
R2-085614 L1 Information for CQI and RI configuration other Samsung R2-63 - [WTS] [JSN]
R2-085615 On priorities of MAC CEs other Samsung R2-63 - [WTS] [JSN]
R2-085616 Considerations on PRB usage measurements other CMCC R2-63 - [WTS] [JSN]
R2-085617 On optimizing BS tables other Samsung R2-63 - [WTS] [JSN]
R2-085618 Correction on priority handling on MAC CEs and DCCH MAC SDUs other Samsung, Nokia Siemens Networks,Nokia Corporation R2-63 - [WTS] [JSN]
R2-085619 Clarification of PUCCH configuration information other Samsung R2-63 - [WTS] [JSN]
R2-085620 Discussion on CR for missing L1 parameters (CQI related) other Texas Instruments Inc R2-63 - [WTS] [JSN]
R2-085621 L1 Information for SRS other Samsung R2-63 - [WTS] [JSN]
R2-085622 Considerations on PRB usage measurements other CMCC R2-63 - [WTS] [JSN]
R2-085623 E-TFC restriction and minimum set in 25.321 other Qualcomm Europe R2-63 - [WTS] [JSN]
R2-085624 Robustness of Buffer Status Reporting other Texas Instruments Inc R2-63 - [WTS] [JSN]
R2-085625 Considerations on PRB usage measurements other CMCC R2-63 - [WTS] [JSN]
R2-085626 CR: Robustness of Buffer Status Reporting other Texas Instruments Inc R2-63 - [WTS] [JSN]
R2-085627 SRB1 establishment clarification other Nokia R2-63 - [WTS] [JSN]
R2-085628 Correction to DRX and Measurement Gap other CATT R2-63 - [WTS] [JSN]
R2-085629 Correction to the BSR triggers other Samsung, Nokia Siemens Networks,Nokia Corporation R2-63 - [WTS] [JSN]
R2-085630 Clarification of DRX Active Time other Ericsson R2-63 - [WTS] [JSN]
R2-085631 L1 Information for PRACH other Samsung, Panasonic R2-63 - [WTS] [JSN]
R2-085632 Issues regarding DRX operation other NTT DOCOMO R2-63 - [WTS] [JSN]
R2-085633 Correction on PHR triggering condition other Samsung R2-63 - [WTS] [JSN]
R2-085634 SPS HARQ process linking other Samsung, RIM R2-63 - [WTS] [JSN]
R2-085635 Linking HARQ process ID with the SPS resource other Samsung, RIM R2-63 - [WTS] [JSN]
R2-085636 Miscellaneous corrections and clarifications other Rapporteur (Samsung) R2-63 - [WTS] [JSN]
R2-085637 Adding MAC architecture other Samsung R2-63 - [WTS] [JSN]
R2-085638 Removing a redundant text on VT(A) setting other Samsung R2-63 - [WTS] [JSN]
R2-085639 Adding RLC TM operation other Samsung, Nokia Siemens Networks,Nokia Corporation R2-63 - [WTS] [JSN]
R2-085640 Corrections on NDI handling for the uplink other Samsung R2-63 - [WTS] [JSN]
R2-085641 Small correction on Reception of a RRCConnectionReconfiguration for handover other LG Electronics Inc. R2-63 - [WTS] [JSN]
R2-085642 E-UTRA RRC main issues other Rapporteur (Samsung) R2-63 - [WTS] [JSN]
R2-085643 Considerations on PRB usage measurements other CMCC R2-63 - [WTS] [JSN]
R2-085644 Issues regarding ETWS other NTT DOCOMO R2-63 - [WTS] [JSN]
R2-085645 Miscellaneous corrections to 36.321 other Samsung R2-63 - [WTS] [JSN]
R2-085646 Generic error handling other Samsung R2-63 - [WTS] [JSN]
R2-085647 Inter-RAT mobility other Samsung R2-63 - [WTS] [JSN]
R2-085648 Considerations on PRB usage measurements other CMCC R2-63 - [WTS] [JSN]
R2-085649 Corrections and clarifications on system information other Samsung R2-63 - [WTS] [JSN]
R2-085650 Removal of MAC-ehs dependency for CS voice over HSPA other Samsung R2-63 - [WTS] [JSN]
R2-085651 Removal of FFSs and correction to the messages used for UE capability signalling other Samsung R2-63 - [WTS] [JSN]
R2-085652 On MAC parqameter value range and default values other NTT DOCOMO R2-63 - [WTS] [JSN]
R2-085653 Corrections and clarifications on connection control other Samsung R2-63 - [WTS] [JSN]
R2-085654 Removal of FFSs and correction to the messages used for UE capability signalling other Samsung R2-63 - [WTS] [JSN]
R2-085655 Correction to initiation of RRC Connection re-establishment other CMCC R2-63 - [WTS] [JSN]
R2-085656 Correction to the segmentation status field other Samsung R2-63 - [WTS] [JSN]
R2-085657 HARQ RTT Timer other Ericsson R2-63 - [WTS] [JSN]
R2-085658 Corrections and clarifications on measurements other Samsung R2-63 - [WTS] [JSN]
R2-085659 Inter frequency Cell Reselection from macro cell to CSG other Huawei R2-63 - [WTS] [JSN]
R2-085660 Discussion on parameters of inter-RAT cell reselection other CMCC R2-63 - [WTS] [JSN]
R2-085661 CR for inter freq cell reselection from macro cell to CSG (36.304) other Huawei R2-63 - [WTS] [JSN]
R2-085662 Issues on RA failure and RRC re-establishment initiation other NTT DOCOMO R2-63 - [WTS] [JSN]
R2-085663 Need for PCI CSG to be known in the UE other Huawei R2-63 - [WTS] [JSN]
R2-085664 UPH transmission for Dual Cell HSDPA other Samsung R2-63 - [WTS] [JSN]
R2-085665 Happy Bit Analysis other Qualcomm Europe R2-63 - [WTS] [JSN]
R2-085666 Open issues on configurable parameters in MAC other Ericsson R2-63 - [WTS] [JSN]
