Please enter the search related information in the fields below. Partial information works, e.g. "SP-21
" in the "tdoc" field lists all TSG SA documents from 2021. Regular expressions mostly work in all fields (e.g. "2[34].501
" in the "Spec" field lists all documents related to 23.501 and 24.501. Capitalization is disregarded, i.e. "3GPP
" gives the same results as "3gpp
".
Download results in JSON format
tdoc | Title | Type / Revs | Source | Spec / CR | S/WID | Release | Meeting | Status | Links |
---|---|---|---|---|---|---|---|---|---|
R1-1709880 | Draft Agenda of RAN1#AH_NR2 meeting |
agenda revised to R1-1711601 |
RAN1 Chair |
R1-ah-18512 AI: 2 |
revised | [WTS] [JSN] | |||
R1-1709881 | Report of RAN1#89 meeting | report | ETSI |
R1-ah-18512 AI: 3 |
noted | [WTS] [JSN] | |||
R1-1709882 | Enhancement of Early Termination of Polar Codes by placing UE-ID on Frozen Symbols | discussion | Tsofun Algorithm |
R1-ah-18512 AI: 5.1.4.2.1 |
available | [WTS] [JSN] | |||
R1-1709883 | Study of Split-CRC Polar Code Construction for Early Termination |
discussion revised to R1-1711644 |
Tsofun Algorithm |
R1-ah-18512 AI: 5.1.4.2.1 |
revised | [WTS] [JSN] | |||
R1-1709884 | NR-SS sequence design | discussion | ZTE |
R1-ah-18512 AI: 5.1.1.1.1 |
available | [WTS] [JSN] | |||
R1-1709885 | The composition of SS burst sets | discussion | ZTE |
R1-ah-18512 AI: 5.1.1.1.2 |
available | [WTS] [JSN] | |||
R1-1709886 | Timing indication based on SS blocks | discussion | ZTE |
R1-ah-18512 AI: 5.1.1.1.3 |
available | [WTS] [JSN] | |||
R1-1709887 | Multiple SS blocks in wideband CC | discussion | ZTE |
R1-ah-18512 AI: 5.1.1.1.4 |
available | [WTS] [JSN] | |||
R1-1709888 | NR-PBCH contents | discussion | ZTE |
R1-ah-18512 AI: 5.1.1.2.1 |
available | [WTS] [JSN] | |||
R1-1709889 | NR-PBCH RE mapping and SS block composition | discussion | ZTE |
R1-ah-18512 AI: 5.1.1.2.2 |
available | [WTS] [JSN] | |||
R1-1709890 | NR-PBCH DMRS design | discussion | ZTE |
R1-ah-18512 AI: 5.1.1.2.3 |
available | [WTS] [JSN] | |||
R1-1709891 | RMSI delivery | discussion | ZTE |
R1-ah-18512 AI: 5.1.1.2.4 |
available | [WTS] [JSN] | |||
R1-1709892 | Other SI delivery | discussion | ZTE |
R1-ah-18512 AI: 5.1.1.2.5 |
available | [WTS] [JSN] | |||
R1-1709893 | Paging design in NR | discussion | ZTE |
R1-ah-18512 AI: 5.1.1.3 |
available | [WTS] [JSN] | |||
R1-1709894 | NR-PRACH formats for long/short sequences | discussion | ZTE |
R1-ah-18512 AI: 5.1.1.4.1 |
available | [WTS] [JSN] | |||
R1-1709895 | NR-PRACH formats: capacity enhancements and other use cases | discussion | ZTE |
R1-ah-18512 AI: 5.1.1.4.2 |
available | [WTS] [JSN] | |||
R1-1709896 | Power control during random access procedure | discussion | ZTE |
R1-ah-18512 AI: 5.1.1.4.3 |
available | [WTS] [JSN] | |||
R1-1709897 | 4-step random access procedure | discussion | ZTE |
R1-ah-18512 AI: 5.1.1.4.4 |
available | [WTS] [JSN] | |||
R1-1709898 | RRM measurements on IDLE mode RS | discussion | ZTE |
R1-ah-18512 AI: 5.1.1.5.1 |
available | [WTS] [JSN] | |||
R1-1709899 | RRM measurements on CSI-RS for L3 mobility | discussion | ZTE |
R1-ah-18512 AI: 5.1.1.5.2 |
available | [WTS] [JSN] | |||
R1-1709900 | Radio link monitoring in NR | discussion | ZTE |
R1-ah-18512 AI: 5.1.1.5.3 |
available | [WTS] [JSN] | |||
R1-1709901 | Scrambling pattern for timing indication over PBCH | discussion | Sequans Communications |
R1-ah-18512 AI: 5.1.1.1.3 |
available | [WTS] [JSN] | |||
R1-1709902 | Enhancements for Polar code construction | discussion | Sequans Communications |
R1-ah-18512 AI: 5.1.4.2.1 |
available | [WTS] [JSN] | |||
R1-1709903 | Discussion of LTE-RM decoding ambiguity | discussion | Sequans Communications |
R1-ah-18512 AI: 5.1.4.4 |
available | [WTS] [JSN] | |||
R1-1709904 | Discussion on Remaining Details of Codeword Mapping | discussion | Beijing Xinwei Telecom Techn. |
R1-ah-18512 AI: 5.1.2.1.1 |
available | [WTS] [JSN] | |||
R1-1709905 | Further Discussion on DL PRB Bundling | discussion | Beijing Xinwei Telecom Techn. |
R1-ah-18512 AI: 5.1.2.1.5 |
noted | [WTS] [JSN] | |||
R1-1709906 | Discussion on DL Beam Management | discussion | Beijing Xinwei Telecom Techn. |
R1-ah-18512 AI: 5.1.2.2.1 |
available | [WTS] [JSN] | |||
R1-1709907 | Discussion on Beam Failure Recovery | discussion | Beijing Xinwei Telecom Techn. |
R1-ah-18512 AI: 5.1.2.2.2 |
available | [WTS] [JSN] | |||
R1-1709908 | Discussion on CSI Framework and Semi-persistent CSI-RS Resources and Reports Activation | discussion | Beijing Xinwei Telecom Techn. |
R1-ah-18512 AI: 5.1.2.3.1 |
available | [WTS] [JSN] | |||
R1-1709909 | Further Evaluation and Discussion on DMRS Design Details | discussion | Beijing Xinwei Telecom Techn. |
R1-ah-18512 AI: 5.1.2.4.3 |
noted | [WTS] [JSN] | |||
R1-1709910 | NR MIMO System Level Phase 3 Calibration Results | discussion | Beijing Xinwei Telecom Techn. |
R1-ah-18512 AI: 5.1.2.5 |
available | [WTS] [JSN] | |||
R1-1709911 | Finalization of the NR-SSS | other | Huawei, HiSilicon |
R1-ah-18512 AI: 5.1.1.1.1 |
available | [WTS] [JSN] | |||
R1-1709912 | SS Burst Set and Block Composition | other | Huawei, HiSilicon |
R1-ah-18512 AI: 5.1.1.1.2 |
available | [WTS] [JSN] | |||
R1-1709913 | Time Index Indication | other | Huawei, HiSilicon |
R1-ah-18512 AI: 5.1.1.1.3 |
available | [WTS] [JSN] | |||
R1-1709914 | NR-PBCH contents and payload size | other | Huawei, HiSilicon |
R1-ah-18512 AI: 5.1.1.2.1 |
available | [WTS] [JSN] | |||
R1-1709915 | Discussion on NR RMSI delivery | other | Huawei, HiSilicon |
R1-ah-18512 AI: 5.1.1.2.4 |
available | [WTS] [JSN] | |||
R1-1709916 | Multi-beam Paging for NR | other | Huawei, HiSilicon |
R1-ah-18512 AI: 5.1.1.3 |
available | [WTS] [JSN] | |||
R1-1709917 | PRACH preamble sequences and formats for capacity enhancement and beam management |
other revised to R1-1711600 |
Huawei, HiSilicon |
R1-ah-18512 AI: 5.1.1.4.2 |
revised | [WTS] [JSN] | |||
R1-1709918 | Discussion on power ramping and power control during RA procedure | other | Huawei, HiSilicon |
R1-ah-18512 AI: 5.1.1.4.3 |
available | [WTS] [JSN] | |||
R1-1709919 | SS Burst Periodicities and timing for UE RRM measurement | other | Huawei, HiSilicon |
R1-ah-18512 AI: 5.1.1.5.1 |
noted | [WTS] [JSN] | |||
R1-1709920 | CSI-RS configuration parameters for L3 mobility | other | Huawei, HiSilicon |
R1-ah-18512 AI: 5.1.1.5.2 |
available | [WTS] [JSN] | |||
R1-1709921 | Discussion on remaining issues of radio link monitoring | other | Huawei, HiSilicon |
R1-ah-18512 AI: 5.1.1.5.3 |
available | [WTS] [JSN] | |||
R1-1709922 | On numerology determination during initial access | discussion | Huawei, HiSilicon |
R1-ah-18512 AI: 5.1.1.6 |
available | [WTS] [JSN] | |||
R1-1709923 | Non-codebook based transmission for UL MIMO | other | Huawei, HiSilicon |
R1-ah-18512 AI: 5.1.2.1.3 |
noted | [WTS] [JSN] | |||
R1-1709924 | Multiple NR-PDCCH for Multiple TRP transmission | other | Huawei, HiSilicon |
R1-ah-18512 AI: 5.1.2.1.6 |
available | [WTS] [JSN] | |||
R1-1709925 | PRB bundling size for DL data precoding | other | Huawei, HiSilicon |
R1-ah-18512 AI: 5.1.2.1.5 |
available | [WTS] [JSN] | |||
R1-1709926 | Discussion on transmission parameter sets | other | Huawei, HiSilicon |
R1-ah-18512 AI: 5.1.2.1.8 |
available | [WTS] [JSN] | |||
R1-1709927 | Beam indication for DL control channel | other | Huawei, HiSilicon |
R1-ah-18512 AI: 5.1.2.2.3 |
available | [WTS] [JSN] | |||
R1-1709928 | UL beam management | other | Huawei, HiSilicon |
R1-ah-18512 AI: 5.1.2.2.1 |
noted | [WTS] [JSN] | |||
R1-1709929 | General views on beam failure recovery | other | Huawei, HiSilicon |
R1-ah-18512 AI: 5.1.2.2.2 |
available | [WTS] [JSN] | |||
R1-1709930 | Procedure details for beam failure recovery | other | Huawei, HiSilicon |
R1-ah-18512 AI: 5.1.2.2.3 |
available | [WTS] [JSN] | |||
R1-1709931 | Discussion on CSI Framework Design | other | Huawei, HiSilicon |
R1-ah-18512 AI: 5.1.2.3.1 |
noted | [WTS] [JSN] | |||
R1-1709932 | Channel and interference measurement for CSI acquisition |
other revised to R1-1711632 |
Huawei, HiSilicon |
R1-ah-18512 AI: 5.1.2.3.2 |
revised | [WTS] [JSN] | |||
R1-1709933 | Rate matching for data channel | other | Huawei, HiSilicon |
R1-ah-18512 AI: 5.1.2.1.7 |
available | [WTS] [JSN] | |||
R1-1709934 | Reference signal for fine time and frequency tracking | other | Huawei, HiSilicon |
R1-ah-18512 AI: 5.1.2.4.6 |
noted | [WTS] [JSN] | |||
R1-1709935 | Details of QCL assumptions and related RS design considerations | other | Huawei, HiSilicon |
R1-ah-18512 AI: 5.1.2.4.7 |
available | [WTS] [JSN] | |||
R1-1709936 | UL SRS design for beam management and CSI acquisition | other | Huawei, HiSilicon |
R1-ah-18512 AI: 5.1.2.4.5 |
available | [WTS] [JSN] | |||
R1-1709937 | UL SRS sequence design in NR | other | Huawei, HiSilicon |
R1-ah-18512 AI: 5.1.2.4.8 |
available | [WTS] [JSN] | |||
R1-1709938 | SRS antenna switching | other | Huawei, HiSilicon |
R1-ah-18512 AI: 5.1.2.5 |
available | [WTS] [JSN] | |||
R1-1709939 | PTRS for CP-OFDM | other | Huawei, HiSilicon |
R1-ah-18512 AI: 5.1.2.4.4 |
available | [WTS] [JSN] | |||
R1-1709940 | PTRS for DFT-s-OFDM | other | Huawei, HiSilicon |
R1-ah-18512 AI: 5.1.2.4.4 |
noted | [WTS] [JSN] | |||
R1-1709941 | Design of DL DMRS for data transmission | other | Huawei, HiSilicon |
R1-ah-18512 AI: 5.1.2.4.3 |
available | [WTS] [JSN] | |||
R1-1709942 | Evaluation results of DMRS design for DL data channel | other | Huawei, HiSilicon |
R1-ah-18512 AI: 5.1.2.4.3 |
available | [WTS] [JSN] | |||
R1-1709943 | UL DMRS design for data transmission | other | Huawei, HiSilicon |
R1-ah-18512 AI: 5.1.2.4.3 |
available | [WTS] [JSN] | |||
R1-1709944 | Evaluation results of DMRS design for UL data channel | other | Huawei, HiSilicon |
R1-ah-18512 AI: 5.1.2.4.3 |
available | [WTS] [JSN] | |||
R1-1709945 | Common UL/DL DMRS design | other | Huawei, HiSilicon |
R1-ah-18512 AI: 5.1.2.4.8 |
available | [WTS] [JSN] | |||
R1-1709946 | CSI-RS design in NR | other | Huawei, HiSilicon |
R1-ah-18512 AI: 5.1.2.4.2 |
available | [WTS] [JSN] | |||
R1-1709947 | CSI-RS design for beam management | other | Huawei, HiSilicon |
R1-ah-18512 AI: 5.1.2.4.2 |
available | [WTS] [JSN] | |||
R1-1709948 | General considerations on UL power control design | other | Huawei, HiSilicon |
R1-ah-18512 AI: 5.1.9.2 |
available | [WTS] [JSN] | |||
R1-1709949 | Power control for CA and DC | other | Huawei, HiSilicon |
R1-ah-18512 AI: 5.1.9.1 |
noted | [WTS] [JSN] | |||
R1-1709950 | DMRS for NR-PDCCH | other | Huawei, HiSilicon |
R1-ah-18512 AI: 5.1.3.1.1.2 |
available | [WTS] [JSN] | |||
R1-1709951 | Configuration of control resource set | other | Huawei, HiSilicon |
R1-ah-18512 AI: 5.1.3.1.2.1 |
available | [WTS] [JSN] | |||
R1-1709952 | Search space design | other | Huawei, HiSilicon |
R1-ah-18512 AI: 5.1.3.1.2.2 |
available | [WTS] [JSN] | |||
R1-1709953 | Contents of group-common PDCCH | other | Huawei, HiSilicon |
R1-ah-18512 AI: 5.1.3.1.4.2 |
available | [WTS] [JSN] | |||
R1-1709954 | Structure of group-common PDCCH | other | Huawei, HiSilicon |
R1-ah-18512 AI: 5.1.3.1.4.1 |
available | [WTS] [JSN] | |||
R1-1709955 | UE-specific DCI contents in NR | other | Huawei, HiSilicon |
R1-ah-18512 AI: 5.1.3.1.6 |
available | [WTS] [JSN] | |||
R1-1709956 | Resource multiplexing of downlink control and data | other | Huawei, HiSilicon |
R1-ah-18512 AI: 5.1.3.1.3 |
available | [WTS] [JSN] | |||
R1-1709957 | Dynamic and semi-static DL/UL resource partition | other | Huawei, HiSilicon |
R1-ah-18512 AI: 5.1.3.1.6 |
available | [WTS] [JSN] | |||
R1-1709958 | Short PUCCH for up to 2 UCI bits | other | Huawei, HiSilicon |
R1-ah-18512 AI: 5.1.3.2.1.1 |
available | [WTS] [JSN] | |||
R1-1709959 | Short PUCCH with more than 2 UCI bits | other | Huawei, HiSilicon |
R1-ah-18512 AI: 5.1.3.2.1.2 |
available | [WTS] [JSN] | |||
R1-1709960 | Overview of long PUCCH design | other | Huawei, HiSilicon |
R1-ah-18512 AI: 5.1.3.2.2 |
available | [WTS] [JSN] | |||
R1-1709961 | Long PUCCH structure for up to 2 bits with high multiplexing capacity | other | Huawei, HiSilicon |
R1-ah-18512 AI: 5.1.3.2.2.1 |
available | [WTS] [JSN] | |||
R1-1709962 | Long PUCCH structure for moderate payload with some multiplexing capacity | other | Huawei, HiSilicon |
R1-ah-18512 AI: 5.1.3.2.2.2 |
available | [WTS] [JSN] | |||
R1-1709963 | UCI piggyback on PUSCH | other | Huawei, HiSilicon |
R1-ah-18512 AI: 5.1.3.2.5.1 |
available | [WTS] [JSN] | |||
R1-1709964 | HARQ processing time | other | Huawei, HiSilicon |
R1-ah-18512 AI: 5.1.3.3.9 |
available | [WTS] [JSN] | |||
R1-1709965 | Number of HARQ processes and HARQ RTT | other | Huawei, HiSilicon |
R1-ah-18512 AI: 5.1.3.3.6.1 |
available | [WTS] [JSN] | |||
R1-1709966 | Soft buffer handling | other | Huawei, HiSilicon |
R1-ah-18512 AI: 5.1.3.3.6.2 |
available | [WTS] [JSN] | |||
R1-1709967 | Scheduling mechanisms for CBG-based re-transmission | other | Huawei, HiSilicon |
R1-ah-18512 AI: 5.1.3.3.4.2 |
available | [WTS] [JSN] | |||
R1-1709968 | Discussion on CBG construction | other | Huawei, HiSilicon |
R1-ah-18512 AI: 5.1.3.3.4.1 |
available | [WTS] [JSN] | |||
R1-1709969 | Discussion on CBG-based feedback | other | Huawei, HiSilicon |
R1-ah-18512 AI: 5.1.3.3.4.3 |
available | [WTS] [JSN] | |||
R1-1709970 | HARQ feedback timing for NR | other | Huawei, HiSilicon |
R1-ah-18512 AI: 5.1.3.3.5.1 |
available | [WTS] [JSN] | |||
R1-1709971 | Remaining issues on ECP | other | Huawei, HiSilicon |
R1-ah-18512 AI: 5.1.11 |
available | [WTS] [JSN] | |||
R1-1709972 | Overview of wider bandwidth operations | other | Huawei, HiSilicon |
R1-ah-18512 AI: 5.1.7 |
available | [WTS] [JSN] | |||
R1-1709973 | On initial access for wideband carrier | other | Huawei, HiSilicon |
R1-ah-18512 AI: 5.1.1.1.4 |
available | [WTS] [JSN] | |||
R1-1709974 | Scheduling and resource allocation mechanism for active bandwidth parts | other | Huawei, HiSilicon |
R1-ah-18512 AI: 5.1.3.3.1.1 |
available | [WTS] [JSN] | |||
R1-1709975 | On NR carrier aggregation | other | Huawei, HiSilicon |
R1-ah-18512 AI: 5.1.3.4.1.1 |
available | [WTS] [JSN] | |||
R1-1709976 | SRS switching among CCs and bandwidth parts | other | Huawei, HiSilicon |
R1-ah-18512 AI: 5.1.3.4.1.2 |
available | [WTS] [JSN] | |||
R1-1709977 | On NR dual connectivity | other | Huawei, HiSilicon |
R1-ah-18512 AI: 5.1.3.4.2 |
available | [WTS] [JSN] | |||
R1-1709978 | TB mapping and TB size determination | other | Huawei, HiSilicon |
R1-ah-18512 AI: 5.1.3.3.1.3 |
available | [WTS] [JSN] | |||
R1-1709979 | Overview of NR UL for LTE-NR coexistence | other | Huawei, HiSilicon |
R1-ah-18512 AI: 5.1.8 |
available | [WTS] [JSN] | |||
R1-1709980 | Subcarrier mapping for LTE-NR coexistence | other | Huawei, HiSilicon |
R1-ah-18512 AI: 5.1.8 |
noted | [WTS] [JSN] | |||
R1-1709981 | TRP-to-TRP measurement for cross-link interference mitigation | other | Huawei, HiSilicon |
R1-ah-18512 AI: 5.1.6.1 |
available | [WTS] [JSN] | |||
R1-1709982 | UE-to-UE measurement for cross-link interference mitigation | other | Huawei, HiSilicon |
R1-ah-18512 AI: 5.1.6.1 |
noted | [WTS] [JSN] | |||
R1-1709983 | UL Power control for cross-link interference mitigation | other | Huawei, HiSilicon |
R1-ah-18512 AI: 5.1.6.2 |
available | [WTS] [JSN] | |||
R1-1709984 | On pre-emption indication for DL multiplexing of URLLC and eMBB | other | Huawei, HiSilicon |
R1-ah-18512 AI: 5.1.3.3.7.1 |
available | [WTS] [JSN] | |||
R1-1709985 | PDSCH reliability for URLLC | other | Huawei, HiSilicon |
R1-ah-18512 AI: 5.1.3.3.8 |
available | [WTS] [JSN] | |||
R1-1709986 | PDCCH reliability for URLLC | other | Huawei, HiSilicon |
R1-ah-18512 AI: 5.1.3.1.6 |
available | [WTS] [JSN] | |||
R1-1709987 | Discussion on URLLC numerology | other | Huawei, HiSilicon |
R1-ah-18512 AI: 5.1.3.3.8 |
available | [WTS] [JSN] | |||
R1-1709988 | Discussion on UL multiplexing of grant-based eMBB and grant-free URLLC | other | Huawei, HiSilicon |
R1-ah-18512 AI: 5.1.3.3.7.2 |
available | [WTS] [JSN] | |||
R1-1709989 | Discussion on UCI feedback for URLLC | other | Huawei, HiSilicon |
R1-ah-18512 AI: 5.1.3.2.5 |
available | [WTS] [JSN] | |||
R1-1709990 | Link adaption for URLLC transmission | other | Huawei, HiSilicon |
R1-ah-18512 AI: 5.1.3.3.8 |
available | [WTS] [JSN] | |||
R1-1709991 | Resource configuration on UL transmission without grant | other | Huawei, HiSilicon |
R1-ah-18512 AI: 5.1.3.3.3 |
available | [WTS] [JSN] | |||
R1-1709992 | UE identification and HARQ combining for grant-free transmissions | other | Huawei, HiSilicon |
R1-ah-18512 AI: 5.1.3.3.3 |
available | [WTS] [JSN] | |||
R1-1709993 | UE procedure of PDCCH monitoring for URLLC | other | Huawei, HiSilicon |
R1-ah-18512 AI: 5.1.3.1.5 |
available | [WTS] [JSN] | |||
R1-1709994 | Discussion on data transmission duration | other | Huawei, HiSilicon |
R1-ah-18512 AI: 5.1.3.3.1.2 |
available | [WTS] [JSN] | |||
R1-1709995 | Polar code construction | other | Huawei, HiSilicon |
R1-ah-18512 AI: 5.1.4.2.1 |
available | [WTS] [JSN] | |||
R1-1709996 | Parity check bits for Polar code | other | Huawei, HiSilicon |
R1-ah-18512 AI: 5.1.4.2.1 |
noted | [WTS] [JSN] | |||
R1-1709997 | Early termination for Polar code | other | Huawei, HiSilicon |
R1-ah-18512 AI: 5.1.4.2.1 |
noted | [WTS] [JSN] | |||
R1-1709998 | Polar code for very small block length | other | Huawei, HiSilicon |
R1-ah-18512 AI: 5.1.4.2.1 |
noted | [WTS] [JSN] | |||
R1-1709999 | Interleaver design for Polar code | other | Huawei, HiSilicon |
R1-ah-18512 AI: 5.1.4.2.3 |
available | [WTS] [JSN] | |||
R1-1710000 | Nested sequence for Polar code | other | Huawei, HiSilicon |
R1-ah-18512 AI: 5.1.4.2.2 |
noted | [WTS] [JSN] | |||
R1-1710001 | Rate matching for Polar code |
other revised to R1-1711702 |
Huawei, HiSilicon |
R1-ah-18512 AI: 5.1.4.2.3 |
revised | [WTS] [JSN] | |||
R1-1710002 | Support of implicit soft combining for PBCH by Polar code construction |
other revised to R1-1711703 |
Huawei, HiSilicon |
R1-ah-18512 AI: 5.1.4.3 |
revised | [WTS] [JSN] | |||
R1-1710003 | Channel coding chain for control channel | other | Huawei, HiSilicon |
R1-ah-18512 AI: 5.1.4.2.3 |
available | [WTS] [JSN] | |||
R1-1710004 | Channel coding for URLLC | other | Huawei, HiSilicon |
R1-ah-18512 AI: 5.1.4.3 |
available | [WTS] [JSN] | |||
R1-1710005 | Considerations on timing advance design in NR | other | Huawei, HiSilicon |
R1-ah-18512 AI: 5.1.2.2.3 |
available | [WTS] [JSN] | |||
R1-1710006 | Discussion and evaluation on NR-PBCH design | other | Huawei, HiSilicon |
R1-ah-18512 AI: 5.1.1.2.2 |
available | [WTS] [JSN] | |||
R1-1710007 | DMRS for NR-PBCH | other | Huawei, HiSilicon |
R1-ah-18512 AI: 5.1.1.2.3 |
available | [WTS] [JSN] | |||
R1-1710008 | PRACH preamble format details for long/short sequence length | other | Huawei, HiSilicon |
R1-ah-18512 AI: 5.1.1.4.1 |
available | [WTS] [JSN] | |||
R1-1710009 | Multiplexing different types of DL RS | other | Huawei, HiSilicon |
R1-ah-18512 AI: 5.1.2.4.1 |
available | [WTS] [JSN] | |||
R1-1710010 | Multiplexing different types of UL RS | other | Huawei, HiSilicon |
R1-ah-18512 AI: 5.1.2.4.1 |
available | [WTS] [JSN] | |||
R1-1710011 | Overview of PDCCH-CCE-REG mapping and REG bundling | other | Huawei, HiSilicon |
R1-ah-18512 AI: 5.1.3.1.1.1 |
available | [WTS] [JSN] | |||
R1-1710012 | Multi-beam operation for PDCCH | other | Huawei, HiSilicon |
R1-ah-18512 AI: 5.1.3.1.2.3 |
available | [WTS] [JSN] | |||
R1-1710013 | Support of long-PUCCH over multiple slots | other | Huawei, HiSilicon |
R1-ah-18512 AI: 5.1.3.2.2.3 |
available | [WTS] [JSN] | |||
R1-1710014 | Evaluation of UE identification for UL transmission without grant | discussion | ZTE |
R1-ah-18512 AI: 5.1.3.3.3 |
available | [WTS] [JSN] | |||
R1-1710015 | Considerations on the procedures of UL data transmission without grant | discussion | ZTE |
R1-ah-18512 AI: 5.1.3.3.3 |
available | [WTS] [JSN] | |||
R1-1710016 | Repetition/hopping related design and reliablity evaluations for grant-free URLLC | discussion | ZTE |
R1-ah-18512 AI: 5.1.3.3.8 |
available | [WTS] [JSN] | |||
R1-1710017 | CBG construction | discussion | ZTE |
R1-ah-18512 AI: 5.1.3.3.4.1 |
available | [WTS] [JSN] | |||
R1-1710018 | DL control for CBG | discussion | ZTE |
R1-ah-18512 AI: 5.1.3.3.4.2 |
available | [WTS] [JSN] | |||
R1-1710019 | UL control for CBG | discussion | ZTE |
R1-ah-18512 AI: 5.1.3.3.4.3 |
available | [WTS] [JSN] | |||
R1-1710020 | Consideration about CBG soft-buffer management | discussion | ZTE |
R1-ah-18512 AI: 5.1.3.3.6.2 |
available | [WTS] [JSN] | |||
R1-1710021 | Advantages of Underlay Scheduling Request method over PUCCH-based SR | other | Idaho National Laboratory | FS_NR_newRAT | Rel-15 |
R1-ah-18512 AI: 5.1.3.3.2 |
available | [WTS] [JSN] | |
R1-1710022 | Remaining detail of NR-PSS and NR-SSS Sequence Design and RE mapping | discussion | CATT |
R1-ah-18512 AI: 5.1.1.1.1 |
available | [WTS] [JSN] | |||
R1-1710023 | SS Burst Set Composition and SS Block Configuration | discussion | CATT |
R1-ah-18512 AI: 5.1.1.1.2 |
available | [WTS] [JSN] | |||
R1-1710024 | SS-block time index indication | discussion | CATT |
R1-ah-18512 AI: 5.1.1.1.3 |
available | [WTS] [JSN] | |||
R1-1710025 | Multiple SS block Transmission in wideband | discussion | CATT |
R1-ah-18512 AI: 5.1.1.1.4 |
available | [WTS] [JSN] | |||
R1-1710026 | NR PBCH Contents and Payload Size | discussion | CATT |
R1-ah-18512 AI: 5.1.1.2.1 |
available | [WTS] [JSN] | |||
R1-1710027 | NR PBCH RE mapping in SS Block | discussion | CATT |
R1-ah-18512 AI: 5.1.1.2.2 |
available | [WTS] [JSN] | |||
R1-1710028 | NR PBCH DM RS sequence design and RE mapping | discussion | CATT |
R1-ah-18512 AI: 5.1.1.2.3 |
available | [WTS] [JSN] | |||
R1-1710029 | RMSI Delivery | discussion | CATT |
R1-ah-18512 AI: 5.1.1.2.4 |
available | [WTS] [JSN] | |||
R1-1710030 | Delivery of Other System Information | discussion | CATT |
R1-ah-18512 AI: 5.1.1.2.5 |
available | [WTS] [JSN] | |||
R1-1710031 | NR Paging Channel | discussion | CATT |
R1-ah-18512 AI: 5.1.1.3 |
available | [WTS] [JSN] | |||
R1-1710032 | NR RACH Long and Short Preamble Sequence Length | discussion | CATT |
R1-ah-18512 AI: 5.1.1.4.1 |
available | [WTS] [JSN] | |||
R1-1710033 | NR RACH Preamble Format for capacity enhancement, |
discussion revised to R1-1711618 |
CATT |
R1-ah-18512 AI: 5.1.1.4.2 |
revised | [WTS] [JSN] | |||
R1-1710034 | RACH power control and power ramping procedure |
discussion revised to R1-1711617 |
CATT |
R1-ah-18512 AI: 5.1.1.4.3 |
revised | [WTS] [JSN] | |||
R1-1710035 | Further details on NR 4-step RA Procedure | discussion | CATT |
R1-ah-18512 AI: 5.1.1.4.4 |
available | [WTS] [JSN] | |||
R1-1710036 | IDLE and CONNECTED mode UE mobility based on SS-block measurements | discussion | CATT |
R1-ah-18512 AI: 5.1.1.5.1 |
available | [WTS] [JSN] | |||
R1-1710037 | L3 Mobility based on CSI-RS based measurments |
discussion revised to R1-1711576 |
CATT |
R1-ah-18512 AI: 5.1.1.5.2 |
revised | [WTS] [JSN] | |||
R1-1710038 | NR Radio Link Monitoring | discussion | CATT |
R1-ah-18512 AI: 5.1.1.5.3 |
available | [WTS] [JSN] | |||
R1-1710039 | Support of interference management schemes in duplexing flexbility | discussion | CATT |
R1-ah-18512 AI: 5.1.6.1 |
noted | [WTS] [JSN] | |||
R1-1710040 | NR wider bandwidth operation | discussion | CATT |
R1-ah-18512 AI: 5.1.7 |
available | [WTS] [JSN] | |||
R1-1710041 | Support of UL carrier sharing between NR-LTE | discussion | CATT |
R1-ah-18512 AI: 5.1.8 |
available | [WTS] [JSN] | |||
R1-1710042 | Power Sharing Mechanism | discussion | CATT |
R1-ah-18512 AI: 5.1.9.1 |
noted | [WTS] [JSN] | |||
R1-1710043 | NR Power Control Framework | discussion | CATT |
R1-ah-18512 AI: 5.1.9.2 |
available | [WTS] [JSN] | |||
R1-1710044 | Consideration on CRC attachment for eMBB data | discussion | CATT |
R1-ah-18512 AI: 5.1.4.1.1.1 |
available | [WTS] [JSN] | |||
R1-1710045 | IR-HARQ scheme for NR LDPC codes | discussion | CATT |
R1-ah-18512 AI: 5.1.4.1.1.3 |
noted | [WTS] [JSN] | |||
R1-1710046 | LDPC design for eMBB data |
discussion revised to R1-1711669 |
CATT |
R1-ah-18512 AI: 5.1.4.1.2 |
revised | [WTS] [JSN] | |||
R1-1710047 | Offset optimization for NR LDPC | discussion | CATT |
R1-ah-18512 AI: 5.1.4.1.2 |
available | [WTS] [JSN] | |||
R1-1710048 | Polar codes construction for NR control channel | discussion | CATT |
R1-ah-18512 AI: 5.1.4.2.1 |
noted | [WTS] [JSN] | |||
R1-1710049 | Discussion on Polar codes for PBCH |
discussion revised to R1-1711575 |
CATT |
R1-ah-18512 AI: 5.1.4.3 |
revised | [WTS] [JSN] | |||
R1-1710050 | On codeword mapping | discussion | CATT |
R1-ah-18512 AI: 5.1.2.1.1 |
available | [WTS] [JSN] | |||
R1-1710051 | Considerations on codebook based UL transmission | discussion | CATT |
R1-ah-18512 AI: 5.1.2.1.2 |
noted | [WTS] [JSN] | |||
R1-1710052 | On non-codebook based UL transmission | discussion | CATT |
R1-ah-18512 AI: 5.1.2.1.3 |
available | [WTS] [JSN] | |||
R1-1710053 | Considerations on transmission diversity scheme in UL | discussion | CATT |
R1-ah-18512 AI: 5.1.2.1.4 |
available | [WTS] [JSN] | |||
R1-1710054 | PRB bundling for DL transmission | discussion | CATT |
R1-ah-18512 AI: 5.1.2.1.5 |
available | [WTS] [JSN] | |||
R1-1710055 | Considerations on multi-panel/multi-TRP transmission | discussion | CATT |
R1-ah-18512 AI: 5.1.2.1.6 |
available | [WTS] [JSN] | |||
R1-1710056 | Further consideration on downlink beam management | discussion | CATT |
R1-ah-18512 AI: 5.1.2.2.1 |
available | [WTS] [JSN] | |||
R1-1710057 | Considerations on UL beam management | discussion | CATT |
R1-ah-18512 AI: 5.1.2.2.1 |
available | [WTS] [JSN] | |||
R1-1710058 | Consideration on DL beam failure and recovery | discussion | CATT |
R1-ah-18512 AI: 5.1.2.2.2 |
available | [WTS] [JSN] | |||
R1-1710059 | Summary of email discussion [89-17] NR CSI framework | discussion | CATT |
R1-ah-18512 AI: 5.1.2.3.1 |
noted | [WTS] [JSN] | |||
R1-1710060 | Views on CSI framework | discussion | CATT |
R1-ah-18512 AI: 5.1.2.3.1 |
available | [WTS] [JSN] | |||
R1-1710061 | Discussion on details of CSI acquisition | discussion | CATT |
R1-ah-18512 AI: 5.1.2.3.2 |
available | [WTS] [JSN] | |||
R1-1710062 | Views on reciprocity based CSI acquisition | discussion | CATT |
R1-ah-18512 AI: 5.1.2.3.3 |
available | [WTS] [JSN] | |||
R1-1710063 | Discussion on periodic and aperiodic CSI feedback | discussion | CATT |
R1-ah-18512 AI: 5.1.2.3.4 |
available | [WTS] [JSN] | |||
R1-1710064 | Discussion on RS multiplexing | discussion | CATT |
R1-ah-18512 AI: 5.1.2.4.1 |
noted | [WTS] [JSN] | |||
R1-1710065 | Design of CSI-RS for CSI acquisition | discussion | CATT |
R1-ah-18512 AI: 5.1.2.4.2 |
available | [WTS] [JSN] | |||
R1-1710066 | Design of CSI-RS for beam management | discussion | CATT |
R1-ah-18512 AI: 5.1.2.4.2 |
available | [WTS] [JSN] | |||
R1-1710067 | On DMRS design for DL | discussion | CATT |
R1-ah-18512 AI: 5.1.2.4.3 |
available | [WTS] [JSN] | |||
R1-1710068 | On DMRS design for UL | discussion | CATT |
R1-ah-18512 AI: 5.1.2.4.3 |
available | [WTS] [JSN] | |||
R1-1710069 | Considerations on RS for phase tracking | discussion | CATT |
R1-ah-18512 AI: 5.1.2.4.4 |
available | [WTS] [JSN] | |||
R1-1710070 | Further considerations on SRS design | discussion | CATT |
R1-ah-18512 AI: 5.1.2.4.5 |
available | [WTS] [JSN] | |||
R1-1710071 | On QCL for NR | discussion | CATT |
R1-ah-18512 AI: 5.1.2.4.7 |
available | [WTS] [JSN] | |||
R1-1710072 | System level calibration results for NR MIMO | discussion | CATT |
R1-ah-18512 AI: 5.1.2.5 |
available | [WTS] [JSN] | |||
R1-1710073 | Link level calibration results for NR MIMO | discussion | CATT |
R1-ah-18512 AI: 5.1.2.5 |
available | [WTS] [JSN] | |||
R1-1710074 | NR-PDCCH mapping structure | discussion | CATT |
R1-ah-18512 AI: 5.1.3.1.1.1 |
available | [WTS] [JSN] | |||
R1-1710075 | Further details of NR-PDCCH RS structure | discussion | CATT |
R1-ah-18512 AI: 5.1.3.1.1.2 |
available | [WTS] [JSN] | |||
R1-1710076 | Configuration aspects of the NR-PDCCH | discussion | CATT |
R1-ah-18512 AI: 5.1.3.1.2.1 |
available | [WTS] [JSN] | |||
R1-1710077 | Search space design for NR-PDCCH | discussion | CATT |
R1-ah-18512 AI: 5.1.3.1.2.2 |
available | [WTS] [JSN] | |||
R1-1710078 | Discussion on multi-beam operation for NR-PDCCH | discussion | CATT |
R1-ah-18512 AI: 5.1.3.1.2.3 |
available | [WTS] [JSN] | |||
R1-1710079 | Flexible reuse of DL control resources for data transmission | discussion | CATT |
R1-ah-18512 AI: 5.1.3.1.3 |
available | [WTS] [JSN] | |||
R1-1710080 | Channel structure for group-common PDCCH | discussion | CATT |
R1-ah-18512 AI: 5.1.3.1.4.1 |
available | [WTS] [JSN] | |||
R1-1710081 | Contents of the group-common PDCCH | discussion | CATT |
R1-ah-18512 AI: 5.1.3.1.4.2 |
available | [WTS] [JSN] | |||
R1-1710082 | Configuration and monitoring of the group-common PDCCH | discussion | CATT |
R1-ah-18512 AI: 5.1.3.1.4.3 |
available | [WTS] [JSN] | |||
R1-1710083 | Short PUCCH for small UCI payloads |
discussion revised to R1-1711603 |
CATT |
R1-ah-18512 AI: 5.1.3.2.1.1 |
revised | [WTS] [JSN] | |||
R1-1710084 | Short PUCCH for moderate and large UCI payloads | discussion | CATT |
R1-ah-18512 AI: 5.1.3.2.1.2 |
available | [WTS] [JSN] | |||
R1-1710085 | Long PUCCH for small UCI payloads | discussion | CATT |
R1-ah-18512 AI: 5.1.3.2.2.1 |
available | [WTS] [JSN] | |||
R1-1710086 | Long PUCCH for moderate and large UCI payloads | discussion | CATT |
R1-ah-18512 AI: 5.1.3.2.2.2 |
available | [WTS] [JSN] | |||
R1-1710087 | Design of multi-slot PUCCH transmission | discussion | CATT |
R1-ah-18512 AI: 5.1.3.2.2.3 |
available | [WTS] [JSN] | |||
R1-1710088 | Further discussion on PUCCH resource allocation | discussion | CATT |
R1-ah-18512 AI: 5.1.3.2.4 |
available | [WTS] [JSN] | |||
R1-1710089 | Multiplexing of UCI and UL data on PUSCH | discussion | CATT |
R1-ah-18512 AI: 5.1.3.2.5.1 |
available | [WTS] [JSN] | |||
R1-1710090 | Simultaneous PUCCH-PUSCH transmission in NR | discussion | CATT |
R1-ah-18512 AI: 5.1.3.2.5.2 |
available | [WTS] [JSN] | |||
R1-1710091 | NR DL/UL frequency domain resource allocation | discussion | CATT |
R1-ah-18512 AI: 5.1.3.3.1.1 |
available | [WTS] [JSN] | |||
R1-1710092 | NR DL/UL time domain resource allocation | discussion | CATT |
R1-ah-18512 AI: 5.1.3.3.1.2 |
available | [WTS] [JSN] | |||
R1-1710093 | Further details of grant-based UL transmission | discussion | CATT |
R1-ah-18512 AI: 5.1.3.3.2 |
available | [WTS] [JSN] | |||
R1-1710094 | Grant-free UL transmission procedure | discussion | CATT |
R1-ah-18512 AI: 5.1.3.3.3 |
available | [WTS] [JSN] | |||
R1-1710095 | Details of CBG construction | discussion | CATT |
R1-ah-18512 AI: 5.1.3.3.4.1 |
available | [WTS] [JSN] | |||
R1-1710096 | DL control signaling design for CBG-based operation | discussion | CATT |
R1-ah-18512 AI: 5.1.3.3.4.2 |
available | [WTS] [JSN] | |||
R1-1710097 | UL control signaling design for CBG-based operation | discussion | CATT |
R1-ah-18512 AI: 5.1.3.3.4.3 |
available | [WTS] [JSN] | |||
R1-1710098 | NR HARQ-ACK multiplexing | discussion | CATT |
R1-ah-18512 AI: 5.1.3.3.5.2 |
available | [WTS] [JSN] | |||
R1-1710099 | Discussion on number of HARQ processes and HARQ RTT | discussion | CATT |
R1-ah-18512 AI: 5.1.3.3.6.1 |
available | [WTS] [JSN] | |||
R1-1710100 | Soft buffer management for NR | discussion | CATT |
R1-ah-18512 AI: 5.1.3.3.6.2 |
available | [WTS] [JSN] | |||
R1-1710101 | Further design considerations for DL pre-emption indication | discussion | CATT |
R1-ah-18512 AI: 5.1.3.3.7.1 |
available | [WTS] [JSN] | |||
R1-1710102 | Scheduling and HARQ support for NR CA | discussion | CATT |
R1-ah-18512 AI: 5.1.3.4.1.1 |
available | [WTS] [JSN] | |||
R1-1710103 | Scheduling and HARQ support for NR DC | discussion | CATT |
R1-ah-18512 AI: 5.1.3.4.2 |
available | [WTS] [JSN] | |||
R1-1710104 | CCE mapping with REG bundling | discussion | ZTE |
R1-ah-18512 AI: 5.1.3.1.1.1 |
available | [WTS] [JSN] | |||
R1-1710105 | Issues regarding DMRS structure and mapping | discussion | ZTE |
R1-ah-18512 AI: 5.1.3.1.1.2 |
available | [WTS] [JSN] | |||
R1-1710106 | NR-PDCCH CORESET configuration | discussion | ZTE |
R1-ah-18512 AI: 5.1.3.1.2.1 |
available | [WTS] [JSN] | |||
R1-1710107 | Search space design for NR-PDCCH | discussion | ZTE |
R1-ah-18512 AI: 5.1.3.1.2.2 |
available | [WTS] [JSN] | |||
R1-1710108 | Supporting Multi-beam in NR-PDCCH | discussion | ZTE |
R1-ah-18512 AI: 5.1.3.1.2.3 |
available | [WTS] [JSN] | |||
R1-1710109 | Resource sharing between PDCCH and PDSCH | discussion | ZTE |
R1-ah-18512 AI: 5.1.3.1.3 |
available | [WTS] [JSN] | |||
R1-1710110 | Group-common PDCCH design consideration | discussion | ZTE |
R1-ah-18512 AI: 5.1.3.1.4.2 |
available | [WTS] [JSN] | |||
R1-1710111 | NR-PDCCH for supporting URLLC | discussion | ZTE |
R1-ah-18512 AI: 5.1.3.1.5 |
available | [WTS] [JSN] | |||
R1-1710112 | On short PUCCH for up to 2 bits UCI | discussion | ZTE |
R1-ah-18512 AI: 5.1.3.2.1.1 |
available | [WTS] [JSN] | |||
R1-1710113 | On short-PUCCH for more than 2 bits | discussion | ZTE |
R1-ah-18512 AI: 5.1.3.2.1.2 |
available | [WTS] [JSN] | |||
R1-1710114 | On long-PUCCH for up to 2 bits | discussion | ZTE |
R1-ah-18512 AI: 5.1.3.2.2.1 |
available | [WTS] [JSN] | |||
R1-1710115 | On long-PUCCH for more than 2 bits | discussion | ZTE |
R1-ah-18512 AI: 5.1.3.2.2.2 |
available | [WTS] [JSN] | |||
R1-1710116 | Consideration on long-PUCCH over slots | discussion | ZTE |
