Please enter the search related information in the fields below. Partial information works, e.g. "SP-21" in the "tdoc" field lists all TSG SA documents from 2021. Regular expressions mostly work in all fields (e.g. "2[34].501" in the "Spec" field lists all documents related to 23.501 and 24.501. Capitalization is disregarded, i.e. "3GPP" gives the same results as "3gpp".
Download results in JSON format
| tdoc | Title | Type / Revs | Source | Spec / CR | S/WID | Release | Meeting | Status | Links |
|---|---|---|---|---|---|---|---|---|---|
| R2-081400 | Proposed agenda for RAN2 #61bis, Shenzhen, China, 31.03.-04.04.2008 | other | RAN2 chairman | R2-61 | - | [WTS] [JSN] | |||
| R2-081401 | Draft report of RAN2 #61, Sorrento, Italy, 11-15.02.2008 | other | ETSI MCC | R2-61 | - | [WTS] [JSN] | |||
| R2-081402 | SA1 CR SP-080188 on CSG requirements for UTRA/E-UTRA for RAN2 review | other | ETSI MCC | R2-61 | - | [WTS] [JSN] | |||
| R2-081403 | LS on Release 8 non-essential SAE features (SP-080218; to: CT1, CT3, CT4, CT6, RAN1, RAN2, RAN3, RAN4, SA1, SA2, SA3, SA4, SA5, CT, GERAN, RAN; cc: -; contact: Ericsson) | other | SA | R2-61 | - | [WTS] [JSN] | |||
| R2-081404 | LS on Decision of MBMS and LCS in SAE Rel8 Scope Discussions (SP-080223; to: SA2, RAN1, RAN2, RAN3; cc: SA1, GERAN2; contact: NTT) | other | SA | R2-61 | - | [WTS] [JSN] | |||
| R2-081405 | Reply LS to S2-075874 on Earthquake and Tsunami Warning System (G2-080112; to: SA2, SA1, GERAN, GERAN1; cc: RAN2, RAN3, CT1, SA3; contact: Telecom Italia) | other | GERAN2 | R2-61 | - | [WTS] [JSN] | |||
| R2-081406 | Reply LS to G2-080112 and S2-075874 on ETWS (GP-080410; to:SA1, SA2; cc: RAN2, RAN3, CT1, SA3; contact: Vodafone) | other | GERAN | R2-61 | - | [WTS] [JSN] | |||
| R2-081407 | Reply LS to S2-075847 on Earthquake and Tsunami Warning System (R3-080541; to: SA2, RAN2; cc: SA1, GERAN2; contact: NTT) | other | RAN3 | R2-61 | - | [WTS] [JSN] | |||
| R2-081408 | Reply LS to RP-071046 on Tests on receiving System Info 5bis (RP-080230; to: GSMA DG; cc: RAN2; contact: Ericsson) | other | RAN | R2-61 | - | [WTS] [JSN] | |||
| R2-081409 | LS to establish working assumptions for the scope of responsibility for optimized handover specification (C1-080779; to: RAN2, RAN3, CT4, SA2; cc: -; contact: ALU) | other | CT1 | R2-61 | - | [WTS] [JSN] | |||
| R2-081410 | EPS Session management procedure optimisations (C1-080780; to: RAN2, RAN3, CT4; cc: -; contact: Ericsson) | other | CT1 | R2-61 | - | [WTS] [JSN] | |||
| R2-081411 | LS on Equal priority Inter-RAT reselection (GP-080298; to: RAN2; cc: -; contact: NSN) | other | GERAN | R2-61 | - | [WTS] [JSN] | |||
| R2-081412 | Reply LS to R2-080609 and R2-081363 on various aspects related to GERAN to E-UTRAN interworking (GP-080395; to: RAN2, RAN4; cc: -; contact: NSN) | other | GERAN | R2-61 | - | [WTS] [JSN] | |||
| R2-081413 | Reply LS to R2-075478 on CSG related mobility (stage 2 text) (GP-080417; to: SA1, RAN2; cc: SA2, RAN3, RAN4, RAN1; contact: NSN) | other | GERAN | R2-61 | - | [WTS] [JSN] | |||
| R2-081414 | LS on Change Request for LTE TDD Frame Structure to TS.36.300 V8.3.0 (R1-081112; to: RAN2; cc: -; contact: RITT) | other | RAN1 | R2-61 | - | [WTS] [JSN] | |||
| R2-081415 | LS on CR to TS36.306 (R1-081125; to: RAN2, RAN4; cc: -; contact: NTT) | other | RAN1 | R2-61 | - | [WTS] [JSN] | |||
| R2-081416 | LS reply to R2-075481 on NDI vs. RV (R1-081138; to: RAN2; cc: -; contact: Panasonic) | other | RAN1 | R2-61 | - | [WTS] [JSN] | |||
| R2-081417 | LS on Redundancy Version Sequences for HARQ (R1-081141; to: RAN2; cc: -; contact: NSN) | other | RAN1 | R2-61 | - | [WTS] [JSN] | |||
| R2-081418 | LS on High Interference Indicator (R1-081148; to: RAN3; cc: RAN2, SA5; contact: Ericsson) | other | RAN1 | R2-61 | - | [WTS] [JSN] | |||
| R2-081419 | LS on L1-related parameters to be configured by RRC (R1-081156; to: RAN2; cc: -; contact: Ericsson) | other | RAN1 | R2-61 | - | [WTS] [JSN] | |||
| R2-081420 | Reply LS to R2-080621 on RACH retransmission delay requirements (R1-081160; to: RAN2; cc: -; contact: Ericsson, Panasonic) | other | RAN1 | R2-61 | - | [WTS] [JSN] | |||
| R2-081421 | Reply LS to R4-071813 on Signalling of additional spectrum emission requirements (R3-080449; to: RAN2, RAN4; cc: RAN1; contact: Motorola) | other | RAN3 | R2-61 | - | [WTS] [JSN] | |||
| R2-081422 | LS on RAN performance monitoring (R3-08530; to: SA5; cc: RAN1, RAN2, RAN4; contact: NTT) | other | RAN3 | R2-61 | - | [WTS] [JSN] | |||
| R2-081423 | LS on Self Configuring and Self Optimizing Network Use Cases and Solutions TR (R3-080536; to: SA5, RAN2, RAN4, RAN1; cc: GERAN2; contact: T-Mobile) | other | RAN3 | R2-61 | - | [WTS] [JSN] | |||
| R2-081424 | Reply LS to R2-075458, S2-080965 and R2-080605 on Applicability of “subscriber type” indication for UTRAN & GERAN (R3-080543; to: SA2, RAN3, GERAN2; cc: -; contact: Vodafone) | other | RAN3 | R2-61 | - | [WTS] [JSN] | |||
| R2-081425 | LS on LTE-cell- and eNB-identification (R3-080547; to: RAN2, SA2, CT1; cc: -; contact: NSN) | other | RAN3 | R2-61 | - | [WTS] [JSN] | |||
| R2-081426 | LS on RLF Recovery Information over X2 (R3-080553; to: RAN2; cc: -; contact: Nortel) | other | RAN3 | R2-61 | - | [WTS] [JSN] | |||
| R2-081427 | LS on the necessity of Location Reporting procedure in S1 (R3-080564; to: SA2, RAN2; cc: -; contact: NTT) | other | RAN3 | R2-61 | - | [WTS] [JSN] | |||
| R2-081428 | LS on Measurements for self optimisation of cell selection/reselection parameters (R3-080565; to: RAN2; cc: -; contact: NEC) | other | RAN3 | R2-61 | - | [WTS] [JSN] | |||
| R2-081429 | LS to RAN 2 on mobility from E-UTRA to UTRA without explicit neighbour cell list (R4-080458; to: RAN2; cc: GERAN; contact: Nokia) | other | RAN4 | R2-61 | - | [WTS] [JSN] | |||
| R2-081430 | Response LS to R3-080472 on LS Automatic Neighbour Relation (R4-080468; to: RAN3; cc: RAN2; contact: Ericsson) | other | RAN4 | R2-61 | - | [WTS] [JSN] | |||
| R2-081431 | LS on Scale of Reported Measurement Quantities (R4-080484; to: RAN2; cc: RAN1; contact: Ericsson) | other | RAN4 | R2-61 | - | [WTS] [JSN] | |||
| R2-081432 | LS on signalling Intra/Inter-frequency measurement bandwidth (R4-080541; to: RAN2, RAN3, GERAN; cc: RAN1; contact: NTT) | other | RAN4 | R2-61 | - | [WTS] [JSN] | |||
| R2-081433 | Reply LS to R2-075464 on RACH Optimization Use Case (S5-080537; to: RAN2; cc: RAN3; contact: Huawei) | other | SA5 | R2-61 | - | [WTS] [JSN] | |||
| R2-081434 | Reply LS to R3-072401 on Automatic Neighbour Relation (ANR) function (S5-080538; to: RAN3; cc: RAN2, RAN4; contact: Huawei) | other | SA5 | R2-61 | - | [WTS] [JSN] | |||
| R2-081435 | LS reply to R2-081364 and R3-080530 on RAN Performance monitoring (S5-080540; to: RAN2, RAN3; cc: RAN1, RAN4; contact: NSN) | other | SA5 | R2-61 | - | [WTS] [JSN] | |||
| R2-081436 | Reply LS to R5-080525 on HSPA RB and SRB configurations in 34.108 (R1-081144; to: RAN5; cc: RAN2; contact: Ericsson) | other | RAN1 | R2-61 | - | [WTS] [JSN] | |||
| R2-081437 | Reply LS to R5-080526 on new MCCH radio bearer configuration in 34.108 (R1-081145; to: RAN5; cc: RAN2; contact: Ericsson) | other | RAN1 | R2-61 | - | [WTS] [JSN] | |||
| R2-081438 | LS on status of study item “HS-PDSCH serving cell change enhancements” (R1-081149; to: RAN, RAN2; cc: -; contact: Qualcomm) | other | RAN1 | R2-61 | - | [WTS] [JSN] | |||
| R2-081439 | LS on Synchronised E-DCH specification impacts (R1-081150; to: RAN2, RAN3, RAN4 ; cc: -; contact: NSN) | other | RAN1 | R2-61 | - | [WTS] [JSN] | |||
| R2-081440 | LS on “Changes to the format of TMGI” (R3-080434; to: RAN2, CT4; cc: SA2; contact: Huawei) | other | RAN3 | R2-61 | - | [WTS] [JSN] | |||
| R2-081441 | Updated draft report of RAN2 #61, Sorrento, Italy, 11-15.02.2008 | other | ETSI MCC | R2-61 | - | [WTS] [JSN] | |||
| R2-081442 | Void | other | - | R2-61 | - | [WTS] [JSN] | |||
| R2-081443 | Void | other | - | R2-61 | - | [WTS] [JSN] | |||
| R2-081444 | Void | other | - | R2-61 | - | [WTS] [JSN] | |||
| R2-081445 | Final report of RAN2 #61, Sorrento, Italy, 11-15.02.2008 | other | ETSI MCC | R2-61 | - | [WTS] [JSN] | |||
| R2-081446 | RAN2 aspects of the solutions for Subframe Bundling | other | Alcatel-Lucent | R2-61 | - | [WTS] [JSN] | |||
| R2-081447 | Scheduling Information format | other | Alcatel-Lucent | R2-61 | - | [WTS] [JSN] | |||
| R2-081448 | Some Issues Related to Half Duplex Operation | other | NextWave Wireless, IPWireless | R2-61 | - | [WTS] [JSN] | |||
| R2-081449 | Mobility Failure Handling | other | Alcatel-Lucent, ASB | R2-61 | - | [WTS] [JSN] | |||
| R2-081450 | Text proposal for the BSR calculation | other | Ericsson | R2-61 | - | [WTS] [JSN] | |||
| R2-081451 | Clarification of the BSR calculation | other | Ericsson | R2-61 | - | [WTS] [JSN] | |||
| R2-081452 | Clarification of the BSR calculation | other | Ericsson | R2-61 | - | [WTS] [JSN] | |||
| R2-081453 | RAN2 Impacts of Half-Duplex FDD Operation in LTE | other | Ericsson | R2-61 | - | [WTS] [JSN] | |||
| R2-081454 | MAC Flow control | other | Ericsson | R2-61 | - | [WTS] [JSN] | |||
| R2-081455 | BSR triggers based on buffer level change | other | Ericsson | R2-61 | - | [WTS] [JSN] | |||
| R2-081456 | Report from the email discussion on Logical Channel Prioritisation Requirements for 36.321 | other | Ericsson (Rapporteur) | R2-61 | - | [WTS] [JSN] | |||
| R2-081457 | PDCP Status | other | LG Electronics Inc. | R2-61 | - | [WTS] [JSN] | |||
| R2-081458 | PDCP Open issues list | other | LG Electronics Inc. | R2-61 | - | [WTS] [JSN] | |||
| R2-081459 | Semi persistent scheduling for TDD | other | Ericsson | R2-61 | - | [WTS] [JSN] | |||
| R2-081460 | PDCP minor changes | other | LG Electronics Inc. | R2-61 | - | [WTS] [JSN] | |||
| R2-081461 | Report from the email discussion on the configuration of semipersistent scheduling | other | Ericsson (Rapporteur) | R2-61 | - | [WTS] [JSN] | |||