R2-085667 Proposal to change priority for TA comman reception in RA response in the LTE feature list other NTT DOCOMO R2-63 - [WTS] [JSN]
R2-085668 Email discussion [63_LTE_C03] Can redirection info in connection release be removed? other Huawei R2-63 - [WTS] [JSN]
R2-085669 Email discussion [63_LTE_C01] Home-(e)NB mobility; main issues other Huawei R2-63 - [WTS] [JSN]
R2-085670 Removal of MAC-ehs dependency for CS voice over HSPA other Samsung R2-63 - [WTS] [JSN]
R2-085671 MBSFN overallocation issue other Alcatel-Lucent R2-63 - [WTS] [JSN]
R2-085672 Inclusion of CDMA2000 carrier frequency in inter-RAT handover command to CDMA2000 other LG Electronics Inc. R2-63 - [WTS] [JSN]
R2-085673 Frequency information setting in SIB8 during Inter-RAT handover other LG Electronics Inc. R2-63 - [WTS] [JSN]
R2-085674 (Rapporteur's) Update 36.302 Prague1 (Reception of Simultaneous Physical Channels in Downlink) other Alcatel-Lucent R2-63 - [WTS] [JSN]
R2-085675 Align Measurement Definition other Alcatel-Lucent R2-63 - [WTS] [JSN]
R2-085676 Paging receiving for ETWS capable UEs in RRC_CONNECTED other Huawei R2-63 - [WTS] [JSN]
R2-085677 Paging receiving for ETWS capable UEs in RRC_CONNECTED other Huawei R2-63 - [WTS] [JSN]
R2-085678 Analysis of silent active state switch mechanism for VOIP in CPC LCR TDD other ZTE R2-63 - [WTS] [JSN]
R2-085679 Clarifications on measurement results for 1x RTT other Huawei, Alcatel-Lucent, Motorola, Nortel,Verizon R2-63 - [WTS] [JSN]
R2-085680 Change of C-RNTI other Nokia Corporation, Nokia Siemens Networks R2-63 - [WTS] [JSN]
R2-085681 List for Protection Exception of RRC Messages other Nokia Corporation, Nokia Siemens Networks, Alcatel-Lucent, Samsung, RIM R2-63 - [WTS] [JSN]
R2-085682 Align Number of Cell Identities other Alcatel-Lucent R2-63 - [WTS] [JSN]
R2-085683 Default values for parameters in PUSCH-ConfigDedicated other Ericsson R2-63 - [WTS] [JSN]
R2-085684 Draft TP capturing way forward of measurement handling upon handover, RRC connection re-establishment other Panasonic R2-63 - [WTS] [JSN]
R2-085685 ETWS transmission and reception other HTC Corporation R2-63 - [WTS] [JSN]
R2-085686 Consideration on the PRACH indication for dedicated preamble allocation other CATT R2-63 - [WTS] [JSN]
R2-085687 Removal of cellReservationExtension other NTT DOCOMO R2-63 - [WTS] [JSN]
R2-085688 CR to 36.304 on Removal of cellReservationExtension other NTT DOCOMO R2-63 - [WTS] [JSN]
R2-085689 Proposed CR to 36.321 on SR Clarifications other Nokia Corporation, Nokia Siemens Networks, Ericsson, Samsung R2-63 - [WTS] [JSN]
R2-085690 PDCP open issues other LG Electronics Inc. (Rapporteur) R2-63 - [WTS] [JSN]
R2-085691 Corrections on L1 parameters other LG R2-63 - [WTS] [JSN]
R2-085692 Handling of cellsToReportList other LG R2-63 - [WTS] [JSN]
R2-085693 Sharing of HARQ process IDs of SPS with DS other ITRI R2-63 - [WTS] [JSN]
R2-085694 Clarification on Padding value other Fujitsu R2-63 - [WTS] [JSN]
R2-085695 Correction on SR trigger condition other Fujitsu R2-63 - [WTS] [JSN]
R2-085696 Correction for abortion of RRC connection establishment procedure other Via Technologies R2-63 - [WTS] [JSN]
R2-085697 LS on work split for definition of L2 measurements (S5-081376; to: RAN2; cc: -; contact: Huawei) other SA5 R2-63 - [WTS] [JSN]
R2-085698 Definition of Global Cell Identities and related IEs other IPWireless R2-63 - [WTS] [JSN]
R2-085699 Report on Generic error handling email discussion other NSN R2-63 - [WTS] [JSN]
R2-085700 TP to 36.331 for UE Capability Handling other Vodafone R2-63 - [WTS] [JSN]
R2-085701 Considerations for UTRA Home NB other Vodafone R2-63 - [WTS] [JSN]
R2-085702 Periodic Updates in Connected Mode other Vodafone R2-63 - [WTS] [JSN]
R2-085703 D-SR failure handling other Ericsson, Nokia Siemens Networks R2-63 - [WTS] [JSN]
R2-085704 CR to 36.300 on intra E-UTRAN HO other Huawei R2-63 - [WTS] [JSN]
R2-085705 Email discussion [63_LTE_C01] Home-(e)NB mobility; main issues other Huawei R2-63 - [WTS] [JSN]
R2-085706 UPH transmission for Dual Cell HSDPA other Samsung R2-63 - [WTS] [JSN]
R2-085707 Draft reply LS to S1-082418 = R2-084550 on UE-AMBR support in UTRAN other Vodafone R2-63 - [WTS] [JSN]
R2-085708 Draft reply LS to RAN1 on L1-L3 interaction (to: RAN1; cc: RAN3, RAN4; contact: Qualcomm) other Qualcomm Europe R2-63 - [WTS] [JSN]
R2-085709 Discussion on UE categories for DC-HSDPA operation other Huawei R2-63 - [WTS] [JSN]
R2-085710 Serving Cell Change open issues other Interdigital R2-63 - [WTS] [JSN]
R2-085711 Introduce Intra-SecondaryFrequency Indicator for LCR TDD other ZTE R2-63 - [WTS] [JSN]
R2-085712 HARQ feedback with Enhanced Uplink in Cell_FACH state other InterDigital R2-63 - [WTS] [JSN]
