Please enter the search related information in the fields below. Partial information works, e.g. "SP-21" in the "tdoc" field lists all TSG SA documents from 2021. Regular expressions mostly work in all fields (e.g. "2[34].501" in the "Spec" field lists all documents related to 23.501 and 24.501. Capitalization is disregarded, i.e. "3GPP" gives the same results as "3gpp".
Download results in JSON format
| tdoc | Title | Type / Revs | Source | Spec / CR | S/WID | Release | Meeting | Status | Links |
|---|---|---|---|---|---|---|---|---|---|
| R2-084940 | Proposed agenda for RAN2 #63bis, Prague, Czech Republic, 29.09.-03.10.2008 | other | Samsung (RAN2 chairman) | R2-63 | - | [WTS] [JSN] | |||
| R2-084941 | Draft report of RAN2 #63, Jeju, Korea, 18.08.-22.08.2008 | other | ETSI MCC | R2-63 | - | [WTS] [JSN] | |||
| R2-084942 | LS on Terminology alignment for Home Node B and Home eNode B (S1-082397; to: GERAN, RAN, CT; cc: -; contact: T-Mobile) | other | SA1 | R2-63 | - | [WTS] [JSN] | |||
| R2-084943 | Reply LS to R2-083785 on additional RSRP trigger for ICIC (R1-083272; to: RAN2; cc: RAN3; contact: Ericsson) | other | RAN1 | R2-63 | - | [WTS] [JSN] | |||
| R2-084944 | LS on TBS table and UL TTI bundling adjustments (R1-083273; to: RAN2; cc: RAN4; contact: Ericsson) | other | RAN1 | R2-63 | - | [WTS] [JSN] | |||
| R2-084945 | LS on Consequence analysis of Low/ Medium features in LTE Rel-8 (R1-083364; to: RAN2, RAN5; cc: RAN4; contact: NTT DOCOMO) | other | RAN1 | R2-63 | - | [WTS] [JSN] | |||
| R2-084946 | LS on PRACH power control (R1-083365; to: RAN2; cc: RAN4; contact: LG) | other | RAN1 | R2-63 | - | [WTS] [JSN] | |||
| R2-084947 | LS on E-UTRA RRM Main Open Issues in RAN5 (R5-083801; to: RAN4, RAN2; cc: -; contact: Motorola) | other | RAN5 | R2-63 | - | [WTS] [JSN] | |||
| R2-084948 | LS on access control for CSG cells (C1-083429; to: SA2, CT4; cc: RAN2, RAN3; contact: Qualcomm) | other | CT1 | R2-63 | - | [WTS] [JSN] | |||
| R2-084949 | LS on Identifiers for HeNB (C1-083612; to: RAN2, RAN3, SA2; cc: -; contact: Vodafone) | other | CT1 | R2-63 | - | [WTS] [JSN] | |||
| R2-084950 | Reply LS to R2-083786 on ETWS (C1-083623; to: RAN2, RAN3; cc: SA1, SA2; contact: NTT DOCOMO) | other | CT1 | R2-63 | - | [WTS] [JSN] | |||
| R2-084951 | Reply LS to S1-082341 = R2-084521 on HNB/HeNB Open Access Mode (C1-083625; to: SA1; cc: RAN2; contact: Telecom Italia) | other | CT1 | R2-63 | - | [WTS] [JSN] | |||
| R2-084952 | LS on NAS message concatenation and multiple EPS bearer setup (C1-083626; to: RAN2, RAN3; cc: CT4; contact: Qualcomm) | other | CT1 | R2-63 | - | [WTS] [JSN] | |||
| R2-084953 | LS on Protocol Decision on GTP User Plane (C4-082382; to: SA2, RAN2, RAN3; cc: CT1, CT3; contact: Ericsson) | other | CT4 | R2-63 | - | [WTS] [JSN] | |||
| R2-084954 | LS on Definition of Globally Unique Temporary UE Identity (C4-082513; to: SA2, SA1, SA3, RAN2, RAN3, CT1, CT3; cc: -; contact: Alcatel-Lucent) | other | CT4 | R2-63 | - | [WTS] [JSN] | |||
| R2-084955 | Reply LS to S1-080769 = R2-083082 on CSG related mobility (stage 2 text) (GP-081307; to: SA1; cc: SA2, RAN2, RAN3, RAN4, RAN1; contact: Huawei) | other | GERAN | R2-63 | - | [WTS] [JSN] | |||
| R2-084956 | LS on ETWS (GP-081310; to: SA1, SA2, SA3, CT1; cc: RAN2, RAN3; contact: Ericsson) | other | GERAN | R2-63 | - | [WTS] [JSN] | |||
| R2-084957 | LS on reporting E-UTRAN measurements (GP-081347; to: RAN4; cc: RAN2; contact: NSN) | other | GERAN | R2-63 | - | [WTS] [JSN] | |||
| R2-084958 | LS on SRVCC target cell selection (GP-081425; to: SA2; cc: RAN2; contact: NSN) | other | GERAN | R2-63 | - | [WTS] [JSN] | |||
| R2-084959 | Response to 3GPP to C4-081019 = R2-082067 on Messaging Support for Network Based Location Technologies on User Plane (OMA-LS_751; to: CT4, SA2; cc: RAN2, RAN3; contact: Sprint) | other | LOCATION WG of OMA | R2-63 | - | [WTS] [JSN] | |||
| R2-084960 | LS on PDCCH DCI format 1C (R1-083416; to: RAN2; cc: -; contact: LG) | other | RAN1 | R2-63 | - | [WTS] [JSN] | |||
| R2-084961 | LS on CSG cell identification (R1-083424; to: RAN2, RAN4; cc: RAN3; contact: Qualcomm) | other | RAN1 | R2-63 | - | [WTS] [JSN] | |||
| R2-084962 | LS reply to R2-084764 on considerations on transport block sizes for VoIP (R1-083429; to: RAN2; cc: RAN4; contact: Ericsson) | other | RAN1 | R2-63 | - | [WTS] [JSN] | |||
| R2-084963 | LS Reply to R2-083779 on Uplink grant format in Random Access Response (R1-083431; to: RAN2; cc: -; contact: Qualcomm) | other | RAN1 | R2-63 | - | [WTS] [JSN] | |||
| R2-084964 | LS Response to LS R2-082893 on information about new PDCCH Format 1C and LS on SI Scheduling (R1-083432; to: RAN2; cc: -; contact: Motorola) | other | RAN1 | R2-63 | - | [WTS] [JSN] | |||
| R2-084965 | LS on Improved EUL power control at UE power limitation (R1-083440; to: RAN2, RAN3; cc: -; contact: Ericsson) | other | RAN1 | R2-63 | - | [WTS] [JSN] | |||
| R2-084966 | LS on UL SRI Parameters Configuration (R1-083450; to: RAN2; cc: -; contact: CATT) | other | RAN1 | R2-63 | - | [WTS] [JSN] | |||
| R2-084967 | LS on timing adjustment (R1-083452; to: RAN2, RAN4; cc: -; contact: LG) | other | RAN1 | R2-63 | - | [WTS] [JSN] | |||
| R2-084968 | LS on measurement gap (R1-083454; to: RAN2; cc: RAN4; contact: Panasonic) | other | RAN1 | R2-63 | - | [WTS] [JSN] | |||
| R2-084969 | LS on support of TDD ACK/NACK multiplexing in Rel-8 (R1-083465; to: RAN2; cc: RAN4; contact: Texas Instruments) | other | RAN1 | R2-63 | - | [WTS] [JSN] | |||
| R2-084970 | LS on Coding of Global Cell id and Global eNB ID (R3-082363; to: RAN2, SA2; cc: -; contact: Alcatel-Lucent) | other | RAN3 | R2-63 | - | [WTS] [JSN] | |||
| R2-084971 | LS on SAE Bearer/ E-RAB definition for E-UTRAN specification (R3-082366; to: SA2, RAN2, CT1, CT4; cc: -; contact: Alcatel-Lucent) | other | RAN3 | R2-63 | - | [WTS] [JSN] | |||
| R2-084972 | LS on E-UTRAN security related issues (R3-082373; to: SA3; cc: RAN2; contact: Qualcomm) | other | RAN3 | R2-63 | - | [WTS] [JSN] | |||
| R2-084973 | LS reply to R1-082762 = R2-083821 on CSG cell identification (R4-082190; to: RAN1, RAN2; cc: -; contact: Motorola) | other | RAN4 | R2-63 | - | [WTS] [JSN] | |||
| R2-084974 | LS on Special Conformance Testing functions for UE (TS 36.509) (R5-083665; to: RAN2; cc: RAN; contact: Rohde & Schwarz) | other | RAN5 | R2-63 | - | [WTS] [JSN] | |||
| R2-084975 | LS on the addition of CS voice over HSPA radio bearer combinations to TS 34.108 (R5-083690; to: RAN1, RAN2; cc: -; contact: Nokia) | other | RAN5 | R2-63 | - | [WTS] [JSN] | |||
| R2-084976 | Response LS to R2-084823 on HSPA Rel-8 Feature Dependencies (RP-080748; to: RAN2; cc: -; contact: Nokia) | other | RAN | R2-63 | - | [WTS] [JSN] | |||
| R2-084977 | Reply LS to R2-084902 on Paging UE Identity for CS Fallback (S2-086147; to: RAN2; cc: CT1, RAN3; contact: Huawei) | other | SA2 | R2-63 | - | [WTS] [JSN] | |||
| R2-084978 | Response LS to R2-082895 and C1-082800 = R2-083672 on Connection recovery by NAS (S2-086378; to: CT1, RAN2, RAN3; cc: RAN1; contact: Vodafone) | other | SA2 | R2-63 | - | [WTS] [JSN] | |||
| R2-084979 | Reply LS to R3-081607 = R2-083072 on Load balancing signalling on QCI (S2-086388; to: RAN3; cc: RAN2; contact: Ericsson) | other | SA2 | R2-63 | - | [WTS] [JSN] | |||
| R2-084980 | Reply LS to R2-083781 on AMBR Enforcement (S2-086390; to: RAN2; cc: RAN3, CT1; contact: Qualcomm) | other | SA2 | R2-63 | - | [WTS] [JSN] | |||
| R2-084981 | Reply-LS to G2-080228 = R2-082024 and R2-082884 on Applicability of “subscriber type” indication for UTRAN & GERAN (S2-086392; to: GERAN2; cc: RAN2, RAN3; contact: Huawei) | other | SA2 | R2-63 | - | [WTS] [JSN] | |||
| R2-084982 | Reply LS to C4-082513 = R2-084954 on Definition of Globally Unique Temporary UE Identity (S2-086397; to: CT4, CT; cc: SA1, SA3, RAN2, RAN3, CT1, CT3; contact: Alcatel-Lucent) | other | SA2 | R2-63 | - | [WTS] [JSN] | |||
| R2-084983 | LS on Guidance for ARP Values (S2-086405; to: SA1; cc: RAN2, RAN3; contact: Motorola) | other | SA2 | R2-63 | - | [WTS] [JSN] | |||
| R2-084984 | LS on UE Radio Capabilities (S2-086410; to: RAN; cc: SA, RAN2; contact: Vodafone) | other | SA2 | R2-63 | - | [WTS] [JSN] | |||
| R2-084985 | LS reply to R2-082899 on CSG cell identification (R4-082191; to: RAN2, RAN1; cc: -; contact: Motorola) | other | RAN4 | R2-63 | - | [WTS] [JSN] | |||
| R2-084986 | Void | other | - | R2-63 | - | [WTS] [JSN] | |||
| R2-084987 | Void | other | - | R2-63 | - | [WTS] [JSN] | |||
| R2-084988 | Updated report of RAN2 #63, Jeju, Korea, 18.08.-22.08.2008 | other | ETSI MCC | R2-63 | - | [WTS] [JSN] | |||
| R2-084989 | RAN WG2 compendium v1.0 | other | ETSI MCC | R2-63 | - | [WTS] [JSN] | |||
| R2-084990 | Active Time Clarifications | other | Nokia Corporation, Nokia Siemens Networks | R2-63 | - | [WTS] [JSN] | |||
| R2-084991 | Proposed CR to 36.321 on Active Time Clarifications | other | Nokia Corporation, Nokia Siemens Networks, Panasonic, Qualcomm Europe, Sunplus mMobile Inc. | R2-63 | - | [WTS] [JSN] | |||
| R2-084992 | Proposed CR to 36.300 on Contention Resolution | other | Nokia Siemens Networks (Rapporteur) | R2-63 | - | [WTS] [JSN] | |||
| R2-084993 | Proposed CR to 36.300 on ETWS SIB | other | Nokia Siemens Networks (Rapporteur) | R2-63 | - | [WTS] [JSN] | |||
| R2-084994 | Proposed CR to 36.300 on Security Overview | other | Nokia Siemens Networks (Rapporteur) | R2-63 | - | [WTS] [JSN] | |||
| R2-084995 | Uplink HARQ Operation and Measurement Gaps | other | Nokia Corporation, Nokia Siemens Networks | R2-63 | - | [WTS] [JSN] | |||
| R2-084996 | Proposed CR to 36.321 on UL HARQ and Measurement Gaps | other | Nokia Corporation, Nokia Siemens Networks | R2-63 | - | [WTS] [JSN] | |||
| R2-084997 | NDI Handling | other | Nokia Corporation, Nokia Siemens Networks, Samsung | R2-63 | - | [WTS] [JSN] | |||
| R2-084998 | HARQ processes for TTI bundling in TDD | other | Nokia Corporation, Nokia Siemens Networks, Samsung | R2-63 | - | [WTS] [JSN] | |||
| R2-084999 | Proposed CR to 36.321 on Message 3 Definition | other | Nokia Corporation, Nokia Siemens Networks, Samsung | R2-63 | - | [WTS] [JSN] | |||
| R2-085000 | Proposed CR to 36.321 on PHR and BSR Periodic Timer Start | other | Nokia Corporation, Nokia Siemens Networks | R2-63 | - | [WTS] [JSN] | |||
| R2-085001 | Proposed CR to 36.321 on Reference to PHR calculation | other | Nokia Corporation, Nokia Siemens Networks, Samsung | R2-63 | - | [WTS] [JSN] | |||
| R2-085002 | Proposed CR to 36.321 on SR Clarifications | other | Nokia Corporation, Nokia Siemens Networks, Ericsson | R2-63 | - | [WTS] [JSN] | |||
| R2-085003 | Proposed CR to 36.321 on Usage of RRC Parameters | other | Nokia Corporation, Nokia Siemens Networks | R2-63 | - | [WTS] [JSN] | |||
| R2-085004 | Proposed CR to 36.321 on Timer Definitions | other | Nokia Corporation, Nokia Siemens Networks | R2-63 | - | [WTS] [JSN] | |||
| R2-085005 | Proposed CR to 36.321 on TAT and RACH Procedure | other | Nokia Corporation, Nokia Siemens Networks | R2-63 | - | [WTS] [JSN] | |||
| R2-085006 | CQI Reporting and PDCCH Reception During Active Time | other | interdigital | R2-63 | - | [WTS] [JSN] | |||
| R2-085007 | Counting PDU/PDU Segment Retransmissions | other | interdigital | R2-63 | - | [WTS] [JSN] | |||
| R2-085008 | Corrections to RadioResourceConfigDedicated | other | Qasara | R2-63 | - | [WTS] [JSN] | |||
| R2-085009 | Corrections to RadioResourceConfigDedicated | other | Qasara | R2-63 | - | [WTS] [JSN] | |||
| R2-085010 | Limitations on PDCP/RLC SDU into MAC TB processing | other | NXP, Infineon | R2-63 | - | [WTS] [JSN] | |||
| R2-085011 | Allowing time for HARQ on RRCConnectionReject | other | Qasara | R2-63 | - | [WTS] [JSN] | |||
| R2-085012 | Issues regarding LogicalChannelConfig | other | Qasara | R2-63 | - | [WTS] [JSN] | |||
| R2-085013 | RRCTransactionId in UL/DL InfoTransfer messages | other | Qasara | R2-63 | - | [WTS] [JSN] | |||
| R2-085014 | Limitations on PDCP/RLC SDU into MAC TB processing | other | NXP, Infineon | R2-63 | - | [WTS] [JSN] | |||
| R2-085015 | Limitations on PDCP/RLC SDU into MAC TB processing | other | NXP, Infineon | R2-63 | - | [WTS] [JSN] | |||
| R2-085016 | Required SIBs prior to RRC connection establishment | other | NTT DOCOMO | R2-63 | - | [WTS] [JSN] | |||
| R2-085017 | Required SIBs prior to RRC connection establishment | other | NTT DOCOMO | R2-63 | - | [WTS] [JSN] | |||
| R2-085018 | Measurement Gaps and Semi-persistent Scheduling | other | Alcatel-Lucent, Alcatel Shanghai Bell | R2-63 | - | [WTS] [JSN] | |||
| R2-085019 | Measurement Gaps and Semi-persistent Scheduling | other | Alcatel-Lucent, Alcatel Shanghai Bell | R2-63 | - | [WTS] [JSN] | |||
| R2-085020 | Measurement Gaps and Semi-persistent Scheduling | other | Alcatel-Lucent, Alcatel Shanghai Bell | R2-63 | - | [WTS] [JSN] | |||
| R2-085021 | Measurement Gaps and Semi-persistent Scheduling | other | Alcatel-Lucent, Alcatel Shanghai Bell | R2-63 | - | [WTS] [JSN] | |||
| R2-085022 | Measurement Gaps and Semi-persistent Scheduling | other | Alcatel-Lucent, Alcatel Shanghai Bell | R2-63 | - | [WTS] [JSN] | |||
| R2-085023 | CR on Timing Advance MAC Control Element | other | Alcatel-Lucent, Alcatel Shanghai Bell | R2-63 | - | [WTS] [JSN] | |||
| R2-085024 | CR on MAC payload for Random Access Response | other | Alcatel-Lucent, Alcatel Shanghai Bell | R2-63 | - | [WTS] [JSN] | |||
| R2-085025 | Correction and Clarification on TTI Bundling | other | ASUSTeK | R2-63 | - | [WTS] [JSN] | |||
| R2-085026 | Interactions between measurement gap and Msg3 transmission | other | ASUSTeK | R2-63 | - | [WTS] [JSN] | |||
| R2-085027 | Handling SPS resources at TA timer expiry | other | ASUSTeK | R2-63 | - | [WTS] [JSN] | |||
| R2-085028 | PAGING Enhancement for ETWS on UMTS | other | NTT DOCOMO | R2-63 | - | [WTS] [JSN] | |||
| R2-085029 | Proposed CR to 36.321 on UL Transmission with Empty Buffer | other | Nokia Corporation, Nokia Siemens Networks | R2-63 | - | [WTS] [JSN] | |||
| R2-085030 | Proposed modification to the value range of PollPDU | other | Nokia Corporation, Nokia Siemens Networks, Samsung | R2-63 | - | [WTS] [JSN] | |||
| R2-085031 | Proposed CR for aligning the construction of partial Status PDUs with intended operation | other | Nokia Corporation, Nokia Siemens Networks, NTT DOCOMO, Inc., Samsung | R2-63 | - | [WTS] [JSN] | |||
| R2-085032 | Proposed CR on starting T_status_prohibit after sending a partial Status PDU | other | Nokia Corporation, Nokia Siemens Networks | R2-63 | - | [WTS] [JSN] | |||
| R2-085033 | Fixing radio-frame over-allocation for MBSFN | other | Nokia Corporation, Nokia Siemens Networks, ZTE | R2-63 | - | [WTS] [JSN] | |||
| R2-085034 | Changes to 36.300 on security part | other | Orange | R2-63 | - | [WTS] [JSN] | |||
| R2-085035 | Restriction to indicated RAT at redirection from UTRAN | other | Orange | R2-63 | - | [WTS] [JSN] | |||
| R2-085036 | Proposed CR to 36.321 on PHR Reporting Values | other | Nokia Corporation, Nokia Siemens Networks | R2-63 | - | [WTS] [JSN] | |||
| R2-085037 | PDCP entity establishment | other | Nokia Corporation, Nokia Siemens Networks | R2-63 | - | [WTS] [JSN] | |||
| R2-085038 | Discussion on addition of UE categories for dual cell HSDPA | other | Nokia, Nokia Siemens Networks | R2-63 | - | [WTS] [JSN] | |||
| R2-085039 | Discussion on addition of UE categories for dual cell HSDPA | other | Nokia, Nokia Siemens Networks | R2-63 | - | [WTS] [JSN] | |||
| R2-085040 | Discussion on addition of UE categories for dual cell HSDPA | other | Nokia, Nokia Siemens Networks | R2-63 | - | [WTS] [JSN] | |||
| R2-085041 | MAC Architecture Model | other | ETRI | R2-63 | - | [WTS] [JSN] | |||
| R2-085042 | MAC Architecture Model | other | ETRI | R2-63 | - | [WTS] [JSN] | |||
| R2-085043 | MAC Architecture Model | other | ETRI | R2-63 | - | [WTS] [JSN] | |||