R1-ah-18512 AI: 5.1.3.2.2.3 |
available | [WTS] [JSN] | |||
R1-1710117 | NR PUCCH resource allocation | discussion | ZTE |
R1-ah-18512 AI: 5.1.3.2.4 |
available | [WTS] [JSN] | |||
R1-1710118 | UCI multiplexing on PUSCH | discussion | ZTE |
R1-ah-18512 AI: 5.1.3.2.5.1 |
available | [WTS] [JSN] | |||
R1-1710119 | Multiplexing of PUSCH and short PUCCH | discussion | ZTE |
R1-ah-18512 AI: 5.1.3.2.5.2 |
available | [WTS] [JSN] | |||
R1-1710120 | Analysis of URLLC reliability for uplink control channel | discussion | ZTE |
R1-ah-18512 AI: 5.1.3.2.6 |
available | [WTS] [JSN] | |||
R1-1710121 | Resource allocation in frequency domain | discussion | ZTE |
R1-ah-18512 AI: 5.1.3.3.1.1 |
available | [WTS] [JSN] | |||
R1-1710122 | On scheduling request in NR | discussion | ZTE |
R1-ah-18512 AI: 5.1.3.3.2 |
available | [WTS] [JSN] | |||
R1-1710123 | DL pre-emption indication | discussion | ZTE |
R1-ah-18512 AI: 5.1.3.3.7.1 |
available | [WTS] [JSN] | |||
R1-1710124 | Uplink multiplexing for different transmission durations | discussion | ZTE |
R1-ah-18512 AI: 5.1.3.3.7.2 |
available | [WTS] [JSN] | |||
R1-1710125 | Supporting Ultra reliability in scheduling | discussion | ZTE |
R1-ah-18512 AI: 5.1.3.3.8 |
available | [WTS] [JSN] | |||
R1-1710126 | Resource allocation for wideband operation | discussion | ZTE |
R1-ah-18512 AI: 5.1.7 |
available | [WTS] [JSN] | |||
R1-1710127 | Viewpoint on NR CLI Management for Duplexing Work Plan | discussion | ZTE |
R1-ah-18512 AI: 5.1.6 |
noted | [WTS] [JSN] | |||
R1-1710128 | UE-to-UE measurement as an enabler for CLI mitigation schemes | discussion | ZTE |
R1-ah-18512 AI: 5.1.6.1 |
noted | [WTS] [JSN] | |||
R1-1710129 | Channel sensing based schemes for cross-link interference mitigation in NR | discussion | ZTE |
R1-ah-18512 AI: 5.1.6.1 |
available | [WTS] [JSN] | |||
R1-1710130 | TRP-to-TRP measurement as an enabler for CLI mitigation schemes | discussion | ZTE |
R1-ah-18512 AI: 5.1.6.2 |
available | [WTS] [JSN] | |||
R1-1710131 | Discussion on design of SS block | discussion | Guangdong OPPO Mobile Telecom. |
R1-ah-18512 AI: 5.1.1.1.2 |
available | [WTS] [JSN] | |||
R1-1710132 | Discussion on the timing indication of SS block | discussion | Guangdong OPPO Mobile Telecom. |
R1-ah-18512 AI: 5.1.1.1.3 |
available | [WTS] [JSN] | |||
R1-1710133 | Remaining details on multiple SS block transmissions in wideband CC | discussion | Guangdong OPPO Mobile Telecom. |
R1-ah-18512 AI: 5.1.1.1.4 |
available | [WTS] [JSN] | |||
R1-1710134 | Discussion on the numerology of the RMSI | discussion | Guangdong OPPO Mobile Telecom. |
R1-ah-18512 AI: 5.1.1.2.4 |
available | [WTS] [JSN] | |||
R1-1710135 | Discussion on the on-demand SI | discussion | Guangdong OPPO Mobile Telecom. |
R1-ah-18512 AI: 5.1.1.2.5 |
available | [WTS] [JSN] | |||
R1-1710136 | On NR paging design and transmission | discussion | Guangdong OPPO Mobile Telecom. |
R1-ah-18512 AI: 5.1.1.3 |
available | [WTS] [JSN] | |||
R1-1710137 | Discussion on Power ramping and power control during RA procedure | discussion | Guangdong OPPO Mobile Telecom. |
R1-ah-18512 AI: 5.1.1.4.3 |
available | [WTS] [JSN] | |||
R1-1710138 | NR 4-Step Random Access Procedure | discussion | Guangdong OPPO Mobile Telecom. |
R1-ah-18512 AI: 5.1.1.4.4 |
available | [WTS] [JSN] | |||
R1-1710139 | On RRM measurement based on SS block | discussion | Guangdong OPPO Mobile Telecom. |
R1-ah-18512 AI: 5.1.1.5.1 |
available | [WTS] [JSN] | |||
R1-1710140 | On uplink codebook design | discussion | Guangdong OPPO Mobile Telecom. |
R1-ah-18512 AI: 5.1.2.1.2 |
available | [WTS] [JSN] | |||
R1-1710141 | Considerations on the multi-TRP/Multi-pannel design to support the reception of multiple PDCCH | discussion | Guangdong OPPO Mobile Telecom. |
R1-ah-18512 AI: 5.1.2.1.6 |
available | [WTS] [JSN] | |||
R1-1710142 | Discussion on the DL Beam Management | discussion | Guangdong OPPO Mobile Telecom. |
R1-ah-18512 AI: 5.1.2.2.1 |
available | [WTS] [JSN] | |||
R1-1710143 | Discussion on the UL Beam Management | discussion | Guangdong OPPO Mobile Telecom. |
R1-ah-18512 AI: 5.1.2.2.1 |
available | [WTS] [JSN] | |||
R1-1710144 | On Beam Recovery Mechanism | discussion | Guangdong OPPO Mobile Telecom. |
R1-ah-18512 AI: 5.1.2.2.2 |
available | [WTS] [JSN] | |||
R1-1710145 | Beam association relationship between data and control channels | discussion | Guangdong OPPO Mobile Telecom. |
R1-ah-18512 AI: 5.1.2.2.3 |
available | [WTS] [JSN] | |||
R1-1710146 | Disussion on CSI-RS design for beam management | discussion | Guangdong OPPO Mobile Telecom. |
R1-ah-18512 AI: 5.1.2.4.2 |
available | [WTS] [JSN] | |||
R1-1710147 | On SRS design for NR | discussion | Guangdong OPPO Mobile Telecom. |
R1-ah-18512 AI: 5.1.2.4.5 |
available | [WTS] [JSN] | |||
R1-1710148 | NR-PDCCH CCE-to-REG mapping with REG bundling | discussion | Guangdong OPPO Mobile Telecom. |
R1-ah-18512 AI: 5.1.3.1.1.1 |
available | [WTS] [JSN] | |||
R1-1710149 | On NR PDCCH RS design | discussion | Guangdong OPPO Mobile Telecom. |
R1-ah-18512 AI: 5.1.3.1.1.2 |
available | [WTS] [JSN] | |||
R1-1710150 | PDCCH CORESET configuration and UE procedure on NR-PDCCH monitoring | discussion | Guangdong OPPO Mobile Telecom. |
R1-ah-18512 AI: 5.1.3.1.2.1 |
available | [WTS] [JSN] | |||
R1-1710151 | NR PDCCH search space design with nested structure | discussion | Guangdong OPPO Mobile Telecom. |
R1-ah-18512 AI: 5.1.3.1.2.2 |
available | [WTS] [JSN] | |||
R1-1710152 | Search space design consideration for NR PDCCH with BF | discussion | Guangdong OPPO Mobile Telecom. |
R1-ah-18512 AI: 5.1.3.1.2.3 |
available | [WTS] [JSN] | |||
R1-1710153 | On resource sharing between PDCCH and PDSCH | discussion | Guangdong OPPO Mobile Telecom. |
R1-ah-18512 AI: 5.1.3.1.3 |
available | [WTS] [JSN] | |||
R1-1710154 | Impact on common channel reception to PDCCH design | discussion | Guangdong OPPO Mobile Telecom. |
R1-ah-18512 AI: 5.1.3.1.4.3 |
available | [WTS] [JSN] | |||
R1-1710155 | DL control channel design for URLLC | discussion | Guangdong OPPO Mobile Telecom. |
R1-ah-18512 AI: 5.1.3.1.5 |
available | [WTS] [JSN] | |||
R1-1710156 | Discussion on short PUCCH for up to 2 UCI bits | discussion | Guangdong OPPO Mobile Telecom. |
R1-ah-18512 AI: 5.1.3.2.1.1 |
available | [WTS] [JSN] | |||
R1-1710157 | Discussion on short PUCCH for more than 2 UCI bits | discussion | Guangdong OPPO Mobile Telecom. |
R1-ah-18512 AI: 5.1.3.2.1.2 |
available | [WTS] [JSN] | |||
R1-1710158 | Discussion on long PUCCH for up to 2 UCI bits | discussion | Guangdong OPPO Mobile Telecom. |
R1-ah-18512 AI: 5.1.3.2.2.1 |
available | [WTS] [JSN] | |||
R1-1710159 | Slot aggregation and configuration for NR long PUCCH | discussion | Guangdong OPPO Mobile Telecom. |
R1-ah-18512 AI: 5.1.3.2.2.3 |
available | [WTS] [JSN] | |||
R1-1710160 | Design of NR PUCCH with long duration | discussion | Guangdong OPPO Mobile Telecom. |
R1-ah-18512 AI: 5.1.3.2.3 |
available | [WTS] [JSN] | |||
R1-1710161 | Resource indication for UL control channel | discussion | Guangdong OPPO Mobile Telecom. |
R1-ah-18512 AI: 5.1.3.2.4 |
available | [WTS] [JSN] | |||
R1-1710162 | On UCI and data multiplexing in PUSCH | discussion | Guangdong OPPO Mobile Telecom. |
R1-ah-18512 AI: 5.1.3.2.5.1 |
available | [WTS] [JSN] | |||
R1-1710163 | Multiplexing of short PUCCH and long PUCCH | discussion | Guangdong OPPO Mobile Telecom. |
R1-ah-18512 AI: 5.1.3.2.5.2 |
available | [WTS] [JSN] | |||
R1-1710164 | Bandwidth part configuration and frequency resource allocation | discussion | Guangdong OPPO Mobile Telecom. |
R1-ah-18512 AI: 5.1.3.3.1.1 |
available | [WTS] [JSN] | |||
R1-1710165 | Time-domain resource allocation for NR | discussion | Guangdong OPPO Mobile Telecom. |
R1-ah-18512 AI: 5.1.3.3.1.2 |
available | [WTS] [JSN] | |||
R1-1710166 | Discussion on the UL waveform indication | discussion | Guangdong OPPO Mobile Telecom. |
R1-ah-18512 AI: 5.1.3.3.2 |
available | [WTS] [JSN] | |||
R1-1710167 | HARQ for uplink grant-free transmission | discussion | Guangdong OPPO Mobile Telecom. |
R1-ah-18512 AI: 5.1.3.3.3 |
available | [WTS] [JSN] | |||
R1-1710168 | Discussion on CBG indication in DCI | discussion | Guangdong OPPO Mobile Telecom. |
R1-ah-18512 AI: 5.1.3.3.4.2 |
available | [WTS] [JSN] | |||
R1-1710169 | Discussion on HARQ-ACK feedback for CBG-based transmission | discussion | Guangdong OPPO Mobile Telecom. |
R1-ah-18512 AI: 5.1.3.3.4.3 |
available | [WTS] [JSN] | |||
R1-1710170 | Symbol-level resource allocation and pre-emption indication | discussion | Guangdong OPPO Mobile Telecom. |
R1-ah-18512 AI: 5.1.3.3.7.1 |
available | [WTS] [JSN] | |||
R1-1710171 | Bandwidth part based resource scheduling for carrier aggregation | discussion | Guangdong OPPO Mobile Telecom. |
R1-ah-18512 AI: 5.1.3.4.1.1 |
available | [WTS] [JSN] | |||
R1-1710172 | Discussion on UE specific RF bandwidth adaptation in NR | discussion | Guangdong OPPO Mobile Telecom. |
R1-ah-18512 AI: 5.1.7 |
available | [WTS] [JSN] | |||
R1-1710173 | Discussion on the NR-LTE self-interference issue | discussion | Guangdong OPPO Mobile Telecom. |
R1-ah-18512 AI: 5.1.8 |
noted | [WTS] [JSN] | |||
R1-1710174 | Uplink power control for NR | discussion | Guangdong OPPO Mobile Telecom. |
R1-ah-18512 AI: 5.1.9.2 |
noted | [WTS] [JSN] | |||
R1-1710175 | Codeword mapping and interleaving |
discussion revised to R1-1711606 |
ZTE |
R1-ah-18512 AI: 5.1.2.1.1 |
revised | [WTS] [JSN] | |||
R1-1710176 | Codebook based UL transmission | discussion | ZTE |
R1-ah-18512 AI: 5.1.2.1.2 |
available | [WTS] [JSN] | |||
R1-1710177 | Non-Codebook based and Hybrid based UL transmission | discussion | ZTE |
R1-ah-18512 AI: 5.1.2.1.3 |
noted | [WTS] [JSN] | |||
R1-1710178 | Diversity based uplink transmission schemes | discussion | ZTE |
R1-ah-18512 AI: 5.1.2.1.4 |
noted | [WTS] [JSN] | |||
R1-1710179 | On PRB Bundling | discussion | ZTE |
R1-ah-18512 AI: 5.1.2.1.5 |
available | [WTS] [JSN] | |||
R1-1710180 | Multi-TRP Transmission and interference coordination | discussion | ZTE |
R1-ah-18512 AI: 5.1.2.1.6 |
noted | [WTS] [JSN] | |||
R1-1710181 | Discussion on rate matching | discussion | ZTE |
R1-ah-18512 AI: 5.1.2.1.7 |
available | [WTS] [JSN] | |||
R1-1710182 | On transmission setting | discussion | ZTE |
R1-ah-18512 AI: 5.1.2.1.8 |
available | [WTS] [JSN] | |||
R1-1710183 | DL beam management for NR MIMO | discussion | ZTE |
R1-ah-18512 AI: 5.1.2.2.1 |
noted | [WTS] [JSN] | |||
R1-1710184 | UL beam management for NR MIMO | discussion | ZTE |
R1-ah-18512 AI: 5.1.2.2.1 |
available | [WTS] [JSN] | |||
R1-1710185 | Discussion on beam recovery mechanism | discussion | ZTE |
R1-ah-18512 AI: 5.1.2.2.2 |
available | [WTS] [JSN] | |||
R1-1710186 | Beam grouping evaluation for beam management | discussion | ZTE |
R1-ah-18512 AI: 5.1.2.2.3 |
noted | [WTS] [JSN] | |||
R1-1710187 | On CSI framework details |
discussion revised to R1-1711607 |
ZTE |
R1-ah-18512 AI: 5.1.2.3.1 |
revised | [WTS] [JSN] | |||
R1-1710188 | Details of CSI acquisition | discussion | ZTE |
R1-ah-18512 AI: 5.1.2.3.2 |
available | [WTS] [JSN] | |||
R1-1710189 | On reciprocity based CSI acquisition |
discussion revised to R1-1711608 |
ZTE |
R1-ah-18512 AI: 5.1.2.3.3 |
revised | [WTS] [JSN] | |||
R1-1710190 | CSI feedback mechanism on PUCCH | discussion | ZTE |
R1-ah-18512 AI: 5.1.2.3.4 |
noted | [WTS] [JSN] | |||
R1-1710191 | CSI feedback mechanism on PUSCH | discussion | ZTE |
R1-ah-18512 AI: 5.1.2.3.4 |
available | [WTS] [JSN] | |||
R1-1710192 | Overhead reduction for Type II CSI | discussion | ZTE |
R1-ah-18512 AI: 5.1.2.3.4 |
available | [WTS] [JSN] | |||
R1-1710193 | Discussion on multiplexing of different RSs | discussion | ZTE |
R1-ah-18512 AI: 5.1.2.4.1 |
noted | [WTS] [JSN] | |||
R1-1710194 | On CSI-RS for beam management | discussion | ZTE |
R1-ah-18512 AI: 5.1.2.4.2 |
available | [WTS] [JSN] | |||
R1-1710195 | On CSI-RS for CSI acquisition | discussion | ZTE |
R1-ah-18512 AI: 5.1.2.4.2 |
available | [WTS] [JSN] | |||
R1-1710196 | Discussion on downlink DMRS design | discussion | ZTE |
R1-ah-18512 AI: 5.1.2.4.3 |
noted | [WTS] [JSN] | |||
R1-1710197 | Evaluation results on DL DMRS | discussion | ZTE |
R1-ah-18512 AI: 5.1.2.4.3 |
available | [WTS] [JSN] | |||
R1-1710198 | Discussion on uplink DMRS design | discussion | ZTE |
R1-ah-18512 AI: 5.1.2.4.3 |
available | [WTS] [JSN] | |||
R1-1710199 | Discussion on RS for phase tracking | discussion | ZTE |
R1-ah-18512 AI: 5.1.2.4.4 |
available | [WTS] [JSN] | |||
R1-1710200 | Discussion on SRS design for NR | discussion | ZTE |
R1-ah-18512 AI: 5.1.2.4.5 |
available | [WTS] [JSN] | |||
R1-1710201 | Discussion on fine time/frequency tracking of channel | discussion | ZTE |
R1-ah-18512 AI: 5.1.2.4.6 |
available | [WTS] [JSN] | |||
R1-1710202 | QCL design for UL and DL MIMO | discussion | ZTE |
R1-ah-18512 AI: 5.1.2.4.7 |
noted | [WTS] [JSN] | |||
R1-1710203 | Calibration results for Phase 1 NR MIMO link level calibration | discussion | ZTE |
R1-ah-18512 AI: 5.1.2.5 |
withdrawn | [WTS] [JSN] | |||
R1-1710204 | Calibration results for Phase 1 NR MIMO system level calibration | discussion | ZTE |
R1-ah-18512 AI: 5.1.2.5 |
withdrawn | [WTS] [JSN] | |||
R1-1710205 | Calibration results for Phase 2 NR MIMO link level calibration | discussion | ZTE |
R1-ah-18512 AI: 5.1.2.5 |
withdrawn | [WTS] [JSN] | |||
R1-1710206 | Calibration results for Phase 2 NR MIMO system level calibration | discussion | ZTE |
R1-ah-18512 AI: 5.1.2.5 |
available | [WTS] [JSN] | |||
R1-1710207 | Calibration results for Phase 3 NR MIMO calibration | discussion | ZTE |
R1-ah-18512 AI: 5.1.2.5 |
available | [WTS] [JSN] | |||
R1-1710208 | Further clarification on Phase 3 NR MIMO calibration | discussion | ZTE |
R1-ah-18512 AI: 5.1.2.5 |
available | [WTS] [JSN] | |||
R1-1710209 | On NR power control | discussion | ZTE |
R1-ah-18512 AI: 5.1.9.2 |
available | [WTS] [JSN] | |||
R1-1710210 | On NR PHR calculation | discussion | ZTE |
R1-ah-18512 AI: 5.1.9.2 |
available | [WTS] [JSN] | |||
R1-1710211 | LS on SR design principles in NR |
LS in source LS: R2-1705867 LS To: RAN1 |
RAN2, Samsung | NR_newRAT-Core | Rel-15 |
R1-ah-18512 AI: 4 |
treated | [WTS] [JSN] | |
R1-1710212 | LS on UE measurement capabilities across LTE and NR |
LS in source LS: R2-1706140 LS To: RAN4 |
RAN2, NTT DOCOMO | NR_newRAT-Core | Rel-15 |
R1-ah-18512 AI: 4 |
treated | [WTS] [JSN] | |
R1-1710213 | LS on UE categories for NR and LTE-NR Dual Connectivity |
LS in source LS: R2-1706141 LS To: RAN, RAN1 |
RAN2, NTT DOCOMO | NR_newRAT-Core | Rel-15 |
R1-ah-18512 AI: 4 |
treated | [WTS] [JSN] | |
R1-1710214 | LS reply to SA2 on maximum data rate |
LS in LS is reply to S2-172398, R1-1706857 source LS: R2-1706155 LS To: SA2, RAN1 |
RAN2, MediaTek | EDCE5, 5GS_Ph1 | Rel-15 |
R1-ah-18512 AI: 4 |
treated | [WTS] [JSN] | |
R1-1710215 | Response LS on reading time index indication for RRM measurements |
LS in LS is reply to R1-1706707 source LS: R2-1706160 LS To: RAN1 |
RAN2, Intel | NR_newRAT-Core | Rel-15 |
R1-ah-18512 AI: 4 |
treated | [WTS] [JSN] | |
R1-1710216 | LS on Emergency Support in NR |
LS in source LS: S2-173700 LS To: RAN |
SA2, Nokia | 5GS_Ph1 | Rel-15 |
R1-ah-18512 AI: 4 |
treated | [WTS] [JSN] | |
R1-1710217 | LS on Support for fake gNB detection mechanisms |
LS in source LS: S3-171568 LS To: RAN1, RAN2, RAN4 |
SA3, Nokia | NR_newRAT-Core | Rel-15 |
R1-ah-18512 AI: 4 |
treated | [WTS] [JSN] | |
R1-1710218 | RACH transmission count | discussion | Mitsubishi Electric Co. |
R1-ah-18512 AI: 5.1.1.4.4 |
available | [WTS] [JSN] | |||
R1-1710219 | UL transmission power control | discussion | Mitsubishi Electric Co. |
R1-ah-18512 AI: 5.1.9.2 |
available | [WTS] [JSN] | |||
R1-1710220 | Reply LS on Emergency Support in NR |
LS in LS is reply to S2-173700 source LS: RP-171434 LS To: SA2 |
RAN, T-Mobile | 5GS_Ph1 | Rel-15 |
R1-ah-18512 AI: 4 |
treated | [WTS] [JSN] | |
R1-1710221 | Reply LS on UE categories for NR and LTE-NR Dual Connectivity |
LS in LS is reply to R2-1706141 source LS: RP-171480 LS To: RAN2, RAN1 |
RAN, NTT DOCOMO | NR_newRAT-Core | Rel-15 |
R1-ah-18512 AI: 4 |
treated | [WTS] [JSN] | |
R1-1710222 | Transmit diversity for DFTsOFDM-based PUCCH in long duration | discussion | Mitsubishi Electric RCE | Rel-15 |
R1-ah-18512 AI: 5.1.3.2.3 |
available | [WTS] [JSN] | ||
R1-1710223 | Discussion on timing indication based on SS block | discussion | Beijing Xinwei Telecom Techn. |
R1-ah-18512 AI: 5.1.1.1.3 |
available | [WTS] [JSN] | |||
R1-1710224 | Discussion and evaluation on SS block composition | discussion | Beijing Xinwei Telecom Techn. |
R1-ah-18512 AI: 5.1.1.2.2 |
available | [WTS] [JSN] | |||
R1-1710225 | Discussion and evaluation on DMRS design for NR-PBCH | discussion | Beijing Xinwei Telecom Techn. |
R1-ah-18512 AI: 5.1.1.2.3 |
available | [WTS] [JSN] | |||
R1-1710226 | Discussion on 2-symbol Short PUCCH with More Than 2 Bits | discussion | Beijing Xinwei Telecom Techn. |
R1-ah-18512 AI: 5.1.3.2.1.2 |
available | [WTS] [JSN] | |||
R1-1710227 | Further Discussion on PTRS Design Details | discussion | Beijing Xinwei Telecom Techn. |
R1-ah-18512 AI: 5.1.2.4.4 |
withdrawn | [WTS] [JSN] | |||
R1-1710228 | Further discussion on channel reciprocity and beam correspondence | discussion | MTI |
R1-ah-18512 AI: 5.1.2.2.3 |
available | [WTS] [JSN] | |||
R1-1710229 | [89-16] Email discussion on NR-PRACH preamble formats based on short sequence length |
discussion revised to R1-1711270 |
ZTE Corporation |
R1-ah-18512 AI: 5.1.1.4.1 |
revised | [WTS] [JSN] | |||
R1-1710230 | UL PTRS for DFTsOFDM waveform | discussion | Mitsubishi Electric RCE | Rel-15 |
R1-ah-18512 AI: 5.1.2.4.4 |
noted | [WTS] [JSN] | ||
R1-1710231 | Consideration on timing indication based on SS block | other | Fujitsu |
R1-ah-18512 AI: 5.1.1.1.3 |
available | [WTS] [JSN] | |||
R1-1710232 | Discussion on DMRS for NR-PBCH | other | Fujitsu |
R1-ah-18512 AI: 5.1.1.2.3 |
available | [WTS] [JSN] | |||
R1-1710233 | Discussion on the CORESET for RMSI delivery | other | Fujitsu |
R1-ah-18512 AI: 5.1.1.2.4 |
available | [WTS] [JSN] | |||
R1-1710234 | Discussion on 4-step RA procedure | other | Fujitsu |
R1-ah-18512 AI: 5.1.1.4.4 |
available | [WTS] [JSN] | |||
R1-1710235 | Discussion on multiple NR-PDCCHs in NC-JT scheme | other | Fujitsu |
R1-ah-18512 AI: 5.1.2.1.6 |
available | [WTS] [JSN] | |||
R1-1710236 | Discussion on beam failure recovery procedure | other | Fujitsu |
R1-ah-18512 AI: 5.1.2.2.2 |
available | [WTS] [JSN] | |||
R1-1710237 | PUCCH resource allocation | other | Fujitsu |
R1-ah-18512 AI: 5.1.3.2.4 |
available | [WTS] [JSN] | |||
R1-1710238 | Discussion on time domain resource allocation | other | Fujitsu |
R1-ah-18512 AI: 5.1.3.3.1.2 |
available | [WTS] [JSN] | |||
R1-1710239 | Discussions on HARQ for grant-free transmission | other | Fujitsu |
R1-ah-18512 AI: 5.1.3.3.3 |
available | [WTS] [JSN] | |||
R1-1710240 | Discussion on DL control signaling related to CBG based (re)-transmission | other | Fujitsu |
R1-ah-18512 AI: 5.1.3.3.4.2 |
available | [WTS] [JSN] | |||
R1-1710241 | Discussion on CBG based HARQ-ACK Design | other | Fujitsu |
R1-ah-18512 AI: 5.1.3.3.4.3 |
available | [WTS] [JSN] | |||
R1-1710242 | Discussion on HARQ-ACK codebook | other | Fujitsu |
R1-ah-18512 AI: 5.1.3.3.5.2 |
available | [WTS] [JSN] | |||
R1-1710243 | On eMBB and URLLC multiplexing for Uplink | other | Fujitsu |
R1-ah-18512 AI: 5.1.3.3.7.2 |
available | [WTS] [JSN] | |||
R1-1710244 | PRB indexing for RMSI in NR | discussion | NEC | NR_newRAT | Rel-15 |
R1-ah-18512 AI: 5.1.1.2.4 |
available | [WTS] [JSN] | |
R1-1710245 | Frequency-domain resource allocation schemes for NR | discussion | NEC | NR_newRAT | Rel-15 |
R1-ah-18512 AI: 5.1.3.3.1.1 |
available | [WTS] [JSN] | |
R1-1710246 | Time-domain resource allocation schemes for NR | discussion | NEC | NR_newRAT | Rel-15 |
R1-ah-18512 AI: 5.1.3.3.1.2 |
available | [WTS] [JSN] | |
R1-1710247 | Frequency hopping for NR UL PUSCH | discussion | NEC | NR_newRAT | Rel-15 |
R1-ah-18512 AI: 5.1.3.3.2 |
available | [WTS] [JSN] | |
R1-1710248 | UL data transmission without grant | discussion | NEC | NR_newRAT | Rel-15 |
R1-ah-18512 AI: 5.1.3.3.3 |
available | [WTS] [JSN] | |
R1-1710249 | PRB and RBG indexing within wider channel BW for NR | discussion | NEC | NR_newRAT | Rel-15 |
R1-ah-18512 AI: 5.1.7 |
available | [WTS] [JSN] | |
R1-1710250 | Discussion on UL sharing of NR and LTE | discussion | NEC | NR_newRAT | Rel-15 |
R1-ah-18512 AI: 5.1.8 |
noted | [WTS] [JSN] | |
R1-1710251 | Discussion on beam failure recovery request | discussion | NEC Corporation |
R1-ah-18512 AI: 5.1.2.2.2 |
available | [WTS] [JSN] | |||
R1-1710252 | Discussion on preamble transmitting power | discussion | NEC Corporation |
R1-ah-18512 AI: 5.1.1.4.3 |
withdrawn | [WTS] [JSN] | |||
R1-1710253 | Discussion on extending of scheduling request | discussion | NEC Corporation |
R1-ah-18512 AI: 5.1.3.2.1.2 |
withdrawn | [WTS] [JSN] | |||
R1-1710254 | Discussion on beam sweeping or beam changing of SR | discussion | NEC Corporation |
R1-ah-18512 AI: 5.1.3.2.3 |
withdrawn | [WTS] [JSN] | |||
R1-1710255 | Remaining details on DMRS ports and number of layers indication | discussion | NEC Corporation |
R1-ah-18512 AI: 5.1.2.1.1 |
available | [WTS] [JSN] | |||
R1-1710256 | CSI-RS design for beam management and interference measurement | discussion | NEC Corporation |
R1-ah-18512 AI: 5.1.2.4.2 |
available | [WTS] [JSN] | |||
R1-1710257 | Considerations on the design of DMRS | discussion | NEC Corporation |
R1-ah-18512 AI: 5.1.2.4.3 |
available | [WTS] [JSN] | |||
R1-1710258 | Remaining issue on SS Sequence Design | discussion | LG Electronics |
R1-ah-18512 AI: 5.1.1.1.1 |
available | [WTS] [JSN] | |||
R1-1710259 | Discussion on SS burst set composition | discussion | LG Electronics |
R1-ah-18512 AI: 5.1.1.1.2 |
available | [WTS] [JSN] | |||
R1-1710260 | Discussion on SS block time index indication | discussion | LG Electronics |
R1-ah-18512 AI: 5.1.1.1.3 |
available | [WTS] [JSN] | |||
R1-1710261 | Remaining issues on Multiple SS block transmissions in wideband CC | discussion | LG Electronics |
R1-ah-18512 AI: 5.1.1.1.4 |
available | [WTS] [JSN] | |||
R1-1710262 | Consideration on NR-PBCH contents and payload size | discussion | LG Electronics |
R1-ah-18512 AI: 5.1.1.2.1 |
available | [WTS] [JSN] | |||
R1-1710263 | Discussion on NR-PBCH RE mapping and SS block composition | discussion | LG Electronics |
R1-ah-18512 AI: 5.1.1.2.2 |
available | [WTS] [JSN] | |||
R1-1710264 | Discussion on DMRS design for NR-PBCH | discussion | LG Electronics |
R1-ah-18512 AI: 5.1.1.2.3 |
available | [WTS] [JSN] | |||
R1-1710265 | Remaining minimum system information delivery | discussion | LG Electronics |
R1-ah-18512 AI: 5.1.1.2.4 |
available | [WTS] [JSN] | |||
R1-1710266 | Other system information delivery | discussion | LG Electronics |
R1-ah-18512 AI: 5.1.1.2.5 |
withdrawn | [WTS] [JSN] | |||
R1-1710267 | Paging design in NR | discussion | LG Electronics |
R1-ah-18512 AI: 5.1.1.3 |
available | [WTS] [JSN] | |||
R1-1710268 | Discussion on PRACH preamble format details | discussion | LG Electronics |
R1-ah-18512 AI: 5.1.1.4.1 |
available | [WTS] [JSN] | |||
R1-1710269 | Discussion on PRACH preamble for capacity enhancement | discussion | LG Electronics |
R1-ah-18512 AI: 5.1.1.4.2 |
available | [WTS] [JSN] | |||
R1-1710270 | Discussion on Power Control issue for Message 1 and 3 | discussion | LG Electronics |
R1-ah-18512 AI: 5.1.1.4.3 |
available | [WTS] [JSN] | |||
R1-1710271 | RACH Procedure | discussion | LG Electronics |
R1-ah-18512 AI: 5.1.1.4.4 |
available | [WTS] [JSN] | |||
R1-1710272 | SS block based RRM Measurement | discussion | LG Electronics |
R1-ah-18512 AI: 5.1.1.5.1 |
available | [WTS] [JSN] | |||
R1-1710273 | CSI-RS based RRM Measurement for L3 Mobility | discussion | LG Electronics |
R1-ah-18512 AI: 5.1.1.5.2 |
noted | [WTS] [JSN] | |||
R1-1710274 | Discussion on Radio Link Monitoring in NR | discussion | LG Electronics |
R1-ah-18512 AI: 5.1.1.5.3 |
available | [WTS] [JSN] | |||
R1-1710275 | Discussion on codeword mapping | discussion | LG Electronics |
R1-ah-18512 AI: 5.1.2.1.1 |
available | [WTS] [JSN] | |||
R1-1710276 | Discussion on codebook based transmission for UL | discussion | LG Electronics |
R1-ah-18512 AI: 5.1.2.1.2 |
available | [WTS] [JSN] | |||
R1-1710277 | Discussion on non-codebook based transmission for UL | discussion | LG Electronics |
R1-ah-18512 AI: 5.1.2.1.3 |
available | [WTS] [JSN] | |||
R1-1710278 | Discussion on diversity transmission for UL | discussion | LG Electronics |
R1-ah-18512 AI: 5.1.2.1.4 |
available | [WTS] [JSN] | |||
R1-1710279 | Discussion on cooperative transmission | discussion | LG Electronics |
R1-ah-18512 AI: 5.1.2.1.6 |
available | [WTS] [JSN] | |||
R1-1710280 | Discussion on rate matching | discussion | LG Electronics |
R1-ah-18512 AI: 5.1.2.1.7 |
available | [WTS] [JSN] | |||
R1-1710281 | Discussion on DL beam management | discussion | LG Electronics |
R1-ah-18512 AI: 5.1.2.2.1 |
available | [WTS] [JSN] | |||
R1-1710282 | Discussion on UL beam management | discussion | LG Electronics |
R1-ah-18512 AI: 5.1.2.2.1 |
available | [WTS] [JSN] | |||
R1-1710283 | Discussion on beam failure recovery | discussion | LG Electronics |
R1-ah-18512 AI: 5.1.2.2.2 |
noted | [WTS] [JSN] | |||
R1-1710284 | Discussion on CSI framework | discussion | LG Electronics |
R1-ah-18512 AI: 5.1.2.3.1 |
available | [WTS] [JSN] | |||
R1-1710285 | Discussion on interference measurement | discussion | LG Electronics |
R1-ah-18512 AI: 5.1.2.3.2 |
available | [WTS] [JSN] | |||
R1-1710286 | Discussion on CSI acquisition for reciprocity based operation | discussion | LG Electronics |
R1-ah-18512 AI: 5.1.2.3.3 |
available | [WTS] [JSN] | |||
R1-1710287 | Discussion on overhead reduction for Type II codebook | discussion | LG Electronics |
R1-ah-18512 AI: 5.1.2.3.4 |
available | [WTS] [JSN] | |||
R1-1710288 | Discussions on CSI reporting contents | discussion | LG Electronics |
R1-ah-18512 AI: 5.1.2.3.4 |
available | [WTS] [JSN] | |||
R1-1710289 | CSI feedback for OL and semi-OL MIMO | discussion | LG Electronics |
R1-ah-18512 AI: 5.1.2.3.4 |
available | [WTS] [JSN] | |||
R1-1710290 | UL channel utilization for CSI reporting | discussion | LG Electronics |
R1-ah-18512 AI: 5.1.2.3.4 |
available | [WTS] [JSN] | |||
R1-1710291 | On collision avoidance for PTRS and other RSs | discussion | LG Electronics |
R1-ah-18512 AI: 5.1.2.4.1 |
available | [WTS] [JSN] | |||
R1-1710292 | On CSI-RS design for beam management | discussion | LG Electronics |
R1-ah-18512 AI: 5.1.2.4.2 |
available | [WTS] [JSN] | |||
R1-1710293 | On CSI-RS design for CSI acquisition | discussion | LG Electronics |
R1-ah-18512 AI: 5.1.2.4.2 |
available | [WTS] [JSN] | |||
R1-1710294 | On DL DMRS design | discussion | LG Electronics |
R1-ah-18512 AI: 5.1.2.4.3 |
available | [WTS] [JSN] | |||
R1-1710295 | On UL DMRS design | discussion | LG Electronics |
R1-ah-18512 AI: 5.1.2.4.3 |
available | [WTS] [JSN] | |||
R1-1710296 | On DL PT-RS design | discussion | LG Electronics |
R1-ah-18512 AI: 5.1.2.4.4 |
noted | [WTS] [JSN] | |||
R1-1710297 | On UL PT-RS design |
discussion revised to R1-1711663 |
LG Electronics |
R1-ah-18512 AI: 5.1.2.4.4 |
revised | [WTS] [JSN] | |||
R1-1710298 | On SRS design and related operations | discussion | LG Electronics |
R1-ah-18512 AI: 5.1.2.4.5 |
available | [WTS] [JSN] | |||
R1-1710299 | Discussion on fine time/frequency tracking of channel | discussion | LG Electronics |
R1-ah-18512 AI: 5.1.2.4.6 |
available | [WTS] [JSN] | |||
R1-1710300 | Discussion on QCL for NR | discussion | LG Electronics |
R1-ah-18512 AI: 5.1.2.4.7 |
available | [WTS] [JSN] | |||
R1-1710301 | Phase 3 SLS Calibration Results for NR MIMO | discussion | LG Electronics |
R1-ah-18512 AI: 5.1.2.5 |
available | [WTS] [JSN] | |||
R1-1710302 | Phase 2 LLS Calibration Results for NR MIMO | discussion | LG Electronics |
R1-ah-18512 AI: 5.1.2.5 |
available | [WTS] [JSN] | |||
R1-1710303 | Discussion on NR-PDCCH structure | discussion | LG Electronics |
R1-ah-18512 AI: 5.1.3.1.1.1 |
available | [WTS] [JSN] | |||
R1-1710304 | Discussion on reference signal for NR-PDCCH | discussion | LG Electronics |
R1-ah-18512 AI: 5.1.3.1.1.2 |
available | [WTS] [JSN] | |||
R1-1710305 | Discussion on CORESET configuration | discussion | LG Electronics |
R1-ah-18512 AI: 5.1.3.1.2.1 |
available | [WTS] [JSN] | |||
R1-1710306 | Discussion on hierarchical search space structure | discussion | LG Electronics |
R1-ah-18512 AI: 5.1.3.1.2.2 |
available | [WTS] [JSN] | |||
R1-1710307 | Discussion on multi-beam operation for NR-PDCCH | discussion | LG Electronics |
R1-ah-18512 AI: 5.1.3.1.2.3 |
available | [WTS] [JSN] | |||
R1-1710308 | Discussion on multiplexing between control and data | discussion | LG Electronics |
R1-ah-18512 AI: 5.1.3.1.3 |
available | [WTS] [JSN] | |||
R1-1710309 | Discussion on the structure of group common PDCCH | discussion | LG Electronics |
R1-ah-18512 AI: 5.1.3.1.4.1 |
available | [WTS] [JSN] | |||
R1-1710310 | Discussion on the contents of group common PDCCH | discussion | LG Electronics |
R1-ah-18512 AI: 5.1.3.1.4.2 |
available | [WTS] [JSN] | |||
R1-1710311 | Discussion on UE behavior for the group common PDCCH | discussion | LG Electronics |
R1-ah-18512 AI: 5.1.3.1.4.3 |
available | [WTS] [JSN] | |||
R1-1710312 | Discussion on DL control with ultra-reliability | discussion | LG Electronics |
R1-ah-18512 AI: 5.1.3.1.5 |
available | [WTS] [JSN] | |||
R1-1710313 | Design of short NR-PUCCH for up to 2 UCI bits | discussion | LG Electronics |
R1-ah-18512 AI: 5.1.3.2.1.1 |
available | [WTS] [JSN] | |||
R1-1710314 | Design of short NR-PUCCH for more than 2 UCI bits | discussion | LG Electronics |
R1-ah-18512 AI: 5.1.3.2.1.2 |
available | [WTS] [JSN] | |||
R1-1710315 | Design of long NR-PUCCH for up to 2 UCI bits | discussion | LG Electronics |
R1-ah-18512 AI: 5.1.3.2.2.1 |
available | [WTS] [JSN] | |||
R1-1710316 | Design of long NR-PUCCH for more than 2 UCI bits | discussion | LG Electronics |
R1-ah-18512 AI: 5.1.3.2.2.2 |
available | [WTS] [JSN] | |||
R1-1710317 | Support of long NR-PUCCH over multiple slots | discussion | LG Electronics |
R1-ah-18512 AI: 5.1.3.2.2.3 |
available | [WTS] [JSN] | |||
R1-1710318 | Consideration on transmit diversity for NR-PUCCH | discussion | LG Electronics |
R1-ah-18512 AI: 5.1.3.2.3 |
available | [WTS] [JSN] | |||
R1-1710319 | Consideration on resource allocation for NR-PUCCH | discussion | LG Electronics |
R1-ah-18512 AI: 5.1.3.2.4 |
available | [WTS] [JSN] | |||
R1-1710320 | Support of UCI piggyback on PUSCH for NR | discussion | LG Electronics |
R1-ah-18512 AI: 5.1.3.2.5.1 |
available | [WTS] [JSN] | |||
R1-1710321 | Support of uplink channel multiplexing for NR | discussion | LG Electronics |
R1-ah-18512 AI: 5.1.3.2.5.2 |
available | [WTS] [JSN] | |||
R1-1710322 | Discussion on UL control with ultra-reliability | discussion | LG Electronics |
R1-ah-18512 AI: 5.1.3.2.6 |
available | [WTS] [JSN] | |||
R1-1710323 | Discussion on frequency-domain resource allocation | discussion | LG Electronics |
R1-ah-18512 AI: 5.1.3.3.1.1 |
available | [WTS] [JSN] | |||
R1-1710324 | Discussion on time-domain resource allocation | discussion | LG Electronics |
R1-ah-18512 AI: 5.1.3.3.1.2 |
available | [WTS] [JSN] | |||
R1-1710325 | Discussion on TB size determination for NR | discussion | LG Electronics |
R1-ah-18512 AI: 5.1.3.3.1.3 |
available | [WTS] [JSN] | |||
R1-1710326 | Discussion on scheduling request for UL transmission with grant | discussion | LG Electronics |
R1-ah-18512 AI: 5.1.3.3.2 |
available | [WTS] [JSN] | |||
R1-1710327 | Discussion on UL transmission without grant | discussion | LG Electronics |
R1-ah-18512 AI: 5.1.3.3.3 |
available | [WTS] [JSN] | |||
R1-1710328 | Summary of [89-22] Email discussion about UL data transmission without UL grant | discussion | LG Electronics |
R1-ah-18512 AI: 5.1.3.3.3 |
noted | [WTS] [JSN] | |||
R1-1710329 | Consideration on CBG construction for NR HARQ | discussion | LG Electronics |
R1-ah-18512 AI: 5.1.3.3.4.1 |
available | [WTS] [JSN] | |||
R1-1710330 | Consideration on DCI signaling for CBG based HARQ | discussion | LG Electronics |
R1-ah-18512 AI: 5.1.3.3.4.2 |
available | [WTS] [JSN] | |||
R1-1710331 | Consideration on UCI signaling for CBG based HARQ | discussion | LG Electronics |
R1-ah-18512 AI: 5.1.3.3.4.3 |
available | [WTS] [JSN] | |||
R1-1710332 | Consideration on HARQ-ACK feedback timing for NR | discussion | LG Electronics |
R1-ah-18512 AI: 5.1.3.3.5.1 |
available | [WTS] [JSN] | |||
R1-1710333 | Support of HARQ-ACK multiplexing/bundling for NR | discussion | LG Electronics |
R1-ah-18512 AI: 5.1.3.3.5.2 |
available | [WTS] [JSN] | |||
R1-1710334 | Discussion on HARQ process number for NR | discussion | LG Electronics |
R1-ah-18512 AI: 5.1.3.3.6.1 |
available | [WTS] [JSN] | |||
R1-1710335 | Discussion on soft buffer management for NR | discussion | LG Electronics |
R1-ah-18512 AI: 5.1.3.3.6.2 |
available | [WTS] [JSN] | |||
R1-1710336 | Discussion on pre-emption indication for downlink | discussion | LG Electronics |
R1-ah-18512 AI: 5.1.3.3.7.1 |
available | [WTS] [JSN] | |||
R1-1710337 | Discussion on eMBB and URLLC multiplexing for uplink | discussion | LG Electronics |
R1-ah-18512 AI: 5.1.3.3.7.2 |
available | [WTS] [JSN] | |||
R1-1710338 | Discussion on scheduling and HARQ procedure for URLLC | discussion | LG Electronics |
