Please enter the search related information in the fields below. Partial information works, e.g. "SP-21" in the "tdoc" field lists all TSG SA documents from 2021. Regular expressions mostly work in all fields (e.g. "2[34].501" in the "Spec" field lists all documents related to 23.501 and 24.501. Capitalization is disregarded, i.e. "3GPP" gives the same results as "3gpp".
Download results in JSON format
| tdoc | Title | Type / Revs | Source | Spec / CR | S/WID | Release | Meeting | Status | Links |
|---|---|---|---|---|---|---|---|---|---|
| R2-083040 | Proposed agenda for RAN2 #62bis, Warsaw, Poland, 30.06.-04.07.2008 | other | RAN2 chairman | R2-62 | - | [WTS] [JSN] | |||
| R2-083041 | Draft report of RAN2 #62, Kansas City, USA, 31.03.-04.04.2008 | other | ETSI MCC | R2-62 | - | [WTS] [JSN] | |||
| R2-083042 | Draft report of RAN2 LTE RRC ad hoc, Sophia Antipolis, France, 05.-06.06.2008 | other | ETSI MCC | R2-62 | - | [WTS] [JSN] | |||
| R2-083043 | Handling of MBMS in release 8 (RP-080472, source: Panasonic, Motorola) | other | ETSI MCC | R2-62 | - | [WTS] [JSN] | |||
| R2-083044 | Reply LS to R2-081964 with "Comments on the LS on CSG requirements for UTRA/E-UTRA" (C1-081867; to: RAN2, SA1, SA; cc: SA2, GERAN, RAN3; contact: Samsung) | other | CT1 | R2-62 | - | [WTS] [JSN] | |||
| R2-083045 | Reply LS to R2-082041 on LTE-cell- and eNB-identification (C1-081868; to: RAN2; cc: RAN3, SA2; contact: NSN) | other | CT1 | R2-62 | - | [WTS] [JSN] | |||
| R2-083046 | Reply LS to S3-080502 (=R2-082096) on AS and NAS message protection (C1-081869; to: SA3; cc: RAN2; contact: NEC) | other | CT1 | R2-62 | - | [WTS] [JSN] | |||
| R2-083047 | Reply LS to S3-080525 (=R2-082099) on Outstanding NAS messages (C1-081870; to: RAN2; cc: SA3, RAN3; contact: Ericsson) | other | CT1 | R2-62 | - | [WTS] [JSN] | |||
| R2-083048 | LS on Message header for EPS session management (C1-082060; to: RAN2, RAN3, SA2; cc: -; contact: NSN) | other | CT1 | R2-62 | - | [WTS] [JSN] | |||
| R2-083049 | LS on “Changes to the format of TMGI” (C4-081359; to: CT3, RAN3; cc: RAN2, CT1; contact: Huawei) | other | CT4 | R2-62 | - | [WTS] [JSN] | |||
| R2-083050 | Reply LS to S2-084436 = R2-083086 on UE Radio Capabilities (CP-080411; to: SA; cc: CT1, CT4, GERAN, SA2, RAN2, RAN3, RAN, GERAN2; contact: Nokia) | other | CT | R2-62 | - | [WTS] [JSN] | |||
| R2-083051 | LS regarding GAN Iu mode security (GP-080883; to: SA3, RAN2, RAN3; cc: CT1; contact: Kineto) | other | GERAN2 | R2-62 | - | [WTS] [JSN] | |||
| R2-083052 | Reply LS to R2-082891 on reselection priorities (GP-080954; to: RAN2; cc: -; contact: NSN) | other | GERAN | R2-62 | - | [WTS] [JSN] | |||
| R2-083053 | LS Response to S4-080256 = R2-082088 Request for Evaluation Framework Link Level Data (R1-082084; to: SA4; cc: RAN2; contact: Qualcomm) | other | RAN1 | R2-62 | - | [WTS] [JSN] | |||
| R2-083054 | LS response to R2-082048 on RAN2 assumptions on L1 (R1-082195; to: RAN2; cc: -; contact: Ericsson) | other | RAN1 | R2-62 | - | [WTS] [JSN] | |||
| R2-083055 | Response to LS R2-0802039 on Transmission of physical layer parameters (R1-082196; to: RAN2; cc: RAN4; contact: Ericsson) | other | RAN1 | R2-62 | - | [WTS] [JSN] | |||
| R2-083056 | LS on L1-related parameters to be configured by RRC (R1-082200; to: RAN2; cc: -; contact: Ericsson) | other | RAN1 | R2-62 | - | [WTS] [JSN] | |||
| R2-083057 | Response to LS R2-081362 on change rate of physical layer parameters (R1-082201; to: RAN2; cc: -; contact: Ericsson) | other | RAN1 | R2-62 | - | [WTS] [JSN] | |||
| R2-083058 | LS on CR to TS36.306 (R1-082202; to: RAN2; cc: -; contact: Motorola) | other | RAN1 | R2-62 | - | [WTS] [JSN] | |||
| R2-083059 | LS on L1 impact of measurement gaps (R1-082222; to: RAN2, RAN4; cc: -; contact: Qualcomm) | other | RAN1 | R2-62 | - | [WTS] [JSN] | |||
| R2-083060 | LS to RAN2 on L1-L3 interaction (R1-082226; to: RAN2; cc: -; contact: NSN) | other | RAN1 | R2-62 | - | [WTS] [JSN] | |||
| R2-083061 | LS reply to R2-082040 on PDCCH for DL data arrival and random access response format (R1-082251; to: RAN2; cc: -; contact: Qualcomm) | other | RAN1 | R2-62 | - | [WTS] [JSN] | |||
| R2-083062 | LS on indicating radio problem detection (R1-082252; to: RAN2, RAN4; cc: -; contact: Ericsson) | other | RAN1 | R2-62 | - | [WTS] [JSN] | |||
| R2-083063 | LS on MCS and TBS Tables (R1-082262; to: RAN2, RAN4; cc: -; contact: Ericsson) | other | RAN1 | R2-62 | - | [WTS] [JSN] | |||
| R2-083064 | Response LS to C4-081303 on RAN3 requirements for GTPv2 (R3-081532; to: CT4; cc: RAN2; contact: Ericsson) | other | RAN3 | R2-62 | - | [WTS] [JSN] | |||
| R2-083065 | Reply LS to C1-081422 = R2-082064 and R2-082041 on E-UTRAN Identifiers (R3-081534; to: RAN2, CT1, CT4, SA2; cc: -; contact: NSN) | other | RAN3 | R2-62 | - | [WTS] [JSN] | |||
| R2-083066 | LS on Handover Restriction List signalling (R3-081573; to: SA2; cc: RAN2; contact: Ericsson) | other | RAN3 | R2-62 | - | [WTS] [JSN] | |||
| R2-083067 | LS reply to C4-081302 on Data forwarding for Inter 3GPP-RAT HO from E-UTRAN to UMTS/GERAN (R3-081576; to: SA2, RAN2, CT4; cc: CT1; contact: NSN) | other | RAN3 | R2-62 | - | [WTS] [JSN] | |||
| R2-083068 | LS on Intra-cell handover for MME load rebalancing (R3-081580; to: SA2; cc: RAN2; contact: Samsung) | other | RAN3 | R2-62 | - | [WTS] [JSN] | |||
| R2-083069 | LS on RAN3 Status on Enhanced Uplink in Cell_FACH in FDD (R3-081586; to: RAN2; cc: -; contact: NSN) | other | RAN3 | R2-62 | - | [WTS] [JSN] | |||
| R2-083070 | Reply LS on reply LS R2-081343 on Paging Permission with Access Control (PPAC) (R3-081587; to: RAN2, CT1; cc: GERAN; contact: NTT) | other | RAN3 | R2-62 | - | [WTS] [JSN] | |||
| R2-083071 | LS on enhancements of Inter-RAT ANR (R3-081606; to: RAN2; cc: -; contact: NEC) | other | RAN3 | R2-62 | - | [WTS] [JSN] | |||
| R2-083072 | LS reply to R2-081368 on Load balancing signalling on QCI (R3-081607; to: RAN2, SA2; cc: -; contact: Ericsson) | other | RAN3 | R2-62 | - | [WTS] [JSN] | |||
| R2-083073 | Response LS to R2-080589 on value ranges (R4-081188; to: RAN2, GERAN; cc: -; contact: NTT) | other | RAN4 | R2-62 | - | [WTS] [JSN] | |||
| R2-083074 | RSRP Reporting Range (R4-081208; to: RAN2; cc: RAN1; contact: Ericsson) | other | RAN4 | R2-62 | - | [WTS] [JSN] | |||
| R2-083075 | Response LS to R2-081392 on Enhanced Uplink for CELL_FACH and UE DRX (R4-081234; to: RAN2; cc: -; contact: Nokia) | other | RAN4 | R2-62 | - | [WTS] [JSN] | |||
| R2-083076 | LS Response to R2-082039 on Transmission of Physical Layer Parameters (R4-081249; to: RAN2; cc: RAN1; contact: Ericsson) | other | RAN4 | R2-62 | - | [WTS] [JSN] | |||
| R2-083077 | Response LS to S2-084436 = R2-083086 on UE Radio Capabilities (RP-080473; to: SA, SA2; cc: CT1, CT4, GERAN, RAN2, RAN3, GERAN2, CT; contact: Alcatel-Lucent) | other | RAN | R2-62 | - | [WTS] [JSN] | |||
| R2-083078 | LS on decision for NW interface option for ETWS support (RP-080475; to: SA, SA2, RAN2, RAN3; cc: CT, CT1, CT4; contact: NTT) | other | RAN | R2-62 | - | [WTS] [JSN] | |||
| R2-083079 | LS on HSPA VoIP Continuity Solution (RP-080489; to: SA; cc: SA2, CT, CT1, GERAN, GERAN2, RAN2, RAN3; contact: NSN) | other | RAN | R2-62 | - | [WTS] [JSN] | |||
| R2-083080 | Reply LS to GP-080071 = R2-081405 and GP-080410 = R2-081406 on ETWS clarifications (S1-080759; to: GERAN2, GERAN; cc: SA2, RAN2; contact: Telecom Italia) | other | SA1 | R2-62 | - | [WTS] [JSN] | |||
| R2-083081 | Reply LS to R2-081964 on CSG requirements for UTRA/E-UTRA (S1-080768; to: RAN2; cc: SA2, CT1, GERAN, SA; contact: Nokia) | other | SA1 | R2-62 | - | [WTS] [JSN] | |||
| R2-083082 | Reply LS to GP-080417 = R2-081413 on CSG related mobility (stage 2 text) (S1-080769; to: GERAN, RAN2; cc: SA2, RAN3, RAN4, RAN1; contact: NSN) | other | SA1 | R2-62 | - | [WTS] [JSN] | |||
| R2-083083 | Response LS to R3-080982 = R2-082073 on Partial handover (S2-084324; to: RAN3; cc: RAN2; contact: Ericsson) | other | SA2 | R2-62 | - | [WTS] [JSN] | |||
| R2-083084 | LS on AMBR Enforcement (S2-084413; to: RAN2, RAN3; cc: -; contact: Nextwave) | other | SA2 | R2-62 | - | [WTS] [JSN] | |||
| R2-083085 | LS on SRVCC target cell selection (S2-084419; to: RAN2, GERAN; cc: RAN3; contact: NSN) | other | SA2 | R2-62 | - | [WTS] [JSN] | |||
| R2-083086 | LS on UE Radio Capabilities (S2-084436; to: RAN2, RAN3, RAN, GERAN2, CT, SA; cc: CT1, CT4, GERAN; contact: Nortel) | other | SA2 | R2-62 | - | [WTS] [JSN] | |||
| R2-083087 | Reply LS to C4-081019 = R2-082067 on Support for Network Based Location Technologies on User Plane (S2-084454; to: CT4, OMA LOC; cc: RAN, RAN2, RAN3; contact: Qualcomm) | other | SA2 | R2-62 | - | [WTS] [JSN] | |||
| R2-083088 | Response LS to R2-080600 on the need for TAU in connected mode (S2-084456; to: RAN2; cc: RAN3, CT1; contact: Ericsson) | other | SA2 | R2-62 | - | [WTS] [JSN] | |||
| R2-083089 | LS on Active mode paging in E-UTRAN (S2-084457; to: RAN2, CT1; cc: RAN3; contact: Samsung) | other | SA2 | R2-62 | - | [WTS] [JSN] | |||
| R2-083090 | Reply LS to R2-081380 on inclusion of MNC and MCC in RRC Connection Setup Complete message (S2-084458; to: RAN2; cc: RAN3; contact: Vodafone) | other | SA2 | R2-62 | - | [WTS] [JSN] | |||
| R2-083091 | LS on Earthquake and Tsunami Warning System (S2-084460; to: RAN1, RAN2, RAN3, GERAN1, GERAN2, SA1, SA3, CT1, CT4; cc: -; contact: NTT) | other | SA2 | R2-62 | - | [WTS] [JSN] | |||
| R2-083092 | LS on CS fallback for 1xRTT CS domain access (S2-084461; to: RAN2, CT4; cc: CT1; contact: Nortel) | other | SA2 | R2-62 | - | [WTS] [JSN] | |||
| R2-083093 | Reply to R2-082038 Response LS on Authentication at RRC Connection Re-establishment (S3-080532; to: RAN2; cc: -; contact: NTT) | other | SA3 | R2-62 | - | [WTS] [JSN] | |||
| R2-083094 | LS reply to RP-080489 = R2-083079 on multiple solutions for VoIP call continuity (SP-080436; to: RAN, RAN2, SA2; cc: GERAN, CT, CT1, GERAN2, RAN3; contact: Telia-Sonera) | other | SA | R2-62 | - | [WTS] [JSN] | |||
| R2-083095 | Reply to LS RP-080475 = R2-083078 from TSG-RAN on decision for NW interface option for ETWS support (SP-080440; to: SA2; cc: CT, CT1, RAN, RAN2, RAN3; contact: Ericsson) | other | SA | R2-62 | - | [WTS] [JSN] | |||
| R2-083096 | Void | other | - | R2-62 | - | [WTS] [JSN] | |||
| R2-083097 | Void | other | - | R2-62 | - | [WTS] [JSN] | |||
| R2-083098 | Void | other | - | R2-62 | - | [WTS] [JSN] | |||
| R2-083099 | Void | other | - | R2-62 | - | [WTS] [JSN] | |||
| R2-083100 | LS on MCS and TBS Tables (R1-082262; to: RAN2, RAN4; cc: -; contact: Ericsson) | other | RAN1 | R2-62 | - | [WTS] [JSN] | |||
| R2-083101 | Buffer Size Levels for BSR in E-UTRA Uplink | other | Ericsson, Nokia Corporation, Nokia Siemens Networks, Samsung | R2-62 | - | [WTS] [JSN] | |||
| R2-083102 | Buffer size levels for BSR | other | Ericsson, Nokia Corporation, Nokia Siemens Networks, Samsung | R2-62 | - | [WTS] [JSN] | |||
| R2-083103 | Paging Channel Description | other | Nokia Corporation, Nokia Siemens Networks | R2-62 | - | [WTS] [JSN] | |||
| R2-083104 | Last HARQ feedback and Measurement Gaps | other | Nokia Corporation, Nokia Siemens Networks | R2-62 | - | [WTS] [JSN] | |||
| R2-083105 | Measurement Gaps and UL activity | other | Nokia Corporation, Nokia Siemens Networks, Samsung | R2-62 | - | [WTS] [JSN] | |||
| R2-083106 | Measurement Gaps and UL Activity | other | Nokia Corporation, Nokia Siemens Networks, Samsung | R2-62 | - | [WTS] [JSN] | |||
| R2-083107 | Bundling Issues | other | Nokia Corporation, Nokia Siemens Networks | R2-62 | - | [WTS] [JSN] | |||
| R2-083108 | TTI Bundling | other | Nokia Corporation, Nokia Siemens Networks | R2-62 | - | [WTS] [JSN] | |||