| R2-081462 | Summary of the email discussion on Lossless handovers | other | LG Electronics Inc. | R2-61 | - | [WTS] [JSN] | |||
| R2-081463 | PDCP references to the security algorithms | other | LG Electronics Inc., Alcatel-Lucent | R2-61 | - | [WTS] [JSN] | |||
| R2-081464 | Random Access Procedure modelling | other | Ericsson (Rapporteur) | R2-61 | - | [WTS] [JSN] | |||
| R2-081465 | Evaluation of TTI-Bundling Alternatives | other | Ericsson | R2-61 | - | [WTS] [JSN] | |||
| R2-081466 | Text Proposal for TTI bundling | other | Ericsson | R2-61 | - | [WTS] [JSN] | |||
| R2-081467 | Assignment of dedicated preamble for DL data arrival | other | Ericsson | R2-61 | - | [WTS] [JSN] | |||
| R2-081468 | Triggering of SR in relation to allocated uplink grants | other | Ericsson | R2-61 | - | [WTS] [JSN] | |||
| R2-081469 | Updating of VR(MS) | other | Ericsson | R2-61 | - | [WTS] [JSN] | |||
| R2-081470 | Removal of Editor’s Note on updating of VR(MS) upon expiry of T_reordering | other | Ericsson | R2-61 | - | [WTS] [JSN] | |||
| R2-081471 | Handling of large RLC status reports | other | Ericsson | R2-61 | - | [WTS] [JSN] | |||
| R2-081472 | Clarification to the handling of large RLC status reports | other | Ericsson | R2-61 | - | [WTS] [JSN] | |||
| R2-081473 | RLC small open issues | other | Ericsson | R2-61 | - | [WTS] [JSN] | |||
| R2-081474 | Small corrections to RLC | other | Ericsson | R2-61 | - | [WTS] [JSN] | |||
| R2-081475 | Error cases for RLC | other | Ericsson | R2-61 | - | [WTS] [JSN] | |||
| R2-081476 | L2 UE capability limitations | other | Ericsson | R2-61 | - | [WTS] [JSN] | |||
| R2-081477 | Definition of UE total L2 buffer size | other | Ericsson | R2-61 | - | [WTS] [JSN] | |||
| R2-081478 | Reconfiguration of PDCP profiles at handover | other | LG Electronics Inc., Alcatel-Lucent | R2-61 | - | [WTS] [JSN] | |||
| R2-081479 | Exclusion of invalid PDCP Profiles configurations | other | LG Electronics Inc. | R2-61 | - | [WTS] [JSN] | |||
| R2-081480 | Exclusion of invalid PDCP Profiles configurations | other | LG Electronics Inc. | R2-61 | - | [WTS] [JSN] | |||
| R2-081481 | Reconfiguration of measurements | other | LG Electronics Inc. | R2-61 | - | [WTS] [JSN] | |||
| R2-081482 | Signaling of the MBSFN subframe allocation parameter | other | Ericsson | R2-61 | - | [WTS] [JSN] | |||
| R2-081483 | L1 parameter handling in dedicated signalling | other | Ericsson | R2-61 | - | [WTS] [JSN] | |||
| R2-081484 | Summary of the email discussion on Layer 1 parameters | other | Ericsson (Rapporteur) | R2-61 | - | [WTS] [JSN] | |||
| R2-081485 | Scheduling and transmission of SIB1 | other | Ericsson | R2-61 | - | [WTS] [JSN] | |||
| R2-081486 | Proposed way forward with NAS / RRC / S1-AP inter-actions | other | Ericsson | R2-61 | - | [WTS] [JSN] | |||
| R2-081487 | ETWS support in Rel-8 | other | Ericsson | R2-61 | - | [WTS] [JSN] | |||
| R2-081488 | CondA for Handover | other | Ericsson | R2-61 | - | [WTS] [JSN] | |||
| R2-081489 | Synchronized RRC re-configuration | other | Ericsson | R2-61 | - | [WTS] [JSN] | |||
| R2-081490 | Open issues on radio resource configuration | other | Ericsson | R2-61 | - | [WTS] [JSN] | |||
| R2-081491 | Mechanism to perform Tracking Area Update (TAU) in RRC Connected state | other | Ericsson | R2-61 | - | [WTS] [JSN] | |||
| R2-081492 | Bandwidth information used for measurement purposes | other | Ericsson, NTT DoCoMo, Inc | R2-61 | - | [WTS] [JSN] | |||
| R2-081493 | KeNB derivation at Inter-RAT handover | other | Ericsson | R2-61 | - | [WTS] [JSN] | |||
| R2-081494 | KeNB derivation at Idle to Active transition | other | Ericsson | R2-61 | - | [WTS] [JSN] | |||
| R2-081495 | Clarification on MAX_CID | other | Ericsson | R2-61 | - | [WTS] [JSN] | |||
| R2-081496 | Clarification on MAX_CID | other | Ericsson | R2-61 | - | [WTS] [JSN] | |||
| R2-081497 | Interpretation of the 'Neighbouring cell identity' in MBMS NEIGHBOURING CELL PTM RB INFO | other | Ericsson | R2-61 | - | [WTS] [JSN] | |||
| R2-081498 | Clarification on MBMS dispersion | other | Ericsson | R2-61 | - | [WTS] [JSN] | |||
| R2-081499 | Minor ASN.1 corrections due errors detected during v780 implementation | other | Ericsson | R2-61 | - | [WTS] [JSN] | |||
| R2-081500 | HS-PDSCH Serving Cell Change Enhancements | other | Ericsson | R2-61 | - | [WTS] [JSN] | |||
| R2-081501 | Implicit release for enhanced uplink in CELL_FACH | other | Ericsson | R2-61 | - | [WTS] [JSN] | |||
| R2-081502 | Back-off operation for enhanced uplink in CELL_FACH | other | Ericsson | R2-61 | - | [WTS] [JSN] | |||
| R2-081503 | Location of the MAC-is for CCCH | other | Ericsson | R2-61 | - | [WTS] [JSN] | |||
| R2-081504 | Correction of a spelling error of E-TFC selection | other | Ericsson | R2-61 | - | [WTS] [JSN] | |||
| R2-081505 | Configurable values for the minimum and maximum RLC PDU size | other | Ericsson | R2-61 | - | [WTS] [JSN] | |||
| R2-081506 | Configurable values for the minimum and maximum RLC PDU size | other | Ericsson | R2-61 | - | [WTS] [JSN] | |||
| R2-081507 | HS-SCCH orders for HS-SCCH-less operation | other | Ericsson | R2-61 | - | [WTS] [JSN] | |||
| R2-081508 | HS-SCCH orders for HS-SCCH-less operation | other | Ericsson | R2-61 | - | [WTS] [JSN] | |||
| R2-081509 | Measurement reporting | other | Nokia Corporation, Nokia Siemens Networks | R2-61 | - | [WTS] [JSN] | |||
| R2-081510 | Measurement related actions upon inter-frequency handover | other | Nokia Corporation, Nokia Siemens Networks | R2-61 | - | [WTS] [JSN] | |||
| R2-081511 | Measurements Clarifications | other | Nokia Corporation, Nokia Siemens Networks | R2-61 | - | [WTS] [JSN] | |||
| R2-081512 | On setting the C-RNTI in RACH message two | other | Nokia Corporation, Nokia Siemens Networks | R2-61 | - | [WTS] [JSN] | |||
| R2-081513 | Handover failure issues | other | Samsung | R2-61 | - | [WTS] [JSN] | |||
| R2-081514 | Multi-layer RACH model | other | LG Electronics Inc. | R2-61 | - | [WTS] [JSN] | |||
| R2-081515 | ETWS Support in Release 8 | other | LG Electronics Inc. | R2-61 | - | [WTS] [JSN] | |||
| R2-081516 | Correction to RA Power Ramping | other | LG Electronics Inc. | R2-61 | - | [WTS] [JSN] | |||
| R2-081517 | Allocation of a “short” CRNTI in msg2 | other | LG Electronics Inc. | R2-61 | - | [WTS] [JSN] | |||
| R2-081518 | Removal of MBMS | other | LG Electronics Inc. | R2-61 | - | [WTS] [JSN] | |||
| R2-081519 | Discussion on way forward for LTE MBMS | other | LG Electronics Inc. | R2-61 | - | [WTS] [JSN] | |||
| R2-081520 | Value Range for Access Class Barring Timer | other | Vodafone Ltd | R2-61 | - | [WTS] [JSN] | |||
| R2-081521 | Last Visited Cell List Definition | other | Vodafone Ltd | R2-61 | - | [WTS] [JSN] | |||
| R2-081522 | Network assisted cell change | other | Ericsson | R2-61 | - | [WTS] [JSN] | |||
| R2-081523 | Default configuration for SRB0 and SRB1 at RRC connection establishment | other | Ericsson | R2-61 | - | [WTS] [JSN] | |||
| R2-081524 | RLC PDU size selection for Enhanced L2 UL | other | Nokia Corporation, Nokia Siemens Networks, Ericsson | R2-61 | - | [WTS] [JSN] | |||
| R2-081525 | RLC PDU size adaptation | other | Ericsson, Nokia Corporation, Nokia Siemens Networks | R2-61 | - | [WTS] [JSN] | |||
| R2-081526 | Consistent AMBR Concept | other | Ericsson, Nokia Corporation, Nokia Siemens Networks | R2-61 | - | [WTS] [JSN] | |||
| R2-081527 | HNB/HeNB Requirements | other | Nokia Corporation, Nokia Siemens Networks | R2-61 | - | [WTS] [JSN] | |||
| R2-081528 | Support of Half Duplex UEs in MAC | other | Nokia Corporation, Nokia Siemens Networks | R2-61 | - | [WTS] [JSN] | |||
| R2-081529 | RV for non-adaptive retransmissions | other | Nokia Corporation, Nokia Siemens Networks | R2-61 | - | [WTS] [JSN] | |||
| R2-081530 | LCID for Scheduling Information | other | Nokia Corporation, Nokia Siemens Networks | R2-61 | - | [WTS] [JSN] | |||
| R2-081531 | In Sequence Delivery at PDCP | other | Nokia Corporation, Nokia Siemens Networks, Samsung | R2-61 | - | [WTS] [JSN] | |||
| R2-081532 | Timers in RLC | other | Samsung | R2-61 | - | [WTS] [JSN] | |||
| R2-081533 | PUCCH handling during DRX | other | Samsung | R2-61 | - | [WTS] [JSN] | |||
| R2-081534 | Threshold based BSR trigger | other | Nokia Corporation, Nokia Siemens Networks, Samsung | R2-61 | - | [WTS] [JSN] | |||
| R2-081535 | Scheme for C-RNTI Assignment in RACH | other | Samsung | R2-61 | - | [WTS] [JSN] | |||
| R2-081536 | MAC CE for TA | other | Samsung, Nokia Corporation, Nokia Siemens Networks | R2-61 | - | [WTS] [JSN] | |||
| R2-081537 | VoIP support in LTE | other | Samsung | R2-61 | - | [WTS] [JSN] | |||
| R2-081538 | on cancelling BSR | other | Samsung | R2-61 | - | [WTS] [JSN] | |||
| R2-081539 | TP for multiplexing/demultiplexing | other | Samsung | R2-61 | - | [WTS] [JSN] | |||
| R2-081540 | L2 UE capability | other | Samsung | R2-61 | - | [WTS] [JSN] | |||
| R2-081541 | UE L2 Buffer Capability | other | Nokia Corporation, Nokia Siemens Networks | R2-61 | - | [WTS] [JSN] | |||
| R2-081542 | Persistent scheduling for DL | other | Nokia Corporation, Nokia Siemens Networks | R2-61 | - | [WTS] [JSN] | |||
| R2-081543 | Persistent scheduling for UL | other | Nokia Corporation, Nokia Siemens Networks | R2-61 | - | [WTS] [JSN] | |||
| R2-081544 | Discussion on MAC-d flow definition for MAC-ehs | other | Alcatel-Lucent | R2-61 | - | [WTS] [JSN] | |||
| R2-081545 | Change of MAC-d flow definition for MAC-ehs | other | Alcatel-Lucent | R2-61 | - | [WTS] [JSN] | |||
| R2-081546 | Change of MAC-d flow definition for MAC-ehs | other | Alcatel-Lucent | R2-61 | - | [WTS] [JSN] | |||
| R2-081547 | Change of MAC-d flow definition for MAC-ehs | other | Alcatel-Lucent | R2-61 | - | [WTS] [JSN] | |||
| R2-081548 | Change of MAC-d flow definition for MAC-ehs | other | Alcatel-Lucent | R2-61 | - | [WTS] [JSN] | |||
| R2-081549 | Handover failure handling | other | Qualcomm Europe | R2-61 | - | [WTS] [JSN] | |||