R2-085713 Update of stage 2 description for Enhanced Uplink for CELL_FACH State and Idle mode in FDD other Infineon R2-63 - [WTS] [JSN]
R2-085714 Introduction of support of “Enhanced Uplink for CELL_FACH State in FDD” and “Improved L2 for uplink” other Infineon R2-63 - [WTS] [JSN]
R2-085715 Interaction of DC-HSDPA and Enhanced Serving Cell Change in 25.331 messages other Qualcomm Europe R2-63 - [WTS] [JSN]
R2-085716 Update of stage 2 description for Enhanced Uplink for CELL_FACH State and Idle mode in FDD other Infineon R2-63 - [WTS] [JSN]
R2-085717 Introduction of support of “Enhanced Uplink for CELL_FACH State in FDD” and “Improved L2 for uplink” other Infineon R2-63 - [WTS] [JSN]
R2-085718 Reply LS to R1-082226 = R2-083060 on L1-L3 interaction (to: RAN1; cc: -; contact: Qualcomm) LS out RAN2 R2-63 - [WTS] [JSN]
R2-085719 Reply LS to R1-082763 = R2-083822 on UE Reconfiguration Timing and HS-SCCH Order (to: RAN1; cc: -; contact: Qualcomm) LS out RAN2 R2-63 - [WTS] [JSN]
R2-085720 Addition of UE categories for dual cell HSDPA other Nokia Corporation, Nokia Siemens Networks, Ericsson, Samsung, Qualcomm R2-63 - [WTS] [JSN]
R2-085721 [Draft] LS to RAN WG4 on UE categories for Dual Cell operation (to: RAN4; cc: -; contact: Ericsson) other Ericsson R2-63 - [WTS] [JSN]
R2-085722 [Draft] LS to RAN WG4 on UE categories for Dual Cell operation (to: RAN4; cc: -; contact: Ericsson) other Ericsson R2-63 - [WTS] [JSN]
R2-085723 [Draft] LS to RAN WG4 on UE measurement capability and UE categories for Dual Cell operation (to: RAN4; cc: -; contact: Ericsson) other Ericsson R2-63 - [WTS] [JSN]
R2-085724 Introduction of UE Measurement Capability for DC-HSDPA other Qualcomm Europe R2-63 - [WTS] [JSN]
R2-085725 Clarification of non-used frequency definition for secondary frequency in DC-HSDPA other Qualcomm Europe R2-63 - [WTS] [JSN]
R2-085726 Correct the description of UE behaviour during HS-DSCH Reception in CELL_PCH other Huawei R2-63 - [WTS] [JSN]
R2-085727 Some corrections for Enhanced UE DRX other Huawei R2-63 - [WTS] [JSN]
R2-085728 Remove FFS from the figure for MAC-e details other Huawei R2-63 - [WTS] [JSN]
R2-085729 Introduction of C-Plane solution for MBSFN case other Huawei R2-63 - [WTS] [JSN]
R2-085730 Clarification of common E-DCH resource usage in 25.321 other Nokia Corporation, Nokia Siemens Networks R2-63 - [WTS] [JSN]
R2-085731 PAGING Enhancement for ETWS on UMTS other NTT DoCoMo R2-63 - [WTS] [JSN]
R2-085732 LS to RAN WG4 on UE measurement capability and UE categories for Dual Cell operation (to: RAN4; cc: -; contact: Ericsson) LS out RAN2 R2-63 - [WTS] [JSN]
R2-085733 Text proposals capturing RAN2 agreements for Home NodeB other Qualcomm Europe R2-63 - [WTS] [JSN]
R2-085734 Reply LS to S1-082418 = R2-084550 on UE-AMBR support in UTRAN (to: SA1; cc: SA2, RAN3, GERAN2, CT1, CT4; contact: Vodafone) LS out RAN2 R2-63 - [WTS] [JSN]
R2-085735 [Draft] LS to CT1 on AS/NAS Split for CSG Selection other Vodafone R2-63 - [WTS] [JSN]
R2-085736 Void other - R2-63 - [WTS] [JSN]
R2-085737 Remove FFS from the figure for MAC-e details other Huawei R2-63 - [WTS] [JSN]
R2-085738 Clarification of common E-DCH resource use in 25.321 other Nokia Corporation, Nokia Siemens Networks R2-63 - [WTS] [JSN]
R2-085739 Draft LS on AS/NAS split for CSG selection (to: CT1; cc: -; contact: Vodafone) other Vodafone R2-63 - [WTS] [JSN]
R2-085740 Text proposals for Stage 2 TS on Home NodeB Support other Qualcomm Europe R2-63 - [WTS] [JSN]
R2-085741 Configuration of Multiple Periodicity Patterns for SPS in TDD other Nokia Corporation, Nokia Siemens Networks R2-63 - [WTS] [JSN]
R2-085742 Reply Ls to R2-084952 on NAS message concatenation and multiple EPS bearer setup other Qualcomm Europe R2-63 - [WTS] [JSN]
R2-085743 Reply LS to SA5 to R2-085697 on work split for definition of L2 measurements other Huawei R2-63 - [WTS] [JSN]
R2-085744 Reply LS to R2-084974 on Special Conformance Testing functions for UE (TS 36.509) other Qualcomm Europe R2-63 - [WTS] [JSN]
R2-085745 Reply LS to R2-084978 on NAS trigger for RLF other Alcatel-Lucent R2-63 - [WTS] [JSN]
R2-085746 Pilot list Information for HO to CDMA 1xRTT other Alcatel-Lucent, Nortel, Ericsson, NSN R2-63 - [WTS] [JSN]
R2-085747 PDCP In-sequence Delivery Always On other Qualcomm Europe R2-63 - [WTS] [JSN]
R2-085748 Setting the short MAC-I other Fujitsu R2-63 - [WTS] [JSN]
R2-085749 Configuration of Semi-Persistent Scheduling other Ericsson R2-63 - [WTS] [JSN]
R2-085750 CR to 36.304 on Speed dependent scaling factor for CDMA2000 other Huawei R2-63 - [WTS] [JSN]
R2-085751 Cell reselection towards to CDMA2000 other Huawei R2-63 - [WTS] [JSN]
R2-085752 Value ranges for physical layer parameters other Ericsson R2-63 - [WTS] [JSN]