| R2-085044 | Proposed CR to 36.321 on Timing Advance Values | other | Nokia Corporation, Nokia Siemens Networks | R2-63 | - | [WTS] [JSN] | |||
| R2-085045 | Discussion on addition of UE categories for dual cell HSDPA | other | Nokia, Nokia Siemens Networks | R2-63 | - | [WTS] [JSN] | |||
| R2-085046 | Discussion on addition of UE categories for dual cell HSDPA | other | Nokia, Nokia Siemens Networks | R2-63 | - | [WTS] [JSN] | |||
| R2-085047 | Proposed CR 25.305: Support for additional navigation satellite systems in UTRAN | other | Qualcomm Europe | R2-63 | - | [WTS] [JSN] | |||
| R2-085048 | Proposed CR 25.331: Support for additional navigation satellite systems in RRC | other | Qualcomm Europe | R2-63 | - | [WTS] [JSN] | |||
| R2-085049 | Proposed CR 25.306: UE positioning capabilities for support of additional navigation satellite systems | other | Qualcomm Europe | R2-63 | - | [WTS] [JSN] | |||
| R2-085050 | Addition of UE categories for dual cell HSDPA | other | Nokia Corporation, Nokia Siemens Networks | R2-63 | - | [WTS] [JSN] | |||
| R2-085051 | Corrections related to the cell update wait timer T320 | other | Infineon | R2-63 | - | [WTS] [JSN] | |||
| R2-085052 | UE Aggregate Maximum Bit Rate for UTRAN | other | Vodafone | R2-63 | - | [WTS] [JSN] | |||
| R2-085053 | HARQ operation after completion of RA procedure | other | ASUSTeK | R2-63 | - | [WTS] [JSN] | |||
| R2-085054 | HARQ operation for SPS | other | ASUSTeK | R2-63 | - | [WTS] [JSN] | |||
| R2-085055 | UE specific paging DRX handling | other | Nokia Corporation, Nokia Siemens Networks | R2-63 | - | [WTS] [JSN] | |||
| R2-085056 | Clarifications on connection establishment | other | Nokia Corporation, Nokia Siemens Networks | R2-63 | - | [WTS] [JSN] | |||
| R2-085057 | Clarifications on connection release | other | Nokia Corporation, Nokia Siemens Networks | R2-63 | - | [WTS] [JSN] | |||
| R2-085058 | Inter-RAT HO failure timer handling | other | Nokia Corporation, Nokia Siemens Networks | R2-63 | - | [WTS] [JSN] | |||
| R2-085059 | Clarification on system information value tag handling | other | Nokia Corporation, Nokia Siemens Networks | R2-63 | - | [WTS] [JSN] | |||
| R2-085060 | PDCP SDU limitation | other | Nokia Corporation, Nokia Siemens Networks | R2-63 | - | [WTS] [JSN] | |||
| R2-085061 | Email report on RLF monitoring | other | Nokia | R2-63 | - | [WTS] [JSN] | |||
| R2-085062 | PDCP state variables | other | Alcatel-Lucent | R2-63 | - | [WTS] [JSN] | |||
| R2-085063 | Time To Trigger and DRX co-operation in EUTRAN | other | Nokia Corporation, Nokia Siemens Networks | R2-63 | - | [WTS] [JSN] | |||
| R2-085064 | Correction of the target eNB initial HFNs and SNs values | other | Alcatel-Lucent | R2-63 | - | [WTS] [JSN] | |||
| R2-085065 | Clarification with regards to the PDCP state variables | other | Alcatel-Lucent | R2-63 | - | [WTS] [JSN] | |||
| R2-085066 | Miscellaneous Clarifications on Security | other | Alcatel-Lucent, Samsung | R2-63 | - | [WTS] [JSN] | |||
| R2-085067 | Removal of the reference to E-TFCI threshold | other | Infineon | R2-63 | - | [WTS] [JSN] | |||
| R2-085068 | Proposed modification for disabling HS-SCCH less operation | other | Infineon | R2-63 | - | [WTS] [JSN] | |||
| R2-085069 | Naming conventions in ASN.1 | other | Nokia Corporation, Nokia Siemens Networks | R2-63 | - | [WTS] [JSN] | |||
| R2-085070 | Missing details semi-persistent scheduling for UL | other | Nokia Corporation, Nokia Siemens Networks | R2-63 | - | [WTS] [JSN] | |||
| R2-085071 | Open issues for semi-persistent scheduling for DL | other | Nokia Corporation, Nokia Siemens Networks | R2-63 | - | [WTS] [JSN] | |||
| R2-085072 | Configuration of Multiple Periodicity Patterns for SPS in TDD | other | Nokia Corporation, Nokia Siemens Networks | R2-63 | - | [WTS] [JSN] | |||
| R2-085073 | CR to 36.321 on HARQ for Msg3 transmission | other | Sharp | R2-63 | - | [WTS] [JSN] | |||
| R2-085074 | CR to 36.321 on Active time procedure | other | Sharp | R2-63 | - | [WTS] [JSN] | |||
| R2-085075 | Buffer Status Field Table | other | Philips, NXP Semiconductors | R2-63 | - | [WTS] [JSN] | |||
| R2-085076 | Buffer Status Field Table | other | Philips, NXP Semiconductors | R2-63 | - | [WTS] [JSN] | |||
| R2-085077 | Improving the robustness of Buffer Status Reporting | other | Philips, NXP Semiconductors | R2-63 | - | [WTS] [JSN] | |||
| R2-085078 | Signalling of SIB7 information to speed up RACH access | other | Philips | R2-63 | - | [WTS] [JSN] | |||
| R2-085079 | UE Capabilities for Dual-Cell HSDPA Operation | other | Philips | R2-63 | - | [WTS] [JSN] | |||
| R2-085080 | PRACH resource selection | other | Nokia Corporation, Nokia Siemens Networks | R2-63 | - | [WTS] [JSN] | |||
| R2-085081 | Correction on PRACH resource selection | other | Nokia Corporation, Nokia Siemens Networks | R2-63 | - | [WTS] [JSN] | |||
| R2-085082 | PRACH assignment for dedicated preambles | other | Nokia Corporation, Nokia Siemens Networks | R2-63 | - | [WTS] [JSN] | |||
| R2-085083 | RACH partition message size | other | Nokia Corporation, Nokia Siemens Networks | R2-63 | - | [WTS] [JSN] | |||
| R2-085084 | Representation of BCCH and PCCH | other | Nokia Corporation, Nokia Siemens Networks | R2-63 | - | [WTS] [JSN] | |||
| R2-085085 | Corrections relating to BCCH and PCCH reception | other | Nokia corporation, Nokia Siemens Networks | R2-63 | - | [WTS] [JSN] | |||
| R2-085086 | MBSFN-SubframeConfiguration - Subframes excluded from possible allocation | other | IPWireless | R2-63 | - | [WTS] [JSN] | |||
| R2-085087 | RACH editorial corrections | other | Nokia Corporation, Nokia Siemens Networks | R2-63 | - | [WTS] [JSN] | |||
| R2-085088 | Definition of Global Cell Identities and related IEs | other | IPWireless | R2-63 | - | [WTS] [JSN] | |||
| R2-085089 | Correction relating to equal priorities | other | Nokia Corporation, Nokia Siemens Networks | R2-63 | - | [WTS] [JSN] | |||
| R2-085090 | System information change handling during on-going procduere | other | Panasonic | R2-63 | - | [WTS] [JSN] | |||
| R2-085091 | Remaining issues relating to ETWS | other | Nokia Corporation, Nokia Siemens Networks | R2-63 | - | [WTS] [JSN] | |||
| R2-085092 | timer handling for inter-RAT handover from E-UTRA | other | Panasonic | R2-63 | - | [WTS] [JSN] | |||
| R2-085093 | Explicit release of semi-persistent resources | other | Panasonic | R2-63 | - | [WTS] [JSN] | |||
| R2-085094 | Uplink behaviour relating to active time and DRX | other | Panasonic | R2-63 | - | [WTS] [JSN] | |||
| R2-085095 | Analysis of ETWS primary notification mechanism | other | Panasonic | R2-63 | - | [WTS] [JSN] | |||
| R2-085096 | Clarification on connected UE behaviour for handling system information | other | Panasonic | R2-63 | - | [WTS] [JSN] | |||
| R2-085097 | Correction on ASN.1 fields of SIB1 | other | Panasonic | R2-63 | - | [WTS] [JSN] | |||
| R2-085098 | Email report on 'Inter-freq/Inter-RAT measurement continuation at handover' | other | Panasonic | R2-63 | - | [WTS] [JSN] | |||
| R2-085099 | User plane handling for inter-RAT handover from E-UTRAN | other | Panasonic | R2-63 | - | [WTS] [JSN] | |||
| R2-085100 | Maximum PDCP SDU size | other | Panasonic | R2-63 | - | [WTS] [JSN] | |||
| R2-085101 | SRB for NAS message during RRC connection re-establishment | other | Panasonic | R2-63 | - | [WTS] [JSN] | |||
| R2-085102 | Measurement Gap Activation | other | Panasonic | R2-63 | - | [WTS] [JSN] | |||
| R2-085103 | Handling of Measurement Configuration | other | Panasonic | R2-63 | - | [WTS] [JSN] | |||
| R2-085104 | Reporting of Serving Cell Measured Result | other | Panasonic | R2-63 | - | [WTS] [JSN] | |||
| R2-085105 | Various clarifications/corrections to TS36.321 | other | Panasonic | R2-63 | - | [WTS] [JSN] | |||
| R2-085106 | Priority of MAC Control elements | other | Panasonic | R2-63 | - | [WTS] [JSN] | |||
| R2-085107 | Problems associated with using a constant CSG offset when performing reselection ranking | other | Sharp | R2-63 | - | [WTS] [JSN] | |||
| R2-085108 | Processing of Contention resolution message | other | Panasonic | R2-63 | - | [WTS] [JSN] | |||
| R2-085109 | Processing of Contention resolution message | other | Panasonic | R2-63 | - | [WTS] [JSN] | |||
| R2-085110 | Problems associated with using a constant CSG offset when performing reselection ranking | other | Sharp | R2-63 | - | [WTS] [JSN] | |||
| R2-085111 | Acquisition of SI-messages in TDD | other | IPWireless, NextWave Wireless | R2-63 | - | [WTS] [JSN] | |||
| R2-085112 | HARQ protocol issues for CQI-only"" | other | Panasonic | R2-63 | - | [WTS] [JSN] | |||
| R2-085113 | Determination of next random access occasion and PRACH selection | other | IPWireless, NextWave Wireless | R2-63 | - | [WTS] [JSN] | |||
| R2-085114 | RAN1/2 specification alignment on HARQ operation | other | Panasonic | R2-63 | - | [WTS] [JSN] | |||
| R2-085115 | Correction on determination of next available RACH occasion and PRACH selection | other | IPWireless, NextWave Wireless | R2-63 | - | [WTS] [JSN] | |||
| R2-085116 | Presence of multiple PRACHs and PRACH selection | other | IPWireless, NextWave Wireless | R2-63 | - | [WTS] [JSN] | |||
| R2-085117 | DL HARQ operation without TBsize information | other | Panasonic | R2-63 | - | [WTS] [JSN] | |||
| R2-085118 | Correction on presence of multiple PRACHs and PRACH selection | other | IPWireless, NextWave Wireless | R2-63 | - | [WTS] [JSN] | |||
| R2-085119 | Transmission of scheduling request while in DRX | other | IPWireless, NextWave Wireless | R2-63 | - | [WTS] [JSN] | |||
| R2-085120 | Correction on transmission of scheduling request while in DRX-solution1 | other | IPWireless, NextWave Wireless | R2-63 | - | [WTS] [JSN] | |||
| R2-085121 | Correction on transmission of scheduling request while in DRX-solution2 | other | IPWireless, NextWave Wireless | R2-63 | - | [WTS] [JSN] | |||
| R2-085122 | Correction on DL assignment reception | other | IPWireless, NextWave Wireless | R2-63 | - | [WTS] [JSN] | |||
| R2-085123 | Correction on UL grant reception | other | IPWireless, NextWave Wireless | R2-63 | - | [WTS] [JSN] | |||
| R2-085124 | Comparisons of methods on obtaining CSG Qoffset(s) | other | Sharp | R2-63 | - | [WTS] [JSN] | |||
| R2-085125 | RRC Updates on CGI reading and reporting | other | Nortel | R2-63 | - | [WTS] [JSN] | |||
| R2-085126 | Editorial correction to the table on structure of Segmentation Status | other | InterDigital | R2-63 | - | [WTS] [JSN] | |||
| R2-085127 | Resource release after contention resolution failure | other | InterDigital | R2-63 | - | [WTS] [JSN] | |||
| R2-085128 | Happy bit setting with Improved L2 for UL | other | InterDigital, Nokia Corporation, Nokia Siemens Networks, Ericsson | R2-63 | - | [WTS] [JSN] | |||
| R2-085129 | Happy bit setting with MAC-i/is | other | InterDigital | R2-63 | - | [WTS] [JSN] | |||
| R2-085130 | SchedulingInformation aspects of SIB1 | other | Qasara | R2-63 | - | [WTS] [JSN] | |||
| R2-085131 | PDCP Behaviour at Reestablishment for RLC UM | other | interdigital | R2-63 | - | [WTS] [JSN] | |||
| R2-085132 | Empty BSR and DRX Inactivity Timer handling | other | Research In Motion | R2-63 | - | [WTS] [JSN] | |||
| R2-085133 | Clarification on Regular BSR for restoring time alignment | other | Research In Motion | R2-63 | - | [WTS] [JSN] | |||
| R2-085134 | Fast Dormancy: A way forward | other | Research In Motion, AT&T | R2-63 | - | [WTS] [JSN] | |||
| R2-085135 | MAC Architecture Model | other | ETRI | R2-63 | - | [WTS] [JSN] | |||
| R2-085136 | MAC Architecture Model | other | ETRI | R2-63 | - | [WTS] [JSN] | |||
| R2-085137 | Ack/Nak feedback in Cell_FACH | other | InterDigital | R2-63 | - | [WTS] [JSN] | |||
| R2-085138 | HS-DPCCH feedback in Cell_FACH | other | InterDigital | R2-63 | - | [WTS] [JSN] | |||
| R2-085139 | Issues regarding Access barred alleviation | other | VIA Technologies Inc | R2-63 | - | [WTS] [JSN] | |||
| R2-085140 | MAC Architecture Model in Section 4.2 | other | ETRI | R2-63 | - | [WTS] [JSN] | |||
| R2-085141 | APN-AMBR support in UE | other | Qualcomm Europe | R2-63 | - | [WTS] [JSN] | |||
| R2-085142 | BSR Reliability | other | Qualcomm Europe | R2-63 | - | [WTS] [JSN] | |||
| R2-085143 | Bucket Size Parameter | other | Qualcomm Europe | R2-63 | - | [WTS] [JSN] | |||
| R2-085144 | PDCP In-sequence Delivery Always On | other | Qualcomm Europe | R2-63 | - | [WTS] [JSN] | |||
| R2-085145 | [63_LTE_B03] Flush Timer email report | other | Qualcomm Europe | R2-63 | - | [WTS] [JSN] | |||
| R2-085146 | Local NACKing Optionality | other | Qualcomm Europe | R2-63 | - | [WTS] [JSN] | |||
| R2-085147 | Max number of MAC SDUs | other | Qualcomm Europe | R2-63 | - | [WTS] [JSN] | |||
| R2-085148 | Bucket Size Parameter | other | Qualcomm Europe | R2-63 | - | [WTS] [JSN] | |||
| R2-085149 | CR to Remove UE History Information | other | Vodafone | R2-63 | - | [WTS] [JSN] | |||
| R2-085150 | Removal of UE History Information in TS 36.331 | other | Vodafone | R2-63 | - | [WTS] [JSN] | |||
| R2-085151 | Seamless RRC State transition from Enhanced CELL_FACH to CELL_DCH | other | Huawei | R2-63 | - | [WTS] [JSN] | |||
| R2-085152 | Seamless RRC State transition from Enhanced CELL_FACH to CELL_DCH | other | Huawei | R2-63 | - | [WTS] [JSN] | |||
| R2-085153 | Clarification for LI size decision for UM RLC uplink | other | Huawei | R2-63 | - | [WTS] [JSN] | |||
| R2-085154 | correct the description of UE behaviour during HS-DSCH Reception in CELL_PCH-R7 | other | Huawei | R2-63 | - | [WTS] [JSN] | |||
| R2-085155 | correct the description of UE behaviour during HS-DSCH Reception in CELL_PCH-R8 | other | Huawei | R2-63 | - | [WTS] [JSN] | |||
| R2-085156 | happy bit setting with L2 improved for UL | other | Huawei | R2-63 | - | [WTS] [JSN] | |||
| R2-085157 | Introduction of the UE behavior on PPAC parameter | other | Huawei | R2-63 | - | [WTS] [JSN] | |||
| R2-085158 | Some corrections for Enhanced UE DRX | other | Huawei | R2-63 | - | [WTS] [JSN] | |||
| R2-085159 | Remove FFS from the figure for MAC-e details | other | Huawei | R2-63 | - | [WTS] [JSN] | |||
| R2-085160 | Add MAC-i PDU in the description of HARQ entity | other | Huawei | R2-63 | - | [WTS] [JSN] | |||
| R2-085161 | Correction to measurement behaviour for CELL_FACH UE | other | Huawei | R2-63 | - | [WTS] [JSN] | |||
| R2-085162 | Correction to measurement behaviour for CELL_FACH UE | other | Huawei | R2-63 | - | [WTS] [JSN] | |||
| R2-085163 | Discussion on ETWS primary notification transmission | other | Huawei | R2-63 | - | [WTS] [JSN] | |||
| R2-085164 | Clarification on DTX impact on internal measurement | other | Huawei | R2-63 | - | [WTS] [JSN] | |||
| R2-085165 | UE capability reporting for enhanced DRX | other | Huawei | R2-63 | - | [WTS] [JSN] | |||
| R2-085166 | Transaction ID in HS-DSCH serving cell change procedure | other | Huawei | R2-63 | - | [WTS] [JSN] | |||
| R2-085167 | Interaction between HS-DSCH serving cell change and CPC | other | Huawei | R2-63 | - | [WTS] [JSN] | |||
| R2-085168 | Discussion on mobility procedures for Dual Cell operation | other | Huawei | R2-63 | - | [WTS] [JSN] | |||
| R2-085169 | Measurement optimazation on DC-HSDPA operation | other | Huawei | R2-63 | - | [WTS] [JSN] | |||
| R2-085170 | On the need for compressed mode for secondary carrier search in DC-HSDPA | other | Qualcomm Europe | R2-63 | - | [WTS] [JSN] | |||
| R2-085171 | On the need for compressed mode for secondary carrier search in DC-HSDPA | other | Qualcomm Europe | R2-63 | - | [WTS] [JSN] | |||
| R2-085172 | Clarification of non-used frequency definition for secondary carrier in DC-HSDPA | other | Qualcomm Europe | R2-63 | - | [WTS] [JSN] | |||
| R2-085173 | Miscellaneous corrections to 36.300 | other | Huawei | R2-63 | - | [WTS] [JSN] | |||
| R2-085174 | Miscellaneous corrections to 36.300 | other | Huawei | R2-63 | - | [WTS] [JSN] | |||