| R2-081550 | RRC Connection Re-establishment procedure | other | Qualcomm Europe | R2-61 | - | [WTS] [JSN] | |||
| R2-081551 | RAN level “keep-alive” signalling | other | Qualcomm Europe | R2-61 | - | [WTS] [JSN] | |||
| R2-081552 | Further clarification on inter-RAT ANR function | other | Qualcomm Europe | R2-61 | - | [WTS] [JSN] | |||
| R2-081553 | Measurement rules in camped on any cell state | other | Qualcomm Europe | R2-61 | - | [WTS] [JSN] | |||
| R2-081554 | RRC enhancements to support CS Fallback for MT calls | other | Texas Instruments Inc. | R2-61 | - | [WTS] [JSN] | |||
| R2-081555 | Rank/CQI configuration for Handover | other | Texas Instruments Inc. | R2-61 | - | [WTS] [JSN] | |||
| R2-081556 | DL Persistent HARQ Id | other | Nortel, Huawei | R2-61 | - | [WTS] [JSN] | |||
| R2-081557 | Removal of duplicate information | other | LG Electronics Inc. | R2-61 | - | [WTS] [JSN] | |||
| R2-081558 | PDCCH for DL data arrival | other | Qualcomm Europe | R2-61 | - | [WTS] [JSN] | |||
| R2-081559 | RA window and RA-RNTI allocation | other | Qualcomm Europe | R2-61 | - | [WTS] [JSN] | |||
| R2-081560 | Inter-RAT reselection from UTMS to LTE | other | Nokia Corporation, Nokia Siemens Networks | R2-61 | - | [WTS] [JSN] | |||
| R2-081561 | Inter-RAT mobility from UTMS to LTE | other | Nokia Corporation, Nokia Siemens Networks | R2-61 | - | [WTS] [JSN] | |||
| R2-081562 | Introduction of CELL_FACH DRX | other | Nokia Corporation, Nokia Siemens Networks | R2-61 | - | [WTS] [JSN] | |||
| R2-081563 | Details of the CELL_FACH DRX scheme | other | Nokia Corporation, Nokia Siemens Networks | R2-61 | - | [WTS] [JSN] | |||
| R2-081564 | Equal priority reselection | other | Nokia Corporation, Nokia Siemens Networks | R2-61 | - | [WTS] [JSN] | |||
| R2-081565 | UL grant in Message 2 | other | Qualcomm Europe | R2-61 | - | [WTS] [JSN] | |||
| R2-081566 | Correction to HCS | other | LG Electronics Inc. | R2-61 | - | [WTS] [JSN] | |||
| R2-081567 | Efficient utilization of DL HS-resources in CELL_FACH | other | Qualcomm Europe | R2-61 | - | [WTS] [JSN] | |||
| R2-081568 | Uplink Power Headroom definition for E-DCH in CELL_FACH | other | Qualcomm Europe | R2-61 | - | [WTS] [JSN] | |||
| R2-081569 | RACH modelling | other | Panasonic | R2-61 | - | [WTS] [JSN] | |||
| R2-081570 | Handover procedure and failure handling | other | Panasonic | R2-61 | - | [WTS] [JSN] | |||
| R2-081571 | RLC handling in RRC connection re-establishment | other | Panasonic | R2-61 | - | [WTS] [JSN] | |||
| R2-081572 | PDCP for RRC connection re-establishment procedure | other | Panasonic | R2-61 | - | [WTS] [JSN] | |||
| R2-081573 | RV usage for UL HARQ | other | Panasonic | R2-61 | - | [WTS] [JSN] | |||
| R2-081574 | Signalling and configuration of CQI reporting | other | Panasonic | R2-61 | - | [WTS] [JSN] | |||
| R2-081575 | Configuration of semi-persistent scheduling | other | Panasonic | R2-61 | - | [WTS] [JSN] | |||
| R2-081576 | Priority Handling of MAC Control Elements | other | Panasonic | R2-61 | - | [WTS] [JSN] | |||
| R2-081577 | Number of Measurement Gap Sequence | other | Panasonic | R2-61 | - | [WTS] [JSN] | |||
| R2-081578 | Retransmission of System Information | other | Panasonic | R2-61 | - | [WTS] [JSN] | |||
| R2-081579 | BCCH modification period and paging period | other | Panasonic | R2-61 | - | [WTS] [JSN] | |||
| R2-081580 | BCCH modification occasion for LTE_ACTIVE UE | other | Panasonic | R2-61 | - | [WTS] [JSN] | |||
| R2-081581 | Empty Buffer Status reporting and Implicit release for CCCH messages using enhanced uplink in CELL_FACH | other | Qualcomm Europe | R2-61 | - | [WTS] [JSN] | |||
| R2-081582 | Content of E-AGCH for contention resolution, scheduling and explicit resource release | other | Infineon | R2-61 | - | [WTS] [JSN] | |||
| R2-081583 | Proposal for the RACH modeling | other | Infineon | R2-61 | - | [WTS] [JSN] | |||
| R2-081584 | Proposal for the PDCP handling of AM DRBs during Handover | other | Infineon | R2-61 | - | [WTS] [JSN] | |||
| R2-081585 | Usage of the term 'EPS bearer' in LTE specifications | other | Infineon | R2-61 | - | [WTS] [JSN] | |||
| R2-081586 | PDCP SN size for UL and DL | other | LG Electronics Inc. | R2-61 | - | [WTS] [JSN] | |||
| R2-081587 | Correction to RLC PDU size | other | LG Electronics Inc. | R2-61 | - | [WTS] [JSN] | |||
| R2-081588 | Correction to Polling procedure | other | LG Electronics Inc. | R2-61 | - | [WTS] [JSN] | |||
| R2-081589 | BSR priority | other | LG Electronics Inc. | R2-61 | - | [WTS] [JSN] | |||
| R2-081590 | [Rel-8] Proposed CR to 36.322 on correction to RLC PDU reassembly | other | LG Electronics Inc. | R2-61 | - | [WTS] [JSN] | |||
| R2-081591 | HARQ operation for retransmitted data | other | LG Electronics Inc. | R2-61 | - | [WTS] [JSN] | |||
| R2-081592 | Duplicate Data at Handover | other | LG Electronics Inc. | R2-61 | - | [WTS] [JSN] | |||
| R2-081593 | Issue with MAC Padding | other | LG Electronics Inc. | R2-61 | - | [WTS] [JSN] | |||
| R2-081594 | [Rel-8] Proposed CR to 25.323 on Correction to PDCP Status report | other | LG Electronics Inc. | R2-61 | - | [WTS] [JSN] | |||
| R2-081595 | [Rel-8] Proposed CR to 25.323 on Correction to SN management for UM | other | LG Electronics Inc. | R2-61 | - | [WTS] [JSN] | |||
| R2-081596 | Timing of RLC STATUS PDU construction | other | LG Electronics Inc. | R2-61 | - | [WTS] [JSN] | |||
| R2-081597 | Issues with scheduling request procedure | other | LG Electronics Inc. | R2-61 | - | [WTS] [JSN] | |||
| R2-081598 | BSR for persistent scheduling | other | LG Electronics Inc. | R2-61 | - | [WTS] [JSN] | |||
| R2-081599 | ReTransmission of Persistent Scheduling | other | LG Electronics Inc. | R2-61 | - | [WTS] [JSN] | |||
| R2-081600 | RLC STATUS PDU transmission | other | LG Electronics Inc. | R2-61 | - | [WTS] [JSN] | |||
| R2-081601 | RLC-PDCP behaviour during Handover | other | LG Electronics Inc. | R2-61 | - | [WTS] [JSN] | |||
| R2-081602 | HARQ feedback and Measurement Gap | other | LG Electronics Inc. | R2-61 | - | [WTS] [JSN] | |||
| R2-081603 | Corrections on DRX | other | LG Electronics Inc. | R2-61 | - | [WTS] [JSN] | |||
| R2-081604 | Void | other | - | R2-61 | - | [WTS] [JSN] | |||
| R2-081605 | Issues on Setting Temporary C-RNTI | other | LG Electronics Inc. | R2-61 | - | [WTS] [JSN] | |||
| R2-081606 | Restriction of PDCCH used for Contention Resolution | other | LG Electronics Inc. | R2-61 | - | [WTS] [JSN] | |||
| R2-081607 | UL Timing Control related to Contention Resolution | other | LG Electronics Inc. | R2-61 | - | [WTS] [JSN] | |||
| R2-081608 | DL Assignment in Msg2 | other | LG Electronics Inc. | R2-61 | - | [WTS] [JSN] | |||
| R2-081609 | Miscellaneous corrections on MAC | other | LG Electronics Inc. | R2-61 | - | [WTS] [JSN] | |||
| R2-081610 | On Notification of Failed Delivery of TB | other | LG Electronics Inc. | R2-61 | - | [WTS] [JSN] | |||
| R2-081611 | problem and solution concerning the network option to extend the SRNC identity over 12 bits | other | ZTE | R2-61 | - | [WTS] [JSN] | |||
| R2-081612 | Adding 16bitmode" indicator for RNC identity" | other | ZTE | R2-61 | - | [WTS] [JSN] | |||
| R2-081613 | On Physical Layer Feedback for Enhanced DL | other | ZTE | R2-61 | - | [WTS] [JSN] | |||
| R2-081614 | Carrier Access Control in Enhanced CELL_FACH | other | ZTE | R2-61 | - | [WTS] [JSN] | |||
| R2-081615 | Discussion on E-RACH Procedure | other | ZTE | R2-61 | - | [WTS] [JSN] | |||
| R2-081616 | Introduction of 64 QAM in RAN2 LCR TDD specifications | other | ZTE | R2-61 | - | [WTS] [JSN] | |||
| R2-081617 | Introduction of 64QAM in RRC LCR TDD specification | other | ZTE, RITT, CATT, TD-TECH, Spreadtrum Communications, Potevio | R2-61 | - | [WTS] [JSN] | |||
| R2-081618 | Introduction of 64QAM in MAC LCR TDD specification | other | ZTE, RITT, CATT, TD-TECH, Spreadtrum Communications, Potevio | R2-61 | - | [WTS] [JSN] | |||
| R2-081619 | Cell Reselection while transmitting E-DCH in CELL_FACH | other | Qualcomm Europe | R2-61 | - | [WTS] [JSN] | |||
| R2-081620 | Introduction of 64QAM in UE LCR TDD capability specification | other | ZTE, RITT, CATT, TD-TECH, Spreadtrum Communications, Potevio | R2-61 | - | [WTS] [JSN] | |||
| R2-081621 | update of backoff parameter | other | ZTE | R2-61 | - | [WTS] [JSN] | |||
| R2-081622 | mapping between RA-RNTI and random access slot | other | ZTE | R2-61 | - | [WTS] [JSN] | |||
| R2-081623 | RRC re-establishment procedure | other | ZTE | R2-61 | - | [WTS] [JSN] | |||
| R2-081624 | scheduling of system information on DL-SCH | other | ZTE | R2-61 | - | [WTS] [JSN] | |||
| R2-081625 | band information for UTRAN and E-UTRAN interworking | other | ZTE | R2-61 | - | [WTS] [JSN] | |||
| R2-081626 | MBSFN Subframe Allocation | other | ZTE | R2-61 | - | [WTS] [JSN] | |||
| R2-081627 | SDU discard impact on BSR calculation | other | ZTE | R2-61 | - | [WTS] [JSN] | |||
| R2-081628 | Details of BSR calculation | other | ZTE | R2-61 | - | [WTS] [JSN] | |||
| R2-081629 | RLC AM reordering and status prohibit | other | ZTE | R2-61 | - | [WTS] [JSN] | |||
| R2-081630 | Duplicate detection in UM RLC | other | LG Electronics Inc. | R2-61 | - | [WTS] [JSN] | |||
| R2-081631 | Differentiate access causes in RACH backoff – Further discussion | other | CMCC, ZTE, CATT, Huawei | R2-61 | - | [WTS] [JSN] | |||
| R2-081632 | Paging subframe pattern for TDD | other | CMCC, CATT, ZTE | R2-61 | - | [WTS] [JSN] | |||
| R2-081633 | ETWS Air Interface Study | other | NTT DoCoMo | R2-61 | - | [WTS] [JSN] | |||
| R2-081634 | MAC-i/is PDU format | other | HUAWEI | R2-61 | - | [WTS] [JSN] | |||
| R2-081635 | First quantification of UL control overhead | other | Samsung | R2-61 | - | [WTS] [JSN] | |||
| R2-081636 | System Information Change issues | other | HUAWEI | R2-61 | - | [WTS] [JSN] | |||
| R2-081637 | Reselection and access class barring | other | Samsung | R2-61 | - | [WTS] [JSN] | |||