R2-085753 Need of PDSCH-ConfigDedicated in PhysicalConfigDedicated other Ericsson R2-63 - [WTS] [JSN]
R2-085754 Activation of CQI reporting, Sounding and Scheduling Request other Ericsson R2-63 - [WTS] [JSN]
R2-085755 RACH contention resolution ambiguity other Qualcomm Europe R2-63 - [WTS] [JSN]
R2-085756 Bucket Size Parameter other Qualcomm Europe R2-63 - [WTS] [JSN]
R2-085757 Configuration of DRX Start Offset other Ericsson R2-63 - [WTS] [JSN]
R2-085758 Corrections to MAC-MainConfiguration other Ericsson R2-63 - [WTS] [JSN]
R2-085759 Bucket Size Parameter other Qualcomm Europe R2-63 - [WTS] [JSN]
R2-085760 RRC container-X2.S1 examples other NSN R2-63 - [WTS] [JSN]
R2-085761 Measurement report for Pilot List other Motorola R2-63 - [WTS] [JSN]
R2-085762 CR to 36.300 covering RAN2 #63bis agreements on Home eNB other Qualcomm Europe R2-63 - [WTS] [JSN]
R2-085763 TP to 25.xxx covering RAN2 #63bis agreements on Home eNB other Qualcomm Europe R2-63 - [WTS] [JSN]
R2-085764 Pending SR with SPS other HTC Corporation R2-63 - [WTS] [JSN]
R2-085765 Reflection of RAN1 LS on timing adjustment other LG Electronics Inc, Alcaltel-Lucent, Alcatel Shanghai Bell R2-63 - [WTS] [JSN]
R2-085766 Clarification/correction of the Inter-RAT Mobility Procedure other Nortel, Nokia Siemens Networks, Motorola, Ericsson, Huawei R2-63 - [WTS] [JSN]
R2-085767 Corrections to CDMA System Information and Measurement IE definitions other Nortel, Alcatel-Lucent, Ericsson, Motorola, Verizon, Huawei R2-63 - [WTS] [JSN]
R2-085768 Complete the Actions upon reception of SIB8 Procedure other Nortel, Nokia Siemens Networks, Motorola, Ericsson, Huawei R2-63 - [WTS] [JSN]
R2-085769 Add Hysteresis to the ReportConfigInterRAT IE other Nortel, Nokia Siemens Networks, Motorola, Ericsson, Huawei R2-63 - [WTS] [JSN]
R2-085770 CGI for CDMA2000 other Nortel, Ericsson, Verizon, Huawei R2-63 - [WTS] [JSN]
R2-085771 LS on PCI Clarification (S3-081118; to: RAN2; cc: RAN3; contact: Qualcomm) other SA3 R2-63 - [WTS] [JSN]
R2-085772 Reply LS to R2-084907 on KeNB handling at handover (S3-081121; to: RAN2, RAN3; cc: -; contact: NTT DOCOMO) other SA3 R2-63 - [WTS] [JSN]
R2-085773 Reply LS to R2-083787 on "LS NULL integrity protection algorithm" (S3-081129; to: RAN2, RAN5, CT1; cc: -; contact: NSN) other SA3 R2-63 - [WTS] [JSN]
R2-085774 Reply LS to R2-084876 on "AS Message Exception list" (S3-081130; to: RAN2; cc: -; contact: Nokia) other SA3 R2-63 - [WTS] [JSN]
R2-085775 Reply LS to R2-084898 on "counter check procedure" (S3-081135; to: RAN2; cc: -; contact: Nokia) other SA3 R2-63 - [WTS] [JSN]
R2-085776 Reply LS to R2-084909 on “Intersystem RAT handover security” (S3-081138; to: RAN2; cc: -; contact: NSN) other SA3 R2-63 - [WTS] [JSN]
R2-085777 LS on preventing inter-RAT HO for UE with SIM access (S3-081150; to: RAN3; cc: RAN2, CT1, CT4; contact: Huawei) other SA3 R2-63 - [WTS] [JSN]
R2-085778 On MAC parameter value range and default values other NTT DOCOMO R2-63 - [WTS] [JSN]
R2-085779 Open issues on configurable parameters in MAC other Ericsson R2-63 - [WTS] [JSN]
R2-085780 pdcp-configuration IE and PDCP reconfiguration other Ericsson R2-63 - [WTS] [JSN]
R2-085781 Miscellaneous corrections to 36.300 other Huawei R2-63 - [WTS] [JSN]
R2-085782 Removing of end-time for dedicated preamble other ZTE R2-63 - [WTS] [JSN]
R2-085783 Some Small Corrections to TS 36.300 other CATT R2-63 - [WTS] [JSN]
R2-085784 Removal of T312 other Ericsson R2-63 - [WTS] [JSN]
R2-085785 Draft LS to SA3 on maximum PDCP SDU size other Panasonic R2-63 - [WTS] [JSN]
R2-085786 Reply LS to R3-082373 = R2-084972 on E-UTRAN security related issues (S3-081175; to: RAN3; cc: RAN2; contact: Ericsson) other SA3 R2-63 - [WTS] [JSN]
R2-085787 Correction and Clarification on TTI Bundling other ASUSTeK R2-63 - [WTS] [JSN]
R2-085788 Dedicated preamble transmission and measurement gap other ZTE R2-63 - [WTS] [JSN]
R2-085789 Clarification of DRX Active Time other Ericsson, Nokia Siemens Networks, Nokia Corporation, Sunplus mMobile Inc. R2-63 - [WTS] [JSN]
R2-085790 CQI/ SRS/PMI/RI transmission during active time other Panasonic, Nokia Siemens Networks, Nokia Corporation, Fujitsu R2-63 - [WTS] [JSN]
R2-085791 Text Proposal for Dedicated Preamble Assignment other Ericsson R2-63 - [WTS] [JSN]
R2-085792 Dedicated PRACH indication in handover other CATT R2-63 - [WTS] [JSN]
R2-085793 Message 3 Definition other Nokia Corporation, Nokia Siemens Networks, Samsung R2-63 - [WTS] [JSN]
R2-085794 Correction to prevent wrong contention resolution by adaptive retransmission command other Samsung R2-63 - [WTS] [JSN]
R2-085795 Bucket Size parameter other Qualcomm Europe R2-63 - [WTS] [JSN]
R2-085796 Bucket Size Parameter other Qualcomm Europe R2-63 - [WTS] [JSN]