| R2-083109 | CQI Reporting Configuration | other | Nokia Corporation, Nokia Siemens Networks, Samsung | R2-62 | - | [WTS] [JSN] | |||
| R2-083110 | MAC PDU Structure Simplifications | other | Nokia Corporation, Nokia Siemens Networks | R2-62 | - | [WTS] [JSN] | |||
| R2-083111 | Proposed CR to 36.322 on Definition of Length Indicator | other | LG Electronics Inc. | R2-62 | - | [WTS] [JSN] | |||
| R2-083112 | Removal of 0ms for T_Poll_Retransmit | other | LG Electronics Inc., Ericsson, Nokia Corporation, Nokia Siemens Networks, Samsung, Qualcomm | R2-62 | - | [WTS] [JSN] | |||
| R2-083113 | Considerations on various open items in 36.304 | other | Nokia Corporation, Nokia Siemens Networks | R2-62 | - | [WTS] [JSN] | |||
| R2-083114 | CR on Considerations on various open items in 36.304 | other | Nokia Corporation, Nokia Siemens Networks | R2-62 | - | [WTS] [JSN] | |||
| R2-083115 | System Information Offsetting | other | Nokia Corporation, Nokia Siemens Networks | R2-62 | - | [WTS] [JSN] | |||
| R2-083116 | System Information Segmentation | other | Nokia Corporation, Nokia Siemens Networks | R2-62 | - | [WTS] [JSN] | |||
| R2-083117 | PDCP SDU Limitation | other | Nokia Corporation, Nokia Siemens Networks | R2-62 | - | [WTS] [JSN] | |||
| R2-083118 | SON ANR Text Proposal based on email discussion | other | Rapporteur (Nokia Corporation) | R2-62 | - | [WTS] [JSN] | |||
| R2-083119 | SON ANR email report | other | Rapporteur (Nokia Corporation) | R2-62 | - | [WTS] [JSN] | |||
| R2-083120 | Small RRC correction | other | Nokia Corporation, Nokia Siemens Networks | R2-62 | - | [WTS] [JSN] | |||
| R2-083121 | Considerations about possibly unnecessary measurement events | other | Nokia Corporation, Nokia Siemens Networks | R2-62 | - | [WTS] [JSN] | |||
| R2-083122 | MBSFN Corrections | other | Nextwave Wireless | R2-62 | - | [WTS] [JSN] | |||
| R2-083123 | MBSFN Corrections | other | Nextwave Wireless | R2-62 | - | [WTS] [JSN] | |||
| R2-083124 | APN-AMBR | other | Nextwave Wireless | R2-62 | - | [WTS] [JSN] | |||
| R2-083125 | L2 architecture for Dual Carrier HSDPA operation | other | Ericsson | R2-62 | - | [WTS] [JSN] | |||
| R2-083126 | HS-DSCH Serving Cell Change Enhancements | other | Ericsson | R2-62 | - | [WTS] [JSN] | |||
| R2-083127 | Overall effect of MBSFN allocation granularity on radio-resource efficiency | other | Nokia Corporation, Nokia Siemens Networks | R2-62 | - | [WTS] [JSN] | |||
| R2-083128 | Introduction of HS Serving cell change | other | Ericsson | R2-62 | - | [WTS] [JSN] | |||
| R2-083129 | Clarification of the CS counter handling | other | Ericsson | R2-62 | - | [WTS] [JSN] | |||
| R2-083130 | Corrections to Enhanced UE DRX | other | Ericsson | R2-62 | - | [WTS] [JSN] | |||
| R2-083131 | Indicating support of MAC-i/is in RRC Connection Request | other | Ericsson | R2-62 | - | [WTS] [JSN] | |||
| R2-083132 | Mapping of the LCH-ID | other | Ericsson | R2-62 | - | [WTS] [JSN] | |||
| R2-083133 | Miscellaneous corrections to RLC specification | other | Nokia Corporation, Nokia Siemens Networks | R2-62 | - | [WTS] [JSN] | |||
| R2-083134 | HS-SCCH repointing message and ACK from UE | other | Ericsson | R2-62 | - | [WTS] [JSN] | |||
| R2-083135 | Back-off operation for enhanced uplink in CELL_FACH | other | Ericsson | R2-62 | - | [WTS] [JSN] | |||
| R2-083136 | Implicit release for enhanced uplink in CELL_FACH | other | Ericsson | R2-62 | - | [WTS] [JSN] | |||
| R2-083137 | Harnessing constant padding in the RLC Status PDU | other | Nokia Corporation, Nokia Siemens Networks | R2-62 | - | [WTS] [JSN] | |||
| R2-083138 | Refinement of polling triggers | other | Nokia Corporation, Nokia Siemens Networks | R2-62 | - | [WTS] [JSN] | |||
| R2-083139 | Correction to UE transmission power headroom report for LTE | other | Ericsson | R2-62 | - | [WTS] [JSN] | |||
| R2-083140 | Report from the email discussion on Logical Channel Prioritisation | other | Ericsson | R2-62 | - | [WTS] [JSN] | |||
| R2-083141 | Text for Multiplexing and Demultiplexing Sections | other | Ericsson, Nokia Siemens Networks | R2-62 | - | [WTS] [JSN] | |||
| R2-083142 | Discussion on MAC reset and reconfiguration | other | Ericsson | R2-62 | - | [WTS] [JSN] | |||
| R2-083143 | Text proposal on MAC reset and reconfiguration | other | Ericsson | R2-62 | - | [WTS] [JSN] | |||
| R2-083144 | Summary of the email discussion on remaining issues on Semi Persistent Scheduling | other | Ericsson | R2-62 | - | [WTS] [JSN] | |||
| R2-083145 | MAC reaction to unexpected HARQ retransmission | other | Ericsson | R2-62 | - | [WTS] [JSN] | |||
| R2-083146 | Clarification of MAC reaction to unexpected HARQ retransmission | other | Ericsson | R2-62 | - | [WTS] [JSN] | |||
| R2-083147 | E-UTRA UE Radio Measurement Reporting for ICIC | other | Ericsson | R2-62 | - | [WTS] [JSN] | |||
| R2-083148 | Dedicated Preamble Assignment | other | Ericsson | R2-62 | - | [WTS] [JSN] | |||
| R2-083149 | Robustness of Buffer Status Reporting | other | Ericsson | R2-62 | - | [WTS] [JSN] | |||
| R2-083150 | Correction on Buffer Status reporting | other | Ericsson | R2-62 | - | [WTS] [JSN] | |||
| R2-083151 | Correction on UE behavior for DRX for Regular BSRs | other | Ericsson | R2-62 | - | [WTS] [JSN] | |||
| R2-083152 | Clarification on UE behavior for DRX and configured measurement gaps | other | Ericsson | R2-62 | - | [WTS] [JSN] | |||
| R2-083153 | Value ranges for PDCP parameters | other | Ericsson | R2-62 | - | [WTS] [JSN] | |||
| R2-083154 | Error cases for RLC | other | Ericsson | R2-62 | - | [WTS] [JSN] | |||
| R2-083155 | Error cases for RLC | other | Ericsson | R2-62 | - | [WTS] [JSN] | |||
| R2-083156 | Default values for SRB configurations | other | Ericsson | R2-62 | - | [WTS] [JSN] | |||
| R2-083157 | Clarification of the reordering timer | other | Ericsson | R2-62 | - | [WTS] [JSN] | |||
| R2-083158 | Discussion on Polling | other | Ericsson | R2-62 | - | [WTS] [JSN] | |||
| R2-083159 | Clarification of polling | other | Ericsson | R2-62 | - | [WTS] [JSN] | |||
| R2-083160 | Value ranges for RLC parameters | other | Ericsson | R2-62 | - | [WTS] [JSN] | |||
| R2-083161 | Signaling of MBSFN frame allocation | other | Ericsson | R2-62 | - | [WTS] [JSN] | |||
| R2-083162 | System Information Change Notification for Connected Mode UEs | other | Ericsson | R2-62 | - | [WTS] [JSN] | |||
| R2-083163 | Dedicated signaling of Connected Mode RRC Timers | other | Ericsson | R2-62 | - | [WTS] [JSN] | |||
| R2-083164 | Report on email discussion on value ranges of RRC timers | other | Ericsson | R2-62 | - | [WTS] [JSN] | |||
| R2-083165 | Clarification on Event Evaluation | other | Nokia Corporation, Nokia Siemens Networks | R2-62 | - | [WTS] [JSN] | |||
| R2-083166 | Reconfiguration Failure Handling | other | Nokia Corporation, Nokia Siemens Networks | R2-62 | - | [WTS] [JSN] | |||
| R2-083167 | E-UTRAN Neighbour Cell Lists and Neighbour Operator coordination | other | Nokia Corporation, Nokia Siemens Networks | R2-62 | - | [WTS] [JSN] | |||
| R2-083168 | Delivery of ETWS Notification in E-UTRAN | other | Ericsson | R2-62 | - | [WTS] [JSN] | |||
| R2-083169 | Optimisation of the GERAN neighbour cell list | other | Ericsson | R2-62 | - | [WTS] [JSN] | |||
| R2-083170 | Editorial correction to HS-DSCH frame protocol header field | other | NEC | R2-62 | - | [WTS] [JSN] | |||
| R2-083171 | Correct the description of UE behaviour during HS-DSCH Reception in CELL_PCH and URA_PCH | other | NEC | R2-62 | - | [WTS] [JSN] | |||
| R2-083172 | Failure handling at mobility from E-UTRAN | other | Ericsson | R2-62 | - | [WTS] [JSN] | |||
| R2-083173 | Details of Hand Over Failure for Inter-RAT hand-over to E-UTRAN | other | Ericsson | R2-62 | - | [WTS] [JSN] | |||
| R2-083174 | Report on the email discussion on physical-layer parameters to be configured by RRC | other | Ericsson | R2-62 | - | [WTS] [JSN] | |||
| R2-083175 | Value ranges for physical layer parameters | other | Ericsson | R2-62 | - | [WTS] [JSN] | |||
| R2-083176 | Reporting of detected cells for Inter RAT UTRA | other | Ericsson | R2-62 | - | [WTS] [JSN] | |||
| R2-083177 | Alignment of periods for gap pattern, DRX, sys info and paging for a UE in connected mode | other | Ericsson | R2-62 | - | [WTS] [JSN] | |||
| R2-083178 | Need for separate filter coefficients for RSRP and RSRQ | other | Ericsson | R2-62 | - | [WTS] [JSN] | |||
| R2-083179 | PDCP-Configuration and UE-EUTRA-Capability IEs | other | Ericsson | R2-62 | - | [WTS] [JSN] | |||
| R2-083180 | MAC-I calculation at RRC connection re-establishment | other | Ericsson | R2-62 | - | [WTS] [JSN] | |||
| R2-083181 | General aspects on the RRC message transfer syntax | other | Ericsson | R2-62 | - | [WTS] [JSN] | |||
| R2-083182 | Time to read SIB2 after handover | other | Ericsson | R2-62 | - | [WTS] [JSN] | |||
| R2-083183 | RRC Connection Reconfiguration failure | other | Ericsson | R2-62 | - | [WTS] [JSN] | |||
| R2-083184 | Connection release without security | other | Ericsson | R2-62 | - | [WTS] [JSN] | |||
| R2-083185 | Defining PRB measurements for concatenated packets | other | Ericsson | R2-62 | - | [WTS] [JSN] | |||
| R2-083186 | Identification of E-UTRA Cell | other | Ericsson | R2-62 | - | [WTS] [JSN] | |||
| R2-083187 | KeNB derivation at Idle to Active transition | other | Ericsson | R2-62 | - | [WTS] [JSN] | |||
| R2-083188 | Proposed updates to Stage 2 for CDMA2000 handover | other | Ericsson, Alcatel-Lucent, Motorola, Nokia Siemens Networks, Nortel, Verizon | R2-62 | - | [WTS] [JSN] | |||
| R2-083189 | Unreliable uplink and network controlled connection release | other | Ericsson | R2-62 | - | [WTS] [JSN] | |||
| R2-083190 | Correction to RA procedure for network controlled connection release | other | Ericsson | R2-62 | - | [WTS] [JSN] | |||
| R2-083191 | Lifetime of cell reselection priorities | other | T-Mobile, Nokia, Nokia Siemens Networks | R2-62 | - | [WTS] [JSN] | |||
| R2-083192 | Introduction of Home Basestation Identifier on BCCH | other | T-Mobile | R2-62 | - | [WTS] [JSN] | |||
| R2-083193 | Support for Manual CSG ID Selection | other | T-Mobile | R2-62 | - | [WTS] [JSN] | |||
| R2-083194 | CSG related correction to 36.304 | other | T-Mobile | R2-62 | - | [WTS] [JSN] | |||
| R2-083195 | Clarification of the UE behavior on DSAC | other | NTT DOCOMO | R2-62 | - | [WTS] [JSN] | |||
| R2-083196 | Clarification of the UE behavior on DSAC and PPAC | other | NTT DOCOMO | R2-62 | - | [WTS] [JSN] | |||
| R2-083197 | PDCP open issues | other | LG Electronics Inc. | R2-62 | - | [WTS] [JSN] | |||
| R2-083198 | Restructuring of PDCP specification | other | LG Electronics Inc., Nokia Corporation, Nokia Siemens Networks | R2-62 | - | [WTS] [JSN] | |||
| R2-083199 | Proposed CR to 36.323 on Restructuring of PDCP specification | other | LG Electronics Inc. | R2-62 | - | [WTS] [JSN] | |||
| R2-083200 | Introduction of modular operation in PDCP | other | LG Electronics Inc. | R2-62 | - | [WTS] [JSN] | |||
| R2-083201 | Proposed CR to 36.323 on Introduction of modular operation in PDCP | other | LG Electronics Inc. | R2-62 | - | [WTS] [JSN] | |||
| R2-083202 | Proposed CR to 36.323 on Miscellaneous PDCP corrections | other | LG Electronics Inc., Nokia Siemens Networks | R2-62 | - | [WTS] [JSN] | |||
| R2-083203 | Clarification on MAC DRX control | other | ASUSTeK | R2-62 | - | [WTS] [JSN] | |||
| R2-083204 | Clarification on Polling procedure | other | ASUSTeK | R2-62 | - | [WTS] [JSN] | |||
| R2-083205 | Proposed CR to 36.323 on Introduction of modular operation in PDCP only for AM at handover | other | LG Electronics Inc. | R2-62 | - | [WTS] [JSN] | |||