| R2-081638 | Power loop handling at backoff | other | Samsung | R2-61 | - | [WTS] [JSN] | |||
| R2-081639 | ANR based on UE measurement report | other | Samsung | R2-61 | - | [WTS] [JSN] | |||
| R2-081640 | Common E-DCH resource usage report | other | Qualcomm Europe | R2-61 | - | [WTS] [JSN] | |||
| R2-081641 | Validation of system infomation in HO CMD | other | HUAWEI | R2-61 | - | [WTS] [JSN] | |||
| R2-081642 | Mapping between RA-RNTI and PRACH resource | other | HUAWEI | R2-61 | - | [WTS] [JSN] | |||
| R2-081643 | Recovery after handover failure in target cell | other | HUAWEI | R2-61 | - | [WTS] [JSN] | |||
| R2-081644 | open issues on system information scheduling | other | HUAWEI | R2-61 | - | [WTS] [JSN] | |||
| R2-081645 | Correction on the attribute of Treset in system information | other | HUAWEI | R2-61 | - | [WTS] [JSN] | |||
| R2-081646 | Editorial correction to reconfigure MAC-ehs reordering queue | other | HUAWEI | R2-61 | - | [WTS] [JSN] | |||
| R2-081647 | Editorial correction to variable description of CELL_INFO_LIST | other | HUAWEI | R2-61 | - | [WTS] [JSN] | |||
| R2-081648 | RLC TM mode allowed when BCCH mapping on HS-DSCH | other | HUAWEI | R2-61 | - | [WTS] [JSN] | |||
| R2-081649 | Traffic Volume Measurement for enhanced Cell_FACH | other | HUAWEI | R2-61 | - | [WTS] [JSN] | |||
| R2-081650 | Cell Recelection for UL enhancement in Cell_FACH | other | HUAWEI | R2-61 | - | [WTS] [JSN] | |||
| R2-081651 | Avoiding UE camp on Dedicated Carrier cell | other | HUAWEI | R2-61 | - | [WTS] [JSN] | |||
| R2-081652 | T-CRNTI assignment in Msg2 | other | HUAWEI | R2-61 | - | [WTS] [JSN] | |||
| R2-081653 | State transition from enhanced CELL_FACH to CELL_DCH state | other | HUAWEI | R2-61 | - | [WTS] [JSN] | |||
| R2-081654 | RLC UM reordering | other | HUAWEI | R2-61 | - | [WTS] [JSN] | |||
| R2-081655 | Additional BSR triggers | other | HUAWEI | R2-61 | - | [WTS] [JSN] | |||
| R2-081656 | Discussion on UTRA hNB WI | other | HUAWEI | R2-61 | - | [WTS] [JSN] | |||
| R2-081657 | Proposed WID on support of UTRA HNB | other | HUAWEI | R2-61 | - | [WTS] [JSN] | |||
| R2-081658 | Way forward for UTRA hNB Rel-8 | other | HUAWEI | R2-61 | - | [WTS] [JSN] | |||
| R2-081659 | Idle mode mobility for legacy UEs | other | HUAWEI | R2-61 | - | [WTS] [JSN] | |||
| R2-081660 | UE idle mode mobility for HNB | other | HUAWEI | R2-61 | - | [WTS] [JSN] | |||
| R2-081661 | UL Persistent Resource Release | other | HUAWEI | R2-61 | - | [WTS] [JSN] | |||
| R2-081662 | CS Fallback consideration | other | HUAWEI | R2-61 | - | [WTS] [JSN] | |||
| R2-081663 | Common E-DCH usage in CELL_FACH state | other | HUAWEI | R2-61 | - | [WTS] [JSN] | |||
| R2-081664 | Void | other | - | R2-61 | - | [WTS] [JSN] | |||
| R2-081665 | Correction to the calcuration of DPCH frame offset for F-DPCH on timing re-initialised hard handover | other | NTT DoCoMo | R2-61 | - | [WTS] [JSN] | |||
| R2-081666 | Issues on RLC STATUS PDU | other | Samsung | R2-61 | - | [WTS] [JSN] | |||
| R2-081667 | Signalling on DL data arrival | other | NEC | R2-61 | - | [WTS] [JSN] | |||
| R2-081668 | Resource handling during persistent scheduling | other | NEC | R2-61 | - | [WTS] [JSN] | |||
| R2-081669 | Multi Layer interaction modeling for connection | other | CATT | R2-61 | - | [WTS] [JSN] | |||
| R2-081670 | Discussion on RB mapping info | other | CATT | R2-61 | - | [WTS] [JSN] | |||
| R2-081671 | SON-Paging load measurement | other | CATT | R2-61 | - | [WTS] [JSN] | |||
| R2-081672 | Valid PRACH resource for dedicated preamble | other | CATT | R2-61 | - | [WTS] [JSN] | |||
| R2-081673 | RA-RNTI design | other | CATT | R2-61 | - | [WTS] [JSN] | |||
| R2-081674 | Process ID allocation for downlink persistent scheduling | other | CATT | R2-61 | - | [WTS] [JSN] | |||
| R2-081675 | Correction to polling procedure | other | CATT | R2-61 | - | [WTS] [JSN] | |||
| R2-081676 | Correction to Status reporting transmitting | other | CATT | R2-61 | - | [WTS] [JSN] | |||
| R2-081677 | Measurement Parameters in UE capability | other | CATT | R2-61 | - | [WTS] [JSN] | |||
| R2-081678 | Forwarding of measurement config info | other | CATT | R2-61 | - | [WTS] [JSN] | |||
| R2-081679 | Definition of UM window size | other | LG Electronics Inc. | R2-61 | - | [WTS] [JSN] | |||
| R2-081680 | Discussion on DRX cycle | other | ASUSTeK | R2-61 | - | [WTS] [JSN] | |||
| R2-081681 | Removal of STATUS receiving window | other | LG Electronics Inc. | R2-61 | - | [WTS] [JSN] | |||
| R2-081682 | The operation of DRX Short Cycle Timer | other | ASUSTeK | R2-61 | - | [WTS] [JSN] | |||
| R2-081683 | Early Implementation of PPAC | other | NTT DoCoMo | R2-61 | - | [WTS] [JSN] | |||
| R2-081684 | RRC connection re-establishment | other | Samsung | R2-61 | - | [WTS] [JSN] | |||
| R2-081685 | E-UTRA RRC TP on Measurement event(s) | other | Samsung | R2-61 | - | [WTS] [JSN] | |||
| R2-081686 | Contention resolution modelling issues | other | Samsung | R2-61 | - | [WTS] [JSN] | |||
| R2-081687 | Review of protocol extension proposals | other | Samsung | R2-61 | - | [WTS] [JSN] | |||
| R2-081688 | PDU related issues | other | Samsung | R2-61 | - | [WTS] [JSN] | |||
| R2-081689 | E-mail review summary | other | Rapporteur (Samsung) | R2-61 | - | [WTS] [JSN] | |||
| R2-081690 | Draft CR on Miscelaneous clarifications/ corrections | other | Rapporteur (Samsung) | R2-61 | - | [WTS] [JSN] | |||
| R2-081691 | E-UTRA RRC main issues | other | Rapporteur (Samsung) | R2-61 | - | [WTS] [JSN] | |||
| R2-081692 | E-UTRA RRC TP on Specified configurations | other | Samsung | R2-61 | - | [WTS] [JSN] | |||
| R2-081693 | MBSFN subframe allocation signaling | other | HUAWEI | R2-61 | - | [WTS] [JSN] | |||
| R2-081694 | Efficiency of Dedicated RA Preamble | other | HUAWEI | R2-61 | - | [WTS] [JSN] | |||
| R2-081695 | Access Class Barring | other | HUAWEI | R2-61 | - | [WTS] [JSN] | |||
| R2-081696 | some clarifications on idle mode mobility | other | HUAWEI | R2-61 | - | [WTS] [JSN] | |||
| R2-081697 | RLF analysis | other | HUAWEI | R2-61 | - | [WTS] [JSN] | |||
| R2-081698 | Activation of DRX | other | HUAWEI | R2-61 | - | [WTS] [JSN] | |||
| R2-081699 | Security handling during RLF | other | Alcatel-Lucent | R2-61 | - | [WTS] [JSN] | |||
| R2-081700 | Miscellaneous corrections to TS 36.322 | other | NTT DoCoMo | R2-61 | - | [WTS] [JSN] | |||
| R2-081701 | Extended power control gap for E-PUCH in LCR TDD | other | TD Tech Ltd. | R2-61 | - | [WTS] [JSN] | |||
| R2-081702 | Release 7 clarification of HARQ power offset selection during multiplexing of multiple MAC-d flows | other | TD Tech Ltd. | R2-61 | - | [WTS] [JSN] | |||
| R2-081703 | Release 8 clarification of HARQ power offset selection during multiplexing of multiple MAC-d flows | other | TD Tech Ltd. | R2-61 | - | [WTS] [JSN] | |||
| R2-081704 | Correction to PDCP SN space | other | ASUSTeK | R2-61 | - | [WTS] [JSN] | |||
| R2-081705 | Discussion on reducing downlink signalling overhead in eFACH state | other | TD Tech Ltd. | R2-61 | - | [WTS] [JSN] | |||
| R2-081706 | Procedural analysis of Enhanced Uplink for CELL_FACH state | other | TD Tech Ltd. | R2-61 | - | [WTS] [JSN] | |||
| R2-081707 | Resource allocation method analysis of Enhanced Uplink for CELL_FACH state | other | TD Tech Ltd. | R2-61 | - | [WTS] [JSN] | |||
| R2-081708 | Further clarifications upon per-carrier admission control in 1.28Mcps TDD HSPA+ scope | other | TD Tech Ltd. | R2-61 | - | [WTS] [JSN] | |||
| R2-081709 | DRX aspect in enhanced CELL_FACH for 1.28Mcps TDD | other | TD Tech Ltd. | R2-61 | - | [WTS] [JSN] | |||
| R2-081710 | Work frequncy select in Enhanced CELL_FACH for 1.28mcps TDD | other | TD Tech Ltd. | R2-61 | - | [WTS] [JSN] | |||
| R2-081711 | Void | other | - | R2-61 | - | [WTS] [JSN] | |||
| R2-081712 | RLC PDU Size Adaptation | other | Samsung | R2-61 | - | [WTS] [JSN] | |||
| R2-081713 | HS-DSCH Serving Cell Change Enhancements | other | Samsung | R2-61 | - | [WTS] [JSN] | |||
| R2-081714 | Correction on UM model depiction | other | Samsung | R2-61 | - | [WTS] [JSN] | |||
| R2-081715 | Handling of PDCP SDU Discard Timer at HO | other | Fujitsu | R2-61 | - | [WTS] [JSN] | |||
| R2-081716 | Msg1/ Msg3 Cancellation | other | Fujitsu | R2-61 | - | [WTS] [JSN] | |||
| R2-081717 | Clarification on DAR Operation | other | Samsung | R2-61 | - | [WTS] [JSN] | |||
| R2-081718 | MAC Open Issues list | other | MAC Rapporteurs (Ericsson, Qualcomm Europe) | R2-61 | - | [WTS] [JSN] | |||
| R2-081719 | E-UTRA MAC protocol specification update (CR) | other | MAC Rapporteurs (Ericsson, Qualcomm Europe) | R2-61 | - | [WTS] [JSN] | |||
| R2-081720 | Clarification of Random Access identities | other | MAC Rapporteurs (Ericsson, Qualcomm Europe) | R2-61 | - | [WTS] [JSN] | |||
| R2-081721 | Correction of dedicated preamble handling in absence of expiry time | other | MAC Rapporteurs (Ericsson, Qualcomm Europe) | R2-61 | - | [WTS] [JSN] | |||
| R2-081722 | Correction to local-NACK | other | MAC Rapporteurs (Ericsson, Qualcomm Europe) | R2-61 | - | [WTS] [JSN] | |||
| R2-081723 | TP on uplink RV handling | other | MAC Rapporteurs (Ericsson, Qualcomm Europe) | R2-61 | - | [WTS] [JSN] | |||
| R2-081724 | UE behaviour for sub-80-bit grant for RA msg3 | other | MAC Rapporteurs (Ericsson, Qualcomm Europe) | R2-61 | - | [WTS] [JSN] | |||
| R2-081725 | Streamlining of the description of UL HARQ | other | MAC Rapporteurs (Ericsson, Qualcomm Europe) | R2-61 | - | [WTS] [JSN] | |||
| R2-081726 | Configurable parameters in MAC | other | MAC Rapporteurs (Ericsson, Qualcomm Europe) | R2-61 | - | [WTS] [JSN] | |||
| R2-081727 | UL HARQ handling when P-HICH collides with measurement gap | other | NTT DoCoMo | R2-61 | - | [WTS] [JSN] | |||
| R2-081728 | Void | other | - | R2-61 | - | [WTS] [JSN] | |||
| R2-081729 | Paging details in LTE | other | Nokia Corporation, Nokia Siemens Networks | R2-61 | - | [WTS] [JSN] | |||