| R2-085175 | Miscellaneous corrections to 36.300 | other | Huawei | R2-63 | - | [WTS] [JSN] | |||
| R2-085176 | CR on PCH in case of SI change | other | Huawei | R2-63 | - | [WTS] [JSN] | |||
| R2-085177 | CR on UL TA | other | Huawei | R2-63 | - | [WTS] [JSN] | |||
| R2-085178 | Correction to Random UL HARQ Process for the transmission of Msg3 | other | Huawei | R2-63 | - | [WTS] [JSN] | |||
| R2-085179 | Further considerations on validity pattern for dedicated preambles | other | Huawei | R2-63 | - | [WTS] [JSN] | |||
| R2-085180 | Handling of RRC Timer T312 | other | Huawei | R2-63 | - | [WTS] [JSN] | |||
| R2-085181 | Corrections to Random Access Procedure | other | Huawei | R2-63 | - | [WTS] [JSN] | |||
| R2-085182 | Pictures of Random access model | other | Huawei | R2-63 | - | [WTS] [JSN] | |||
| R2-085183 | max HARQ transmission number of TTI bundling | other | Huawei | R2-63 | - | [WTS] [JSN] | |||
| R2-085184 | CR on max HARQ transmission number of TTI bundling | other | Huawei | R2-63 | - | [WTS] [JSN] | |||
| R2-085185 | Preventing UL HARQ transmissions without MCS information | other | Huawei | R2-63 | - | [WTS] [JSN] | |||
| R2-085186 | Correction to DRX Active time | other | Huawei | R2-63 | - | [WTS] [JSN] | |||
| R2-085187 | Corrections to MAC PDU format | other | Huawei | R2-63 | - | [WTS] [JSN] | |||
| R2-085188 | Correction to PHR | other | Huawei | R2-63 | - | [WTS] [JSN] | |||
| R2-085189 | Corrections to SPS activation failure | other | Huawei | R2-63 | - | [WTS] [JSN] | |||
| R2-085190 | Correction to RLC SDU reassembly during RLC re-establishment | other | Huawei | R2-63 | - | [WTS] [JSN] | |||
| R2-085191 | Correction to PDCP functional view | other | Huawei | R2-63 | - | [WTS] [JSN] | |||
| R2-085192 | Corrections to PDCP procedure for SRB and DRB | other | Huawei | R2-63 | - | [WTS] [JSN] | |||
| R2-085193 | Removal of the redundant description for BSR cancellation | other | HTC Corporation | R2-63 | - | [WTS] [JSN] | |||
| R2-085194 | ETWS transmission and reception | other | HTC Corporation | R2-63 | - | [WTS] [JSN] | |||
| R2-085195 | Removal of the redundant description for BSR cancellation | other | HTC Corporation | R2-63 | - | [WTS] [JSN] | |||
| R2-085196 | Clarification on BSR triggering | other | HTC Corporation | R2-63 | - | [WTS] [JSN] | |||
| R2-085197 | Remaining Issues in HNB | other | InterDigital | R2-63 | - | [WTS] [JSN] | |||
| R2-085198 | Remaining Issues in HNB | other | InterDigital | R2-63 | - | [WTS] [JSN] | |||
| R2-085199 | Resumption of PUCCH and SRS transmission | other | HTC Corporation | R2-63 | - | [WTS] [JSN] | |||
| R2-085200 | Clarification on Semi-Persistent Scheduling | other | HTC Corporation | R2-63 | - | [WTS] [JSN] | |||
| R2-085201 | BSR Triggering with SPS | other | HTC Corporation | R2-63 | - | [WTS] [JSN] | |||
| R2-085202 | Remaining Issues in HNB | other | InterDigital | R2-63 | - | [WTS] [JSN] | |||
| R2-085203 | Pending SR with SPS | other | HTC Corporation | R2-63 | - | [WTS] [JSN] | |||
| R2-085204 | Correction on data available for transmission | other | HTC Corporation | R2-63 | - | [WTS] [JSN] | |||
| R2-085205 | Clarification of Key Derivation | other | CATT | R2-63 | - | [WTS] [JSN] | |||
| R2-085206 | Use of GCI for MAC-I calculation | other | CATT | R2-63 | - | [WTS] [JSN] | |||
| R2-085207 | Some Small Corrections to TS 36.300 | other | CATT | R2-63 | - | [WTS] [JSN] | |||
| R2-085208 | Reporting content for supporting SON-ANR | other | CATT | R2-63 | - | [WTS] [JSN] | |||
| R2-085209 | Establishment of PDCP entity | other | CATT | R2-63 | - | [WTS] [JSN] | |||
| R2-085210 | NAS involved DRB handling | other | CATT | R2-63 | - | [WTS] [JSN] | |||
| R2-085211 | Consideration on Inter-node Message | other | CATT | R2-63 | - | [WTS] [JSN] | |||
| R2-085212 | Action of VarMeasurementReports after measurement configuration change | other | CATT | R2-63 | - | [WTS] [JSN] | |||
| R2-085213 | Introduction of UE Measurement Capability for DC-HSDPA | other | Qualcomm Europe | R2-63 | - | [WTS] [JSN] | |||
| R2-085214 | Handling of VarMeasurementReports after reporting complete | other | CATT | R2-63 | - | [WTS] [JSN] | |||
| R2-085215 | Proposal about Frequency and Bandwidth Information in TDD | other | CATT | R2-63 | - | [WTS] [JSN] | |||
| R2-085216 | Content of Global Cell ID for E-UTRA | other | CATT | R2-63 | - | [WTS] [JSN] | |||
| R2-085217 | Clarification of NAS Message Transfer | other | CATT | R2-63 | - | [WTS] [JSN] | |||
| R2-085218 | Clarification of Cell Reselection Priority | other | CATT | R2-63 | - | [WTS] [JSN] | |||
| R2-085219 | Remaining Issues in HNB | other | InterDigital | R2-63 | - | [WTS] [JSN] | |||
| R2-085220 | PDCP receive window re-wording, using a modulus base | other | Infineon | R2-63 | - | [WTS] [JSN] | |||
| R2-085221 | PDCP reordering function removal | other | Infineon | R2-63 | - | [WTS] [JSN] | |||
| R2-085222 | Text Proposal for Cell Change Order/NACC | other | Nokia Siement Networks, Nokia Corporation, Ericsson | R2-63 | - | [WTS] [JSN] | |||
| R2-085223 | RRC Container definition and Work split between RAN2 and RAN3 | other | Nokia Siemens Networks, Nokia Corporation | R2-63 | - | [WTS] [JSN] | |||
| R2-085224 | Removal of Security Context from RRC Container | other | Nokia Siemens Networks, Nokia Corporation | R2-63 | - | [WTS] [JSN] | |||
| R2-085225 | Text proposal to clean up Paging | other | Nokia Siemens Networks, Nokia Corporation | R2-63 | - | [WTS] [JSN] | |||
| R2-085226 | Clarification on radioResourceConfigDedicated | other | Nokia Siemens Networks, Nokia Corporation | R2-63 | - | [WTS] [JSN] | |||
| R2-085227 | Definition of UL and DL PRB usage per traffic class | other | Nokia Siemens Networks, Nokia Corporation | R2-63 | - | [WTS] [JSN] | |||
| R2-085228 | EUTRA coexistence with GPS | other | Qualcomm Europe | R2-63 | - | [WTS] [JSN] | |||
| R2-085229 | RAPID encoding | other | Qualcomm Europe, Nokia Siemens Networks | R2-63 | - | [WTS] [JSN] | |||
| R2-085230 | Update to MeasResultListCDMA2000 | other | Motorola | R2-63 | - | [WTS] [JSN] | |||
| R2-085231 | UL HARQ for Message 3 | other | Qualcomm Europe | R2-63 | - | [WTS] [JSN] | |||
| R2-085232 | Random Acces Response padding | other | Qualcomm Europe | R2-63 | - | [WTS] [JSN] | |||
| R2-085233 | Rules for SPS HARQ process sharing | other | Qualcomm Europe | R2-63 | - | [WTS] [JSN] | |||
| R2-085234 | 36.321 CR with rules for SPS HARQ process sharing | other | Qualcomm Europe | R2-63 | - | [WTS] [JSN] | |||
| R2-085235 | Measurement gaps and SPS | other | Qualcomm Europe | R2-63 | - | [WTS] [JSN] | |||
| R2-085236 | Correction to RACH Procedure | other | LG Electronics Inc. | R2-63 | - | [WTS] [JSN] | |||
| R2-085237 | MAC RAR extension mechanism | other | LG Electronics Inc. | R2-63 | - | [WTS] [JSN] | |||
| R2-085238 | MAC RAR Padding | other | LG Electronics Inc. | R2-63 | - | [WTS] [JSN] | |||
| R2-085239 | Proposed CR to 36.321 [Rel-8] Correction to MAC RAR | other | LG Electronics Inc. | R2-63 | - | [WTS] [JSN] | |||
| R2-085240 | MAC BCCH Reception Procedure | other | LG Electronics Inc. | R2-63 | - | [WTS] [JSN] | |||
| R2-085241 | Proposed CR to 36.321 Rel-8 Correction to BCCH Reception procedure | other | LG Electronics Inc. | R2-63 | - | [WTS] [JSN] | |||
| R2-085242 | RRC Re-establishment and BSR | other | LG Electronics Inc. | R2-63 | - | [WTS] [JSN] | |||
| R2-085243 | Proposed CR to 36.321 [Rel-8] MAC BSR Triggering | other | LG Electronics Inc. | R2-63 | - | [WTS] [JSN] | |||
| R2-085244 | Issue on multiple BSRs | other | LG Electronics Inc. | R2-63 | - | [WTS] [JSN] | |||
| R2-085245 | Proposed CR to 36.321 Correction to multiple BSRs | other | LG Electronics Inc. | R2-63 | - | [WTS] [JSN] | |||
| R2-085246 | Proposed CR to 36.321 [Rel-8] Correction to PDU format | other | LG Electronics Inc. | R2-63 | - | [WTS] [JSN] | |||
| R2-085247 | Proposed CR to 36.321 [Rel-8] Correction to Multiplexing for BSR | other | LG Electronics Inc. | R2-63 | - | [WTS] [JSN] | |||
| R2-085248 | Error Handling in MAC | other | LG Electronics Inc. | R2-63 | - | [WTS] [JSN] | |||
| R2-085249 | MAC Reset and RRC Interaction | other | LG Electronics Inc. | R2-63 | - | [WTS] [JSN] | |||
| R2-085250 | Proposed CR to 36.321 [Rel-8] MAC Reset | other | LG Electronics Inc. | R2-63 | - | [WTS] [JSN] | |||
| R2-085251 | Proposed CR to 36.321 [Rel-8] Correction to cell change | other | LG Electronics Inc. | R2-63 | - | [WTS] [JSN] | |||
| R2-085252 | Proposed CR to 36.322 [Rel-8] Correction to RB Suspension | other | LG Electronics Inc. | R2-63 | - | [WTS] [JSN] | |||
| R2-085253 | Proposed CR to 36.323 [Rel-8] Correction to RB Suspension | other | LG Electronics Inc. | R2-63 | - | [WTS] [JSN] | |||
| R2-085254 | Clarifications to Maintenance of Uplink Time Alignment | other | Nortel, Alcatel-Lucent | R2-63 | - | [WTS] [JSN] | |||
| R2-085255 | Clarification/correction of the Inter-RAT Mobility Procedure | other | Nortel, Nokia Siemens Networks | R2-63 | - | [WTS] [JSN] | |||
| R2-085256 | Corrections to CDMA System Information and Measurement IE definitions | other | Nortel, Alcatel-Lucent, Verizon | R2-63 | - | [WTS] [JSN] | |||
| R2-085257 | Complete the Actions upon reception of SIB8 Procedure | other | Nortel, Nokia Siemens Networks | R2-63 | - | [WTS] [JSN] | |||
| R2-085258 | Add Hysteresis to the ReportConfigInterRAT IE | other | Nortel, Nokia Siemens Networks | R2-63 | - | [WTS] [JSN] | |||
| R2-085259 | CGI for CDMA2000 | other | Nortel, Verizon | R2-63 | - | [WTS] [JSN] | |||
| R2-085260 | Dedicated Preamble Assignment | other | Ericsson | R2-63 | - | [WTS] [JSN] | |||
| R2-085261 | Text Proposal for Dedicated Preamble Assignment | other | Ericsson | R2-63 | - | [WTS] [JSN] | |||
| R2-085262 | UE support of single radio voice call continuity to 1xRTT | other | Ericsson | R2-63 | - | [WTS] [JSN] | |||
| R2-085263 | Scheduling of ETWS Notifications | other | Ericsson | R2-63 | - | [WTS] [JSN] | |||
| R2-085264 | CS Fallback at Mobility from EUTRA | other | Ericsson | R2-63 | - | [WTS] [JSN] | |||
| R2-085265 | Handling of DRBs at Mobility from EUTRA | other | Ericsson | R2-63 | - | [WTS] [JSN] | |||
| R2-085266 | UE State Change at Mobility from EUTRA | other | Ericsson | R2-63 | - | [WTS] [JSN] | |||
| R2-085267 | Need of PDSCH-ConfigDedicated in PhysicalConfigDedicated | other | Ericsson | R2-63 | - | [WTS] [JSN] | |||
| R2-085268 | Activation of CQI reporting, Sounding and Scheduling Request | other | Ericsson | R2-63 | - | [WTS] [JSN] | |||
| R2-085269 | Configuration of Semi-Persistent Scheduling | other | Ericsson | R2-63 | - | [WTS] [JSN] | |||
| R2-085270 | MBSFN subframe micro-allocation | other | Ericsson | R2-63 | - | [WTS] [JSN] | |||
| R2-085271 | Location of the Uplink EARFCN parameter | other | Ericsson | R2-63 | - | [WTS] [JSN] | |||
| R2-085272 | Offsetting system information | other | Ericsson | R2-63 | - | [WTS] [JSN] | |||
| R2-085273 | Paging procedure clarifications | other | Ericsson | R2-63 | - | [WTS] [JSN] | |||
| R2-085274 | Value range for the default paging cycle | other | Ericsson | R2-63 | - | [WTS] [JSN] | |||
| R2-085275 | Re-entry of service area upon connection re-establishment | other | Ericsson | R2-63 | - | [WTS] [JSN] | |||
| R2-085276 | Update of stage 2 description for Enhanced Uplink for CELL_FACH State and Idle mode in FDD | other | Infineon | R2-63 | - | [WTS] [JSN] | |||
| R2-085277 | Introduction of support of “Enhanced Uplink for CELL_FACH State in FDD” and “Improved L2 for uplink” | other | Infineon | R2-63 | - | [WTS] [JSN] | |||
| R2-085278 | Removal of UE History Information in TS 36.331 | other | Vodafone | R2-63 | - | [WTS] [JSN] | |||
| R2-085279 | Removal of UE History Information in TS 36.331 | other | Vodafone | R2-63 | - | [WTS] [JSN] | |||
| R2-085280 | Support of Open Access and Semi Open Access for UTRA HNB | other | Vodafone | R2-63 | - | [WTS] [JSN] | |||
| R2-085281 | IP Address Discovery to Support ANR SON Function | other | Vodafone | R2-63 | - | [WTS] [JSN] | |||
| R2-085282 | Clarification on Padding value | other | Fujitsu | R2-63 | - | [WTS] [JSN] | |||
| R2-085283 | Clarification on Padding value | other | Fujitsu | R2-63 | - | [WTS] [JSN] | |||
| R2-085284 | Clarification on Padding value | other | Fujitsu | R2-63 | - | [WTS] [JSN] | |||
| R2-085285 | Paging Capacity for Low Bandwidth Systems | other | Vodafone | R2-63 | - | [WTS] [JSN] | |||
| R2-085286 | Clarification on Padding value | other | Fujitsu | R2-63 | - | [WTS] [JSN] | |||
| R2-085287 | Clarification on Padding value | other | Fujitsu | R2-63 | - | [WTS] [JSN] | |||
| R2-085288 | Clarification on Padding value | other | Fujitsu | R2-63 | - | [WTS] [JSN] | |||
| R2-085289 | Clarification on Logical Channel Prioritization | other | Fujitsu | R2-63 | - | [WTS] [JSN] | |||
| R2-085290 | Void | other | - | R2-63 | - | [WTS] [JSN] | |||
| R2-085291 | Void | other | - | R2-63 | - | [WTS] [JSN] | |||
| R2-085292 | Setting the short MAC-I | other | Fujitsu | R2-63 | - | [WTS] [JSN] | |||
| R2-085293 | E-UTRAN cell detection in idle mode | other | Telecom Italia | R2-63 | - | [WTS] [JSN] | |||
| R2-085294 | Typo in IE 'Domain Specific Access Restriction' | other | Ericsson | R2-63 | - | [WTS] [JSN] | |||
| R2-085295 | Typo in IE 'Domain Specific Access Restriction' | other | Ericsson | R2-63 | - | [WTS] [JSN] | |||
| R2-085296 | Typo in IE 'Domain Specific Access Restriction' | other | Ericsson | R2-63 | - | [WTS] [JSN] | |||
| R2-085297 | Misplaced IEs in RADIO BEARER RECONFIGURATION | other | Ericsson | R2-63 | - | [WTS] [JSN] | |||
| R2-085298 | Misplaced IEs in RADIO BEARER RECONFIGURATION | other | Ericsson | R2-63 | - | [WTS] [JSN] | |||
| R2-085299 | Planning of the Rel-8 RRC message and ASN.1 review for UTRA | other | Ericsson | R2-63 | - | [WTS] [JSN] | |||
| R2-085300 | Priority based cell (re-)selection in UTRA | other | Ericsson | R2-63 | - | [WTS] [JSN] | |||
| R2-085301 | Harmonisation of certain RRC protocol elements in EUTRA and UTRA | other | Ericsson | R2-63 | - | [WTS] [JSN] | |||
| R2-085302 | Improved EUL power control at UE power limitation | other | Ericsson | R2-63 | - | [WTS] [JSN] | |||
| R2-085303 | Discussion on ETWS primary notification | other | Ericsson | R2-63 | - | [WTS] [JSN] | |||
| R2-085304 | Replacement of E-AICH in 25.302 | other | Nokia Corporation, Nokia Siemens Networks, Alcatel-Lucent | R2-63 | - | [WTS] [JSN] | |||
| R2-085305 | Replacement of E-AICH in 25.321 | other | Nokia Corporation, Nokia Siemens Networks, Alcatel-Lucent | R2-63 | - | [WTS] [JSN] | |||
| R2-085306 | Replacement of E-AICH in 25.321 | other | Nokia Corporation, Nokia Siemens Networks, Alcatel-Lucent | R2-63 | - | [WTS] [JSN] | |||
| R2-085307 | Replacement of E-AICH in 25.331 | other | Nokia Corporation, Nokia Siemens Networks, Alcatel-Lucent | R2-63 | - | [WTS] [JSN] | |||
| R2-085308 | Reseting the periodic cell update timer T305 after autonomous state transition to CELL_FACH | other | InterDigital, Nokia Corporation, Nokia Siemens Networks | R2-63 | - | [WTS] [JSN] | |||
| R2-085309 | Reseting the periodic cell update timer T305 after autonomous state transition to CELL_FACH | other | InterDigital, Nokia Corporation, Nokia Siemens Networks | R2-63 | - | [WTS] [JSN] | |||
| R2-085310 | Reseting the periodic cell update timer T305 after autonomous state transition to CELL_FACH | other | InterDigital, Nokia Corporation, Nokia Siemens Networks | R2-63 | - | [WTS] [JSN] | |||
| R2-085311 | Clarification of common E-DCH resource usage in 25.319 | other | Nokia Corporation, Nokia Siemens Networks | R2-63 | - | [WTS] [JSN] | |||
| R2-085312 | Clarification of common E-DCH resource use in 25.321 | other | Nokia Corporation, Nokia Siemens Networks | R2-63 | - | [WTS] [JSN] | |||
| R2-085313 | Clarification on common E-DCH resource usage in 25.331 | other | Nokia Corporation, Nokia Siemens Networks | R2-63 | - | [WTS] [JSN] | |||