R2-085797 Text proposal to TS 36.331 for parameter retxBSR-Timer other Ericsson, Nokia Siemens Networks, Nortel, NTT DOCOMO, Qualcomm Europe, Alcatel-Lucent R2-63 - [WTS] [JSN]
R2-085798 Issues on multiple BSRs other LG R2-63 - [WTS] [JSN]
R2-085799 MAC BSR trigger other Motorola R2-63 - [WTS] [JSN]
R2-085800 Correction on PHR triggering condition other Samsung R2-63 - [WTS] [JSN]
R2-085801 Reflection of RAN1 LS on timing adjust other LG Electronics Inc, Alcaltel-Lucent, Alcatel Shanghai Bell, Nokia Corporation, Nokia Siemens Networks R2-63 - [WTS] [JSN]
R2-085802 RACH preambles labelling other Qualcomm Europe R2-63 - [WTS] [JSN]
R2-085803 Addition of MAC padding in random access response, and setting of R bit on DL other Qualcomm Europe, Nokia Siemens Networks R2-63 - [WTS] [JSN]
R2-085804 Correction to MAC PDU Format other LG R2-63 - [WTS] [JSN]
R2-085805 CQI/ SRS/PMI/RI transmission during active time other Panasonic, Nokia Siemens Networks, Nokia Corporation, Fujitsu R2-63 - [WTS] [JSN]
R2-085806 NDI and Msg4 Carrying Contention Resolution ID other LG R2-63 - [WTS] [JSN]
R2-085807 UL HARQ and Measurement Gaps other ASUSTek, CATT, Huawei, LG Electronics Inc., Motorola, NEC, Nokia Corporation, Nokia Siemens Networks R2-63 - [WTS] [JSN]
R2-085808 Clarification about Restarting the Periodic BSR Timer other CATT R2-63 - [WTS] [JSN]
R2-085809 PDCP “in-sequence delivery and duplicate elimination” always on other Ericsson, Infineon, LG Electronics Inc., Qualcomm Europe R2-63 - [WTS] [JSN]
R2-085810 UL HARQ for Message 3 other Qualcomm R2-63 - [WTS] [JSN]
R2-085811 Clarification of AS-NAS concatenation - Stage 2 other NEC, Alcatel-Lucent R2-63 - [WTS] [JSN]
R2-085812 Max allowed Tx power in E-UTRAN other NTT DOCOMO R2-63 - [WTS] [JSN]
R2-085813 Draft Ls to RAN4 on Max allowed Tx power in E-UTRAN other NTT DOCOMO R2-63 - [WTS] [JSN]
R2-085814 LS on UE emission control (R4-082585; to: RAN1, RAN2; cc: RAN3; contact: Motorola) other RAN4 R2-63 - [WTS] [JSN]
R2-085815 Issues Related to Measurements other Motorola R2-63 - [WTS] [JSN]
R2-085816 PRACH resource pattern for TDD other ZTE R2-63 - [WTS] [JSN]
R2-085817 Paging procedure clarifications other Ericsson R2-63 - [WTS] [JSN]
R2-085818 Corrections on radio resource configuration other Ericsson R2-63 - [WTS] [JSN]
R2-085819 Full vs Delta configuration in case of connection re-establishment other Qualcomm Europe R2-63 - [WTS] [JSN]
R2-085820 Corrections and clarifications on connection control other Samsung R2-63 - [WTS] [JSN]
R2-085821 Clarifications on connection establishment other Nokia Corporation, Nokia Siemens Networks R2-63 - [WTS] [JSN]
R2-085822 Clarification on radioResourceConfigDedicated other Nokia Siemens Networks, Nokia Corporation R2-63 - [WTS] [JSN]
R2-085823 Issues regarding Access barred alleviation other VIA Technologies Inc, NTT DOCOMO R2-63 - [WTS] [JSN]
R2-085824 Change of C-RNTI other Nokia Corporation, Nokia Siemens Networks R2-63 - [WTS] [JSN]
R2-085825 SRB for NAS message during RRC connection re-establishment other Panasonic R2-63 - [WTS] [JSN]
R2-085826 Uplink transmission scheme in CPC for LCR TDD other CATT R2-63 - [WTS] [JSN]
R2-085827 Detail of the uplink synchronization procedure in enhanced CELL_FACH for LCR TDD other CATT R2-63 - [WTS] [JSN]
R2-085828 The mechanism in enhanced PCH state for LCR TDD other CATT R2-63 - [WTS] [JSN]
R2-085829 MAC BSR trigger CR other Ericsson, LG, Motorola, NSN, Qualcomm, Samsung R2-63 - [WTS] [JSN]
R2-085830 Clarification with regards to the PDCP state variables other Alcatel-Lucent, Ericsson R2-63 - [WTS] [JSN]
R2-085831 Correction to PDCP functional view other Huawei R2-63 - [WTS] [JSN]
R2-085832 Delivery of PDCP SDU after header decompression other LG R2-63 - [WTS] [JSN]
R2-085833 Correction to UL HARQ Process for the transmission of Msg3 other Huawei, Qualcomm Europe R2-63 - [WTS] [JSN]
R2-085834 SPS Occasions other CATT R2-63 - [WTS] [JSN]
R2-085835 Correction on PHR triggering condition other Samsung R2-63 - [WTS] [JSN]
R2-085836 Report of E-UTRA user plane session other RIM (RAN2 vice chairman) R2-63 - [WTS] [JSN]
R2-085837 Void other - R2-63 - [WTS] [JSN]
R2-085838 Void other - R2-63 - [WTS] [JSN]
R2-085839 Void other - R2-63 - [WTS] [JSN]
R2-085840 Void other - R2-63 - [WTS] [JSN]
R2-085841 Void other - R2-63 - [WTS] [JSN]
R2-085842 Void other - R2-63 - [WTS] [JSN]
R2-085843 Void other - R2-63 - [WTS] [JSN]
R2-085844 Void other - R2-63 - [WTS] [JSN]
R2-085845 Void other - R2-63 - [WTS] [JSN]
R2-085846 Void other - R2-63 - [WTS] [JSN]
R2-085847 Void other - R2-63 - [WTS] [JSN]
R2-085848 Void other - R2-63 - [WTS] [JSN]
R2-085849 Void other - R2-63 - [WTS] [JSN]
R2-085850 Void other - R2-63 - [WTS] [JSN]