R1-ah-18512 AI: 5.1.3.3.8 |
available | [WTS] [JSN] | |||
R1-1710339 | Support of cross-CC DCI/UCI transmission for NR CA | discussion | LG Electronics |
R1-ah-18512 AI: 5.1.3.4.1.1 |
available | [WTS] [JSN] | |||
R1-1710340 | Discussion on dual connectivity with single active UL at a given time | discussion | LG Electronics |
R1-ah-18512 AI: 5.1.3.4.2 |
available | [WTS] [JSN] | |||
R1-1710341 | Discussion on CRC reduction and attachement for eMBB data | discussion | LG Electronics |
R1-ah-18512 AI: 5.1.4.1.1.1 |
available | [WTS] [JSN] | |||
R1-1710342 | Code block segmentation for eMBB | discussion | LG Electronics |
R1-ah-18512 AI: 5.1.4.1.1.2 |
noted | [WTS] [JSN] | |||
R1-1710343 | On rate matching with LDPC code for eMBB | discussion | LG Electronics |
R1-ah-18512 AI: 5.1.4.1.1.3 |
available | [WTS] [JSN] | |||
R1-1710344 | Discussion on bit level interleaver | discussion | LG Electronics |
R1-ah-18512 AI: 5.1.4.1.1.3 |
noted | [WTS] [JSN] | |||
R1-1710345 | Circulant permutation matrix design for LDPC codes |
discussion revised to R1-1711774 |
LG Electronics | Rel-15 |
R1-ah-18512 AI: 5.1.4.1.2 |
revised | [WTS] [JSN] | ||
R1-1710346 | Early termination effect of polar codes | discussion | LG Electronics |
R1-ah-18512 AI: 5.1.4.2.1 |
available | [WTS] [JSN] | |||
R1-1710347 | Repetition scheme of polar codes |
discussion revised to R1-1711641 |
LG Electronics |
R1-ah-18512 AI: 5.1.4.2.2 |
revised | [WTS] [JSN] | |||
R1-1710348 | Design of polar codes with high order modulations | discussion | LG Electronics |
R1-ah-18512 AI: 5.1.4.2.2 |
available | [WTS] [JSN] | |||
R1-1710349 | Details on PBCH coding | discussion | LG Electronics |
R1-ah-18512 AI: 5.1.4.3 |
available | [WTS] [JSN] | |||
R1-1710350 | Discussion on CLI measurement for Duplexing Flexibility | discussion | LG Electronics |
R1-ah-18512 AI: 5.1.6.1 |
noted | [WTS] [JSN] | |||
R1-1710351 | Discussion on details of backhaul signaling for duplexing flexibility | discussion | LG Electronics |
R1-ah-18512 AI: 5.1.6.1 |
available | [WTS] [JSN] | |||
R1-1710352 | Remaining details on wider bandwith operation | discussion | LG Electronics |
R1-ah-18512 AI: 5.1.7 |
available | [WTS] [JSN] | |||
R1-1710353 | Remaining details on DL sharing between LTE and NR | discussion | LG Electronics |
R1-ah-18512 AI: 5.1.8 |
available | [WTS] [JSN] | |||
R1-1710354 | Remaining details on UL sharing between LTE and NR | discussion | LG Electronics |
R1-ah-18512 AI: 5.1.8 |
available | [WTS] [JSN] | |||
R1-1710355 | Discussion on power sharing for LTE-NR dual connectivity | discussion | LG Electronics |
R1-ah-18512 AI: 5.1.9.1 |
available | [WTS] [JSN] | |||
R1-1710356 | Discussion on uplink power control for NR | discussion | LG Electronics |
R1-ah-18512 AI: 5.1.9.2 |
noted | [WTS] [JSN] | |||
R1-1710357 | Discussion on uplink power headroom report for NR | discussion | LG Electronics |
R1-ah-18512 AI: 5.1.9.2 |
available | [WTS] [JSN] | |||
R1-1710358 | Multiplexing NCP and ECP | discussion | LG Electronics |
R1-ah-18512 AI: 5.1.11 |
available | [WTS] [JSN] | |||
R1-1710359 | PT-RS design | discussion | Panasonic Corporation |
R1-ah-18512 AI: 5.1.2.4.4 |
available | [WTS] [JSN] | |||
R1-1710360 | Discussion on PRB bundling size for NR DL | discussion | Spreadtrum Communications | Rel-15 |
R1-ah-18512 AI: 5.1.2.1.5 |
available | [WTS] [JSN] | ||
R1-1710361 | Differential RSRP report for beam management | discussion | Spreadtrum Communications | Rel-15 |
R1-ah-18512 AI: 5.1.2.2.1 |
available | [WTS] [JSN] | ||
R1-1710362 | DMRS configurations for CP-OFDM. | discussion | Spreadtrum Communications | Rel-15 |
R1-ah-18512 AI: 5.1.2.4.3 |
available | [WTS] [JSN] | ||
R1-1710363 | Considerations on PT-RS for CP-OFDM | discussion | Spreadtrum Communications | Rel-15 |
R1-ah-18512 AI: 5.1.2.4.4 |
available | [WTS] [JSN] | ||
R1-1710364 | Discussion on beam failure recovery | discussion | Spreadtrum Communications | Rel-15 |
R1-ah-18512 AI: 5.1.2.2.2 |
available | [WTS] [JSN] | ||
R1-1710365 | Discussion on CSI-RS design for CSI acquisition | discussion | Spreadtrum Communications | Rel-15 |
R1-ah-18512 AI: 5.1.2.4.2 |
available | [WTS] [JSN] | ||
R1-1710366 | Discussion on NR-REG to NR-CCE time-/frequency mapping | discussion | Spreadtrum Communications | Rel-15 |
R1-ah-18512 AI: 5.1.3.1.1.1 |
available | [WTS] [JSN] | ||
R1-1710367 | Discussion on 1-symbol PUCCH design | discussion | Spreadtrum Communications | Rel-15 |
R1-ah-18512 AI: 5.1.3.2.1.2 |
available | [WTS] [JSN] | ||
R1-1710368 | The relation among UE-specific DCI, GC-PDCCH, and semi-static signaling | discussion | Spreadtrum Communications | Rel-15 |
R1-ah-18512 AI: 5.1.3.1.4.3 |
available | [WTS] [JSN] | ||
R1-1710369 | NR-PBCH RE mapping and SS block composition | discussion | Spreadtrum Communications | Rel-15 |
R1-ah-18512 AI: 5.1.1.2.2 |
noted | [WTS] [JSN] | ||
R1-1710370 | Discussion on time index indication | discussion | Spreadtrum Communications | Rel-15 |
R1-ah-18512 AI: 5.1.1.1.3 |
available | [WTS] [JSN] | ||
R1-1710371 | Remaining issues on the subcarrier spacing of SS block | discussion | Spreadtrum Communications | Rel-15 |
R1-ah-18512 AI: 5.1.1.1.2 |
available | [WTS] [JSN] | ||
R1-1710372 | Remaining issues on SS block and SS burst set composition | discussion | vivo |
R1-ah-18512 AI: 5.1.1.1.2 |
available | [WTS] [JSN] | |||
R1-1710373 | Discussion on SS block time index indication | discussion | vivo |
R1-ah-18512 AI: 5.1.1.1.3 |
available | [WTS] [JSN] | |||
R1-1710374 | SS block transmissions and RRM measurement in wideband CC | discussion | vivo |
R1-ah-18512 AI: 5.1.1.1.4 |
available | [WTS] [JSN] | |||
R1-1710375 | Views on NR-PBCH contents and payload size | discussion | vivo |
R1-ah-18512 AI: 5.1.1.2.1 |
available | [WTS] [JSN] | |||
R1-1710376 | NR-PBCH RE mapping and evaluation | discussion | vivo |
R1-ah-18512 AI: 5.1.1.2.2 |
noted | [WTS] [JSN] | |||
R1-1710377 | SS block time index for idle/inactive measurement | discussion | vivo |
R1-ah-18512 AI: 5.1.1.5.1 |
withdrawn | [WTS] [JSN] | |||
R1-1710378 | CSI-RS configuration for L3 mobility | discussion | vivo |
R1-ah-18512 AI: 5.1.1.5.2 |
available | [WTS] [JSN] | |||
R1-1710379 | Identification NSA mode during initial access | discussion | vivo |
R1-ah-18512 AI: 5.1.1.2.5 |
available | [WTS] [JSN] | |||
R1-1710380 | Discussion on UL grant-free transmission | discussion | vivo |
R1-ah-18512 AI: 5.1.3.3.3 |
available | [WTS] [JSN] | |||
R1-1710381 | Scheduling and HARQ aspects for URLLC reliability | discussion | vivo |
R1-ah-18512 AI: 5.1.3.3.8 |
available | [WTS] [JSN] | |||
R1-1710382 | Discussion on pre-emption indication for downlink | discussion | vivo |
R1-ah-18512 AI: 5.1.3.3.7.1 |
available | [WTS] [JSN] | |||
R1-1710383 | Discussion on UL multiplexing data with different transmission durations | discussion | vivo |
R1-ah-18512 AI: 5.1.3.3.7.2 |
available | [WTS] [JSN] | |||
R1-1710384 | Interference analysis for LTE-NR co-existence | discussion | vivo |
R1-ah-18512 AI: 5.1.8 |
noted | [WTS] [JSN] | |||
R1-1710385 | Issues on UL transmission for LTE-NR co-existence | discussion | vivo |
R1-ah-18512 AI: 5.1.8 |
available | [WTS] [JSN] | |||
R1-1710386 | Discussion on short-PUCCH up to 2-bit | discussion | vivo |
R1-ah-18512 AI: 5.1.3.2.1.1 |
withdrawn | [WTS] [JSN] | |||
R1-1710387 | Discussion on short-PUCCH more than 2-bit |
discussion revised to R1-1711655 |
vivo |
R1-ah-18512 AI: 5.1.3.2.1.2 |
revised | [WTS] [JSN] | |||
R1-1710388 | Discussion of PUCCH resource indication | discussion | vivo |
R1-ah-18512 AI: 5.1.3.2.4 |
withdrawn | [WTS] [JSN] | |||
R1-1710389 | DMRS design for NR-PDCCH | discussion | vivo |
R1-ah-18512 AI: 5.1.3.1.1.2 |
available | [WTS] [JSN] | |||
R1-1710390 | Discussion on REG bundling size/structure | discussion | vivo |
R1-ah-18512 AI: 5.1.3.1.1.1 |
available | [WTS] [JSN] | |||
R1-1710391 | Discussion on group common PDCCH and BD | discussion | vivo |
R1-ah-18512 AI: 5.1.3.1.4.2 |
available | [WTS] [JSN] | |||
R1-1710392 | Discussion on downlink RA | discussion | vivo |
R1-ah-18512 AI: 5.1.3.3.1.1 |
available | [WTS] [JSN] | |||
R1-1710393 | Discussion on search space design supporting dynamic DCI size | discussion | vivo |
R1-ah-18512 AI: 5.1.3.1.2.2 |
available | [WTS] [JSN] | |||
R1-1710394 | Discussion on NR UE supporting self-contained operation | discussion | vivo |
R1-ah-18512 AI: 5.1.3.3.6.1 |
available | [WTS] [JSN] | |||
R1-1710395 | DCI content size and compression | discussion | vivo |
R1-ah-18512 AI: 5.1.3.1.6 |
available | [WTS] [JSN] | |||
R1-1710396 | Discussion on CB grouping | discussion | vivo |
R1-ah-18512 AI: 5.1.3.3.4.1 |
available | [WTS] [JSN] | |||
R1-1710397 | Discussion on flexible length scheduling | discussion | vivo |
R1-ah-18512 AI: 5.1.3.3.1.2 |
available | [WTS] [JSN] | |||
R1-1710398 | NR transmission on anchor bandwidth part | discussion | vivo |
R1-ah-18512 AI: 5.1.7 |
available | [WTS] [JSN] | |||
R1-1710399 | Beam management and beam reporting | discussion | vivo |
R1-ah-18512 AI: 5.1.2.2.1 |
available | [WTS] [JSN] | |||
R1-1710400 | Beam failure recovery procedure | discussion | vivo |
R1-ah-18512 AI: 5.1.2.2.2 |
available | [WTS] [JSN] | |||
R1-1710401 | On CSI-RS design for beam management | discussion | vivo |
R1-ah-18512 AI: 5.1.2.4.2 |
available | [WTS] [JSN] | |||
R1-1710402 | On DL DMRS design | discussion | vivo |
R1-ah-18512 AI: 5.1.2.4.3 |
available | [WTS] [JSN] | |||
R1-1710403 | On PT-RS design for CP-OFDM | discussion | vivo |
R1-ah-18512 AI: 5.1.2.4.4 |
available | [WTS] [JSN] | |||
R1-1710404 | UL multi-beam power control | discussion | vivo |
R1-ah-18512 AI: 5.1.9.2 |
available | [WTS] [JSN] | |||
R1-1710405 | Feasibility study on subband constellation rotation for uplink PAPR reduction for CP-OFDM waveform | discussion | vivo |
R1-ah-18512 AI: 5.1.11 |
available | [WTS] [JSN] | |||
R1-1710406 | PAE consideration on supporting CP-OFDM and DFT-S-OFDM | discussion | vivo |
R1-ah-18512 AI: 5.1.11 |
available | [WTS] [JSN] | |||
R1-1710407 | Forward compatibility consideration for ECP design and NR-MBMS | discussion | vivo |
R1-ah-18512 AI: 5.1.11 |
available | [WTS] [JSN] | |||
R1-1710408 | On pre-DFT RS/UCI multiplexing for PUCCH in short duration | discussion | Mitsubishi Electric RCE | Rel-15 |
R1-ah-18512 AI: 5.1.3.2.1.2 |
available | [WTS] [JSN] | ||
R1-1710409 | Views on SRS designs |
discussion revised to R1-1711643 |
Mitsubishi Electric Co. |
R1-ah-18512 AI: 5.1.2.4.5 |
revised | [WTS] [JSN] | |||
R1-1710410 | Evaluation of DL DMRS designs | discussion | Mitsubishi Electric Co. |
R1-ah-18512 AI: 5.1.2.4.3 |
available | [WTS] [JSN] | |||
R1-1710411 | Views on DL DMRS designs | discussion | Mitsubishi Electric Co. |
R1-ah-18512 AI: 5.1.2.4.3 |
available | [WTS] [JSN] | |||
R1-1710412 | NR SS block and burst set composition | discussion | AT&T |
R1-ah-18512 AI: 5.1.1.1.2 |
noted | [WTS] [JSN] | |||
R1-1710413 | Further details on forward compatible resources in NR | discussion | AT&T |
R1-ah-18512 AI: 5.1.3.3.1.1 |
available | [WTS] [JSN] | |||
R1-1710414 | Transmission duration indication for symbol-level/slot-level/multi-slot-level scheduling | discussion | AT&T |
R1-ah-18512 AI: 5.1.3.3.1.2 |
available | [WTS] [JSN] | |||
R1-1710415 | Remaining details on the number of HARQ processes in NR | discussion | AT&T |
R1-ah-18512 AI: 5.1.3.3.6.1 |
available | [WTS] [JSN] | |||
R1-1710416 | Design considerations for NR operation with wide bandwidths | discussion | AT&T |
R1-ah-18512 AI: 5.1.7 |
available | [WTS] [JSN] | |||
R1-1710417 | Remaining details of NR-LTE coexistence in overlapping spectrum | discussion | AT&T |
R1-ah-18512 AI: 5.1.8 |
noted | [WTS] [JSN] | |||
R1-1710418 | HARQ-ACK feedback timing for FDD, semi-static TDD and mini-slot based transmissions | discussion | AT&T |
R1-ah-18512 AI: 5.1.3.3.5.1 |
available | [WTS] [JSN] | |||
R1-1710419 | SS block time index indication | discussion | AT&T |
R1-ah-18512 AI: 5.1.1.1.3 |
available | [WTS] [JSN] | |||
R1-1710420 | SS block transmissions in a wideband CC | discussion | AT&T |
R1-ah-18512 AI: 5.1.1.1.4 |
available | [WTS] [JSN] | |||
R1-1710421 | Details of NR-PBCH contents | discussion | AT&T |
R1-ah-18512 AI: 5.1.1.2.1 |
available | [WTS] [JSN] | |||
R1-1710422 | DL Tx beam reporting in msg. 3 | discussion | AT&T |
R1-ah-18512 AI: 5.1.1.4.4 |
available | [WTS] [JSN] | |||
R1-1710423 | Measurement based on SS block | discussion | AT&T |
R1-ah-18512 AI: 5.1.1.5.1 |
available | [WTS] [JSN] | |||
R1-1710424 | Measurement based on CSI-RS for L3 mobility | discussion | AT&T |
R1-ah-18512 AI: 5.1.1.5.2 |
available | [WTS] [JSN] | |||
R1-1710425 | Radio link monitoring | discussion | AT&T |
R1-ah-18512 AI: 5.1.1.5.3 |
available | [WTS] [JSN] | |||
R1-1710426 | Remaining details of codeword mapping for NR MIMO | discussion | AT&T |
R1-ah-18512 AI: 5.1.2.1.1 |
noted | [WTS] [JSN] | |||
R1-1710427 | UL diversity transmision for NR | discussion | AT&T |
R1-ah-18512 AI: 5.1.2.1.4 |
noted | [WTS] [JSN] | |||
R1-1710428 | On the details of multi-TRP and multi-panel transmission | discussion | AT&T |
R1-ah-18512 AI: 5.1.2.1.6 |
available | [WTS] [JSN] | |||
R1-1710429 | On the need of per RE level PDSCH rate-matching and RE mapping signalling | discussion | AT&T |
R1-ah-18512 AI: 5.1.2.1.7 |
available | [WTS] [JSN] | |||
R1-1710430 | DL beam management details | discussion | AT&T |
R1-ah-18512 AI: 5.1.2.2.1 |
available | [WTS] [JSN] | |||
R1-1710431 | Considerations on beam failure recovery mechanism | discussion | AT&T |
R1-ah-18512 AI: 5.1.2.2.2 |
available | [WTS] [JSN] | |||
R1-1710432 | Discussion on the channels to carry CSI report | discussion | AT&T |
R1-ah-18512 AI: 5.1.2.3.1 |
available | [WTS] [JSN] | |||
R1-1710433 | On the details of CSI acquisition | discussion | AT&T |
R1-ah-18512 AI: 5.1.2.3.2 |
available | [WTS] [JSN] | |||
R1-1710434 | CSI feedback for closed loop and semi open loop transmission schemes | discussion | AT&T |
R1-ah-18512 AI: 5.1.2.3.4 |
available | [WTS] [JSN] | |||
R1-1710435 | Multiplexing of CSI-RS with PDSCH in mixed numerology scenarios | discussion | AT&T |
R1-ah-18512 AI: 5.1.2.4.1 |
noted | [WTS] [JSN] | |||
R1-1710436 | Remaining details of CSI-RS | discussion | AT&T |
R1-ah-18512 AI: 5.1.2.4.2 |
available | [WTS] [JSN] | |||
R1-1710437 | Control channel configuration for multi-TRP and multi-panel transmission | discussion | AT&T |
R1-ah-18512 AI: 5.1.3.1.2.3 |
available | [WTS] [JSN] | |||
R1-1710438 | Group common PDCCH Structure for NR | discussion | AT&T |
R1-ah-18512 AI: 5.1.3.1.4.1 |
available | [WTS] [JSN] | |||
R1-1710439 | On the contents of group common PDCCH | discussion | AT&T |
R1-ah-18512 AI: 5.1.3.1.4.2 |
available | [WTS] [JSN] | |||
R1-1710440 | UE behaviour for group common PDCCH | discussion | AT&T |
R1-ah-18512 AI: 5.1.3.1.4.3 |
available | [WTS] [JSN] | |||
R1-1710441 | Transmit diversity for PUCCH | discussion | AT&T |
R1-ah-18512 AI: 5.1.3.2.3 |
withdrawn | [WTS] [JSN] | |||
R1-1710442 | On CBG construction for NR PDSCH and PUSCH | discussion | AT&T |
R1-ah-18512 AI: 5.1.3.3.4.1 |
available | [WTS] [JSN] | |||
R1-1710443 | DCI design for CBG based re transmision | discussion | AT&T |
R1-ah-18512 AI: 5.1.3.3.4.2 |
available | [WTS] [JSN] | |||
R1-1710444 | Uplink control channel design for CBG based re transmission | discussion | AT&T |
R1-ah-18512 AI: 5.1.3.3.4.3 |
available | [WTS] [JSN] | |||
R1-1710445 | Minimum UE bandwidth in NR | discussion | Huawei, HiSilicon |
R1-ah-18512 AI: 5.1.1.6 |
available | [WTS] [JSN] | |||
R1-1710446 | Codeword to layer mapping in NR | other | Huawei, HiSilicon |
R1-ah-18512 AI: 5.1.2.1.1 |
noted | [WTS] [JSN] | |||
R1-1710447 | Codebook based transmission for UL MIMO | other | Huawei, HiSilicon |
R1-ah-18512 AI: 5.1.2.1.2 |
available | [WTS] [JSN] | |||
R1-1710448 | Diversity-based transmission for UL | other | Huawei, HiSilicon |
R1-ah-18512 AI: 5.1.2.1.4 |
available | [WTS] [JSN] | |||
R1-1710449 | General views on DL beam management |
other revised to R1-1711636 |
Huawei, HiSilicon |
R1-ah-18512 AI: 5.1.2.2.1 |
revised | [WTS] [JSN] | |||
R1-1710450 | Multi-beam transmission for DL control channel | other | Huawei, HiSilicon |
R1-ah-18512 AI: 5.1.2.2.3 |
available | [WTS] [JSN] | |||
R1-1710451 | CSI acquisition details for NCJT | other | Huawei, HiSilicon |
R1-ah-18512 AI: 5.1.2.1.6 |
available | [WTS] [JSN] | |||
R1-1710452 | CSI acquisition details for hybrid CSI | other | Huawei, HiSilicon |
R1-ah-18512 AI: 5.1.2.3.4 |
available | [WTS] [JSN] | |||
R1-1710453 | The remaining issues for Type I codebook | other | Huawei, HiSilicon |
R1-ah-18512 AI: 5.1.2.3.4 |
available | [WTS] [JSN] | |||
R1-1710454 | The remaining issues for Type II codebook | other | Huawei, HiSilicon |
R1-ah-18512 AI: 5.1.2.3.4 |
available | [WTS] [JSN] | |||
R1-1710455 | Signaling of DMRS ports for SU/MU-MIMO | other | Huawei, HiSilicon |
R1-ah-18512 AI: 5.1.2.4.8 |
available | [WTS] [JSN] | |||
R1-1710456 | DMRS design for URLLC | other | Huawei, HiSilicon |
R1-ah-18512 AI: 5.1.2.4.8 |
available | [WTS] [JSN] | |||
R1-1710457 | Considerations on UE-specific RS Sequence Design | other | Huawei, HiSilicon |
R1-ah-18512 AI: 5.1.2.4.8 |
available | [WTS] [JSN] | |||
R1-1710458 | Discussion on UL DMRS power boosting | other | Huawei, HiSilicon |
R1-ah-18512 AI: 5.1.2.4.8 |
available | [WTS] [JSN] | |||
R1-1710459 | Discussion on UL SRS transmission power | other | Huawei, HiSilicon |
R1-ah-18512 AI: 5.1.2.2.3 |
available | [WTS] [JSN] | |||
R1-1710460 | Resource sharing between NR-PDCCH and data | other | Huawei, HiSilicon |
R1-ah-18512 AI: 5.1.3.1.6 |
available | [WTS] [JSN] | |||
R1-1710461 | PUCCH resource allocation for HARQ-ACK and SR | other | Huawei, HiSilicon |
R1-ah-18512 AI: 5.1.3.2.4 |
available | [WTS] [JSN] | |||
R1-1710462 | On HARQ-ACK multiplexing and/or bundling | other | Huawei, HiSilicon |
R1-ah-18512 AI: 5.1.3.3.5.2 |
available | [WTS] [JSN] | |||
R1-1710463 | Transmit diversity for PUCCH | other | Huawei, HiSilicon |
R1-ah-18512 AI: 5.1.3.2.3 |
available | [WTS] [JSN] | |||
R1-1710464 | Multiplexing of PUCCH and PUSCH | other | Huawei, HiSilicon |
R1-ah-18512 AI: 5.1.3.2.5.2 |
available | [WTS] [JSN] | |||
R1-1710465 | On uplink data scheduling | other | Huawei, HiSilicon |
R1-ah-18512 AI: 5.1.3.3.2 |
available | [WTS] [JSN] | |||
R1-1710466 | Consideration on subsequent transmission after pre-emption | other | Huawei, HiSilicon |
R1-ah-18512 AI: 5.1.3.3.8 |
available | [WTS] [JSN] | |||
R1-1710467 | DCI design for URLLC | other | Huawei, HiSilicon |
R1-ah-18512 AI: 5.1.3.1.6 |
available | [WTS] [JSN] | |||
R1-1710468 | Discussion on Multi-TRP cooperation for URLLC | other | Huawei, HiSilicon |
R1-ah-18512 AI: 5.1.3.3.8 |
available | [WTS] [JSN] | |||
R1-1710469 | Support of URLLC for TDD | other | Huawei, HiSilicon |
R1-ah-18512 AI: 5.1.3.3.8 |
available | [WTS] [JSN] | |||
R1-1710470 | Necessity of multiple sequence for Polar code | other | Huawei, HiSilicon |
R1-ah-18512 AI: 5.1.4.2.2 |
noted | [WTS] [JSN] | |||
R1-1710471 | CRC polynomial for L1 control information and MIB | other | Huawei, HiSilicon |
R1-ah-18512 AI: 5.1.4.4 |
available | [WTS] [JSN] | |||
R1-1710472 | Benefits of implicit soft combining for PBCH by Polar code construction |
other revised to R1-1711704 |
Huawei, HiSilicon |
R1-ah-18512 AI: 5.1.4.3 |
revised | [WTS] [JSN] | |||
R1-1710473 | Network-based mechanism for millimeter-wave link recovery | other | Huawei, HiSilicon |
R1-ah-18512 AI: 5.1.2.2.3 |
available | [WTS] [JSN] | |||
R1-1710474 | Further consideration on pi/2 BPSK with FDSS | other | Huawei, HiSilicon |
R1-ah-18512 AI: 5.1.5 |
available | [WTS] [JSN] | |||
R1-1710475 | Discussion on PHR calculation | other | Huawei, HiSilicon |
R1-ah-18512 AI: 5.1.9.2 |
available | [WTS] [JSN] | |||
R1-1710476 | UE behavior related to group-common PDCCH | other | Huawei, HiSilicon |
R1-ah-18512 AI: 5.1.3.1.4.3 |
available | [WTS] [JSN] | |||
R1-1710477 | Discussion on other system information delivery | other | Huawei, HiSilicon |
R1-ah-18512 AI: 5.1.1.2.5 |
available | [WTS] [JSN] | |||
R1-1710478 | RACH procedures and resource configuration | other | Huawei, HiSilicon |
R1-ah-18512 AI: 5.1.1.4.4 |
available | [WTS] [JSN] | |||
R1-1710479 | Evaluation of PM based early termination for Polar code | other | Huawei, HiSilicon |
R1-ah-18512 AI: 5.1.4.2.1 |
available | [WTS] [JSN] | |||
R1-1710480 | CRC Attachment for Code Block Group | discussion | Ericsson |
R1-ah-18512 AI: 5.1.4.1.1.1 |
available | [WTS] [JSN] | |||
R1-1710481 | Study of Number of CRC Bits for Code Blocks | discussion | Ericsson |
R1-ah-18512 AI: 5.1.4.1.1.1 |
available | [WTS] [JSN] | |||
R1-1710482 | Study of Number of CRC Bits for Small Transport Blocks | discussion | Ericsson |
R1-ah-18512 AI: 5.1.4.1.1.1 |
noted | [WTS] [JSN] | |||
R1-1710483 | LDPC Code Performance at High Code Rate | discussion | Ericsson |
R1-ah-18512 AI: 5.1.4.1.1.3 |
available | [WTS] [JSN] | |||
R1-1710484 | Bit Ordering for Circular Buffer of LDPC Codes | discussion | Ericsson |
R1-ah-18512 AI: 5.1.4.1.1.3 |
noted | [WTS] [JSN] | |||
R1-1710485 | Rate Matching for NR LDPC codes | discussion | Ericsson |
R1-ah-18512 AI: 5.1.4.1.1.3 |
noted | [WTS] [JSN] | |||
R1-1710486 | Throughput Requirements of LDPC Decoder | discussion | Ericsson |
R1-ah-18512 AI: 5.1.4.1.1.4 |
available | [WTS] [JSN] | |||
R1-1710487 | LDPC Code Design for Base Graph #1 | discussion | Ericsson |
R1-ah-18512 AI: 5.1.4.1.2 |
available | [WTS] [JSN] | |||
R1-1710488 | LDPC Code Design for Base Graph #2 | discussion | Ericsson |
R1-ah-18512 AI: 5.1.4.1.2 |
available | [WTS] [JSN] | |||
R1-1710489 | Application of Two Base Graphs for NR Data Channels | discussion | Ericsson |
R1-ah-18512 AI: 5.1.4.1.2 |
available | [WTS] [JSN] | |||
R1-1710490 | CRC-based Polar Code Construction | discussion | Ericsson |
R1-ah-18512 AI: 5.1.4.2.1 |
noted | [WTS] [JSN] | |||
R1-1710491 | Study of Early Termination for DCI | discussion | Ericsson |
R1-ah-18512 AI: 5.1.4.2.1 |
available | [WTS] [JSN] | |||
R1-1710492 | Information Sequence Design for Polar Codes | discussion | Ericsson |
R1-ah-18512 AI: 5.1.4.2.2 |
withdrawn | [WTS] [JSN] | |||
R1-1710493 | On Bit Mapping Design for Polar Codes |
discussion revised to R1-1711751 |
Ericsson |
R1-ah-18512 AI: 5.1.4.2.2 |
revised | [WTS] [JSN] | |||
R1-1710494 | Impact of Puncturing on Bit-channel Capacities |
discussion revised to R1-1711679 |
Ericsson |
R1-ah-18512 AI: 5.1.4.2.2 |
revised | [WTS] [JSN] | |||
R1-1710495 | Polar Code Performance in Fading Channel |
discussion revised to R1-1711752 |
Ericsson |
R1-ah-18512 AI: 5.1.4.2.2 |
revised | [WTS] [JSN] | |||
R1-1710496 | Thresholds for Mother Code Size Determination | discussion | Ericsson |
R1-ah-18512 AI: 5.1.4.2.2 |
available | [WTS] [JSN] | |||
R1-1710497 | Study of Number of CRC Bits for PBCH | discussion | Ericsson |
R1-ah-18512 AI: 5.1.4.3 |
available | [WTS] [JSN] | |||
R1-1710498 | Polar Code Design for NR-PBCH | discussion | Ericsson |
R1-ah-18512 AI: 5.1.4.3 |
available | [WTS] [JSN] | |||
R1-1710499 | LDPC Code Performance for High Reliability Use Cases | discussion | Ericsson |
R1-ah-18512 AI: 5.1.4.4 |
available | [WTS] [JSN] | |||
R1-1710500 | Draft Reply LS on reading time index indication for RRM measurements |
LS out LS is reply to R2-170215 LS To: RAN2 revised to R1-1711907 |
Intel Corporation | NR_newRAT-Core | Rel-15 |
R1-ah-18512 AI: 4 |
noted | [WTS] [JSN] | |
R1-1710501 | NR PSS and SSS design | discussion | Intel Corporation |
R1-ah-18512 AI: 5.1.1.1.1 |
noted | [WTS] [JSN] | |||
R1-1710502 | SS Burst Set Composition | discussion | Intel Corporation |
R1-ah-18512 AI: 5.1.1.1.2 |
available | [WTS] [JSN] | |||
R1-1710503 | Time Index Signaling for SS Blocks |
discussion revised to R1-1711611 |
Intel Corporation |
R1-ah-18512 AI: 5.1.1.1.3 |
revised | [WTS] [JSN] | |||
R1-1710504 | SS Block(s) in Wideband Operation | discussion | Intel Corporation |
R1-ah-18512 AI: 5.1.1.1.4 |
available | [WTS] [JSN] | |||
R1-1710505 | NR PBCH Design | discussion | Intel Corporation |
R1-ah-18512 AI: 5.1.1.2.1 |
available | [WTS] [JSN] | |||
R1-1710506 | SS Block Composition |
discussion revised to R1-1711612 |
Intel Corporation |
R1-ah-18512 AI: 5.1.1.2.2 |
revised | [WTS] [JSN] | |||
R1-1710507 | DMRS Sequence for NR PBCH | discussion | Intel Corporation |
R1-ah-18512 AI: 5.1.1.2.3 |
available | [WTS] [JSN] | |||
R1-1710508 | RMSI Delivery Mechanisms | discussion | Intel Corporation |
R1-ah-18512 AI: 5.1.1.2.4 |
available | [WTS] [JSN] | |||
R1-1710509 | NR Paging Design | discussion | Intel Corporation |
R1-ah-18512 AI: 5.1.1.3 |
available | [WTS] [JSN] | |||
R1-1710510 | NR PRACH Preamble design | discussion | Intel Corporation |
R1-ah-18512 AI: 5.1.1.4.1 |
available | [WTS] [JSN] | |||
R1-1710511 | Discussions on PRACH Capacity | discussion | Intel Corporation |
R1-ah-18512 AI: 5.1.1.4.2 |
available | [WTS] [JSN] | |||
R1-1710512 | PRACH Power ramping procedure | discussion | Intel Corporation |
R1-ah-18512 AI: 5.1.1.4.3 |
available | [WTS] [JSN] | |||
R1-1710513 | 4-step PRACH Procedures | discussion | Intel Corporation |
R1-ah-18512 AI: 5.1.1.4.4 |
available | [WTS] [JSN] | |||
R1-1710514 | SS Block based RRM Measurements | discussion | Intel Corporation |
R1-ah-18512 AI: 5.1.1.5.1 |
available | [WTS] [JSN] | |||
R1-1710515 | CSI-RS based RRM Measurements | discussion | Intel Corporation |
R1-ah-18512 AI: 5.1.1.5.2 |
available | [WTS] [JSN] | |||
R1-1710516 | NR Radio Link Monitoring | discussion | Intel Corporation |
R1-ah-18512 AI: 5.1.1.5.3 |
available | [WTS] [JSN] | |||
R1-1710517 | Remaining details on CW to MIMO layer mapping | discussion | Intel Corporation |
R1-ah-18512 AI: 5.1.2.1.1 |
noted | [WTS] [JSN] | |||
R1-1710518 | On codebook based UL tansmission | discussion | Intel Corporation |
R1-ah-18512 AI: 5.1.2.1.2 |
noted | [WTS] [JSN] | |||
R1-1710519 | On non-codebook based UL transmission | discussion | Intel Corporation |
R1-ah-18512 AI: 5.1.2.1.3 |
available | [WTS] [JSN] | |||
R1-1710520 | On diversity based UL transmission | discussion | Intel Corporation |
R1-ah-18512 AI: 5.1.2.1.4 |
available | [WTS] [JSN] | |||
R1-1710521 | On PRB bundling for DL | discussion | Intel Corporation |
R1-ah-18512 AI: 5.1.2.1.5 |
available | [WTS] [JSN] | |||
R1-1710522 | Discussion on uplink multi-panel and multi-TRP operation | discussion | Intel Corporation |
R1-ah-18512 AI: 5.1.2.1.6 |
noted | [WTS] [JSN] | |||
R1-1710523 | Support of downlink NC-JT in NR | discussion | Intel Corporation |
R1-ah-18512 AI: 5.1.2.1.6 |
available | [WTS] [JSN] | |||
R1-1710524 | Rate matching for NR | discussion | Intel Corporation |
R1-ah-18512 AI: 5.1.2.1.7 |
available | [WTS] [JSN] | |||
R1-1710525 | Details for UL Beam Management | discussion | Intel Corporation |
R1-ah-18512 AI: 5.1.2.2.1 |
available | [WTS] [JSN] | |||
R1-1710526 | Details for DL Beam Management | discussion | Intel Corporation |
R1-ah-18512 AI: 5.1.2.2.1 |
available | [WTS] [JSN] | |||
R1-1710527 | Discussion for Mechanism to Recover from Beam Failure | discussion | Intel Corporation |
R1-ah-18512 AI: 5.1.2.2.2 |
noted | [WTS] [JSN] | |||
R1-1710528 | On Timing Advance for multi-beam operation | discussion | Intel Corporation |
R1-ah-18512 AI: 5.1.2.2.3 |
available | [WTS] [JSN] | |||
R1-1710529 | On NR CSI framework | discussion | Intel Corporation |
R1-ah-18512 AI: 5.1.2.3.1 |
available | [WTS] [JSN] | |||
R1-1710530 | On Details of CSI acquisition | discussion | Intel Corporation |
R1-ah-18512 AI: 5.1.2.3.2 |
noted | [WTS] [JSN] | |||
R1-1710531 | On multiplexing of different RS types | discussion | Intel Corporation |
R1-ah-18512 AI: 5.1.2.4.1 |
available | [WTS] [JSN] | |||
R1-1710532 | On CSI-RS for beam management | discussion | Intel Corporation |
R1-ah-18512 AI: 5.1.2.4.2 |
noted | [WTS] [JSN] | |||
R1-1710533 | On CSI-RS for CSI acquisition | discussion | Intel Corporation |
R1-ah-18512 AI: 5.1.2.4.2 |
available | [WTS] [JSN] | |||
R1-1710534 | On the remaining details of DM-RS design | discussion | Intel Corporation |
R1-ah-18512 AI: 5.1.2.4.3 |
available | [WTS] [JSN] | |||
R1-1710535 | On PT-RS for CP-OFDM | discussion | Intel Corporation |
R1-ah-18512 AI: 5.1.2.4.4 |
noted | [WTS] [JSN] | |||
R1-1710536 | On PT-RS for DFT-s-OFDM | discussion | Intel Corporation |
R1-ah-18512 AI: 5.1.2.4.4 |
noted | [WTS] [JSN] | |||
R1-1710537 | Discussion on SRS for NR | discussion | Intel Corporation |
R1-ah-18512 AI: 5.1.2.4.5 |
available | [WTS] [JSN] | |||
R1-1710538 | Discussion on TRS | discussion | Intel Corporation |
R1-ah-18512 AI: 5.1.2.4.6 |
available | [WTS] [JSN] | |||
R1-1710539 | On QCL for different BW parts and other QCL details | discussion | Intel Corporation |
R1-ah-18512 AI: 5.1.2.4.7 |
noted | [WTS] [JSN] | |||
R1-1710540 | Calibration results for Phase 2 NR MIMO system level calibration | discussion | Intel Corporation |
R1-ah-18512 AI: 5.1.2.5 |
available | [WTS] [JSN] | |||
R1-1710541 | NR PDCCH physical structure | discussion | Intel Corporation |
R1-ah-18512 AI: 5.1.3.1.1.1 |
noted | [WTS] [JSN] | |||
R1-1710542 | On DM-RS design for NR PDCCH | discussion | Intel Corporation |
R1-ah-18512 AI: 5.1.3.1.1.2 |
available | [WTS] [JSN] | |||
R1-1710543 | CORESETs for NR PDCCH | discussion | Intel Corporation |
R1-ah-18512 AI: 5.1.3.1.2.1 |
available | [WTS] [JSN] | |||
R1-1710544 | NR PDCCH: Search spaces and monitoring behavior | discussion | Intel Corporation |
R1-ah-18512 AI: 5.1.3.1.2.2 |
available | [WTS] [JSN] | |||
R1-1710545 | Multi-beam operation for NR PDCCH | discussion | Intel Corporation |
R1-ah-18512 AI: 5.1.3.1.2.3 |
available | [WTS] [JSN] | |||
R1-1710546 | Dynamic resource sharing between control and data | discussion | Intel Corporation |
R1-ah-18512 AI: 5.1.3.1.3 |
available | [WTS] [JSN] | |||
R1-1710547 | Group-common PDCCH: Physical structure | discussion | Intel Corporation |
R1-ah-18512 AI: 5.1.3.1.4.1 |
available | [WTS] [JSN] | |||
R1-1710548 | Group-common PDCCH: Contents | discussion | Intel Corporation |
R1-ah-18512 AI: 5.1.3.1.4.2 |
available | [WTS] [JSN] | |||
R1-1710549 | Group-common PDCCH: UE behavior | discussion | Intel Corporation |
R1-ah-18512 AI: 5.1.3.1.4.3 |
available | [WTS] [JSN] | |||
R1-1710550 | Satisfying ultra-reliability targets for NR PDCCH | discussion | Intel Corporation |
R1-ah-18512 AI: 5.1.3.1.5 |
available | [WTS] [JSN] | |||
R1-1710551 | Performance of short PUCCH format for 1~2 bits HARQ-ACK | discussion | Intel Corporation |
R1-ah-18512 AI: 5.1.3.2.1.1 |
available | [WTS] [JSN] | |||
R1-1710552 | 2-symbol NR PUCCH | discussion | Intel Corporation |
R1-ah-18512 AI: 5.1.3.2.1.2 |
available | [WTS] [JSN] | |||
R1-1710553 | Structure of 1~2 bits HARQ-ACK long PUCCH with TDM DMRS | discussion | Intel Corporation |
R1-ah-18512 AI: 5.1.3.2.2.1 |
available | [WTS] [JSN] | |||
R1-1710554 | Long PUCCH for moderate and large payload | discussion | Intel Corporation |
R1-ah-18512 AI: 5.1.3.2.2.2 |
available | [WTS] [JSN] | |||
R1-1710555 | Long PUCCH over multiple slots | discussion | Intel Corporation |
R1-ah-18512 AI: 5.1.3.2.2.3 |
available | [WTS] [JSN] | |||
R1-1710556 | Transmit diversity for PUCCH | discussion | Intel Corporation |
R1-ah-18512 AI: 5.1.3.2.3 |
available | [WTS] [JSN] | |||
R1-1710557 | Resource allocation for PUCCH during initial access | discussion | Intel Corporation |
R1-ah-18512 AI: 5.1.3.2.4 |
available | [WTS] [JSN] | |||
R1-1710558 | UCI multiplexing onto PUSCH | discussion | Intel Corporation |
R1-ah-18512 AI: 5.1.3.2.5.1 |
available | [WTS] [JSN] | |||
R1-1710559 | PUCCH-PUSCH multiplexing | discussion | Intel Corporation |
R1-ah-18512 AI: 5.1.3.2.5.2 |
available | [WTS] [JSN] | |||
R1-1710560 | On UL control channel design aspects for URLLC | discussion | Intel Corporation |
R1-ah-18512 AI: 5.1.3.2.6 |
available | [WTS] [JSN] | |||
R1-1710561 | Configurations of various long PUCCH lengths | discussion | Intel Corporation |
R1-ah-18512 AI: 5.1.3.2.7 |
available | [WTS] [JSN] | |||
R1-1710562 | Short PUCCH formats for 1~2 bits UCI | discussion | Intel Corporation |
R1-ah-18512 AI: 5.1.3.2.7 |
available | [WTS] [JSN] | |||
R1-1710563 | Cyclic shift assignment and CM for FDM DMRS and UCI | discussion | Intel Corporation |
R1-ah-18512 AI: 5.1.3.2.7 |
available | [WTS] [JSN] | |||
R1-1710564 | Short UL control channel early in a slot | discussion | Intel Corporation |
R1-ah-18512 AI: 5.1.3.2.7 |
available | [WTS] [JSN] | |||
R1-1710565 | DL/UL data frequency-domain resource allocation | discussion | Intel Corporation |
R1-ah-18512 AI: 5.1.3.3.1.1 |
available | [WTS] [JSN] | |||
R1-1710566 | Time-domain resource allocation for DL and UL data | discussion | Intel Corporation |
R1-ah-18512 AI: 5.1.3.3.1.2 |
available | [WTS] [JSN] | |||
R1-1710567 | SR configuration and UL data scheduling | discussion | Intel Corporation |
R1-ah-18512 AI: 5.1.3.3.2 |
available | [WTS] [JSN] | |||
R1-1710568 | UL grant-free transmissions: Resource configuration | discussion | Intel Corporation |
R1-ah-18512 AI: 5.1.3.3.3 |
available | [WTS] [JSN] | |||
R1-1710569 | On CBG construction | discussion | Intel Corporation |
R1-ah-18512 AI: 5.1.3.3.4.1 |
available | [WTS] [JSN] | |||
R1-1710570 | DCI design and scheduling of CBG-based (re)transmissions | discussion | Intel Corporation |
R1-ah-18512 AI: 5.1.3.3.4.2 |
available | [WTS] [JSN] | |||