| R2-085314 | Corrections for Enhanced Uplink in CELL_FACH in 25.331 | other | Nokia Corporation, Nokia Siemens Networks | R2-63 | - | [WTS] [JSN] | |||
| R2-085315 | Inclusion of UE historical information in SRNC RELOCATION INFO | other | Nokia Corporation, Nokia Siemens Networks | R2-63 | - | [WTS] [JSN] | |||
| R2-085316 | SIB7 reading time with Enhanced Uplink for CELL_FACH state | other | Nokia Corporation, Nokia Siemens Networks | R2-63 | - | [WTS] [JSN] | |||
| R2-085317 | MBSFN subframe allocation | other | CATT | R2-63 | - | [WTS] [JSN] | |||
| R2-085318 | Miscellaneous corrections to 36.331 | other | CATT | R2-63 | - | [WTS] [JSN] | |||
| R2-085319 | TP to update long DRX cycle in 36.331 | other | CATT | R2-63 | - | [WTS] [JSN] | |||
| R2-085320 | Dedicated PRACH indication in handover | other | CATT | R2-63 | - | [WTS] [JSN] | |||
| R2-085321 | TTI bundling for TDD | other | CATT | R2-63 | - | [WTS] [JSN] | |||
| R2-085322 | DRX and measurement gap | other | CATT | R2-63 | - | [WTS] [JSN] | |||
| R2-085323 | Discussion on DRX offset configuration | other | CATT | R2-63 | - | [WTS] [JSN] | |||
| R2-085324 | Completion of the RA procedure initialization | other | CATT | R2-63 | - | [WTS] [JSN] | |||
| R2-085325 | RAR Window Size for TDD | other | CATT | R2-63 | - | [WTS] [JSN] | |||
| R2-085326 | Consideration on PHR | other | CATT | R2-63 | - | [WTS] [JSN] | |||
| R2-085327 | Correction to PHR | other | CATT | R2-63 | - | [WTS] [JSN] | |||
| R2-085328 | Clarification of MAC PDU | other | CATT | R2-63 | - | [WTS] [JSN] | |||
| R2-085329 | Configuration for two-intervals-SPS | other | CATT | R2-63 | - | [WTS] [JSN] | |||
| R2-085330 | Two-intervals-SPS configuration in MAC | other | CATT | R2-63 | - | [WTS] [JSN] | |||
| R2-085331 | Clarification of Triggering Conditions for T_reordering | other | CATT | R2-63 | - | [WTS] [JSN] | |||
| R2-085332 | Correction to Triggering Conditions for T_reordering | other | CATT | R2-63 | - | [WTS] [JSN] | |||
| R2-085333 | SDU Discarding | other | CATT | R2-63 | - | [WTS] [JSN] | |||
| R2-085334 | Uplink transmission scheme in CPC for LCR TDD | other | CATT | R2-63 | - | [WTS] [JSN] | |||
| R2-085335 | Detail of the uplink synchronization procedure in enhanced CELL_FACH for LCR TDD | other | CATT | R2-63 | - | [WTS] [JSN] | |||
| R2-085336 | Further discussion on CCCH transmission in enhanced CELL_FACH state for LCR TDD | other | CATT | R2-63 | - | [WTS] [JSN] | |||
| R2-085337 | Cell reselection in enhanced CELL_FACH state for LCR TDD | other | CATT | R2-63 | - | [WTS] [JSN] | |||
| R2-085338 | SPS and TTI bundling | other | ZTE | R2-63 | - | [WTS] [JSN] | |||
| R2-085339 | The mechanism in enhanced PCH state for LCR TDD | other | CATT | R2-63 | - | [WTS] [JSN] | |||
| R2-085340 | State transition from enhanced PCH to FACH for LCR TDD | other | CATT | R2-63 | - | [WTS] [JSN] | |||
| R2-085341 | Clarification of adaptive retransmission | other | ZTE | R2-63 | - | [WTS] [JSN] | |||
| R2-085342 | Clarification of adaptive retransmission | other | ZTE | R2-63 | - | [WTS] [JSN] | |||
| R2-085343 | Timers for DRX in enhanced CELL_FACH state for LCR TDD | other | CATT | R2-63 | - | [WTS] [JSN] | |||
| R2-085344 | Dedicated preamble transmission and measurement gap | other | ZTE | R2-63 | - | [WTS] [JSN] | |||
| R2-085345 | Removing of end-time for dedicated preamble | other | ZTE | R2-63 | - | [WTS] [JSN] | |||
| R2-085346 | TDD ACK NACK feedback modes in RRC | other | ZTE | R2-63 | - | [WTS] [JSN] | |||
| R2-085347 | PRACH resource pattern for TDD | other | ZTE | R2-63 | - | [WTS] [JSN] | |||
| R2-085348 | Clarification of uplink power control with DCI format 3/3A | other | ZTE | R2-63 | - | [WTS] [JSN] | |||
| R2-085349 | How to notify UE in connected of primary notification | other | ZTE | R2-63 | - | [WTS] [JSN] | |||
| R2-085350 | Transmission of ETWS primary notification | other | ZTE | R2-63 | - | [WTS] [JSN] | |||
| R2-085351 | Update of ETWS secondary notification | other | ZTE | R2-63 | - | [WTS] [JSN] | |||
| R2-085352 | Serveral clarification for cell reselection | other | ZTE | R2-63 | - | [WTS] [JSN] | |||
| R2-085353 | ETWS primary notification on paging information | other | ZTE | R2-63 | - | [WTS] [JSN] | |||
| R2-085354 | IRAT ANR Stage 3 functionality | other | NEC | R2-63 | - | [WTS] [JSN] | |||
| R2-085355 | Size constraints on UE band capabilities | other | Nokia Corporation, Nokia Siemens Networks | R2-63 | - | [WTS] [JSN] | |||
| R2-085356 | Correction to Introduction of HS-DSCH DRX in CELL_FACH | other | Nokia Corporation, Nokia Siemens Networks | R2-63 | - | [WTS] [JSN] | |||
| R2-085357 | TAC and PLMN list for SON ANR | other | Alcatel-Lucent | R2-63 | - | [WTS] [JSN] | |||
| R2-085358 | Cell Global Identity and TAC definitions | other | Alcatel-Lucent | R2-63 | - | [WTS] [JSN] | |||
| R2-085359 | Measurements for ICIC | other | Alcatel-Lucent | R2-63 | - | [WTS] [JSN] | |||
| R2-085360 | Paging and MBSFN subframes | other | Motorola | R2-63 | - | [WTS] [JSN] | |||
| R2-085361 | Paging and MBSFN subframes | other | Motorola | R2-63 | - | [WTS] [JSN] | |||
| R2-085362 | Report of Email discussion on use of Need | other | Alcatel-Lucent (Rapporteur) | R2-63 | - | [WTS] [JSN] | |||
| R2-085363 | ASN.1 corrections on Need | other | Alcatel-Lucent | R2-63 | - | [WTS] [JSN] | |||
| R2-085364 | Miscellaneous minor corrections and updates to ASN.1 | other | Alcatel-Lucent | R2-63 | - | [WTS] [JSN] | |||
| R2-085365 | Issues Related to Measurements | other | Motorola | R2-63 | - | [WTS] [JSN] | |||
| R2-085366 | Discussion on parameters for HO to 1xRTT | other | Alcatel-Lucent | R2-63 | - | [WTS] [JSN] | |||
| R2-085367 | TP for inclusion of some parameters for HO to 1xRTT | other | Alcatel-Lucent | R2-63 | - | [WTS] [JSN] | |||
| R2-085368 | C-RNTI in RRC Connection Reconfiguration | other | Motorola | R2-63 | - | [WTS] [JSN] | |||
| R2-085369 | Alignment of 36.300 with stage 3 on 1xRTT CSfallback | other | Alcatel-Lucent | R2-63 | - | [WTS] [JSN] | |||
| R2-085370 | Radio Link Failure Monitoring | other | Motorola | R2-63 | - | [WTS] [JSN] | |||
| R2-085371 | Data handling in UE during Inter-RAT mobility | other | Alcatel-Lucent | R2-63 | - | [WTS] [JSN] | |||
| R2-085372 | NAS information for bearer establishment | other | Alcatel-Lucent | R2-63 | - | [WTS] [JSN] | |||
| R2-085373 | Data available for transmission after HO | other | Motorola | R2-63 | - | [WTS] [JSN] | |||
| R2-085374 | Draft LS response to SA2 LS on NAS trigger for RLF | other | Alcatel-Lucent | R2-63 | - | [WTS] [JSN] | |||
| R2-085375 | Removal of a leftover note on autonomous search | other | Qualcomm Europe | R2-63 | - | [WTS] [JSN] | |||
| R2-085376 | Removal of a leftover note on autonomous search | other | Qualcomm Europe | R2-63 | - | [WTS] [JSN] | |||
| R2-085377 | Removal of a leftover note on autonomous search | other | Qualcomm Europe | R2-63 | - | [WTS] [JSN] | |||
| R2-085378 | Removal of a leftover note on autonomous search | other | Qualcomm Europe | R2-63 | - | [WTS] [JSN] | |||
| R2-085379 | Allocation of CSG IDs | other | Qualcomm Europe | R2-63 | - | [WTS] [JSN] | |||
| R2-085380 | UE Assisted Heuristic Collision Detection | other | Qualcomm Europe | R2-63 | - | [WTS] [JSN] | |||
| R2-085381 | Qoffsets for CSG Cells | other | Qualcomm Europe | R2-63 | - | [WTS] [JSN] | |||
| R2-085382 | Treselection modifications for CSG cells | other | Qualcomm Europe | R2-63 | - | [WTS] [JSN] | |||
| R2-085383 | Intra-frequency reselection indicator for CSG Cells | other | Qualcomm Europe | R2-63 | - | [WTS] [JSN] | |||
| R2-085384 | Introduction of DC-HSDPA support in 25.331 - Stage 3 CR | other | Qualcomm Europe | R2-63 | - | [WTS] [JSN] | |||
| R2-085385 | Interaction of DC-HSDPA and Enhanced Serving Cell Change in 25.331 messages - Stage 3 CR | other | Qualcomm Europe | R2-63 | - | [WTS] [JSN] | |||
| R2-085386 | Robustness of Buffer Status Reporting | other | Ericsson, Nokia Siemens Networks, Nortel | R2-63 | - | [WTS] [JSN] | |||
| R2-085387 | Configuration of DRX Start Offset | other | Ericsson | R2-63 | - | [WTS] [JSN] | |||
| R2-085388 | D-SR failure handling | other | Ericsson, Nokia Siemens Networks | R2-63 | - | [WTS] [JSN] | |||
| R2-085389 | D-SR failure handling | other | Ericsson, LG Electronics Inc. | R2-63 | - | [WTS] [JSN] | |||
| R2-085390 | Discussion on MAC reset and reconfiguration | other | Ericsson | R2-63 | - | [WTS] [JSN] | |||
| R2-085391 | Text for MAC reset and reconfiguration | other | Ericsson | R2-63 | - | [WTS] [JSN] | |||
| R2-085392 | Freeing of reserved RNTIs | other | Ericsson | R2-63 | - | [WTS] [JSN] | |||
| R2-085393 | HARQ RTT Timer | other | Ericsson | R2-63 | - | [WTS] [JSN] | |||
| R2-085394 | Text for Multiplexing and Demultiplexing Sections | other | Ericsson, Nokia Corporation, Nokia Siemens Networks | R2-63 | - | [WTS] [JSN] | |||
| R2-085395 | TTI Bundling Configuration | other | Ericsson | R2-63 | - | [WTS] [JSN] | |||
| R2-085396 | Details of UL power headroom report | other | Ericsson | R2-63 | - | [WTS] [JSN] | |||
| R2-085397 | Remaining issues in Semi Persistent Scheduling | other | Ericsson | R2-63 | - | [WTS] [JSN] | |||
| R2-085398 | Contention Resolution Timer | other | Ericsson | R2-63 | - | [WTS] [JSN] | |||
| R2-085399 | Corrections to MAC-MainConfiguration | other | Ericsson | R2-63 | - | [WTS] [JSN] | |||
| R2-085400 | Correction to Starting of TA timer | other | Ericsson | R2-63 | - | [WTS] [JSN] | |||
| R2-085401 | Number of HARQ processes for MIMO | other | Ericsson | R2-63 | - | [WTS] [JSN] | |||
| R2-085402 | Summary of the email discussion on the PDCP re-establishment procedure | other | Ericsson | R2-63 | - | [WTS] [JSN] | |||
| R2-085403 | PDCP re-establishment procedure | other | Ericsson | R2-63 | - | [WTS] [JSN] | |||
| R2-085404 | Spares for T-statusprohibit and T-pollretransmit | other | Ericsson | R2-63 | - | [WTS] [JSN] | |||
| R2-085405 | L2 UE capability limitations | other | Ericsson | R2-63 | - | [WTS] [JSN] | |||
| R2-085406 | Status report of the email discussion on the LTE Rel-8 features dependency | other | Ericsson | R2-63 | - | [WTS] [JSN] | |||
| R2-085407 | Mapping of the RNTIs to different transport channels | other | Ericsson | R2-63 | - | [WTS] [JSN] | |||
| R2-085408 | Range Encoding Proposal for Physical Cell Identities | other | Ericsson | R2-63 | - | [WTS] [JSN] | |||
| R2-085409 | cdma2000 System Time information change should not change Value Tag | other | Ericsson | R2-63 | - | [WTS] [JSN] | |||
| R2-085410 | Value ranges for physical layer parameters | other | Ericsson | R2-63 | - | [WTS] [JSN] | |||
| R2-085411 | pdcp-configuration IE and PDCP reconfiguration | other | Ericsson | R2-63 | - | [WTS] [JSN] | |||
| R2-085412 | Default values for parameters in Uplink Power Control | other | Ericsson | R2-63 | - | [WTS] [JSN] | |||
| R2-085413 | Definition of parameters in PCCH-Configuration | other | Ericsson | R2-63 | - | [WTS] [JSN] | |||
| R2-085414 | Measurement event b1 and b2 threshold value ranges | other | Ericsson | R2-63 | - | [WTS] [JSN] | |||
| R2-085415 | Network support to ensure UE autonomous CSG discovery after change | other | T-Mobile | R2-63 | - | [WTS] [JSN] | |||
| R2-085416 | Cleanup of measurement chapters in TS 36.331 | other | Ericsson | R2-63 | - | [WTS] [JSN] | |||
| R2-085417 | Clarification of EUTRAN Measurement report triggering | other | Ericsson | R2-63 | - | [WTS] [JSN] | |||
| R2-085418 | Including serving cell in measurement report | other | Ericsson | R2-63 | - | [WTS] [JSN] | |||
| R2-085419 | Value ranges of parameters for intra LTE events | other | Ericsson | R2-63 | - | [WTS] [JSN] | |||
| R2-085420 | NAS level retransmission | other | Ericsson | R2-63 | - | [WTS] [JSN] | |||
| R2-085421 | Multiplicity and type constraints values | other | Ericsson | R2-63 | - | [WTS] [JSN] | |||
| R2-085422 | Planning of the Rel-8 ASN.1 review for LTE | other | Ericsson | R2-63 | - | [WTS] [JSN] | |||
| R2-085423 | Corrections on radio resource configuration | other | Ericsson | R2-63 | - | [WTS] [JSN] | |||
| R2-085424 | Removal of T312 | other | Ericsson | R2-63 | - | [WTS] [JSN] | |||
| R2-085425 | Handling of optional information elements in system information | other | Ericsson | R2-63 | - | [WTS] [JSN] | |||
| R2-085426 | Defining PRB measurements for concatenated packets | other | Ericsson | R2-63 | - | [WTS] [JSN] | |||
| R2-085427 | Optionality of RAI reporting for ANR | other | Ericsson | R2-63 | - | [WTS] [JSN] | |||
| R2-085428 | Setting of NDI after MIMO to non-MIMO configuration | other | Ericsson | R2-63 | - | [WTS] [JSN] | |||
| R2-085429 | Cell Change Order to E-UTRAN | other | NEC | R2-63 | - | [WTS] [JSN] | |||
| R2-085430 | Open issues for Dual Cell HSDPA operation | other | Ericsson | R2-63 | - | [WTS] [JSN] | |||
| R2-085431 | Introduction of Dual Cell HSDPA operation | other | Ericsson | R2-63 | - | [WTS] [JSN] | |||
| R2-085432 | Introduction of Dual Cell HSDPA operation | other | Ericsson | R2-63 | - | [WTS] [JSN] | |||
| R2-085433 | Introduction of Dual Cell HSDPA operation | other | Ericsson | R2-63 | - | [WTS] [JSN] | |||
| R2-085434 | Smaller value ranges for DRX burst length | other | Ericsson | R2-63 | - | [WTS] [JSN] | |||
| R2-085435 | Number of reserved HARQ processes for DL SPS and related signalling aspects | other | Research In Motion | R2-63 | - | [WTS] [JSN] | |||
| R2-085436 | Reference for path loss | other | Qualcomm Europe | R2-63 | - | [WTS] [JSN] | |||
| R2-085437 | Open Issues HS-DSCH Serving Cell Change Enhancements | other | Ericsson | R2-63 | - | [WTS] [JSN] | |||
| R2-085438 | Detection Time of SPS Activation/Reconfiguration Signalling | other | Research In Motion | R2-63 | - | [WTS] [JSN] | |||
| R2-085439 | HARQ process ID at SFN roll over in TDD | other | Qualcomm Europe | R2-63 | - | [WTS] [JSN] | |||
| R2-085440 | Introduction of HS-DSCH cell change enhancements | other | Ericsson | R2-63 | - | [WTS] [JSN] | |||
| R2-085441 | TB Size signalling for the SPS | other | Research In Motion | R2-63 | - | [WTS] [JSN] | |||
| R2-085442 | Addition of CSG indicator bit to the definition of ECI | other | Qualcomm Europe | R2-63 | - | [WTS] [JSN] | |||
| R2-085443 | E-TFC minimum set and power limitation with DCH configured | other | Ericsson | R2-63 | - | [WTS] [JSN] | |||
| R2-085444 | SPS Activation and Reconfiguration Packet Handling during DRX | other | Research In Motion Limited, Sunplus mMobile Inc. | R2-63 | - | [WTS] [JSN] | |||
| R2-085445 | Incorporation of CSG indicator bit into CellIdentity | other | Qualcomm Europe | R2-63 | - | [WTS] [JSN] | |||
| R2-085446 | HNB remaining Issues | other | InterDigital | R2-63 | - | [WTS] [JSN] | |||
| R2-085447 | Correcting E-TFC minimum set behaviour when DCH is configured | other | Ericsson | R2-63 | - | [WTS] [JSN] | |||
| R2-085448 | Correcting E-TFC minimum set behaviour when DCH is configured | other | Ericsson | R2-63 | - | [WTS] [JSN] | |||
| R2-085449 | Robustness of Buffer Status Reporting | other | Ericsson | R2-63 | - | [WTS] [JSN] | |||
| R2-085450 | Enforcement of APN-AMBR | other | NEC | R2-63 | - | [WTS] [JSN] | |||
| R2-085451 | Clarification of AS-NAS concatenation - Stage 2 | other | NEC, Alcatel-Lucent | R2-63 | - | [WTS] [JSN] | |||
| R2-085452 | Corrections to 36.331 for ETWS Notifications | other | LG Electronics Inc. | R2-63 | - | [WTS] [JSN] | |||
| R2-085453 | Corrections to 36.331 for ETWS Notifications | other | LG Electronics Inc. | R2-63 | - | [WTS] [JSN] | |||
| R2-085454 | Clarification of AS-NAS concatenation - Stage 3 | other | NEC, Alcatel-Lucent | R2-63 | - | [WTS] [JSN] | |||
| R2-085455 | Discussion on emergency calls and CS Fallback | other | NEC | R2-63 | - | [WTS] [JSN] | |||
| R2-085456 | Handling of SIB10/11 Change | other | LG Electronics Inc. | R2-63 | - | [WTS] [JSN] | |||