R2-085851 Introduction of signalling connection release indication other Qualcomm Europe R2-63 - [WTS] [JSN]
R2-085852 Clarifications on connection release other Nokia Corporation, Nokia Siemens Networks R2-63 - [WTS] [JSN]
R2-085853 Required SIBs prior to RRC connection establishment other NTT DOCOMO R2-63 - [WTS] [JSN]
R2-085854 System information change handling during on-going procduere other Panasonic R2-63 - [WTS] [JSN]
R2-085855 Issues regarding LogicalChannelConfig other Qasara R2-63 - [WTS] [JSN]
R2-085856 Clarification on change of bearer mapping at reconfiguration other Qualcomm Europe R2-63 - [WTS] [JSN]
R2-085857 LS on the start of security on IRAT handover from GERAN/UTRAN (S3-081139; to: CT1, RAN2; cc: -; contact: Nokia) other SA3 R2-63 - [WTS] [JSN]
R2-085858 Measurement handling at inter-frequency handover other NTT DOCOMO R2-63 - [WTS] [JSN]
R2-085859 Value ranges of parameters for intra LTE events other Ericsson R2-63 - [WTS] [JSN]
R2-085860 Measurement event b1 and b2 threshold value ranges other Ericsson R2-63 - [WTS] [JSN]
R2-085861 Corrections and clarifications on measurements other Samsung R2-63 - [WTS] [JSN]
R2-085862 Action of VarMeasurementReports after measurement configuration change other CATT R2-63 - [WTS] [JSN]
R2-085863 Value range of reportAmount, and relevant clarifications other LG Electronics Inc. R2-63 - [WTS] [JSN]
R2-085864 Including serving cell in measurement report other Ericsson R2-63 - [WTS] [JSN]
R2-085865 Draft LS on DRX and TimeToTrigger (to: RAN4; cc: -; contact: Nokia) other Nokia R2-63 - [WTS] [JSN]
R2-085866 Measurements for ICIC other Huawei R2-63 - [WTS] [JSN]
R2-085867 Cleanup of measurement chapters in TS 36.331 other Ericsson R2-63 - [WTS] [JSN]
R2-085868 Measurement Gap Activation other Panasonic R2-63 - [WTS] [JSN]
R2-085869 Handling of cellsToReportList other LG R2-63 - [WTS] [JSN]
R2-085870 Handling of DRBs at Mobility from EUTRA other Ericsson R2-63 - [WTS] [JSN]
R2-085871 Inter-RAT mobility other Samsung R2-63 - [WTS] [JSN]
R2-085872 Text Proposal for Cell Change Order/NACC other Nokia Siement Networks, Nokia Corporation, Ericsson R2-63 - [WTS] [JSN]
R2-085873 Cell Change Order to E-UTRAN other NEC R2-63 - [WTS] [JSN]
R2-085874 Corrections to CDMA System Information and Measurement IE definitions other Nortel, Alcatel-Lucent, Ericsson, Motorola, Verizon, Huawei R2-63 - [WTS] [JSN]
R2-085875 Complete the Actions upon reception of SIB8 Procedure other Nortel, Nokia Siemens Networks, Motorola, Ericsson, Huawei R2-63 - [WTS] [JSN]
R2-085876 Text proposal on concatenation of NAS PDUs other Qualcomm Europe R2-63 - [WTS] [JSN]
R2-085877 Definition of Global Cell Identities and related IEs other IPWireless R2-63 - [WTS] [JSN]
R2-085878 CGI for CDMA2000 other Nortel, Ericsson, Verizon, Huawei R2-63 - [WTS] [JSN]
R2-085879 Miscellaneous minor corrections and updates to ASN.1 other Alcatel-Lucent R2-63 - [WTS] [JSN]
R2-085880 Corrections and clarifications on system information other Samsung R2-63 - [WTS] [JSN]
R2-085881 Draft LS to CT1, SA2 (cc: RAN3) about paging cause removal other NSN R2-63 - [WTS] [JSN]
R2-085882 Handling of optional information elements in system information other Ericsson R2-63 - [WTS] [JSN]
R2-085883 Clarification on system information value tag handling other Nokia Corporation, Nokia Siemens Networks R2-63 - [WTS] [JSN]
R2-085884 Correction on ASN.1 fields of SIB1 other Panasonic R2-63 - [WTS] [JSN]
R2-085885 Clarification of definition of SnonServingCell,x for CDMA2000 RATs other Qualcomm Europe R2-63 - [WTS] [JSN]
R2-085886 CR to 36.304 on black listed cells other Huawei R2-63 - [WTS] [JSN]
R2-085887 Pending SR with SPS other HTC Corporation R2-63 - [WTS] [JSN]
R2-085888 Issues regarding ETWS other NTT DOCOMO R2-63 - [WTS] [JSN]
R2-085889 Update to MeasResultListCDMA2000 other Motorola R2-63 - [WTS] [JSN]
R2-085890 SRB for NAS message during RRC connection re-establishment other Panasonic R2-63 - [WTS] [JSN]
R2-085891 Cleanup of measurement chapters in TS 36.331 other Ericsson R2-63 - [WTS] [JSN]
R2-085892 Paging procedure clarifications other Ericsson R2-63 - [WTS] [JSN]
R2-085893 Measurement Gap Activation other Panasonic R2-63 - [WTS] [JSN]
R2-085894 Change of C-RNTI other Nokia Corporation, Nokia Siemens Networks R2-63 - [WTS] [JSN]
R2-085895 Clarification on radioResourceConfigDedicated other Nokia Siemens Networks, Nokia Corporation R2-63 - [WTS] [JSN]
R2-085896 Measurement Gap Activation other Panasonic R2-63 - [WTS] [JSN]
R2-085897 Inter-RAT mobility other Samsung R2-63 - [WTS] [JSN]
R2-085898 Clarifications on connection release other Nokia Corporation, Nokia Siemens Networks R2-63 - [WTS] [JSN]
R2-085899 Corrections and clarifications on system information other Samsung R2-63 - [WTS] [JSN]