| R2-083206 | Issues on DRX Activation | other | ASUSTeK | R2-62 | - | [WTS] [JSN] | |||
| R2-083207 | Issues on Random Access Procedure | other | ASUSTeK | R2-62 | - | [WTS] [JSN] | |||
| R2-083208 | Introduction of absolute priorities reselection (UTRA-LTE) | other | Nokia, Nokia Siemens Networks | R2-62 | - | [WTS] [JSN] | |||
| R2-083209 | Introduction of absolute priorities reselection (UTRA-LTE) | other | Nokia, Nokia Siemens Networks | R2-62 | - | [WTS] [JSN] | |||
| R2-083210 | UE Capabilities and redirection (UTRA-LTE) | other | Nokia, Nokia Siemens Networks | R2-62 | - | [WTS] [JSN] | |||
| R2-083211 | Reselection bias towards lower priority | other | Nokia, Nokia Siemens Networks | R2-62 | - | [WTS] [JSN] | |||
| R2-083212 | Semi-persistent scheduling with TTI bundling | other | ZTE | R2-62 | - | [WTS] [JSN] | |||
| R2-083213 | reselection bias avoidance, and hysteresis | other | Nokia, Nokia Siemens Networks | R2-62 | - | [WTS] [JSN] | |||
| R2-083214 | HARQ association for DL Semi-persistent scheduling | other | ZTE | R2-62 | - | [WTS] [JSN] | |||
| R2-083215 | Void | other | - | R2-62 | - | [WTS] [JSN] | |||
| R2-083216 | Combined measurement reporting | other | ZTE | R2-62 | - | [WTS] [JSN] | |||
| R2-083217 | scheduling issue for window size of 1ms | other | ZTE, CMCC | R2-62 | - | [WTS] [JSN] | |||
| R2-083218 | system information scheduling | other | ZTE, CMCC | R2-62 | - | [WTS] [JSN] | |||
| R2-083219 | Some Considerations for TTI-Bundling | other | ZTE | R2-62 | - | [WTS] [JSN] | |||
| R2-083220 | Miscellaneous Corrections on Security | other | Alcatel-Lucent | R2-62 | - | [WTS] [JSN] | |||
| R2-083221 | Security related discussion on the handling of emergency calls | other | Alcatel-Lucent | R2-62 | - | [WTS] [JSN] | |||
| R2-083222 | Signalling of ROHC profiles in 36.331 | other | Alcatel-Lucent | R2-62 | - | [WTS] [JSN] | |||
| R2-083223 | Small corrections to services expected from lower layers section | other | Alcatel-Lucent | R2-62 | - | [WTS] [JSN] | |||
| R2-083224 | UE Capabilities for LTE^^(Actually title is now " Introduction of E-UTRA support") | other | Nokia, Nokia Siemens Networks | R2-62 | - | [WTS] [JSN] | |||
| R2-083225 | Priority of Power Headroom Report | other | ASUSTeK | R2-62 | - | [WTS] [JSN] | |||
| R2-083226 | Handling of reordering function when HO failure | other | ASUSTeK | R2-62 | - | [WTS] [JSN] | |||
| R2-083227 | eDRX scheme finalisation | other | Nokia, Nokia Siemens Networks | R2-62 | - | [WTS] [JSN] | |||
| R2-083228 | Usage of PDCCH addressed to Temporary C-RNTI for CONNECTED UEs | other | ASUSTeK | R2-62 | - | [WTS] [JSN] | |||
| R2-083229 | Introduction of CELL_FACH DRX | other | Nokia, Nokia Siemens Networks | R2-62 | - | [WTS] [JSN] | |||
| R2-083230 | PDCP handling of AM DRBs during Handover | other | Infineon | R2-62 | - | [WTS] [JSN] | |||
| R2-083231 | Interactions between RRC-PDCP-RLC in case of a handover | other | Infineon | R2-62 | - | [WTS] [JSN] | |||
| R2-083232 | ASN.1 extension mechanisms | other | Infineon | R2-62 | - | [WTS] [JSN] | |||
| R2-083233 | Delivery of Primary Notification on BCCH | other | LG Electronics Inc. | R2-62 | - | [WTS] [JSN] | |||
| R2-083234 | Discussion on LTE MBMS dedicated cell | other | LG Electronics Inc. | R2-62 | - | [WTS] [JSN] | |||
| R2-083235 | RRC state upon reception of a RRCConnectionRelease message | other | Infineon | R2-62 | - | [WTS] [JSN] | |||
| R2-083236 | RRC state upon reception of a RRCConnectionRelease message | other | Infineon | R2-62 | - | [WTS] [JSN] | |||
| R2-083237 | Failure handling of mobility from E-UTRA | other | LG Electronics Inc. | R2-62 | - | [WTS] [JSN] | |||
| R2-083238 | Correction to failure indication after maximum number of HARQ transmissions | other | LG Electronics Inc. | R2-62 | - | [WTS] [JSN] | |||
| R2-083239 | Correction to the BSR triggering events | other | LG Electronics Inc. | R2-62 | - | [WTS] [JSN] | |||
| R2-083240 | RRC and PDCP specification alignment for ROHC | other | Nokia Corporation, Nokia Siemens Networks | R2-62 | - | [WTS] [JSN] | |||
| R2-083241 | Limiting power ramp up of RACH preambles | other | Nokia Corporation, Nokia Siemens Networks | R2-62 | - | [WTS] [JSN] | |||
| R2-083242 | Correction relating to RACH | other | Nokia Corporation, Nokia Siemens Networks | R2-62 | - | [WTS] [JSN] | |||
| R2-083243 | RAN2 alternatives for HSPA VoIP to WCDMA/GSM CS continuity | other | Alcatel-Lucent | R2-62 | - | [WTS] [JSN] | |||
| R2-083244 | Buffer status field table | other | Philips | R2-62 | - | [WTS] [JSN] | |||
| R2-083245 | HSDSCH Serving CELL Change | other | Philips | R2-62 | - | [WTS] [JSN] | |||
| R2-083246 | Modification of GANSS timing representation to avoid large integers | other | Alcatel-Lucent | R2-62 | - | [WTS] [JSN] | |||
| R2-083247 | Modification of GANSS timing representation to avoid large integers | other | Alcatel-Lucent | R2-62 | - | [WTS] [JSN] | |||
| R2-083248 | Correction of GPS-TOW ASN.1 change | other | Alcatel-Lucent | R2-62 | - | [WTS] [JSN] | |||
| R2-083249 | Definition of Cell Identity and CSG Id for SIB1 | other | Vodafone | R2-62 | - | [WTS] [JSN] | |||
| R2-083250 | UE History Information issues | other | Vodafone | R2-62 | - | [WTS] [JSN] | |||
| R2-083251 | Proposal on UE Historical Information | other | Nokia Siemens Networks | R2-62 | - | [WTS] [JSN] | |||
| R2-083252 | Preamble group selection in the RACH procedure | other | Texas Instruments Inc | R2-62 | - | [WTS] [JSN] | |||
| R2-083253 | A simple counter based model for the RACH procedure | other | Texas Instruments Inc | R2-62 | - | [WTS] [JSN] | |||
| R2-083254 | A simple approach to MAC headers and padding | other | Texas Instruments Inc | R2-62 | - | [WTS] [JSN] | |||
| R2-083255 | SRI Resource Configuration on PUCCH | other | Texas Instruments Inc | R2-62 | - | [WTS] [JSN] | |||
| R2-083256 | BSR clarification | other | Qualcomm Europe, Nokia Siemens Networks | R2-62 | - | [WTS] [JSN] | |||
| R2-083257 | RACH preamble group selection | other | Qualcomm Europe | R2-62 | - | [WTS] [JSN] | |||
| R2-083258 | UL grant in Message 2 | other | Qualcomm Europe | R2-62 | - | [WTS] [JSN] | |||
| R2-083259 | Per-APN AMBR | other | Nextwave, Qualcomm Europe | R2-62 | - | [WTS] [JSN] | |||
| R2-083260 | MAC SDU Per TB | other | Qualcomm Europe | R2-62 | - | [WTS] [JSN] | |||
| R2-083261 | RLC Re-establishment | other | Qualcomm Europe | R2-62 | - | [WTS] [JSN] | |||
| R2-083262 | UL Channel Prioritisation | other | Qualcomm Europe | R2-62 | - | [WTS] [JSN] | |||
| R2-083263 | Various issues at system-information update | other | Qualcomm Europe | R2-62 | - | [WTS] [JSN] | |||
| R2-083264 | 'Need OP' fields in RRC ASN.1 | other | Qualcomm Europe | R2-62 | - | [WTS] [JSN] | |||
| R2-083265 | Reporting multiple and prior-observed CGI values in response to CGI Request | other | Qualcomm Europe | R2-62 | - | [WTS] [JSN] | |||
| R2-083266 | Mixed Open/Closed HeNB Deployments | other | Qualcomm Europe | R2-62 | - | [WTS] [JSN] | |||
| R2-083267 | Reserving a portion of the PCI space for non-macro cells | other | Qualcomm Europe | R2-62 | - | [WTS] [JSN] | |||
| R2-083268 | Optimized handover in the presence of PCI confusion | other | Qualcomm Europe | R2-62 | - | [WTS] [JSN] | |||
| R2-083269 | Issue on Buffer Status Reporitng Procedure | other | ETRI | R2-62 | - | [WTS] [JSN] | |||
| R2-083270 | Re-Transmission of Persistent Scheduling | other | LG Electronics Inc. | R2-62 | - | [WTS] [JSN] | |||
| R2-083271 | Error Handling in MAC | other | LG Electronics Inc. | R2-62 | - | [WTS] [JSN] | |||
| R2-083272 | BCCH Reception Procedure | other | LG Electronics Inc. | R2-62 | - | [WTS] [JSN] | |||
| R2-083273 | Proposed CR to 36.321 Rel-8 Correction to BCH Reception procedure | other | LG Electronics Inc. | R2-62 | - | [WTS] [JSN] | |||
| R2-083274 | Proposed CR to 36.321 REL-8 Correction to DRX Procedure | other | LG Electronics Inc. | R2-62 | - | [WTS] [JSN] | |||
| R2-083275 | Proposed CR to 36.321 REL-8 Correction to Multiplexing for BSR | other | LG Electronics Inc. | R2-62 | - | [WTS] [JSN] | |||
| R2-083276 | Proposed CR to 36.321 REL-8 Correction to Multiplexing for RACH MSG3 | other | LG Electronics Inc. | R2-62 | - | [WTS] [JSN] | |||
| R2-083277 | Summary of email discussion on Padding and BSR | other | Rapporteur (LG Electonics Inc.) | R2-62 | - | [WTS] [JSN] | |||
| R2-083278 | Proposed CR to 36.321 REL-8 Correction to PDU format | other | LG Electronics Inc. | R2-62 | - | [WTS] [JSN] | |||
| R2-083279 | Proposed CR to 36.321 REL-8 Correction to RACH procedure | other | LG Electronics Inc. | R2-62 | - | [WTS] [JSN] | |||
| R2-083280 | Discussion on RB Suspension | other | LG Electronics Inc. | R2-62 | - | [WTS] [JSN] | |||
| R2-083281 | Proposed CR to 36.322 REL-8 Correction to RB Suspension | other | LG Electronics Inc. | R2-62 | - | [WTS] [JSN] | |||
| R2-083282 | Proposed CR to 36.323 REL-8 Correction to RB Suspension | other | LG Electronics Inc. | R2-62 | - | [WTS] [JSN] | |||
| R2-083283 | CQI and SRS Transmission during DRX | other | CATT | R2-62 | - | [WTS] [JSN] | |||
| R2-083284 | Discussion on Contention Resolution Timer | other | CATT | R2-62 | - | [WTS] [JSN] | |||
| R2-083285 | Allocation of SPS C-RNTI | other | CATT | R2-62 | - | [WTS] [JSN] | |||
| R2-083286 | Correction on UM Receive Operation | other | CATT | R2-62 | - | [WTS] [JSN] | |||
| R2-083287 | Corrections to 36.300: Measurement scenarios & Radio link failure cases | other | CATT | R2-62 | - | [WTS] [JSN] | |||
| R2-083288 | Some editorial corrections to 36.304 | other | CATT | R2-62 | - | [WTS] [JSN] | |||
| R2-083289 | Some issues on Measurement | other | CATT | R2-62 | - | [WTS] [JSN] | |||
| R2-083290 | Differentiate FDD and TDD in LTE ASN.1 | other | CATT | R2-62 | - | [WTS] [JSN] | |||
| R2-083291 | Measurement signalling for UTRA | other | CATT, CMCC | R2-62 | - | [WTS] [JSN] | |||
| R2-083292 | Proposed CR to 36.331 REL-8 Correction to RB Suspension | other | LG Electronics Inc. | R2-62 | - | [WTS] [JSN] | |||
| R2-083293 | Proposed CR to 36.321 REL-8 Correction to RB Suspension | other | LG Electronics Inc. | R2-62 | - | [WTS] [JSN] | |||
| R2-083294 | use of SPS C-RNTI for SPS HARQ | other | LG Electronics Inc. | R2-62 | - | [WTS] [JSN] | |||
| R2-083295 | LCH-ID field structure and mapping to logical channel identity | other | Nokia Corporation, Nokia Siemens Networks, Alcatel-Lucent | R2-62 | - | [WTS] [JSN] | |||
| R2-083296 | LCH-ID field structure and mapping to logical channel identity | other | Nokia Corporation, Nokia Siemens Networks, Alcatel-Lucent | R2-62 | - | [WTS] [JSN] | |||
| R2-083297 | Clarification on the usage of serving E-RGCH | other | Infineon | R2-62 | - | [WTS] [JSN] | |||
| R2-083298 | UTRA-LTE 25.331 CR email discussion | other | Nokia Corporation | R2-62 | - | [WTS] [JSN] | |||
| R2-083299 | Procedure for HRPD pre-registration / 1x Registration from idle mode | other | Nortel | R2-62 | - | [WTS] [JSN] | |||
| R2-083300 | RAT priority for CDMA2000 | other | Nortel | R2-62 | - | [WTS] [JSN] | |||
| R2-083301 | 1xRTT CS Fallback support | other | Nortel | R2-62 | - | [WTS] [JSN] | |||
| R2-083302 | Group selection for RA preamble | other | ETRI | R2-62 | - | [WTS] [JSN] | |||
| R2-083303 | Update rate of PRACH power related parameters on SIB | other | Panasonic | R2-62 | - | [WTS] [JSN] | |||
| R2-083304 | Dedicated L1 resource usage after handover | other | Panasonic | R2-62 | - | [WTS] [JSN] | |||
| R2-083305 | RRC procedure delay value for C-plane/U-plane setup | other | Panasonic | R2-62 | - | [WTS] [JSN] | |||