| R2-085457 | Corrections to 36.331 for Change of MIB | other | LG Electronics Inc. | R2-63 | - | [WTS] [JSN] | |||
| R2-085458 | Terminology issue with the HANDOVER COMMAND | other | NEC | R2-63 | - | [WTS] [JSN] | |||
| R2-085459 | Handling of S-measure for ANR | other | Ericsson | R2-63 | - | [WTS] [JSN] | |||
| R2-085460 | Simplification of the transparent container in the HANDOVER COMMAND | other | NEC | R2-63 | - | [WTS] [JSN] | |||
| R2-085461 | Conditional presence of some PDCP parameters in RRC messages | other | NEC | R2-63 | - | [WTS] [JSN] | |||
| R2-085462 | MAC Time Alignment Timer definition | other | NEC, Alcatel-Lucent | R2-63 | - | [WTS] [JSN] | |||
| R2-085463 | Clarification to the scope of Uplink DPCCH slot format 4 feature | other | Nokia Corporation, Nokia Siemens Networks | R2-63 | - | [WTS] [JSN] | |||
| R2-085464 | Corrections to absolute priority reselection and redirection to EUTRA procedures and parameters | other | Nokia Corporation, Nokia Siemens Networks | R2-63 | - | [WTS] [JSN] | |||
| R2-085465 | Correction to absolute priority reselection procedure | other | Nokia Corporation, Nokia Siemens Networks | R2-63 | - | [WTS] [JSN] | |||
| R2-085466 | Offset parameter in PRACH power control | other | LG Electronics Inc. | R2-63 | - | [WTS] [JSN] | |||
| R2-085467 | Measurement and measurement reporting of E-UTRA cells - open issues | other | Nokia Corporation, Nokia Siemens Networks | R2-63 | - | [WTS] [JSN] | |||
| R2-085468 | Consideration on Measurement results | other | LG Electronics Inc. | R2-63 | - | [WTS] [JSN] | |||
| R2-085469 | Update of references to TS 34.108 CS voice over HSPA RAB combinations | other | Nokia Corporation, Nokia Siemens Networks | R2-63 | - | [WTS] [JSN] | |||
| R2-085470 | Email discussion [63_LTE_C03] Can redirection info in connection release be removed? | other | Huawei | R2-63 | - | [WTS] [JSN] | |||
| R2-085471 | Email discussion [63_LTE_C03] Can redirection info in connection release be removed? | other | Huawei | R2-63 | - | [WTS] [JSN] | |||
| R2-085472 | Email discussion [63_LTE_C03] Can redirection info in connection release be removed? | other | Huawei | R2-63 | - | [WTS] [JSN] | |||
| R2-085473 | Email discussion [63_LTE_C03] Can redirection info in connection release be removed? | other | Huawei | R2-63 | - | [WTS] [JSN] | |||
| R2-085474 | Email discussion [63_LTE_C03] Can redirection info in connection release be removed? | other | Huawei | R2-63 | - | [WTS] [JSN] | |||
| R2-085475 | H(e)NB PCI/PSC and Frequency Identification | other | Qualcomm Europe | R2-63 | - | [WTS] [JSN] | |||
| R2-085476 | Proposed Structure for Stage 2 TS on Home NodeB Support | other | Qualcomm Europe | R2-63 | - | [WTS] [JSN] | |||
| R2-085477 | Text proposals capturing RAN2 agreements for Home NodeB | other | Qualcomm Europe | R2-63 | - | [WTS] [JSN] | |||
| R2-085478 | Correction on UL HARQ transmission | other | ETRI | R2-63 | - | [WTS] [JSN] | |||
| R2-085479 | Open Issues in Enhanced Serving Cell Change | other | Qualcomm Europe | R2-63 | - | [WTS] [JSN] | |||
| R2-085480 | Proposed Reply LS to R1-082763 on UE Reconfiguration Timing and HS-SCCH Order | other | Qualcomm Europe | R2-63 | - | [WTS] [JSN] | |||
| R2-085481 | Robust BSR | other | LG Electronics Inc. | R2-63 | - | [WTS] [JSN] | |||
| R2-085482 | Proposed CR to 36.321 [Rel-8] reliabilty of BSR | other | LG Electronics Inc. | R2-63 | - | [WTS] [JSN] | |||
| R2-085483 | Modification to UE DRX to include support for PRACH | other | Qualcomm Europe | R2-63 | - | [WTS] [JSN] | |||
| R2-085484 | NDI and Msg4 Carrying Contention Resolution ID | other | LG Electronics Inc. | R2-63 | - | [WTS] [JSN] | |||
| R2-085485 | Proposed CR to NDI and Msg4 Carrying Contention Resolution ID | other | LG Electronics Inc. | R2-63 | - | [WTS] [JSN] | |||
| R2-085486 | PCH reception | other | LG Electronics Inc. | R2-63 | - | [WTS] [JSN] | |||
| R2-085487 | DRX with PCH, BCH and DL-SCH mapped on BCCH | other | LG Electronics Inc. | R2-63 | - | [WTS] [JSN] | |||
| R2-085488 | Proposed CR to DRX with PCH, BCH and DL-SCH mapped on BCCH | other | LG Electronics Inc. | R2-63 | - | [WTS] [JSN] | |||
| R2-085489 | RACH Triggering | other | LG Electronics Inc. | R2-63 | - | [WTS] [JSN] | |||
| R2-085490 | Proposed CR to RACH Triggering | other | LG Electronics Inc. | R2-63 | - | [WTS] [JSN] | |||
| R2-085491 | Reflection of RAN1 LS on timing adjustment | other | LG Electronics Inc. | R2-63 | - | [WTS] [JSN] | |||
| R2-085492 | Correction to E field for MAC PDU | other | LG Electronics Inc. | R2-63 | - | [WTS] [JSN] | |||
| R2-085493 | Small corrections to MAC | other | LG Electronics Inc. | R2-63 | - | [WTS] [JSN] | |||
| R2-085494 | UE simultaneous physical channels combinations related to DC-HSPA | other | LG Electronics Inc. | R2-63 | - | [WTS] [JSN] | |||
| R2-085495 | MAC BSR trigger CR | other | Motorola | R2-63 | - | [WTS] [JSN] | |||
| R2-085496 | MAC BSR Coding | other | Motorola | R2-63 | - | [WTS] [JSN] | |||
| R2-085497 | Void | other | - | R2-63 | - | [WTS] [JSN] | |||
| R2-085498 | Discussion on Handling of a Poll in a duplicated PDU | other | LG Electronics Inc. | R2-63 | - | [WTS] [JSN] | |||
| R2-085499 | Logical Channel Prioritization CR | other | Motorola | R2-63 | - | [WTS] [JSN] | |||
| R2-085500 | MAC PDU text update in 36.321 | other | Motorola | R2-63 | - | [WTS] [JSN] | |||
| R2-085501 | Additional BSR trigger | other | Motorola | R2-63 | - | [WTS] [JSN] | |||
| R2-085502 | Proposed CR to 36.322 on Handling of a Poll in a duplicated PDU | other | LG Electronics Inc. | R2-63 | - | [WTS] [JSN] | |||
| R2-085503 | Proposed CR to 36.323 on Processing of PDCP SDU received from upper layer | other | LG Electronics Inc. | R2-63 | - | [WTS] [JSN] | |||
| R2-085504 | Proposed CR to 36.323 on Delivery of PDCP SDU after header decompression | other | LG Electronics Inc. | R2-63 | - | [WTS] [JSN] | |||
| R2-085505 | Introduction of additional UE categories for 1.28Mcps TDD 64QAM DL | other | ZTE Corporation | R2-63 | - | [WTS] [JSN] | |||
| R2-085506 | Introduction of additional UE categories for 1.28Mcps TDD 64QAM DL | other | ZTE Corporation | R2-63 | - | [WTS] [JSN] | |||
| R2-085507 | Report of E-mail activities on PDCP modular operation | other | Rapporteur (LG Electronics Inc.) | R2-63 | - | [WTS] [JSN] | |||
| R2-085508 | Introduction of additional UE categories for 1.28Mcps TDD 64QAM DL | other | ZTE Corporation | R2-63 | - | [WTS] [JSN] | |||
| R2-085509 | Introduction of additional UE categories for 1.28Mcps TDD 64QAM DL | other | ZTE Corporation | R2-63 | - | [WTS] [JSN] | |||
| R2-085510 | Detailed operation on the HS-DSCH transmission in PCH state | other | ZTE Corporation | R2-63 | - | [WTS] [JSN] | |||
| R2-085511 | Proposed CR to 36.323 on Introduction of PDCP modular oepration | other | LG Electronics Inc. | R2-63 | - | [WTS] [JSN] | |||
| R2-085512 | Some clarifications for enhanced CELL_FACH state | other | ZTE Corporation | R2-63 | - | [WTS] [JSN] | |||
| R2-085513 | Proposal on Uplink data transmission in enhanced CELL_FACH state | other | ZTE Corporation | R2-63 | - | [WTS] [JSN] | |||
| R2-085514 | Implicit analysis between MBSFN subframe and Paging subframe | other | ZTE | R2-63 | - | [WTS] [JSN] | |||
| R2-085515 | Consideration of SFN Rollling Over in SPS | other | CATT | R2-63 | - | [WTS] [JSN] | |||
| R2-085516 | PRB measurements | other | Huawei | R2-63 | - | [WTS] [JSN] | |||
| R2-085517 | Correction to the Co-exist of SPS-RNTI and SI-RNTI or RA-RNTI | other | CATT | R2-63 | - | [WTS] [JSN] | |||
| R2-085518 | Clarification about Restarting the Periodic BSR Timer | other | CATT | R2-63 | - | [WTS] [JSN] | |||
| R2-085519 | Discussion on reestablishment procedure | other | Huawei | R2-63 | - | [WTS] [JSN] | |||
| R2-085520 | MAC Open Issues list | other | Ericsson (Rapporteur) | R2-63 | - | [WTS] [JSN] | |||
| R2-085521 | Some issues about Access Class Barring | other | Huawei | R2-63 | - | [WTS] [JSN] | |||
| R2-085522 | Configuration of the Time Alignment Timer | other | Ericsson | R2-63 | - | [WTS] [JSN] | |||
| R2-085523 | Correction to reception of assignments and grants | other | Ericsson | R2-63 | - | [WTS] [JSN] | |||
| R2-085524 | Moving from E-UTRA | other | Huawei | R2-63 | - | [WTS] [JSN] | |||
| R2-085525 | NCC and KSI details | other | Ericsson | R2-63 | - | [WTS] [JSN] | |||
| R2-085526 | system information change of ETWS PN for RRC_CONNECTED UE | other | Huawei | R2-63 | - | [WTS] [JSN] | |||
| R2-085527 | CR to 36.304 on black listed cells | other | Huawei | R2-63 | - | [WTS] [JSN] | |||
| R2-085528 | CR to 36.304 on Speed dependent scaling factor for CDMA2000 | other | Huawei | R2-63 | - | [WTS] [JSN] | |||
| R2-085529 | Priority of Power Headroom Report | other | ASUSTeK | R2-63 | - | [WTS] [JSN] | |||
| R2-085530 | Cell reselection towards to CDMA2000 | other | Huawei | R2-63 | - | [WTS] [JSN] | |||
| R2-085531 | CR to 36.300 on intra E-UTRAN HO | other | Huawei | R2-63 | - | [WTS] [JSN] | |||
| R2-085532 | EUTRA measurement result | other | Huawei | R2-63 | - | [WTS] [JSN] | |||
| R2-085533 | Misc small corrections 36.331 | other | Huawei | R2-63 | - | [WTS] [JSN] | |||
| R2-085534 | RB Identity | other | Motorola | R2-63 | - | [WTS] [JSN] | |||
| R2-085535 | Multiple Cell preparation at Handover | other | Huawei | R2-63 | - | [WTS] [JSN] | |||
| R2-085536 | Discussion on the usage of KSI ASME | other | Huawei | R2-63 | - | [WTS] [JSN] | |||
| R2-085537 | Time to trigger configuration and DRX | other | Huawei | R2-63 | - | [WTS] [JSN] | |||
| R2-085538 | Further VoIP uplink scheduling discussion in CPC for 1.28 Mcps TDD | other | TD Tech | R2-63 | - | [WTS] [JSN] | |||
| R2-085539 | Further VoIP uplink scheduling discussion in CPC for 1.28 Mcps TDD | other | TD Tech | R2-63 | - | [WTS] [JSN] | |||
| R2-085540 | Keeping C-RNTI in RRCConnectionReestablishment message | other | Motorola | R2-63 | - | [WTS] [JSN] | |||
| R2-085541 | Keeping C-RNTI in RRCConnectionReestablishment message | other | Motorola | R2-63 | - | [WTS] [JSN] | |||
| R2-085542 | VoIP downlink scheduling in CPC for 1.28 Mcps TDD | other | TD Tech | R2-63 | - | [WTS] [JSN] | |||
| R2-085543 | Measurement event for ICIC | other | Huawei | R2-63 | - | [WTS] [JSN] | |||
| R2-085544 | Proposal to cipher the SecurityModeComplete message | other | Motorola | R2-63 | - | [WTS] [JSN] | |||
| R2-085545 | Correction to Definition of homePLMN | other | Huawei | R2-63 | - | [WTS] [JSN] | |||
| R2-085546 | Consideration on Mobility from E-UTRA procedure | other | Huawei | R2-63 | - | [WTS] [JSN] | |||
| R2-085547 | Battery saving for receiving ETWS | other | Huawei | R2-63 | - | [WTS] [JSN] | |||
| R2-085548 | Proposal to remove RRCConnectionReestablishmentReject message | other | Motorola | R2-63 | - | [WTS] [JSN] | |||
| R2-085549 | Multiple KeNB* and shortMAC-I forwarding at handover | other | NTT DOCOMO | R2-63 | - | [WTS] [JSN] | |||
| R2-085550 | Correction on SR trigger condition | other | Fujitsu | R2-63 | - | [WTS] [JSN] | |||
| R2-085551 | Max allowed Tx power in E-UTRAN | other | NTT DOCOMO | R2-63 | - | [WTS] [JSN] | |||
| R2-085552 | Correction on padding subheader | other | Fujitsu | R2-63 | - | [WTS] [JSN] | |||
| R2-085553 | Clarifications on E-CGI | other | Huawei | R2-63 | - | [WTS] [JSN] | |||
| R2-085554 | Clarification of E-RUCCH transmission in 25.321 for R7 | other | TD Tech | R2-63 | - | [WTS] [JSN] | |||
| R2-085555 | Access class barring handling for emergency calls | other | NTT DOCOMO | R2-63 | - | [WTS] [JSN] | |||
| R2-085556 | Error handling in PDCP | other | Motorola | R2-63 | - | [WTS] [JSN] | |||
| R2-085557 | Radio problem detection | other | Huawei | R2-63 | - | [WTS] [JSN] | |||
| R2-085558 | Measurement handling at inter-frequency handover | other | NTT DOCOMO | R2-63 | - | [WTS] [JSN] | |||
| R2-085559 | Pre-registration in EUTRAN and CDMA interworking | other | Huawei | R2-63 | - | [WTS] [JSN] | |||
| R2-085560 | introduce Intra-SecondaryFrequency Indicator for LCR TDD | other | ZTE CORPORATION | R2-63 | - | [WTS] [JSN] | |||
| R2-085561 | The process for TTI Bundling at handover | other | ZTE Corporation | R2-63 | - | [WTS] [JSN] | |||
| R2-085562 | introduce Intra-SecondaryFrequency Indicator for LCR TDD | other | ZTE CORPORATION | R2-63 | - | [WTS] [JSN] | |||
| R2-085563 | PDCP modeling updates for section 4.2.1 | other | Motorola | R2-63 | - | [WTS] [JSN] | |||
| R2-085564 | The start time for TTI Bundling | other | ZTE Corporation | R2-63 | - | [WTS] [JSN] | |||
| R2-085565 | MBSFN subframe signalling interaction with paging subframe | other | Huawei | R2-63 | - | [WTS] [JSN] | |||
| R2-085566 | PDCP modeling updates for section 4.2.2 | other | Motorola | R2-63 | - | [WTS] [JSN] | |||
| R2-085567 | TP for HNBID (36.331) | other | Huawei | R2-63 | - | [WTS] [JSN] | |||
| R2-085568 | clarification of E-RUCCH transmission in 25.321 for R8 | other | TD tech | R2-63 | - | [WTS] [JSN] | |||
| R2-085569 | CR for CSG definitions (36.304) | other | Huawei | R2-63 | - | [WTS] [JSN] | |||
| R2-085570 | Editorial Corrections | other | Motorola | R2-63 | - | [WTS] [JSN] | |||
| R2-085571 | Discussions on outbound mobility for UTRA hNB | other | Huawei | R2-63 | - | [WTS] [JSN] | |||
| R2-085572 | Discussions on idle mobility between UTRA hNBs | other | Huawei | R2-63 | - | [WTS] [JSN] | |||
| R2-085573 | Clarification of T-RUCCH startup condition for R7 | other | TD Tech | R2-63 | - | [WTS] [JSN] | |||
| R2-085574 | CR for CSG selection (36.304) | other | Huawei | R2-63 | - | [WTS] [JSN] | |||
| R2-085575 | CR for CSG Intro (25.304) | other | Huawei | R2-63 | - | [WTS] [JSN] | |||
| R2-085576 | Correction of the Description of FS2 and Downlink Reference Signal | other | CATT | R2-63 | - | [WTS] [JSN] | |||
| R2-085577 | CR on hNB ID String | other | Huawei | R2-63 | - | [WTS] [JSN] | |||
| R2-085578 | UL SPS collision in TDD | other | Huawei | R2-63 | - | [WTS] [JSN] | |||
| R2-085579 | Correction on Contention Resolution | other | Samsung, Nokia Siemens Networks, Nokia Corporation | R2-63 | - | [WTS] [JSN] | |||
| R2-085580 | TTI Bundling: Overlap with Measurement Gap | other | Samsung | R2-63 | - | [WTS] [JSN] | |||
| R2-085581 | S-measure handling for SON-ANR | other | Qualcomm Europe | R2-63 | - | [WTS] [JSN] | |||
| R2-085582 | Full vs Delta configuration in case of connection re-establishment | other | Qualcomm Europe | R2-63 | - | [WTS] [JSN] | |||
| R2-085583 | Clarification on change of bearer mapping at reconfiguration | other | Qualcomm Europe | R2-63 | - | [WTS] [JSN] | |||
| R2-085584 | Introduction of signalling connection release indication | other | Qualcomm Europe | R2-63 | - | [WTS] [JSN] | |||
| R2-085585 | Delta configuration in case of handover | other | Qualcomm Europe | R2-63 | - | [WTS] [JSN] | |||
| R2-085586 | Text proposal on concatenation of NAS PDUs | other | Qualcomm Europe | R2-63 | - | [WTS] [JSN] | |||
| R2-085587 | Granularity of information at SIB modification | other | Qualcomm Europe | R2-63 | - | [WTS] [JSN] | |||
| R2-085588 | Further considerations on ETWS mechanisms | other | Qualcomm Europe | R2-63 | - | [WTS] [JSN] | |||
| R2-085589 | Further considerations on ETWS mechanisms | other | Qualcomm Europe | R2-63 | - | [WTS] [JSN] | |||
| R2-085590 | SIB2 Offset Considered Harmful | other | Qualcomm Europe | R2-63 | - | [WTS] [JSN] | |||
| R2-085591 | Clarification of definition of SnonServingCell,x for CDMA2000 RATs | other | Qualcomm Europe | R2-63 | - | [WTS] [JSN] | |||
| R2-085592 | Report on Generic error handling email discussion | other | NSN | R2-63 | - | [WTS] [JSN] | |||
| R2-085593 | Clarification on required system information for UEs in on-going procedure | other | LG Electronics Inc. | R2-63 | - | [WTS] [JSN] | |||
| R2-085594 | Value range of reportAmount, and relevant clarifications | other | LG Electronics Inc. | R2-63 | - | [WTS] [JSN] | |||