| R2-081730 | SON Automatic Neighbour Relation Function | other | Nokia Corporation, Nokia Siemens Networks | R2-61 | - | [WTS] [JSN] | |||
| R2-081731 | Handover failure handling | other | NTT DoCoMo | R2-61 | - | [WTS] [JSN] | |||
| R2-081732 | UE power consumption and processing limitations | other | Nokia Corporation, Nokia Siemens Networks | R2-61 | - | [WTS] [JSN] | |||
| R2-081733 | Handling of RRC Re-establishment message | other | NTT DoCoMo | R2-61 | - | [WTS] [JSN] | |||
| R2-081734 | Summary of email discussion on Mobility performance requirements for Home eNB | other | NTT DoCoMo | R2-61 | - | [WTS] [JSN] | |||
| R2-081735 | Simple CSG for REL8 | other | Nokia Corporation, Nokia Siemens Networks | R2-61 | - | [WTS] [JSN] | |||
| R2-081736 | Operators' views on Mobility performance requirements for Home eNB | other | NTT DoCoMo, T-Mobile, Vodafone, Orange, Telefonica | R2-61 | - | [WTS] [JSN] | |||
| R2-081737 | Access Class barring enhancements to support PPAC | other | NTT DoCoMo | R2-61 | - | [WTS] [JSN] | |||
| R2-081738 | Correction on the Mapping of TRRI field and MSB/LSB for 1.28 Mcps TDD EUL | other | CATT | R2-61 | - | [WTS] [JSN] | |||
| R2-081739 | CS fallback solutions | other | NTT DoCoMo, T-Mobile | R2-61 | - | [WTS] [JSN] | |||
| R2-081740 | Offsetting SI transmission SFN | other | NTT DoCoMo | R2-61 | - | [WTS] [JSN] | |||
| R2-081741 | Clarification of method in determine state of a E-TFC for TDD | other | CATT | R2-61 | - | [WTS] [JSN] | |||
| R2-081742 | Various System Information topics | other | Nokia Corporation, Nokia Siemens Networks | R2-61 | - | [WTS] [JSN] | |||
| R2-081743 | BCCH Retransmissions | other | Nokia Corporation, Nokia Siemens Networks | R2-61 | - | [WTS] [JSN] | |||
| R2-081744 | NAS-AS interaction | other | NTT DoCoMo | R2-61 | - | [WTS] [JSN] | |||
| R2-081745 | Modification of TBS tables and E-TFC selection for LCR TDD | other | CATT | R2-61 | - | [WTS] [JSN] | |||
| R2-081746 | Modification of TBS tables and E-TFC selection for LCR TDD | other | CATT | R2-61 | - | [WTS] [JSN] | |||
| R2-081747 | Clarification of the definition of PRRI for TDD | other | CATT | R2-61 | - | [WTS] [JSN] | |||
| R2-081748 | Clarification of the definition of PRRI for TDD | other | CATT | R2-61 | - | [WTS] [JSN] | |||
| R2-081749 | Clarification of the definition of PRRI for TDD | other | CATT | R2-61 | - | [WTS] [JSN] | |||
| R2-081750 | Completion of the mechanism for Scheduling Information transmission on MAC-e PDU alone for 1.28 Mcps TDD in EUL | other | CATT | R2-61 | - | [WTS] [JSN] | |||
| R2-081751 | Completion of the mechanism for Scheduling Information transmission on MAC-e PDU alone for 1.28 Mcps TDD in EUL | other | CATT | R2-61 | - | [WTS] [JSN] | |||
| R2-081752 | Completion of the mechanism for Scheduling Information transmission on MAC-e PDU alone for 1.28 Mcps TDD in EUL | other | CATT | R2-61 | - | [WTS] [JSN] | |||
| R2-081753 | Triggers, transmission and reliability of Scheduling Information for LCR TDD | other | CATT | R2-61 | - | [WTS] [JSN] | |||
| R2-081754 | Triggers, transmission and reliability of Scheduling Information for LCR TDD | other | CATT | R2-61 | - | [WTS] [JSN] | |||
| R2-081755 | Counter and timers for Scheduling Inforamtion Reporting of LCR TDD | other | CATT | R2-61 | - | [WTS] [JSN] | |||
| R2-081756 | Discussion on Synchronization and HARQ Mechanism in Enhanced CELL_FACH State for LCR TDD | other | CATT | R2-61 | - | [WTS] [JSN] | |||
| R2-081757 | Void | other | - | R2-61 | - | [WTS] [JSN] | |||
| R2-081758 | Operation of E-UTRAN UL Scheduling and DRX | other | Philips, NXP Semiconductors | R2-61 | - | [WTS] [JSN] | |||
| R2-081759 | Correction on UM Receive Operations | other | Samsung | R2-61 | - | [WTS] [JSN] | |||
| R2-081760 | UE Mobility State Reporting | other | Interdigital | R2-61 | - | [WTS] [JSN] | |||
| R2-081761 | Correction on Polling and Status Reporting | other | Samsung | R2-61 | - | [WTS] [JSN] | |||
| R2-081762 | RLC Reestablishment | other | Interdigital | R2-61 | - | [WTS] [JSN] | |||
| R2-081763 | Security in Inter RAT HOs to E-UTRAN | other | Samsung | R2-61 | - | [WTS] [JSN] | |||
| R2-081764 | Control of HARQ for RACH message 3 | other | Philips, NXP Semiconductors | R2-61 | - | [WTS] [JSN] | |||
| R2-081765 | Draft Response LS to WG SA3 LS S3-080226 = R2-081917 | other | Samsung | R2-61 | - | [WTS] [JSN] | |||
| R2-081766 | Control of HARQ for RACH message 4 | other | Philips, NXP Semiconductors | R2-61 | - | [WTS] [JSN] | |||
| R2-081767 | Triggering of Scheduling Request | other | Philips | R2-61 | - | [WTS] [JSN] | |||
| R2-081768 | UL coverage enhancement for VoIP transmission | other | Philips, NXP Semiconductors | R2-61 | - | [WTS] [JSN] | |||
| R2-081769 | RRC signalling for Enhanced CELL_FACH | other | Philips, Qualcomm Europe | R2-61 | - | [WTS] [JSN] | |||
| R2-081770 | Some open issues | other | Nokia Corporation, Nokia Siemens Networks | R2-61 | - | [WTS] [JSN] | |||
| R2-081771 | Introduction of Enhanced Uplink in CELL_FACH | other | Nokia Corporation, Nokia Siemens Networks | R2-61 | - | [WTS] [JSN] | |||
| R2-081772 | Conversion of clause 10 tabular into ASN.1 | other | Ericsson | R2-61 | - | [WTS] [JSN] | |||
| R2-081773 | Introduction of Uplink Enhanced CELL_FACH in 25.301 | other | Nokia Corporation, Nokia Siemens Networks | R2-61 | - | [WTS] [JSN] | |||
| R2-081774 | Enhanced Uplink for CELL_FACH in 25.321 | other | Nokia Corporation, Nokia Siemens Networks | R2-61 | - | [WTS] [JSN] | |||
| R2-081775 | Introduction of Enhanced Uplink in CELL_FACH in 25.302 | other | Nokia Corporation, Nokia Siemens Networks | R2-61 | - | [WTS] [JSN] | |||
| R2-081776 | Short impact analysis on 25.331 | other | Nokia Corporation, Nokia Siemens Networks | R2-61 | - | [WTS] [JSN] | |||
| R2-081777 | LTE Flow Control | other | NEC, Panasonic, Qualcomm Europe | R2-61 | - | [WTS] [JSN] | |||
| R2-081778 | Clarification on UL Logical Channel Prioritization | other | Qualcomm Europe | R2-61 | - | [WTS] [JSN] | |||
| R2-081779 | EUL coverage enhancements | other | Ericsson | R2-61 | - | [WTS] [JSN] | |||
| R2-081780 | Measurements for Self-optimisation of DL Physical Channel Parameters | other | Vodafone Ltd | R2-61 | - | [WTS] [JSN] | |||
| R2-081781 | Non-GBR QoS indication for Load Balancing SON use case | other | Nortel, Orange | R2-61 | - | [WTS] [JSN] | |||
| R2-081782 | CDMA sysInfo IEs for broadcast | other | Nortel, Nokia Siemens Networks, Ericsson, Alcatel-Lucent, Motorola, Verizon, Vodafone | R2-61 | - | [WTS] [JSN] | |||
| R2-081783 | CS-HSPA UL Segmentation | other | Nokia Siemens Networks, Nokia corporation | R2-61 | - | [WTS] [JSN] | |||
| R2-081784 | UE ability to obtain Serving Cellid | other | Alcatel-Lucent | R2-61 | - | [WTS] [JSN] | |||
| R2-081785 | Connection Establishment and paging cause values | other | Alcatel-Lucent, Alcatel Shanghai Bell | R2-61 | - | [WTS] [JSN] | |||
| R2-081786 | Optimised GSM NCL | other | Vodafone Ltd | R2-61 | - | [WTS] [JSN] | |||
| R2-081787 | UE id in RACH msg 3 and for contention resolution | other | Alcatel-Lucent, Alcatel Shanghai Bell | R2-61 | - | [WTS] [JSN] | |||
| R2-081788 | Discussion on Bearer identities | other | Alcatel-Lucent, Alcatel Shanghai Bell | R2-61 | - | [WTS] [JSN] | |||
| R2-081789 | Transfer of UE capability | other | Alcatel-Lucent, Alcatel Shanghai Bell | R2-61 | - | [WTS] [JSN] | |||
| R2-081790 | Handling of DL NAS messages during RLF | other | Alcatel-Lucent, Alcatel Shanghai Bell | R2-61 | - | [WTS] [JSN] | |||
| R2-081791 | Report of email discussion on SRB2 usage | other | Alcatel-Lucent (rapporteur) | R2-61 | - | [WTS] [JSN] | |||
| R2-081792 | Radio Resource Configuration | other | Nokia Corporation, Nokia Siemens Networks | R2-61 | - | [WTS] [JSN] | |||
| R2-081793 | Summary of email discussion on NAS-AS interaction | other | Alcatel-Lucent (rapporteur) | R2-61 | - | [WTS] [JSN] | |||
| R2-081794 | Handling of NAS information | other | Alcatel-Lucent | R2-61 | - | [WTS] [JSN] | |||
| R2-081795 | Overload Indication | other | Nokia Corporation, Nokia Siemens Networks | R2-61 | - | [WTS] [JSN] | |||
| R2-081796 | UE behavior with regards to acquisition of CDMA2000 system time | other | Nortel, ALU, Ericsson, NSN, Verizon | R2-61 | - | [WTS] [JSN] | |||
| R2-081797 | Correction relating to PDU formation description | other | Nokia Corporation, Nokia Siemens Networks | R2-61 | - | [WTS] [JSN] | |||
| R2-081798 | CDMA sysInfo IEs for broadcast | other | Nortel, ALU, Ericsson, NSN, Verizon | R2-61 | - | [WTS] [JSN] | |||
| R2-081799 | Report of MAC activities | other | MAC Rapporteurs (Qualcomm Europe, Ericsson) | R2-61 | - | [WTS] [JSN] | |||
| R2-081800 | Correction to Random Access power setting | other | MAC Rapporteurs (Qualcomm Europe, Ericsson) | R2-61 | - | [WTS] [JSN] | |||
| R2-081801 | Comment on MAC specification v6 | other | MAC Rapporteurs (Qualcomm Europe, Ericsson) | R2-61 | - | [WTS] [JSN] | |||
| R2-081802 | Neighbour List Parameters | other | Motorola | R2-61 | - | [WTS] [JSN] | |||
| R2-081803 | Reselection and measurement ASN.1 | other | Motorola | R2-61 | - | [WTS] [JSN] | |||
| R2-081804 | Need for Complete Whitelist | other | Motorola | R2-61 | - | [WTS] [JSN] | |||
| R2-081805 | UE capability value ranges | other | Motorola | R2-61 | - | [WTS] [JSN] | |||
| R2-081806 | Remaining issues related to Handover Failure handling | other | Motorola | R2-61 | - | [WTS] [JSN] | |||
| R2-081807 | MBSFN Sub-frame Allocation Signalling | other | Motorola | R2-61 | - | [WTS] [JSN] | |||
| R2-081808 | Cell Selection upon Radio Link Failure | other | Motorola | R2-61 | - | [WTS] [JSN] | |||
| R2-081809 | PDCP Handover Handling | other | Motorola | R2-61 | - | [WTS] [JSN] | |||
| R2-081810 | RLC Retransmission Count | other | Motorola | R2-61 | - | [WTS] [JSN] | |||
| R2-081811 | Layer 2 Buffer Management | other | Motorola | R2-61 | - | [WTS] [JSN] | |||