| R2-083306 | Measurement validity and DRX dependant measurement criteria | other | Panasonic | R2-62 | - | [WTS] [JSN] | |||
| R2-083307 | UL HARQ protocol behaviour for CQI-only" reports" | other | Panasonic | R2-62 | - | [WTS] [JSN] | |||
| R2-083308 | Uplink behaviour relating active time in DRX | other | Panasonic | R2-62 | - | [WTS] [JSN] | |||
| R2-083309 | Power setting of backoff | other | Panasonic | R2-62 | - | [WTS] [JSN] | |||
| R2-083310 | Implicit release of UL persistent resources | other | Panasonic | R2-62 | - | [WTS] [JSN] | |||
| R2-083311 | Remaining issues on Persistent scheduling | other | Panasonic | R2-62 | - | [WTS] [JSN] | |||
| R2-083312 | Various clarification/corrections to TS36.321 | other | Panasonic | R2-62 | - | [WTS] [JSN] | |||
| R2-083313 | Priority handling of MAC Control Elements | other | Panasonic | R2-62 | - | [WTS] [JSN] | |||
| R2-083314 | An issue during RLC re-establishment from eNB side | other | Panasonic | R2-62 | - | [WTS] [JSN] | |||
| R2-083315 | Clarification of RLC PDU data element field size | other | Panasonic | R2-62 | - | [WTS] [JSN] | |||
| R2-083316 | Connected mode UE monitoring paging for system information change detection | other | Panasonic | R2-62 | - | [WTS] [JSN] | |||
| R2-083317 | System information change handling during RRC connection establishment procedure | other | Panasonic | R2-62 | - | [WTS] [JSN] | |||
| R2-083318 | Paging monitoring in case of the reception of RRCConnectionReject message | other | Panasonic | R2-62 | - | [WTS] [JSN] | |||
| R2-083319 | Measurement validity and DRx dependant measurement criteria | other | Panasonic | R2-62 | - | [WTS] [JSN] | |||
| R2-083320 | Gap Activation by Handover Command | other | Panasonic | R2-62 | - | [WTS] [JSN] | |||
| R2-083321 | Measurement Behaviour for CS Fallback | other | Panasonic | R2-62 | - | [WTS] [JSN] | |||
| R2-083322 | Miscellaneous corrections to 36.331 | other | Panasonic | R2-62 | - | [WTS] [JSN] | |||
| R2-083323 | Report on email discussion on ASN.1 extension mechanisms | other | Ericsson | R2-62 | - | [WTS] [JSN] | |||
| R2-083324 | Use of ASN.1 extension marker versus traditional NCE and VLEC extension mechanisms | other | Ericsson | R2-62 | - | [WTS] [JSN] | |||
| R2-083325 | Update of ASN.1 extension mechanisms | other | Ericsson | R2-62 | - | [WTS] [JSN] | |||
| R2-083326 | Compromise proposal for HS-PDSCH serving cell change enhancement | other | Nokia Corporation, Nokia Siemens Networks | R2-62 | - | [WTS] [JSN] | |||
| R2-083327 | Need of uplink acknowledgement for serving cell change enhancement proposal | other | Nokia Corporation, Nokia Siemens Networks | R2-62 | - | [WTS] [JSN] | |||
| R2-083328 | Clarification on Measurements | other | LG Electronics Inc. | R2-62 | - | [WTS] [JSN] | |||
| R2-083329 | Discussion on measurement reporting | other | LG Electronics Inc. | R2-62 | - | [WTS] [JSN] | |||
| R2-083330 | Transport of NAS messages by AS | other | Alcatel-Lucent, Alcatel Shanghai Bell | R2-62 | - | [WTS] [JSN] | |||
| R2-083331 | User plane handling for inter-RAT HO | other | Alcatel-Lucent, Alcatel Shanghai Bell | R2-62 | - | [WTS] [JSN] | |||
| R2-083332 | NAS message for Bearer release | other | Alcatel-Lucent, Alcatel Shanghai Bell | R2-62 | - | [WTS] [JSN] | |||
| R2-083333 | MNC MCC in RRC connection establishment | other | Alcatel-Lucent, Alcatel Shanghai Bell | R2-62 | - | [WTS] [JSN] | |||
| R2-083334 | Corrections to RRC connection release | other | Alcatel-Lucent, Alcatel Shanghai Bell | R2-62 | - | [WTS] [JSN] | |||
| R2-083335 | Section numbers for RRC messages and IEs | other | Alcatel-Lucent, Alcatel Shanghai Bell | R2-62 | - | [WTS] [JSN] | |||
| R2-083336 | Rules for use of Transaction id for RRC messages | other | Alcatel-Lucent, Alcatel Shanghai Bell | R2-62 | - | [WTS] [JSN] | |||
| R2-083337 | Reporting Serving Cellid to higher layers | other | Alcatel-Lucent | R2-62 | - | [WTS] [JSN] | |||
| R2-083338 | Measurement reporting for ICIC | other | Alcatel-Lucent | R2-62 | - | [WTS] [JSN] | |||
| R2-083339 | Reading Traffic Volume Measurement System Information in SIB11 | other | Nokia Corporation, Nokia Siemens Networks | R2-62 | - | [WTS] [JSN] | |||
| R2-083340 | Replacement of MAC-es by MAC-is in section “details of MAC-is” | other | Nokia Corporation, Nokia Siemens Networks | R2-62 | - | [WTS] [JSN] | |||
| R2-083341 | RAB combinations for CS voice over HSPA | other | Nokia Corporation, Nokia Siemens Networks | R2-62 | - | [WTS] [JSN] | |||
| R2-083342 | on open issues in 25.319 | other | Nokia Corporation, Nokia Siemens Networks | R2-62 | - | [WTS] [JSN] | |||
| R2-083343 | On Implicit Resource Release and DL Activity | other | Nokia Corporation, Nokia Siemens Networks | R2-62 | - | [WTS] [JSN] | |||
| R2-083344 | Introduction of Enhanced Uplink in CELL_FACH state and Idle mode in 25.321 | other | Nokia Corporation, Nokia Siemens Networks | R2-62 | - | [WTS] [JSN] | |||
| R2-083345 | Introduction of Enhanced Uplink in CELL_FACH state and Idle mode in 25.302 | other | Nokia Corporation, Nokia Siemens Networks | R2-62 | - | [WTS] [JSN] | |||
| R2-083346 | Introduction of Enhanced Uplink in CELL_FACH in 25.331 | other | Nokia Corporation, Nokia Siemens Networks | R2-62 | - | [WTS] [JSN] | |||
| R2-083347 | Draft 25.331 CR for TVM for Enhanced Uplink with comments | other | Nokia Corporation, Nokia Siemens Networks | R2-62 | - | [WTS] [JSN] | |||
| R2-083348 | Terminology issue related to Handover Command | other | NEC | R2-62 | - | [WTS] [JSN] | |||
| R2-083349 | PDCP discard function and handling of undelivered NAS message at mobility | other | NEC | R2-62 | - | [WTS] [JSN] | |||
| R2-083350 | Alignment of figure and field description for FMS | other | NEC | R2-62 | - | [WTS] [JSN] | |||
| R2-083351 | Definition of the Time Alignment Timer | other | NEC | R2-62 | - | [WTS] [JSN] | |||
| R2-083352 | Clarification of the Scheduling Request procedure | other | NEC | R2-62 | - | [WTS] [JSN] | |||
| R2-083353 | Aligning RRC to latest version of 36.306 | other | Ericsson | R2-62 | - | [WTS] [JSN] | |||
| R2-083354 | Clarification on data available for transmission for BSR triggering | other | Ericsson | R2-62 | - | [WTS] [JSN] | |||
| R2-083355 | UL transmissions during measurement gaps | other | Ericsson | R2-62 | - | [WTS] [JSN] | |||
| R2-083356 | Support for transmission without ciphering in PDCP | other | Ericsson | R2-62 | - | [WTS] [JSN] | |||
| R2-083357 | PDCP reconfiguration at Handover | other | Ericsson | R2-62 | - | [WTS] [JSN] | |||
| R2-083358 | Clarification on flexible DL RLC AM PDU size | other | Infineon | R2-62 | - | [WTS] [JSN] | |||
| R2-083359 | UE action upon unsuccessful RRC connection establishment | other | Infineon | R2-62 | - | [WTS] [JSN] | |||
| R2-083360 | HARQ transmissions counter | other | Alcatel-Lucent, Alcatel Shanghai Bell, NEC | R2-62 | - | [WTS] [JSN] | |||
| R2-083361 | On the need for signalling Target Cell SFN during Handover | other | NEC, Alcatel Lucent | R2-62 | - | [WTS] [JSN] | |||
| R2-083362 | Cell reselection parameters tuning | other | NEC | R2-62 | - | [WTS] [JSN] | |||
| R2-083363 | DL HARQ association for semi-persistent scheduling | other | Alcatel-Lucent, Alcatel Shanghai Bell | R2-62 | - | [WTS] [JSN] | |||
| R2-083364 | Triggers for RLC Status Report | other | Alcatel-Lucent, Alcatel Shanghai Bell | R2-62 | - | [WTS] [JSN] | |||
| R2-083365 | Handling of integrity verification failed packets | other | LG Electronics Inc. | R2-62 | - | [WTS] [JSN] | |||
| R2-083366 | Stop of Flush_Timer | other | LG Electronics Inc. | R2-62 | - | [WTS] [JSN] | |||
| R2-083367 | Delivery of PDCP SDU received in-sequence | other | LG Electronics Inc. | R2-62 | - | [WTS] [JSN] | |||
| R2-083368 | MAC PDU Structure Simplifications | other | Nokia Corporation, Nokia Siemens Networks | R2-62 | - | [WTS] [JSN] | |||
| R2-083369 | Padding issue for MAC RAR | other | LG Electronics Inc. | R2-62 | - | [WTS] [JSN] | |||
| R2-083370 | Proposed CR to 36.321 REL-8 Correction to MAC RAR | other | LG Electronics Inc. | R2-62 | - | [WTS] [JSN] | |||
| R2-083371 | Deletion of Duplicate Definition of CELL_FACH HS-DSCH Variables | other | InterDigital | R2-62 | - | [WTS] [JSN] | |||
| R2-083372 | Deletion of Duplicate Definition of CELL_FACH HS-DSCH Variables | other | InterDigital | R2-62 | - | [WTS] [JSN] | |||
| R2-083373 | RRC procedures for configuring Improved layer 2 for UL | other | InterDigital | R2-62 | - | [WTS] [JSN] | |||
| R2-083374 | Happy Bit Setting with Improved L2 for UL | other | InterDigital | R2-62 | - | [WTS] [JSN] | |||
| R2-083375 | Random Access Procedure in enhanced CELL_FACH state for LCR TDD | other | CATT | R2-62 | - | [WTS] [JSN] | |||
| R2-083376 | Consideration on DRX mechanism in enhanced CELL_FACH state for LCR TDD | other | CATT | R2-62 | - | [WTS] [JSN] | |||
| R2-083377 | Cell Reselection in enhanced CELL_FACH state for LCR TDD | other | CATT | R2-62 | - | [WTS] [JSN] | |||
| R2-083378 | Discussion on Reference Desired E-PUCH RX Power in Enhanced CELL_FACH state | other | CATT | R2-62 | - | [WTS] [JSN] | |||
| R2-083379 | Introduce E-DCH Traffic volume measurement for LCR TDD | other | CATT | R2-62 | - | [WTS] [JSN] | |||
| R2-083380 | MAC-es/e RESET for LCR TDD | other | CATT | R2-62 | - | [WTS] [JSN] | |||
| R2-083381 | HSDPA TBS Table correction for LCR TDD | other | CATT | R2-62 | - | [WTS] [JSN] | |||
| R2-083382 | RACH uniform random backoff | other | Qualcomm Europe | R2-62 | - | [WTS] [JSN] | |||
| R2-083383 | PUSCH PUCCH Power Control RNTIs | other | Qualcomm Europe | R2-62 | - | [WTS] [JSN] | |||
| R2-083384 | PLMN per carrier for UTRAN and E-UTRAN Neighbor cell lists | other | Ericsson | R2-62 | - | [WTS] [JSN] | |||
| R2-083385 | NAS requested local release | other | Ericsson | R2-62 | - | [WTS] [JSN] | |||
| R2-083386 | Synchronization Establishment in Enhanced CELL_FACH State | other | ZTE, CATT | R2-62 | - | [WTS] [JSN] | |||
| R2-083387 | Enhanced Random Access Procedure in CELL_FACH | other | ZTE | R2-62 | - | [WTS] [JSN] | |||
| R2-083388 | Ki restriction for cat 13/15 | other | Qualcomm Europe | R2-62 | - | [WTS] [JSN] | |||
| R2-083389 | Ki restriction for cat 13/15 | other | Qualcomm Europe | R2-62 | - | [WTS] [JSN] | |||
| R2-083390 | Voice Interruption during Serving Cell Change in Urban Canyon Environments | other | Qualcomm Europe | R2-62 | - | [WTS] [JSN] | |||
| R2-083391 | SIB 18 and Network Sharing | other | Qualcomm Europe | R2-62 | - | [WTS] [JSN] | |||
| R2-083392 | Proposals for Idle mode mobiliy | other | Qualcomm Europe | R2-62 | - | [WTS] [JSN] | |||
| R2-083393 | Alternate Proposal for Enhancing HS-DSCH Serving Cell Change Procedure | other | Qualcomm Europe | R2-62 | - | [WTS] [JSN] | |||
| R2-083394 | DC-HSDPA and CPC | other | Qualcomm Europe | R2-62 | - | [WTS] [JSN] | |||
| R2-083395 | DC-HSDPA hotspot mobility | other | Qualcomm Europe | R2-62 | - | [WTS] [JSN] | |||
| R2-083396 | DC-HSDPA mobility | other | Qualcomm Europe | R2-62 | - | [WTS] [JSN] | |||
| R2-083397 | Void | other | - | R2-62 | - | [WTS] [JSN] | |||
| R2-083398 | On specifying the range of DPCCH in units of TTI that are configurable | other | Qualcomm Europe | R2-62 | - | [WTS] [JSN] | |||
| R2-083399 | DTX cancellation timer | other | Qualcomm Europe | R2-62 | - | [WTS] [JSN] | |||
| R2-083400 | Clarification of DL- and UL-SCH Data Transfer | other | Ericsson | R2-62 | - | [WTS] [JSN] | |||
| R2-083401 | Clarification of DRX | other | Ericsson | R2-62 | - | [WTS] [JSN] | |||
| R2-083402 | Handling of Semi-Persistent assignments and grants | other | Ericsson | R2-62 | - | [WTS] [JSN] | |||