| R2-085595 | Clarification on required system information for UEs in on-going procedure | other | LG Electronics Inc. | R2-63 | - | [WTS] [JSN] | |||
| R2-085596 | Summary of email discussion on TDD specific value ranges for MAC parameters | other | CATT | R2-63 | - | [WTS] [JSN] | |||
| R2-085597 | Some field descriptions for L1 information | other | Samsung | R2-63 | - | [WTS] [JSN] | |||
| R2-085598 | Adding the indication for SDU discarding for RLC UM | other | CATT | R2-63 | - | [WTS] [JSN] | |||
| R2-085599 | Correction on System Information Acquisition | other | LG Electronics Inc. | R2-63 | - | [WTS] [JSN] | |||
| R2-085600 | Missing L1 information | other | Samsung | R2-63 | - | [WTS] [JSN] | |||
| R2-085601 | On replay protection | other | Samsung | R2-63 | - | [WTS] [JSN] | |||
| R2-085602 | UP handling during inter-RAT HO | other | Samsung | R2-63 | - | [WTS] [JSN] | |||
| R2-085603 | Correction on cell reselection candidates cells of inter-RAT | other | LG Electronics Inc. | R2-63 | - | [WTS] [JSN] | |||
| R2-085604 | On HARQ suspension | other | Samsung | R2-63 | - | [WTS] [JSN] | |||
| R2-085605 | Discussion and TP for Missing L1 parameters (CQI related) | other | Texas Instruments Inc | R2-63 | - | [WTS] [JSN] | |||
| R2-085606 | L1 Information for PRACH | other | Samsung | R2-63 | - | [WTS] [JSN] | |||
| R2-085607 | Capture two-intervals-SPS into Stage 2 | other | CATT | R2-63 | - | [WTS] [JSN] | |||
| R2-085608 | Correction on UE behaviour to HARQ suspension | other | Samsung | R2-63 | - | [WTS] [JSN] | |||
| R2-085609 | NDI handling in the uplink | other | Samsung | R2-63 | - | [WTS] [JSN] | |||
| R2-085610 | Considerations on PRB usage measurements | other | CMCC | R2-63 | - | [WTS] [JSN] | |||
| R2-085611 | Tie SPS Resource to SFN | other | CATT | R2-63 | - | [WTS] [JSN] | |||
| R2-085612 | Message 3 transmission interrupted by the adaptive retransmission command | other | Samsung | R2-63 | - | [WTS] [JSN] | |||
| R2-085613 | Correction to prevent message 3 transmission being interrupted by adaptive retransmission command | other | Samsung | R2-63 | - | [WTS] [JSN] | |||
| R2-085614 | L1 Information for CQI and RI configuration | other | Samsung | R2-63 | - | [WTS] [JSN] | |||
| R2-085615 | On priorities of MAC CEs | other | Samsung | R2-63 | - | [WTS] [JSN] | |||
| R2-085616 | Considerations on PRB usage measurements | other | CMCC | R2-63 | - | [WTS] [JSN] | |||
| R2-085617 | On optimizing BS tables | other | Samsung | R2-63 | - | [WTS] [JSN] | |||
| R2-085618 | Correction on priority handling on MAC CEs and DCCH MAC SDUs | other | Samsung, Nokia Siemens Networks,Nokia Corporation | R2-63 | - | [WTS] [JSN] | |||
| R2-085619 | Clarification of PUCCH configuration information | other | Samsung | R2-63 | - | [WTS] [JSN] | |||
| R2-085620 | Discussion on CR for missing L1 parameters (CQI related) | other | Texas Instruments Inc | R2-63 | - | [WTS] [JSN] | |||
| R2-085621 | L1 Information for SRS | other | Samsung | R2-63 | - | [WTS] [JSN] | |||
| R2-085622 | Considerations on PRB usage measurements | other | CMCC | R2-63 | - | [WTS] [JSN] | |||
| R2-085623 | E-TFC restriction and minimum set in 25.321 | other | Qualcomm Europe | R2-63 | - | [WTS] [JSN] | |||
| R2-085624 | Robustness of Buffer Status Reporting | other | Texas Instruments Inc | R2-63 | - | [WTS] [JSN] | |||
| R2-085625 | Considerations on PRB usage measurements | other | CMCC | R2-63 | - | [WTS] [JSN] | |||
| R2-085626 | CR: Robustness of Buffer Status Reporting | other | Texas Instruments Inc | R2-63 | - | [WTS] [JSN] | |||
| R2-085627 | SRB1 establishment clarification | other | Nokia | R2-63 | - | [WTS] [JSN] | |||
| R2-085628 | Correction to DRX and Measurement Gap | other | CATT | R2-63 | - | [WTS] [JSN] | |||
| R2-085629 | Correction to the BSR triggers | other | Samsung, Nokia Siemens Networks,Nokia Corporation | R2-63 | - | [WTS] [JSN] | |||
| R2-085630 | Clarification of DRX Active Time | other | Ericsson | R2-63 | - | [WTS] [JSN] | |||
| R2-085631 | L1 Information for PRACH | other | Samsung, Panasonic | R2-63 | - | [WTS] [JSN] | |||
| R2-085632 | Issues regarding DRX operation | other | NTT DOCOMO | R2-63 | - | [WTS] [JSN] | |||
| R2-085633 | Correction on PHR triggering condition | other | Samsung | R2-63 | - | [WTS] [JSN] | |||
| R2-085634 | SPS HARQ process linking | other | Samsung, RIM | R2-63 | - | [WTS] [JSN] | |||
| R2-085635 | Linking HARQ process ID with the SPS resource | other | Samsung, RIM | R2-63 | - | [WTS] [JSN] | |||
| R2-085636 | Miscellaneous corrections and clarifications | other | Rapporteur (Samsung) | R2-63 | - | [WTS] [JSN] | |||
| R2-085637 | Adding MAC architecture | other | Samsung | R2-63 | - | [WTS] [JSN] | |||
| R2-085638 | Removing a redundant text on VT(A) setting | other | Samsung | R2-63 | - | [WTS] [JSN] | |||
| R2-085639 | Adding RLC TM operation | other | Samsung, Nokia Siemens Networks,Nokia Corporation | R2-63 | - | [WTS] [JSN] | |||
| R2-085640 | Corrections on NDI handling for the uplink | other | Samsung | R2-63 | - | [WTS] [JSN] | |||
| R2-085641 | Small correction on Reception of a RRCConnectionReconfiguration for handover | other | LG Electronics Inc. | R2-63 | - | [WTS] [JSN] | |||
| R2-085642 | E-UTRA RRC main issues | other | Rapporteur (Samsung) | R2-63 | - | [WTS] [JSN] | |||
| R2-085643 | Considerations on PRB usage measurements | other | CMCC | R2-63 | - | [WTS] [JSN] | |||
| R2-085644 | Issues regarding ETWS | other | NTT DOCOMO | R2-63 | - | [WTS] [JSN] | |||
| R2-085645 | Miscellaneous corrections to 36.321 | other | Samsung | R2-63 | - | [WTS] [JSN] | |||
| R2-085646 | Generic error handling | other | Samsung | R2-63 | - | [WTS] [JSN] | |||
| R2-085647 | Inter-RAT mobility | other | Samsung | R2-63 | - | [WTS] [JSN] | |||
| R2-085648 | Considerations on PRB usage measurements | other | CMCC | R2-63 | - | [WTS] [JSN] | |||
| R2-085649 | Corrections and clarifications on system information | other | Samsung | R2-63 | - | [WTS] [JSN] | |||
| R2-085650 | Removal of MAC-ehs dependency for CS voice over HSPA | other | Samsung | R2-63 | - | [WTS] [JSN] | |||
| R2-085651 | Removal of FFSs and correction to the messages used for UE capability signalling | other | Samsung | R2-63 | - | [WTS] [JSN] | |||
| R2-085652 | On MAC parqameter value range and default values | other | NTT DOCOMO | R2-63 | - | [WTS] [JSN] | |||
| R2-085653 | Corrections and clarifications on connection control | other | Samsung | R2-63 | - | [WTS] [JSN] | |||
| R2-085654 | Removal of FFSs and correction to the messages used for UE capability signalling | other | Samsung | R2-63 | - | [WTS] [JSN] | |||
| R2-085655 | Correction to initiation of RRC Connection re-establishment | other | CMCC | R2-63 | - | [WTS] [JSN] | |||
| R2-085656 | Correction to the segmentation status field | other | Samsung | R2-63 | - | [WTS] [JSN] | |||
| R2-085657 | HARQ RTT Timer | other | Ericsson | R2-63 | - | [WTS] [JSN] | |||
| R2-085658 | Corrections and clarifications on measurements | other | Samsung | R2-63 | - | [WTS] [JSN] | |||
| R2-085659 | Inter frequency Cell Reselection from macro cell to CSG | other | Huawei | R2-63 | - | [WTS] [JSN] | |||
| R2-085660 | Discussion on parameters of inter-RAT cell reselection | other | CMCC | R2-63 | - | [WTS] [JSN] | |||
| R2-085661 | CR for inter freq cell reselection from macro cell to CSG (36.304) | other | Huawei | R2-63 | - | [WTS] [JSN] | |||
| R2-085662 | Issues on RA failure and RRC re-establishment initiation | other | NTT DOCOMO | R2-63 | - | [WTS] [JSN] | |||
| R2-085663 | Need for PCI CSG to be known in the UE | other | Huawei | R2-63 | - | [WTS] [JSN] | |||
| R2-085664 | UPH transmission for Dual Cell HSDPA | other | Samsung | R2-63 | - | [WTS] [JSN] | |||
| R2-085665 | Happy Bit Analysis | other | Qualcomm Europe | R2-63 | - | [WTS] [JSN] | |||
| R2-085666 | Open issues on configurable parameters in MAC | other | Ericsson | R2-63 | - | [WTS] [JSN] | |||
| R2-085667 | Proposal to change priority for TA comman reception in RA response in the LTE feature list | other | NTT DOCOMO | R2-63 | - | [WTS] [JSN] | |||
| R2-085668 | Email discussion [63_LTE_C03] Can redirection info in connection release be removed? | other | Huawei | R2-63 | - | [WTS] [JSN] | |||
| R2-085669 | Email discussion [63_LTE_C01] Home-(e)NB mobility; main issues | other | Huawei | R2-63 | - | [WTS] [JSN] | |||
| R2-085670 | Removal of MAC-ehs dependency for CS voice over HSPA | other | Samsung | R2-63 | - | [WTS] [JSN] | |||
| R2-085671 | MBSFN overallocation issue | other | Alcatel-Lucent | R2-63 | - | [WTS] [JSN] | |||
| R2-085672 | Inclusion of CDMA2000 carrier frequency in inter-RAT handover command to CDMA2000 | other | LG Electronics Inc. | R2-63 | - | [WTS] [JSN] | |||
| R2-085673 | Frequency information setting in SIB8 during Inter-RAT handover | other | LG Electronics Inc. | R2-63 | - | [WTS] [JSN] | |||
| R2-085674 | (Rapporteur's) Update 36.302 Prague1 (Reception of Simultaneous Physical Channels in Downlink) | other | Alcatel-Lucent | R2-63 | - | [WTS] [JSN] | |||
| R2-085675 | Align Measurement Definition | other | Alcatel-Lucent | R2-63 | - | [WTS] [JSN] | |||
| R2-085676 | Paging receiving for ETWS capable UEs in RRC_CONNECTED | other | Huawei | R2-63 | - | [WTS] [JSN] | |||
| R2-085677 | Paging receiving for ETWS capable UEs in RRC_CONNECTED | other | Huawei | R2-63 | - | [WTS] [JSN] | |||
| R2-085678 | Analysis of silent active state switch mechanism for VOIP in CPC LCR TDD | other | ZTE | R2-63 | - | [WTS] [JSN] | |||
| R2-085679 | Clarifications on measurement results for 1x RTT | other | Huawei, Alcatel-Lucent, Motorola, Nortel,Verizon | R2-63 | - | [WTS] [JSN] | |||
| R2-085680 | Change of C-RNTI | other | Nokia Corporation, Nokia Siemens Networks | R2-63 | - | [WTS] [JSN] | |||
| R2-085681 | List for Protection Exception of RRC Messages | other | Nokia Corporation, Nokia Siemens Networks, Alcatel-Lucent, Samsung, RIM | R2-63 | - | [WTS] [JSN] | |||
| R2-085682 | Align Number of Cell Identities | other | Alcatel-Lucent | R2-63 | - | [WTS] [JSN] | |||
| R2-085683 | Default values for parameters in PUSCH-ConfigDedicated | other | Ericsson | R2-63 | - | [WTS] [JSN] | |||
| R2-085684 | Draft TP capturing way forward of measurement handling upon handover, RRC connection re-establishment | other | Panasonic | R2-63 | - | [WTS] [JSN] | |||
| R2-085685 | ETWS transmission and reception | other | HTC Corporation | R2-63 | - | [WTS] [JSN] | |||
| R2-085686 | Consideration on the PRACH indication for dedicated preamble allocation | other | CATT | R2-63 | - | [WTS] [JSN] | |||
| R2-085687 | Removal of cellReservationExtension | other | NTT DOCOMO | R2-63 | - | [WTS] [JSN] | |||
| R2-085688 | CR to 36.304 on Removal of cellReservationExtension | other | NTT DOCOMO | R2-63 | - | [WTS] [JSN] | |||
| R2-085689 | Proposed CR to 36.321 on SR Clarifications | other | Nokia Corporation, Nokia Siemens Networks, Ericsson, Samsung | R2-63 | - | [WTS] [JSN] | |||
| R2-085690 | PDCP open issues | other | LG Electronics Inc. (Rapporteur) | R2-63 | - | [WTS] [JSN] | |||
| R2-085691 | Corrections on L1 parameters | other | LG | R2-63 | - | [WTS] [JSN] | |||
| R2-085692 | Handling of cellsToReportList | other | LG | R2-63 | - | [WTS] [JSN] | |||
| R2-085693 | Sharing of HARQ process IDs of SPS with DS | other | ITRI | R2-63 | - | [WTS] [JSN] | |||
| R2-085694 | Clarification on Padding value | other | Fujitsu | R2-63 | - | [WTS] [JSN] | |||
| R2-085695 | Correction on SR trigger condition | other | Fujitsu | R2-63 | - | [WTS] [JSN] | |||
| R2-085696 | Correction for abortion of RRC connection establishment procedure | other | Via Technologies | R2-63 | - | [WTS] [JSN] | |||
| R2-085697 | LS on work split for definition of L2 measurements (S5-081376; to: RAN2; cc: -; contact: Huawei) | other | SA5 | R2-63 | - | [WTS] [JSN] | |||
| R2-085698 | Definition of Global Cell Identities and related IEs | other | IPWireless | R2-63 | - | [WTS] [JSN] | |||
| R2-085699 | Report on Generic error handling email discussion | other | NSN | R2-63 | - | [WTS] [JSN] | |||
| R2-085700 | TP to 36.331 for UE Capability Handling | other | Vodafone | R2-63 | - | [WTS] [JSN] | |||
| R2-085701 | Considerations for UTRA Home NB | other | Vodafone | R2-63 | - | [WTS] [JSN] | |||
| R2-085702 | Periodic Updates in Connected Mode | other | Vodafone | R2-63 | - | [WTS] [JSN] | |||
| R2-085703 | D-SR failure handling | other | Ericsson, Nokia Siemens Networks | R2-63 | - | [WTS] [JSN] | |||
| R2-085704 | CR to 36.300 on intra E-UTRAN HO | other | Huawei | R2-63 | - | [WTS] [JSN] | |||
| R2-085705 | Email discussion [63_LTE_C01] Home-(e)NB mobility; main issues | other | Huawei | R2-63 | - | [WTS] [JSN] | |||
| R2-085706 | UPH transmission for Dual Cell HSDPA | other | Samsung | R2-63 | - | [WTS] [JSN] | |||
| R2-085707 | Draft reply LS to S1-082418 = R2-084550 on UE-AMBR support in UTRAN | other | Vodafone | R2-63 | - | [WTS] [JSN] | |||
| R2-085708 | Draft reply LS to RAN1 on L1-L3 interaction (to: RAN1; cc: RAN3, RAN4; contact: Qualcomm) | other | Qualcomm Europe | R2-63 | - | [WTS] [JSN] | |||
| R2-085709 | Discussion on UE categories for DC-HSDPA operation | other | Huawei | R2-63 | - | [WTS] [JSN] | |||
| R2-085710 | Serving Cell Change open issues | other | Interdigital | R2-63 | - | [WTS] [JSN] | |||
| R2-085711 | Introduce Intra-SecondaryFrequency Indicator for LCR TDD | other | ZTE | R2-63 | - | [WTS] [JSN] | |||
| R2-085712 | HARQ feedback with Enhanced Uplink in Cell_FACH state | other | InterDigital | R2-63 | - | [WTS] [JSN] | |||
| R2-085713 | Update of stage 2 description for Enhanced Uplink for CELL_FACH State and Idle mode in FDD | other | Infineon | R2-63 | - | [WTS] [JSN] | |||
| R2-085714 | Introduction of support of “Enhanced Uplink for CELL_FACH State in FDD” and “Improved L2 for uplink” | other | Infineon | R2-63 | - | [WTS] [JSN] | |||
| R2-085715 | Interaction of DC-HSDPA and Enhanced Serving Cell Change in 25.331 messages | other | Qualcomm Europe | R2-63 | - | [WTS] [JSN] | |||
| R2-085716 | Update of stage 2 description for Enhanced Uplink for CELL_FACH State and Idle mode in FDD | other | Infineon | R2-63 | - | [WTS] [JSN] | |||
| R2-085717 | Introduction of support of “Enhanced Uplink for CELL_FACH State in FDD” and “Improved L2 for uplink” | other | Infineon | R2-63 | - | [WTS] [JSN] | |||
| R2-085718 | Reply LS to R1-082226 = R2-083060 on L1-L3 interaction (to: RAN1; cc: -; contact: Qualcomm) | LS out | RAN2 | R2-63 | - | [WTS] [JSN] | |||
| R2-085719 | Reply LS to R1-082763 = R2-083822 on UE Reconfiguration Timing and HS-SCCH Order (to: RAN1; cc: -; contact: Qualcomm) | LS out | RAN2 | R2-63 | - | [WTS] [JSN] | |||
| R2-085720 | Addition of UE categories for dual cell HSDPA | other | Nokia Corporation, Nokia Siemens Networks, Ericsson, Samsung, Qualcomm | R2-63 | - | [WTS] [JSN] | |||
| R2-085721 | [Draft] LS to RAN WG4 on UE categories for Dual Cell operation (to: RAN4; cc: -; contact: Ericsson) | other | Ericsson | R2-63 | - | [WTS] [JSN] | |||
| R2-085722 | [Draft] LS to RAN WG4 on UE categories for Dual Cell operation (to: RAN4; cc: -; contact: Ericsson) | other | Ericsson | R2-63 | - | [WTS] [JSN] | |||
| R2-085723 | [Draft] LS to RAN WG4 on UE measurement capability and UE categories for Dual Cell operation (to: RAN4; cc: -; contact: Ericsson) | other | Ericsson | R2-63 | - | [WTS] [JSN] | |||
| R2-085724 | Introduction of UE Measurement Capability for DC-HSDPA | other | Qualcomm Europe | R2-63 | - | [WTS] [JSN] | |||
| R2-085725 | Clarification of non-used frequency definition for secondary frequency in DC-HSDPA | other | Qualcomm Europe | R2-63 | - | [WTS] [JSN] | |||
| R2-085726 | Correct the description of UE behaviour during HS-DSCH Reception in CELL_PCH | other | Huawei | R2-63 | - | [WTS] [JSN] | |||
| R2-085727 | Some corrections for Enhanced UE DRX | other | Huawei | R2-63 | - | [WTS] [JSN] | |||