R1-1710571 | HARQ-ACK feedback for CBG-based (re)transmissions | discussion | Intel Corporation |
R1-ah-18512 AI: 5.1.3.3.4.3 |
available | [WTS] [JSN] | |||
R1-1710572 | HARQ-ACK multiplexing and bundling | discussion | Intel Corporation |
R1-ah-18512 AI: 5.1.3.3.5.2 |
available | [WTS] [JSN] | |||
R1-1710573 | On HARQ processes and HARQ RTT | discussion | Intel Corporation |
R1-ah-18512 AI: 5.1.3.3.6.1 |
available | [WTS] [JSN] | |||
R1-1710574 | Soft-buffer requirements in NR | discussion | Intel Corporation |
R1-ah-18512 AI: 5.1.3.3.6.2 |
available | [WTS] [JSN] | |||
R1-1710575 | Remaining details of DL pre-emption indication | discussion | Intel Corporation |
R1-ah-18512 AI: 5.1.3.3.7.1 |
available | [WTS] [JSN] | |||
R1-1710576 | Multiplexing of UL transmissions with different data durations and latency requirements | discussion | Intel Corporation |
R1-ah-18512 AI: 5.1.3.3.7.2 |
available | [WTS] [JSN] | |||
R1-1710577 | On link adaptation enhancements to support URLLC | discussion | Intel Corporation |
R1-ah-18512 AI: 5.1.3.3.8 |
available | [WTS] [JSN] | |||
R1-1710578 | Scheduling and UCI feedback for carrier aggregation | discussion | Intel Corporation |
R1-ah-18512 AI: 5.1.3.4.1.1 |
available | [WTS] [JSN] | |||
R1-1710579 | On SRS fast switching | discussion | Intel Corporation |
R1-ah-18512 AI: 5.1.3.4.1.2 |
available | [WTS] [JSN] | |||
R1-1710580 | On Dual Connectivity for NR | discussion | Intel Corporation |
R1-ah-18512 AI: 5.1.3.4.2 |
available | [WTS] [JSN] | |||
R1-1710581 | Details on cross-link interference measurement | discussion | Intel Corporation |
R1-ah-18512 AI: 5.1.6.1 |
noted | [WTS] [JSN] | |||
R1-1710582 | On RS transmission location for cross-link interference measurement for NR duplex flexibility | discussion | Intel Corporation |
R1-ah-18512 AI: 5.1.6.1 |
available | [WTS] [JSN] | |||
R1-1710583 | Open issues for wider bandwidth operations | discussion | Intel Corporation |
R1-ah-18512 AI: 5.1.7 |
available | [WTS] [JSN] | |||
R1-1710584 | Open issues for LTE-NR coexistence | discussion | Intel Corporation |
R1-ah-18512 AI: 5.1.8 |
noted | [WTS] [JSN] | |||
R1-1710585 | Power sharing mechanism for NR dual connectivity | discussion | Intel Corporation |
R1-ah-18512 AI: 5.1.9.1 |
available | [WTS] [JSN] | |||
R1-1710586 | PUSCH and PUCCH power control | discussion | Intel Corporation |
R1-ah-18512 AI: 5.1.9.2 |
available | [WTS] [JSN] | |||
R1-1710587 | Polar code construction for NR control channel | discussion | NEC Corporation |
R1-ah-18512 AI: 5.1.4.2.1 |
available | [WTS] [JSN] | |||
R1-1710588 | Results for short PUCCH for UCI of up to 2 bits | discussion | IITH |
R1-ah-18512 AI: 5.1.3.2.1.1 |
available | [WTS] [JSN] | |||
R1-1710589 | Further discussion on pre-DFT multiplexing for short PUCCH | discussion | IITH |
R1-ah-18512 AI: 5.1.3.2.1.2 |
available | [WTS] [JSN] | |||
R1-1710590 | Views on long-duration PUCCH | discussion | IITH |
R1-ah-18512 AI: 5.1.3.2.2 |
available | [WTS] [JSN] | |||
R1-1710591 | Sequence design evaluation for rate-matched polar codes | discussion | NEC Corporation |
R1-ah-18512 AI: 5.1.4.2.2 |
available | [WTS] [JSN] | |||
R1-1710592 | Next steps for pi/2 BPSK with spectrum shaping | discussion | IITH |
R1-ah-18512 AI: 5.1.5 |
available | [WTS] [JSN] | |||
R1-1710593 | Discussion on CBG grouping | discussion | Guangdong OPPO Mobile Telecom. |
R1-ah-18512 AI: 5.1.3.3.4.1 |
available | [WTS] [JSN] | |||
R1-1710594 | On codeword to RE mapping scheme | discussion | Lenovo, Motorola Mobility |
R1-ah-18512 AI: 5.1.2.1.1 |
available | [WTS] [JSN] | |||
R1-1710595 | Discussion of RS for DL beam management | discussion | Lenovo, Motorola Mobility |
R1-ah-18512 AI: 5.1.2.2.1 |
available | [WTS] [JSN] | |||
R1-1710596 | Discussion of beam recovery procedure | discussion | Lenovo, Motorola Mobility |
R1-ah-18512 AI: 5.1.2.2.2 |
available | [WTS] [JSN] | |||
R1-1710597 | Enhanced SR carried in UL control channel | discussion | Lenovo, Motorola Mobility |
R1-ah-18512 AI: 5.1.3.2.6 |
available | [WTS] [JSN] | |||
R1-1710598 | Long PUCCH design for UCI of up to 2 bits | discussion | Lenovo, Motorola Mobility |
R1-ah-18512 AI: 5.1.3.2.2.1 |
available | [WTS] [JSN] | |||
R1-1710599 | Long PUCCH design for UCI of more than 2 bits | discussion | Lenovo, Motorola Mobility |
R1-ah-18512 AI: 5.1.3.2.2.2 |
available | [WTS] [JSN] | |||
R1-1710600 | Long PUCCH over multiple slots | discussion | Lenovo, Motorola Mobility |
R1-ah-18512 AI: 5.1.3.2.2.3 |
available | [WTS] [JSN] | |||
R1-1710601 | UL grant-free transmission for URLLC | discussion | Lenovo, Motorola Mobility |
R1-ah-18512 AI: 5.1.3.3.3 |
available | [WTS] [JSN] | |||
R1-1710602 | CBG construction for CBG-based retransmission | discussion | Lenovo, Motorola Mobility |
R1-ah-18512 AI: 5.1.3.3.4.1 |
available | [WTS] [JSN] | |||
R1-1710603 | DL control signalling for CBG-based retransmission | discussion | Lenovo, Motorola Mobility |
R1-ah-18512 AI: 5.1.3.3.4.2 |
available | [WTS] [JSN] | |||
R1-1710604 | UL HARQ-ACK feedback for CBG-based retransmission | discussion | Lenovo, Motorola Mobility |
R1-ah-18512 AI: 5.1.3.3.4.3 |
available | [WTS] [JSN] | |||
R1-1710605 | HARQ-ACK codebook design for CBG-based transmission | discussion | Lenovo, Motorola Mobility |
R1-ah-18512 AI: 5.1.3.3.5.2 |
available | [WTS] [JSN] | |||
R1-1710606 | On eMBB/URLLC multiplexing for uplink transmission | discussion | Lenovo, Motorola Mobility |
R1-ah-18512 AI: 5.1.3.3.7.2 |
available | [WTS] [JSN] | |||
R1-1710607 | On DM-RS for NR | discussion | Intel Corporation | Rel-15 |
R1-ah-18512 AI: 5.1.2.4.3 |
available | [WTS] [JSN] | ||
R1-1710608 | Delivery of remaining minimum system information | discussion | ETRI |
R1-ah-18512 AI: 5.1.1.2.4 |
available | [WTS] [JSN] | |||
R1-1710609 | Delivery of other system information | discussion | ETRI |
R1-ah-18512 AI: 5.1.1.2.5 |
available | [WTS] [JSN] | |||
R1-1710610 | NR-PRACH for various use cases | discussion | ETRI |
R1-ah-18512 AI: 5.1.1.4.2 |
available | [WTS] [JSN] | |||
R1-1710611 | Discussion on codeword mapping | discussion | ETRI |
R1-ah-18512 AI: 5.1.2.1.1 |
available | [WTS] [JSN] | |||
R1-1710612 | Discussion on downlink DMRS design | discussion | ETRI |
R1-ah-18512 AI: 5.1.2.4.3 |
available | [WTS] [JSN] | |||
R1-1710613 | Discussion on uplink DMRS design | discussion | ETRI |
R1-ah-18512 AI: 5.1.2.4.3 |
available | [WTS] [JSN] | |||
R1-1710614 | NR-PDCCH mapping structure and REG bundle size | discussion | ETRI |
R1-ah-18512 AI: 5.1.3.1.1.1 |
available | [WTS] [JSN] | |||
R1-1710615 | DMRS design for NR-PDCCH | discussion | ETRI |
R1-ah-18512 AI: 5.1.3.1.1.2 |
available | [WTS] [JSN] | |||
R1-1710616 | NR-PDCCH for broadcast information delivery | discussion | ETRI |
R1-ah-18512 AI: 5.1.3.1.2.3 |
available | [WTS] [JSN] | |||
R1-1710617 | Discussion on dynamic indication of PDSCH start symbol | discussion | ETRI |
R1-ah-18512 AI: 5.1.3.1.3 |
available | [WTS] [JSN] | |||
R1-1710618 | Short-PUCCH for UCI of up to 2 bits | discussion | ETRI |
R1-ah-18512 AI: 5.1.3.2.1.1 |
available | [WTS] [JSN] | |||
R1-1710619 | Short-PUCCH for UCI of more than 2 bits | discussion | ETRI |
R1-ah-18512 AI: 5.1.3.2.1.2 |
available | [WTS] [JSN] | |||
R1-1710620 | Long-PUCCH over multiple slots | discussion | ETRI |
R1-ah-18512 AI: 5.1.3.2.2.3 |
available | [WTS] [JSN] | |||
R1-1710621 | Resource allocation and transmission scheme for URLLC grant-free transmission | discussion | ETRI |
R1-ah-18512 AI: 5.1.3.3.3 |
available | [WTS] [JSN] | |||
R1-1710622 | UE bandwidth configuration during initial access | discussion | ETRI |
R1-ah-18512 AI: 5.1.7 |
available | [WTS] [JSN] | |||
R1-1710623 | Remaining details on SS sequence design | other | Samsung |
R1-ah-18512 AI: 5.1.1.1.1 |
available | [WTS] [JSN] | |||
R1-1710624 | SS burst set composition |
other revised to R1-1711580 |
Samsung |
R1-ah-18512 AI: 5.1.1.1.2 |
revised | [WTS] [JSN] | |||
R1-1710625 | Timing indication based on SS block |
other revised to R1-1711589 |
Samsung |
R1-ah-18512 AI: 5.1.1.1.3 |
revised | [WTS] [JSN] | |||
R1-1710626 | Remaining details on mulitple SS block transmissions in wideband CC | other | Samsung |
R1-ah-18512 AI: 5.1.1.1.4 |
available | [WTS] [JSN] | |||
R1-1710627 | NR-PBCH contents and payload size | other | Samsung |
R1-ah-18512 AI: 5.1.1.2.1 |
available | [WTS] [JSN] | |||
R1-1710628 | NR-PBCH RE mapping and SS block composition | other | Samsung |
R1-ah-18512 AI: 5.1.1.2.2 |
noted | [WTS] [JSN] | |||
R1-1710629 | Sequence design of DMRS for NR-PBCH | other | Samsung |
R1-ah-18512 AI: 5.1.1.2.3 |
available | [WTS] [JSN] | |||
R1-1710630 | Remaining minimum system information delivery | other | Samsung |
R1-ah-18512 AI: 5.1.1.2.4 |
available | [WTS] [JSN] | |||
R1-1710631 | Other system information delivery | other | Samsung |
R1-ah-18512 AI: 5.1.1.2.5 |
available | [WTS] [JSN] | |||
R1-1710632 | Paging design | other | Samsung |
R1-ah-18512 AI: 5.1.1.3 |
available | [WTS] [JSN] | |||
R1-1710633 | PRACH preamble format details for long/short sequence length | other | Samsung |
R1-ah-18512 AI: 5.1.1.4.1 |
available | [WTS] [JSN] | |||
R1-1710634 | PRACH preamble format details for capacity enhancement and beam management | other | Samsung |
R1-ah-18512 AI: 5.1.1.4.2 |
available | [WTS] [JSN] | |||
R1-1710635 | Power ramping and power control during RA procedure | other | Samsung |
R1-ah-18512 AI: 5.1.1.4.3 |
available | [WTS] [JSN] | |||
R1-1710636 | 4-step RACH procedure | other | Samsung |
R1-ah-18512 AI: 5.1.1.4.4 |
available | [WTS] [JSN] | |||
R1-1710637 | Measurement based on SS block | other | Samsung |
R1-ah-18512 AI: 5.1.1.5.1 |
noted | [WTS] [JSN] | |||
R1-1710638 | Measurement based on CSI-RS for L3 mobility |
other revised to R1-1711581 |
Samsung |
R1-ah-18512 AI: 5.1.1.5.2 |
revised | [WTS] [JSN] | |||
R1-1710639 | Radio link monitoring | other | Samsung |
R1-ah-18512 AI: 5.1.1.5.3 |
available | [WTS] [JSN] | |||
R1-1710640 | Discussion on SS periodicity and PBCH TTI | discussion | Samsung |
R1-ah-18512 AI: 5.1.1.6 |
available | [WTS] [JSN] | |||
R1-1710641 | Considerations on PRACH design in high-mobility scenario | discussion | Samsung |
R1-ah-18512 AI: 5.1.1.6 |
available | [WTS] [JSN] | |||
R1-1710642 | Finalizing Layer Mapping | other | Samsung |
R1-ah-18512 AI: 5.1.2.1.1 |
noted | [WTS] [JSN] | |||
R1-1710643 | Codebook-Based UL Transmission | other | Samsung |
R1-ah-18512 AI: 5.1.2.1.2 |
noted | [WTS] [JSN] | |||
R1-1710644 | Discussion on Non-Codebook-Based UL Transmission | other | Samsung |
R1-ah-18512 AI: 5.1.2.1.3 |
noted | [WTS] [JSN] | |||
R1-1710645 | Diversity transmission for UL | other | Samsung |
R1-ah-18512 AI: 5.1.2.1.4 |
available | [WTS] [JSN] | |||
R1-1710646 | PRB bundling for NR DMRS | other | Samsung |
R1-ah-18512 AI: 5.1.2.1.5 |
available | [WTS] [JSN] | |||
R1-1710647 | Discussions on NR DL network coordination | other | Samsung |
R1-ah-18512 AI: 5.1.2.1.6 |
available | [WTS] [JSN] | |||
R1-1710648 | Discussions on NR UL multi-panel/multi-TRP | other | Samsung |
R1-ah-18512 AI: 5.1.2.1.6 |
noted | [WTS] [JSN] | |||
R1-1710649 | On PDSCH rate matching for NR | other | Samsung |
R1-ah-18512 AI: 5.1.2.1.7 |
noted | [WTS] [JSN] | |||
R1-1710650 | Discussion on transmission parameter sets | other | Samsung |
R1-ah-18512 AI: 5.1.2.1.8 |
available | [WTS] [JSN] | |||
R1-1710651 | Discussion of number of PDSCHs in NR-CoMP | other | Samsung |
R1-ah-18512 AI: 5.1.2.1.8 |
available | [WTS] [JSN] | |||
R1-1710652 | Multi-TA procedures for Multi-TRP | other | Samsung |
R1-ah-18512 AI: 5.1.2.1.8 |
available | [WTS] [JSN] | |||
R1-1710653 | UL beam management | other | Samsung |
R1-ah-18512 AI: 5.1.2.2.1 |
available | [WTS] [JSN] | |||
R1-1710654 | DL beam management for NR | other | Samsung |
R1-ah-18512 AI: 5.1.2.2.1 |
noted | [WTS] [JSN] | |||
R1-1710655 | Beam failure recovery | other | Samsung |
R1-ah-18512 AI: 5.1.2.2.2 |
available | [WTS] [JSN] | |||
R1-1710656 | Measurement and reporting for beam management | other | Samsung |
R1-ah-18512 AI: 5.1.2.2.3 |
available | [WTS] [JSN] | |||
R1-1710657 | Discussion on Group based reporting | other | Samsung |
R1-ah-18512 AI: 5.1.2.2.3 |
available | [WTS] [JSN] | |||
R1-1710658 | Discusssion on Tx beam grouping configuration | other | Samsung |
R1-ah-18512 AI: 5.1.2.2.3 |
available | [WTS] [JSN] | |||
R1-1710659 | Discussion on beam indication for PDSCH | other | Samsung |
R1-ah-18512 AI: 5.1.2.2.3 |
available | [WTS] [JSN] | |||
R1-1710660 | L1 RSRP reporting for beam management | other | Samsung |
R1-ah-18512 AI: 5.1.2.2.3 |
available | [WTS] [JSN] | |||
R1-1710661 | L1-RSRP measurement duration | other | Samsung |
R1-ah-18512 AI: 5.1.2.2.3 |
available | [WTS] [JSN] | |||
R1-1710662 | On SS-block based beam management | other | Samsung |
R1-ah-18512 AI: 5.1.2.2.3 |
noted | [WTS] [JSN] | |||
R1-1710663 | DL beam management configuration | other | Samsung |
R1-ah-18512 AI: 5.1.2.2.3 |
available | [WTS] [JSN] | |||
R1-1710664 | QCL associations for beam management RS | other | Samsung |
R1-ah-18512 AI: 5.1.2.2.3 |
available | [WTS] [JSN] | |||
R1-1710665 | Aperiodic BSI reporting | other | Samsung |
R1-ah-18512 AI: 5.1.2.2.3 |
available | [WTS] [JSN] | |||
R1-1710666 | Beam management for PDCCH |
other revised to R1-1711604 |
Samsung |
R1-ah-18512 AI: 5.1.2.2.3 |
revised | [WTS] [JSN] | |||
R1-1710667 | CSI Acquisition and Beam Management Framework | other | Samsung |
R1-ah-18512 AI: 5.1.2.3.1 |
available | [WTS] [JSN] | |||
R1-1710668 | Discussions on CSI measurements and reporting for NR | other | Samsung |
R1-ah-18512 AI: 5.1.2.3.2 |
available | [WTS] [JSN] | |||
R1-1710669 | CSI Reporting for Reciprocity Operation | other | Samsung |
R1-ah-18512 AI: 5.1.2.3.3 |
noted | [WTS] [JSN] | |||
R1-1710670 | Remaining details of Type I and Type II CSI codebooks | other | Samsung |
R1-ah-18512 AI: 5.1.2.3.4 |
available | [WTS] [JSN] | |||
R1-1710671 | CSI support for transparent precoder cycling | other | Samsung |
R1-ah-18512 AI: 5.1.2.3.4 |
available | [WTS] [JSN] | |||
R1-1710672 | CSI parameters and multiplexing | other | Samsung |
R1-ah-18512 AI: 5.1.2.3.4 |
noted | [WTS] [JSN] | |||
R1-1710673 | Differential reporting of Type II CSI | other | Samsung |
R1-ah-18512 AI: 5.1.2.3.4 |
available | [WTS] [JSN] | |||
R1-1710674 | On higher rank (3 and 4) Type II CSI | other | Samsung |
R1-ah-18512 AI: 5.1.2.3.4 |
available | [WTS] [JSN] | |||
R1-1710675 | Discussion on CSI-RS Resource Activation | other | Samsung |
R1-ah-18512 AI: 5.1.2.3.5 |
available | [WTS] [JSN] | |||
R1-1710676 | Discussions on channel and interference measurements for NR | other | Samsung |
R1-ah-18512 AI: 5.1.2.3.5 |
available | [WTS] [JSN] | |||
R1-1710677 | Discussions on CSI Feedback Signalling Overhead Reduction | other | Samsung |
R1-ah-18512 AI: 5.1.2.3.5 |
available | [WTS] [JSN] | |||
R1-1710678 | Discussions on multiplexing of different types of RSs for DL | other | Samsung |
R1-ah-18512 AI: 5.1.2.4.1 |
noted | [WTS] [JSN] | |||
R1-1710679 | Discussions on multiplexing of different types of RSs for UL | other | Samsung |
R1-ah-18512 AI: 5.1.2.4.1 |
available | [WTS] [JSN] | |||
R1-1710680 | Discussions on CSI-RS design for NR MIMO | other | Samsung |
R1-ah-18512 AI: 5.1.2.4.2 |
available | [WTS] [JSN] | |||
R1-1710681 | CSI-RS for beam management | other | Samsung |
R1-ah-18512 AI: 5.1.2.4.2 |
available | [WTS] [JSN] | |||
R1-1710682 | Discussion on DL DMRS design for NR | other | Samsung |
R1-ah-18512 AI: 5.1.2.4.3 |
available | [WTS] [JSN] | |||
R1-1710683 | Evaluation results on DL DMRS for NR | other | Samsung |
R1-ah-18512 AI: 5.1.2.4.3 |
available | [WTS] [JSN] | |||
R1-1710684 | Discussion on UL DMRS design for NR | other | Samsung |
R1-ah-18512 AI: 5.1.2.4.3 |
available | [WTS] [JSN] | |||
R1-1710685 | Evaluation results on UL DMRS for NR | other | Samsung |
R1-ah-18512 AI: 5.1.2.4.3 |
available | [WTS] [JSN] | |||
R1-1710686 | On DL PTRS design | other | Samsung |
R1-ah-18512 AI: 5.1.2.4.4 |
available | [WTS] [JSN] | |||
R1-1710687 | On UL PTRS for DFT-s-OFDM | other | Samsung |
R1-ah-18512 AI: 5.1.2.4.4 |
available | [WTS] [JSN] | |||
R1-1710688 | SRS design for NR | other | Samsung |
R1-ah-18512 AI: 5.1.2.4.5 |
available | [WTS] [JSN] | |||
R1-1710689 | Discussions on fine time/frequency tracking for NR | other | Samsung |
R1-ah-18512 AI: 5.1.2.4.6 |
available | [WTS] [JSN] | |||
R1-1710690 | On QCL for NR | other | Samsung |
R1-ah-18512 AI: 5.1.2.4.7 |
available | [WTS] [JSN] | |||
R1-1710691 | Resource Mapping for PDCCH | other | Samsung |
R1-ah-18512 AI: 5.1.3.1.1.1 |
available | [WTS] [JSN] | |||
R1-1710692 | DMRS Structure for PDCCH |
other revised to R1-1711583 |
Samsung |
R1-ah-18512 AI: 5.1.3.1.1.2 |
revised | [WTS] [JSN] | |||
R1-1710693 | CORESET Configurations | other | Samsung |
R1-ah-18512 AI: 5.1.3.1.2.1 |
available | [WTS] [JSN] | |||
R1-1710694 | Search Space Design | other | Samsung |
R1-ah-18512 AI: 5.1.3.1.2.2 |
available | [WTS] [JSN] | |||
R1-1710695 | Multibeam Transmission for PDCCH | other | Samsung |
R1-ah-18512 AI: 5.1.3.1.2.3 |
available | [WTS] [JSN] | |||
R1-1710696 | Multiplexing NR-PDCCH and PDSCH | other | Samsung |
R1-ah-18512 AI: 5.1.3.1.3 |
available | [WTS] [JSN] | |||
R1-1710697 | UE-Group Common PDCCH Structure | other | Samsung |
R1-ah-18512 AI: 5.1.3.1.4.1 |
available | [WTS] [JSN] | |||
R1-1710698 | Functionalities of UE-Common PDCCH | other | Samsung |
R1-ah-18512 AI: 5.1.3.1.4.2 |
available | [WTS] [JSN] | |||
R1-1710699 | UE Behavior for UE-Group Common PDCCH Detection | other | Samsung |
R1-ah-18512 AI: 5.1.3.1.4.3 |
available | [WTS] [JSN] | |||
R1-1710700 | PDCCH Design for URLLC | other | Samsung |
R1-ah-18512 AI: 5.1.3.1.5 |
available | [WTS] [JSN] | |||
R1-1710701 | Transmit Diversity for PDCCH | other | Samsung |
R1-ah-18512 AI: 5.1.3.1.6 |
available | [WTS] [JSN] | |||
R1-1710702 | Bandwidth Part Hopping for CORESETS | other | Samsung |
R1-ah-18512 AI: 5.1.3.1.6 |
available | [WTS] [JSN] | |||
R1-1710703 | Short PUCCH for UCI of 1 or 2 Bits | other | Samsung |
R1-ah-18512 AI: 5.1.3.2.1.1 |
available | [WTS] [JSN] | |||
R1-1710704 | Short PUCCH for UCI of more than 2 Bits | other | Samsung |
R1-ah-18512 AI: 5.1.3.2.1.2 |
available | [WTS] [JSN] | |||
R1-1710705 | Long PUCCH for UCI of 1 or 2 Bits | other | Samsung |
R1-ah-18512 AI: 5.1.3.2.2.1 |
available | [WTS] [JSN] | |||
R1-1710706 | Long PUCCH for UCI of more than 2 Bits | other | Samsung |
R1-ah-18512 AI: 5.1.3.2.2.2 |
available | [WTS] [JSN] | |||
R1-1710707 | Multi-Slot Long PUCCH Transmission | other | Samsung |
R1-ah-18512 AI: 5.1.3.2.2.3 |
available | [WTS] [JSN] | |||
R1-1710708 | Transmit Diversity for PUCCH | other | Samsung |
R1-ah-18512 AI: 5.1.3.2.3 |
available | [WTS] [JSN] | |||
R1-1710709 | Resource Allocation for PUCCH with HARQ-ACK | other | Samsung |
R1-ah-18512 AI: 5.1.3.2.4 |
available | [WTS] [JSN] | |||
R1-1710710 | On UCI Multiplexing in PUSCH | other | Samsung |
R1-ah-18512 AI: 5.1.3.2.5.1 |
available | [WTS] [JSN] | |||
R1-1710711 | On Simultaneous PUSCH and PUCCH Transmissions | other | Samsung |
R1-ah-18512 AI: 5.1.3.2.5.2 |
available | [WTS] [JSN] | |||
R1-1710712 | PUCCH Design for URLLC | other | Samsung |
R1-ah-18512 AI: 5.1.3.2.6 |
available | [WTS] [JSN] | |||
R1-1710713 | Performance Results for Long PUCCH | other | Samsung |
R1-ah-18512 AI: 5.1.3.2.7 |
available | [WTS] [JSN] | |||
R1-1710714 | Performance Results for UCI and Data Multiplexing | other | Samsung |
R1-ah-18512 AI: 5.1.3.2.7 |
available | [WTS] [JSN] | |||
R1-1710715 | UE-Group CSI Reporting | other | Samsung |
R1-ah-18512 AI: 5.1.3.2.7 |
withdrawn | [WTS] [JSN] | |||
R1-1710716 | Multiplexing PUSCH with Short PUCCH or SRS | other | Samsung |
R1-ah-18512 AI: 5.1.3.2.7 |
available | [WTS] [JSN] | |||
R1-1710717 | BSI/CSI Transmission on PUCCH | other | Samsung |
R1-ah-18512 AI: 5.1.3.2.7 |
available | [WTS] [JSN] | |||
R1-1710718 | DL/UL Frequency Resource Allocation | other | Samsung |
R1-ah-18512 AI: 5.1.3.3.1.1 |
available | [WTS] [JSN] | |||
R1-1710719 | DL/UL Time Resource Allocation | other | Samsung |
R1-ah-18512 AI: 5.1.3.3.1.2 |
available | [WTS] [JSN] | |||
R1-1710720 | Transport Block Size Determination | other | Samsung |
R1-ah-18512 AI: 5.1.3.3.1.3 |
available | [WTS] [JSN] | |||
R1-1710721 | SR Transmission for Multiple Configurations | other | Samsung |
R1-ah-18512 AI: 5.1.3.3.2 |
available | [WTS] [JSN] | |||
R1-1710722 | Procedures for Grant-Based UL Transmissions | other | Samsung |
R1-ah-18512 AI: 5.1.3.3.2 |
available | [WTS] [JSN] | |||
R1-1710723 | Procedures for Grant-Free UL Transmissions | other | Samsung |
R1-ah-18512 AI: 5.1.3.3.3 |
available | [WTS] [JSN] | |||
R1-1710724 | Grant-Free and Grant-Based UL Transmissions | other | Samsung |
R1-ah-18512 AI: 5.1.3.3.3 |
available | [WTS] [JSN] | |||
R1-1710725 | CBG Construction | other | Samsung |
R1-ah-18512 AI: 5.1.3.3.4.1 |
available | [WTS] [JSN] | |||
R1-1710726 | Scheduling for CBG Retransmissions | other | Samsung |
R1-ah-18512 AI: 5.1.3.3.4.2 |
available | [WTS] [JSN] | |||
R1-1710727 | HARQ-ACK Feedback for CBG-Based Retransmissions | other | Samsung |
R1-ah-18512 AI: 5.1.3.3.4.3 |
available | [WTS] [JSN] | |||
R1-1710728 | HARQ-ACK Feedback Timing | other | Samsung |
R1-ah-18512 AI: 5.1.3.3.5.1 |
available | [WTS] [JSN] | |||
R1-1710729 | HARQ-ACK Codeword Determination | other | Samsung |
R1-ah-18512 AI: 5.1.3.3.5.2 |
available | [WTS] [JSN] | |||
R1-1710730 | On Number of HARQ Processes and HARQ RTT | other | Samsung |
R1-ah-18512 AI: 5.1.3.3.6.1 |
available | [WTS] [JSN] | |||
R1-1710731 | Soft Buffer Partitioning | other | Samsung |
R1-ah-18512 AI: 5.1.3.3.6.2 |
available | [WTS] [JSN] | |||
R1-1710732 | Indication of Preempted Resources in DL | other | Samsung |
R1-ah-18512 AI: 5.1.3.3.7.1 |
available | [WTS] [JSN] | |||
R1-1710733 | On Indication of Preempted Resources in UL | other | Samsung |
R1-ah-18512 AI: 5.1.3.3.7.2 |
available | [WTS] [JSN] | |||
R1-1710734 | Scheduling/HARQ Procedures for URLLC | other | Samsung |
R1-ah-18512 AI: 5.1.3.3.8 |
available | [WTS] [JSN] | |||
R1-1710735 | Remaining Aspects for Short Scheduling Durations | other | Samsung |
R1-ah-18512 AI: 5.1.3.3.9 |
available | [WTS] [JSN] | |||
R1-1710736 | Triggered UCI Transmissions | other | Samsung |
R1-ah-18512 AI: 5.1.3.3.9 |
available | [WTS] [JSN] | |||
R1-1710737 | DL Resource Allocation for Multiplexing Data with Different Transmissions Durations | other | Samsung |
R1-ah-18512 AI: 5.1.3.3.9 |
available | [WTS] [JSN] | |||
R1-1710738 | Average User Plane Latency for Preemption based Multiplexing | other | Samsung |
R1-ah-18512 AI: 5.1.3.3.9 |
available | [WTS] [JSN] | |||
R1-1710739 | Cross-Carrier Scheduling and HARQ-ACK Feedback | other | Samsung |
R1-ah-18512 AI: 5.1.3.4.1.1 |
available | [WTS] [JSN] | |||
R1-1710740 | Fast Carrier Switcing for SRS Transmissions | other | Samsung |
R1-ah-18512 AI: 5.1.3.4.1.2 |
available | [WTS] [JSN] | |||
R1-1710741 | DC for UE with Single UL Carrier Capability | other | Samsung |
R1-ah-18512 AI: 5.1.3.4.2 |
available | [WTS] [JSN] | |||
R1-1710742 | CB segmentation on data channel | other | Samsung |
R1-ah-18512 AI: 5.1.4.1.1.2 |
noted | [WTS] [JSN] | |||
R1-1710743 | UE operation for two different base graphs | other | Samsung |
R1-ah-18512 AI: 5.1.4.1.1.2 |
available | [WTS] [JSN] | |||
R1-1710744 | LDPC Code for BG#1 | other | Samsung |
R1-ah-18512 AI: 5.1.4.1.2 |
available | [WTS] [JSN] | |||
R1-1710745 | LDPC Code for BG#2 | other | Samsung |
R1-ah-18512 AI: 5.1.4.1.2 |
available | [WTS] [JSN] | |||
R1-1710746 | Modulo Lifting for Length-Flexible QC LDPC Codes | other | Samsung |
R1-ah-18512 AI: 5.1.4.1.2 |
available | [WTS] [JSN] | |||
R1-1710747 | Polar code construction | other | Samsung |
R1-ah-18512 AI: 5.1.4.2.1 |
available | [WTS] [JSN] | |||
R1-1710748 | Scrambling for polar codes | other | Samsung |
R1-ah-18512 AI: 5.1.4.2.1 |
available | [WTS] [JSN] | |||
R1-1710749 | Design of combined-and-Nested polar code sequences |
other revised to R1-1711822 |
Samsung |
R1-ah-18512 AI: 5.1.4.2.2 |
revised | [WTS] [JSN] | |||
R1-1710750 | Design of unfied rate-matching for polar codes | other | Samsung |
R1-ah-18512 AI: 5.1.4.2.2 |
available | [WTS] [JSN] | |||
R1-1710751 | Circular buffer management for polar code rate-matching | other | Samsung |
R1-ah-18512 AI: 5.1.4.2.2 |
noted | [WTS] [JSN] | |||
R1-1710752 | Design of channel interleaver for polar codes | other | Samsung |
R1-ah-18512 AI: 5.1.4.2.3 |
available | [WTS] [JSN] | |||
R1-1710753 | Modulation Schemes for NR | other | Samsung |
R1-ah-18512 AI: 5.1.5 |
available | [WTS] [JSN] | |||
R1-1710754 | Cross-link Interference Management Based on UE Measurements | other | Samsung |
R1-ah-18512 AI: 5.1.6.1 |
available | [WTS] [JSN] | |||
R1-1710755 | Cross-link Interference Management based on Coordinated Beamforming | other | Samsung |
R1-ah-18512 AI: 5.1.6.1 |
noted | [WTS] [JSN] | |||
R1-1710756 | Performance Evaluation of Cross-Link Interference Management | other | Samsung |
R1-ah-18512 AI: 5.1.6.2 |
available | [WTS] [JSN] | |||
R1-1710757 | Timing Alignment on Cross-Link for Dynamic TDD | other | Samsung |
R1-ah-18512 AI: 5.1.6.2 |
available | [WTS] [JSN] | |||
R1-1710758 | Cross-Link Interference Management based on Power Control | other | Samsung |
R1-ah-18512 AI: 5.1.6.2 |
available | [WTS] [JSN] | |||
R1-1710759 | Discussion on CLI Mitigation with Network Coordination | other | Samsung |
R1-ah-18512 AI: 5.1.6.2 |
available | [WTS] [JSN] | |||
R1-1710760 | Interference Measurement Table and Beam Coordination | other | Samsung |
R1-ah-18512 AI: 5.1.6.2 |
available | [WTS] [JSN] | |||
R1-1710761 | Wider Bandwidth Operations | other | Samsung |
R1-ah-18512 AI: 5.1.7 |
available | [WTS] [JSN] | |||
R1-1710762 | LTE-NR coexistence for DL | other | Samsung |
R1-ah-18512 AI: 5.1.8 |
available | [WTS] [JSN] | |||
R1-1710763 | LTE-NR coexistence for UL | other | Samsung |
R1-ah-18512 AI: 5.1.8 |
noted | [WTS] [JSN] | |||
R1-1710764 | On UL Power Sharing for Multi-Cell Transmissions | other | Samsung |
R1-ah-18512 AI: 5.1.9.1 |
available | [WTS] [JSN] | |||
R1-1710765 | Power Control Framework | other | Samsung |
R1-ah-18512 AI: 5.1.9.2 |
available | [WTS] [JSN] | |||
R1-1710766 | On PHR Requirements and Calculation | other | Samsung |
R1-ah-18512 AI: 5.1.9.2 |
available | [WTS] [JSN] | |||
R1-1710767 | ECP Aspects for 60kHz SCS | other | Samsung |
R1-ah-18512 AI: 5.1.11 |
available | [WTS] [JSN] | |||
R1-1710768 | On PAPR of DMRS for p/2-BPSK DFT-s-OFDM with Spectrum Shaping | other | Samsung |
R1-ah-18512 AI: 5.1.11 |
available | [WTS] [JSN] | |||
R1-1710769 | RACH Aspects for CA and DC | other | Samsung |
R1-ah-18512 AI: 5.1.11 |
available | [WTS] [JSN] | |||
R1-1710770 | Discussion on Polar code construction | discussion | Spreadtrum Communications |
R1-ah-18512 AI: 5.1.4.2.1 |
available | [WTS] [JSN] | |||
R1-1710771 | Discussions on UE-to-UE interference measurement and report |
discussion revised to R1-1713857 |
Panasonic |
R1-ah-18512 AI: 5.1.6.1 |
noted | [WTS] [JSN] | |||
R1-1710772 | Discussions on intended DL/UL direction configuration via Xn signalling |
discussion revised to R1-1713858 |
Panasonic |
R1-ah-18512 AI: 5.1.6.1 |
available | [WTS] [JSN] | |||
R1-1710773 | CORESET configuration for RMSI scheduling | other | CMCC |
R1-ah-18512 AI: 5.1.1.2.4 |
available | [WTS] [JSN] | |||
R1-1710774 | Discussion on RACH configuration | other | CMCC |
R1-ah-18512 AI: 5.1.1.4.4 |
available | [WTS] [JSN] | |||
R1-1710775 | Discussion on RRM measurement on SS blocks | other | CMCC |
R1-ah-18512 AI: 5.1.1.5.2 |
withdrawn | [WTS] [JSN] | |||
R1-1710776 | Comparisons on Beam Reporting in NR | other | CMCC |
R1-ah-18512 AI: 5.1.2.2.1 |
available | [WTS] [JSN] | |||
R1-1710777 | Discussion on PT-RS design | other | CMCC |
R1-ah-18512 AI: 5.1.2.4.4 |
available | [WTS] [JSN] | |||
R1-1710778 | On DMRS Design for NR-PDCCH | other | CMCC |
R1-ah-18512 AI: 5.1.3.1.1.2 |
available | [WTS] [JSN] | |||
R1-1710779 | Discussion on CORESET duration | other | CMCC |
R1-ah-18512 AI: 5.1.3.1.2.1 |
available | [WTS] [JSN] | |||
R1-1710780 | Discussion on NR-PDCCH search space design | other | CMCC |
R1-ah-18512 AI: 5.1.3.1.2.2 |
available | [WTS] [JSN] | |||
R1-1710781 | UE behaviour related to dynamic and semi-static configured resources | other | CMCC |
R1-ah-18512 AI: 5.1.3.1.4.3 |
available | [WTS] [JSN] | |||
R1-1710782 | Discussion on subband-based PUCCH resource allocation and indication | other | CMCC |
R1-ah-18512 AI: 5.1.3.2.4 |
available | [WTS] [JSN] | |||
R1-1710783 | Discussion on timing design for semi-static DL/UL assignment | other | CMCC |
R1-ah-18512 AI: 5.1.3.3.5.1 |
available | [WTS] [JSN] | |||
R1-1710784 | Discussion on UE-to-UE cross-link interference management | other | CMCC |
R1-ah-18512 AI: 5.1.6.1 |
noted | [WTS] [JSN] | |||
R1-1710785 | Discussion on the change of SS block frequency position | other | CMCC |
R1-ah-18512 AI: 5.1.7 |
available | [WTS] [JSN] | |||
R1-1710786 | Discussion on NR power control and sharing | other | CMCC |
R1-ah-18512 AI: 5.1.9.2 |
available | [WTS] [JSN] | |||
R1-1710787 | On default bandwidth part | discussion | PANASONIC |
R1-ah-18512 AI: 5.1.3.3.1.1 |
available | [WTS] [JSN] | |||
R1-1710788 | Discussions on NR-PDCCH Structure | discussion | MediaTek Inc. |
R1-ah-18512 AI: 5.1.3.1.1.1 |
available | [WTS] [JSN] | |||
R1-1710789 | RS structures for NR-PDCCH | discussion | MediaTek Inc. |
R1-ah-18512 AI: 5.1.3.1.1.2 |
available | [WTS] [JSN] | |||
R1-1710790 | Discussions on CORESET configurations | discussion | MediaTek Inc. |
R1-ah-18512 AI: 5.1.3.1.2.1 |
available | [WTS] [JSN] | |||
R1-1710791 | Resource sharing between PDCCH and PDSCH | discussion | MediaTek Inc. |
R1-ah-18512 AI: 5.1.3.1.3 |
available | [WTS] [JSN] | |||
R1-1710792 | Structure of group-common PDCCH | discussion | MediaTek Inc. |
R1-ah-18512 AI: 5.1.3.1.4.1 |
available | [WTS] [JSN] | |||
R1-1710793 | Contents of group-common PDCCH | discussion | MediaTek Inc. |
R1-ah-18512 AI: 5.1.3.1.4.2 |
available | [WTS] [JSN] | |||
R1-1710794 | UE behaviour for group-common PDCCH | discussion | MediaTek Inc. |
R1-ah-18512 AI: 5.1.3.1.4.3 |
available | [WTS] [JSN] | |||
R1-1710795 | Timing of HARQ-ACK for PDSCH | discussion | MediaTek Inc. |
R1-ah-18512 AI: 5.1.3.3.5.1 |
available | [WTS] [JSN] | |||
R1-1710796 | Further Details on Wider Bandwidth Operations in NR | discussion | MediaTek Inc. |
R1-ah-18512 AI: 5.1.7 |
available | [WTS] [JSN] | |||
R1-1710797 | Discussion on PBCH Contents | discussion | MediaTek Inc. |
R1-ah-18512 AI: 5.1.1.2.1 |
available | [WTS] [JSN] | |||
R1-1710798 | Discussion on SS burst set composition | discussion | MediaTek Inc. |
R1-ah-18512 AI: 5.1.1.1.2 |
available | [WTS] [JSN] | |||
R1-1710799 | Further discussion on SS block index indication | discussion | MediaTek Inc. |
R1-ah-18512 AI: 5.1.1.1.3 |
available | [WTS] [JSN] | |||
R1-1710800 | Performance evaluation for RE mapping and SS block composition | discussion | MediaTek Inc. |
R1-ah-18512 AI: 5.1.1.2.2 |
noted | [WTS] [JSN] | |||
R1-1710801 | Further discussion on Remaining minimum system information delivery | discussion | MediaTek Inc. |
R1-ah-18512 AI: 5.1.1.2.4 |
available | [WTS] [JSN] | |||
R1-1710802 | Further discussion on OSI delivery | discussion | MediaTek Inc. |
R1-ah-18512 AI: 5.1.1.2.5 |
available | [WTS] [JSN] | |||
R1-1710803 | Further discussion on paging design | discussion | MediaTek Inc. |
R1-ah-18512 AI: 5.1.1.3 |
available | [WTS] [JSN] | |||
R1-1710804 | Discussion on measurement based on SS block | discussion | MediaTek Inc. |
R1-ah-18512 AI: 5.1.1.5.1 |
available | [WTS] [JSN] | |||
R1-1710805 | Discussion on CSI-RS for L3 mobility | discussion | MediaTek Inc. |
R1-ah-18512 AI: 5.1.1.5.2 |
noted | [WTS] [JSN] | |||
R1-1710806 | Discussion on Radio Link Monitoring | discussion | MediaTek Inc. |
R1-ah-18512 AI: 5.1.1.5.3 |
available | [WTS] [JSN] | |||
R1-1710807 | On the Robustness of NR SSS in Frequency Offset | discussion | MediaTek Inc. |
R1-ah-18512 AI: 5.1.1.1.1 |
noted | [WTS] [JSN] | |||
R1-1710808 | Discussions on NR DL beam management | discussion | MediaTek Inc. |
R1-ah-18512 AI: 5.1.2.2.1 |
available | [WTS] [JSN] | |||
R1-1710809 | Efficient UL beam management with imperfect beam correspondence | discussion | MediaTek Inc. |
R1-ah-18512 AI: 5.1.2.2.1 |
available | [WTS] [JSN] | |||
R1-1710810 | Mechanism for flexible beam failure recovery | discussion | MediaTek Inc. |
R1-ah-18512 AI: 5.1.2.2.2 |
noted | [WTS] [JSN] | |||
R1-1710811 | IFDMA Based Beam Management CSI-RS for Flexible TX/RX Beam Sweeping | discussion | MediaTek Inc. |
R1-ah-18512 AI: 5.1.2.4.2 |
noted | [WTS] [JSN] | |||
R1-1710812 | CSI acquisition for reciprocity based operation | discussion | MediaTek Inc. |
R1-ah-18512 AI: 5.1.2.3.3 |
available | [WTS] [JSN] | |||
R1-1710813 | Remaining issues in NR CSI feedback | discussion | MediaTek Inc. |
R1-ah-18512 AI: 5.1.2.3.4 |
available | [WTS] [JSN] | |||
R1-1710814 | Multi-TRP and panel transmission | discussion | MediaTek Inc. |
R1-ah-18512 AI: 5.1.2.1.6 |
available | [WTS] [JSN] | |||
R1-1710815 | codeword mapping in NR | discussion | MediaTek Inc. |
R1-ah-18512 AI: 5.1.2.1.1 |
available | [WTS] [JSN] | |||
R1-1710816 | Codebook based transmission in UL | discussion | MediaTek Inc. |