| R2-083403 | Draft CR to update MAC parameters in 36.331 | other | Email Rapporteur (Ericsson) | R2-62 | - | [WTS] [JSN] | |||
| R2-083404 | Miscellaneous corrections and clarifications | other | Rapporteur (Samsung) | R2-62 | - | [WTS] [JSN] | |||
| R2-083405 | Restructuring of the TransportChannelConfiguration | other | Ericsson | R2-62 | - | [WTS] [JSN] | |||
| R2-083406 | E-UTRA RRC main issues | other | Rapporteur (Samsung) | R2-62 | - | [WTS] [JSN] | |||
| R2-083407 | Summary of email discussion on Value ranges for configurable MAC parameters | other | Email Rapporteur (Ericsson) | R2-62 | - | [WTS] [JSN] | |||
| R2-083408 | Specification of conditions regarding message contents | other | Samsung | R2-62 | - | [WTS] [JSN] | |||
| R2-083409 | Acceleration of HO complete signalling | other | Ericsson | R2-62 | - | [WTS] [JSN] | |||
| R2-083410 | E-UTRA MAC protocol specification update | other | MAC Rapporteurs (Ericsson, Qualcomm Europe) | R2-62 | - | [WTS] [JSN] | |||
| R2-083411 | Neighbouring cell lists within measurement object | other | Samsung, Broadcom Corporation | R2-62 | - | [WTS] [JSN] | |||
| R2-083412 | MAC Open Issues list | other | MAC Rapporteurs (Ericsson, Qualcomm Europe) | R2-62 | - | [WTS] [JSN] | |||
| R2-083413 | Simulation for Multiple patterns | other | CATT | R2-62 | - | [WTS] [JSN] | |||
| R2-083414 | TP for number of HARQ processes and MIMO | other | MAC Rapporteurs (Ericsson, Qualcomm Europe) | R2-62 | - | [WTS] [JSN] | |||
| R2-083415 | Configuration of UL semi-persistent scheduling | other | CATT, CMCC | R2-62 | - | [WTS] [JSN] | |||
| R2-083416 | Alignment of connection re-establishment cases | other | Samsung, Ericsson | R2-62 | - | [WTS] [JSN] | |||
| R2-083417 | Freeing of reserved RNTIs | other | Ericsson | R2-62 | - | [WTS] [JSN] | |||
| R2-083418 | MAC architecture for DC-HSDPA | other | NEC | R2-62 | - | [WTS] [JSN] | |||
| R2-083419 | Polling issue | other | Fujitsu | R2-62 | - | [WTS] [JSN] | |||
| R2-083420 | Limitations on RLC SDU into MAC SDU multiplexing | other | NXP Semiconductors, Philips | R2-62 | - | [WTS] [JSN] | |||
| R2-083421 | Re-ordering conntrol in HO command | other | Fujitsu | R2-62 | - | [WTS] [JSN] | |||
| R2-083422 | TAT expiry during RA procedure | other | Fujitsu | R2-62 | - | [WTS] [JSN] | |||
| R2-083423 | Protocol extension proposals | other | Samsung | R2-62 | - | [WTS] [JSN] | |||
| R2-083424 | Update of MAC dedicated preamble expiry | other | MAC Rapporteur (Ericsson, Qualcomm Europe) | R2-62 | - | [WTS] [JSN] | |||
| R2-083425 | Status PDU processing | other | NXP Semiconductors | R2-62 | - | [WTS] [JSN] | |||
| R2-083426 | Correction of RA response reception on DL-SCH | other | Sunplus mMobile Inc. | R2-62 | - | [WTS] [JSN] | |||
| R2-083427 | Correction for Rename of L1L2 control channel | other | LG Electronics Inc., Nokia Siemens Networks | R2-62 | - | [WTS] [JSN] | |||
| R2-083428 | Align the DRX Active Time with RA procedure | other | Sunplus mMobile Inc. | R2-62 | - | [WTS] [JSN] | |||
| R2-083429 | Limitations on variable sized PDU headers | other | NXP Semiconductors | R2-62 | - | [WTS] [JSN] | |||
| R2-083430 | Corrections to formatting | other | Ericsson | R2-62 | - | [WTS] [JSN] | |||
| R2-083431 | Impact of semi-persistent scheduling on DRX Active Time | other | Sunplus mMobile Inc. | R2-62 | - | [WTS] [JSN] | |||
| R2-083432 | Corrections to Discontinuous Reception for paging | other | Research in Motion Ltd | R2-62 | - | [WTS] [JSN] | |||
| R2-083433 | Considerations for HARQ Associations for DL SPS | other | Research in Motion Ltd | R2-62 | - | [WTS] [JSN] | |||
| R2-083434 | MIMO Related Uplink Feedback during DRX | other | Research in Motion Ltd | R2-62 | - | [WTS] [JSN] | |||
| R2-083435 | Failure handling | other | Samsung | R2-62 | - | [WTS] [JSN] | |||
| R2-083436 | Limit Endless SR Transmission | other | LG Electronics Inc. | R2-62 | - | [WTS] [JSN] | |||
| R2-083437 | Reliability Analysis of UL SPS Activation Signalling | other | Research in Motion Ltd | R2-62 | - | [WTS] [JSN] | |||
| R2-083438 | Fast Dormancy using Data Transfer Complete Indication | other | Research in Motion Ltd | R2-62 | - | [WTS] [JSN] | |||
| R2-083439 | NDI and Msg3 | other | LG Electronics Inc. | R2-62 | - | [WTS] [JSN] | |||
| R2-083440 | MAC SDU multiplexing | other | NXP Semiconductors | R2-62 | - | [WTS] [JSN] | |||
| R2-083441 | Inter-RAT transitions between E-UTRA and UTRA | other | NTT DOCOMO | R2-62 | - | [WTS] [JSN] | |||
| R2-083442 | Removal of Preamble Expiry Time | other | LG Electronics Inc. | R2-62 | - | [WTS] [JSN] | |||
| R2-083443 | Measurement structure for SON-ANR | other | Samsung | R2-62 | - | [WTS] [JSN] | |||
| R2-083444 | Correction and Clarification in HCS Reselection | other | LG Electronics Inc. | R2-62 | - | [WTS] [JSN] | |||
| R2-083445 | MAC PDU construction | other | NXP Semiconductors | R2-62 | - | [WTS] [JSN] | |||
| R2-083446 | Inter-RAT HO/ CCO failure handling | other | NTT DOCOMO | R2-62 | - | [WTS] [JSN] | |||
| R2-083447 | Correction to E field for MAC PDU | other | LG Electronics Inc. | R2-62 | - | [WTS] [JSN] | |||
| R2-083448 | PDCP profile signalling in RRC | other | Samsung | R2-62 | - | [WTS] [JSN] | |||
| R2-083449 | Consistent Name of TA command | other | LG Electronics Inc. | R2-62 | - | [WTS] [JSN] | |||
| R2-083450 | Procedural specification of inter-RAT mobility | other | Samsung | R2-62 | - | [WTS] [JSN] | |||
| R2-083451 | Introduction of PAGING enhancements for ETWS | other | NTT DOCOMO | R2-62 | - | [WTS] [JSN] | |||
| R2-083452 | Saving FFFD RNTI | other | LG Electronics Inc. | R2-62 | - | [WTS] [JSN] | |||
| R2-083453 | Correct SDU handling at handover | other | Samsung | R2-62 | - | [WTS] [JSN] | |||
| R2-083454 | Discussion on the HS-DSCH serving cell change | other | Samsung | R2-62 | - | [WTS] [JSN] | |||
| R2-083455 | Initial TX_HFN and RX_HFN values | other | NTT DOCOMO | R2-62 | - | [WTS] [JSN] | |||
| R2-083456 | Void | other | - | R2-62 | - | [WTS] [JSN] | |||
| R2-083457 | Short MAC-I for re-establishment request | other | NTT DOCOMO | R2-62 | - | [WTS] [JSN] | |||
| R2-083458 | Void | other | - | R2-62 | - | [WTS] [JSN] | |||
| R2-083459 | Radio resource configuration | other | Samsung | R2-62 | - | [WTS] [JSN] | |||
| R2-083460 | CSG mobility scenarios | other | NTT DOCOMO | R2-62 | - | [WTS] [JSN] | |||
| R2-083461 | Establishment cause and access class barring clarification | other | NTT DOCOMO | R2-62 | - | [WTS] [JSN] | |||
| R2-083462 | UE Backoff after Explicit Release | other | Samsung, Qualcomm | R2-62 | - | [WTS] [JSN] | |||
| R2-083463 | Measurement reporting | other | NTT DOCOMO | R2-62 | - | [WTS] [JSN] | |||
| R2-083464 | Timing to read preambleInitialReceivedTargetPower, P0-NominalPUSCH and P0-NominalPUCCH | other | NTT DOCOMO | R2-62 | - | [WTS] [JSN] | |||
| R2-083465 | Updates to MAC modeling | other | Motorola | R2-62 | - | [WTS] [JSN] | |||
| R2-083466 | Initiation conditions of RRC Connection Re-establishment | other | LG Electronics Inc. | R2-62 | - | [WTS] [JSN] | |||
| R2-083467 | RLC entity re-establishment | other | Motorola | R2-62 | - | [WTS] [JSN] | |||
| R2-083468 | Introduction of Dedicated Paging for CS fallback | other | LG Electronics Inc. | R2-62 | - | [WTS] [JSN] | |||
| R2-083469 | Review of AC barring-Decision of Barring Status | other | LG Electronics Inc. | R2-62 | - | [WTS] [JSN] | |||
| R2-083470 | Review of AC barring-Clarifications on barring timers | other | LG Electronics Inc. | R2-62 | - | [WTS] [JSN] | |||
| R2-083471 | Handling poll in received PDU which is duplicate or outside receiving window | other | Samsung; Nokia Corporation, Nokia Siemens Networks | R2-62 | - | [WTS] [JSN] | |||
| R2-083472 | Updates to PDCP modeling | other | Motorola | R2-62 | - | [WTS] [JSN] | |||
| R2-083473 | Stop of the reordering function | other | Motorola | R2-62 | - | [WTS] [JSN] | |||
| R2-083474 | Removal of unnecessary re-establishment of RLC | other | LG Electronics Inc. | R2-62 | - | [WTS] [JSN] | |||
| R2-083475 | Specification of Event-driven PDCP functionality | other | Motorola | R2-62 | - | [WTS] [JSN] | |||
| R2-083476 | Removal of MBMS channels | other | Samsung, Nokia Corporation, Nokia Siemens Networks | R2-62 | - | [WTS] [JSN] | |||
| R2-083477 | Editorial corrections to 36.306 v 8.2.0 | other | Motorola | R2-62 | - | [WTS] [JSN] | |||
| R2-083478 | Correction on Poll Retransmit Timer Operation | other | Samsung, Nokia Corporation, Nokia Siemens Networks | R2-62 | - | [WTS] [JSN] | |||
| R2-083479 | Measurements on CSG cells | other | LG Electronics Inc. | R2-62 | - | [WTS] [JSN] | |||
| R2-083480 | UL Bundling Feedback | other | Samsung | R2-62 | - | [WTS] [JSN] | |||
| R2-083481 | Configuration of PDCP variables by RRC | other | Motorola | R2-62 | - | [WTS] [JSN] | |||
| R2-083482 | Void | other | - | R2-62 | - | [WTS] [JSN] | |||
| R2-083483 | Generic error codes for Reject messages | other | Motorola | R2-62 | - | [WTS] [JSN] | |||
| R2-083484 | Testing and debugging support | other | Motorola | R2-62 | - | [WTS] [JSN] | |||
| R2-083485 | S-TMSI versus random value UE identity | other | Motorola | R2-62 | - | [WTS] [JSN] | |||
| R2-083486 | DRX solution for Enhanced CELL_FACH state in 1.28Mcps TDD | other | TD Tech Ltd. | R2-62 | - | [WTS] [JSN] | |||
| R2-083487 | TP for HARQ RTT Timer | other | MAC Rapporteurs (Ericsson, Qualcomm Europe) | R2-62 | - | [WTS] [JSN] | |||
| R2-083488 | Reduce control signalling overhead for Enhanced CELL_FACH in 1.28Mcps TDD | other | TD Tech Ltd. | R2-62 | - | [WTS] [JSN] | |||
| R2-083489 | Power control at the reception of backoff | other | Samsung | R2-62 | - | [WTS] [JSN] | |||
| R2-083490 | Paging occasion calculation | other | Samsung | R2-62 | - | [WTS] [JSN] | |||
| R2-083491 | Values of RRC multiplicity and type constraints | other | Samsung | R2-62 | - | [WTS] [JSN] | |||
| R2-083492 | Enhanced uplink procedure improvement for Enhanced CELL_FACH in 1.28Mcps TDD | other | TD Tech Ltd. | R2-62 | - | [WTS] [JSN] | |||
| R2-083493 | Home-eNB handling in Rel-8 | other | Samsung | R2-62 | - | [WTS] [JSN] | |||
| R2-083494 | Home cell “whitelist” handling | other | Samsung | R2-62 | - | [WTS] [JSN] | |||
| R2-083495 | Scheduling operations for CPC in 1.28Mcps TDD | other | TD Tech Ltd. | R2-62 | - | [WTS] [JSN] | |||
| R2-083496 | Correction of Non-schedule E-HICH configuration for 1.28Mcps TDD (Actually the title is now "Correction on the non-scheduled E-PUCH configuration for 1.28Mcps TDD") | other | TD Tech Ltd. | R2-62 | - | [WTS] [JSN] | |||
| R2-083497 | Correction to UMTS WID on HNB | other | Vodafone | R2-62 | - | [WTS] [JSN] | |||
| R2-083498 | Reliability of BSR | other | Samsung | R2-62 | - | [WTS] [JSN] | |||
| R2-083499 | Consideration on MAC padding | other | Samsung | R2-62 | - | [WTS] [JSN] | |||
| R2-083500 | Required reliability of SPS uplink grant | other | Samsung | R2-62 | - | [WTS] [JSN] | |||
| R2-083501 | HARQ retransmissions for the DL persistent scheduling | other | Samsung | R2-62 | - | [WTS] [JSN] | |||
| R2-083502 | Limiting TB size for SPS | other | Samsung | R2-62 | - | [WTS] [JSN] | |||
| R2-083503 | Considerations on TB sizes | other | Samsung | R2-62 | - | [WTS] [JSN] | |||
| R2-083504 | The complexity of BSR cancellation | other | Samsung | R2-62 | - | [WTS] [JSN] | |||
| R2-083505 | MAC Architecture | other | Samsung | R2-62 | - | [WTS] [JSN] | |||
| R2-083506 | Proposed way forward for HSPA VoIP continuity | other | Orange, Qualcomm | R2-62 | - | [WTS] [JSN] | |||
| R2-083507 | UE history information for HSPA | other | Telecom Italia | R2-62 | - | [WTS] [JSN] | |||