| R2-085728 | Remove FFS from the figure for MAC-e details | other | Huawei | R2-63 | - | [WTS] [JSN] | |||
| R2-085729 | Introduction of C-Plane solution for MBSFN case | other | Huawei | R2-63 | - | [WTS] [JSN] | |||
| R2-085730 | Clarification of common E-DCH resource usage in 25.321 | other | Nokia Corporation, Nokia Siemens Networks | R2-63 | - | [WTS] [JSN] | |||
| R2-085731 | PAGING Enhancement for ETWS on UMTS | other | NTT DoCoMo | R2-63 | - | [WTS] [JSN] | |||
| R2-085732 | LS to RAN WG4 on UE measurement capability and UE categories for Dual Cell operation (to: RAN4; cc: -; contact: Ericsson) | LS out | RAN2 | R2-63 | - | [WTS] [JSN] | |||
| R2-085733 | Text proposals capturing RAN2 agreements for Home NodeB | other | Qualcomm Europe | R2-63 | - | [WTS] [JSN] | |||
| R2-085734 | Reply LS to S1-082418 = R2-084550 on UE-AMBR support in UTRAN (to: SA1; cc: SA2, RAN3, GERAN2, CT1, CT4; contact: Vodafone) | LS out | RAN2 | R2-63 | - | [WTS] [JSN] | |||
| R2-085735 | [Draft] LS to CT1 on AS/NAS Split for CSG Selection | other | Vodafone | R2-63 | - | [WTS] [JSN] | |||
| R2-085736 | Void | other | - | R2-63 | - | [WTS] [JSN] | |||
| R2-085737 | Remove FFS from the figure for MAC-e details | other | Huawei | R2-63 | - | [WTS] [JSN] | |||
| R2-085738 | Clarification of common E-DCH resource use in 25.321 | other | Nokia Corporation, Nokia Siemens Networks | R2-63 | - | [WTS] [JSN] | |||
| R2-085739 | Draft LS on AS/NAS split for CSG selection (to: CT1; cc: -; contact: Vodafone) | other | Vodafone | R2-63 | - | [WTS] [JSN] | |||
| R2-085740 | Text proposals for Stage 2 TS on Home NodeB Support | other | Qualcomm Europe | R2-63 | - | [WTS] [JSN] | |||
| R2-085741 | Configuration of Multiple Periodicity Patterns for SPS in TDD | other | Nokia Corporation, Nokia Siemens Networks | R2-63 | - | [WTS] [JSN] | |||
| R2-085742 | Reply Ls to R2-084952 on NAS message concatenation and multiple EPS bearer setup | other | Qualcomm Europe | R2-63 | - | [WTS] [JSN] | |||
| R2-085743 | Reply LS to SA5 to R2-085697 on work split for definition of L2 measurements | other | Huawei | R2-63 | - | [WTS] [JSN] | |||
| R2-085744 | Reply LS to R2-084974 on Special Conformance Testing functions for UE (TS 36.509) | other | Qualcomm Europe | R2-63 | - | [WTS] [JSN] | |||
| R2-085745 | Reply LS to R2-084978 on NAS trigger for RLF | other | Alcatel-Lucent | R2-63 | - | [WTS] [JSN] | |||
| R2-085746 | Pilot list Information for HO to CDMA 1xRTT | other | Alcatel-Lucent, Nortel, Ericsson, NSN | R2-63 | - | [WTS] [JSN] | |||
| R2-085747 | PDCP In-sequence Delivery Always On | other | Qualcomm Europe | R2-63 | - | [WTS] [JSN] | |||
| R2-085748 | Setting the short MAC-I | other | Fujitsu | R2-63 | - | [WTS] [JSN] | |||
| R2-085749 | Configuration of Semi-Persistent Scheduling | other | Ericsson | R2-63 | - | [WTS] [JSN] | |||
| R2-085750 | CR to 36.304 on Speed dependent scaling factor for CDMA2000 | other | Huawei | R2-63 | - | [WTS] [JSN] | |||
| R2-085751 | Cell reselection towards to CDMA2000 | other | Huawei | R2-63 | - | [WTS] [JSN] | |||
| R2-085752 | Value ranges for physical layer parameters | other | Ericsson | R2-63 | - | [WTS] [JSN] | |||
| R2-085753 | Need of PDSCH-ConfigDedicated in PhysicalConfigDedicated | other | Ericsson | R2-63 | - | [WTS] [JSN] | |||
| R2-085754 | Activation of CQI reporting, Sounding and Scheduling Request | other | Ericsson | R2-63 | - | [WTS] [JSN] | |||
| R2-085755 | RACH contention resolution ambiguity | other | Qualcomm Europe | R2-63 | - | [WTS] [JSN] | |||
| R2-085756 | Bucket Size Parameter | other | Qualcomm Europe | R2-63 | - | [WTS] [JSN] | |||
| R2-085757 | Configuration of DRX Start Offset | other | Ericsson | R2-63 | - | [WTS] [JSN] | |||
| R2-085758 | Corrections to MAC-MainConfiguration | other | Ericsson | R2-63 | - | [WTS] [JSN] | |||
| R2-085759 | Bucket Size Parameter | other | Qualcomm Europe | R2-63 | - | [WTS] [JSN] | |||
| R2-085760 | RRC container-X2.S1 examples | other | NSN | R2-63 | - | [WTS] [JSN] | |||
| R2-085761 | Measurement report for Pilot List | other | Motorola | R2-63 | - | [WTS] [JSN] | |||
| R2-085762 | CR to 36.300 covering RAN2 #63bis agreements on Home eNB | other | Qualcomm Europe | R2-63 | - | [WTS] [JSN] | |||
| R2-085763 | TP to 25.xxx covering RAN2 #63bis agreements on Home eNB | other | Qualcomm Europe | R2-63 | - | [WTS] [JSN] | |||
| R2-085764 | Pending SR with SPS | other | HTC Corporation | R2-63 | - | [WTS] [JSN] | |||
| R2-085765 | Reflection of RAN1 LS on timing adjustment | other | LG Electronics Inc, Alcaltel-Lucent, Alcatel Shanghai Bell | R2-63 | - | [WTS] [JSN] | |||
| R2-085766 | Clarification/correction of the Inter-RAT Mobility Procedure | other | Nortel, Nokia Siemens Networks, Motorola, Ericsson, Huawei | R2-63 | - | [WTS] [JSN] | |||
| R2-085767 | Corrections to CDMA System Information and Measurement IE definitions | other | Nortel, Alcatel-Lucent, Ericsson, Motorola, Verizon, Huawei | R2-63 | - | [WTS] [JSN] | |||
| R2-085768 | Complete the Actions upon reception of SIB8 Procedure | other | Nortel, Nokia Siemens Networks, Motorola, Ericsson, Huawei | R2-63 | - | [WTS] [JSN] | |||
| R2-085769 | Add Hysteresis to the ReportConfigInterRAT IE | other | Nortel, Nokia Siemens Networks, Motorola, Ericsson, Huawei | R2-63 | - | [WTS] [JSN] | |||
| R2-085770 | CGI for CDMA2000 | other | Nortel, Ericsson, Verizon, Huawei | R2-63 | - | [WTS] [JSN] | |||
| R2-085771 | LS on PCI Clarification (S3-081118; to: RAN2; cc: RAN3; contact: Qualcomm) | other | SA3 | R2-63 | - | [WTS] [JSN] | |||
| R2-085772 | Reply LS to R2-084907 on KeNB handling at handover (S3-081121; to: RAN2, RAN3; cc: -; contact: NTT DOCOMO) | other | SA3 | R2-63 | - | [WTS] [JSN] | |||
| R2-085773 | Reply LS to R2-083787 on "LS NULL integrity protection algorithm" (S3-081129; to: RAN2, RAN5, CT1; cc: -; contact: NSN) | other | SA3 | R2-63 | - | [WTS] [JSN] | |||
| R2-085774 | Reply LS to R2-084876 on "AS Message Exception list" (S3-081130; to: RAN2; cc: -; contact: Nokia) | other | SA3 | R2-63 | - | [WTS] [JSN] | |||
| R2-085775 | Reply LS to R2-084898 on "counter check procedure" (S3-081135; to: RAN2; cc: -; contact: Nokia) | other | SA3 | R2-63 | - | [WTS] [JSN] | |||
| R2-085776 | Reply LS to R2-084909 on “Intersystem RAT handover security” (S3-081138; to: RAN2; cc: -; contact: NSN) | other | SA3 | R2-63 | - | [WTS] [JSN] | |||
| R2-085777 | LS on preventing inter-RAT HO for UE with SIM access (S3-081150; to: RAN3; cc: RAN2, CT1, CT4; contact: Huawei) | other | SA3 | R2-63 | - | [WTS] [JSN] | |||
| R2-085778 | On MAC parameter value range and default values | other | NTT DOCOMO | R2-63 | - | [WTS] [JSN] | |||
| R2-085779 | Open issues on configurable parameters in MAC | other | Ericsson | R2-63 | - | [WTS] [JSN] | |||
| R2-085780 | pdcp-configuration IE and PDCP reconfiguration | other | Ericsson | R2-63 | - | [WTS] [JSN] | |||
| R2-085781 | Miscellaneous corrections to 36.300 | other | Huawei | R2-63 | - | [WTS] [JSN] | |||
| R2-085782 | Removing of end-time for dedicated preamble | other | ZTE | R2-63 | - | [WTS] [JSN] | |||
| R2-085783 | Some Small Corrections to TS 36.300 | other | CATT | R2-63 | - | [WTS] [JSN] | |||
| R2-085784 | Removal of T312 | other | Ericsson | R2-63 | - | [WTS] [JSN] | |||
| R2-085785 | Draft LS to SA3 on maximum PDCP SDU size | other | Panasonic | R2-63 | - | [WTS] [JSN] | |||
| R2-085786 | Reply LS to R3-082373 = R2-084972 on E-UTRAN security related issues (S3-081175; to: RAN3; cc: RAN2; contact: Ericsson) | other | SA3 | R2-63 | - | [WTS] [JSN] | |||
| R2-085787 | Correction and Clarification on TTI Bundling | other | ASUSTeK | R2-63 | - | [WTS] [JSN] | |||
| R2-085788 | Dedicated preamble transmission and measurement gap | other | ZTE | R2-63 | - | [WTS] [JSN] | |||
| R2-085789 | Clarification of DRX Active Time | other | Ericsson, Nokia Siemens Networks, Nokia Corporation, Sunplus mMobile Inc. | R2-63 | - | [WTS] [JSN] | |||
| R2-085790 | CQI/ SRS/PMI/RI transmission during active time | other | Panasonic, Nokia Siemens Networks, Nokia Corporation, Fujitsu | R2-63 | - | [WTS] [JSN] | |||
| R2-085791 | Text Proposal for Dedicated Preamble Assignment | other | Ericsson | R2-63 | - | [WTS] [JSN] | |||
| R2-085792 | Dedicated PRACH indication in handover | other | CATT | R2-63 | - | [WTS] [JSN] | |||
| R2-085793 | Message 3 Definition | other | Nokia Corporation, Nokia Siemens Networks, Samsung | R2-63 | - | [WTS] [JSN] | |||
| R2-085794 | Correction to prevent wrong contention resolution by adaptive retransmission command | other | Samsung | R2-63 | - | [WTS] [JSN] | |||
| R2-085795 | Bucket Size parameter | other | Qualcomm Europe | R2-63 | - | [WTS] [JSN] | |||
| R2-085796 | Bucket Size Parameter | other | Qualcomm Europe | R2-63 | - | [WTS] [JSN] | |||
| R2-085797 | Text proposal to TS 36.331 for parameter retxBSR-Timer | other | Ericsson, Nokia Siemens Networks, Nortel, NTT DOCOMO, Qualcomm Europe, Alcatel-Lucent | R2-63 | - | [WTS] [JSN] | |||
| R2-085798 | Issues on multiple BSRs | other | LG | R2-63 | - | [WTS] [JSN] | |||
| R2-085799 | MAC BSR trigger | other | Motorola | R2-63 | - | [WTS] [JSN] | |||
| R2-085800 | Correction on PHR triggering condition | other | Samsung | R2-63 | - | [WTS] [JSN] | |||
| R2-085801 | Reflection of RAN1 LS on timing adjust | other | LG Electronics Inc, Alcaltel-Lucent, Alcatel Shanghai Bell, Nokia Corporation, Nokia Siemens Networks | R2-63 | - | [WTS] [JSN] | |||
| R2-085802 | RACH preambles labelling | other | Qualcomm Europe | R2-63 | - | [WTS] [JSN] | |||
| R2-085803 | Addition of MAC padding in random access response, and setting of R bit on DL | other | Qualcomm Europe, Nokia Siemens Networks | R2-63 | - | [WTS] [JSN] | |||
| R2-085804 | Correction to MAC PDU Format | other | LG | R2-63 | - | [WTS] [JSN] | |||
| R2-085805 | CQI/ SRS/PMI/RI transmission during active time | other | Panasonic, Nokia Siemens Networks, Nokia Corporation, Fujitsu | R2-63 | - | [WTS] [JSN] | |||
| R2-085806 | NDI and Msg4 Carrying Contention Resolution ID | other | LG | R2-63 | - | [WTS] [JSN] | |||
| R2-085807 | UL HARQ and Measurement Gaps | other | ASUSTek, CATT, Huawei, LG Electronics Inc., Motorola, NEC, Nokia Corporation, Nokia Siemens Networks | R2-63 | - | [WTS] [JSN] | |||
| R2-085808 | Clarification about Restarting the Periodic BSR Timer | other | CATT | R2-63 | - | [WTS] [JSN] | |||
| R2-085809 | PDCP “in-sequence delivery and duplicate elimination” always on | other | Ericsson, Infineon, LG Electronics Inc., Qualcomm Europe | R2-63 | - | [WTS] [JSN] | |||
| R2-085810 | UL HARQ for Message 3 | other | Qualcomm | R2-63 | - | [WTS] [JSN] | |||
| R2-085811 | Clarification of AS-NAS concatenation - Stage 2 | other | NEC, Alcatel-Lucent | R2-63 | - | [WTS] [JSN] | |||
| R2-085812 | Max allowed Tx power in E-UTRAN | other | NTT DOCOMO | R2-63 | - | [WTS] [JSN] | |||
| R2-085813 | Draft Ls to RAN4 on Max allowed Tx power in E-UTRAN | other | NTT DOCOMO | R2-63 | - | [WTS] [JSN] | |||
| R2-085814 | LS on UE emission control (R4-082585; to: RAN1, RAN2; cc: RAN3; contact: Motorola) | other | RAN4 | R2-63 | - | [WTS] [JSN] | |||
| R2-085815 | Issues Related to Measurements | other | Motorola | R2-63 | - | [WTS] [JSN] | |||
| R2-085816 | PRACH resource pattern for TDD | other | ZTE | R2-63 | - | [WTS] [JSN] | |||
| R2-085817 | Paging procedure clarifications | other | Ericsson | R2-63 | - | [WTS] [JSN] | |||
| R2-085818 | Corrections on radio resource configuration | other | Ericsson | R2-63 | - | [WTS] [JSN] | |||
| R2-085819 | Full vs Delta configuration in case of connection re-establishment | other | Qualcomm Europe | R2-63 | - | [WTS] [JSN] | |||
| R2-085820 | Corrections and clarifications on connection control | other | Samsung | R2-63 | - | [WTS] [JSN] | |||
| R2-085821 | Clarifications on connection establishment | other | Nokia Corporation, Nokia Siemens Networks | R2-63 | - | [WTS] [JSN] | |||
| R2-085822 | Clarification on radioResourceConfigDedicated | other | Nokia Siemens Networks, Nokia Corporation | R2-63 | - | [WTS] [JSN] | |||
| R2-085823 | Issues regarding Access barred alleviation | other | VIA Technologies Inc, NTT DOCOMO | R2-63 | - | [WTS] [JSN] | |||
| R2-085824 | Change of C-RNTI | other | Nokia Corporation, Nokia Siemens Networks | R2-63 | - | [WTS] [JSN] | |||
| R2-085825 | SRB for NAS message during RRC connection re-establishment | other | Panasonic | R2-63 | - | [WTS] [JSN] | |||
| R2-085826 | Uplink transmission scheme in CPC for LCR TDD | other | CATT | R2-63 | - | [WTS] [JSN] | |||
| R2-085827 | Detail of the uplink synchronization procedure in enhanced CELL_FACH for LCR TDD | other | CATT | R2-63 | - | [WTS] [JSN] | |||
| R2-085828 | The mechanism in enhanced PCH state for LCR TDD | other | CATT | R2-63 | - | [WTS] [JSN] | |||
| R2-085829 | MAC BSR trigger CR | other | Ericsson, LG, Motorola, NSN, Qualcomm, Samsung | R2-63 | - | [WTS] [JSN] | |||
| R2-085830 | Clarification with regards to the PDCP state variables | other | Alcatel-Lucent, Ericsson | R2-63 | - | [WTS] [JSN] | |||
| R2-085831 | Correction to PDCP functional view | other | Huawei | R2-63 | - | [WTS] [JSN] | |||
| R2-085832 | Delivery of PDCP SDU after header decompression | other | LG | R2-63 | - | [WTS] [JSN] | |||
| R2-085833 | Correction to UL HARQ Process for the transmission of Msg3 | other | Huawei, Qualcomm Europe | R2-63 | - | [WTS] [JSN] | |||
| R2-085834 | SPS Occasions | other | CATT | R2-63 | - | [WTS] [JSN] | |||
| R2-085835 | Correction on PHR triggering condition | other | Samsung | R2-63 | - | [WTS] [JSN] | |||
| R2-085836 | Report of E-UTRA user plane session | other | RIM (RAN2 vice chairman) | R2-63 | - | [WTS] [JSN] | |||
| R2-085837 | Void | other | - | R2-63 | - | [WTS] [JSN] | |||
| R2-085838 | Void | other | - | R2-63 | - | [WTS] [JSN] | |||
| R2-085839 | Void | other | - | R2-63 | - | [WTS] [JSN] | |||
| R2-085840 | Void | other | - | R2-63 | - | [WTS] [JSN] | |||
| R2-085841 | Void | other | - | R2-63 | - | [WTS] [JSN] | |||
| R2-085842 | Void | other | - | R2-63 | - | [WTS] [JSN] | |||
| R2-085843 | Void | other | - | R2-63 | - | [WTS] [JSN] | |||
| R2-085844 | Void | other | - | R2-63 | - | [WTS] [JSN] | |||
| R2-085845 | Void | other | - | R2-63 | - | [WTS] [JSN] | |||
| R2-085846 | Void | other | - | R2-63 | - | [WTS] [JSN] | |||
| R2-085847 | Void | other | - | R2-63 | - | [WTS] [JSN] | |||
| R2-085848 | Void | other | - | R2-63 | - | [WTS] [JSN] | |||
| R2-085849 | Void | other | - | R2-63 | - | [WTS] [JSN] | |||
| R2-085850 | Void | other | - | R2-63 | - | [WTS] [JSN] | |||
| R2-085851 | Introduction of signalling connection release indication | other | Qualcomm Europe | R2-63 | - | [WTS] [JSN] | |||
| R2-085852 | Clarifications on connection release | other | Nokia Corporation, Nokia Siemens Networks | R2-63 | - | [WTS] [JSN] | |||
| R2-085853 | Required SIBs prior to RRC connection establishment | other | NTT DOCOMO | R2-63 | - | [WTS] [JSN] | |||
| R2-085854 | System information change handling during on-going procduere | other | Panasonic | R2-63 | - | [WTS] [JSN] | |||
| R2-085855 | Issues regarding LogicalChannelConfig | other | Qasara | R2-63 | - | [WTS] [JSN] | |||
| R2-085856 | Clarification on change of bearer mapping at reconfiguration | other | Qualcomm Europe | R2-63 | - | [WTS] [JSN] | |||
| R2-085857 | LS on the start of security on IRAT handover from GERAN/UTRAN (S3-081139; to: CT1, RAN2; cc: -; contact: Nokia) | other | SA3 | R2-63 | - | [WTS] [JSN] | |||
| R2-085858 | Measurement handling at inter-frequency handover | other | NTT DOCOMO | R2-63 | - | [WTS] [JSN] | |||
| R2-085859 | Value ranges of parameters for intra LTE events | other | Ericsson | R2-63 | - | [WTS] [JSN] | |||
| R2-085860 | Measurement event b1 and b2 threshold value ranges | other | Ericsson | R2-63 | - | [WTS] [JSN] | |||