R1-ah-18512 AI: 5.1.2.1.2 |
available | [WTS] [JSN] | |||
R1-1710817 | SRS design in NR | discussion | MediaTek Inc. |
R1-ah-18512 AI: 5.1.2.4.5 |
available | [WTS] [JSN] | |||
R1-1710818 | CLI measurements in NR | discussion | MediaTek Inc. |
R1-ah-18512 AI: 5.1.6.1 |
noted | [WTS] [JSN] | |||
R1-1710819 | Performance evaluation on channel structure of short PUCCH for 1 or 2 bits UCI | discussion | MediaTek Inc. |
R1-ah-18512 AI: 5.1.3.2.1.1 |
available | [WTS] [JSN] | |||
R1-1710820 | Discussion on UCI on PUSCH | discussion | MediaTek Inc. |
R1-ah-18512 AI: 5.1.3.2.5.1 |
available | [WTS] [JSN] | |||
R1-1710821 | Discussion on PUCCH and PUSCH multiplexing | discussion | MediaTek Inc. |
R1-ah-18512 AI: 5.1.3.2.5.2 |
available | [WTS] [JSN] | |||
R1-1710822 | On PRACH design to support uplink requests | discussion | MediaTek Inc. |
R1-ah-18512 AI: 5.1.1.4.2 |
available | [WTS] [JSN] | |||
R1-1710823 | PRACH Msg1 retransmission |
discussion revised to R1-1711625 |
MediaTek Inc. |
R1-ah-18512 AI: 5.1.1.4.3 |
revised | [WTS] [JSN] | |||
R1-1710824 | On 4-step RACH procedure | discussion | MediaTek Inc. |
R1-ah-18512 AI: 5.1.1.4.4 |
available | [WTS] [JSN] | |||
R1-1710825 | Optimization and comparison of Polar code rate-matching design | discussion | MediaTek Inc. |
R1-ah-18512 AI: 5.1.4.2.2 |
available | [WTS] [JSN] | |||
R1-1710826 | Polar coding design for NR-PBCH combining | discussion | MediaTek Inc. |
R1-ah-18512 AI: 5.1.4.3 |
available | [WTS] [JSN] | |||
R1-1710827 | On CRC attachment for TB and CB | discussion | MediaTek Inc. |
R1-ah-18512 AI: 5.1.4.1.1.1 |
noted | [WTS] [JSN] | |||
R1-1710828 | On interleaver for NR LDPC code | discussion | MediaTek Inc. |
R1-ah-18512 AI: 5.1.4.1.1.3 |
noted | [WTS] [JSN] | |||
R1-1710829 | On NR LDPC design and performance |
discussion revised to R1-1711696 |
MediaTek Inc. |
R1-ah-18512 AI: 5.1.4.1.2 |
revised | [WTS] [JSN] | |||
R1-1710830 | Discussion on CBG construction for CBG-based (re)transmission | discussion | MediaTek Inc. |
R1-ah-18512 AI: 5.1.3.3.4.1 |
available | [WTS] [JSN] | |||
R1-1710831 | On downlink DMRS design | discussion | MediaTek Inc. |
R1-ah-18512 AI: 5.1.2.4.3 |
noted | [WTS] [JSN] | |||
R1-1710832 | On TRS design requirement | discussion | MediaTek Inc. |
R1-ah-18512 AI: 5.1.2.4.6 |
noted | [WTS] [JSN] | |||
R1-1710833 | On CSI-RS configuration for fine time and frequency tracking support | discussion | MediaTek Inc. |
R1-ah-18512 AI: 5.1.2.4.2 |
available | [WTS] [JSN] | |||
R1-1710834 | On support of Grant-free and Grant-based transmission for UL URLLC | discussion | MediaTek Inc. |
R1-ah-18512 AI: 5.1.3.3.2 |
available | [WTS] [JSN] | |||
R1-1710835 | Grant-free Scheduling and retransmission schemes for UL URLLC | discussion | MediaTek Inc. |
R1-ah-18512 AI: 5.1.3.3.3 |
available | [WTS] [JSN] | |||
R1-1710836 | On use of scrambling for UL Grant-free URLLC transmission | discussion | MediaTek Inc. |
R1-ah-18512 AI: 5.1.3.3.3 |
available | [WTS] [JSN] | |||
R1-1710837 | HARQ procedure for DL URLLC | discussion | MediaTek Inc. |
R1-ah-18512 AI: 5.1.3.3.8 |
available | [WTS] [JSN] | |||
R1-1710838 | Cross-slot scheduling for UE power saving | discussion | MediaTek Inc. |
R1-ah-18512 AI: 5.1.3.3.1.2 |
available | [WTS] [JSN] | |||
R1-1710839 | UL Power Sharing for LTE-NR Dual Connectivity | discussion | MediaTek Inc. |
R1-ah-18512 AI: 5.1.9.1 |
noted | [WTS] [JSN] | |||
R1-1710840 | Discussion on Uplink TDM Operation for NR NSA | discussion | China Telecommunications |
R1-ah-18512 AI: 5.1.8 |
noted | [WTS] [JSN] | |||
R1-1710841 | Discussion on remaining system information delivery | discussion | Beijing Xinwei Telecom Techn. |
R1-ah-18512 AI: 5.1.1.2.4 |
available | [WTS] [JSN] | |||
R1-1710842 | A flexible, low-latency, hardware-efficient SCL polar decoder | discussion | AccelerComm Ltd |
R1-ah-18512 AI: 5.1.4.2.3 |
available | [WTS] [JSN] | |||
R1-1710843 | On the storage of polar code sequences | discussion | AccelerComm Ltd |
R1-ah-18512 AI: 5.1.4.2.2 |
noted | [WTS] [JSN] | |||
R1-1710844 | Consideration on coding chain for eMBB data channel | discussion | ZTE |
R1-ah-18512 AI: 5.1.4.1.1 |
available | [WTS] [JSN] | |||
R1-1710845 | Shift coefficients design for base graph 1 |
discussion revised to R1-1711587 |
ZTE |
R1-ah-18512 AI: 5.1.4.1.2 |
revised | [WTS] [JSN] | |||
R1-1710846 | Shift coefficients design for base graph 2 |
discussion revised to R1-1711588 |
ZTE |
R1-ah-18512 AI: 5.1.4.1.2 |
revised | [WTS] [JSN] | |||
R1-1710847 | Performance evaluations on Polar codes | discussion | ZTE |
R1-ah-18512 AI: 5.1.4.2.1 |
available | [WTS] [JSN] | |||
R1-1710848 | Rate matching scheme of Polar codes | discussion | ZTE |
R1-ah-18512 AI: 5.1.4.2.2 |
available | [WTS] [JSN] | |||
R1-1710849 | Segmentation of Polar codes |
discussion revised to R1-1711749 |
ZTE |
R1-ah-18512 AI: 5.1.4.2.3 |
revised | [WTS] [JSN] | |||
R1-1710850 | Considerations on Channel Coding for NR-PBCH | discussion | ZTE |
R1-ah-18512 AI: 5.1.4.3 |
available | [WTS] [JSN] | |||
R1-1710851 | Considerations on DL beam management | other | Sony |
R1-ah-18512 AI: 5.1.2.2.1 |
available | [WTS] [JSN] | |||
R1-1710852 | Considerations on UL beam management | other | Sony |
R1-ah-18512 AI: 5.1.2.2.1 |
available | [WTS] [JSN] | |||
R1-1710853 | Considerations on fine time/frequency tracking | other | Sony |
R1-ah-18512 AI: 5.1.2.4.6 |
available | [WTS] [JSN] | |||
R1-1710854 | Considerations on interference measurement | other | Sony |
R1-ah-18512 AI: 5.1.2.3.2 |
available | [WTS] [JSN] | |||
R1-1710855 | Considerations on SRS design | other | Sony |
R1-ah-18512 AI: 5.1.2.4.5 |
noted | [WTS] [JSN] | |||
R1-1710856 | On contents of group-common PDCCH | other | Sony |
R1-ah-18512 AI: 5.1.3.1.4.2 |
available | [WTS] [JSN] | |||
R1-1710857 | On structure of group-common PDCCH | other | Sony |
R1-ah-18512 AI: 5.1.3.1.4.1 |
available | [WTS] [JSN] | |||
R1-1710858 | Discussion on SS block time index indication |
other revised to R1-1711659 |
Sony |
R1-ah-18512 AI: 5.1.1.1.3 |
revised | [WTS] [JSN] | |||
R1-1710859 | Considerations on SS block compositions |
other revised to R1-1711658 |
Sony |
R1-ah-18512 AI: 5.1.1.2.2 |
revised | [WTS] [JSN] | |||
R1-1710860 | Considerations on 4-step RA procedure | other | Sony |
R1-ah-18512 AI: 5.1.1.4.4 |
available | [WTS] [JSN] | |||
R1-1710861 | Pre-emption in UL grant free resource | other | Sony |
R1-ah-18512 AI: 5.1.3.3.3 |
available | [WTS] [JSN] | |||
R1-1710862 | Reliable PDCCH operation for URLLC | other | Sony |
R1-ah-18512 AI: 5.1.3.1.5 |
available | [WTS] [JSN] | |||
R1-1710863 | Discussion on the retransmission of UL transmission without grant | other | Sony |
R1-ah-18512 AI: 5.1.3.3.3 |
available | [WTS] [JSN] | |||
R1-1710864 | Discussion on the CBG index indication by DCI | other | Sony |
R1-ah-18512 AI: 5.1.3.3.4.2 |
available | [WTS] [JSN] | |||
R1-1710865 | Remaining issues on using pre-emption indicator for DL URLLC/eMBB multiplexing | other | Sony |
R1-ah-18512 AI: 5.1.3.3.7.1 |
available | [WTS] [JSN] | |||
R1-1710866 | Feedback for improving URLLC reliability | other | Sony |
R1-ah-18512 AI: 5.1.3.3.8 |
available | [WTS] [JSN] | |||
R1-1710867 | Multiplexing data with different transmission durations for Uplink | other | Sony |
R1-ah-18512 AI: 5.1.3.3.7.2 |
available | [WTS] [JSN] | |||
R1-1710868 | Blind Detection with Polar Codes |
discussion revision of R1-1708273 |
McGill University |
R1-ah-18512 AI: 5.1.4.2.3 |
withdrawn | [WTS] [JSN] | |||
R1-1710869 | Partitioned List Decoding of Polar Codes | discussion | McGill University |
R1-ah-18512 AI: 5.1.4.2.3 |
withdrawn | [WTS] [JSN] | |||
R1-1710870 | Power ramping for Msg1 preamble re-transmission | discussion | InterDigital, Inc. | NR_newRAT | Rel-15 |
R1-ah-18512 AI: 5.1.1.4.3 |
available | [WTS] [JSN] | |
R1-1710871 | Multiple Msg1 transmissions for one monitored RAR window | discussion | InterDigital, Inc. | NR_newRAT | Rel-15 |
R1-ah-18512 AI: 5.1.1.4.4 |
available | [WTS] [JSN] | |
R1-1710872 | CORESET Monitoring Under Dynamic Change of BWP | discussion | InterDigital, Inc. | NR_newRAT | Rel-15 |
R1-ah-18512 AI: 5.1.3.1.2.1 |
available | [WTS] [JSN] | |
R1-1710873 | PDSCH starting position in NR | discussion | InterDigital, Inc. | NR_newRAT | Rel-15 |
R1-ah-18512 AI: 5.1.3.1.3 |
available | [WTS] [JSN] | |
R1-1710874 | Considerations for ultra-reliable DCI transmission | discussion | InterDigital, Inc. | NR_newRAT | Rel-15 |
R1-ah-18512 AI: 5.1.3.1.5 |
available | [WTS] [JSN] | |
R1-1710875 | Considerations for ultra-reliable UCI transmission | discussion | InterDigital, Inc. | NR_newRAT | Rel-15 |
R1-ah-18512 AI: 5.1.3.2.6 |
available | [WTS] [JSN] | |
R1-1710876 | CBG based HARQ for NR | discussion | InterDigital, Inc. | NR_newRAT | Rel-15 |
R1-ah-18512 AI: 5.1.3.3.4.1 |
available | [WTS] [JSN] | |
R1-1710877 | DL HARQ Feedback suppression | discussion | InterDigital, Inc. | NR_newRAT | Rel-15 |
R1-ah-18512 AI: 5.1.3.3.5.1 |
available | [WTS] [JSN] | |
R1-1710878 | Bandwidth Adaptation via BWP Selection in NR | discussion | InterDigital, Inc. | NR_newRAT | Rel-15 |
R1-ah-18512 AI: 5.1.7 |
available | [WTS] [JSN] | |
R1-1710879 | Power Sharing Mechanisms with LTE-NR DC and NR DC | discussion | InterDigital, Inc. | NR_newRAT | Rel-15 |
R1-ah-18512 AI: 5.1.9.1 |
noted | [WTS] [JSN] | |
R1-1710880 | On uplink half-tone shift | discussion | Ericsson AB |
R1-ah-18512 AI: 5.1.8 |
noted | [WTS] [JSN] | |||
R1-1710881 | On pi/2-BPSK DFTS-OFDM with spectrum shaping | discussion | Ericsson AB |
R1-ah-18512 AI: 5.1.5 |
available | [WTS] [JSN] | |||
R1-1710882 | Multiple SS Blocks in wideband carrier | discussion | Ericsson AB |
R1-ah-18512 AI: 5.1.1.1.4 |
available | [WTS] [JSN] | |||
R1-1710883 | On wider band aspects of NR | other | Nokia, Alcatel-Lucent Shanghai Bell |
R1-ah-18512 AI: 5.1.7 |
available | [WTS] [JSN] | |||
R1-1710884 | On NR CA/DC configuration | other | Nokia, Alcatel-Lucent Shanghai Bell |
R1-ah-18512 AI: 5.1.3.4.2 |
available | [WTS] [JSN] | |||
R1-1710885 | On cross-carrier scheduling and joint UCI design | other | Nokia, Alcatel-Lucent Shanghai Bell |
R1-ah-18512 AI: 5.1.3.4.1.1 |
available | [WTS] [JSN] | |||
R1-1710886 | UL diversity transmission for DFTsOFDM | discussion | Mitsubishi Electric RCE | Rel-15 |
R1-ah-18512 AI: 5.1.2.1.4 |
available | [WTS] [JSN] | ||
R1-1710887 | UL grant-free transmissions: Physical layer procedures | discussion | Intel Corporation | Rel-15 |
R1-ah-18512 AI: 5.1.3.3.3 |
available | [WTS] [JSN] | ||
R1-1710888 | HARQ-ACK feedback: Timing considerations | discussion | Intel Corporation | Rel-15 |
R1-ah-18512 AI: 5.1.3.3.5.1 |
withdrawn | [WTS] [JSN] | ||
R1-1710889 | NR Physical Random Access Channel | discussion | Nokia, Alcatel-Lucent Shanghai Bell |
R1-ah-18512 AI: 5.1.1.4.1 |
available | [WTS] [JSN] | |||
R1-1710890 | NR Physical Random Access Channel Capacity | discussion | Nokia, Alcatel-Lucent Shanghai Bell |
R1-ah-18512 AI: 5.1.1.4.2 |
noted | [WTS] [JSN] | |||
R1-1710891 | Preamble Power Ramping and RACH Message 3 Power Control | discussion | Nokia, Alcatel-Lucent Shanghai Bell |
R1-ah-18512 AI: 5.1.1.4.3 |
available | [WTS] [JSN] | |||
R1-1710892 | NR 4-step RACH procedure | discussion | Nokia, Alcatel-Lucent Shanghai Bell |
R1-ah-18512 AI: 5.1.1.4.4 |
available | [WTS] [JSN] | |||
R1-1710893 | On the short PUCCH design for small UCI payloads | discussion | Nokia, Alcatel-Lucent Shanghai Bell |
R1-ah-18512 AI: 5.1.3.2.1.1 |
available | [WTS] [JSN] | |||
R1-1710894 | Short PUCCH design for UCI of more than 2 bits | discussion | Nokia, Alcatel-Lucent Shanghai Bell |
R1-ah-18512 AI: 5.1.3.2.1.2 |
available | [WTS] [JSN] | |||
R1-1710895 | On long PUCCH design for small payloads | discussion | Nokia, Alcatel-Lucent Shanghai Bell |
R1-ah-18512 AI: 5.1.3.2.2.1 |
available | [WTS] [JSN] | |||
R1-1710896 | Long PUCCH design for UCI more than 2 bits | discussion | Nokia, Alcatel-Lucent Shanghai Bell |
R1-ah-18512 AI: 5.1.3.2.2.2 |
available | [WTS] [JSN] | |||
R1-1710897 | Transmit Diversity for PUCCH | discussion | Nokia, Alcatel-Lucent Shanghai Bell |
R1-ah-18512 AI: 5.1.3.2.3 |
available | [WTS] [JSN] | |||
R1-1710898 | On the resource allocation for PUCCH | discussion | Nokia, Alcatel-Lucent Shanghai Bell |
R1-ah-18512 AI: 5.1.3.2.4 |
available | [WTS] [JSN] | |||
R1-1710899 | UCI multiplexing on PUSCH | discussion | Nokia, Alcatel-Lucent Shanghai Bell |
R1-ah-18512 AI: 5.1.3.2.5.1 |
available | [WTS] [JSN] | |||
R1-1710900 | On the multiplexing between PUCCHs and PUSCH | discussion | Nokia, Alcatel-Lucent Shanghai Bell |
R1-ah-18512 AI: 5.1.3.2.5.2 |
available | [WTS] [JSN] | |||
R1-1710901 | On URLLC UCI transmission | discussion | Nokia, Alcatel-Lucent Shanghai Bell |
R1-ah-18512 AI: 5.1.3.2.6 |
available | [WTS] [JSN] | |||
R1-1710902 | CP-OFDM waveform for NR long PUCCH | discussion | Nokia, Alcatel-Lucent Shanghai Bell |
R1-ah-18512 AI: 5.1.3.2.7 |
available | [WTS] [JSN] | |||
R1-1710903 | PDCCH structure for NR | discussion | NEC | NR_newRAT | Rel-15 |
R1-ah-18512 AI: 5.1.3.1.1.1 |
available | [WTS] [JSN] | |
R1-1710904 | Uplink transmission in NR NSA mode | discussion | Apple Inc. |
R1-ah-18512 AI: 5.1.8 |
noted | [WTS] [JSN] | |||
R1-1710905 | Signaling of SS block index | discussion | Apple Inc. |
R1-ah-18512 AI: 5.1.1.1.3 |
noted | [WTS] [JSN] | |||
R1-1710906 | UE behavior on UL/DL transmission direction determination in NR TDD | discussion | Apple Inc. |
R1-ah-18512 AI: 5.1.3.1.4.3 |
available | [WTS] [JSN] | |||
R1-1710907 | Control indicator in group-common PDCCH for UE power saving | discussion | Apple Inc. |
R1-ah-18512 AI: 5.1.3.1.4.2 |
available | [WTS] [JSN] | |||
R1-1710908 | DL control signal for CBG-based transmission | discussion | Apple Inc. |
R1-ah-18512 AI: 5.1.3.3.4.2 |
available | [WTS] [JSN] | |||
R1-1710909 | Discussion of NR-LTE coexistence on DL | discussion | ZTE |
R1-ah-18512 AI: 5.1.8 |
available | [WTS] [JSN] | |||
R1-1710910 | Considerations of NR-LTE coexistence in uplink |
discussion revised to R1-1711653 |
ZTE |
R1-ah-18512 AI: 5.1.8 |
revised | [WTS] [JSN] | |||
R1-1710911 | Power Control for CA and DC in NR | discussion | ZTE |
R1-ah-18512 AI: 5.1.9.1 |
available | [WTS] [JSN] | |||
R1-1710912 | Reserved resources supporting NR co-existence with LTE and NB-IoT | discussion | Ericsson AB |
R1-ah-18512 AI: 5.1.8 |
available | [WTS] [JSN] | |||
R1-1710913 | On Design of Synchronization Signal Sequences in NR | discussion | InterDigital, Inc. |
R1-ah-18512 AI: 5.1.1.1.1 |
available | [WTS] [JSN] | |||
R1-1710914 | On SS Burst Set Composition and Multiplexing | discussion | InterDigital, Inc. |
R1-ah-18512 AI: 5.1.1.1.2 |
available | [WTS] [JSN] | |||
R1-1710915 | On SS Block Based Timing Indication in NR | discussion | InterDigital, Inc. |
R1-ah-18512 AI: 5.1.1.1.3 |
available | [WTS] [JSN] | |||
R1-1710916 | On Physical Broadcast Channel in NR | discussion | InterDigital, Inc. |
R1-ah-18512 AI: 5.1.1.2.1 |
available | [WTS] [JSN] | |||
R1-1710917 | On NR-PBCH RE Mapping and SS Block Composition | discussion | InterDigital, Inc. |
R1-ah-18512 AI: 5.1.1.2.2 |
noted | [WTS] [JSN] | |||
R1-1710918 | On DMRS Designs for NR-PBCH | discussion | InterDigital, Inc. |
R1-ah-18512 AI: 5.1.1.2.3 |
available | [WTS] [JSN] | |||
R1-1710919 | On Minimum System Information Delivery | discussion | InterDigital, Inc. |
R1-ah-18512 AI: 5.1.1.2.4 |
available | [WTS] [JSN] | |||
R1-1710920 | TPMI Indication for Frequency Selective UL Precoding | discussion | InterDigital, Inc. |
R1-ah-18512 AI: 5.1.2.1.2 |
available | [WTS] [JSN] | |||
R1-1710921 | STBC-based Transmission for Uplink Transmit Diversity | discussion | InterDigital, Inc. |
R1-ah-18512 AI: 5.1.2.1.4 |
available | [WTS] [JSN] | |||
R1-1710922 | PRG Size Indication in NR | discussion | InterDigital, Inc. |
R1-ah-18512 AI: 5.1.2.1.5 |
available | [WTS] [JSN] | |||
R1-1710923 | DCI Design for Multi-TRP/Panel Transmission for DL | discussion | InterDigital, Inc. |
R1-ah-18512 AI: 5.1.2.1.6 |
available | [WTS] [JSN] | |||
R1-1710924 | On Beam Management for DL Control and Data Channels | discussion | InterDigital, Inc. |
R1-ah-18512 AI: 5.1.2.2.1 |
available | [WTS] [JSN] | |||
R1-1710925 | On Efficient UL Beam Management | discussion | InterDigital, Inc. |
R1-ah-18512 AI: 5.1.2.2.1 |
available | [WTS] [JSN] | |||
R1-1710926 | On Remaining Details of Beam Failure Recovery | discussion | InterDigital, Inc. |
R1-ah-18512 AI: 5.1.2.2.2 |
available | [WTS] [JSN] | |||
R1-1710927 | On CSI framework for NR | discussion | InterDigital, Inc. |
R1-ah-18512 AI: 5.1.2.3.1 |
available | [WTS] [JSN] | |||
R1-1710928 | On CSI acquisition for NR | discussion | InterDigital, Inc. |
R1-ah-18512 AI: 5.1.2.3.2 |
available | [WTS] [JSN] | |||
R1-1710929 | Discussion on SRS sequence generation for NR | discussion | Panasonic Corporation |
R1-ah-18512 AI: 5.1.2.4.5 |
available | [WTS] [JSN] | |||
R1-1710930 | Discussion on 1-symbol NR-PUCCH for UCI of up to 2 bits |
discussion revised to R1-1711649 |
Panasonic Corporation |
R1-ah-18512 AI: 5.1.3.2.1.1 |
revised | [WTS] [JSN] | |||
R1-1710931 | CSI-RS Design for Beam Management | discussion | InterDigital, Inc. |
R1-ah-18512 AI: 5.1.2.4.2 |
noted | [WTS] [JSN] | |||
R1-1710932 | Discussion on channel structure of long-duration NR-PUCCH for UCI of up to 2 bits | discussion | Panasonic Corporation |
R1-ah-18512 AI: 5.1.3.2.2.1 |
available | [WTS] [JSN] | |||
R1-1710933 | On DM-RS design for NR | discussion | InterDigital, Inc. |
R1-ah-18512 AI: 5.1.2.4.3 |
available | [WTS] [JSN] | |||
R1-1710934 | Discussion on channel design of long-duration NR-PUCCH for UCI of more than 2 bits | discussion | Panasonic Corporation |
R1-ah-18512 AI: 5.1.3.2.2.2 |
available | [WTS] [JSN] | |||
R1-1710935 | Discussion on support of long-duration NR-PUCCH over multiple slots | discussion | Panasonic Corporation |
R1-ah-18512 AI: 5.1.3.2.2.3 |
available | [WTS] [JSN] | |||
R1-1710936 | Remaining Issues on PTRS for NR | discussion | InterDigital, Inc. |
R1-ah-18512 AI: 5.1.2.4.4 |
noted | [WTS] [JSN] | |||
R1-1710937 | Discussion on resource allocation for uplink control channel | discussion | Panasonic Corporation |
R1-ah-18512 AI: 5.1.3.2.4 |
available | [WTS] [JSN] | |||
R1-1710938 | On SRS for NR | discussion | InterDigital, Inc. |
R1-ah-18512 AI: 5.1.2.4.5 |
available | [WTS] [JSN] | |||
R1-1710939 | Discussion on UCI on PUSCH | discussion | Panasonic Corporation |
R1-ah-18512 AI: 5.1.3.2.5.1 |
available | [WTS] [JSN] | |||
R1-1710940 | Discussion on UCI and data multiplexing | discussion | Panasonic Corporation |
R1-ah-18512 AI: 5.1.3.2.5.2 |
available | [WTS] [JSN] | |||
R1-1710941 | On QCL for NR | discussion | InterDigital, Inc. |
R1-ah-18512 AI: 5.1.2.4.7 |
available | [WTS] [JSN] | |||
R1-1710942 | Discussion on SR for URLLC and multiplexing with HARQ-ACK | discussion | Panasonic Corporation |
R1-ah-18512 AI: 5.1.3.2.6 |
available | [WTS] [JSN] | |||
R1-1710943 | Discussion on PRB grid and PRB indexing | discussion | Panasonic Corporation |
R1-ah-18512 AI: 5.1.7 |
available | [WTS] [JSN] | |||
R1-1710944 | On the impact of multi-beam operation on PDCCH structure | discussion | InterDigital, Inc. |
R1-ah-18512 AI: 5.1.3.1.1.1 |
available | [WTS] [JSN] | |||
R1-1710945 | On REG bundling and associated DMRS | discussion | InterDigital, Inc. |
R1-ah-18512 AI: 5.1.3.1.1.2 |
available | [WTS] [JSN] | |||
R1-1710946 | Search space design for eMBB-URLLC Multiplexing | discussion | InterDigital, Inc. |
R1-ah-18512 AI: 5.1.3.1.2.2 |
available | [WTS] [JSN] | |||
R1-1710947 | Group-common PDCCH design considerations | discussion | InterDigital, Inc. |
R1-ah-18512 AI: 5.1.3.1.4.1 |
available | [WTS] [JSN] | |||
R1-1710948 | UE behaviour related to CORESET(s) configured by PBCH | discussion | InterDigital, Inc. |
R1-ah-18512 AI: 5.1.3.1.4.3 |
available | [WTS] [JSN] | |||
R1-1710949 | On Ultra-reliable and low-latency PDCCH | discussion | InterDigital, Inc. |
R1-ah-18512 AI: 5.1.3.1.5 |
available | [WTS] [JSN] | |||
R1-1710950 | Evaluations of 1-symbol short-PUCCH with 1 or 2 bit(s) | discussion | InterDigital, Inc. |
R1-ah-18512 AI: 5.1.3.2.1.1 |
available | [WTS] [JSN] | |||
R1-1710951 | On transmit diversity for Long PUCCH | discussion | InterDigital, Inc. |
R1-ah-18512 AI: 5.1.3.2.3 |
available | [WTS] [JSN] | |||
R1-1710952 | Considerations on UCI transmission on PUSCH | discussion | InterDigital, Inc. |
R1-ah-18512 AI: 5.1.3.2.5.1 |
available | [WTS] [JSN] | |||
R1-1710953 | On frequency-domain resource allocation for NR | discussion | InterDigital, Inc. |
R1-ah-18512 AI: 5.1.3.3.1.1 |
available | [WTS] [JSN] | |||
R1-1710954 | HARQ feedback design considerations for CBG based transmission | discussion | InterDigital, Inc. |
R1-ah-18512 AI: 5.1.3.3.4.3 |
available | [WTS] [JSN] | |||
R1-1710955 | Signalling design considerations for DL pre-emption indication | discussion | InterDigital, Inc. |
R1-ah-18512 AI: 5.1.3.3.7.1 |
available | [WTS] [JSN] | |||
R1-1710956 | Multiplexing of low-latency traffic and non-latency sensitive traffic in UL | discussion | InterDigital, Inc. |
R1-ah-18512 AI: 5.1.3.3.7.2 |
available | [WTS] [JSN] | |||
R1-1710957 | Data channel processing and CRC attachment | discussion | InterDigital, Inc. |
R1-ah-18512 AI: 5.1.4.1.1.1 |
noted | [WTS] [JSN] | |||
R1-1710958 | Code block segmentation for eMBB data channel | discussion | InterDigital, Inc. |
R1-ah-18512 AI: 5.1.4.1.1.2 |
available | [WTS] [JSN] | |||
R1-1710959 | Parameter selection for polar codes puncturing and shortening | discussion | InterDigital, Inc. |
R1-ah-18512 AI: 5.1.4.2.2 |
available | [WTS] [JSN] | |||
R1-1710960 | Parameter selection for polar codes repetition | discussion | InterDigital, Inc. |
R1-ah-18512 AI: 5.1.4.2.2 |
available | [WTS] [JSN] | |||
R1-1710961 | Interleaver design for polar codes with high order modulation | discussion | InterDigital, Inc. |
R1-ah-18512 AI: 5.1.4.2.2 |
available | [WTS] [JSN] | |||
R1-1710962 | Common and Beam Specific Power Control Parameters |
discussion revised to R1-1711602 |
InterDigital, Inc. |
R1-ah-18512 AI: 5.1.9.2 |
withdrawn | [WTS] [JSN] | |||
R1-1710963 | On network resources and UE transmission configurations for grant-free access | discussion | NEC |
R1-ah-18512 AI: 5.1.3.3.3 |
available | [WTS] [JSN] | |||
R1-1710964 | On UE-to-UE measurement for CLI management | discussion | NEC |
R1-ah-18512 AI: 5.1.3.4.1.1 |
available | [WTS] [JSN] | |||
R1-1710965 | On cross-carrier scheduling and HARQ-ACK feedback for NR CA | discussion | NEC |
R1-ah-18512 AI: 5.1.6.1 |
available | [WTS] [JSN] | |||
R1-1710966 | Flexible subcarrier spacing in the uplink for NR use cases including mMTC | discussion | ATR |
R1-ah-18512 AI: 5.1.11 |
available | [WTS] [JSN] | |||
R1-1710967 | Number of HARQ processes for co-existence with TD-LTE |
discussion revised to R1-1712995 |
NEC Corporation |
R1-ah-18512 AI: 5.1.3.3.6.1 |
available | [WTS] [JSN] | |||
R1-1710968 | Summary of [89-20] email discussion on Group-common PDCCH for NR | discussion | CATT |
R1-ah-18512 AI: 5.1.3.1.4 |
noted | [WTS] [JSN] | |||
R1-1710969 | NR-PDCCH for multi-TRP transmission | discussion | China Telecommunications |
R1-ah-18512 AI: 5.1.2.1.6 |
available | [WTS] [JSN] | |||
R1-1710970 | On front-load DMRS design | discussion | China Telecommunications |
R1-ah-18512 AI: 5.1.2.4.3 |
available | [WTS] [JSN] | |||
R1-1710971 | UL grant-free transmission for URLLC | discussion | China Telecommunications |
R1-ah-18512 AI: 5.1.3.3.3 |
available | [WTS] [JSN] | |||
R1-1710972 | Control signalling for CBG-based (re)transmission | discussion | China Telecommunications |
R1-ah-18512 AI: 5.1.3.3.4.2 |
available | [WTS] [JSN] | |||
R1-1710973 | Discussion on REG bundle size | discussion | ITRI | NR_newRAT-Core |
R1-ah-18512 AI: 5.1.3.1.1.1 |
available | [WTS] [JSN] | ||
R1-1710974 | Discussion on using sub-time unit for CSI-RS of beam management | discussion | ITRI | NR_newRAT-Core |
R1-ah-18512 AI: 5.1.2.4.2 |
available | [WTS] [JSN] | ||
R1-1710975 | Considerations and Evaluation on SS Sequence Design for New Radio | discussion | ITRI | NR_newRAT-Core |
R1-ah-18512 AI: 5.1.1.1.1 |
available | [WTS] [JSN] | ||
R1-1710976 | NR Long PUCCH Requirements | other | CMCC |
R1-ah-18512 AI: 5.1.3.2.2.3 |
available | [WTS] [JSN] | |||
R1-1710977 | Discussion on RRM measurement on SS blocks | other | CMCC |
R1-ah-18512 AI: 5.1.1.5.1 |
noted | [WTS] [JSN] | |||
R1-1710978 | On the PDCCH construction for NR | discussion | Nokia, Alcatel-Lucent Shanghai Bell |
R1-ah-18512 AI: 5.1.3.1.1.1 |
available | [WTS] [JSN] | |||
R1-1710979 | On the remaining details of PDCCH reference signal structure | discussion | Nokia, Alcatel-Lucent Shanghai Bell |
R1-ah-18512 AI: 5.1.3.1.1.2 |
available | [WTS] [JSN] | |||
R1-1710980 | On the PDCCH control resource set and its connection to the search space for NR | discussion | Nokia, Alcatel-Lucent Shanghai Bell |
R1-ah-18512 AI: 5.1.3.1.2.1 |
available | [WTS] [JSN] | |||
R1-1710981 | On the search space design and UE blind detection | discussion | Nokia, Alcatel-Lucent Shanghai Bell |
R1-ah-18512 AI: 5.1.3.1.2.2 |
available | [WTS] [JSN] | |||
R1-1710982 | PDCCH support for multi-beam system | discussion | Nokia, Alcatel-Lucent Shanghai Bell |
R1-ah-18512 AI: 5.1.3.1.2.3 |
available | [WTS] [JSN] | |||
R1-1710983 | Resource sharing between PDCCH and PDSCH in NR | discussion | Nokia, Alcatel-Lucent Shanghai Bell |
R1-ah-18512 AI: 5.1.3.1.3 |
available | [WTS] [JSN] | |||
R1-1710984 | On the structure of group common PDCCH in NR | discussion | Nokia, Alcatel-Lucent Shanghai Bell |
R1-ah-18512 AI: 5.1.3.1.4.1 |
available | [WTS] [JSN] | |||
R1-1710985 | On the contents of group common PDCCH in NR | discussion | Nokia, Alcatel-Lucent Shanghai Bell |
R1-ah-18512 AI: 5.1.3.1.4.2 |
available | [WTS] [JSN] | |||
R1-1710986 | On the UE behaviour related to group common PDCCH in NR | discussion | Nokia, Alcatel-Lucent Shanghai Bell |
R1-ah-18512 AI: 5.1.3.1.4.3 |
available | [WTS] [JSN] | |||
R1-1710987 | On the URLLC specific aspects for DL control channel | discussion | Nokia, Alcatel-Lucent Shanghai Bell |
R1-ah-18512 AI: 5.1.3.1.5 |
available | [WTS] [JSN] | |||
R1-1710988 | On the usage of PDCCH DMRS as a complementary synchronization signal in DL | discussion | Nokia, Alcatel-Lucent Shanghai Bell |
R1-ah-18512 AI: 5.1.3.1.6 |
available | [WTS] [JSN] | |||
R1-1710989 | On resource allocation in frequency domain for PDSCH and PUSCH in NR | discussion | Nokia, Alcatel-Lucent Shanghai Bell |
R1-ah-18512 AI: 5.1.3.3.1.1 |
available | [WTS] [JSN] | |||
R1-1710990 | Time-domain resource allocation for NR | discussion | Nokia, Alcatel-Lucent Shanghai Bell |
R1-ah-18512 AI: 5.1.3.3.1.2 |
available | [WTS] [JSN] | |||
R1-1710991 | Transport block size determination and the support of slot aggregation in NR | discussion | Nokia, Alcatel-Lucent Shanghai Bell |
R1-ah-18512 AI: 5.1.3.3.1.3 |
available | [WTS] [JSN] | |||
R1-1710992 | Discussion on multiple SR configuration | discussion | Nokia, Alcatel-Lucent Shanghai Bell |
R1-ah-18512 AI: 5.1.3.3.2 |
available | [WTS] [JSN] | |||
R1-1710993 | Unified framework for UL grant-free and UL SPS | discussion | Nokia, Alcatel-Lucent Shanghai Bell |
R1-ah-18512 AI: 5.1.3.3.3 |
available | [WTS] [JSN] | |||
R1-1710994 | UE identification and HARQ for URLLC UL grant-free | discussion | Nokia, Alcatel-Lucent Shanghai Bell |
R1-ah-18512 AI: 5.1.3.3.3 |
available | [WTS] [JSN] | |||
R1-1710995 | Mapping code blocks to code block groups | discussion | Nokia, Alcatel-Lucent Shanghai Bell |
R1-ah-18512 AI: 5.1.3.3.4.1 |
available | [WTS] [JSN] | |||
R1-1710996 | DL control signalling for CBG-based transmissions | discussion | Nokia, Alcatel-Lucent Shanghai Bell |
R1-ah-18512 AI: 5.1.3.3.4.2 |
available | [WTS] [JSN] | |||
R1-1710997 | HARQ-ACK feedback for CBG-based (re-)transmission in NR | discussion | Nokia, Alcatel-Lucent Shanghai Bell |
R1-ah-18512 AI: 5.1.3.3.4.3 |
available | [WTS] [JSN] | |||
R1-1710998 | Timing aspects for HARQ-ACK feedback | discussion | Nokia, Alcatel-Lucent Shanghai Bell |
R1-ah-18512 AI: 5.1.3.3.5.1 |
available | [WTS] [JSN] | |||
R1-1710999 | On HARQ feedback determination | discussion | Nokia, Alcatel-Lucent Shanghai Bell |
R1-ah-18512 AI: 5.1.3.3.5.2 |
available | [WTS] [JSN] | |||
R1-1711000 | On the number of HARQ processes | discussion | Nokia, Alcatel-Lucent Shanghai Bell |
R1-ah-18512 AI: 5.1.3.3.6.1 |
available | [WTS] [JSN] | |||
R1-1711001 | On the HARQ soft buffer handling | discussion | Nokia, Alcatel-Lucent Shanghai Bell |
R1-ah-18512 AI: 5.1.3.3.6.2 |
available | [WTS] [JSN] | |||
R1-1711002 | On pre-emption indication | discussion | Nokia, Alcatel-Lucent Shanghai Bell |
R1-ah-18512 AI: 5.1.3.3.7.1 |
available | [WTS] [JSN] | |||
R1-1711003 | Pause-Resume Scheduling for Low Latency Uplink Transmissions | discussion | Nokia, Alcatel-Lucent Shanghai Bell |
R1-ah-18512 AI: 5.1.3.3.7.2 |
available | [WTS] [JSN] | |||
R1-1711004 | Discussion on scheduling based URLLC transmission | discussion | Nokia, Alcatel-Lucent Shanghai Bell |
R1-ah-18512 AI: 5.1.3.3.8 |
available | [WTS] [JSN] | |||
R1-1711005 | CSI measuring and reporting procedure for URLLC | discussion | Nokia, Alcatel-Lucent Shanghai Bell |
R1-ah-18512 AI: 5.1.3.3.8 |
available | [WTS] [JSN] | |||
R1-1711006 | Issues and Control Design for UL Grant-free URLLC | discussion | III |
R1-ah-18512 AI: 5.1.3.3.3 |
available | [WTS] [JSN] | |||
R1-1711007 | Codeword to layer mapping for DL and UL | discussion | Ericsson |
R1-ah-18512 AI: 5.1.2.1.1 |
noted | [WTS] [JSN] | |||
R1-1711008 | UL MIMO for codebook based transmission |
discussion revised to R1-1711610 |
Ericsson |
R1-ah-18512 AI: 5.1.2.1.2 |
revised | [WTS] [JSN] | |||
R1-1711009 | UL MIMO for non-codebook based transmission | discussion | Ericsson |
R1-ah-18512 AI: 5.1.2.1.3 |
available | [WTS] [JSN] | |||
R1-1711010 | Robust Transmission Scheme for PUSCH | discussion | Ericsson |
R1-ah-18512 AI: 5.1.2.1.4 |
available | [WTS] [JSN] | |||
R1-1711011 | PRB bundling | discussion | Ericsson |
R1-ah-18512 AI: 5.1.2.1.5 |
available | [WTS] [JSN] | |||
R1-1711012 | UL multi-panel transmission | discussion | Ericsson |
R1-ah-18512 AI: 5.1.2.1.6 |
available | [WTS] [JSN] | |||
R1-1711013 | DL multi-TRP and multi-panel transmission | discussion | Ericsson |
R1-ah-18512 AI: 5.1.2.1.6 |
noted | [WTS] [JSN] | |||
R1-1711014 | On rate matching | discussion | Ericsson |
R1-ah-18512 AI: 5.1.2.1.7 |
noted | [WTS] [JSN] | |||
R1-1711015 | On DL beam indication | discussion | Ericsson |
R1-ah-18512 AI: 5.1.2.2.1 |
available | [WTS] [JSN] | |||
R1-1711016 | UL beam management details | discussion | Ericsson |
R1-ah-18512 AI: 5.1.2.2.1 |
noted | [WTS] [JSN] | |||
R1-1711017 | Mechanism to recover from beam failure | discussion | Ericsson |
R1-ah-18512 AI: 5.1.2.2.2 |
available | [WTS] [JSN] | |||
R1-1711018 | Beam management in C-DRX | discussion | Ericsson |
R1-ah-18512 AI: 5.1.2.2.3 |
available | [WTS] [JSN] | |||
R1-1711019 | On the use of SS for beam management | discussion | Ericsson |
R1-ah-18512 AI: 5.1.2.2.3 |
available | [WTS] [JSN] | |||
R1-1711020 | Further results on beam management without beam indication | discussion | Ericsson |
R1-ah-18512 AI: 5.1.2.2.3 |
available | [WTS] [JSN] | |||
R1-1711021 | Performance of beam grouping | discussion | Ericsson |
R1-ah-18512 AI: 5.1.2.2.3 |
available | [WTS] [JSN] | |||
R1-1711022 | On beam grouping | discussion | Ericsson |
R1-ah-18512 AI: 5.1.2.2.3 |
available | [WTS] [JSN] | |||
R1-1711023 | Analysis of beam indication signalling options | discussion | Ericsson |
R1-ah-18512 AI: 5.1.2.2.3 |
available | [WTS] [JSN] | |||
R1-1711024 | Further details of CSI framework | discussion | Ericsson |
R1-ah-18512 AI: 5.1.2.3.1 |
noted | [WTS] [JSN] | |||
R1-1711025 | On CSI acquisition and reporting | discussion | Ericsson |
R1-ah-18512 AI: 5.1.2.3.2 |
available | [WTS] [JSN] | |||
R1-1711026 | Further discussion on CSI acquisition for reciprocity-based operation |
discussion revised to R1-1711609 |
Ericsson |
R1-ah-18512 AI: 5.1.2.3.3 |
revised | [WTS] [JSN] | |||
R1-1711027 | CSI feedback and Transparent PDSCH TxD | discussion | Ericsson |
R1-ah-18512 AI: 5.1.2.3.4 |
available | [WTS] [JSN] | |||
R1-1711028 | Codebook subset restriction | discussion | Ericsson |
R1-ah-18512 AI: 5.1.2.3.4 |
available | [WTS] [JSN] | |||
R1-1711029 | Type I & II CSI reporting | discussion | Ericsson |
R1-ah-18512 AI: 5.1.2.3.4 |
available | [WTS] [JSN] | |||
R1-1711030 | Encoding and mapping of CSI parameters | discussion | Ericsson |
R1-ah-18512 AI: 5.1.2.3.4 |
available | [WTS] [JSN] | |||
R1-1711031 | CSI feedback for multi-TRP | discussion | Ericsson |
R1-ah-18512 AI: 5.1.2.3.4 |
available | [WTS] [JSN] | |||
R1-1711032 | On Dynamic Triggering for CSI Reports and CSI-RS | discussion | Ericsson |
R1-ah-18512 AI: 5.1.2.3.5 |
available | [WTS] [JSN] | |||
R1-1711033 | A comparison of CSI-RS activation schemes based on MAC CE and DCI | discussion | Ericsson |
R1-ah-18512 AI: 5.1.2.3.5 |
available | [WTS] [JSN] | |||
R1-1711034 | Identifying bounds on parameters in CSI framework | discussion | Ericsson |
R1-ah-18512 AI: 5.1.2.3.5 |
available | [WTS] [JSN] | |||
R1-1711035 | Frequency parametrization for Type II CSI codebook | discussion | Ericsson |
R1-ah-18512 AI: 5.1.2.3.5 |
available | [WTS] [JSN] | |||