| R2-081812 | E-DCH interference in CELL_FACH | other | Ericsson | R2-61 | - | [WTS] [JSN] | |||
| R2-081813 | Key indicator setting at handover | other | Alcatel-Lucent | R2-61 | - | [WTS] [JSN] | |||
| R2-081814 | Pre-registration Control for the Mobility from E-UTRAN to HRPD | other | Motorola, Alcatel-Lucent, Ericsson, Nokia Siemens Networks, Nortel, Verizon | R2-61 | - | [WTS] [JSN] | |||
| R2-081815 | Grants to Temporary C-RNTI | other | Ericsson | R2-61 | - | [WTS] [JSN] | |||
| R2-081816 | Network Sharing Breaks SIB18 | other | Qualcomm Europe | R2-61 | - | [WTS] [JSN] | |||
| R2-081817 | E-DCH explicit resource release with E-AGCH | other | Qualcomm Europe | R2-61 | - | [WTS] [JSN] | |||
| R2-081818 | Handling of TRANSPORT FORMAT COMBINATION CONTROL | other | Qualcomm Europe | R2-61 | - | [WTS] [JSN] | |||
| R2-081819 | Handling of TRANSPORT FORMAT COMBINATION CONTROL | other | Qualcomm Europe | R2-61 | - | [WTS] [JSN] | |||
| R2-081820 | Cell Selection/Reselection in Deployments with Home NodeBs | other | Qualcomm Europe | R2-61 | - | [WTS] [JSN] | |||
| R2-081821 | Number of PRACH per subframe | other | Qualcomm Europe | R2-61 | - | [WTS] [JSN] | |||
| R2-081822 | COUNT persistence for DRB mapped onto RLC AM | other | Qualcomm Europe | R2-61 | - | [WTS] [JSN] | |||
| R2-081823 | Consideration of CSG cell identification in E-UTRAN | other | Qualcomm Europe | R2-61 | - | [WTS] [JSN] | |||
| R2-081824 | RA-RNTI Allocation | other | Motorola | R2-61 | - | [WTS] [JSN] | |||
| R2-081825 | Scheduling block structure and procedures | other | Qualcomm Europe | R2-61 | - | [WTS] [JSN] | |||
| R2-081826 | Coexistence of unicast reception with future multicast requirements | other | Qualcomm Europe | R2-61 | - | [WTS] [JSN] | |||
| R2-081827 | Effect of false positive Semi-Persistent grants | other | Qualcomm Europe | R2-61 | - | [WTS] [JSN] | |||
| R2-081828 | Release of semi-persistent resources | other | Qualcomm Europe | R2-61 | - | [WTS] [JSN] | |||
| R2-081829 | Load Management on E-DCH resource Release | other | LG Electronics Inc. | R2-61 | - | [WTS] [JSN] | |||
| R2-081830 | Removal of UTRAN behaviour | other | LG Electronics Inc. | R2-61 | - | [WTS] [JSN] | |||
| R2-081831 | HARQ retransmissions for the DL persistent scheduling | other | Samsung | R2-61 | - | [WTS] [JSN] | |||
| R2-081832 | Specifying RLC PDU size selection for uplink improved L2 | other | InterDigital | R2-61 | - | [WTS] [JSN] | |||
| R2-081833 | RLC buffer management and polling | other | InterDigital | R2-61 | - | [WTS] [JSN] | |||
| R2-081834 | Reconfiguration of L2 protocols between enhanced and non-enhanced cells | other | InterDigital | R2-61 | - | [WTS] [JSN] | |||
| R2-081835 | Path loss variations during E-DCH transmission in Cell_FACH | other | InterDigital | R2-61 | - | [WTS] [JSN] | |||
| R2-081836 | Comments on HNB WID RP-080159 | other | Qualcomm Europe | R2-61 | - | [WTS] [JSN] | |||
| R2-081837 | Cell selection after handover failure | other | LG Electronics Inc. | R2-61 | - | [WTS] [JSN] | |||
| R2-081838 | Discussion on priority based scheme | other | LG Electronics Inc. | R2-61 | - | [WTS] [JSN] | |||
| R2-081839 | Proposal for an LS reply to SA4 LS R2-080671 = S4-080126 | other | Qualcomm Europe, Nokia Siemens Networks | R2-61 | - | [WTS] [JSN] | |||
| R2-081840 | Restriction rules for inter-RAT cell reselection | other | LG Electronics Inc. | R2-61 | - | [WTS] [JSN] | |||
| R2-081841 | Support for RLC Segmentation in CS voice over HSPA | other | Qualcomm Europe | R2-61 | - | [WTS] [JSN] | |||
| R2-081842 | Void | other | - | R2-61 | - | [WTS] [JSN] | |||
| R2-081843 | Analysis of Voice Interruption Delay and Comparison of HS-DSCH Serving Cell Change procedures | other | Qualcomm Europe | R2-61 | - | [WTS] [JSN] | |||
| R2-081844 | Inter-frequency measurements and cell reselection | other | Qualcomm Europe | R2-61 | - | [WTS] [JSN] | |||
| R2-081845 | Analysis of HD-FDD error and TX/RX conflict scenarios | other | Nortel | R2-61 | - | [WTS] [JSN] | |||
| R2-081846 | Coexistence of non-MBMS UE and MBSFN | other | Alcatel Shanghai Bell, Alcatel-Lucent | R2-61 | - | [WTS] [JSN] | |||
| R2-081847 | CAC support for VoIP | other | NTT DoCoMo | R2-61 | - | [WTS] [JSN] | |||
| R2-081848 | BSR consideration when Contention Resolution failure | other | ASUSTeK | R2-61 | - | [WTS] [JSN] | |||
| R2-081849 | Incremental fixes to the PDCP spec sections covering lossless DRBs HO | other | Motorola | R2-61 | - | [WTS] [JSN] | |||
| R2-081850 | Problem with PDCP/RLC interactions at HO of AM DRBs | other | Motorola | R2-61 | - | [WTS] [JSN] | |||
| R2-081851 | Down link data reordering at the UE | other | Motorola | R2-61 | - | [WTS] [JSN] | |||
| R2-081852 | Step 4: Lossless HO “restructuring” version: Reorder 2-windows -> Reorder 1-window | other | Motorola | R2-61 | - | [WTS] [JSN] | |||
| R2-081853 | Step 5: Restructuring” version: update for unified reordering window | other | Motorola | R2-61 | - | [WTS] [JSN] | |||
| R2-081854 | Step 1: DuplicateButNotReorder Window for “restructuring” version | other | Motorola | R2-61 | - | [WTS] [JSN] | |||
| R2-081855 | Step 2: Lossless HO “restructuring” version: Duplicate Elimination Window -> Reorder window | other | Motorola | R2-61 | - | [WTS] [JSN] | |||
| R2-081856 | Summary of email discussion: Threshold BSR trigger | other | Huawei (rapporteur) | R2-61 | - | [WTS] [JSN] | |||
| R2-081857 | UL ACK/NACK resource allocation for DL semi-persistent scheduling | other | NTT DoCoMo | R2-61 | - | [WTS] [JSN] | |||
| R2-081858 | Step 3: “Restructuring” version: update for reordering window (restored functionality R2-081341) | other | Motorola | R2-61 | - | [WTS] [JSN] | |||
| R2-081859 | UL semi-persistent resource deactivation | other | NTT DoCoMo | R2-61 | - | [WTS] [JSN] | |||
| R2-081860 | Considerations on Enabling DRX in CELL_FACH | other | Qualcomm Europe | R2-61 | - | [WTS] [JSN] | |||
| R2-081861 | PDCP CR supporting solution to PDCP/RLC problem at lossless DRBs HO | other | Motorola | R2-61 | - | [WTS] [JSN] | |||
| R2-081862 | RLC CR supporting solution to PDCP/RLC problem at lossless DRBs HO in R2-081850 | other | Motorola | R2-61 | - | [WTS] [JSN] | |||
| R2-081863 | SFN reading at handover crossing async-sync cell boundary | other | LG Electronics Inc. | R2-61 | - | [WTS] [JSN] | |||
| R2-081864 | Suspension of Uplink Transmission during Radio Link Problem | other | LG Electronics Inc. | R2-61 | - | [WTS] [JSN] | |||
| R2-081865 | Radio Link Monitoring during Handover | other | LG Electronics Inc. | R2-61 | - | [WTS] [JSN] | |||
| R2-081866 | Some Details on CQI Transmission during DRX | other | Research In Motion | R2-61 | - | [WTS] [JSN] | |||
| R2-081867 | SRS Transmission Timing during DRX | other | Research In Motion | R2-61 | - | [WTS] [JSN] | |||
| R2-081868 | Go to Long Sleep Command for LTE DRX | other | Research In Motion | R2-61 | - | [WTS] [JSN] | |||
| R2-081869 | Resource release considerations for VoIP | other | Research In Motion | R2-61 | - | [WTS] [JSN] | |||
| R2-081870 | Various issues regarding SR channel handling | other | Research In Motion | R2-61 | - | [WTS] [JSN] | |||
| R2-081871 | Paging frame calculation in LTE | other | Research In Motion, NTT DoCoMo | R2-61 | - | [WTS] [JSN] | |||
| R2-081872 | Simulation for Multiple patterns | other | CATT | R2-61 | - | [WTS] [JSN] | |||
| R2-081873 | Configuration of UL semi-persistent scheduling | other | CATT, CMCC | R2-61 | - | [WTS] [JSN] | |||
| R2-081874 | DRX clarification in TDD | other | CATT, CMCC | R2-61 | - | [WTS] [JSN] | |||
| R2-081875 | CQI and SRS transmission during DRX in TDD | other | CATT | R2-61 | - | [WTS] [JSN] | |||
| R2-081876 | RLC PDU size selection for Improved L2 | other | Qualcomm Europe | R2-61 | - | [WTS] [JSN] | |||
| R2-081877 | Introduction of POLL_SUFI for the uplink | other | Samsung | R2-61 | - | [WTS] [JSN] | |||
| R2-081878 | Correction to transmitting AM RLC entity | other | Samsung | R2-61 | - | [WTS] [JSN] | |||
| R2-081879 | DRX related correction and clarification | other | Sunplus mMobile Inc. | R2-61 | - | [WTS] [JSN] | |||
| R2-081880 | LCG reconfiguration via MAC CE | other | Sunplus mMobile Inc. | R2-61 | - | [WTS] [JSN] | |||
| R2-081881 | RA Response format | other | Sunplus mMobile Inc. | R2-61 | - | [WTS] [JSN] | |||
| R2-081882 | Early stop of Random Access Response Monitoring | other | Sunplus mMobile Inc. | R2-61 | - | [WTS] [JSN] | |||
| R2-081883 | Text for PDCP Open issue 28: delayed delivery | other | Motorola | R2-61 | - | [WTS] [JSN] | |||
| R2-081884 | Annex to 36.331 with ASN.1 guidelines | other | Ericsson, Qualcomm | R2-61 | - | [WTS] [JSN] | |||
| R2-081885 | Void | other | - | R2-61 | - | [WTS] [JSN] | |||
| R2-081886 | Void | other | - | R2-61 | - | [WTS] [JSN] | |||
| R2-081887 | Analysis of the requirements for logical channel prioritization | other | Ericsson | R2-61 | - | [WTS] [JSN] | |||
| R2-081888 | HSPA VoIP to WCDMA/GSM CS continuity | other | Qualcomm Europe | R2-61 | - | [WTS] [JSN] | |||
| R2-081889 | Void | other | - | R2-61 | - | [WTS] [JSN] | |||
| R2-081890 | RRC | other | Motorola | R2-61 | - | [WTS] [JSN] | |||
| R2-081891 | RRC | other | Motorola | R2-61 | - | [WTS] [JSN] | |||
| R2-081892 | UE behavior with regards to acquisition of CDMA2000 system time | other | Nortel, Alcatel-Lucent, Ericsson, NSN, Verizon | R2-61 | - | [WTS] [JSN] | |||
| R2-081893 | Signalling of MBSFN subframe allocation on mixed carrier | other | Nokia Corporation, Nokia Siemens Networks | R2-61 | - | [WTS] [JSN] | |||
| R2-081894 | CDMA sysInfo IEs for broadcast | other | Nortel, Alcatel-Lucent, Ericsson, Motorola, NSN, Verizon | R2-61 | - | [WTS] [JSN] | |||
| R2-081895 | Solution for interference reduction SON use case | other | Orange | R2-61 | - | [WTS] [JSN] | |||
| R2-081896 | Handling of multiple triggered events | other | NTT DoCoMo | R2-61 | - | [WTS] [JSN] | |||