R2-085900 Clarifications on connection release other Nokia Corporation, Nokia Siemens Networks R2-63 - [WTS] [JSN]
R2-085901 Update to MeasResultListCDMA2000 other Motorola R2-63 - [WTS] [JSN]
R2-085902 Cell Change Order to E-UTRAN other NEC R2-63 - [WTS] [JSN]
R2-085903 Handling of optional information elements in system information other Ericsson R2-63 - [WTS] [JSN]
R2-085904 Draft reply LS to R3-01607 = R2-083072 on PRB usage measurements (to: RAN3; cc: SA2; contact: Huawei) other Huawei R2-63 - [WTS] [JSN]
R2-085905 Generic error handling other Samsung R2-63 - [WTS] [JSN]
R2-085906 Miscellaneous corrections to 36.331 other CATT R2-63 - [WTS] [JSN]
R2-085907 Clarification of Key Derivation other CATT R2-63 - [WTS] [JSN]
R2-085908 Including serving cell in measurement report other Ericsson R2-63 - [WTS] [JSN]
R2-085909 Update to MeasResultListCDMA2000 other Motorola R2-63 - [WTS] [JSN]
R2-085910 Reply LS to S1-082418 = R2-084550 on UE-Aggregate Maximum Bit Rate for GERAN/UTRAN (G2-080614; to: SA1, SA2; cc: RAN3, RAN2, CT1, CT4; contact: Vodafone) other GERAN2 R2-63 - [WTS] [JSN]
R2-085911 TP to 36.331 for UE Capability Handling other Vodafone R2-63 - [WTS] [JSN]
R2-085912 CR to 36.300 related to RRC Container definition other Nokia Siemens Networks, Nokia Corporation R2-63 - [WTS] [JSN]
R2-085913 Draft LS to RAN2 on RRC Container definition other NSN R2-63 - [WTS] [JSN]
R2-085914 Removal of UE History Information in TS 36.331 other Vodafone R2-63 - [WTS] [JSN]
R2-085915 CR to 36.300 covering RAN2 #63bis agreements on Home eNB other Qualcomm Europe R2-63 - [WTS] [JSN]
R2-085916 Update to MeasResultListCDMA2000 other Motorola R2-63 - [WTS] [JSN]
R2-085917 Optionality of RAI reporting for ANR other Ericsson R2-63 - [WTS] [JSN]
R2-085918 Reporting content for supporting SON-ANR other CATT R2-63 - [WTS] [JSN]
R2-085919 Value ranges of parameters for intra LTE events other Ericsson R2-63 - [WTS] [JSN]
R2-085920 Update to MeasResultListCDMA2000 other Motorola R2-63 - [WTS] [JSN]
R2-085921 Report of LTE CP session other Samsung (RAN2 chairman) R2-63 - [WTS] [JSN]
R2-085922 Draft reply LS to R3-082363 = R2-084970 other Alcatel-Lucent R2-63 - [WTS] [JSN]
R2-085923 MAC BSR trigger CR other Motorola, Ericsson, LG, NSN, Qualcomm, Samsung R2-63 - [WTS] [JSN]
R2-085924 Clarification about restarting the PERIODIC BSR TIMER other CATT R2-63 - [WTS] [JSN]
R2-085925 CR to 36.300 related to RRC Container definition other Nokia Siemens Networks, Nokia Corporation R2-63 - [WTS] [JSN]
R2-085926 Final LS to RAN2 on RRC Container definition (contact: NSN) other RAN2 R2-63 - [WTS] [JSN]
R2-085927 Configuration of Semi-Persistent Scheduling other Ericsson R2-63 - [WTS] [JSN]
R2-085928 LS on Rules for RRC Container vs X2/S1 application protocol (to: RAN3; cc: -; contact: NSN) LS out RAN2 R2-63 - [WTS] [JSN]
R2-085929 Corrections to MAC-MainConfiguration other Ericsson R2-63 - [WTS] [JSN]
R2-085930 Need of PDSCH-ConfigDedicated in PhysicalConfigDedicated other Ericsson R2-63 - [WTS] [JSN]
R2-085931 Configuration of the Time Alignment Timer other Ericsson R2-63 - [WTS] [JSN]
R2-085932 Measurement gaps and SPS other Qualcomm Europe R2-63 - [WTS] [JSN]
R2-085933 Max allowed Tx power in E-UTRAN other NTT DOCOMO R2-63 - [WTS] [JSN]
R2-085934 Bucket Size Parameter other Qualcomm Europe R2-63 - [WTS] [JSN]
R2-085935 Configuration of the Time Alignment Timer other Ericsson R2-63 - [WTS] [JSN]
R2-085936 Offline discussion summary and proposed way forward on R2-085662 other NTT DOCOMO R2-63 - [WTS] [JSN]
R2-085937 Correction of RA procedure initiated by eNode B PDCCH order other NTT DOCOMO R2-63 - [WTS] [JSN]
R2-085938 TP to 36.331 to removed T312 other NTT DOCOMO R2-63 - [WTS] [JSN]
R2-085939 pdcp-configuration IE and PDCP reconfiguration other Ericsson R2-63 - [WTS] [JSN]
R2-085940 Miscellaneous corrections to 36.300 other Huawei R2-63 - [WTS] [JSN]
R2-085941 TP to 36.331 for UE Capability Handling other Vodafone R2-63 - [WTS] [JSN]
R2-085942 Clarification of Key Derivation other CATT R2-63 - [WTS] [JSN]
R2-085943 TP to 36.331 to removed T312 other NTT DOCOMO R2-63 - [WTS] [JSN]
R2-085944 Draft LS to RAN1 related to R2-085943 other Qualcomm Europe R2-63 - [WTS] [JSN]
R2-085945 Correction on PHR triggering condition other Samsung R2-63 - [WTS] [JSN]
R2-085946 Draft LS to SA2 (cc: CT1, CT4) on Duplicate detection for ETWS other NTT DOCOMO R2-63 - [WTS] [JSN]
R2-085947 Correction to UL HARQ Process for the transmission of Msg3 other Huawei, Qualcomm Europe R2-63 - [WTS] [JSN]
R2-085948 PDCP “in-sequence delivery and duplicate elimination” always on other Ericsson, Infineon, LG Electronics Inc., Qualcomm Europe R2-63 - [WTS] [JSN]