R1-1711036 | Further details of measurement restriction configuration | discussion | Ericsson |
R1-ah-18512 AI: 5.1.2.3.5 |
available | [WTS] [JSN] | |||
R1-1711037 | Performance impact of inactive antenna ports |
discussion revised to R1-1711671 |
Ericsson |
R1-ah-18512 AI: 5.1.2.3.5 |
revised | [WTS] [JSN] | |||
R1-1711038 | On partial bands and CSI acquistion | discussion | Ericsson |
R1-ah-18512 AI: 5.1.2.3.5 |
available | [WTS] [JSN] | |||
R1-1711039 | NR CSI Computation Capability | discussion | Ericsson |
R1-ah-18512 AI: 5.1.2.3.5 |
available | [WTS] [JSN] | |||
R1-1711040 | On Multiplexing of RS types for downlink | discussion | Ericsson |
R1-ah-18512 AI: 5.1.2.4.1 |
available | [WTS] [JSN] | |||
R1-1711041 | On CSI-RS for CSI-acquisition | discussion | Ericsson |
R1-ah-18512 AI: 5.1.2.4.2 |
noted | [WTS] [JSN] | |||
R1-1711042 | On CSI-RS for beam management | discussion | Ericsson |
R1-ah-18512 AI: 5.1.2.4.2 |
noted | [WTS] [JSN] | |||
R1-1711043 | On DL DMRS design | discussion | Ericsson |
R1-ah-18512 AI: 5.1.2.4.3 |
noted | [WTS] [JSN] | |||
R1-1711044 | On DL DMRS evaluations | discussion | Ericsson |
R1-ah-18512 AI: 5.1.2.4.3 |
available | [WTS] [JSN] | |||
R1-1711045 | On UL DMRS design | discussion | Ericsson |
R1-ah-18512 AI: 5.1.2.4.3 |
available | [WTS] [JSN] | |||
R1-1711046 | On UL DMRS evaluations | discussion | Ericsson |
R1-ah-18512 AI: 5.1.2.4.3 |
available | [WTS] [JSN] | |||
R1-1711047 | On PTRS DL design | discussion | Ericsson |
R1-ah-18512 AI: 5.1.2.4.4 |
available | [WTS] [JSN] | |||
R1-1711048 | On PTRS UL design | discussion | Ericsson |
R1-ah-18512 AI: 5.1.2.4.4 |
available | [WTS] [JSN] | |||
R1-1711049 | On SRS design | discussion | Ericsson |
R1-ah-18512 AI: 5.1.2.4.5 |
noted | [WTS] [JSN] | |||
R1-1711050 | On time and frequency tracking of the channel |
discussion revised to R1-1711613 |
Ericsson |
R1-ah-18512 AI: 5.1.2.4.6 |
revised | [WTS] [JSN] | |||
R1-1711051 | The QCL framework in NR | discussion | Ericsson |
R1-ah-18512 AI: 5.1.2.4.7 |
available | [WTS] [JSN] | |||
R1-1711052 | On the number of antenna ports for CSI-RS | discussion | Ericsson |
R1-ah-18512 AI: 5.1.2.4.8 |
available | [WTS] [JSN] | |||
R1-1711053 | On the collision between DMRS and DC subcarrier | discussion | Ericsson |
R1-ah-18512 AI: 5.1.2.4.8 |
available | [WTS] [JSN] | |||
R1-1711054 | On the NR UL power control framework | discussion | Ericsson |
R1-ah-18512 AI: 5.1.9.2 |
available | [WTS] [JSN] | |||
R1-1711055 | Initial views on UE category | discussion | NTT DOCOMO, INC. |
R1-ah-18512 AI: 4 |
noted | [WTS] [JSN] | |||
R1-1711056 | Discussion on remaining details on SS sequence design for NR | discussion | NTT DOCOMO, INC. |
R1-ah-18512 AI: 5.1.1.1.1 |
available | [WTS] [JSN] | |||
R1-1711057 | Discussion on SS burst set composition for NR | discussion | NTT DOCOMO, INC. |
R1-ah-18512 AI: 5.1.1.1.2 |
available | [WTS] [JSN] | |||
R1-1711058 | Discussion on timing indication based on SS block for NR | discussion | NTT DOCOMO, INC. |
R1-ah-18512 AI: 5.1.1.1.3 |
available | [WTS] [JSN] | |||
R1-1711059 | Discussion on remaining details on multiple SS block transmissions in wideband CC for NR | discussion | NTT DOCOMO, INC. |
R1-ah-18512 AI: 5.1.1.1.4 |
available | [WTS] [JSN] | |||
R1-1711060 | Discussion on NR-PBCH contents and payload size | discussion | NTT DOCOMO, INC. |
R1-ah-18512 AI: 5.1.1.2.1 |
available | [WTS] [JSN] | |||
R1-1711061 | Discussion on NR-PBCH design and SS block composition |
discussion revised to R1-1711622 |
NTT DOCOMO, INC. |
R1-ah-18512 AI: 5.1.1.2.2 |
revised | [WTS] [JSN] | |||
R1-1711062 | Discussion on sequence design of DMRS for NR-PBCH | discussion | NTT DOCOMO, INC. |
R1-ah-18512 AI: 5.1.1.2.3 |
available | [WTS] [JSN] | |||
R1-1711063 | Discussion on remaining minimum system information delivery for NR | discussion | NTT DOCOMO, INC. |
R1-ah-18512 AI: 5.1.1.2.4 |
available | [WTS] [JSN] | |||
R1-1711064 | Discussion on paging design for NR | discussion | NTT DOCOMO, INC. |
R1-ah-18512 AI: 5.1.1.3 |
available | [WTS] [JSN] | |||
R1-1711065 | Discussion on PRACH preamble format details for long/short sequence length for NR | discussion | NTT DOCOMO, INC. |
R1-ah-18512 AI: 5.1.1.4.1 |
available | [WTS] [JSN] | |||
R1-1711066 | Discussion on PRACH preamble format details for capacity enhancement and beam management for NR | discussion | NTT DOCOMO, INC. |
R1-ah-18512 AI: 5.1.1.4.2 |
available | [WTS] [JSN] | |||
R1-1711067 | Discussion on power ramping and power control during RA procedure for NR | discussion | NTT DOCOMO, INC. |
R1-ah-18512 AI: 5.1.1.4.3 |
available | [WTS] [JSN] | |||
R1-1711068 | Discussion on 4-step RA procedure for NR | discussion | NTT DOCOMO, INC. |
R1-ah-18512 AI: 5.1.1.4.4 |
available | [WTS] [JSN] | |||
R1-1711069 | Discussion on NR RRM measurement based on SS block | discussion | NTT DOCOMO, INC. |
R1-ah-18512 AI: 5.1.1.5.1 |
available | [WTS] [JSN] | |||
R1-1711070 | Discussion on NR RRM measurement based on CSI-RS for L3 mobility | discussion | NTT DOCOMO, INC. |
R1-ah-18512 AI: 5.1.1.5.2 |
available | [WTS] [JSN] | |||
R1-1711071 | Discussion on NR RLM and RLF | discussion | NTT DOCOMO, INC. |
R1-ah-18512 AI: 5.1.1.5.3 |
available | [WTS] [JSN] | |||
R1-1711072 | Discussion on codeword mapping | discussion | NTT DOCOMO, INC. |
R1-ah-18512 AI: 5.1.2.1.1 |
available | [WTS] [JSN] | |||
R1-1711073 | Codebook design for uplink | discussion | NTT DOCOMO, INC. |
R1-ah-18512 AI: 5.1.2.1.2 |
noted | [WTS] [JSN] | |||
R1-1711074 | Beam determination for non-codebook based transmission for uplink | discussion | NTT DOCOMO, INC. |
R1-ah-18512 AI: 5.1.2.1.3 |
available | [WTS] [JSN] | |||
R1-1711075 | View on Beam Management Details | discussion | NTT DOCOMO, INC. |
R1-ah-18512 AI: 5.1.2.2.1 |
available | [WTS] [JSN] | |||
R1-1711076 | Further views on mechanism to recover from beam failure | discussion | NTT DOCOMO, INC. |
R1-ah-18512 AI: 5.1.2.2.2 |
noted | [WTS] [JSN] | |||
R1-1711077 | Discussion on CSI framework | discussion | NTT DOCOMO, INC. |
R1-ah-18512 AI: 5.1.2.3.1 |
available | [WTS] [JSN] | |||
R1-1711078 | On CSI measurement for NR | discussion | NTT DOCOMO, INC. |
R1-ah-18512 AI: 5.1.2.3.2 |
available | [WTS] [JSN] | |||
R1-1711079 | CSI Feedback Design for NR MIMO | discussion | NTT DOCOMO, INC. |
R1-ah-18512 AI: 5.1.2.3.4 |
available | [WTS] [JSN] | |||
R1-1711080 | Feedback Design for CSI Type I | discussion | NTT DOCOMO, INC. |
R1-ah-18512 AI: 5.1.2.3.4 |
available | [WTS] [JSN] | |||
R1-1711081 | Feedback Design for CSI Type II | discussion | NTT DOCOMO, INC. |
R1-ah-18512 AI: 5.1.2.3.4 |
available | [WTS] [JSN] | |||
R1-1711082 | CSI-RS for beam managmenent | discussion | NTT DOCOMO, INC. |
R1-ah-18512 AI: 5.1.2.4.2 |
available | [WTS] [JSN] | |||
R1-1711083 | CSI-RS for CSI acquisition | discussion | NTT DOCOMO, INC. |
R1-ah-18512 AI: 5.1.2.4.2 |
available | [WTS] [JSN] | |||
R1-1711084 | Evaluation results of DM-RS | discussion | NTT DOCOMO, INC. |
R1-ah-18512 AI: 5.1.2.4.3 |
available | [WTS] [JSN] | |||
R1-1711085 | Discussion on DM-RS design | discussion | NTT DOCOMO, INC. |
R1-ah-18512 AI: 5.1.2.4.3 |
available | [WTS] [JSN] | |||
R1-1711086 | Discussion on PT-RS design | discussion | NTT DOCOMO, INC. |
R1-ah-18512 AI: 5.1.2.4.4 |
available | [WTS] [JSN] | |||
R1-1711087 | Discussions on NR SRS Design | discussion | NTT DOCOMO, INC. |
R1-ah-18512 AI: 5.1.2.4.5 |
noted | [WTS] [JSN] | |||
R1-1711088 | Views on remaining issues of resource mapping for NR-PDCCH | discussion | NTT DOCOMO, INC. |
R1-ah-18512 AI: 5.1.3.1.1.1 |
available | [WTS] [JSN] | |||
R1-1711089 | Views on DM-RS design for NR-PDCCH | discussion | NTT DOCOMO, INC. |
R1-ah-18512 AI: 5.1.3.1.1.2 |
available | [WTS] [JSN] | |||
R1-1711090 | Views on control resource set configuration for NR-PDCCH | discussion | NTT DOCOMO, INC. |
R1-ah-18512 AI: 5.1.3.1.2.1 |
available | [WTS] [JSN] | |||
R1-1711091 | Views on search space design for NR-PDCCH | discussion | NTT DOCOMO, INC. |
R1-ah-18512 AI: 5.1.3.1.2.2 |
available | [WTS] [JSN] | |||
R1-1711092 | Views on multi-beam based NR-PDCCH | discussion | NTT DOCOMO, INC. |
R1-ah-18512 AI: 5.1.3.1.2.3 |
available | [WTS] [JSN] | |||
R1-1711093 | Resource sharing between data and control channels | discussion | NTT DOCOMO, INC. |
R1-ah-18512 AI: 5.1.3.1.3 |
available | [WTS] [JSN] | |||
R1-1711094 | Views on structure of group-common PDCCH | discussion | NTT DOCOMO, INC. |
R1-ah-18512 AI: 5.1.3.1.4.1 |
available | [WTS] [JSN] | |||
R1-1711095 | Views on contents of group-common PDCCH | discussion | NTT DOCOMO, INC. |
R1-ah-18512 AI: 5.1.3.1.4.2 |
available | [WTS] [JSN] | |||
R1-1711096 | Views on UE behavior for group-common PDCCH | discussion | NTT DOCOMO, INC. |
R1-ah-18512 AI: 5.1.3.1.4.3 |
available | [WTS] [JSN] | |||
R1-1711097 | DL control channel design for URLLC | discussion | NTT DOCOMO, INC. |
R1-ah-18512 AI: 5.1.3.1.5 |
available | [WTS] [JSN] | |||
R1-1711098 | Sequence-based PUCCH for UCI of up to 2 bits | discussion | NTT DOCOMO, INC. |
R1-ah-18512 AI: 5.1.3.2.1.1 |
available | [WTS] [JSN] | |||
R1-1711099 | FDM-based PUCCH for UCI of more than 2 bits | discussion | NTT DOCOMO, INC. |
R1-ah-18512 AI: 5.1.3.2.1.2 |
available | [WTS] [JSN] | |||
R1-1711100 | Long-PUCCH for UCI of up to 2 bits | discussion | NTT DOCOMO, INC. |
R1-ah-18512 AI: 5.1.3.2.2.1 |
available | [WTS] [JSN] | |||
R1-1711101 | Long-PUCCH for UCI of more than 2 bits | discussion | NTT DOCOMO, INC. |
R1-ah-18512 AI: 5.1.3.2.2.2 |
available | [WTS] [JSN] | |||
R1-1711102 | Long-PUCCH for more than one slot | discussion | NTT DOCOMO, INC. |
R1-ah-18512 AI: 5.1.3.2.2.3 |
available | [WTS] [JSN] | |||
R1-1711103 | PUCCH resource allocation | discussion | NTT DOCOMO, INC. |
R1-ah-18512 AI: 5.1.3.2.4 |
available | [WTS] [JSN] | |||
R1-1711104 | UCI on PUSCH | discussion | NTT DOCOMO, INC. |
R1-ah-18512 AI: 5.1.3.2.5.1 |
available | [WTS] [JSN] | |||
R1-1711105 | Multiplexing of PUCCH and PUSCH | discussion | NTT DOCOMO, INC. |
R1-ah-18512 AI: 5.1.3.2.5.2 |
available | [WTS] [JSN] | |||
R1-1711106 | UL control channel design for URLLC | discussion | NTT DOCOMO, INC. |
R1-ah-18512 AI: 5.1.3.2.6 |
available | [WTS] [JSN] | |||
R1-1711107 | Frequency-domain resource allocation | discussion | NTT DOCOMO, INC. |
R1-ah-18512 AI: 5.1.3.3.1.1 |
available | [WTS] [JSN] | |||
R1-1711108 | Time-domain resource allocation | discussion | NTT DOCOMO, INC. |
R1-ah-18512 AI: 5.1.3.3.1.2 |
available | [WTS] [JSN] | |||
R1-1711109 | Transport block size determination | discussion | NTT DOCOMO, INC. |
R1-ah-18512 AI: 5.1.3.3.1.3 |
available | [WTS] [JSN] | |||
R1-1711110 | Scheduling request design in NR system | discussion | NTT DOCOMO, INC. |
R1-ah-18512 AI: 5.1.3.3.2 |
available | [WTS] [JSN] | |||
R1-1711111 | Overall solutions for UL grant free transmission | discussion | NTT DOCOMO, INC. |
R1-ah-18512 AI: 5.1.3.3.3 |
available | [WTS] [JSN] | |||
R1-1711112 | CBG construction | discussion | NTT DOCOMO, INC. |
R1-ah-18512 AI: 5.1.3.3.4.1 |
available | [WTS] [JSN] | |||
R1-1711113 | DL control signalling for CBG-based (re)transmission | discussion | NTT DOCOMO, INC. |
R1-ah-18512 AI: 5.1.3.3.4.2 |
available | [WTS] [JSN] | |||
R1-1711114 | UL control signalling for CBG-based (re)transmission | discussion | NTT DOCOMO, INC. |
R1-ah-18512 AI: 5.1.3.3.4.3 |
available | [WTS] [JSN] | |||
R1-1711115 | HARQ-ACK timing | discussion | NTT DOCOMO, INC. |
R1-ah-18512 AI: 5.1.3.3.5.1 |
available | [WTS] [JSN] | |||
R1-1711116 | HARQ-ACK multiplexing | discussion | NTT DOCOMO, INC. |
R1-ah-18512 AI: 5.1.3.3.5.2 |
available | [WTS] [JSN] | |||
R1-1711117 | Processing time and HARQ process number for NR | discussion | NTT DOCOMO, INC. |
R1-ah-18512 AI: 5.1.3.3.6.1 |
available | [WTS] [JSN] | |||
R1-1711118 | Soft-buffer size and management | discussion | NTT DOCOMO, INC. |
R1-ah-18512 AI: 5.1.3.3.6.2 |
available | [WTS] [JSN] | |||
R1-1711119 | Pre-emption indication for downlink | discussion | NTT DOCOMO, INC. |
R1-ah-18512 AI: 5.1.3.3.7.1 |
available | [WTS] [JSN] | |||
R1-1711120 | Multiplexing of different data durations for uplink | discussion | NTT DOCOMO, INC. |
R1-ah-18512 AI: 5.1.3.3.7.2 |
available | [WTS] [JSN] | |||
R1-1711121 | Scheduling and HARQ procedures for URLLC | discussion | NTT DOCOMO, INC. |
R1-ah-18512 AI: 5.1.3.3.8 |
available | [WTS] [JSN] | |||
R1-1711122 | NR carrier aggregation | discussion | NTT DOCOMO, INC. |
R1-ah-18512 AI: 5.1.3.4.1.1 |
available | [WTS] [JSN] | |||
R1-1711123 | LTE-NR Dual connectivity | discussion | NTT DOCOMO, INC. |
R1-ah-18512 AI: 5.1.3.4.2 |
available | [WTS] [JSN] | |||
R1-1711124 | Distributed simple parity check Polar codes | discussion | NTT DOCOMO, INC. |
R1-ah-18512 AI: 5.1.4.2.1 |
available | [WTS] [JSN] | |||
R1-1711125 | Performance evaluation of DSPC-Polar codes | discussion | NTT DOCOMO, INC. |
R1-ah-18512 AI: 5.1.4.2.1 |
noted | [WTS] [JSN] | |||
R1-1711126 | Sequence design of Polar codes | discussion | NTT DOCOMO, INC. |
R1-ah-18512 AI: 5.1.4.2.2 |
noted | [WTS] [JSN] | |||
R1-1711127 | Rate matching of Polar codes | discussion | NTT DOCOMO, INC. |
R1-ah-18512 AI: 5.1.4.2.2 |
available | [WTS] [JSN] | |||
R1-1711128 | Interleaving design of Polar codes | discussion | NTT DOCOMO, INC. |
R1-ah-18512 AI: 5.1.4.2.3 |
available | [WTS] [JSN] | |||
R1-1711129 | Discussion on cross-link interference mitigation for duplexing flexibility | discussion | NTT DOCOMO, INC. |
R1-ah-18512 AI: 5.1.6.1 |
noted | [WTS] [JSN] | |||
R1-1711130 | Discussion on prioritized scenarios for duplexing flexibility | discussion | NTT DOCOMO, INC. |
R1-ah-18512 AI: 5.1.6.2 |
available | [WTS] [JSN] | |||
R1-1711131 | Remaing issues on wider bandwidth operations for NR | discussion | NTT DOCOMO, INC. |
R1-ah-18512 AI: 5.1.7 |
available | [WTS] [JSN] | |||
R1-1711132 | Views on single UL transmission and UL sharing | discussion | NTT DOCOMO, INC. |
R1-ah-18512 AI: 5.1.8 |
noted | [WTS] [JSN] | |||
R1-1711133 | LTE-NR power sharing mechanism | discussion | NTT DOCOMO, INC. |
R1-ah-18512 AI: 5.1.9.1 |
available | [WTS] [JSN] | |||
R1-1711134 | Power control framework for PUSCH | discussion | NTT DOCOMO, INC. |
R1-ah-18512 AI: 5.1.9.2 |
noted | [WTS] [JSN] | |||
R1-1711135 | Synchronization signal sequence design | discussion | Qualcomm Incorporated | Rel-15 |
R1-ah-18512 AI: 5.1.1.1.1 |
available | [WTS] [JSN] | ||
R1-1711136 | SS burst set composition consideration |
discussion revised to R1-1711645 |
Qualcomm Incorporated | Rel-15 |
R1-ah-18512 AI: 5.1.1.1.2 |
revised | [WTS] [JSN] | ||
R1-1711137 | Timing indication based on SS block consideration |
discussion revised to R1-1711646 |
Qualcomm Incorporated | Rel-15 |
R1-ah-18512 AI: 5.1.1.1.3 |
revised | [WTS] [JSN] | ||
R1-1711138 | Multiple SS block transmissions design in wideband CC | discussion | Qualcomm Incorporated | Rel-15 |
R1-ah-18512 AI: 5.1.1.1.4 |
available | [WTS] [JSN] | ||
R1-1711139 | PBCH contents and payload size consideration | discussion | Qualcomm Incorporated | Rel-15 |
R1-ah-18512 AI: 5.1.1.2.1 |
available | [WTS] [JSN] | ||
R1-1711140 | SS bock composition and PBCH RE mapping design | discussion | Qualcomm Incorporated | Rel-15 |
R1-ah-18512 AI: 5.1.1.2.2 |
noted | [WTS] [JSN] | ||
R1-1711141 | DMRS design for NR-PBCH | discussion | Qualcomm Incorporated | Rel-15 |
R1-ah-18512 AI: 5.1.1.2.3 |
available | [WTS] [JSN] | ||
R1-1711142 | Remaining system information delivery consideration | discussion | Qualcomm Incorporated | Rel-15 |
R1-ah-18512 AI: 5.1.1.2.4 |
available | [WTS] [JSN] | ||
R1-1711143 | Other system information delivery consideration | discussion | Qualcomm Incorporated | Rel-15 |
R1-ah-18512 AI: 5.1.1.2.5 |
available | [WTS] [JSN] | ||
R1-1711144 | Paging design consideration | discussion | Qualcomm Incorporated | Rel-15 |
R1-ah-18512 AI: 5.1.1.3 |
available | [WTS] [JSN] | ||
R1-1711145 | PRACH preamble format design for long/short sequence length | discussion | Qualcomm Incorporated | Rel-15 |
R1-ah-18512 AI: 5.1.1.4.1 |
available | [WTS] [JSN] | ||
R1-1711146 | PRACH preamble design for capacity enhancement | discussion | Qualcomm Incorporated | Rel-15 |
R1-ah-18512 AI: 5.1.1.4.2 |
available | [WTS] [JSN] | ||
R1-1711147 | Power ramping and power control for RA procedure | discussion | Qualcomm Incorporated | Rel-15 |
R1-ah-18512 AI: 5.1.1.4.3 |
available | [WTS] [JSN] | ||
R1-1711148 | 4-step RACH procedure consideration | discussion | Qualcomm Incorporated | Rel-15 |
R1-ah-18512 AI: 5.1.1.4.4 |
available | [WTS] [JSN] | ||
R1-1711149 | Measurement based on SS block consideration | discussion | Qualcomm Incorporated | Rel-15 |
R1-ah-18512 AI: 5.1.1.5.1 |
available | [WTS] [JSN] | ||
R1-1711150 | Measurement based on CSI-RS for L3 mobility consideration | discussion | Qualcomm Incorporated | Rel-15 |
R1-ah-18512 AI: 5.1.1.5.2 |
available | [WTS] [JSN] | ||
R1-1711151 | Radio link monitoring consideration | discussion | Qualcomm Incorporated | Rel-15 |
R1-ah-18512 AI: 5.1.1.5.3 |
noted | [WTS] [JSN] | ||
R1-1711152 | CW to layer mapping and frequency domain interleaving | discussion | Qualcomm Incorporated | Rel-15 |
R1-ah-18512 AI: 5.1.2.1.1 |
noted | [WTS] [JSN] | ||
R1-1711153 | Codebook based UL transmission | discussion | Qualcomm Incorporated | Rel-15 |
R1-ah-18512 AI: 5.1.2.1.2 |
available | [WTS] [JSN] | ||
R1-1711154 | Non-codebook based UL transmission | discussion | Qualcomm Incorporated | Rel-15 |
R1-ah-18512 AI: 5.1.2.1.3 |
noted | [WTS] [JSN] | ||
R1-1711155 | On UL diversity transmission scheme | discussion | Qualcomm Incorporated | Rel-15 |
R1-ah-18512 AI: 5.1.2.1.4 |
available | [WTS] [JSN] | ||
R1-1711156 | Discussion on PRB bundling for DL | discussion | Qualcomm Incorporated | Rel-15 |
R1-ah-18512 AI: 5.1.2.1.5 |
noted | [WTS] [JSN] | ||
R1-1711157 | On multi-TRP and multi-panel transmission | discussion | Qualcomm Incorporated | Rel-15 |
R1-ah-18512 AI: 5.1.2.1.6 |
available | [WTS] [JSN] | ||
R1-1711158 | On PDSCH and PUSCH RE mapping | discussion | Qualcomm Incorporated | Rel-15 |
R1-ah-18512 AI: 5.1.2.1.7 |
available | [WTS] [JSN] | ||
R1-1711159 | Transmission scheme for broadcast PDSCH | discussion | Qualcomm Incorporated | Rel-15 |
R1-ah-18512 AI: 5.1.2.1.8 |
noted | [WTS] [JSN] | ||
R1-1711160 | Beam management for NR | discussion | Qualcomm Incorporated | Rel-15 |
R1-ah-18512 AI: 5.1.2.2.1 |
noted | [WTS] [JSN] | ||
R1-1711161 | Beam recovery procedures | discussion | Qualcomm Incorporated | Rel-15 |
R1-ah-18512 AI: 5.1.2.2.2 |
available | [WTS] [JSN] | ||
R1-1711162 | Details of CSI framework | discussion | Qualcomm Incorporated | Rel-15 |
R1-ah-18512 AI: 5.1.2.3.1 |
available | [WTS] [JSN] | ||
R1-1711163 | Details of CSI acquisition | discussion | Qualcomm Incorporated | Rel-15 |
R1-ah-18512 AI: 5.1.2.3.2 |
available | [WTS] [JSN] | ||
R1-1711164 | CSI acquisition for reciprocity based operation | discussion | Qualcomm Incorporated | Rel-15 |
R1-ah-18512 AI: 5.1.2.3.3 |
available | [WTS] [JSN] | ||
R1-1711165 | On Type I and Type II CSI feedback using PUCCH | discussion | Qualcomm Incorporated | Rel-15 |
R1-ah-18512 AI: 5.1.2.3.4 |
available | [WTS] [JSN] | ||
R1-1711166 | On CSI feedback for open- or semi-open-loop transmission | discussion | Qualcomm Incorporated | Rel-15 |
R1-ah-18512 AI: 5.1.2.3.4 |
available | [WTS] [JSN] | ||
R1-1711167 | On multiplexing of different types of RSs | discussion | Qualcomm Incorporated | Rel-15 |
R1-ah-18512 AI: 5.1.2.4.1 |
available | [WTS] [JSN] | ||
R1-1711168 | Discussion on CSI-RS design |
discussion revised to R1-1711651 |
Qualcomm Incorporated | Rel-15 |
R1-ah-18512 AI: 5.1.2.4.2 |
revised | [WTS] [JSN] | ||
R1-1711169 | Discussion on UL DMRS design | discussion | Qualcomm Incorporated | Rel-15 |
R1-ah-18512 AI: 5.1.2.4.3 |
available | [WTS] [JSN] | ||
R1-1711170 | Discussion on DL DMRS design | discussion | Qualcomm Incorporated | Rel-15 |
R1-ah-18512 AI: 5.1.2.4.3 |
available | [WTS] [JSN] | ||
R1-1711171 | Evaluation of UL DMRS design | discussion | Qualcomm Incorporated | Rel-15 |
R1-ah-18512 AI: 5.1.2.4.3 |
available | [WTS] [JSN] | ||
R1-1711172 | Evaluation of DL DMRS design | discussion | Qualcomm Incorporated | Rel-15 |
R1-ah-18512 AI: 5.1.2.4.3 |
available | [WTS] [JSN] | ||
R1-1711173 | Phase and frequency tracking reference signal considerations | discussion | Qualcomm Incorporated | Rel-15 |
R1-ah-18512 AI: 5.1.2.4.4 |
available | [WTS] [JSN] | ||
R1-1711174 | Discussion on SRS design | discussion | Qualcomm Incorporated | Rel-15 |
R1-ah-18512 AI: 5.1.2.4.5 |
noted | [WTS] [JSN] | ||
R1-1711175 | Further analysis on fine time/frequency tracking RS design | discussion | Qualcomm Incorporated | Rel-15 |
R1-ah-18512 AI: 5.1.2.4.6 |
noted | [WTS] [JSN] | ||
R1-1711176 | Discussion on QCL | discussion | Qualcomm Incorporated | Rel-15 |
R1-ah-18512 AI: 5.1.2.4.7 |
noted | [WTS] [JSN] | ||
R1-1711177 | PDCCH structure |
discussion revised to R1-1711633 |
Qualcomm Incorporated | Rel-15 |
R1-ah-18512 AI: 5.1.3.1.1.1 |
revised | [WTS] [JSN] | ||
R1-1711178 | RS for DL control channel |
discussion revised to R1-1711634 |
Qualcomm Incorporated | Rel-15 |
R1-ah-18512 AI: 5.1.3.1.1.2 |
revised | [WTS] [JSN] | ||
R1-1711179 | Control resource set and search space | discussion | Qualcomm Incorporated | Rel-15 |
R1-ah-18512 AI: 5.1.3.1.2.1 |
available | [WTS] [JSN] | ||
R1-1711180 | Nested search space design | discussion | Qualcomm Incorporated | Rel-15 |
R1-ah-18512 AI: 5.1.3.1.2.2 |
available | [WTS] [JSN] | ||
R1-1711181 | Multi-beam control operation | discussion | Qualcomm Incorporated | Rel-15 |
R1-ah-18512 AI: 5.1.3.1.2.3 |
withdrawn | [WTS] [JSN] | ||
R1-1711182 | Resource reuse for data in DL control region | discussion | Qualcomm Incorporated | Rel-15 |
R1-ah-18512 AI: 5.1.3.1.3 |
available | [WTS] [JSN] | ||
R1-1711183 | Structure of group common PDCCH | discussion | Qualcomm Incorporated | Rel-15 |
R1-ah-18512 AI: 5.1.3.1.4.1 |
available | [WTS] [JSN] | ||
R1-1711184 | Contents of group common PDCCH |
discussion revised to R1-1711247 |
Qualcomm Incorporated | Rel-15 |
R1-ah-18512 AI: 5.1.3.1.4.2 |
revised | [WTS] [JSN] | ||
R1-1711185 | UE behaviour related to group common PDCCH | discussion | Qualcomm Incorporated | Rel-15 |
R1-ah-18512 AI: 5.1.3.1.4.3 |
available | [WTS] [JSN] | ||
R1-1711186 | Common control resource set signaling in MIB | discussion | Qualcomm Incorporated | Rel-15 |
R1-ah-18512 AI: 5.1.3.1.6 |
available | [WTS] [JSN] | ||
R1-1711187 | Advanced Grant Indication for UE Power Saving | discussion | Qualcomm Incorporated | Rel-15 |
R1-ah-18512 AI: 5.1.3.1.6 |
available | [WTS] [JSN] | ||
R1-1711188 | Channelization of 1-symbol short PUCCH with 1 or 2 bits payload | discussion | Qualcomm Incorporated | Rel-15 |
R1-ah-18512 AI: 5.1.3.2.1.1 |
available | [WTS] [JSN] | ||
R1-1711189 | Channelization of 1-symbol short PUCCH with more than 2 bits payload | discussion | Qualcomm Incorporated | Rel-15 |
R1-ah-18512 AI: 5.1.3.2.1.2 |
available | [WTS] [JSN] | ||
R1-1711190 | Long PUCCH design with 1 or 2 bits UCI payload | discussion | Qualcomm Incorporated | Rel-15 |
R1-ah-18512 AI: 5.1.3.2.2.1 |
available | [WTS] [JSN] | ||
R1-1711191 | Long PUCCH design with more than 2 bits UCI payload | discussion | Qualcomm Incorporated | Rel-15 |
R1-ah-18512 AI: 5.1.3.2.2.2 |
available | [WTS] [JSN] | ||
R1-1711192 | Long PUCCH over multiple slots | discussion | Qualcomm Incorporated | Rel-15 |
R1-ah-18512 AI: 5.1.3.2.2.3 |
available | [WTS] [JSN] | ||
R1-1711193 | Transmit diversity for PUCCH | discussion | Qualcomm Incorporated | Rel-15 |
R1-ah-18512 AI: 5.1.3.2.3 |
available | [WTS] [JSN] | ||
R1-1711194 | Resource allocation for PUCCH | discussion | Qualcomm Incorporated | Rel-15 |
R1-ah-18512 AI: 5.1.3.2.4 |
available | [WTS] [JSN] | ||
R1-1711195 | UCI piggyback on PUSCH | discussion | Qualcomm Incorporated | Rel-15 |
R1-ah-18512 AI: 5.1.3.2.5.1 |
available | [WTS] [JSN] | ||
R1-1711196 | Multiplexing of PUCCH and PUSCH | discussion | Qualcomm Incorporated | Rel-15 |
R1-ah-18512 AI: 5.1.3.2.5.2 |
available | [WTS] [JSN] | ||
R1-1711197 | MPR issue with distributed RB allocation in UL | discussion | Qualcomm Incorporated | Rel-15 |
R1-ah-18512 AI: 5.1.3.3.1.1 |
available | [WTS] [JSN] | ||
R1-1711198 | Short PUSCH transmission in UL short duration | discussion | Qualcomm Incorporated | Rel-15 |
R1-ah-18512 AI: 5.1.3.3.1.1 |
available | [WTS] [JSN] | ||
R1-1711199 | Discussion TB size determination | discussion | Qualcomm Incorporated | Rel-15 |
R1-ah-18512 AI: 5.1.3.3.1.3 |
available | [WTS] [JSN] | ||
R1-1711200 | Simultaneous UL SR channel | discussion | Qualcomm Incorporated | Rel-15 |
R1-ah-18512 AI: 5.1.3.3.2 |
available | [WTS] [JSN] | ||
R1-1711201 | Uplink Resource for SR | discussion | Qualcomm Incorporated | Rel-15 |
R1-ah-18512 AI: 5.1.3.2.2 |
available | [WTS] [JSN] | ||
R1-1711202 | CBG Construction Principles for CBG-based Transmission with Multi-Bit HARQ feedback | discussion | Qualcomm Incorporated | Rel-15 |
R1-ah-18512 AI: 5.1.3.3.4.1 |
available | [WTS] [JSN] | ||
R1-1711203 | DCI considerations for CBG-based (re)-Transmissions | discussion | Qualcomm Incorporated | Rel-15 |
R1-ah-18512 AI: 5.1.3.3.4.2 |
available | [WTS] [JSN] | ||
R1-1711204 | UCI considerations for CBG-based (re)-Transmissions | discussion | Qualcomm Incorporated | Rel-15 |
R1-ah-18512 AI: 5.1.3.3.4.3 |
available | [WTS] [JSN] | ||
R1-1711205 | Low latency impact analysis on user plane and control plane | discussion | Qualcomm Incorporated | Rel-15 |
R1-ah-18512 AI: 5.1.3.3.5.1 |
available | [WTS] [JSN] | ||
R1-1711206 | UE processing time | discussion | Qualcomm Incorporated | Rel-15 |
R1-ah-18512 AI: 5.1.3.3.6.1 |
available | [WTS] [JSN] | ||
R1-1711207 | Considerations for soft buffer management | discussion | Qualcomm Incorporated | Rel-15 |
R1-ah-18512 AI: 5.1.3.3.6.2 |
available | [WTS] [JSN] | ||
R1-1711208 | Timing advance for different numerology | discussion | Qualcomm Incorporated | Rel-15 |
R1-ah-18512 AI: 5.1.3.3.7.2 |
available | [WTS] [JSN] | ||
R1-1711209 | CA with mixed numerology | discussion | Qualcomm Incorporated | Rel-15 |
R1-ah-18512 AI: 5.1.3.4.1.1 |
available | [WTS] [JSN] | ||
R1-1711210 | CRC attachment | discussion | Qualcomm Incorporated | Rel-15 |
R1-ah-18512 AI: 5.1.4.1.1.1 |
noted | [WTS] [JSN] | ||
R1-1711211 | LDPC segmentation | discussion | Qualcomm Incorporated | Rel-15 |
R1-ah-18512 AI: 5.1.4.1.1.2 |
noted | [WTS] [JSN] | ||
R1-1711212 | LDPC rate matching | discussion | Qualcomm Incorporated | Rel-15 |
R1-ah-18512 AI: 5.1.4.1.1.3 |
available | [WTS] [JSN] | ||
R1-1711213 | LDPC rate compatible design |
discussion revised to R1-1711978 |
Qualcomm Incorporated | Rel-15 |
R1-ah-18512 AI: 5.1.4.1.2 |
revised | [WTS] [JSN] | ||
R1-1711214 | Early termination scheme for Polar codes | discussion | Qualcomm Incorporated | Rel-15 |
R1-ah-18512 AI: 5.1.4.2.1 |
available | [WTS] [JSN] | ||
R1-1711215 | Evaluation of early termination for Polar codes | discussion | Qualcomm Incorporated | Rel-15 |
R1-ah-18512 AI: 5.1.4.2.1 |
noted | [WTS] [JSN] | ||
R1-1711216 | Decoding and encoding latency for polar codes with PC frozen bits or distributed CRC bits | discussion | Qualcomm Incorporated | Rel-15 |
R1-ah-18512 AI: 5.1.4.2.1 |
noted | [WTS] [JSN] | ||
R1-1711217 | Performance comparison between CA-polar and PC-polar | discussion | Qualcomm Incorporated | Rel-15 |
R1-ah-18512 AI: 5.1.4.2.1 |
available | [WTS] [JSN] | ||
R1-1711218 | Sequence construction of Polar codes for control channel |
discussion revised to R1-1711977 |
Qualcomm Incorporated | Rel-15 |
R1-ah-18512 AI: 5.1.4.2.2 |
revised | [WTS] [JSN] | ||
R1-1711219 | Determination of the values for the parameters in rate-matching for control channel | discussion | Qualcomm Incorporated | Rel-15 |
R1-ah-18512 AI: 5.1.4.2.2 |
available | [WTS] [JSN] | ||
R1-1711220 | Rate-matching scheme for control channel | discussion | Qualcomm Incorporated | Rel-15 |
R1-ah-18512 AI: 5.1.4.2.2 |
available | [WTS] [JSN] | ||
R1-1711221 | Design of Polar code for large UCI with segmentation | discussion | Qualcomm Incorporated | Rel-15 |
R1-ah-18512 AI: 5.1.4.2.3 |
available | [WTS] [JSN] | ||
R1-1711222 | Design and evaluation of Interleaver for Polar codes | discussion | Qualcomm Incorporated | Rel-15 |
R1-ah-18512 AI: 5.1.4.2.3 |
available | [WTS] [JSN] | ||
R1-1711223 | PBCH channel coding |
discussion revised to R1-1711605 |
Qualcomm Incorporated | Rel-15 |
R1-ah-18512 AI: 5.1.4.3 |
revised | [WTS] [JSN] | ||
R1-1711224 | Consideration for MCS table | discussion | Qualcomm Incorporated | Rel-15 |
R1-ah-18512 AI: 5.1.5 |
noted | [WTS] [JSN] | ||
R1-1711225 | Dynamic TDD UE-to-UE measurement considerations | discussion | Qualcomm Incorporated | Rel-15 |
R1-ah-18512 AI: 5.1.6.1 |
available | [WTS] [JSN] | ||
R1-1711226 | Dynamic TDD Cross-link interference management consideration | discussion | Qualcomm Incorporated | Rel-15 |
R1-ah-18512 AI: 5.1.6.1 |
available | [WTS] [JSN] | ||
R1-1711227 | UE Power Saving during Active State | discussion | Qualcomm Incorporated | Rel-15 |
R1-ah-18512 AI: 5.1.7 |
available | [WTS] [JSN] | ||
R1-1711228 | NR LTE Adjacent Channel Coexistence Consideration | discussion | Qualcomm Incorporated | Rel-15 |
R1-ah-18512 AI: 5.1.8 |
available | [WTS] [JSN] | ||
R1-1711229 | NR-LTE Co-channel Coexistence Considerations | discussion | Qualcomm Incorporated | Rel-15 |
R1-ah-18512 AI: 5.1.8 |
noted | [WTS] [JSN] | ||
R1-1711230 | Power control and PHR for NR | discussion | Qualcomm Incorporated | Rel-15 |
R1-ah-18512 AI: 5.1.9.2 |
noted | [WTS] [JSN] | ||
R1-1711231 | TDD-SUL CA scenario | discussion | Qualcomm Incorporated | Rel-15 |
R1-ah-18512 AI: 5.1.11 |
withdrawn | [WTS] [JSN] | ||
R1-1711232 | Indication of actually transmitted SS blocks | other | Sharp |
R1-ah-18512 AI: 5.1.1.1.2 |
available | [WTS] [JSN] | |||
R1-1711233 | Remaining issues on power ramping in NR | other | Sharp |
R1-ah-18512 AI: 5.1.1.4.3 |
available | [WTS] [JSN] | |||
R1-1711234 | Discussion on mechanisms for beam failure recovery | other | Sharp |
R1-ah-18512 AI: 5.1.2.2.2 |
available | [WTS] [JSN] | |||
R1-1711235 | REG bundling for NR PDCCH | other | Sharp |
R1-ah-18512 AI: 5.1.3.1.1.1 |
available | [WTS] [JSN] | |||
R1-1711236 | Indication of PDSCH starting position for NR | other | Sharp |
R1-ah-18512 AI: 5.1.3.1.3 |
available | [WTS] [JSN] | |||
R1-1711237 | Group common PDCCH structure for NR | other | Sharp |
R1-ah-18512 AI: 5.1.3.1.4.1 |
available | [WTS] [JSN] | |||
R1-1711238 | Group common PDCCH contents for NR | other | Sharp |
R1-ah-18512 AI: 5.1.3.1.4.2 |
available | [WTS] [JSN] | |||
R1-1711239 | Group common PDCCH monitoring for NR | other | Sharp |
R1-ah-18512 AI: 5.1.3.1.4.3 |
available | [WTS] [JSN] | |||
R1-1711240 | Slot structure of NR long PUCCH for more than 2 bits | other | Sharp |
R1-ah-18512 AI: 5.1.3.2.2.2 |
available | [WTS] [JSN] | |||
R1-1711241 | Structure of NR long PUCCH over multiple slots | other | Sharp |
R1-ah-18512 AI: 5.1.3.2.2.3 |
available | [WTS] [JSN] | |||
R1-1711242 | Short PUCCH structure for UCI of up to 2 bits | other | Sharp |
R1-ah-18512 AI: 5.1.3.2.1.1 |
available | [WTS] [JSN] | |||
R1-1711243 | Short PUCCH structure for UCI of more than 2 bits | other | Sharp |
R1-ah-18512 AI: 5.1.3.2.1.2 |
available | [WTS] [JSN] | |||
R1-1711244 | PUCCH and PUSCH multiplexing methods | other | Sharp |
R1-ah-18512 AI: 5.1.3.2.5.2 |
available | [WTS] [JSN] | |||
R1-1711245 | Pardon the Interruption: Downlink Control Signaling to Enable Preemption and CBG-based (Re) Transmission | other | Sharp |
R1-ah-18512 AI: 5.1.3.3.4.2 |
available | [WTS] [JSN] | |||
R1-1711246 | Discussion on Bursty Interference Measurement Resources | discussion | Qualcomm Incorporated | Rel-15 |
R1-ah-18512 AI: 5.1.2.4.8 |
available | [WTS] [JSN] | ||
R1-1711247 | Contents of group common PDCCH |
discussion revision of R1-1711184 |
Qualcomm Incorporated | Rel-15 |
R1-ah-18512 AI: 5.1.3.1.4.2 |
available | [WTS] [JSN] | ||
R1-1711248 | NR-LTE Co-channel Coexistence Considerations | discussion | Qualcomm Incorporated | Rel-15 |
R1-ah-18512 AI: 5.1.8 |
withdrawn | [WTS] [JSN] | ||
R1-1711249 | Power control and PHR for NR | discussion | Qualcomm Incorporated | Rel-15 |
R1-ah-18512 AI: 5.1.9 |
withdrawn | [WTS] [JSN] | ||
R1-1711250 | TDD-SUL CA scenario | discussion | Qualcomm Incorporated | Rel-15 |
R1-ah-18512 AI: 5.1.11 |
withdrawn | [WTS] [JSN] | ||
R1-1711251 | Design of Long-PUCCH for UCI of more than 2 bits | discussion | Cohere Technologies |
R1-ah-18512 AI: 5.1.3.2.2.2 |
available | [WTS] [JSN] | |||
R1-1711252 | Support of long-PUCCH over multiple slots | discussion | Cohere Technologies |
R1-ah-18512 AI: 5.1.3.2.2.3 |
available | [WTS] [JSN] | |||
R1-1711253 | Resource configuration for UL transmission without grant | discussion | NICT |
R1-ah-18512 AI: 5.1.3.3.3 |
available | [WTS] [JSN] | |||
R1-1711254 | Discussion on Paging Design | discussion | III |
R1-ah-18512 AI: 5.1.1.3 |
available | [WTS] [JSN] | |||
R1-1711255 | Correction on the formula of AnnexA |
draftCR revised to R1-1711623 |
ZTE | FS_6GHz_CH_model | Rel-14 |
R1-ah-18512 AI: 5.1. |
revised | [WTS] [JSN] | |
R1-1711256 | Correction on Procedure A of spatially-consistency UT mobility modeling |
draftCR revised to R1-1711624 |
ZTE | FS_6GHz_CH_model | Rel-14 |
R1-ah-18512 AI: 5.1. |