| R2-083508 | Removal of mandatory network behaviour | other | Samsung | R2-62 | - | [WTS] [JSN] | |||
| R2-083509 | UE history information for HSPA | other | Telecom Italia | R2-62 | - | [WTS] [JSN] | |||
| R2-083510 | Cell detection for RAT indicator | other | Telecom Italia | R2-62 | - | [WTS] [JSN] | |||
| R2-083511 | Handling of FDD and TDD in RRC specification | other | Ericsson | R2-62 | - | [WTS] [JSN] | |||
| R2-083512 | Non-GBR QoS indication for Load Balancing SON use case | other | Nortel, Orange | R2-62 | - | [WTS] [JSN] | |||
| R2-083513 | Corrections on BSR | other | Samsung | R2-62 | - | [WTS] [JSN] | |||
| R2-083514 | Inbound mobility Issues for UEs in RRC Connected | other | Huawei | R2-62 | - | [WTS] [JSN] | |||
| R2-083515 | Discussion of CSG identification for UTRA hNB | other | Huawei | R2-62 | - | [WTS] [JSN] | |||
| R2-083516 | Further considerations on idle mobility for R8 CSG UEs | other | Huawei | R2-62 | - | [WTS] [JSN] | |||
| R2-083517 | Criteria of Cell Reselection from macro cell to HNB | other | Huawei | R2-62 | - | [WTS] [JSN] | |||
| R2-083518 | HARQ process Id of DL persistent scheduling | other | Huawei | R2-62 | - | [WTS] [JSN] | |||
| R2-083519 | Correction to BSR triggering | other | Huawei | R2-62 | - | [WTS] [JSN] | |||
| R2-083520 | Discussion on supplementary carrier controlling | other | Huawei | R2-62 | - | [WTS] [JSN] | |||
| R2-083521 | Persistent resource release for UL | other | Huawei | R2-62 | - | [WTS] [JSN] | |||
| R2-083522 | CR for closing various open items in 36.304 | other | Nokia Corporation | R2-62 | - | [WTS] [JSN] | |||
| R2-083523 | CR on UL HARQ transmission without MCS | other | Huawei | R2-62 | - | [WTS] [JSN] | |||
| R2-083524 | HSPA VoIP to WCDMA/GSM CS continuity | other | Huawei | R2-62 | - | [WTS] [JSN] | |||
| R2-083525 | Seamless RRC State transition from Enhanced CELL_FACH to CELL_DCH | other | Huawei | R2-62 | - | [WTS] [JSN] | |||
| R2-083526 | Open issues relative to RLF in CELL_FACH | other | Huawei | R2-62 | - | [WTS] [JSN] | |||
| R2-083527 | CR on UL and DL HARQ operation | other | Huawei | R2-62 | - | [WTS] [JSN] | |||
| R2-083528 | HS-PDSCH Serving Cell change enhancements | other | Huawei | R2-62 | - | [WTS] [JSN] | |||
| R2-083529 | Corrections to polling | other | Huawei | R2-62 | - | [WTS] [JSN] | |||
| R2-083530 | Corrections to Scheduling Information | other | Huawei | R2-62 | - | [WTS] [JSN] | |||
| R2-083531 | HS-PDSCH Serving Cell change enhancements | other | Huawei | R2-62 | - | [WTS] [JSN] | |||
| R2-083532 | LS on OAM support for RRC neighbour lists and RRC blacklists (S5-080996: to: RAN2: cc: RAN3: contact: Qualcomm) | other | SA5 | R2-62 | - | [WTS] [JSN] | |||
| R2-083533 | Correction of HARQ procedure for RACH msg3 | other | Huawei | R2-62 | - | [WTS] [JSN] | |||
| R2-083534 | MAC RACH behaviour for handover failure | other | Huawei | R2-62 | - | [WTS] [JSN] | |||
| R2-083535 | Text Proposal to TS 36.321 on dedicated preamble Validity | other | Huawei | R2-62 | - | [WTS] [JSN] | |||
| R2-083536 | MBSFN macro allocation signalling | other | Alcatel-Lucent | R2-62 | - | [WTS] [JSN] | |||
| R2-083537 | Choice of SIBs for MBSFN subframe allocation signalling | other | Alcatel-Lucent | R2-62 | - | [WTS] [JSN] | |||
| R2-083538 | RLF analysis | other | Huawei | R2-62 | - | [WTS] [JSN] | |||
| R2-083539 | Cell reselection to an equal priority layer | other | Huawei | R2-62 | - | [WTS] [JSN] | |||
| R2-083540 | Interaction between Redirection and UE default and specific priorities | other | Huawei | R2-62 | - | [WTS] [JSN] | |||
| R2-083541 | Counter Check | other | Huawei | R2-62 | - | [WTS] [JSN] | |||
| R2-083542 | System Information for ETWS message | other | Huawei | R2-62 | - | [WTS] [JSN] | |||
| R2-083543 | UE ICIC report | other | Huawei | R2-62 | - | [WTS] [JSN] | |||
| R2-083544 | Dedicated RACH Resource for handover | other | Huawei | R2-62 | - | [WTS] [JSN] | |||
| R2-083545 | Inter layer HO analysis | other | Huawei | R2-62 | - | [WTS] [JSN] | |||
| R2-083546 | Combined RSRP & RSRQ reporting | other | Huawei | R2-62 | - | [WTS] [JSN] | |||
| R2-083547 | Clarification for the Usage of S-measure | other | Huawei | R2-62 | - | [WTS] [JSN] | |||
| R2-083548 | Worksplit between RAN2, SA5 and RAN3 related to TS 36.314 | other | Huawei, NTT DoCoMo | R2-62 | - | [WTS] [JSN] | |||
| R2-083549 | PRB measurements | other | Huawei, NTT DoCoMo, Vodafone | R2-62 | - | [WTS] [JSN] | |||
| R2-083550 | RACH measurements | other | Huawei, NTT DoCoMo | R2-62 | - | [WTS] [JSN] | |||
| R2-083551 | TS 36.314 L2 measurements | other | Huawei, NTT DoCoMo | R2-62 | - | [WTS] [JSN] | |||
| R2-083552 | Idle mobility related considerations in 36.331 | other | Huawei | R2-62 | - | [WTS] [JSN] | |||
| R2-083553 | Mobility state detection criteria in active mode | other | Huawei | R2-62 | - | [WTS] [JSN] | |||
| R2-083554 | Criteria of Cell Reselection from macro cell to CSG | other | Huawei | R2-62 | - | [WTS] [JSN] | |||
| R2-083555 | Cell selection reselection in CSG-only coverage | other | Huawei | R2-62 | - | [WTS] [JSN] | |||
| R2-083556 | Security at RRC Connection Re-establishment | other | Huawei | R2-62 | - | [WTS] [JSN] | |||
| R2-083557 | Corrections for Uplink Bundling: “Bundle” and Feedback | other | Samsung | R2-62 | - | [WTS] [JSN] | |||
| R2-083558 | Clarifications to Maintenance of Uplink Time Alignment | other | Nortel, Alcatel-Lucent | R2-62 | - | [WTS] [JSN] | |||
| R2-083559 | Limiting Random Preamble Transmission Power | other | Nortel | R2-62 | - | [WTS] [JSN] | |||
| R2-083560 | System Information Change during connection setup procedure | other | Motorola | R2-62 | - | [WTS] [JSN] | |||
| R2-083561 | UE awareness of PCIs reserved for HeNBs | other | Motorola | R2-62 | - | [WTS] [JSN] | |||
| R2-083562 | RRC-MAC interaction for Random Access | other | Motorola | R2-62 | - | [WTS] [JSN] | |||
| R2-083563 | Measurement Reporting for Simultaneous Events | other | Motorola | R2-62 | - | [WTS] [JSN] | |||
| R2-083564 | Summary of email discussion on Handling of Low/Medium priority features in Rel 8 | other | Motorola | R2-62 | - | [WTS] [JSN] | |||
| R2-083565 | MBSFN subframe signaling | other | Motorola | R2-62 | - | [WTS] [JSN] | |||
| R2-083566 | CR on the value of ACK_SN for partial STATUS PDU | other | Motorola | R2-62 | - | [WTS] [JSN] | |||
| R2-083567 | HARQ Process ID’s for DL Persistent scheduling | other | Nortel | R2-62 | - | [WTS] [JSN] | |||
| R2-083568 | Email discussion summary: [62_LTE_C01] The need of CSG cell specific PCIs | other | Qualcomm Europe | R2-62 | - | [WTS] [JSN] | |||
| R2-083569 | Email discussion summary: [62_LTE_C02] Home eNB inbound mobility support: Remaining issues | other | Qualcomm Europe | R2-62 | - | [WTS] [JSN] | |||
| R2-083570 | AS-NAS interaction during RRCconnection establishment procedure | other | Qualcomm Europe | R2-62 | - | [WTS] [JSN] | |||
| R2-083571 | NAS abortion during RRC_CONNECTED state | other | Qualcomm Europe | R2-62 | - | [WTS] [JSN] | |||
| R2-083572 | Handling of integrity protection check failure | other | Qualcomm Europe | R2-62 | - | [WTS] [JSN] | |||
| R2-083573 | Considerations on ETWS mechanisms | other | Qualcomm Europe | R2-62 | - | [WTS] [JSN] | |||
| R2-083574 | Impact of DC HSDPA on RAN2 Specifications with Joint Queue at Node B | other | Qualcomm Europe | R2-62 | - | [WTS] [JSN] | |||
| R2-083575 | RACH load balancing in DC-HSDPA | other | Huawei | R2-62 | - | [WTS] [JSN] | |||
| R2-083576 | Discussion on Exchange of the Anchor Carrier and the Supplementary | other | Huawei | R2-62 | - | [WTS] [JSN] | |||
| R2-083577 | Consideration of the Anchor Carrier Serving Cell Change | other | Huawei | R2-62 | - | [WTS] [JSN] | |||
| R2-083578 | Consideration on DRX | other | Huawei | R2-62 | - | [WTS] [JSN] | |||
| R2-083579 | RLF handling during CS over HSPA reconfiguration | other | Huawei | R2-62 | - | [WTS] [JSN] | |||
| R2-083580 | Clarification on when TVM object is not included | other | Huawei | R2-62 | - | [WTS] [JSN] | |||
| R2-083581 | E-DCH into Traffic volume measurement object | other | Huawei | R2-62 | - | [WTS] [JSN] | |||
| R2-083582 | Comments on MAC CR after RAN2#62 | other | MAC Rapporteurs (Ericsson, QUALCOMM Europe) | R2-62 | - | [WTS] [JSN] | |||
| R2-083583 | Report of MAC activities | other | MAC Rapporteurs (Ericsson, QUALCOMM Europe) | R2-62 | - | [WTS] [JSN] | |||
| R2-083584 | Alignment of periods for gap pattern, DRX, sys info and paging for a UE in connected mode | other | Ericsson, Panasonic | R2-62 | - | [WTS] [JSN] | |||
| R2-083585 | Correction and Clarification in HCS Reselection | other | LG Electronics Inc. | R2-62 | - | [WTS] [JSN] | |||
| R2-083586 | NACC from E-UTRAN to HRPD | other | Motorola | R2-62 | - | [WTS] [JSN] | |||
| R2-083587 | Update to the Reception of SystemInformationBlockType8 | other | Motorola | R2-62 | - | [WTS] [JSN] | |||
| R2-083588 | Cell identification for HNB | other | Samsung | R2-62 | - | [WTS] [JSN] | |||
| R2-083589 | Network support to ensure UE autonomous CSG discovery after change of macro cell identification | other | T-Mobile, Huawei | R2-62 | - | [WTS] [JSN] | |||
| R2-083590 | Consequence analysis of Low/ Medium features in LTE Rel-8 | other | NTT DOCOMO | R2-62 | - | [WTS] [JSN] | |||
| R2-083591 | Operators' proposals on Low/ Medium feature handling in LTE Rel-8 | other | NTT DOCOMO | R2-62 | - | [WTS] [JSN] | |||
| R2-083592 | Summary of email discussion on Padding and BSR | other | Rapporteur (LG Electonics Inc.) | R2-62 | - | [WTS] [JSN] | |||
| R2-083593 | RRC procedure delay value for C-plane/U-plane setup | other | Panasonic, Fujitsu, NEC | R2-62 | - | [WTS] [JSN] | |||
| R2-083594 | RACH measurements | other | Huawei, NTT DoCoMo, Vodafone | R2-62 | - | [WTS] [JSN] | |||
| R2-083595 | TS 36.314 L2 measurements | other | Huawei, NTT DoCoMo, Vodafone | R2-62 | - | [WTS] [JSN] | |||
| R2-083596 | Clarification of polling | other | Ericsson | R2-62 | - | [WTS] [JSN] | |||
| R2-083597 | Reply LS to C4-081359 = R2-083049 on “Changes to the format of TMGI” (C3-081062; to: CT4; cc: RAN2, RAN3, CT1; contact: Huawei) | other | CT3 | R2-62 | - | [WTS] [JSN] | |||
| R2-083598 | LS on Measurement Reporting of multiple triggered events (R4-081691; to: RAN2; cc: -; contact: NTT) | other | RAN4 | R2-62 | - | [WTS] [JSN] | |||
| R2-083599 | LS on RSRQ Definition Update (R4-081699; to: RAN1; cc: RAN2, RAN5; contact: Ericsson) | other | RAN4 | R2-62 | - | [WTS] [JSN] | |||
| R2-083600 | LS on RSRQ Reporting Range (R4-081700; to: RAN2; cc: RAN1; contact: Ericsson) | other | RAN4 | R2-62 | - | [WTS] [JSN] | |||
| R2-083601 | Draft LS to CT1/SA1/SA2 on ETWS questions | other | NTT DOCOMO | R2-62 | - | [WTS] [JSN] | |||
| R2-083602 | Draft LS reply to SA2 to R2-083085 on SRVCC target cell selection | other | NSN | R2-62 | - | [WTS] [JSN] | |||
| R2-083603 | Draft LS reply to R2-083052 on reselection priorities | other | Nokia | R2-62 | - | [WTS] [JSN] | |||
| R2-083604 | Draft reply LS to R1-082222 = R2-083059 on L1 impact of measurement gaps | other | Qualcomm | R2-62 | - | [WTS] [JSN] | |||
| R2-083605 | Draft reply LS to R2-083061 | other | Qualcomm | R2-62 | - | [WTS] [JSN] | |||
| R2-083606 | Draft reply LS to R3-081576 = R2-083067 on Data forwarding for Inter 3GPP-RAT HO from E-UTRAN to UMTS/GERAN | other | NSN | R2-62 | - | [WTS] [JSN] | |||
| R2-083607 | Draft reply LS to R2-083071 on Inter RAT ANR | other | NEC | R2-62 | - | [WTS] [JSN] | |||
| R2-083608 | Draft reply LS to R3-01607 = R2-083072 on Load balancing signalling on QCI | other | Huawei | R2-62 | - | [WTS] [JSN] | |||