| R2-081897 | Cell specific time-to-trigger | other | Nortel | R2-61 | - | [WTS] [JSN] | |||
| R2-081898 | eNB knowledge of HD-FDD UE capability | other | Nortel | R2-61 | - | [WTS] [JSN] | |||
| R2-081899 | Dual Cell HSDPA Operation Consideration | other | HUAWEI | R2-61 | - | [WTS] [JSN] | |||
| R2-081900 | Release 8 mandatory features | other | NEC | R2-61 | - | [WTS] [JSN] | |||
| R2-081901 | HS-DSCH Serving Cell Change | other | Nokia Corporation, Nokia Siemens Networks | R2-61 | - | [WTS] [JSN] | |||
| R2-081902 | Mapping between EPS bearer and Radio Bearer | other | NEC | R2-61 | - | [WTS] [JSN] | |||
| R2-081903 | Description of action for redirection information in RRC Connection Release Message | other | NEC | R2-61 | - | [WTS] [JSN] | |||
| R2-081904 | quick switch to macro diversity | other | LG Electronics Inc. | R2-61 | - | [WTS] [JSN] | |||
| R2-081905 | NAS Sequence Number parameter in AS Security Mode Command | other | NEC | R2-61 | - | [WTS] [JSN] | |||
| R2-081906 | Radio Link Failure recovery on non prepared eNB | other | NEC | R2-61 | - | [WTS] [JSN] | |||
| R2-081907 | Network support to ensure UE autonomous CSG discovery | other | T-Mobile, Huawei | R2-61 | - | [WTS] [JSN] | |||
| R2-081908 | Grants to Temporary C-RNTI | other | Ericsson | R2-61 | - | [WTS] [JSN] | |||
| R2-081909 | Void | other | - | R2-61 | - | [WTS] [JSN] | |||
| R2-081910 | Clarification of the definition of PRRI for TDD | other | CATT, IPWireless | R2-61 | - | [WTS] [JSN] | |||
| R2-081911 | Clarification of the definition of PRRI for TDD | other | CATT, IPWireless | R2-61 | - | [WTS] [JSN] | |||
| R2-081912 | Clarification of the definition of PRRI for TDD | other | CATT, IPWireless | R2-61 | - | [WTS] [JSN] | |||
| R2-081913 | Fast CS service redirection for LTE | other | NEC | R2-61 | - | [WTS] [JSN] | |||
| R2-081914 | Cell Reselection Parameters Tuning | other | NEC | R2-61 | - | [WTS] [JSN] | |||
| R2-081915 | Some suggestions on scheduling in CPC for 1 28Mcps TDD | other | TD Tech Ltd. | R2-61 | - | [WTS] [JSN] | |||
| R2-081916 | Reply LS to SA2 to S2-075875 regarding ETWS Security (S3-080219; to: SA2; cc: RAN2, RAN3, GERAN2, CT1, SA1; contact: NTT) | other | SA3 | R2-61 | - | [WTS] [JSN] | |||
| R2-081917 | Response LS to RAN2 to R2-081369 on Authentication at RRC Connection Re-establishment (S3-080226; to: RAN2; cc: -; contact: Samsung) | other | SA3 | R2-61 | - | [WTS] [JSN] | |||
| R2-081918 | Reply LS to R2-080601 on outstanding NAS messages (S3-080229; to: RAN2; cc: RAN3, CT1; contact: Ericsson) | other | SA3 | R2-61 | - | [WTS] [JSN] | |||
| R2-081919 | Reply LS to R2-080540 on assumptions about UE security capabilities (S3-080230; to: RAN2; cc: CT1; contact: Ericsson) | other | SA3 | R2-61 | - | [WTS] [JSN] | |||
| R2-081920 | Reply-LS to R2-080602 on security aspects on inter-system handover (S3-080249; to: RAN2; cc: -; contact: Nokia) | other | SA3 | R2-61 | - | [WTS] [JSN] | |||
| R2-081921 | LS on CS Fallback (S2-081993; to: RAN2, RAN3, CT1, CT4; cc: -; contact: NTT) | other | SA2 | R2-61 | - | [WTS] [JSN] | |||
| R2-081922 | Correction and Clarification of E-RUCCH Info for LCR TDD | other | CATT, TD-TECH | R2-61 | - | [WTS] [JSN] | |||
| R2-081923 | UE Specific RRM Container | other | NSN | R2-61 | - | [WTS] [JSN] | |||
| R2-081924 | Handover failure handling | other | NTT DoCoMo | R2-61 | - | [WTS] [JSN] | |||
| R2-081925 | Correction of a spelling error of E-TFC selection | other | Ericsson | R2-61 | - | [WTS] [JSN] | |||
| R2-081926 | Draft LS reply to R2-081412 | other | NSN | R2-61 | - | [WTS] [JSN] | |||
| R2-081927 | Draft LS reply to R2-081411 | other | NSN | R2-61 | - | [WTS] [JSN] | |||
| R2-081928 | Draft LS reply to R2-081413 | other | NSN | R2-61 | - | [WTS] [JSN] | |||
| R2-081929 | Draft LS reply to R2-081404 | other | NTT | R2-61 | - | [WTS] [JSN] | |||
| R2-081930 | Draft LS reply to R2-081410 | other | Ericsson | R2-61 | - | [WTS] [JSN] | |||
| R2-081931 | Draft LS reply to R2-081424 on Applicability of “subscriber type” indication for UTRAN & GERAN (to: RAN3, SA2, GERAN2; cc: -; contact: Orange) | other | Orange | R2-61 | - | [WTS] [JSN] | |||
| R2-081932 | Discussion on priority based scheme | other | LG Electronics Inc. | R2-61 | - | [WTS] [JSN] | |||
| R2-081933 | Draft Reply LS to R3-080434 = R2-081440 on “Changes to the format of TMGI” | other | Huawei | R2-61 | - | [WTS] [JSN] | |||
| R2-081934 | LS on MAC-d flow definition for MAC-ehs (to:RAN3; cc: -; contact: Alcatel-Lucent) | LS out | RAN2 | R2-61 | - | [WTS] [JSN] | |||
| R2-081935 | Change of MAC-d flow definition for MAC-ehs | other | Alcatel-Lucent | R2-61 | - | [WTS] [JSN] | |||
| R2-081936 | Change of MAC-d flow definition for MAC-ehs | other | Alcatel-Lucent | R2-61 | - | [WTS] [JSN] | |||
| R2-081937 | Change of MAC-d flow definition for MAC-ehs | other | Alcatel-Lucent | R2-61 | - | [WTS] [JSN] | |||
| R2-081938 | Change of MAC-d flow definition for MAC-ehs | other | Alcatel-Lucent | R2-61 | - | [WTS] [JSN] | |||
| R2-081939 | Clarification of method in determine state of a E-TFC for TDD | other | CATT, TDTech, ZTE, RITT, Spreadtrum Communications | R2-61 | - | [WTS] [JSN] | |||
| R2-081940 | Modification of TBS tables and E-TFC selection for LCR TDD | other | CATT, TDTech, ZTE, RITT, Spreadtrum Communications | R2-61 | - | [WTS] [JSN] | |||
| R2-081941 | Completion of the mechanism for Scheduling Information transmission on MAC-e PDU alone for 1.28 Mcps TDD in EUL | other | CATT, TDTech, ZTE, RITT, Spreadtrum Communications | R2-61 | - | [WTS] [JSN] | |||
| R2-081942 | Triggers, transmission and reliability of Scheduling Information for LCR TDD | other | CATT, TDTech, ZTE, RITT, Spreadtrum Communications | R2-61 | - | [WTS] [JSN] | |||
| R2-081943 | Triggers, transmission and reliability of Scheduling Information for LCR TDD | other | CATT, TDTech, ZTE, RITT, Spreadtrum Communications | R2-61 | - | [WTS] [JSN] | |||
| R2-081944 | Counter and timers for Scheduling Inforamtion Reporting of LCR TDD | other | CATT, TDTech, ZTE, RITT, Spreadtrum Communications | R2-61 | - | [WTS] [JSN] | |||
| R2-081945 | Clarification of the definition of PRRI for TDD | other | CATT, TDTech, ZTE, RITT, Spreadtrum Communications, IPWireless, Nextwave | R2-61 | - | [WTS] [JSN] | |||
| R2-081946 | Clarification of the definition of PRRI for TDD | other | CATT, TDTech, ZTE, RITT, Spreadtrum Communications, IPWireless, Nextwave | R2-61 | - | [WTS] [JSN] | |||
| R2-081947 | Clarification of the definition of PRRI for TDD | other | CATT, TDTech, ZTE, RITT, Spreadtrum Communications, IPWireless, Nextwave | R2-61 | - | [WTS] [JSN] | |||
| R2-081948 | Correction and Clarification of E-RUCCH Info for LCR TDD | other | CATT, TDTech, ZTE, RITT, Spreadtrum Communications | R2-61 | - | [WTS] [JSN] | |||
| R2-081949 | Extended power control gap for E-PUCH in LCR TDD | other | CATT, TDTech, ZTE, RITT, Spreadtrum Communications | R2-61 | - | [WTS] [JSN] | |||
| R2-081950 | Release 7 clarification of HARQ power offset selection during multiplexing of multiple MAC-d flows | other | CATT, TDTech, ZTE, RITT, Spreadtrum Communications | R2-61 | - | [WTS] [JSN] | |||
| R2-081951 | Release 8 clarification of HARQ power offset selection during multiplexing of multiple MAC-d flows | other | CATT, TDTech, ZTE, RITT, Spreadtrum Communications | R2-61 | - | [WTS] [JSN] | |||
| R2-081952 | Draft reply LS on CS Voice over HSPA | other | Qualcomm | R2-61 | - | [WTS] [JSN] | |||
| R2-081953 | Introduction of 64 QAM in RAN2 LCR TDD specifications | other | ZTE | R2-61 | - | [WTS] [JSN] | |||
| R2-081954 | Introduction of 64QAM in MAC LCR TDD specification | other | ZTE, RITT, CATT, TD-TECH, Spreadtrum Communications, Potevio | R2-61 | - | [WTS] [JSN] | |||
| R2-081955 | Draft LS reply to R2-081426 | other | Nortel | R2-61 | - | [WTS] [JSN] | |||
| R2-081956 | Draft LS reply to R2-081427 | other | NTT | R2-61 | - | [WTS] [JSN] | |||
| R2-081957 | DL flow control - initial conditions | other | Freescale | R2-61 | - | [WTS] [JSN] | |||
| R2-081958 | Draft LS reply to R2-081917 | other | ALU | R2-61 | - | [WTS] [JSN] | |||
| R2-081959 | Draft LS reply to R2-081918 | other | Ericsson | R2-61 | - | [WTS] [JSN] | |||
| R2-081960 | Draft LS reply to R2-081920 | other | ALU | R2-61 | - | [WTS] [JSN] | |||
| R2-081961 | Release 8 mandatory features | other | NEC | R2-61 | - | [WTS] [JSN] | |||
| R2-081962 | Indication of persistent allocation for UL | other | Nokia, NSN | R2-61 | - | [WTS] [JSN] | |||
| R2-081963 | Reselection and measurement ASN.1 | other | Motorola | R2-61 | - | [WTS] [JSN] | |||
| R2-081964 | LS related to CR SP-080188 on CSG requirements for UTRA/E-UTRA (to: SA, SA1; cc: SA2, CT1, GERAN; contact: NSN) | LS out | RAN2 | R2-61 | - | [WTS] [JSN] | |||
| R2-081965 | Analysis of Voice Interruption Delay and Comparison of HS-DSCH Serving Cell Change procedures | other | Qualcomm | R2-61 | - | [WTS] [JSN] | |||
| R2-081966 | Draft LS on Progress on E-DCH in CELL_FACH state | other | Huawei | R2-61 | - | [WTS] [JSN] | |||
| R2-081967 | Re-establishment condition for RLC reconfiguration to fixed from flexible PDU size | other | Ericsson | R2-61 | - | [WTS] [JSN] | |||
| R2-081968 | Draft LS on Progress on E-DCH in CELL_FACH state | other | Huawei | R2-61 | - | [WTS] [JSN] | |||
| R2-081969 | LS on RAN2 status on enhanced uplink for CELL_FACH state in FDD (to: RAN3; cc: RAN1; contact: Huawei) | LS out | RAN2 | R2-61 | - | [WTS] [JSN] | |||
| R2-081970 | Reply LS to S4-080126 = R2-080671 on CS Voice over HSPA (to: SA4; cc: -; contact: Qualcomm) | LS out | RAN2 | R2-61 | - | [WTS] [JSN] | |||
| R2-081971 | Reply LS to R3-080434 = R2-081440 on “Changes to the format of TMGI” (to: RAN3; cc: CT4; contact: Huawei) | LS out | RAN2 | R2-61 | - | [WTS] [JSN] | |||
| R2-081972 | Revised WID on support of UTRA HNB | other | LG Electronics Inc. (RAN2 vice chairman) | R2-61 | - | [WTS] [JSN] | |||