| R2-085861 | Corrections and clarifications on measurements | other | Samsung | R2-63 | - | [WTS] [JSN] | |||
| R2-085862 | Action of VarMeasurementReports after measurement configuration change | other | CATT | R2-63 | - | [WTS] [JSN] | |||
| R2-085863 | Value range of reportAmount, and relevant clarifications | other | LG Electronics Inc. | R2-63 | - | [WTS] [JSN] | |||
| R2-085864 | Including serving cell in measurement report | other | Ericsson | R2-63 | - | [WTS] [JSN] | |||
| R2-085865 | Draft LS on DRX and TimeToTrigger (to: RAN4; cc: -; contact: Nokia) | other | Nokia | R2-63 | - | [WTS] [JSN] | |||
| R2-085866 | Measurements for ICIC | other | Huawei | R2-63 | - | [WTS] [JSN] | |||
| R2-085867 | Cleanup of measurement chapters in TS 36.331 | other | Ericsson | R2-63 | - | [WTS] [JSN] | |||
| R2-085868 | Measurement Gap Activation | other | Panasonic | R2-63 | - | [WTS] [JSN] | |||
| R2-085869 | Handling of cellsToReportList | other | LG | R2-63 | - | [WTS] [JSN] | |||
| R2-085870 | Handling of DRBs at Mobility from EUTRA | other | Ericsson | R2-63 | - | [WTS] [JSN] | |||
| R2-085871 | Inter-RAT mobility | other | Samsung | R2-63 | - | [WTS] [JSN] | |||
| R2-085872 | Text Proposal for Cell Change Order/NACC | other | Nokia Siement Networks, Nokia Corporation, Ericsson | R2-63 | - | [WTS] [JSN] | |||
| R2-085873 | Cell Change Order to E-UTRAN | other | NEC | R2-63 | - | [WTS] [JSN] | |||
| R2-085874 | Corrections to CDMA System Information and Measurement IE definitions | other | Nortel, Alcatel-Lucent, Ericsson, Motorola, Verizon, Huawei | R2-63 | - | [WTS] [JSN] | |||
| R2-085875 | Complete the Actions upon reception of SIB8 Procedure | other | Nortel, Nokia Siemens Networks, Motorola, Ericsson, Huawei | R2-63 | - | [WTS] [JSN] | |||
| R2-085876 | Text proposal on concatenation of NAS PDUs | other | Qualcomm Europe | R2-63 | - | [WTS] [JSN] | |||
| R2-085877 | Definition of Global Cell Identities and related IEs | other | IPWireless | R2-63 | - | [WTS] [JSN] | |||
| R2-085878 | CGI for CDMA2000 | other | Nortel, Ericsson, Verizon, Huawei | R2-63 | - | [WTS] [JSN] | |||
| R2-085879 | Miscellaneous minor corrections and updates to ASN.1 | other | Alcatel-Lucent | R2-63 | - | [WTS] [JSN] | |||
| R2-085880 | Corrections and clarifications on system information | other | Samsung | R2-63 | - | [WTS] [JSN] | |||
| R2-085881 | Draft LS to CT1, SA2 (cc: RAN3) about paging cause removal | other | NSN | R2-63 | - | [WTS] [JSN] | |||
| R2-085882 | Handling of optional information elements in system information | other | Ericsson | R2-63 | - | [WTS] [JSN] | |||
| R2-085883 | Clarification on system information value tag handling | other | Nokia Corporation, Nokia Siemens Networks | R2-63 | - | [WTS] [JSN] | |||
| R2-085884 | Correction on ASN.1 fields of SIB1 | other | Panasonic | R2-63 | - | [WTS] [JSN] | |||
| R2-085885 | Clarification of definition of SnonServingCell,x for CDMA2000 RATs | other | Qualcomm Europe | R2-63 | - | [WTS] [JSN] | |||
| R2-085886 | CR to 36.304 on black listed cells | other | Huawei | R2-63 | - | [WTS] [JSN] | |||
| R2-085887 | Pending SR with SPS | other | HTC Corporation | R2-63 | - | [WTS] [JSN] | |||
| R2-085888 | Issues regarding ETWS | other | NTT DOCOMO | R2-63 | - | [WTS] [JSN] | |||
| R2-085889 | Update to MeasResultListCDMA2000 | other | Motorola | R2-63 | - | [WTS] [JSN] | |||
| R2-085890 | SRB for NAS message during RRC connection re-establishment | other | Panasonic | R2-63 | - | [WTS] [JSN] | |||
| R2-085891 | Cleanup of measurement chapters in TS 36.331 | other | Ericsson | R2-63 | - | [WTS] [JSN] | |||
| R2-085892 | Paging procedure clarifications | other | Ericsson | R2-63 | - | [WTS] [JSN] | |||
| R2-085893 | Measurement Gap Activation | other | Panasonic | R2-63 | - | [WTS] [JSN] | |||
| R2-085894 | Change of C-RNTI | other | Nokia Corporation, Nokia Siemens Networks | R2-63 | - | [WTS] [JSN] | |||
| R2-085895 | Clarification on radioResourceConfigDedicated | other | Nokia Siemens Networks, Nokia Corporation | R2-63 | - | [WTS] [JSN] | |||
| R2-085896 | Measurement Gap Activation | other | Panasonic | R2-63 | - | [WTS] [JSN] | |||
| R2-085897 | Inter-RAT mobility | other | Samsung | R2-63 | - | [WTS] [JSN] | |||
| R2-085898 | Clarifications on connection release | other | Nokia Corporation, Nokia Siemens Networks | R2-63 | - | [WTS] [JSN] | |||
| R2-085899 | Corrections and clarifications on system information | other | Samsung | R2-63 | - | [WTS] [JSN] | |||
| R2-085900 | Clarifications on connection release | other | Nokia Corporation, Nokia Siemens Networks | R2-63 | - | [WTS] [JSN] | |||
| R2-085901 | Update to MeasResultListCDMA2000 | other | Motorola | R2-63 | - | [WTS] [JSN] | |||
| R2-085902 | Cell Change Order to E-UTRAN | other | NEC | R2-63 | - | [WTS] [JSN] | |||
| R2-085903 | Handling of optional information elements in system information | other | Ericsson | R2-63 | - | [WTS] [JSN] | |||
| R2-085904 | Draft reply LS to R3-01607 = R2-083072 on PRB usage measurements (to: RAN3; cc: SA2; contact: Huawei) | other | Huawei | R2-63 | - | [WTS] [JSN] | |||
| R2-085905 | Generic error handling | other | Samsung | R2-63 | - | [WTS] [JSN] | |||
| R2-085906 | Miscellaneous corrections to 36.331 | other | CATT | R2-63 | - | [WTS] [JSN] | |||
| R2-085907 | Clarification of Key Derivation | other | CATT | R2-63 | - | [WTS] [JSN] | |||
| R2-085908 | Including serving cell in measurement report | other | Ericsson | R2-63 | - | [WTS] [JSN] | |||
| R2-085909 | Update to MeasResultListCDMA2000 | other | Motorola | R2-63 | - | [WTS] [JSN] | |||
| R2-085910 | Reply LS to S1-082418 = R2-084550 on UE-Aggregate Maximum Bit Rate for GERAN/UTRAN (G2-080614; to: SA1, SA2; cc: RAN3, RAN2, CT1, CT4; contact: Vodafone) | other | GERAN2 | R2-63 | - | [WTS] [JSN] | |||
| R2-085911 | TP to 36.331 for UE Capability Handling | other | Vodafone | R2-63 | - | [WTS] [JSN] | |||
| R2-085912 | CR to 36.300 related to RRC Container definition | other | Nokia Siemens Networks, Nokia Corporation | R2-63 | - | [WTS] [JSN] | |||
| R2-085913 | Draft LS to RAN2 on RRC Container definition | other | NSN | R2-63 | - | [WTS] [JSN] | |||
| R2-085914 | Removal of UE History Information in TS 36.331 | other | Vodafone | R2-63 | - | [WTS] [JSN] | |||
| R2-085915 | CR to 36.300 covering RAN2 #63bis agreements on Home eNB | other | Qualcomm Europe | R2-63 | - | [WTS] [JSN] | |||
| R2-085916 | Update to MeasResultListCDMA2000 | other | Motorola | R2-63 | - | [WTS] [JSN] | |||
| R2-085917 | Optionality of RAI reporting for ANR | other | Ericsson | R2-63 | - | [WTS] [JSN] | |||
| R2-085918 | Reporting content for supporting SON-ANR | other | CATT | R2-63 | - | [WTS] [JSN] | |||
| R2-085919 | Value ranges of parameters for intra LTE events | other | Ericsson | R2-63 | - | [WTS] [JSN] | |||
| R2-085920 | Update to MeasResultListCDMA2000 | other | Motorola | R2-63 | - | [WTS] [JSN] | |||
| R2-085921 | Report of LTE CP session | other | Samsung (RAN2 chairman) | R2-63 | - | [WTS] [JSN] | |||
| R2-085922 | Draft reply LS to R3-082363 = R2-084970 | other | Alcatel-Lucent | R2-63 | - | [WTS] [JSN] | |||
| R2-085923 | MAC BSR trigger CR | other | Motorola, Ericsson, LG, NSN, Qualcomm, Samsung | R2-63 | - | [WTS] [JSN] | |||
| R2-085924 | Clarification about restarting the PERIODIC BSR TIMER | other | CATT | R2-63 | - | [WTS] [JSN] | |||
| R2-085925 | CR to 36.300 related to RRC Container definition | other | Nokia Siemens Networks, Nokia Corporation | R2-63 | - | [WTS] [JSN] | |||
| R2-085926 | Final LS to RAN2 on RRC Container definition (contact: NSN) | other | RAN2 | R2-63 | - | [WTS] [JSN] | |||
| R2-085927 | Configuration of Semi-Persistent Scheduling | other | Ericsson | R2-63 | - | [WTS] [JSN] | |||
| R2-085928 | LS on Rules for RRC Container vs X2/S1 application protocol (to: RAN3; cc: -; contact: NSN) | LS out | RAN2 | R2-63 | - | [WTS] [JSN] | |||
| R2-085929 | Corrections to MAC-MainConfiguration | other | Ericsson | R2-63 | - | [WTS] [JSN] | |||
| R2-085930 | Need of PDSCH-ConfigDedicated in PhysicalConfigDedicated | other | Ericsson | R2-63 | - | [WTS] [JSN] | |||
| R2-085931 | Configuration of the Time Alignment Timer | other | Ericsson | R2-63 | - | [WTS] [JSN] | |||
| R2-085932 | Measurement gaps and SPS | other | Qualcomm Europe | R2-63 | - | [WTS] [JSN] | |||
| R2-085933 | Max allowed Tx power in E-UTRAN | other | NTT DOCOMO | R2-63 | - | [WTS] [JSN] | |||
| R2-085934 | Bucket Size Parameter | other | Qualcomm Europe | R2-63 | - | [WTS] [JSN] | |||
| R2-085935 | Configuration of the Time Alignment Timer | other | Ericsson | R2-63 | - | [WTS] [JSN] | |||
| R2-085936 | Offline discussion summary and proposed way forward on R2-085662 | other | NTT DOCOMO | R2-63 | - | [WTS] [JSN] | |||
| R2-085937 | Correction of RA procedure initiated by eNode B PDCCH order | other | NTT DOCOMO | R2-63 | - | [WTS] [JSN] | |||
| R2-085938 | TP to 36.331 to removed T312 | other | NTT DOCOMO | R2-63 | - | [WTS] [JSN] | |||
| R2-085939 | pdcp-configuration IE and PDCP reconfiguration | other | Ericsson | R2-63 | - | [WTS] [JSN] | |||
| R2-085940 | Miscellaneous corrections to 36.300 | other | Huawei | R2-63 | - | [WTS] [JSN] | |||
| R2-085941 | TP to 36.331 for UE Capability Handling | other | Vodafone | R2-63 | - | [WTS] [JSN] | |||
| R2-085942 | Clarification of Key Derivation | other | CATT | R2-63 | - | [WTS] [JSN] | |||
| R2-085943 | TP to 36.331 to removed T312 | other | NTT DOCOMO | R2-63 | - | [WTS] [JSN] | |||
| R2-085944 | Draft LS to RAN1 related to R2-085943 | other | Qualcomm Europe | R2-63 | - | [WTS] [JSN] | |||
| R2-085945 | Correction on PHR triggering condition | other | Samsung | R2-63 | - | [WTS] [JSN] | |||
| R2-085946 | Draft LS to SA2 (cc: CT1, CT4) on Duplicate detection for ETWS | other | NTT DOCOMO | R2-63 | - | [WTS] [JSN] | |||
| R2-085947 | Correction to UL HARQ Process for the transmission of Msg3 | other | Huawei, Qualcomm Europe | R2-63 | - | [WTS] [JSN] | |||
| R2-085948 | PDCP “in-sequence delivery and duplicate elimination” always on | other | Ericsson, Infineon, LG Electronics Inc., Qualcomm Europe | R2-63 | - | [WTS] [JSN] | |||
| R2-085949 | D-SR failure handling | other | Ericsson, Nokia Siemens Networks | R2-63 | - | [WTS] [JSN] | |||
| R2-085950 | Text proposal to TS 36.331 for parameter retxBSR-Timer | other | Ericsson, Nokia Siemens Networks, Nortel, NTT DOCOMO, Qualcomm Europe, Alcatel-Lucent | R2-63 | - | [WTS] [JSN] | |||
| R2-085951 | Measurement gaps and SPS | other | Qualcomm Europe | R2-63 | - | [WTS] [JSN] | |||
| R2-085952 | TP to 36.331 for UE Capability Handling | other | Vodafone | R2-63 | - | [WTS] [JSN] | |||
| R2-085953 | D-SR failure handling | other | Ericsson, Nokia Siemens Networks | R2-63 | - | [WTS] [JSN] | |||
| R2-085954 | LS on Paging cause in TS36.331 (to: CT1, SA2; cc: RAN3; contact: NSN) | LS out | RAN2 | R2-63 | - | [WTS] [JSN] | |||
| R2-085955 | Reply LS to SA5 to R2-085697 on work split for definition of L2 measurements | other | Huawei | R2-63 | - | [WTS] [JSN] | |||
| R2-085956 | Reply LS to C1-083626 = R2-084952 on NAS message concatenation and multiple EPS bearer setup (to: CT1, RAN3; cc: CT4; contact: Qualcomm) | LS out | RAN2 | R2-63 | - | [WTS] [JSN] | |||
| R2-085957 | DRAFT LS on maximum PDCP SDU size (to: SA3, CT1, SA2; cc: -; contact: Panasonic) | other | Panasonic | R2-63 | - | [WTS] [JSN] | |||
| R2-085958 | LS on Maximum allowed transmission power on the uplink (to: RAN4; cc: RAN1; contact: NTT DOCOMO) | LS out | RAN2 | R2-63 | - | [WTS] [JSN] | |||
| R2-085959 | Reply LS to R2-084978 on NAS trigger for RLF | other | Alcatel-Lucent | R2-63 | - | [WTS] [JSN] | |||
| R2-085960 | DRAFT LS on maximum PDCP SDU size (to: SA3, CT1, SA2; cc: -; contact: Panasonic) | other | Panasonic | R2-63 | - | [WTS] [JSN] | |||
| R2-085961 | LS on AS/NAS split for CSG selection (to: CT1; cc: -; contact: Vodafone) | LS out | RAN2 | R2-63 | - | [WTS] [JSN] | |||
| R2-085962 | Issues regarding ETWS | other | NTT DOCOMO | R2-63 | - | [WTS] [JSN] | |||
| R2-085963 | LS on Duplicate detection for ETWS (to: SA2; cc: CT1, CT4; contact: NTT DOCOMO) | LS out | RAN2 | R2-63 | - | [WTS] [JSN] | |||
| R2-085964 | Reply LS to R5-083665 = R2-084974 on Special Conformance Testing functions for UE (to: RAN5; cc: -; contact: Qualcomm) | LS out | RAN2 | R2-63 | - | [WTS] [JSN] | |||
| R2-085965 | DRAFT LS on maximum PDCP SDU size (to: SA3, CT1, SA2; cc: -; contact: Panasonic) | other | Panasonic | R2-63 | - | [WTS] [JSN] | |||
| R2-085966 | LS on Virtual CRC for DL data arrival (to: RAN1; cc: -; contact: Qualcomm) | LS out | RAN2 | R2-63 | - | [WTS] [JSN] | |||
| R2-085967 | Corrections to MAC-MainConfiguration | other | Ericsson | R2-63 | - | [WTS] [JSN] | |||
| R2-085968 | Response LS to R3-082363 = R2-084970 on Coding of Global Cell id and Global eNB ID (to: RAN3; cc: SA2; contact: Alcatel-Lucent) | LS out | RAN2 | R2-63 | - | [WTS] [JSN] | |||
| R2-085969 | CR to 36.300 covering RAN2 #63bis agreements on Home eNB | other | Qualcomm Europe | R2-63 | - | [WTS] [JSN] | |||
| R2-085970 | Reply LS to S5-081376 = R2-085697 on work split for definition of L2 measurements (to: SA5; cc: RAN3; contact: Huawei) | LS out | RAN2 | R2-63 | - | [WTS] [JSN] | |||
| R2-085971 | Final report of RAN2 #63, Jeju, Korea, 18.08.-22.08.2008 | other | ETSI MCC | R2-63 | - | [WTS] [JSN] | |||
| R2-085972 | Response LS to S2-086378 = R2-084978 on Connection recovery by NAS (to: SA2; cc: CT1, RAN1, RAN3; contact: Alcatel-Lucent) | LS out | RAN2 | R2-63 | - | [WTS] [JSN] | |||
| R2-085973 | LS on maximum PDCP SDU size (to: SA3, CT1, SA2; cc: -; contact: Panasonic) | LS out | RAN2 | R2-63 | - | [WTS] [JSN] | |||
| R2-085974 | Detailed operation on the HS-DSCH transmission in PCH state | other | ZTE Corporation | R2-63 | - | [WTS] [JSN] | |||
| R2-085975 | Some clarifications for enhanced CELL_FACH state | other | ZTE Corporation | R2-63 | - | [WTS] [JSN] | |||
| R2-085976 | LS on DRX and TimeToTrigger (to: RAN4; cc: -; contact: Nokia) | other | RAN2 | R2-63 | - | [WTS] [JSN] | |||
| R2-085977 | Void | other | - | R2-63 | - | [WTS] [JSN] | |||
| R2-085978 | Miscellaneous corrections and clarifications | other | Rapporteur (Samsung) | R2-63 | - | [WTS] [JSN] | |||
| R2-085979 | Revision of 36.331 CR to include "Need" changes | other | Alcatel-Lucent | R2-63 | - | [WTS] [JSN] | |||
| R2-085980 | Reply LS to C1-083626 = R2-084952 on NAS message concatenation and multiple EPS bearer setup (to: CT1, RAN3; cc: CT4; contact: Qualcomm) | other | RAN2 | R2-63 | - | [WTS] [JSN] | |||
| R2-085981 | SPS Occasions | other | CATT | R2-63 | - | [WTS] [JSN] | |||
| R2-085982 | Open issues list for TS 36.304 | other | Nokia | R2-63 | - | [WTS] [JSN] | |||
| R2-085983 | Open issues list for TS 36.321 | other | Ericsson | R2-63 | - | [WTS] [JSN] | |||
| R2-085984 | Open issues list for TS 36.323 | other | LG | R2-63 | - | [WTS] [JSN] | |||
| R2-085985 | Open issues list for TS 36.331 | other | Samsung | R2-63 | - | [WTS] [JSN] | |||
| R2-085986 | Void | other | - | R2-63 | - | [WTS] [JSN] | |||
| R2-085987 | Void | other | - | R2-63 | - | [WTS] [JSN] | |||
| R2-085988 | Void | other | - | R2-63 | - | [WTS] [JSN] | |||
| R2-085989 | Void | other | - | R2-63 | - | [WTS] [JSN] | |||
| R2-085990 | Void | other | - | R2-63 | - | [WTS] [JSN] | |||
| R2-085991 | Void | other | - | R2-63 | - | [WTS] [JSN] | |||
| R2-085992 | Void | other | - | R2-63 | - | [WTS] [JSN] | |||
| R2-085993 | Void | other | - | R2-63 | - | [WTS] [JSN] | |||
| R2-085994 | Void | other | - | R2-63 | - | [WTS] [JSN] | |||
| R2-085995 | Void | other | - | R2-63 | - | [WTS] [JSN] | |||
| R2-085996 | Void | other | - | R2-63 | - | [WTS] [JSN] | |||
| R2-085997 | Void | other | - | R2-63 | - | [WTS] [JSN] | |||
| R2-085998 | Void | other | - | R2-63 | - | [WTS] [JSN] | |||
| R2-085999 | Void | other | - | R2-63 | - | [WTS] [JSN] |
1060 documents (1.292732000351 seconds)