| R2-083609 | Review of AC barring | other | LG Electronics Inc. | R2-62 | - | [WTS] [JSN] | |||
| R2-083610 | Home-eNB handling in Rel-8 | other | Samsung | R2-62 | - | [WTS] [JSN] | |||
| R2-083611 | Home cell “whitelist” handling | other | Samsung | R2-62 | - | [WTS] [JSN] | |||
| R2-083612 | Clarification on when TVM object is not included | other | Huawei | R2-62 | - | [WTS] [JSN] | |||
| R2-083613 | Void | other | - | R2-62 | - | [WTS] [JSN] | |||
| R2-083614 | CR to 25.321 REL-5 on HSDPA TBS Table correction for LCR TDD | other | CATT, Ericsson, RITT, Spreadtrum Communications, TD Tech, ZTE | R2-62 | - | [WTS] [JSN] | |||
| R2-083615 | Void | other | - | R2-62 | - | [WTS] [JSN] | |||
| R2-083616 | Void | other | - | R2-62 | - | [WTS] [JSN] | |||
| R2-083617 | CR to 25.304 REL-8 on eDRX introduction | other | Nokia Corporation, Nokia Siemens Networks | R2-62 | - | [WTS] [JSN] | |||
| R2-083618 | CR to 25.331 REL-8 on RRC procedures for configuring Improved layer 2 for UL | other | InterDigital | R2-62 | - | [WTS] [JSN] | |||
| R2-083619 | RACH load balancing in DC-HSDPA | other | Huawei | R2-62 | - | [WTS] [JSN] | |||
| R2-083620 | Discussion on Exchange of the Anchor Carrier and the Supplementary Carrier Cells | other | Huawei | R2-62 | - | [WTS] [JSN] | |||
| R2-083621 | Consideration of the Anchor Carrier Serving Cell Change | other | Huawei | R2-62 | - | [WTS] [JSN] | |||
| R2-083622 | CR to 25.322 REL-8 on Independent shceduling support for DC-HSPA | other | Huawei | R2-62 | - | [WTS] [JSN] | |||
| R2-083623 | [draft] LS on DC-HSDPA interaction with CPC | other | Qualcomm | R2-62 | - | [WTS] [JSN] | |||
| R2-083624 | [draft] Reply LS to R3-080984 (R2-082074) on Introduction of UE History Information in HSPA evolution | other | Nokia Siemens Networks | R2-62 | - | [WTS] [JSN] | |||
| R2-083625 | CR to 25.331 REL-7 on MBSFN Corrections | other | NextWave Wireless | R2-62 | - | [WTS] [JSN] | |||
| R2-083626 | Fast dormancy alternatives | other | Nokia Corporation, Nokia Siemens Networks | R2-62 | - | [WTS] [JSN] | |||
| R2-083627 | Considerations on incoming LSs on VoIP Continuity Solution | other | Nokia Corporation, Nokia Siemens Networks, NEC, Broadcom, Motorola | R2-62 | - | [WTS] [JSN] | |||
| R2-083628 | CR to 25.308 REL-8 on Introduction of HS-DSCH cell change enhancements | other | Ericsson | R2-62 | - | [WTS] [JSN] | |||
| R2-083629 | CR to 25.304 REL-7 on MBSFN Corrections | other | NextWave Wireless | R2-62 | - | [WTS] [JSN] | |||
| R2-083630 | [draft] LS to RAN1 on DC-HSDPA interaction with CPC | other | Qualcomm Europe | R2-62 | - | [WTS] [JSN] | |||
| R2-083631 | CR to 25.304 REL-8 on eDRX introduction | other | Nokia Corporation, Nokia Siemens Networks | R2-62 | - | [WTS] [JSN] | |||
| R2-083632 | LS on DC-HSDPA carrier management (to: RAN1; cc: -; contact: Qualcomm) | LS out | RAN2 | R2-62 | - | [WTS] [JSN] | |||
| R2-083633 | Reply LS to R3-080984 = R2-082074 on Introduction of UE History Information in HSPA evolution (to: RAN3; cc: -; contact: NSN) | LS out | RAN2 | R2-62 | - | [WTS] [JSN] | |||
| R2-083634 | Reply LS to R3-080984 (R2-082074) on Introduction of UE History Information in HSPA evolution | other | RAN2 | R2-62 | - | [WTS] [JSN] | |||
| R2-083635 | Void | other | - | R2-62 | - | [WTS] [JSN] | |||
| R2-083636 | Void | other | - | R2-62 | - | [WTS] [JSN] | |||
| R2-083637 | Void | other | - | R2-62 | - | [WTS] [JSN] | |||
| R2-083638 | Void | other | - | R2-62 | - | [WTS] [JSN] | |||
| R2-083639 | Void | other | - | R2-62 | - | [WTS] [JSN] | |||
| R2-083640 | Void | other | - | R2-62 | - | [WTS] [JSN] | |||
| R2-083641 | Void | other | - | R2-62 | - | [WTS] [JSN] | |||
| R2-083642 | Void | other | - | R2-62 | - | [WTS] [JSN] | |||
| R2-083643 | Void | other | - | R2-62 | - | [WTS] [JSN] | |||
| R2-083644 | Void | other | - | R2-62 | - | [WTS] [JSN] | |||
| R2-083645 | Void | other | - | R2-62 | - | [WTS] [JSN] | |||
| R2-083646 | Void | other | - | R2-62 | - | [WTS] [JSN] | |||
| R2-083647 | Void | other | - | R2-62 | - | [WTS] [JSN] | |||
| R2-083648 | Void | other | - | R2-62 | - | [WTS] [JSN] | |||
| R2-083649 | Void | other | - | R2-62 | - | [WTS] [JSN] | |||
| R2-083650 | Void | other | - | R2-62 | - | [WTS] [JSN] | |||
| R2-083651 | Void | other | - | R2-62 | - | [WTS] [JSN] | |||
| R2-083652 | Void | other | - | R2-62 | - | [WTS] [JSN] | |||
| R2-083653 | Void | other | - | R2-62 | - | [WTS] [JSN] | |||
| R2-083654 | Void | other | - | R2-62 | - | [WTS] [JSN] | |||
| R2-083655 | Void | other | - | R2-62 | - | [WTS] [JSN] | |||
| R2-083656 | Void | other | - | R2-62 | - | [WTS] [JSN] | |||
| R2-083657 | Void | other | - | R2-62 | - | [WTS] [JSN] | |||
| R2-083658 | Void | other | - | R2-62 | - | [WTS] [JSN] | |||
| R2-083659 | Void | other | - | R2-62 | - | [WTS] [JSN] | |||
| R2-083660 | Void | other | - | R2-62 | - | [WTS] [JSN] | |||
| R2-083661 | Draft reply LS to R2-083084 on AMBR Enforcement | other | Ericsson | R2-62 | - | [WTS] [JSN] | |||
| R2-083662 | Draft reply LS to S3-080532 = R2-083093 RRC Connection Re-establishment | other | NTT DOCOMO | R2-62 | - | [WTS] [JSN] | |||
| R2-083663 | Draft reply LS to S5-080996 = R2-083532 on OAM support for RRC neighbour lists and RRC blacklists | other | Qualcomm | R2-62 | - | [WTS] [JSN] | |||
| R2-083664 | Draft reply LS to R2-083057 on Change rate of physical layer parameters | other | Ericsson | R2-62 | - | [WTS] [JSN] | |||
| R2-083665 | Draft LS to RAN (cc: RAN1) on requirements for LTE MBMS | other | Motorola | R2-62 | - | [WTS] [JSN] | |||
| R2-083666 | Signaling of MBSFN frame allocation | other | Ericsson | R2-62 | - | [WTS] [JSN] | |||
| R2-083667 | Draft LS to SA3 on FFS on NULL integrity protection algorithm | other | ALU | R2-62 | - | [WTS] [JSN] | |||
| R2-083668 | Value ranges for physical layer parameters | other | Ericsson | R2-62 | - | [WTS] [JSN] | |||
| R2-083669 | Reply LS to R2-082883 on Earthquake and Tsunami Warning System (C1-082552; to: RAN2; cc: SA2; contact: NTT) | other | CT1 | R2-62 | - | [WTS] [JSN] | |||
| R2-083670 | LS on UE behaviour when the network fails authentication (C1-082714; to: RAN2; cc: -; contact: Ericsson) | other | CT1 | R2-62 | - | [WTS] [JSN] | |||
| R2-083671 | Reply LS to R2-082900 on UTRA R8 hNB requirements (C1-082799; to: RAN2; cc: SA1; contact: Qualcomm) | other | CT1 | R2-62 | - | [WTS] [JSN] | |||
| R2-083672 | Reply LS to R2-082895 on NAS triggering connection recovery after RLF (C1-082800; to: RAN2; cc: SA2, RAN3; contact: Samsung) | other | CT1 | R2-62 | - | [WTS] [JSN] | |||
| R2-083673 | Reply LS to R2-083035 on CS Fallback (C1-082806; to: RAN2, SA1; cc: SA2, RAN3; contact: NEC) | other | CT1 | R2-62 | - | [WTS] [JSN] | |||
| R2-083674 | Reply LS to R2-082894 on reservation of an MMEC value (S2-085261; to: RAN2, CT4; cc: CT1, RAN3, SA5; contact: Ericsson) | other | SA2 | R2-62 | - | [WTS] [JSN] | |||
| R2-083675 | Reply LS to R2-082868 and R3-080993 = R2-082077 on S1 Overload Control (S2-085264; to: RAN2, RAN3; cc: SA3, CT1; contact: NSN) | other | SA2 | R2-62 | - | [WTS] [JSN] | |||
| R2-083676 | Reply LS to R2-083036 and R3-081580 = R2-083068 on Tracking Area Update in RRC Connected and handover for load balancing (S2-085265; to: RAN2, RAN3; cc: CT1; contact: NSN) | other | SA2 | R2-62 | - | [WTS] [JSN] | |||
| R2-083677 | Reply LS to R2-083035 on CS Fallback (S2-085266; to: RAN2; cc: CT1, RAN3; contact: Motorola) | other | SA2 | R2-62 | - | [WTS] [JSN] | |||
| R2-083678 | Reply LS to R2-082883 on Earthquake and Tsunami Warning System (S2-085267; to: RAN2; cc: RAN1, RAN3, CT1, SA1, SA3; contact: NTT) | other | SA2 | R2-62 | - | [WTS] [JSN] | |||
| R2-083679 | Reply LS to R2-082907 on HSPA VoIP to WCDMA/GSM CS continuity (S2-085268; to: RAN2; cc: CT1; contact: Alcatel-Lucent) | other | SA2 | R2-62 | - | [WTS] [JSN] | |||
| R2-083680 | LS on Intersystem RAT handover security from E-UTRAN to UTRAN/GERAN (S3-080839; to: RAN2; cc: RAN3; contact: Nokia) | other | SA3 | R2-62 | - | [WTS] [JSN] | |||
| R2-083681 | LS on indicating needs for the key indicator information on Intersystem RAT handover security from E-UTRAN to UTRAN/GERAN (S3-080869; to: ; cc: -; contact: Nokia) | other | SA3 | R2-62 | - | [WTS] [JSN] | |||
| R2-083682 | LS on AS Message Exception list (Follow up on S3-080502) (S3-080879; to: RAN2; cc: -; contact: Nokia) | other | SA3 | R2-62 | - | [WTS] [JSN] | |||
| R2-083683 | Reply LS to R2-082883 on Earthquake and Tsunami Warning System (S3-080911; to: RAN2; cc: -; contact: NTT) | other | SA3 | R2-62 | - | [WTS] [JSN] | |||
| R2-083684 | Counter check procedure (S3-080927; to: RAN2; cc: -; contact: Ericsson) | other | SA3 | R2-62 | - | [WTS] [JSN] | |||
| R2-083685 | UL HARQ protocol behaviour for CQI-only" reports" | other | Panasonic | R2-62 | - | [WTS] [JSN] | |||
| R2-083686 | Required reliability of SPS uplink grant | other | Samsung | R2-62 | - | [WTS] [JSN] | |||
| R2-083687 | Dedicated RACH Resource for handover | other | Huawei | R2-62 | - | [WTS] [JSN] | |||
| R2-083688 | Value ranges for RLC parameters | other | Ericsson | R2-62 | - | [WTS] [JSN] | |||
| R2-083689 | Value ranges for PDCP parameters | other | Ericsson | R2-62 | - | [WTS] [JSN] | |||
| R2-083690 | PDCP reconfiguration at Handover | other | Ericsson | R2-62 | - | [WTS] [JSN] | |||
| R2-083691 | Update to the Reception of SystemInformationBlockType8 | other | Motorola | R2-62 | - | [WTS] [JSN] | |||
| R2-083692 | Draft LS to RAN1 on ICIC Signalling | other | Ericsson | R2-62 | - | [WTS] [JSN] | |||
| R2-083693 | Proposed CR to 36.323 on Restructuring of PDCP specification | other | LG Electronics Inc. | R2-62 | - | [WTS] [JSN] | |||
| R2-083694 | Dedicated L1 resource usage after handover | other | Panasonic | R2-62 | - | [WTS] [JSN] | |||
| R2-083695 | Interactions between RRC-PDCP-RLC in case of a handover | other | Infineon, Ericsso n | R2-62 | - | [WTS] [JSN] | |||
| R2-083696 | HARQ Process ID’s for DL Persistent scheduling | other | Nortel | R2-62 | - | [WTS] [JSN] | |||
| R2-083697 | Re-ordering conntrol in HO command | other | Fujitsu | R2-62 | - | [WTS] [JSN] | |||
| R2-083698 | Draft reply LS to R2-083057 on Change rate of physical layer parameters | other | Ericsson | R2-62 | - | [WTS] [JSN] | |||
| R2-083699 | CR to 36.321 REL-8 on RACH uniform random backoff | other | QUALCOMM Europe | R2-62 | - | [WTS] [JSN] | |||
| R2-083700 | CR to 36.321 REL-8 on PUSCH PUCCH Power Control RNTIs | other | QUALCOMM Europe | R2-62 | - | [WTS] [JSN] | |||
| R2-083701 | CR to 36.321 REL-8 on Clarification of DL- and UL-SCH Data Transfer | other | Ericsson | R2-62 | - | [WTS] [JSN] | |||
| R2-083702 | CR to 36.321 REL-8 on Preventing UL HARQ transmissions without MCS information | other | Huawei, Ericsson | R2-62 | - | [WTS] [JSN] | |||
| R2-083703 | CR to 36.321 REL-8 on NDI and Msg3 | other | LG Electronics | R2-62 | - | [WTS] [JSN] | |||
| R2-083704 | CR to 36.321 REL-8 on TTI Bundling | other | Nokia Corporation, Nokia Siemens Networks | R2-62 | - | [WTS] [JSN] | |||
| R2-083705 | CR to 36.321 REL-8 on Clarification of DRX | other | Ericsson | R2-62 | - | [WTS] [JSN] | |||
| R2-083706 | CR to 36.321 REL-8 on Clarification on UE behavior for DRX and configured measurement gaps | other | Ericsson | R2-62 | - | [WTS] [JSN] | |||
| R2-083707 | CR to 36.321 REL-8 on Buffer size levels for BSR | other | Ericsson, Nokia Corporation, Nokia Siemens Networks, Samsung | R2-62 | - | [WTS] [JSN] | |||
| R2-083708 | CR to 36.321 REL-8 on Correction to UE transmission power headroom report for LTE | other | Ericsson | R2-62 | - | [WTS] [JSN] | |||