R2-085949 D-SR failure handling other Ericsson, Nokia Siemens Networks R2-63 - [WTS] [JSN]
R2-085950 Text proposal to TS 36.331 for parameter retxBSR-Timer other Ericsson, Nokia Siemens Networks, Nortel, NTT DOCOMO, Qualcomm Europe, Alcatel-Lucent R2-63 - [WTS] [JSN]
R2-085951 Measurement gaps and SPS other Qualcomm Europe R2-63 - [WTS] [JSN]
R2-085952 TP to 36.331 for UE Capability Handling other Vodafone R2-63 - [WTS] [JSN]
R2-085953 D-SR failure handling other Ericsson, Nokia Siemens Networks R2-63 - [WTS] [JSN]
R2-085954 LS on Paging cause in TS36.331 (to: CT1, SA2; cc: RAN3; contact: NSN) LS out RAN2 R2-63 - [WTS] [JSN]
R2-085955 Reply LS to SA5 to R2-085697 on work split for definition of L2 measurements other Huawei R2-63 - [WTS] [JSN]
R2-085956 Reply LS to C1-083626 = R2-084952 on NAS message concatenation and multiple EPS bearer setup (to: CT1, RAN3; cc: CT4; contact: Qualcomm) LS out RAN2 R2-63 - [WTS] [JSN]
R2-085957 DRAFT LS on maximum PDCP SDU size (to: SA3, CT1, SA2; cc: -; contact: Panasonic) other Panasonic R2-63 - [WTS] [JSN]
R2-085958 LS on Maximum allowed transmission power on the uplink (to: RAN4; cc: RAN1; contact: NTT DOCOMO) LS out RAN2 R2-63 - [WTS] [JSN]
R2-085959 Reply LS to R2-084978 on NAS trigger for RLF other Alcatel-Lucent R2-63 - [WTS] [JSN]
R2-085960 DRAFT LS on maximum PDCP SDU size (to: SA3, CT1, SA2; cc: -; contact: Panasonic) other Panasonic R2-63 - [WTS] [JSN]
R2-085961 LS on AS/NAS split for CSG selection (to: CT1; cc: -; contact: Vodafone) LS out RAN2 R2-63 - [WTS] [JSN]
R2-085962 Issues regarding ETWS other NTT DOCOMO R2-63 - [WTS] [JSN]
R2-085963 LS on Duplicate detection for ETWS (to: SA2; cc: CT1, CT4; contact: NTT DOCOMO) LS out RAN2 R2-63 - [WTS] [JSN]
R2-085964 Reply LS to R5-083665 = R2-084974 on Special Conformance Testing functions for UE (to: RAN5; cc: -; contact: Qualcomm) LS out RAN2 R2-63 - [WTS] [JSN]
R2-085965 DRAFT LS on maximum PDCP SDU size (to: SA3, CT1, SA2; cc: -; contact: Panasonic) other Panasonic R2-63 - [WTS] [JSN]
R2-085966 LS on Virtual CRC for DL data arrival (to: RAN1; cc: -; contact: Qualcomm) LS out RAN2 R2-63 - [WTS] [JSN]
R2-085967 Corrections to MAC-MainConfiguration other Ericsson R2-63 - [WTS] [JSN]
R2-085968 Response LS to R3-082363 = R2-084970 on Coding of Global Cell id and Global eNB ID (to: RAN3; cc: SA2; contact: Alcatel-Lucent) LS out RAN2 R2-63 - [WTS] [JSN]
R2-085969 CR to 36.300 covering RAN2 #63bis agreements on Home eNB other Qualcomm Europe R2-63 - [WTS] [JSN]
R2-085970 Reply LS to S5-081376 = R2-085697 on work split for definition of L2 measurements (to: SA5; cc: RAN3; contact: Huawei) LS out RAN2 R2-63 - [WTS] [JSN]
R2-085971 Final report of RAN2 #63, Jeju, Korea, 18.08.-22.08.2008 other ETSI MCC R2-63 - [WTS] [JSN]
R2-085972 Response LS to S2-086378 = R2-084978 on Connection recovery by NAS (to: SA2; cc: CT1, RAN1, RAN3; contact: Alcatel-Lucent) LS out RAN2 R2-63 - [WTS] [JSN]
R2-085973 LS on maximum PDCP SDU size (to: SA3, CT1, SA2; cc: -; contact: Panasonic) LS out RAN2 R2-63 - [WTS] [JSN]
R2-085974 Detailed operation on the HS-DSCH transmission in PCH state other ZTE Corporation R2-63 - [WTS] [JSN]
R2-085975 Some clarifications for enhanced CELL_FACH state other ZTE Corporation R2-63 - [WTS] [JSN]
R2-085976 LS on DRX and TimeToTrigger (to: RAN4; cc: -; contact: Nokia) other RAN2 R2-63 - [WTS] [JSN]
R2-085977 Void other - R2-63 - [WTS] [JSN]
R2-085978 Miscellaneous corrections and clarifications other Rapporteur (Samsung) R2-63 - [WTS] [JSN]
R2-085979 Revision of 36.331 CR to include "Need" changes other Alcatel-Lucent R2-63 - [WTS] [JSN]
R2-085980 Reply LS to C1-083626 = R2-084952 on NAS message concatenation and multiple EPS bearer setup (to: CT1, RAN3; cc: CT4; contact: Qualcomm) other RAN2 R2-63 - [WTS] [JSN]
R2-085981 SPS Occasions other CATT R2-63 - [WTS] [JSN]
R2-085982 Open issues list for TS 36.304 other Nokia R2-63 - [WTS] [JSN]
R2-085983 Open issues list for TS 36.321 other Ericsson R2-63 - [WTS] [JSN]
R2-085984 Open issues list for TS 36.323 other LG R2-63 - [WTS] [JSN]
R2-085985 Open issues list for TS 36.331 other Samsung R2-63 - [WTS] [JSN]
R2-085986 Void other - R2-63 - [WTS] [JSN]
R2-085987 Void other - R2-63 - [WTS] [JSN]
R2-085988 Void other - R2-63 - [WTS] [JSN]
R2-085989 Void other - R2-63 - [WTS] [JSN]
R2-085990 Void other - R2-63 - [WTS] [JSN]
R2-085991 Void other - R2-63 - [WTS] [JSN]
R2-085992 Void other - R2-63 - [WTS] [JSN]
R2-085993 Void other - R2-63 - [WTS] [JSN]
R2-085994 Void other - R2-63 - [WTS] [JSN]
R2-085995 Void other - R2-63 - [WTS] [JSN]
R2-085996 Void other - R2-63 - [WTS] [JSN]
R2-085997 Void other - R2-63 - [WTS] [JSN]
R2-085998 Void other - R2-63 - [WTS] [JSN]
R2-085999 Void other - R2-63 - [WTS] [JSN]

1060 documents (1.292732000351 seconds)