revised | [WTS] [JSN] | |
R1-1711257 | Discussion on DL control signalling for CBG-based retransmission | discussion | HTC Corporation |
R1-ah-18512 AI: 5.1.3.3.4.2 |
available | [WTS] [JSN] | |||
R1-1711258 | Discussion on UL control signalling for CBG-based retransmission | discussion | HTC Corporation |
R1-ah-18512 AI: 5.1.3.3.4.3 |
available | [WTS] [JSN] | |||
R1-1711259 | Discussion on CBG-based HARQ feedback multiplexing | discussion | HTC Corporation |
R1-ah-18512 AI: 5.1.3.3.5.2 |
available | [WTS] [JSN] | |||
R1-1711260 | Remaining open issues on NR Synchronisation signal design | discussion | Nokia, Alcatel-Lucent Shanghai Bell |
R1-ah-18512 AI: 5.1.1.1.1 |
available | [WTS] [JSN] | |||
R1-1711261 | On SS Burst Set Composition | discussion | Nokia, Alcatel-Lucent Shanghai Bell |
R1-ah-18512 AI: 5.1.1.1.2 |
available | [WTS] [JSN] | |||
R1-1711262 | SS block time index indication | discussion | Nokia, Alcatel-Lucent Shanghai Bell |
R1-ah-18512 AI: 5.1.1.1.3 |
available | [WTS] [JSN] | |||
R1-1711263 | SS-block transmission in multi CC deployments | discussion | Nokia, Alcatel-Lucent Shanghai Bell |
R1-ah-18512 AI: 5.1.1.1.4 |
available | [WTS] [JSN] | |||
R1-1711264 | NR-PBCH content |
discussion revised to R1-1711650 |
Nokia, Alcatel-Lucent Shanghai Bell |
R1-ah-18512 AI: 5.1.1.2.1 |
revised | [WTS] [JSN] | |||
R1-1711265 | SS block composition | discussion | Nokia, Alcatel-Lucent Shanghai Bell |
R1-ah-18512 AI: 5.1.1.2.2 |
available | [WTS] [JSN] | |||
R1-1711266 | NR-PBCH DMRS design | discussion | Nokia, Alcatel-Lucent Shanghai Bell |
R1-ah-18512 AI: 5.1.1.2.3 |
available | [WTS] [JSN] | |||
R1-1711267 | On Remaining System Information Delivery | discussion | Nokia, Alcatel-Lucent Shanghai Bell |
R1-ah-18512 AI: 5.1.1.2.4 |
available | [WTS] [JSN] | |||
R1-1711268 | SS block measurements and procedures | discussion | Nokia, Alcatel-Lucent Shanghai Bell |
R1-ah-18512 AI: 5.1.1.5.1 |
available | [WTS] [JSN] | |||
R1-1711269 | NR Radio link monitoring | discussion | Nokia, Alcatel-Lucent Shanghai Bell |
R1-ah-18512 AI: 5.1.1.5.3 |
available | [WTS] [JSN] | |||
R1-1711270 | [89-16] Email discussion on NR-PRACH preamble formats based on short sequence length |
discussion revision of R1-1710229 |
ZTE Corporation |
R1-ah-18512 AI: 5.1.1.4.1 |
available | [WTS] [JSN] | |||
R1-1711271 | Paging in NR | discussion | Nokia, Alcatel-Lucent Shanghai Bell |
R1-ah-18512 AI: 5.1.1.3 |
available | [WTS] [JSN] | |||
R1-1711272 | Configuration for control resource sets and search spaces | discussion | HTC Corporation |
R1-ah-18512 AI: 5.1.3.1.2.1 |
available | [WTS] [JSN] | |||
R1-1711273 | Design of resource mapping and NR-PDCCH | discussion | HTC Corporation |
R1-ah-18512 AI: 5.1.3.1.1.1 |
available | [WTS] [JSN] | |||
R1-1711274 | Discussion on location and timing indication of SS block | discussion | Xiaomi Technology |
R1-ah-18512 AI: 5.1.1.1.3 |
available | [WTS] [JSN] | |||
R1-1711275 | Discussion on NR-SSS working assumption | discussion | Motorola Mobility, Lenovo |
R1-ah-18512 AI: 5.1.1.1.1 |
available | [WTS] [JSN] | |||
R1-1711276 | Indication of SS block timing information | discussion | Motorola Mobility, Lenovo |
R1-ah-18512 AI: 5.1.1.1.3 |
available | [WTS] [JSN] | |||
R1-1711277 | Discussion on NR-PBCH contents | discussion | Motorola Mobility, Lenovo |
R1-ah-18512 AI: 5.1.1.2.1 |
available | [WTS] [JSN] | |||
R1-1711278 | NR-PBCH RE mapping | discussion | Motorola Mobility, Lenovo |
R1-ah-18512 AI: 5.1.1.2.2 |
available | [WTS] [JSN] | |||
R1-1711279 | RACH configuration and procedure | discussion | Motorola Mobility, Lenovo |
R1-ah-18512 AI: 5.1.1.4.4 |
available | [WTS] [JSN] | |||
R1-1711280 | On CCE and PDCCH mapping | discussion | Motorola Mobility, Lenovo |
R1-ah-18512 AI: 5.1.3.1.1.1 |
available | [WTS] [JSN] | |||
R1-1711281 | NR Group-common PDCCH contents and structure | discussion | Motorola Mobility, Lenovo |
R1-ah-18512 AI: 5.1.3.1.4.2 |
available | [WTS] [JSN] | |||
R1-1711282 | Short PUCCH for up to 2 bit UCI | discussion | Motorola Mobility, Lenovo |
R1-ah-18512 AI: 5.1.3.2.1.1 |
available | [WTS] [JSN] | |||
R1-1711283 | PUCCH resource allocation for HARQ-ACK feedback to Msg4 | discussion | Motorola Mobility, Lenovo |
R1-ah-18512 AI: 5.1.3.2.4 |
available | [WTS] [JSN] | |||
R1-1711284 | Codebook Based Transmission and Codebook Design for UL MIMO | discussion | Nokia, Alcatel-Lucent Shanghai Bell |
R1-ah-18512 AI: 5.1.2.1.2 |
available | [WTS] [JSN] | |||
R1-1711285 | Non-codebook based UL-MIMO transmission | discussion | Nokia, Alcatel-Lucent Shanghai Bell |
R1-ah-18512 AI: 5.1.2.1.3 |
available | [WTS] [JSN] | |||
R1-1711286 | UL-MIMO diversity-based transmission | discussion | Nokia, Alcatel-Lucent Shanghai Bell |
R1-ah-18512 AI: 5.1.2.1.4 |
available | [WTS] [JSN] | |||
R1-1711287 | On details of PRB Bundling | discussion | Nokia, Alcatel-Lucent Shanghai Bell |
R1-ah-18512 AI: 5.1.2.1.5 |
noted | [WTS] [JSN] | |||
R1-1711288 | On the maximum number of PDSCH/PDSCHs to be supported for multi-TRP transmission | discussion | Nokia, Alcatel-Lucent Shanghai Bell |
R1-ah-18512 AI: 5.1.2.1.6 |
available | [WTS] [JSN] | |||
R1-1711289 | On the utilization of SS block for beam management | discussion | Nokia, Alcatel-Lucent Shanghai Bell |
R1-ah-18512 AI: 5.1.2.2.1 |
available | [WTS] [JSN] | |||
R1-1711290 | SRS transmission for beam management | discussion | Nokia, Alcatel-Lucent Shanghai Bell |
R1-ah-18512 AI: 5.1.2.2.1 |
available | [WTS] [JSN] | |||
R1-1711291 | Beam Recovery in NR | discussion | Nokia, Alcatel-Lucent Shanghai Bell |
R1-ah-18512 AI: 5.1.2.2.2 |
noted | [WTS] [JSN] | |||
R1-1711292 | BPL definition and Spatial QCL time indication | discussion | Nokia, Alcatel-Lucent Shanghai Bell |
R1-ah-18512 AI: 5.1.2.2.3 |
noted | [WTS] [JSN] | |||
R1-1711293 | On beam grouping and reporting | discussion | Nokia, Alcatel-Lucent Shanghai Bell |
R1-ah-18512 AI: 5.1.2.2.3 |
available | [WTS] [JSN] | |||
R1-1711294 | On Multi-beam Downlink Control Channel Operation | discussion | Nokia, Alcatel-Lucent Shanghai Bell |
R1-ah-18512 AI: 5.1.2.2.3 |
available | [WTS] [JSN] | |||
R1-1711295 | Multi-beam Uplink Control Channel Operation | discussion | Nokia, Alcatel-Lucent Shanghai Bell |
R1-ah-18512 AI: 5.1.2.2.3 |
available | [WTS] [JSN] | |||
R1-1711296 | On the CRI definition and usability in NR | discussion | Nokia, Alcatel-Lucent Shanghai Bell |
R1-ah-18512 AI: 5.1.2.3.1 |
available | [WTS] [JSN] | |||
R1-1711297 | Remaining aspects on interference estimation options and configuration | discussion | Nokia, Alcatel-Lucent Shanghai Bell |
R1-ah-18512 AI: 5.1.2.3.2 |
noted | [WTS] [JSN] | |||
R1-1711298 | On the channel reciprocity support for CSI acquisition | discussion | Nokia, Alcatel-Lucent Shanghai Bell |
R1-ah-18512 AI: 5.1.2.3.3 |
noted | [WTS] [JSN] | |||
R1-1711299 | Feedback transmission of type II codebook |
discussion revised to R1-1711590 |
Nokia, Alcatel-Lucent Shanghai Bell |
R1-ah-18512 AI: 5.1.2.3.4 |
revised | [WTS] [JSN] | |||
R1-1711300 | CSI feedback in support of semi-open loop transmission | discussion | Nokia, Alcatel-Lucent Shanghai Bell |
R1-ah-18512 AI: 5.1.2.3.4 |
noted | [WTS] [JSN] | |||
R1-1711301 | On the CSI timing relationhips | discussion | Nokia, Alcatel-Lucent Shanghai Bell |
R1-ah-18512 AI: 5.1.2.3.5 |
available | [WTS] [JSN] | |||
R1-1711302 | On multiplexing of different RS types | discussion | Nokia, Alcatel-Lucent Shanghai Bell |
R1-ah-18512 AI: 5.1.2.4.1 |
available | [WTS] [JSN] | |||
R1-1711303 | On the CSI-RS configurations for NR CSI acquisition | discussion | Nokia, Alcatel-Lucent Shanghai Bell |
R1-ah-18512 AI: 5.1.2.4.2 |
available | [WTS] [JSN] | |||
R1-1711304 | On CSI-RS Design for DL Beam Management | discussion | Nokia, Alcatel-Lucent Shanghai Bell |
R1-ah-18512 AI: 5.1.2.4.2 |
available | [WTS] [JSN] | |||
R1-1711305 | On design of DL DM-RS for NR physical data channels | discussion | Nokia, Alcatel-Lucent Shanghai Bell |
R1-ah-18512 AI: 5.1.2.4.3 |
available | [WTS] [JSN] | |||
R1-1711306 | DL DM-RS patterns link performance evaluation | discussion | Nokia, Alcatel-Lucent Shanghai Bell |
R1-ah-18512 AI: 5.1.2.4.3 |
available | [WTS] [JSN] | |||
R1-1711307 | On design of UL DM-RS for NR physical data channels | discussion | Nokia, Alcatel-Lucent Shanghai Bell |
R1-ah-18512 AI: 5.1.2.4.3 |
available | [WTS] [JSN] | |||
R1-1711308 | Discussion on PT-RS design for CP-OFDM | discussion | Nokia, Alcatel-Lucent Shanghai Bell |
R1-ah-18512 AI: 5.1.2.4.4 |
available | [WTS] [JSN] | |||
R1-1711309 | On Details of the PT-RS Design for DFT-s-OFDM |
discussion revised to R1-1711631 |
Nokia, Alcatel-Lucent Shanghai Bell |
R1-ah-18512 AI: 5.1.2.4.4 |
revised | [WTS] [JSN] | |||
R1-1711310 | UL SRS design considerations in NR | discussion | Nokia, Alcatel-Lucent Shanghai Bell |
R1-ah-18512 AI: 5.1.2.4.5 |
available | [WTS] [JSN] | |||
R1-1711311 | Views on the fTFT-RS in NR | discussion | Nokia, Alcatel-Lucent Shanghai Bell |
R1-ah-18512 AI: 5.1.2.4.6 |
available | [WTS] [JSN] | |||
R1-1711312 | On QCL Framework and Configurations in NR | discussion | Nokia, Alcatel-Lucent Shanghai Bell |
R1-ah-18512 AI: 5.1.2.4.7 |
noted | [WTS] [JSN] | |||
R1-1711313 | Cross-link interference management based on Xn support | discussion | Nokia, Alcatel-Lucent Shanghai Bell |
R1-ah-18512 AI: 5.1.6.1 |
available | [WTS] [JSN] | |||
R1-1711314 | On NR Cross-Link Symbol Alignment Scheme | discussion | Nokia, Alcatel-Lucent Shanghai Bell |
R1-ah-18512 AI: 5.1.6.1 |
noted | [WTS] [JSN] | |||
R1-1711315 | LBT-based UL transmission for dynamic TDD | discussion | Nokia, Alcatel-Lucent Shanghai Bell |
R1-ah-18512 AI: 5.1.6.2 |
available | [WTS] [JSN] | |||
R1-1711316 | DL control signaling for CBG-based (re)transmission | discussion | Shenzhen Coolpad Technologies |
R1-ah-18512 AI: 5.1.3.3.4.2 |
available | [WTS] [JSN] | |||
R1-1711317 | Discussion on NR Operating in Unlicensed Spectrum | discussion | ASUSTEK COMPUTER (SHANGHAI) |
R1-ah-18512 AI: 5.2 |
available | [WTS] [JSN] | |||
R1-1711318 | Discussion on the options in NR design |
discussion revision of R1-1708105 revised to R1-1713865 |
Panasonic |
R1-ah-18512 AI: 5.1 |
available | [WTS] [JSN] | |||
R1-1711319 | Relation among NR-PBCH, SIBs and subcells |
discussion revision of R1-1708106 revised to R1-1713867 |
Panasonic |
R1-ah-18512 AI: 5.1.1.2.4 |
available | [WTS] [JSN] | |||
R1-1711320 | Resource sharing between PDCCH and PDSCH |
discussion revision of R1-1708111 revised to R1-1713869 |
Panasonic |
R1-ah-18512 AI: 5.1.3.1.3 |
available | [WTS] [JSN] | |||
R1-1711321 | PDCCH BD reduction |
discussion revision of R1-1708110 |
Panasonic |
R1-ah-18512 AI: 5.1.3.1.2.2 |
available | [WTS] [JSN] | |||
R1-1711322 | Frequency/time resource assignment of the operation modes |
discussion revision of R1-1708114 revised to R1-1713870 |
Panasonic |
R1-ah-18512 AI: 5.1.3.3.1 |
available | [WTS] [JSN] | |||
R1-1711323 | UL data transmission without grant | discussion | Panasonic |
R1-ah-18512 AI: 5.1.3.3.3 |
available | [WTS] [JSN] | |||
R1-1711324 | DL control signalling for CBG-based (re)transmission |
discussion revised to R1-1713871 |
Panasonic |
R1-ah-18512 AI: 5.1.3.3.4.2 |
available | [WTS] [JSN] | |||
R1-1711325 | UE category modelling and soft buffer |
discussion revised to R1-1713872 |
Panasonic |
R1-ah-18512 AI: 5.1.3.3.6.2 |
available | [WTS] [JSN] | |||
R1-1711326 | Comment on NR specification |
discussion revision of R1-1708119 |
Panasonic |
R1-ah-18512 AI: 5.1.11 |
available | [WTS] [JSN] | |||
R1-1711327 | The relation among REG, CCE, and CORESET | discussion | Panasonic |
R1-ah-18512 AI: 5.1.3.1.1.1 |
available | [WTS] [JSN] | |||
R1-1711328 | RS mapping of NR-PDCCH |
discussion revision of R1-1708108 |
Panasonic |
R1-ah-18512 AI: 5.1.3.1.1.2 |
available | [WTS] [JSN] | |||
R1-1711329 | Configuration of CORESET |
discussion revision of R1-1708109 revised to R1-1713875 |
Panasonic |
R1-ah-18512 AI: 5.1.3.1.2.1 |
available | [WTS] [JSN] | |||
R1-1711330 | Search space design |
discussion revision of R1-1708109 revised to R1-1713874 |
Panasonic |
R1-ah-18512 AI: 5.1.3.1.2.2 |
available | [WTS] [JSN] | |||
R1-1711331 | Discussion on structure of group common PDCCH |
discussion revision of R1-1708113 revised to R1-1713877 |
Panasonic |
R1-ah-18512 AI: 5.1.3.1.4.1 |
available | [WTS] [JSN] | |||
R1-1711332 | Discussion on contents of group common PDCCH |
discussion revision of R1-1708113 revised to R1-1713878 |
Panasonic |
R1-ah-18512 AI: 5.1.3.1.4.2 |
available | [WTS] [JSN] | |||
R1-1711333 | Discussion on DL/UL transmission direction |
discussion revision of R1-1708112 revised to R1-1713868, R1-1713879 |
Panasonic |
R1-ah-18512 AI: 5.1.3.1.4.3 |
available | [WTS] [JSN] | |||
R1-1711334 | Considerations on UE Beamforming Management | discussion | ASUSTEK COMPUTER (SHANGHAI) |
R1-ah-18512 AI: 5.1.2.2.1 |
available | [WTS] [JSN] | |||
R1-1711335 | UL power control in multi-beam based approaches | discussion | ASUSTEK COMPUTER (SHANGHAI) |
R1-ah-18512 AI: 5.1.9.2 |
available | [WTS] [JSN] | |||
R1-1711336 | Discussion on group based beam reporting | discussion | China Unicom |
R1-ah-18512 AI: 5.1.2.2.1 |
available | [WTS] [JSN] | |||
R1-1711337 | On NR-LTE coexistence for NSA and SA | discussion | China Unicom |
R1-ah-18512 AI: 5.1.8 |
noted | [WTS] [JSN] | |||
R1-1711338 | Consideration on physical downlink control channel for URLLC | other | CATR |
R1-ah-18512 AI: 5.1.3.1.5 |
available | [WTS] [JSN] | |||
R1-1711339 | Consideration on the CSI-RS design for NR | other | CATR |
R1-ah-18512 AI: 5.1.2.4.2 |
available | [WTS] [JSN] | |||
R1-1711340 | Consideration on the font loaded DM RS design for NR | other | CATR |
R1-ah-18512 AI: 5.1.2.4.3 |
available | [WTS] [JSN] | |||
R1-1711341 | Discussions on the indication for CBG | other | CATR |
R1-ah-18512 AI: 5.1.3.3.4.2 |
available | [WTS] [JSN] | |||
R1-1711342 | Discussion on the granularity of preemption indication | other | CATR |
R1-ah-18512 AI: 5.1.3.3.7.1 |
available | [WTS] [JSN] | |||
R1-1711343 | Discussion on URLLC transmitted in same or different numerology resources | agenda | ASUSTEK COMPUTER (SHANGHAI) |
R1-ah-18512 AI: 5.1.3.3.8 |
available | [WTS] [JSN] | |||
R1-1711344 | LDPC Coding chain | discussion | Intel Corporation |
R1-ah-18512 AI: 5.1.4.1.1 |
available | [WTS] [JSN] | |||
R1-1711345 | Base Graph 1 lifting and evaluations |
discussion revised to R1-1711693 |
Intel Corporation |
R1-ah-18512 AI: 5.1.4.1.2 |
revised | [WTS] [JSN] | |||
R1-1711346 | Base Graph 2 lifting and evaluations |
discussion revised to R1-1711694 |
Intel Corporation |
R1-ah-18512 AI: 5.1.4.1.2 |
revised | [WTS] [JSN] | |||
R1-1711347 | Simple distributed CRC design for Polar codes | discussion | Intel Corporation |
R1-ah-18512 AI: 5.1.4.2.1 |
noted | [WTS] [JSN] | |||
R1-1711348 | Evaluations of Polar code designs | discussion | Intel Corporation |
R1-ah-18512 AI: 5.1.4.2.1 |
available | [WTS] [JSN] | |||
R1-1711349 | Discussion on Polar code rate-matching | discussion | Intel Corporation |
R1-ah-18512 AI: 5.1.4.2.2 |
available | [WTS] [JSN] | |||
R1-1711350 | DMRS pattern configuration for NR | other | ITL |
R1-ah-18512 AI: 5.1.2.4.3 |
available | [WTS] [JSN] | |||
R1-1711351 | On timing indication for NR | other | ITL |
R1-ah-18512 AI: 5.1.1.1.3 |
available | [WTS] [JSN] | |||
R1-1711352 | Multiple SS block indication in wideband CC | other | ITL |
R1-ah-18512 AI: 5.1.1.1.4 |
available | [WTS] [JSN] | |||
R1-1711353 | DMRS sequence design for NR-PBCH | other | ITL |
R1-ah-18512 AI: 5.1.1.2.3 |
available | [WTS] [JSN] | |||
R1-1711354 | PDSCH starting position indication for NR | discussion | WILUS Inc. | Rel-15 |
R1-ah-18512 AI: 5.1.3.1.3 |
available | [WTS] [JSN] | ||
R1-1711355 | Discussion on structure for group-common PDCCH for NR | discussion | WILUS Inc. | Rel-15 |
R1-ah-18512 AI: 5.1.3.1.4.1 |
available | [WTS] [JSN] | ||
R1-1711356 | Discussion on contents for group-common PDCCH for NR | discussion | WILUS Inc. | Rel-15 |
R1-ah-18512 AI: 5.1.3.1.4.2 |
available | [WTS] [JSN] | ||
R1-1711357 | Discussion on UE behavior for group-common PDCCH for NR | discussion | WILUS Inc. | Rel-15 |
R1-ah-18512 AI: 5.1.3.1.4.3 |
available | [WTS] [JSN] | ||
R1-1711358 | Short PUCCH structure for UCI of up to 2 bits | discussion | WILUS Inc. | Rel-15 |
R1-ah-18512 AI: 5.1.3.2.1.1 |
available | [WTS] [JSN] | ||
R1-1711359 | Discussion on UCI piggyback on PUSCH | discussion | WILUS Inc. | Rel-15 |
R1-ah-18512 AI: 5.1.3.2.5.1 |
available | [WTS] [JSN] | ||
R1-1711360 | Simultaneous transmission for long-PUCCH and PUSCH | discussion | WILUS Inc. | Rel-15 |
R1-ah-18512 AI: 5.1.3.2.5.2 |
available | [WTS] [JSN] | ||
R1-1711361 | Discussion on UL HARQ-ACK feedback for CBG-based retransmission | discussion | WILUS Inc. | Rel-15 |
R1-ah-18512 AI: 5.1.3.3.4.3 |
available | [WTS] [JSN] | ||
R1-1711362 | Discussion on UE behavior by pre-emption indication | discussion | WILUS Inc. | Rel-15 |
R1-ah-18512 AI: 5.1.3.3.7.1 |
available | [WTS] [JSN] | ||
R1-1711363 | Two-step resource allocation for data channel in NR | discussion | ASUSTEK COMPUTER (SHANGHAI) |
R1-ah-18512 AI: 5.1.3.3.1.1 |
available | [WTS] [JSN] | |||
R1-1711364 | Multiple SS block transmissions in a wideband CC | discussion | ASUSTEK COMPUTER (SHANGHAI) |
R1-ah-18512 AI: 5.1.1.1.4 |
available | [WTS] [JSN] | |||
R1-1711365 | On UL coverage extension of TDD @3.5GHz |
discussion revised to R1-1711577 |
ORANGE |
R1-ah-18512 AI: 5.1.8 |
revised | [WTS] [JSN] | |||
R1-1711366 | TS38.211 v0.0.1 NR; Physical channels and modulation |
draft TS revised to R1-1711886 |
Ericsson LM | NR_newRAT-Core | Rel-15 |
R1-ah-18512 AI: 5.1 |
revised | [WTS] [JSN] | |
R1-1711367 | On UE processing time | discussion | Ericsson LM |
R1-ah-18512 AI: 5.1.3.3.9 |
available | [WTS] [JSN] | |||
R1-1711368 | Discussion on the search space design | discussion | Xiaomi technology |
R1-ah-18512 AI: 5.1.3.1.2.1 |
available | [WTS] [JSN] | |||
R1-1711369 | Discussion on the content of group common PDCCH | discussion | Xiaomi technology |
R1-ah-18512 AI: 5.1.3.1.4.2 |
available | [WTS] [JSN] | |||
R1-1711370 | Discussion on the search space design | discussion | Xiaomi Technology |
R1-ah-18512 AI: 5.1.3.1.4.1 |
withdrawn | [WTS] [JSN] | |||
R1-1711371 | Remaining details on NR-SS sequence design | discussion | Ericsson |
R1-ah-18512 AI: 5.1.1.1.1 |
available | [WTS] [JSN] | |||
R1-1711372 | SS burst set composition | discussion | Ericsson |
R1-ah-18512 AI: 5.1.1.1.2 |
noted | [WTS] [JSN] | |||
R1-1711373 | Timing indication based on SS block | discussion | Ericsson |
R1-ah-18512 AI: 5.1.1.1.3 |
noted | [WTS] [JSN] | |||
R1-1711374 | NR-PBCH Content and payload size | discussion | Ericsson |
R1-ah-18512 AI: 5.1.1.2.1 |
available | [WTS] [JSN] | |||
R1-1711375 | NR-PBCH RE mapping and SS block composition | discussion | Ericsson |
R1-ah-18512 AI: 5.1.1.2.2 |
available | [WTS] [JSN] | |||
R1-1711376 | NR-PBCH DMRS design | discussion | Ericsson |
R1-ah-18512 AI: 5.1.1.2.3 |
available | [WTS] [JSN] | |||
R1-1711377 | NR delivery of remaining minimum system information | discussion | Ericsson |
R1-ah-18512 AI: 5.1.1.2.4 |
available | [WTS] [JSN] | |||
R1-1711378 | NR delivery of other system information | discussion | Ericsson |
R1-ah-18512 AI: 5.1.1.2.5 |
available | [WTS] [JSN] | |||
R1-1711379 | On NR paging design | discussion | Ericsson |
R1-ah-18512 AI: 5.1.1.3 |
available | [WTS] [JSN] | |||
R1-1711380 | NR-RACH preamble format details | discussion | Ericsson |
R1-ah-18512 AI: 5.1.1.4.1 |
available | [WTS] [JSN] | |||
R1-1711381 | NR-RACH preamble format details for capacity enhancement and beam management | discussion | Ericsson |
R1-ah-18512 AI: 5.1.1.4.2 |
available | [WTS] [JSN] | |||
R1-1711382 | Power ramping and power control during RA procedure | discussion | Ericsson |
R1-ah-18512 AI: 5.1.1.4.3 |
available | [WTS] [JSN] | |||
R1-1711383 | 4-step random access procedure | discussion | Ericsson |
R1-ah-18512 AI: 5.1.1.4.4 |
available | [WTS] [JSN] | |||
R1-1711384 | Mobility measurements based on SS block | discussion | Ericsson |
R1-ah-18512 AI: 5.1.1.5.1 |
available | [WTS] [JSN] | |||
R1-1711385 | Measurements based on CSI-RS for L3 mobility | discussion | Ericsson |
R1-ah-18512 AI: 5.1.1.5.2 |
available | [WTS] [JSN] | |||
R1-1711386 | Radio link monitoring | discussion | Ericsson |
R1-ah-18512 AI: 5.1.1.5.3 |
available | [WTS] [JSN] | |||
R1-1711387 | Consideration of PRACH Configuration in NR | discussion | Ericsson |
R1-ah-18512 AI: 5.1.1.6 |
available | [WTS] [JSN] | |||
R1-1711388 | Additional synchronization provision | discussion | Ericsson |
R1-ah-18512 AI: 5.1.1.6 |
available | [WTS] [JSN] | |||
R1-1711389 | Further details on scrambling | discussion | Ericsson |
R1-ah-18512 AI: 5.1.11 |
available | [WTS] [JSN] | |||
R1-1711390 | Discussion on the structure of group common PDCCH | discussion | Xiaomi Technology |
R1-ah-18512 AI: 5.1.3.1.4.1 |
available | [WTS] [JSN] | |||
R1-1711391 | On Other System Information Delivery | discussion | Nokia, Alcatel-Lucent Shanghai Bell |
R1-ah-18512 AI: 5.1.1.2.5 |
available | [WTS] [JSN] | |||
R1-1711392 | CSI-RS configuration for L3 mobility purposes | discussion | Nokia, Alcatel-Lucent Shanghai Bell |
R1-ah-18512 AI: 5.1.1.5.2 |
available | [WTS] [JSN] | |||
R1-1711393 | Calibration results for Phase 1 NR MIMO system level calibration | discussion | MOTOROLA MOBILITY LLC |
R1-ah-18512 AI: 5.1.2.5 |
available | [WTS] [JSN] | |||
R1-1711394 | Discussion on SS Burst Set Design | discussion | Convida Wireless LLC |
R1-ah-18512 AI: 5.1.1.1.2 |
available | [WTS] [JSN] | |||
R1-1711395 | Discussion on Multi-beam Operation for PDCCH | discussion | Convida Wireless LLC |
R1-ah-18512 AI: 5.1.3.1.2.3 |
available | [WTS] [JSN] | |||
R1-1711396 | On power sharing between LTE and NR in DC | discussion | Nokia, Alcatel-Lucent Shanghai Bell |
R1-ah-18512 AI: 5.1.9.1 |
available | [WTS] [JSN] | |||
R1-1711397 | UL Power Control for MIMO | discussion | Nokia, Alcatel-Lucent Shanghai Bell |
R1-ah-18512 AI: 5.1.9.2 |
noted | [WTS] [JSN] | |||
R1-1711398 | On spectrum shaping for uplink Pi/2 BPSK with DFT-S-OFDM | discussion | Nokia, Alcatel-Lucent Shanghai Bell |
R1-ah-18512 AI: 5.1.5 |
available | [WTS] [JSN] | |||
R1-1711399 | LTE and NR performance in NR-LTE UL sharing | discussion | Nokia, Alcatel-Lucent Shanghai Bell |
R1-ah-18512 AI: 5.1.8 |
available | [WTS] [JSN] | |||
R1-1711400 | On 1Tx only UE in LTE-NR Dual Connectivity | discussion | Nokia, Alcatel-Lucent Shanghai Bell |
R1-ah-18512 AI: 5.1.8 |
noted | [WTS] [JSN] | |||
R1-1711401 | Measurement RS for beam management | other | Huawei, HiSilicon |
R1-ah-18512 AI: 5.1.2.2.3 |
available | [WTS] [JSN] | |||
R1-1711402 | Relationship between beam failure recovery and RLF | other | Huawei, HiSilicon |
R1-ah-18512 AI: 5.1.2.2.3 |
available | [WTS] [JSN] | |||
R1-1711403 | Robust transmission for UL control channel | other | Huawei, HiSilicon |
R1-ah-18512 AI: 5.1.2.2.3 |
available | [WTS] [JSN] | |||
R1-1711404 | Discussion on reciprocity based CSI acquisition mechanism | other | Huawei, HiSilicon |
R1-ah-18512 AI: 5.1.2.3.3 |
available | [WTS] [JSN] | |||
R1-1711405 | CSI acquisition for DL robust transmission | other | Huawei, HiSilicon |
R1-ah-18512 AI: 5.1.2.3.4 |
noted | [WTS] [JSN] | |||
R1-1711406 | Other remaining issues for CSI framework | other | Huawei, HiSilicon |
R1-ah-18512 AI: 5.1.2.3.5 |
available | [WTS] [JSN] | |||
R1-1711407 | Multiple-panel codebook | other | Huawei, HiSilicon |
R1-ah-18512 AI: 5.1.2.3.4 |
available | [WTS] [JSN] | |||
R1-1711408 | Category 2 codebook design for type II codebook | other | Huawei, HiSilicon |
R1-ah-18512 AI: 5.1.2.3.4 |
available | [WTS] [JSN] | |||
R1-1711409 | Codebook design for beamformed CSI-RS | other | Huawei, HiSilicon |
R1-ah-18512 AI: 5.1.2.3.4 |
available | [WTS] [JSN] | |||
R1-1711410 | Cross-carrier beam management | other | Huawei, HiSilicon |
R1-ah-18512 AI: 5.1.2.2.3 |
available | [WTS] [JSN] | |||
R1-1711411 | Evaluation on REG bundle sizes for 1-symbol CORESET duration | other | Huawei, HiSilicon |
R1-ah-18512 AI: 5.1.3.1.1.1 |
noted | [WTS] [JSN] | |||
R1-1711412 | Evaluation on REG bundle sizes for more than 1 symbol CORESET duration | other | Huawei, HiSilicon |
R1-ah-18512 AI: 5.1.3.1.1.1 |
noted | [WTS] [JSN] | |||
R1-1711413 | CCE-to-REG mapping | other | Huawei, HiSilicon |
R1-ah-18512 AI: 5.1.3.1.6 |
available | [WTS] [JSN] | |||
R1-1711414 | PDCCH-to-CCE mapping | other | Huawei, HiSilicon |
R1-ah-18512 AI: 5.1.3.1.6 |
available | [WTS] [JSN] | |||
R1-1711415 | NR DL control capacity and blocking probability | other | Huawei, HiSilicon |
R1-ah-18512 AI: 5.1.3.1.6 |
available | [WTS] [JSN] | |||
R1-1711416 | Performance evaluations on 1-symbol PUCCH for up to 2 UCI bits | other | Huawei, HiSilicon |
R1-ah-18512 AI: 5.1.3.2.7 |
available | [WTS] [JSN] | |||
R1-1711417 | Long PUCCH structure for large payload with no multiplexing capacity | other | Huawei, HiSilicon |
R1-ah-18512 AI: 5.1.3.2.7 |
available | [WTS] [JSN] | |||
R1-1711418 | On CSI feedback in NR | other | Huawei, HiSilicon |
R1-ah-18512 AI: 5.1.3.2.7 |
available | [WTS] [JSN] | |||
R1-1711419 | Transmit diversity for short duration PUCCH | other | Huawei, HiSilicon |
R1-ah-18512 AI: 5.1.3.2.7 |
available | [WTS] [JSN] | |||
R1-1711420 | Multiplexing between PUCCHs | other | Huawei, HiSilicon |
R1-ah-18512 AI: 5.1.3.2.7 |
available | [WTS] [JSN] | |||
R1-1711421 | Multiplexing of UL control channel and SRS in NR | other | Huawei, HiSilicon |
R1-ah-18512 AI: 5.1.3.2.7 |
available | [WTS] [JSN] | |||
R1-1711422 | Resource allocation for data channels | other | Huawei, HiSilicon |
R1-ah-18512 AI: 5.1.3.3.9 |
available | [WTS] [JSN] | |||
R1-1711423 | PDCCH monitoring for slot-aggregation and cross-slot scheduling | other | Huawei, HiSilicon |
R1-ah-18512 AI: 5.1.3.1.6 |
available | [WTS] [JSN] | |||
R1-1711424 | On bandwidth adaptation | other | Huawei, HiSilicon |
R1-ah-18512 AI: 5.1.11 |
available | [WTS] [JSN] | |||
R1-1711425 | Summary of LTE CA/DC and remaining issues for NR | other | Huawei, HiSilicon |
R1-ah-18512 AI: 5.1.3.4 |
available | [WTS] [JSN] | |||
R1-1711426 | CBG-based transmission/retransmission for DL multiplexing of eMBB and URLLC | other | Huawei, HiSilicon |
R1-ah-18512 AI: 5.1.3.3.9 |
available | [WTS] [JSN] | |||
R1-1711427 | Discussion on group common pre-emption indication | other | Huawei, HiSilicon |
R1-ah-18512 AI: 5.1.3.3.9 |
available | [WTS] [JSN] | |||
R1-1711428 | Superposed transmission of pre-emption indication with eMBB data | other | Huawei, HiSilicon |
R1-ah-18512 AI: 5.1.3.3.9 |
available | [WTS] [JSN] | |||
R1-1711429 | Consideration on ACK/NACK error in CBG-based retransmission | other | Huawei, HiSilicon |
R1-ah-18512 AI: 5.1.3.3.9 |
available | [WTS] [JSN] | |||
R1-1711430 | Discussion on UL multiplexing of grant-based eMBB and URLLC | other | Huawei, HiSilicon |
R1-ah-18512 AI: 5.1.3.3.9 |
available | [WTS] [JSN] | |||
R1-1711431 | HARQ feedback indication design for UL grant-free transmission | other | Huawei, HiSilicon |
R1-ah-18512 AI: 5.1.3.1.6 |
available | [WTS] [JSN] | |||
R1-1711432 | Discussion on over-the-air time synchronization for URLLC | other | Huawei, HiSilicon |
R1-ah-18512 AI: 5.1.3.3.8 |
available | [WTS] [JSN] | |||
R1-1711433 | Discussion on remaining frequency resources on symbol carrying CORESET | other | Huawei, HiSilicon |
R1-ah-18512 AI: 5.1.3.1.6 |
available | [WTS] [JSN] | |||
R1-1711434 | Discussion on TB size determination | other | Huawei, HiSilicon |
R1-ah-18512 AI: 5.1.3.3.9 |
available | [WTS] [JSN] | |||
R1-1711435 | Unified design for slot and mini-slot | other | Huawei, HiSilicon |
R1-ah-18512 AI: 5.1.3.3.9 |
available | [WTS] [JSN] | |||
R1-1711436 | LDPC design for base graph 1 |
other revised to R1-1711727 |
Huawei, HiSilicon |
R1-ah-18512 AI: 5.1.4.1.2 |
revised | [WTS] [JSN] | |||
R1-1711437 | LDPC design for base graph 2 | other | Huawei, HiSilicon |
R1-ah-18512 AI: 5.1.4.1.2 |
available | [WTS] [JSN] | |||
R1-1711438 | Rate matching for LDPC codes | other | Huawei, HiSilicon |
R1-ah-18512 AI: 5.1.4.1.1.3 |
noted | [WTS] [JSN] | |||
R1-1711439 | Segmentation for eMBB data | other | Huawei, HiSilicon |
R1-ah-18512 AI: 5.1.4.1.1.2 |
noted | [WTS] [JSN] | |||
R1-1711440 | On LDPC codes for eMBB data | other | Huawei, HiSilicon |
R1-ah-18512 AI: 5.1.4.1.1.4 |
withdrawn | [WTS] [JSN] | |||
R1-1711441 | On the feedback overhead reduction for multi-subband UL MIMO | other | Huawei, HiSilicon |
R1-ah-18512 AI: 5.1.2.1.8 |
available | [WTS] [JSN] | |||
R1-1711442 | Summary of [89-27] Polar code proposal for NR | other | Huawei |
R1-ah-18512 AI: 5.1.4.2.1 |
noted | [WTS] [JSN] | |||
R1-1711443 | Summary of [89-26] Polar code for NR -- alignment of latency/complexity calculation for early termination | other | Huawei |
R1-ah-18512 AI: 5.1.4.2.1 |
noted | [WTS] [JSN] | |||
R1-1711444 | Continuous precoding for NR DMRS in time domain | other | Samsung |
R1-ah-18512 AI: 5.1.2.1.8 |
available | [WTS] [JSN] | |||
R1-1711445 | System level evaluation results for beam management | other | Samsung |
R1-ah-18512 AI: 5.1.2.2.3 |
available | [WTS] [JSN] | |||
R1-1711446 | Link level evaluation results for beam management | other | Samsung |
R1-ah-18512 AI: 5.1.2.2.3 |
available | [WTS] [JSN] | |||
R1-1711447 | Link level simulation assumptions for beam management | other | Samsung |
R1-ah-18512 AI: 5.1.2.2.3 |
available | [WTS] [JSN] | |||
R1-1711448 | System level simulation assumptions for beam management | other | Samsung |
R1-ah-18512 AI: 5.1.2.2.3 |
available | [WTS] [JSN] | |||
R1-1711449 | Discussions on service specific CSI for NR | other | Samsung |
R1-ah-18512 AI: 5.1.2.3.5 |
available | [WTS] [JSN] | |||
R1-1711450 | MIMO Phase-2 SLS calibration results on 30GHz frequency band | other | Samsung |
R1-ah-18512 AI: 5.1.2.5 |
available | [WTS] [JSN] | |||
R1-1711451 | MIMO Phase-2 LLS calibration results on 30GHz frequency band | other | Samsung |
R1-ah-18512 AI: 5.1.2.5 |
available | [WTS] [JSN] | |||
R1-1711452 | Evaluation results for dense urban on 30GHz frequency band | other | Samsung |
R1-ah-18512 AI: 5.1.2.5 |
available | [WTS] [JSN] | |||
R1-1711453 | DL and UL Assignment for NR TDD | other | Samsung |
R1-ah-18512 AI: 5.1.3.1.6 |
available | [WTS] [JSN] | |||
R1-1711454 | Slot Reconfiguration for Low Latency in TDD | other | Samsung |
R1-ah-18512 AI: 5.1.3.1.6 |
available | [WTS] [JSN] | |||
R1-1711455 | Indication of Reserved Resources | other | Samsung |
R1-ah-18512 AI: 5.1.3.1.6 |
available | [WTS] [JSN] | |||
R1-1711456 | HARQ Process Management in NR | other | Samsung |
R1-ah-18512 AI: 5.1.3.3.9 |
available | [WTS] [JSN] | |||
R1-1711457 | Indication of Preempted Resources Prior to HARQ-ACK Feedback | other | Samsung |
R1-ah-18512 AI: 5.1.3.3.9 |
available | [WTS] [JSN] | |||
R1-1711458 | Considerations on Signaling for Indicating Preempted Resources | other | Samsung |
R1-ah-18512 AI: 5.1.3.3.9 |
available | [WTS] [JSN] | |||
R1-1711459 | Modulation Scheme for URLLC with Preemption Multiplexing | other | Samsung |
R1-ah-18512 AI: 5.1.11 |
available | [WTS] [JSN] | |||
R1-1711460 | On Transparency of Spectrum Shaping for p/2-BPSK DFT-s-OFDM | other | Samsung |
R1-ah-18512 AI: 5.1.11 |
available | [WTS] [JSN] | |||
R1-1711461 | On Spectrum Shaping Methods for p/2-BPSK DFT-s-OFDM | other | Samsung |
R1-ah-18512 AI: 5.1.11 |
available | [WTS] [JSN] | |||
R1-1711462 | On Modulation Schemes for High Spectral Efficiency | other | Samsung |
R1-ah-18512 AI: 5.1.11 |
available | [WTS] [JSN] | |||
R1-1711463 | Transmission and Reception for High-Order Modulation with MIMO | other | Samsung |
R1-ah-18512 AI: 5.1.11 |
available | [WTS] [JSN] | |||
R1-1711464 | High level consideration on NR unlicensed band operation | other | Huawei, HiSilicon |
R1-ah-18512 AI: 5.2 |
available | [WTS] [JSN] | |||
R1-1711465 | NR Numerology on unlicensed bands | other | Huawei, HiSilicon |
R1-ah-18512 AI: 5.2 |
available | [WTS] [JSN] | |||
R1-1711466 | NR Frame structure on unlicensed bands | other | Huawei, HiSilicon |
R1-ah-18512 AI: 5.2 |
available | [WTS] [JSN] | |||
R1-1711467 | Coexistence and Channel access for NR unlicensed band operations | other | Huawei, HiSilicon |
R1-ah-18512 AI: 5.2 |
available | [WTS] [JSN] | |||
R1-1711468 | On CSI-RS design for DL beam management | discussion | KT Corp. |
R1-ah-18512 AI: 5.1.2.4.2 |
available | [WTS] [JSN] | |||
R1-1711469 | NR standalone operation on unlicensed bands | other | Huawei, HiSilicon |
R1-ah-18512 AI: 5.2 |
available | [WTS] [JSN] | |||
R1-1711470 | Discussion on NoMA study for Rel-15 SI | other | Huawei, HiSilicon |
R1-ah-18512 AI: 5.2 |
available | [WTS] [JSN] | |||
R1-1711471 | Discussions on Transmission Duration | discussion | KT Corp. |
R1-ah-18512 AI: 5.1.3.3.1.2 |
available | [WTS] [JSN] | |||
R1-1711472 | Considerations on TB-CRC Failure | discussion | KT Corp. |
R1-ah-18512 AI: 5.1.3.3.4.3 |
available | [WTS] [JSN] | |||
R1-1711473 | View on Multi-Beam Management | discussion | KT Corp. |
R1-ah-18512 AI: 5.1.2.2.1 |
available | [WTS] [JSN] | |||
R1-1711474 | Views on preemption indication for DL | discussion | KT Corp. |
R1-ah-18512 AI: 5.1.3.3.7.1 |
available | [WTS] [JSN] | |||
R1-1711475 | Views on CCE-to-REG mapping | discussion | KT Corp. |
R1-ah-18512 AI: 5.1.3.1.1.1 |