| R2-081973 | Draft LS on RAN2 status on UE DRX | other | Ericsson | R2-61 | - | [WTS] [JSN] | |||
| R2-081974 | LS on RAN2 status on UE DRX (to: RAN3; cc: -; contact: Ericsson) | LS out | RAN2 | R2-61 | - | [WTS] [JSN] | |||
| R2-081975 | Void | other | - | R2-61 | - | [WTS] [JSN] | |||
| R2-081976 | Void | other | - | R2-61 | - | [WTS] [JSN] | |||
| R2-081977 | Void | other | - | R2-61 | - | [WTS] [JSN] | |||
| R2-081978 | Void | other | - | R2-61 | - | [WTS] [JSN] | |||
| R2-081979 | Void | other | - | R2-61 | - | [WTS] [JSN] | |||
| R2-081980 | Void | other | - | R2-61 | - | [WTS] [JSN] | |||
| R2-081981 | Void | other | - | R2-61 | - | [WTS] [JSN] | |||
| R2-081982 | Void | other | - | R2-61 | - | [WTS] [JSN] | |||
| R2-081983 | Void | other | - | R2-61 | - | [WTS] [JSN] | |||
| R2-081984 | Void | other | - | R2-61 | - | [WTS] [JSN] | |||
| R2-081985 | Void | other | - | R2-61 | - | [WTS] [JSN] | |||
| R2-081986 | Content of E-AGCH for contention resolution, scheduling and explicit resource release | other | Infineon | R2-61 | - | [WTS] [JSN] | |||
| R2-081987 | Draft LS on Transmission of physical layer parameters (to: RAN1, RAN4; cc: -; contact: Ericsson) | other | Ericsson | R2-61 | - | [WTS] [JSN] | |||
| R2-081988 | CR to 36.304 on best cell selection | other | Nokia | R2-61 | - | [WTS] [JSN] | |||
| R2-081989 | CR to 36.331 on best cell selection/Cell selection upon connection re-establishment | other | Samsung | R2-61 | - | [WTS] [JSN] | |||
| R2-081990 | [Draft] LS on AMBR Granularity (to: SA2; cc: -;contact: NSN) | other | NSN | R2-61 | - | [WTS] [JSN] | |||
| R2-081991 | TP to 36.321 on UL HARQ handling when P-HICH collides with measurement gap | other | NTT | R2-61 | - | [WTS] [JSN] | |||
| R2-081992 | Early Implementation of PPAC | other | NTT DoCoMo | R2-61 | - | [WTS] [JSN] | |||
| R2-081993 | MAC TP on PUCCH | other | Samsung | R2-61 | - | [WTS] [JSN] | |||
| R2-081994 | RRC TP on PUCCH | other | Samsung | R2-61 | - | [WTS] [JSN] | |||
| R2-081995 | Paging subframe pattern for TDD | other | CMCC, CATT, ZTE | R2-61 | - | [WTS] [JSN] | |||
| R2-081996 | Draft LS to RAN1 on LTE RACH DL data arrival | other | Qualcomm | R2-61 | - | [WTS] [JSN] | |||
| R2-081997 | Text proposal to 36.321 covering agreements of R2-081879 on DRX | other | Qualcomm | R2-61 | - | [WTS] [JSN] | |||
| R2-081998 | Reply LS to R2-081974 on HS-DPCCH usage with Enhanced Uplink in Cell_FACH (R3-080963; to: RAN2; cc: RAN1; contact: NSN) | other | RAN3 | R2-61 | - | [WTS] [JSN] | |||
| R2-081999 | Miscellaneous corrections to TS 36.322 | other | NTT | R2-61 | - | [WTS] [JSN] | |||
| R2-082000 | Merged TP for 36.331: Draft TP on RadioResourceConfiguration | other | Samsung | R2-61 | - | [WTS] [JSN] | |||
| R2-082001 | TP to 36.331 on redirection information in RRC Connection Release Message | other | NEC? | R2-61 | - | [WTS] [JSN] | |||
| R2-082002 | CR to 36.304 on redirection information in RRC Connection Release Message | other | NEC? | R2-61 | - | [WTS] [JSN] | |||
| R2-082003 | TP for 36.331 ASN.1 on Optimised GSM NCL | other | Vodafone, Ericsson | R2-61 | - | [WTS] [JSN] | |||
| R2-082004 | TP to 36.331 on Introduction of measurement bandwidth in RRC specification | other | Ericsson | R2-61 | - | [WTS] [JSN] | |||
| R2-082005 | Paging subframe pattern for TDD | other | CMCC | R2-61 | - | [WTS] [JSN] | |||
| R2-082006 | CR to 36.304 on Paging details in LTE | other | Nokia? | R2-61 | - | [WTS] [JSN] | |||
| R2-082007 | Report of LTE control plane session | other | Motorola | R2-61 | - | [WTS] [JSN] | |||
| R2-082008 | Report of LTE control plane session | other | Motorola | R2-61 | - | [WTS] [JSN] | |||
| R2-082009 | Void | other | - | R2-61 | - | [WTS] [JSN] | |||
| R2-082010 | Void | other | - | R2-61 | - | [WTS] [JSN] | |||
| R2-082011 | CR to 36.322 on Duplicate detection in UM RLC | other | LG Electronics Inc. | R2-61 | - | [WTS] [JSN] | |||
| R2-082012 | CR on 36.322 on Clarification to the handling of large RLC status reports | other | Ericsson | R2-61 | - | [WTS] [JSN] | |||
| R2-082013 | CR to 36.322 on Correction to Polling procedure | other | LG Electronics | R2-61 | - | [WTS] [JSN] | |||
| R2-082014 | LS on Half-Duplex FDD (R4-080805; to: RAN2; cc: RAN1, RAN3; contact: Ericsson) | other | RAN4 | R2-61 | - | [WTS] [JSN] | |||
| R2-082015 | CR to 36.322 Small corrections to RLC | other | Ericsson | R2-61 | - | [WTS] [JSN] | |||
| R2-082016 | CR to 36.322 on RLC Retransmission Count | other | Motorola | R2-61 | - | [WTS] [JSN] | |||
| R2-082017 | CR to 36.322 on Correction to Polling procedure | other | LG Electronics | R2-61 | - | [WTS] [JSN] | |||
| R2-082018 | CR on 36.322 on Clarification to the handling of large RLC status reports | other | Ericsson | R2-61 | - | [WTS] [JSN] | |||
| R2-082019 | CR to 36.323 on Addition of a duplicate discard window and reordering function | other | LG | R2-61 | - | [WTS] [JSN] | |||
| R2-082020 | Miscellaneous corrections to TS 36.322 | other | NTT | R2-61 | - | [WTS] [JSN] | |||
| R2-082021 | CR to 36.322 Small corrections to RLC | other | Ericsson | R2-61 | - | [WTS] [JSN] | |||
| R2-082022 | PDCP Minor changes | other | LG | R2-61 | - | [WTS] [JSN] | |||
| R2-082023 | CR to 36.322 on RLC Retransmission Count | other | Motorola | R2-61 | - | [WTS] [JSN] | |||
| R2-082024 | Reply LS to R3-080543 = GP-080283 on applicability of “subscriber type” indication for UTRAN & GERAN (G2-080228; to: SA2, RAN3, RAN2; cc: GERAN, CT1; contact: Ericsson) | other | GERAN2 | R2-61 | - | [WTS] [JSN] | |||
| R2-082025 | Reply LS to R2-081363 on E-UTRAN Neighbour Cell List information for GERAN (GP-080231; to: GERAN, GERAN1, RAN2; cc: RAN1, RAN4; contact: Telecom Italia) | other | GERAN2 | R2-61 | - | [WTS] [JSN] | |||
| R2-082026 | Report of LTE user plane session | other | Samsung (chairman) | R2-61 | - | [WTS] [JSN] | |||
| R2-082027 | Draft reply LS to R3-080547 = R2-081425 on eNode B identification | other | Ericsson | R2-61 | - | [WTS] [JSN] | |||
| R2-082028 | Signaling of the MBSFN subframe allocation parameter | other | Ericsson, ZTE, Huawei | R2-61 | - | [WTS] [JSN] | |||
| R2-082029 | Random Access Procedure model | other | Ericsson | R2-61 | - | [WTS] [JSN] | |||
| R2-082030 | Random Access Procedure model | other | Ericsson | R2-61 | - | [WTS] [JSN] | |||
| R2-082031 | Reply LS to GP-080395 = R2-081412 on various aspects related to GERAN to E-UTRAN interworking (to: GERAN; cc: RAN4; contact: NSN) | LS out | RAN2 | R2-61 | - | [WTS] [JSN] | |||
| R2-082032 | Reply LS to C1-080780 = R2-081410 on EPS Session management procedure optimizations (to: CT1; cc: RAN3, CT4; contact: Ericsson) | LS out | RAN2 | R2-61 | - | [WTS] [JSN] | |||
| R2-082033 | Response LS to LS R3-080553 = R2-081426 on RLF Recovery Information over x2 (to: RAN3; cc: -; contact: Nortel) | LS out | RAN2 | R2-61 | - | [WTS] [JSN] | |||
| R2-082034 | Reply LS to R3-080564 = R2-081427 on Location Reporting procedure (to: RAN3, SA2; cc: -; contact: NTT) | LS out | RAN2 | R2-61 | - | [WTS] [JSN] | |||
| R2-082035 | Draft LS reply to R2-081917 | other | ALU | R2-61 | - | [WTS] [JSN] | |||
| R2-082036 | Reply LS to S3-080229 = R2-081918 on outstanding NAS messages (to: SA3; cc: CT1; contact: Ericsson) | LS out | RAN2 | R2-61 | - | [WTS] [JSN] | |||
| R2-082037 | Draft LS reply to R2-081920 | other | ALU | R2-61 | - | [WTS] [JSN] | |||
| R2-082038 | Response LS to S3-080226 = R2-081917 on Authentication at RRC Connection Re-establishment (to: SA3, cc: -; contact:ALU) | LS out | RAN2 | R2-61 | - | [WTS] [JSN] | |||
| R2-082039 | LS related to R1-081156 = R2-081419 on Transmission of physical layer parameters (to: RAN1, RAN4; cc: -; contact: Ericsson) | LS out | RAN2 | R2-61 | - | [WTS] [JSN] | |||
| R2-082040 | LS related to R1-075105 = R2-080590 and R1-081160 = R2-081420 on PDCCH for DL data arrival and random access response format (to: RAN1; cc: -; contact: Qualcomm) | LS out | RAN2 | R2-61 | - | [WTS] [JSN] | |||
| R2-082041 | Reply LS to R3-080547 = R2-081425 on LTE-cell- and eNB-identification (to: RAN3, CT1; cc: SA2, CT4; contact: Ericsson) | LS out | RAN2 | R2-61 | - | [WTS] [JSN] | |||
| R2-082042 | Reselection and measurement ASN.1 | other | Motorola | R2-61 | - | [WTS] [JSN] | |||
| R2-082043 | PDCP Minor changes | other | LG | R2-61 | - | [WTS] [JSN] | |||
| R2-082044 | CR to 36.323 on Addition of a duplicate discard window and reordering function | other | LG | R2-61 | - | [WTS] [JSN] | |||
| R2-082045 | DRAFT LS on NAS–AS interaction for dependent procedures | other | Alcatel-Lucent | R2-61 | - | [WTS] [JSN] | |||
| R2-082046 | Reply LS to R2-081920 = S3-080249 on security aspects on inter-system handover (to: SA3; cc: -; contact: Alcatel-Lucent) | LS out | RAN2 | R2-61 | - | [WTS] [JSN] | |||
| R2-082047 | LS on NAS–AS interaction for dependent procedures (to: CT1; cc: -; contact: Alcatel-Lucent) | LS out | RAN2 | R2-61 | - | [WTS] [JSN] | |||
| R2-082048 | LS on RAN2 assumptions on L1 (to: RAN1; cc: -; contact: Ericsson) | LS out | RAN2 | R2-61 | - | [WTS] [JSN] | |||
| R2-082049 | 36.321 CR covering agreements of RAN2 #61bis | other | Ericsson, Qualcomm | R2-61 | - | [WTS] [JSN] | |||
| R2-082050 | 36.331 CR covering agreements of RAN2 #61bis; Miscelaneous clarifications/ corrections | other | Samsung | R2-61 | - | [WTS] [JSN] | |||
| R2-082051 | Void | other | - | R2-61 | - | [WTS] [JSN] | |||
| R2-082052 | Void | other | - | R2-61 | - | [WTS] [JSN] | |||
| R2-082053 | Void | other | - | R2-61 | - | [WTS] [JSN] | |||
| R2-082054 | Void | other | - | R2-61 | - | [WTS] [JSN] | |||
| R2-082055 | Void | other | - | R2-61 | - | [WTS] [JSN] | |||
| R2-082056 | Void | other | - | R2-61 | - | [WTS] [JSN] | |||
| R2-082057 | Void | other | - | R2-61 | - | [WTS] [JSN] | |||
| R2-082058 | Void | other | - | R2-61 | - | [WTS] [JSN] | |||
| R2-082059 | Void | other | - | R2-61 | - | [WTS] [JSN] |
660 documents (1.2430670261383 seconds)