| R2-083709 | CR to 36.321 REL-8 on Corrections on BSR | other | Samsung | R2-62 | - | [WTS] [JSN] | |||
| R2-083710 | CR to 36.321 REL-8 on Format of UL grant in Message 2 | other | QUALCOMM Europe | R2-62 | - | [WTS] [JSN] | |||
| R2-083711 | Reply LS to R1-082251 = R2-083061 on Uplink grant format in Random Access Response | other | Qualcomm | R2-62 | - | [WTS] [JSN] | |||
| R2-083712 | CR to 36.321 REL-8 on Correction to MAC Padding BSR | other | LG Electronics | R2-62 | - | [WTS] [JSN] | |||
| R2-083713 | Clarification of polling | other | Ericsson | R2-62 | - | [WTS] [JSN] | |||
| R2-083714 | Void | other | - | R2-62 | - | [WTS] [JSN] | |||
| R2-083715 | Last HARQ feedback and Measurement Gaps | other | Nokia Corporation, Nokia Siemens Networks | R2-62 | - | [WTS] [JSN] | |||
| R2-083716 | Draft CR to update MAC parameters in 36.331 | other | Email Rapporteur (Ericsson) | R2-62 | - | [WTS] [JSN] | |||
| R2-083717 | RLC entity re-establishment | other | Motorola | R2-62 | - | [WTS] [JSN] | |||
| R2-083718 | Handling poll in received PDU which is duplicate or outside receiving window | other | Samsung; Nokia Corporation, Nokia Siemens Networks | R2-62 | - | [WTS] [JSN] | |||
| R2-083719 | CR to 36.322 REL-8 on Error cases for RLC | other | Ericsson | R2-62 | - | [WTS] [JSN] | |||
| R2-083720 | Schedule and Baseline CR for Restructuring of PDCP specification | other | LG Electronics Inc., Nokia Corporation, Nokia Siemens Networks | R2-62 | - | [WTS] [JSN] | |||
| R2-083721 | Draft CR to update MAC parameters in 36.331 | other | Ericsson | R2-62 | - | [WTS] [JSN] | |||
| R2-083722 | Last HARQ feedback and Measurement Gaps | other | Nokia Corporation, Nokia Siemens Networks | R2-62 | - | [WTS] [JSN] | |||
| R2-083723 | CR to 36.321 REL-8 on NDI and Msg3 | other | LG Electronics | R2-62 | - | [WTS] [JSN] | |||
| R2-083724 | TTI Bundling | other | Nokia Corporation, Nokia Siemens Networks | R2-62 | - | [WTS] [JSN] | |||
| R2-083725 | CR to 36.321 REL-8 on Clarification of DRX | other | Ericsson | R2-62 | - | [WTS] [JSN] | |||
| R2-083726 | Report of E-UTRA user plane session | other | RAN2 vice chairman (Motorola) | R2-62 | - | [WTS] [JSN] | |||
| R2-083727 | CR to 25.321 REL-8 on Clarification of DL- and UL-SCH Data Transfer | other | Ericsson | R2-62 | - | [WTS] [JSN] | |||
| R2-083728 | Void | other | - | R2-62 | - | [WTS] [JSN] | |||
| R2-083729 | Void | other | - | R2-62 | - | [WTS] [JSN] | |||
| R2-083730 | Void | other | - | R2-62 | - | [WTS] [JSN] | |||
| R2-083731 | CR on UL HARQ transmission without MCS | other | Huawei, Ericsson | R2-62 | - | [WTS] [JSN] | |||
| R2-083732 | Reply LS to R2-082907 on HSPA VoIP to WCDMA/GSM CS continuity (C1-082548; to: RAN2; cc: SA2; contact: NSN) | other | CT1 | R2-62 | - | [WTS] [JSN] | |||
| R2-083733 | Reply LS to R1-082201 = R2-083057 on Change rate of physical layer parameters (to: RAN1; cc: -; contact: Ericsson) | LS out | RAN2 | R2-62 | - | [WTS] [JSN] | |||
| R2-083734 | TP to 36.331 on scheduling issue for window size of 1ms | other | ZTE, CMCC | R2-62 | - | [WTS] [JSN] | |||
| R2-083735 | System Information Change Notification for Connected Mode UEs | other | Ericsson | R2-62 | - | [WTS] [JSN] | |||
| R2-083736 | Reconfiguration of inactive RABs to DCH | other | NSN | R2-62 | - | [WTS] [JSN] | |||
| R2-083737 | Draft LS to SA1 on coding details | other | T-Mobile | R2-62 | - | [WTS] [JSN] | |||
| R2-083738 | Establishment cause and access class barring clarification | other | NTT DOCOMO | R2-62 | - | [WTS] [JSN] | |||
| R2-083739 | Failure handling | other | Samsung | R2-62 | - | [WTS] [JSN] | |||
| R2-083740 | AS-NAS interaction during RRCconnection establishment procedure | other | Qualcomm Europe | R2-62 | - | [WTS] [JSN] | |||
| R2-083741 | MNC MCC in RRC connection establishment | other | Alcatel-Lucent, Alcatel Shanghai Bell | R2-62 | - | [WTS] [JSN] | |||
| R2-083742 | Clarification on Event Evaluation | other | Nokia Corporation, Nokia Siemens Networks | R2-62 | - | [WTS] [JSN] | |||
| R2-083743 | Some issues on Measurement | other | CATT | R2-62 | - | [WTS] [JSN] | |||
| R2-083744 | Draft LS to RAN4 on alignment of 120ms measurement gap with SFN period | other | Ericsson | R2-62 | - | [WTS] [JSN] | |||
| R2-083745 | TP Mobility from E-UTRAN | other | NTT DOCOMO | R2-62 | - | [WTS] [JSN] | |||
| R2-083746 | Text proposal for the Handover to E-UTRAN | other | Samsung | R2-62 | - | [WTS] [JSN] | |||
| R2-083747 | Procedure for HRPD pre-registration / 1x Registration from idle mode | other | Nortel | R2-62 | - | [WTS] [JSN] | |||
| R2-083748 | Updated draft report of RAN2 #62, Kansas City, USA, 31.03.-04.04.2008 | other | ETSI MCC | R2-62 | - | [WTS] [JSN] | |||
| R2-083749 | Update to the Reception of SystemInformationBlockType8 | other | Motorola | R2-62 | - | [WTS] [JSN] | |||
| R2-083750 | Idle mobility related considerations in 36.331 | other | Huawei | R2-62 | - | [WTS] [JSN] | |||
| R2-083751 | Mobility state detection criteria in active mode | other | Huawei | R2-62 | - | [WTS] [JSN] | |||
| R2-083752 | Some editorial corrections to 36.304 | other | CATT | R2-62 | - | [WTS] [JSN] | |||
| R2-083753 | Some Considerations for TTI-Bundling | other | ZTE | R2-62 | - | [WTS] [JSN] | |||
| R2-083754 | Definition of the Time Alignment Timer | other | NEC | R2-62 | - | [WTS] [JSN] | |||
| R2-083755 | Optimisation of the GERAN neighbour cell list | other | Ericsson | R2-62 | - | [WTS] [JSN] | |||
| R2-083756 | Reply LS to S2-084460 = R2-083091 LS on Earthquake and Tsunami Warning System (S3-080912; to: RAN2, RAN3, CT1, SA2; cc: CT4, RAN1, GERAN1, GERAN2; contact: NTT) | other | SA3 | R2-62 | - | [WTS] [JSN] | |||
| R2-083757 | 'Need OP' fields in RRC ASN.1 | other | Qualcomm Europe | R2-62 | - | [WTS] [JSN] | |||
| R2-083758 | Text proposal to 36.331 on Values of RRC multiplicity and type constraints | other | Samsung | R2-62 | - | [WTS] [JSN] | |||
| R2-083759 | Reply LS to R2-082894 on reservation of an MMEC value (C4-081804; to: RAN2; cc: CT1, RAN3, SA2, SA5; contact: Ericsson) | other | CT4 | R2-62 | - | [WTS] [JSN] | |||
| R2-083760 | CR on Considerations on various open items in 36.304 | other | Nokia Corporation, Nokia Siemens Networks | R2-62 | - | [WTS] [JSN] | |||
| R2-083761 | System Information Change Notification for Connected Mode UEs | other | Ericsson | R2-62 | - | [WTS] [JSN] | |||
| R2-083762 | AS-NAS interaction during RRCconnection establishment procedure | other | Qualcomm Europe | R2-62 | - | [WTS] [JSN] | |||
| R2-083763 | Some issues on Measurement | other | CATT | R2-62 | - | [WTS] [JSN] | |||
| R2-083764 | CSG related correction to 36.304 | other | T-Mobile | R2-62 | - | [WTS] [JSN] | |||
| R2-083765 | Measurement structure for SON-ANR | other | Samsung | R2-62 | - | [WTS] [JSN] | |||
| R2-083766 | Draft report of LTE Control Plane session | other | RAN2 chairman | R2-62 | - | [WTS] [JSN] | |||
| R2-083767 | Final report of RAN2 #62, Kansas City, USA, 31.03.-04.04.2008 | other | ETSI MCC | R2-62 | - | [WTS] [JSN] | |||
| R2-083768 | Final report of RAN2 LTE RRC ad hoc, Sophia Antipolis, France, 05.-06.06.2008 | other | ETSI MCC | R2-62 | - | [WTS] [JSN] | |||
| R2-083769 | Dedicated L1 resource usage after handover | other | Panasonic | R2-62 | - | [WTS] [JSN] | |||
| R2-083770 | Schedule and Baseline CR for Restructuring of PDCP specification | other | LG Electronics Inc., Nokia Corporation, Nokia Siemens Networks | R2-62 | - | [WTS] [JSN] | |||
| R2-083771 | CR on Considerations on various open items in 36.304 | other | Nokia Corporation, Nokia Siemens Networks | R2-62 | - | [WTS] [JSN] | |||
| R2-083772 | Clarification of polling | other | Ericsson | R2-62 | - | [WTS] [JSN] | |||
| R2-083773 | Last HARQ feedback and Measurement Gaps | other | Nokia Corporation, Nokia Siemens Networks | R2-62 | - | [WTS] [JSN] | |||
| R2-083774 | System Information Change Notification for Connected Mode UEs | other | Ericsson | R2-62 | - | [WTS] [JSN] | |||
| R2-083775 | Measurement structure for SON-ANR | other | Samsung | R2-62 | - | [WTS] [JSN] | |||
| R2-083776 | Reply LS to S2-084419 = R2-083085 on SRVCC target cell selection (to: SA2; cc: GERAN, RAN3; contact: NSN) | LS out | RAN2 | R2-62 | - | [WTS] [JSN] | |||
| R2-083777 | Reply LS to GP-080954 = R2-083052 on clarification about reselection priorities (to: GERAN; cc: -; contact: Nokia) | other | RAN2 | R2-62 | - | [WTS] [JSN] | |||
| R2-083778 | Reply LS to R3-081576 = R2-083067 on Data forwarding for Inter 3GPP-RAT HO from E-UTRAN to UMTS/GERAN (to: RAN3; cc: SA2, CT1, CT4; contact: NSN) | LS out | RAN2 | R2-62 | - | [WTS] [JSN] | |||
| R2-083779 | Reply LS to R1-082251 = R2-083061 on Uplink grant format in Random Access Response (to: RAN1; cc: -; contact: Qualcomm) | LS out | RAN2 | R2-62 | - | [WTS] [JSN] | |||
| R2-083780 | Draft LS to RAN4 on LS on alignment of 120ms measurement gap with SFN period | other | Ericsson | R2-62 | - | [WTS] [JSN] | |||
| R2-083781 | Reply LS to S2-084413 = R2-083084 on AMBR Enforcement (to: SA2; cc: RAN3, CT1; contact: Ericssson) | LS out | RAN2 | R2-62 | - | [WTS] [JSN] | |||
| R2-083782 | Reply LS to S1-080768 = R2-083081 on coding of Home (e)NodeB identifier (to: SA1, CT1; cc: -; contact: T-Mobile) | LS out | RAN2 | R2-62 | - | [WTS] [JSN] | |||
| R2-083783 | LS on alignment of 120ms measurement gap with SFN period (to: RAN4; cc: -; contact: Ericsson) | LS out | RAN2 | R2-62 | - | [WTS] [JSN] | |||
| R2-083784 | Updated LS to SA3 on FFS on NULL integrity protection algorithm | other | RAN2 | R2-62 | - | [WTS] [JSN] | |||
| R2-083785 | Reply LS to R1-081704 = R2-082094 on ICIC Signalling (to: RAN1; cc: RAN3; contact: Ericsson) | LS out | RAN2 | R2-62 | - | [WTS] [JSN] | |||
| R2-083786 | Reply LS to C1-082552 = R2-083669, S2-085267 = R2-083678, S3-080911 = R2-083683, S1-080759 = R2-083080, S2-084460 = R2-083091 on Further questions on Earthquake and Tsunami Warning System (to: CT1, SA1, SA2; cc: RAN1, RAN3, SA3; contact: NTT DOCOMO) | LS out | NTT DOCOMO | R2-62 | - | [WTS] [JSN] | |||
| R2-083787 | LS on NULL integrity protection algorithm (to: SA3; cc: SA1, CT1; contact: Alcatel-Lucent) | LS out | RAN2 | R2-62 | - | [WTS] [JSN] | |||
| R2-083788 | Draft reply LS to R2-083071 on Inter RAT ANR | other | NEC | R2-62 | - | [WTS] [JSN] | |||
| R2-083789 | Reply LS to S5-080996 = R2-083532 on OAM support for RRC neighbour lists and RRC blacklists (to: SA5; cc: RAN3; contact: Qualcomm) | LS out | RAN2 | R2-62 | - | [WTS] [JSN] | |||
| R2-083790 | TS 36.314 v0.0.0 E-UTRA L2 measurements | other | Huawei | R2-62 | - | [WTS] [JSN] | |||
| R2-083791 | Reply LS to R3-081606 = R2-083071 on Inter RAT ANR (to: RAN3; cc: -; contact: NEC) | other | RAN2 | R2-62 | - | [WTS] [JSN] | |||
| R2-083792 | Reply LS to GP-080954 = R2-083052 on clarification about reselection priorities (to: GERAN; cc: -; contact: Nokia) | LS out | RAN2 | R2-62 | - | [WTS] [JSN] | |||
| R2-083793 | Reply LS to R3-081606 = R2-083071 on Inter RAT ANR (to: RAN3; cc: -; contact: NEC) | LS out | RAN2 | R2-62 | - | [WTS] [JSN] | |||
| R2-083794 | TS 36.314 v0.0.1 Rapporteur's proposal for an update covering agreements of RAN2 #62bis | other | Huawei | R2-62 | - | [WTS] [JSN] | |||
| R2-083795 | Rapporteur's TS 36.331 CR covering all RAN2 #62bis agreements: Miscellaneous corrections and clarifications | other | Samsung (rapporteur) | R2-62 | - | [WTS] [JSN] | |||
| R2-083796 | Void | other | - | R2-62 | - | [WTS] [JSN] | |||
| R2-083797 | Void | other | - | R2-62 | - | [WTS] [JSN] | |||
| R2-083798 | Void | other | - | R2-62 | - | [WTS] [JSN] | |||
| R2-083799 | Void | other | - | R2-62 | - | [WTS] [JSN] |
760 documents (1.2532999515533 seconds)