available | [WTS] [JSN] | |||
R1-1711476 | On UE Categories/Capabilities | discussion | Ericsson |
R1-ah-18512 AI: 4 |
noted | [WTS] [JSN] | |||
R1-1711477 | On NR-PDCCH Structure | discussion | Ericsson |
R1-ah-18512 AI: 5.1.3.1.1.1 |
available | [WTS] [JSN] | |||
R1-1711478 | On DM-RS for NR-PDCCH | discussion | Ericsson |
R1-ah-18512 AI: 5.1.3.1.1.2 |
available | [WTS] [JSN] | |||
R1-1711479 | On Configuration of Control Resource Sets | discussion | Ericsson |
R1-ah-18512 AI: 5.1.3.1.2.1 |
available | [WTS] [JSN] | |||
R1-1711480 | On Search Space and Blind Decoding Design | discussion | Ericsson |
R1-ah-18512 AI: 5.1.3.1.2.2 |
available | [WTS] [JSN] | |||
R1-1711481 | On Multi-beam and Multi-TRP Operation for PDCCH | discussion | Ericsson |
R1-ah-18512 AI: 5.1.3.1.2.3 |
available | [WTS] [JSN] | |||
R1-1711482 | On Data Transmission in Control Resource Sets | discussion | Ericsson |
R1-ah-18512 AI: 5.1.3.1.3 |
available | [WTS] [JSN] | |||
R1-1711483 | On Group-Common PDCCH Structure and Configuration | discussion | Ericsson |
R1-ah-18512 AI: 5.1.3.1.4.1 |
available | [WTS] [JSN] | |||
R1-1711484 | On the Content of Group-Common PDCCH | discussion | Ericsson |
R1-ah-18512 AI: 5.1.3.1.4.2 |
available | [WTS] [JSN] | |||
R1-1711485 | On UE Procedures Related to Group-Common PDCCH | discussion | Ericsson |
R1-ah-18512 AI: 5.1.3.1.4.3 |
available | [WTS] [JSN] | |||
R1-1711486 | On PDCCH for Ultra-Reliable Transmission | discussion | Ericsson |
R1-ah-18512 AI: 5.1.3.1.5 |
available | [WTS] [JSN] | |||
R1-1711487 | On the Performance Evaluation of PDCCH for Ultra-Reliable Transmission | discussion | Ericsson |
R1-ah-18512 AI: 5.1.3.1.5 |
available | [WTS] [JSN] | |||
R1-1711488 | On the Design of Short PUCCH for 1-2 UCI bits | discussion | Ericsson |
R1-ah-18512 AI: 5.1.3.2.1.1 |
available | [WTS] [JSN] | |||
R1-1711489 | On the Design of Short PUCCH for more than 2 UCI bits | discussion | Ericsson |
R1-ah-18512 AI: 5.1.3.2.1.2 |
available | [WTS] [JSN] | |||
R1-1711490 | On the Design of Long PUCCH for 1-2 UCI bits | discussion | Ericsson |
R1-ah-18512 AI: 5.1.3.2.2.1 |
available | [WTS] [JSN] | |||
R1-1711491 | On the Design of Long PUCCH for more than 2 UCI bits | discussion | Ericsson |
R1-ah-18512 AI: 5.1.3.2.2.2 |
available | [WTS] [JSN] | |||
R1-1711492 | On support of Long PUCCH over multiple slots | discussion | Ericsson |
R1-ah-18512 AI: 5.1.3.2.2.3 |
available | [WTS] [JSN] | |||
R1-1711493 | On Transmit Diversity Schemes for PUCCH | discussion | Ericsson |
R1-ah-18512 AI: 5.1.3.2.3 |
available | [WTS] [JSN] | |||
R1-1711494 | On Resource Allocation for PUCCH and Multiplexing PUCCH Formats | discussion | Ericsson |
R1-ah-18512 AI: 5.1.3.2.4 |
available | [WTS] [JSN] | |||
R1-1711495 | On UCI on PUSCH | discussion | Ericsson |
R1-ah-18512 AI: 5.1.3.2.5.1 |
available | [WTS] [JSN] | |||
R1-1711496 | On Simultaneous Transmission of PUSCH and PUCCH | discussion | Ericsson |
R1-ah-18512 AI: 5.1.3.2.5.2 |
available | [WTS] [JSN] | |||
R1-1711497 | On PUCCH for Ultra-Reliable Transmission | discussion | Ericsson |
R1-ah-18512 AI: 5.1.3.2.6 |
available | [WTS] [JSN] | |||
R1-1711498 | On the Performance Evaluation of PUCCH for Ultra-Reliable Transmission | discussion | Ericsson |
R1-ah-18512 AI: 5.1.3.2.6 |
available | [WTS] [JSN] | |||
R1-1711499 | On Resource Allocation in the Frequency Domain | discussion | Ericsson |
R1-ah-18512 AI: 5.1.3.3.1.1 |
available | [WTS] [JSN] | |||
R1-1711500 | On Resource Allocation in the Time Domain | discussion | Ericsson |
R1-ah-18512 AI: 5.1.3.3.1.2 |
available | [WTS] [JSN] | |||
R1-1711501 | On MCS/transport Block Size Determination | discussion | Ericsson |
R1-ah-18512 AI: 5.1.3.3.1.3 |
available | [WTS] [JSN] | |||
R1-1711502 | On UL Data Scheduling Grant in NR | discussion | Ericsson |
R1-ah-18512 AI: 5.1.3.3.2 |
available | [WTS] [JSN] | |||
R1-1711503 | On Scheduling Request Enhancements | discussion | Ericsson |
R1-ah-18512 AI: 5.1.3.3.2 |
available | [WTS] [JSN] | |||
R1-1711504 | On SPS/Grant-Free Transmission | discussion | Ericsson |
R1-ah-18512 AI: 5.1.3.3.3 |
available | [WTS] [JSN] | |||
R1-1711505 | On HARQ Retransmission for SPS/Grant-free | discussion | Ericsson |
R1-ah-18512 AI: 5.1.3.3.3 |
available | [WTS] [JSN] | |||
R1-1711506 | On Code Block Group Formation and CRC Attachment | discussion | Ericsson |
R1-ah-18512 AI: 5.1.3.3.4.1 |
available | [WTS] [JSN] | |||
R1-1711507 | On Retransmission Decoder Throughput Issues and CBG-based Retransmission Control | discussion | Ericsson |
R1-ah-18512 AI: 5.1.3.3.4.2 |
available | [WTS] [JSN] | |||
R1-1711508 | On Design of CBG HARQ-ACK Feedback Schemes | discussion | Ericsson |
R1-ah-18512 AI: 5.1.3.3.4.3 |
available | [WTS] [JSN] | |||
R1-1711509 | On HARQ Feedback Timing | discussion | Ericsson |
R1-ah-18512 AI: 5.1.3.3.5.1 |
available | [WTS] [JSN] | |||
R1-1711510 | On HARQ Codebook | discussion | Ericsson |
R1-ah-18512 AI: 5.1.3.3.5.2 |
available | [WTS] [JSN] | |||
R1-1711511 | On Minimum Processing Time and Number of HARQ Processes in NR | discussion | Ericsson |
R1-ah-18512 AI: 5.1.3.3.6.1 |
available | [WTS] [JSN] | |||
R1-1711512 | On HARQ and Soft Buffer Handling | discussion | Ericsson |
R1-ah-18512 AI: 5.1.3.3.6.2 |
available | [WTS] [JSN] | |||
R1-1711513 | On Pre-emption Indication for Downlink | discussion | Ericsson |
R1-ah-18512 AI: 5.1.3.3.7.1 |
available | [WTS] [JSN] | |||
R1-1711514 | On Pre-emption Indication for Uplink | discussion | Ericsson |
R1-ah-18512 AI: 5.1.3.3.7.2 |
available | [WTS] [JSN] | |||
R1-1711515 | On Supporting High Reliability for Data Transmissions | discussion | Ericsson |
R1-ah-18512 AI: 5.1.3.3.8 |
available | [WTS] [JSN] | |||
R1-1711516 | On Mixed Numerology | discussion | Ericsson |
R1-ah-18512 AI: 5.1.3.3.9 |
available | [WTS] [JSN] | |||
R1-1711517 | On Scheduling and UCI Handling in Carrier Aggregation | discussion | Ericsson |
R1-ah-18512 AI: 5.1.3.4.1.1 |
available | [WTS] [JSN] | |||
R1-1711518 | On SRS Fast Switching in NR | discussion | Ericsson |
R1-ah-18512 AI: 5.1.3.4.1.2 |
available | [WTS] [JSN] | |||
R1-1711519 | On Dual Connectivity for NR | discussion | Ericsson |
R1-ah-18512 AI: 5.1.3.4.2 |
available | [WTS] [JSN] | |||
R1-1711520 | Discussion of Multi-Antenna and Highly Directional Beam-Forming for Operation in Unlicensed Spectrum | discussion | Ericsson |
R1-ah-18512 AI: 5.2 |
available | [WTS] [JSN] | |||
R1-1711521 | On Autonomous UL Transmissions for NR in Unlicensed Spectrum | discussion | Ericsson |
R1-ah-18512 AI: 5.2 |
available | [WTS] [JSN] | |||
R1-1711522 | On Channel Access Mechanisms for NR in Unlicensed Spectrum | discussion | Ericsson |
R1-ah-18512 AI: 5.2 |
available | [WTS] [JSN] | |||
R1-1711523 | On NR Operation in the 60 GHz Unlicensed Band | discussion | Ericsson |
R1-ah-18512 AI: 5.2 |
available | [WTS] [JSN] | |||
R1-1711524 | On Physical Layer Design Policies for Unlicensed Operation of NR | discussion | Ericsson |
R1-ah-18512 AI: 5.2 |
available | [WTS] [JSN] | |||
R1-1711525 | Technology Components for Unlicensed Operation | discussion | Ericsson |
R1-ah-18512 AI: 5.2 |
available | [WTS] [JSN] | |||
R1-1711526 | Power Sharing for LTE-NR Dual Connectivity | discussion | Ericsson |
R1-ah-18512 AI: 5.1.9.1 |
noted | [WTS] [JSN] | |||
R1-1711527 | PRACH Preamble Format Design | discussion | Cohere Technologies |
R1-ah-18512 AI: 5.1.1.4.1 |
available | [WTS] [JSN] | |||
R1-1711528 | Extended Range Considerations for mMTC | discussion | HUGHES Network Systems Ltd |
R1-ah-18512 AI: 5.1.11 |
available | [WTS] [JSN] | |||
R1-1711529 | Channel Model for Non-Terrestrial Networks | discussion | HUGHES Network Systems Ltd |
R1-ah-18512 AI: 5.1.11 |
available | [WTS] [JSN] | |||
R1-1711530 | CBG based HARQ-Ack/Nack | discussion | Sequans Communications |
R1-ah-18512 AI: 5.1.3.3.4.3 |
available | [WTS] [JSN] | |||
R1-1711531 | CBG based retransmission | discussion | Sequans Communications |
R1-ah-18512 AI: 5.1.3.3.4.2 |
available | [WTS] [JSN] | |||
R1-1711532 | CRC attachment for CBG | discussion | Nokia, Alcatel-Lucent Shanghai Bell |
R1-ah-18512 AI: 5.1.4.1.1.1 |
available | [WTS] [JSN] | |||
R1-1711533 | CRC attachment for Smaller TBs | discussion | Nokia, Alcatel-Lucent Shanghai Bell |
R1-ah-18512 AI: 5.1.4.1.1.1 |
noted | [WTS] [JSN] | |||
R1-1711534 | Code block segmentation of eMBB | discussion | Nokia, Alcatel-Lucent Shanghai Bell |
R1-ah-18512 AI: 5.1.4.1.1.2 |
noted | [WTS] [JSN] | |||
R1-1711535 | Padding for LDPC | discussion | Nokia, Alcatel-Lucent Shanghai Bell |
R1-ah-18512 AI: 5.1.4.1.1.2 |
noted | [WTS] [JSN] | |||
R1-1711536 | Rate matching for LDPC | discussion | Nokia, Alcatel-Lucent Shanghai Bell |
R1-ah-18512 AI: 5.1.4.1.1.3 |
available | [WTS] [JSN] | |||
R1-1711537 | LDPC designs for base graph 1 and base graph 2 | discussion | Nokia, Alcatel-Lucent Shanghai Bell |
R1-ah-18512 AI: 5.1.4.1.2 |
available | [WTS] [JSN] | |||
R1-1711538 | Interleaving for LDPC | discussion | Nokia, Alcatel-Lucent Shanghai Bell |
R1-ah-18512 AI: 5.1.4.1.1.3 |
noted | [WTS] [JSN] | |||
R1-1711539 | Distributed CRC Polar code construction | discussion | Nokia, Alcatel-Lucent Shanghai Bell |
R1-ah-18512 AI: 5.1.4.2.1 |
available | [WTS] [JSN] | |||
R1-1711540 | Early termination benefits of CRC distribution | discussion | Nokia, Alcatel-Lucent Shanghai Bell |
R1-ah-18512 AI: 5.1.4.2.1 |
available | [WTS] [JSN] | |||
R1-1711541 | Performance evaluation of polar code constructions | discussion | Nokia, Alcatel-Lucent Shanghai Bell |
R1-ah-18512 AI: 5.1.4.2.1 |
available | [WTS] [JSN] | |||
R1-1711542 | Sequence design for Polar codes | discussion | Nokia, Alcatel-Lucent Shanghai Bell |
R1-ah-18512 AI: 5.1.4.2.2 |
available | [WTS] [JSN] | |||
R1-1711543 | Rate matching for Polar codes | discussion | Nokia, Alcatel-Lucent Shanghai Bell |
R1-ah-18512 AI: 5.1.4.2.2 |
available | [WTS] [JSN] | |||
R1-1711544 | Implicit timing indication for PBCH | discussion | Nokia, Alcatel-Lucent Shanghai Bell |
R1-ah-18512 AI: 5.1.4.3 |
available | [WTS] [JSN] | |||
R1-1711545 | Summary of [89-24] Email discussion LDPC code base graph #1 for NR | discussion | Nokia, Alcatel-Lucent Shanghai Bell |
R1-ah-18512 AI: 5.1.4.1.2 |
available | [WTS] [JSN] | |||
R1-1711546 | Summary of [89-25] Email discussion on LDPC code base graph #2 for NR | discussion | Nokia, Alcatel-Lucent Shanghai Bell |
R1-ah-18512 AI: 5.1.4.1.2 |
available | [WTS] [JSN] | |||
R1-1711547 | Discussion on PRACH designs for short sequence | discussion | Sequans Communications |
R1-ah-18512 AI: 5.1.1.4.1 |
available | [WTS] [JSN] | |||
R1-1711548 | Resource allocation for PUCCH to support URLLC | discussion | Sequans Communications |
R1-ah-18512 AI: 5.1.3.2.6 |
available | [WTS] [JSN] | |||
R1-1711549 | Considerations on Satellite channel model | discussion | THALES | Rel-15 |
R1-ah-18512 AI: 5.2 |
available | [WTS] [JSN] | ||
R1-1711550 | NTN Bentpipe payload architecture and characteristics | discussion | THALES | Rel-5 |
R1-ah-18512 AI: 5.2 |
available | [WTS] [JSN] | ||
R1-1711551 | Considerations on multiplexing with different transmission durations | other | KDDI Corporation |
R1-ah-18512 AI: 5.1.3.3.7.1 |
available | [WTS] [JSN] | |||
R1-1711552 | Management of URLLC DL control channel efficiency and reliability | discussion | Qualcomm Incorporated | Rel-15 |
R1-ah-18512 AI: 5.1.3.1.5 |
available | [WTS] [JSN] | ||
R1-1711553 | The necessity of reliable SR design for GF/GB UL URLLC transmission | discussion | Qualcomm Incorporated | Rel-15 |
R1-ah-18512 AI: 5.1.3.2.6 |
available | [WTS] [JSN] | ||
R1-1711554 | URLLC DL pre-emption and UL suspension indication channel design | discussion | Qualcomm Incorporated | Rel-15 |
R1-ah-18512 AI: 5.1.3.3.7.1 |
available | [WTS] [JSN] | ||
R1-1711555 | UL URLLC Capacity Based on URLLC and eMBB dynamic multiplexing | discussion | Qualcomm Incorporated | Rel-15 |
R1-ah-18512 AI: 5.1.3.3.8 |
available | [WTS] [JSN] | ||
R1-1711556 | Ultra reliable HARQ design with async CSI feedback | discussion | Qualcomm Incorporated | Rel-15 |
R1-ah-18512 AI: 5.1.3.3.8 |
available | [WTS] [JSN] | ||
R1-1711557 | Performance of polar code for very small block length | discussion | Qualcomm Incorporated | Rel-15 |
R1-ah-18512 AI: 5.1.4.2.1 |
available | [WTS] [JSN] | ||
R1-1711558 | Multiplexing of different types of RS for uplink | discussion | Ericsson |
R1-ah-18512 AI: 5.1.2.4.1 |
available | [WTS] [JSN] | |||
R1-1711559 | Uplink operation for LTE+NR Dual Connectivity | discussion | VODAFONE Group Plc |
R1-ah-18512 AI: 5.1.8 |
withdrawn | [WTS] [JSN] | |||
R1-1711560 | Discussion on wireless time synchronization for URLLC | discussion | SIA | Rel-15 |
R1-ah-18512 AI: 5.1.3.3.8 |
available | [WTS] [JSN] | ||
R1-1711561 | On Hybrid TDD and Measurements for Cross-link Interference Mitigation | discussion | Ericsson |
R1-ah-18512 AI: 5.1.6.1 |
available | [WTS] [JSN] | |||
R1-1711562 | On Hybrid TDD and Signaling for Cross-link Interference Mitigation |
discussion revised to R1-1711706 |
Ericsson |
R1-ah-18512 AI: 5.1.6.1 |
revised | [WTS] [JSN] | |||
R1-1711563 | On Dynamic TDD Scenarios | discussion | Ericsson |
R1-ah-18512 AI: 5.1.6.2 |
available | [WTS] [JSN] | |||
R1-1711564 | On Duplexing in Paired Spectrum | discussion | Ericsson |
R1-ah-18512 AI: 5.1.6.2 |
available | [WTS] [JSN] | |||
R1-1711565 | On bandwidth parties | discussion | Ericsson AB |
R1-ah-18512 AI: 5.1.7 |
available | [WTS] [JSN] | |||
R1-1711566 | On semi-persistent CSI reporting on PUSCH | discussion | Ericsson |
R1-ah-18512 AI: 5.1.2.3.4 |
available | [WTS] [JSN] | |||
R1-1711567 | Summary of e-mail discussion on DCI content | discussion | Ericsson LM |
R1-ah-18512 AI: 5.1.3.1 |
available | [WTS] [JSN] | |||
R1-1711568 | Considerations on HAPS channel model | discussion | CNES, Thales | Rel-15 |
R1-ah-18512 AI: 5.2 |
available | [WTS] [JSN] | ||
R1-1711569 | PRACH Design | discussion | TCL Communication Ltd. | Rel-15 |
R1-ah-18512 AI: 5.1.1.4.2 |
available | [WTS] [JSN] | ||
R1-1711570 | UE_ID Insertion for Early Block Discrimination on DCI Blind Detection | discussion | Coherent Logix |
R1-ah-18512 AI: 5.1.4.2.1 |
available | [WTS] [JSN] | |||
R1-1711571 | Scrambling Sequence Design for Early Block Discrimination on DCI Blind Detection | discussion | Coherent Logix |
R1-ah-18512 AI: 5.1.4.2.1 |
available | [WTS] [JSN] | |||
R1-1711572 | Scrambling Sequence Design for Multi-Mode Block Discrimination on DCI Blind Detection | discussion | Coherent Logix |
R1-ah-18512 AI: 5.1.4.2.1 |
withdrawn | [WTS] [JSN] | |||
R1-1711573 | Early Block Discrimination on DCI Blind Detection | discussion | Coherent Logix |
R1-ah-18512 AI: 5.1.4.2.1 |
available | [WTS] [JSN] | |||
R1-1711574 | Discussion on bandwidth part configuration | discussion | LG Electronics Inc. | Rel-15 |
R1-ah-18512 AI: 5.1.11 |
available | [WTS] [JSN] | ||
R1-1711575 | Discussion on Polar codes for PBCH |
discussion revision of R1-1710049 |
CATT |
R1-ah-18512 AI: 5.1.4.3 |
available | [WTS] [JSN] | |||
R1-1711576 | L3 Mobility based on CSI-RS based measurments |
discussion revision of R1-1710037 |
CATT |
R1-ah-18512 AI: 5.1.1.5.2 |
available | [WTS] [JSN] | |||
R1-1711577 | On UL coverage extension of TDD @3.5GHz |
discussion revision of R1-1711365 revised to R1-1711584 |
ORANGE |
R1-ah-18512 AI: 5.1.8 |
revised | [WTS] [JSN] | |||
R1-1711578 | Circulant permutation matrix design for LDPC codes base graph #2 |
discussion revised to R1-1711775 |
LG Electronics | Rel-15 |
R1-ah-18512 AI: 5.1.4.1.2 |
revised | [WTS] [JSN] | ||
R1-1711579 | Calibration results for Phase 1 and Phase 2 NR MIMO system level calibration | discussion | vivo | Rel-15 |
R1-ah-18512 AI: 5.1.2.5 |
available | [WTS] [JSN] | ||
R1-1711580 | SS burst set composition |
other revision of R1-1710624 |
Samsung |
R1-ah-18512 AI: 5.1.1.1.2 |
noted | [WTS] [JSN] | |||
R1-1711581 | Measurement based on CSI-RS for L3 mobility |
other revision of R1-1710638 |
Samsung |
R1-ah-18512 AI: 5.1.1.5.2 |
available | [WTS] [JSN] | |||
R1-1711582 | Analysis of the benefits of PC bits for Polar code | discussion | Huawei, HiSilicon | Rel-15 |
R1-ah-18512 AI: 5.1.4.2.1 |
available | [WTS] [JSN] | ||
R1-1711583 | DMRS Structure for PDCCH |
other revision of R1-1710692 |
Samsung |
R1-ah-18512 AI: 5.1.3.1.1.2 |
available | [WTS] [JSN] | |||
R1-1711584 | On UL coverage extension of TDD @3.5GHz |
discussion revision of R1-1711577 |
ORANGE |
R1-ah-18512 AI: 5.1.8 |
noted | [WTS] [JSN] | |||
R1-1711585 | Partial pre-emption based multiplexing data with different transmission durations in DL | discussion | Samsung | Rel-15 |
R1-ah-18512 AI: 5.1.3.3.9 |
available | [WTS] [JSN] | ||
R1-1711586 | Selected highlights from RAN#76 of relevance to RAN1 | other | RAN1 Chair |
R1-ah-18512 AI: 3 |
noted | [WTS] [JSN] | |||
R1-1711587 | Shift coefficients design for base graph 1 |
discussion revision of R1-1710845 revised to R1-1711747 |
ZTE |
R1-ah-18512 AI: 5.1.4.1.2 |
revised | [WTS] [JSN] | |||
R1-1711588 | Shift coefficients design for base graph 2 |
discussion revision of R1-1710846 revised to R1-1711748 |
ZTE |
R1-ah-18512 AI: 5.1.4.1.2 |
revised | [WTS] [JSN] | |||
R1-1711589 | Timing indication based on SS block |
other revision of R1-1710625 |
Samsung |
R1-ah-18512 AI: 5.1.1.1.3 |
noted | [WTS] [JSN] | |||
R1-1711590 | Feedback transmission of type II codebook |
discussion revision of R1-1711299 |
Nokia, Alcatel-Lucent Shanghai Bell |
R1-ah-18512 AI: 5.1.2.3.4 |
available | [WTS] [JSN] | |||
R1-1711591 | Link level performance evaluation for mobility scenario | discussion | Samsung |
R1-ah-18512 AI: 5.1.2.4.8 |
available | [WTS] [JSN] | |||
R1-1711592 | Composite beam transmission for SS blocks | discussion | Samsung |
R1-ah-18512 AI: 5.1.2.2.3 |
available | [WTS] [JSN] | |||
R1-1711593 | System level evaluation on effect of penetration loss in sub-6GHz and above-6GHz frequency bands | discussion | Samsung |
R1-ah-18512 AI: 5.1.2.5 |
available | [WTS] [JSN] | |||
R1-1711594 | Analysis on random cluster effect in map-based hybrid channel model | discussion | Samsung |
R1-ah-18512 AI: 5.1.2.5 |
available | [WTS] [JSN] | |||
R1-1711595 | Impact of channel estimation error on the performance of high spectral efficiency MIMO schemes | discussion | Samsung |
R1-ah-18512 AI: 5.1.11 |
available | [WTS] [JSN] | |||
R1-1711596 | Indication of Preempted Resources for TB-based re-transmission | discussion | Samsung |
R1-ah-18512 AI: 5.1.3.3.9 |
available | [WTS] [JSN] | |||
R1-1711597 | Remaining Issues on RB Grid | discussion | Samsung |
R1-ah-18512 AI: 5.1.11 |
available | [WTS] [JSN] | |||
R1-1711598 | On numerology for NR RACH | discussion | Samsung |
R1-ah-18512 AI: 5.1.1.6 |
available | [WTS] [JSN] | |||
R1-1711599 | Remaining issues on PT-RS dendisy in CP-OFDM | discussion | Samsung |
R1-ah-18512 AI: 5.1.2.4.8 |
available | [WTS] [JSN] | |||
R1-1711600 | PRACH preamble sequences and formats for capacity enhancement and beam management |
other revision of R1-1709917 |
Huawei, HiSilicon |
R1-ah-18512 AI: 5.1.1.4.2 |
noted | [WTS] [JSN] | |||
R1-1711601 | Draft Agenda of RAN1#AH_NR2 meeting |
agenda revision of R1-1709880 |
RAN1 Chair |
R1-ah-18512 AI: 2 |
approved | [WTS] [JSN] | |||
R1-1711602 | Common and Beam Specific Power Control Parameters |
discussion revision of R1-1710962 |
InterDigital, Inc. |
R1-ah-18512 AI: 5.1.9.2 |
available | [WTS] [JSN] | |||
R1-1711603 | Short PUCCH for small UCI payloads |
discussion revision of R1-1710083 |
CATT |
R1-ah-18512 AI: 5.1.3.2.1.1 |
available | [WTS] [JSN] | |||
R1-1711604 | Beam management for PDCCH |
other revision of R1-1710666 |
Samsung |
R1-ah-18512 AI: 5.1.2.2.3 |
available | [WTS] [JSN] | |||
R1-1711605 | PBCH channel coding |
discussion revision of R1-1711223 |
Qualcomm Incorporated | Rel-15 |
R1-ah-18512 AI: 5.1.4.3 |
available | [WTS] [JSN] | ||
R1-1711606 | Codeword mapping and interleaving |
discussion revision of R1-1710175 |
ZTE |
R1-ah-18512 AI: 5.1.2.1.1 |
available | [WTS] [JSN] | |||
R1-1711607 | On CSI framework details |
discussion revision of R1-1710187 |
ZTE |
R1-ah-18512 AI: 5.1.2.3.1 |
available | [WTS] [JSN] | |||
R1-1711608 | On reciprocity based CSI acquisition |
discussion revision of R1-1710189 |
ZTE |
R1-ah-18512 AI: 5.1.2.3.3 |
available | [WTS] [JSN] | |||
R1-1711609 | Further discussion on CSI acquisition for reciprocity-based operation |
discussion revision of R1-1711026 |
Ericsson |
R1-ah-18512 AI: 5.1.2.3.3 |
available | [WTS] [JSN] | |||
R1-1711610 | UL MIMO for codebook based transmission |
discussion revision of R1-1711008 |
Ericsson |
R1-ah-18512 AI: 5.1.2.1.2 |
noted | [WTS] [JSN] | |||
R1-1711611 | Time Index Signaling for SS Blocks |
discussion revision of R1-1710503 revised to R1-1711647 |
Intel Corporation |
R1-ah-18512 AI: 5.1.1.1.3 |
revised | [WTS] [JSN] | |||
R1-1711612 | SS Block Composition |
discussion revision of R1-1710506 revised to R1-1711648 |
Intel Corporation |
R1-ah-18512 AI: 5.1.1.2.2 |
revised | [WTS] [JSN] | |||
R1-1711613 | On time and frequency tracking of the channel |
discussion revision of R1-1711050 |
Ericsson |
R1-ah-18512 AI: 5.1.2.4.6 |
available | [WTS] [JSN] | |||
R1-1711614 | Dynamic resource allocation for Integrated Access and Backhaul | discussion | Samsung |
R1-ah-18512 AI: 5.2 |
available | [WTS] [JSN] | |||
R1-1711615 | Deployment scenarios for Integrated Access and Backhaul | discussion | Samsung |
R1-ah-18512 AI: 5.2 |
available | [WTS] [JSN] | |||
R1-1711616 | Evaluation assumptions for Integrated Access and Backhaul | discussion | Samsung |
R1-ah-18512 AI: 5.2 |
available | [WTS] [JSN] | |||
R1-1711617 | RACH power control and power ramping procedure |
discussion revision of R1-1710034 |
CATT |
R1-ah-18512 AI: 5.1.1.4.3 |
available | [WTS] [JSN] | |||
R1-1711618 | NR RACH Preamble Format for capacity enhancement, |
discussion revision of R1-1710033 |
CATT |
R1-ah-18512 AI: 5.1.1.4.2 |
available | [WTS] [JSN] | |||
R1-1711619 | Discussion on msg.3 tx timing determination | discussion | Samsung |
R1-ah-18512 AI: 5.1.1.6 |
available | [WTS] [JSN] | |||
R1-1711620 | Discussion on RACH design | discussion | Samsung |
R1-ah-18512 AI: 5.1.1.6 |
available | [WTS] [JSN] | |||
R1-1711621 | Assisted information for Msg.3 tx beam determination | discussion | Samsung |
R1-ah-18512 AI: 5.1.1.6 |
available | [WTS] [JSN] | |||
R1-1711622 | Discussion on NR-PBCH design and SS block composition |
discussion revision of R1-1711061 |
NTT DOCOMO, INC. |
R1-ah-18512 AI: 5.1.1.2.2 |
available | [WTS] [JSN] | |||
R1-1711623 | Correction on the formula of AnnexA |
draftCR revision of R1-1711255 revised to R1-1711758 |
ZTE, Ericsson | NR_newRAT-Core | Rel-14 |
R1-ah-18512 AI: 5.1. |
revised | [WTS] [JSN] | |
R1-1711624 | Correction on Procedure A of spatially-consistency UT mobility modeling |
draftCR revision of R1-1711256 revised to R1-1711760 |
ZTE, Ericsson | NR_newRAT-Core | Rel-14 |
R1-ah-18512 AI: 5.1. |
revised | [WTS] [JSN] | |
R1-1711625 | PRACH Msg1 retransmission |
discussion revision of R1-1710823 |
MediaTek Inc. |
R1-ah-18512 AI: 5.1.1.4.3 |
available | [WTS] [JSN] | |||
R1-1711626 | RRM for wider bandwidth operations | discussion | Samsung |
R1-ah-18512 AI: 5.1.1.6 |
available | [WTS] [JSN] | |||
R1-1711627 | LDPC shift coefficients design for BG1 | other | Samsung |
R1-ah-18512 AI: 5.1.4.1.2 |
available | [WTS] [JSN] | |||
R1-1711628 | LDPC shift coefficients design for BG2 | other | Samsung |
R1-ah-18512 AI: 5.1.4.1.2 |
available | [WTS] [JSN] | |||
R1-1711629 | Performance evaluation of LDPC shift coefficients design for BG1 | other | Samsung |
R1-ah-18512 AI: 5.1.4.1.2 |
available | [WTS] [JSN] | |||
R1-1711630 | Performance evaluation of LDPC shift coefficients design for BG2 | other | Samsung |
R1-ah-18512 AI: 5.1.4.1.2 |
available | [WTS] [JSN] | |||
R1-1711631 | On Details of the PT-RS Design for DFT-s-OFDM |
discussion revision of R1-1711309 |
Nokia, Alcatel-Lucent Shanghai Bell |
R1-ah-18512 AI: 5.1.2.4.4 |
available | [WTS] [JSN] | |||
R1-1711632 | Channel and interference measurement for CSI acquisition |
other revision of R1-1709932 |
Huawei, HiSilicon |
R1-ah-18512 AI: 5.1.2.3.2 |
available | [WTS] [JSN] | |||
R1-1711633 | PDCCH structure |
discussion revision of R1-1711177 |
Qualcomm Incorporated | Rel-15 |
R1-ah-18512 AI: 5.1.3.1.1.1 |
available | [WTS] [JSN] | ||
R1-1711634 | RS for DL control channel |
discussion revision of R1-1711178 |
Qualcomm Incorporated | Rel-15 |
R1-ah-18512 AI: 5.1.3.1.1.2 |
available | [WTS] [JSN] | ||
R1-1711635 | Summary of Open Issues on Layer Mapping |
discussion revised to R1-1711935 |
Samsung | Rel-15 |
R1-ah-18512 AI: 5.1.2.1.1 |
revised | [WTS] [JSN] | ||
R1-1711636 | General views on DL beam management |
other revision of R1-1710449 |
Huawei, HiSilicon |
R1-ah-18512 AI: 5.1.2.2.1 |
available | [WTS] [JSN] | |||
R1-1711637 | Discussion on NTN Deployment Scenarios | discussion | Samsung | Rel-15 |
R1-ah-18512 AI: 5.2 |
available | [WTS] [JSN] | ||
R1-1711638 | Discussion on transition between NR network coordination schemes | discussion | Samsung | Rel-15 |
R1-ah-18512 AI: 5.1.2.1.8 |
available | [WTS] [JSN] | ||
R1-1711639 | Performance comparison of interleaver designs | other | Qualcomm |
R1-ah-18512 AI: 5.1.4.2.3 |
available | [WTS] [JSN] | |||
R1-1711640 | Interleaver design for Polar codes |
discussion revision of R1-1708649 |
Qualcomm Incorporated | Rel-15 |
R1-ah-18512 AI: 5.1.4.2.3 |
withdrawn | [WTS] [JSN] | ||
R1-1711641 | Repetition scheme of polar codes |
discussion revision of R1-1710347 |
LG Electronics | Rel-15 |
R1-ah-18512 AI: 5.1.4.2.2 |
available | [WTS] [JSN] | ||
R1-1711642 | NR topics requiring coordination between RAN1 and RAN2 | discussion | RAN2 Chair | Rel-15 |
R1-ah-18512 AI: 5.1 |
noted | [WTS] [JSN] | ||
R1-1711643 | Views on SRS designs |
discussion revision of R1-1710409 |
Mitsubishi Electric |
R1-ah-18512 AI: 5.1.2.4.5 |
available | [WTS] [JSN] | |||
R1-1711644 | Study of Split-CRC Polar Code Construction for Early Termination |
discussion revision of R1-1709883 |
Tsofun Algorithm |
R1-ah-18512 AI: 5.1.4.2.1 |
noted | [WTS] [JSN] | |||
R1-1711645 | SS burst set composition consideration |
discussion revision of R1-1711136 |
Qualcomm Incorporated | Rel-15 |
R1-ah-18512 AI: 5.1.1.1.2 |
noted | [WTS] [JSN] | ||
R1-1711646 | Timing indication based on SS block consideration |
discussion revision of R1-1711137 |
Qualcomm Incorporated | Rel-15 |
R1-ah-18512 AI: 5.1.1.1.3 |
noted | [WTS] [JSN] | ||
R1-1711647 | Time Index Signaling for SS Blocks |
discussion revision of R1-1711611 |
Intel Corporation |
R1-ah-18512 AI: 5.1.1.1.3 |
available | [WTS] [JSN] | |||
R1-1711648 | SS Block Composition |
discussion revision of R1-1711612 |
Intel Corporation |
R1-ah-18512 AI: 5.1.1.2.2 |
available | [WTS] [JSN] | |||
R1-1711649 | Discussion on 1-symbol NR-PUCCH for UCI of up to 2 bits |
discussion revision of R1-1710930 |
Panasonic Corporation |
R1-ah-18512 AI: 5.1.3.2.1.1 |
available | [WTS] [JSN] | |||
R1-1711650 | NR-PBCH content |
discussion revision of R1-1711264 |
Nokia, Alcatel-Lucent Shanghai Bell |
R1-ah-18512 AI: 5.1.1.2.1 |
available | [WTS] [JSN] | |||
R1-1711651 | Discussion on CSI-RS design |
discussion revision of R1-1711168 |
Qualcomm Incorporated |
R1-ah-18512 AI: 5.1.2.4.2 |
withdrawn | [WTS] [JSN] | |||
R1-1711652 | Summary of the 2nd NOMA Workshop | other | ZTE |
R1-ah-18512 AI: 5.2 |
available | [WTS] [JSN] | |||
R1-1711653 | Considerations of NR-LTE coexistence in uplink |
discussion revision of R1-1710910 revised to R1-1711701 |
ZTE |
R1-ah-18512 AI: 5.1.8 |
revised | [WTS] [JSN] | |||
R1-1711654 | WF on NR-SS sequence design | other | NTT DOCOMO, ZTE, InterDigital |
R1-ah-18512 AI: 5.1.1.1.1 |
noted | [WTS] [JSN] | |||
R1-1711655 | Discussion on short-PUCCH more than 2-bit |
discussion revision of R1-1710387 |
vivo |
R1-ah-18512 AI: 5.1.3.2.1.2 |
available | [WTS] [JSN] | |||
R1-1711656 | WF on PRACH formats for long sequence length (L = 839) | other | ZTE |
R1-ah-18512 AI: 5.1.1.4.1 |
withdrawn | [WTS] [JSN] | |||
R1-1711657 | [DRAFT] Response LS on Support for fake gNB detection mechanisms |
LS out LS is reply to S3-171568 LS To: SA3 revised to R1-1711997 |
Nokia | NR_newRAT-Core | Rel-15 |
R1-ah-18512 AI: 4 |
revised | [WTS] [JSN] | |
R1-1711658 | Considerations on SS block compositions |
other revision of R1-1710859 |
Sony |
R1-ah-18512 AI: 5.1.1.2.2 |
available | [WTS] [JSN] | |||
R1-1711659 | Discussion on SS block time index indication |
other revision of R1-1710858 |
Sony |
R1-ah-18512 AI: 5.1.1.1.3 |
available | [WTS] [JSN] | |||
R1-1711660 | WF on CSI-RS | other | Samsung, Ericsson, NTT DOCOMO, CATT |
R1-ah-18512 AI: 5.1.2.4.2 |
available | [WTS] [JSN] | |||
R1-1711661 | Summary of views on NR CSI-RS | other | Huawei, HiSilicon |
R1-ah-18512 AI: 5.1.2.4.2 |
available | [WTS] [JSN] | |||
R1-1711662 | WF on CW to layer mapping | other | Huawei, HiSilicon, ZTE, Xinwei, China Unicom, ETRI, Softbank, DOCOMO, LGE, Deutsche Telekom, CATR |
R1-ah-18512 AI: 5.1.2.1.1 |
available | [WTS] [JSN] | |||
R1-1711663 | On UL PT-RS design |
discussion revision of R1-1710297 |
LG Electronics |
R1-ah-18512 AI: 5.1.2.4.4 |
withdrawn | [WTS] [JSN] | |||
R1-1711664 | WF on number of MCS and CQI configuration | other | Intel, Samsung |
R1-ah-18512 AI: 5.1.2.1.1 |
available | [WTS] [JSN] | |||
R1-1711665 | WF on MIMO layer to CW correspondence | other | Intel, AT&T |
R1-ah-18512 AI: 5.1.2.1.1 |
available | [WTS] [JSN] | |||
R1-1711666 | WF on SS block and DM-RS collision handling | other | Intel |
R1-ah-18512 AI: 5.1.2.4.3 |
noted | [WTS] [JSN] | |||
R1-1711667 | WF on multiple PDSCH approach of supporting NC-JT | other | Intel |
R1-ah-18512 AI: 5.1.2.1.6 |
noted | [WTS] [JSN] | |||
R1-1711668 | WF on SRS sequence for NR | other | Intel, Samsung, Qualcomm |
R1-ah-18512 AI: 5.1.2.4.5 |
noted | [WTS] [JSN] | |||
R1-1711669 | LDPC design for eMBB data |
discussion revision of R1-1710046 revised to R1-1711711 |
CATT |
R1-ah-18512 AI: 5.1.4.1.2 |
revised | [WTS] [JSN] | |||
R1-1711670 | Summary of remaining items on beam management | other | Qualcomm |
R1-ah-18512 AI: 5.1.2.2.1 |
withdrawn | [WTS] [JSN] | |||
R1-1711671 | Performance impact of inactive antenna ports |
discussion revision of R1-1711037 |
Ericsson |
R1-ah-18512 AI: 5.1.2.3.5 |
available | [WTS] [JSN] | |||
R1-1711672 | Summary of QCL | other | Nokia, Alcatel-Lucent Shanghai Bell |
R1-ah-18512 AI: 5.1.2.4.7 |
available | [WTS] [JSN] | |||
R1-1711673 | WF on QCL | other | Nokia, Alcatel-Lucent Shanghai Bell |
R1-ah-18512 AI: 5.1.2.4.7 |
withdrawn | [WTS] [JSN] | |||
R1-1711674 | Summary of Issues and WFs on Codebook based transmission for UL |
discussion revised to R1-1711881 |
Intel |
R1-ah-18512 AI: 5.1.2.1.2 |
revised | [WTS] [JSN] | |||
R1-1711675 | WF on UE self-interference | other | Vivo, OPPO, Coolpad, China Telecom, Xiaomi, Huawei, HiSilicon, China Unicom |
R1-ah-18512 AI: 5.1.8 |
noted | [WTS] [JSN] | |||
R1-1711676 | WF on Transmission Scheme of Broadcast PDSCH | other | Qualcomm |
R1-ah-18512 AI: 5.1.2.1.8 |
withdrawn | [WTS] [JSN] | |||
R1-1711677 | Summary of the E-mail Discussion [89-21]: On Long PUCCH for NR | other | Ericsson |
R1-ah-18512 AI: 5.1.3.2.2 |
noted | [WTS] [JSN] | |||
R1-1711678 | Way forward on the mapping of SS blocks |
other revised to R1-1711899 |
Nokia |
R1-ah-18512 AI: 5.1.1.1.2 |
revised | [WTS] [JSN] | |||
R1-1711679 | Impact of Puncturing on Bit-channel Capacities |
discussion revision of R1-1710494 |
Ericsson |
R1-ah-18512 AI: 5.1.4.2.2 |
available | [WTS] [JSN] | |||
R1-1711680 | WF on LTE-NR Coexistence with UL sharing | other | Huawei, HiSilicon |
R1-ah-18512 AI: 5.1.8 |
withdrawn | [WTS] [JSN] | |||
R1-1711681 | WF on the structure of a data channel including DMRS | other | Panasonic, OPPO, NTT DOCOMO |
R1-ah-18512 AI: 5.1.3.3 |
available | [WTS] [JSN] | |||
R1-1711682 | WF on UE to UE measurement as an enabler for CLI mitigation schemes | other | ZTE |
R1-ah-18512 AI: 5.1.6.1 |
noted | [WTS] [JSN] | |||
R1-1711683 | [DRAFT LS] on NR Beam Management |
LS out LS To: RAN2 revised to R1-1712007 |
Qualcomm | NR_newRAT-Core | Rel-15 |
R1-ah-18512 AI: 5.1 |
revised | [WTS] [JSN] | |
R1-1711684 | [DRAFT] LS on Beam Aspects of NR RACH |
LS out LS To: RAN2 revised to R1-1711879 |
Huawei | NR_newRAT-Core | Rel-15 |
R1-ah-18512 AI: 5.1 |
revised | [WTS] [JSN] | |
R1-1711685 | [DRAFT] LS on HARQ operation |
LS out LS To: RAN2 revised to R1-1712008 |
Nokia | NR_newRAT-Core | Rel-15 |
R1-ah-18512 AI: 5.1 |
revised | [WTS] [JSN] | |
R1-1711686 | LS on NR UL SPS / UL transmission without UL grant |
LS out LS To: RAN2 |
RAN1, NTT DOCOMO | NR_newRAT-Core | Rel-15 |
R1-ah-18512 AI: 5.1 |
approved | [WTS] [JSN] | |
R1-1711687 | [DRAFT LS] to RAN2 on PDCCH monitoring and DRX |
LS out LS To: RAN2 |
CATT | NR_newRAT-Core | Rel-15 |
R1-ah-18512 AI: 5.1 |
withdrawn | [WTS] [JSN] | |
R1-1711688 | Way Forward on PTRS |
other revised to R1-1711941 |
Intel |
R1-ah-18512 AI: 5.1.2.4.4 |
revised | [WTS] [JSN] | |||
R1-1711689 | Outputs of offline discussion on RBG size/number determination |
other revised to R1-1711843 |
OPPO |
R1-ah-18512 AI: 5.1.3.3.1.1 |
revised | [WTS] [JSN] | |||
R1-1711690 | WF on the number of CBGs | other | OPPO |
R1-ah-18512 AI: 5.1.3.3.4.1 |
available | [WTS] [JSN] | |||
R1-1711691 | Analysis of SSS Proposals |
other revised to R1-1711810 |
Intel Corporation |
R1-ah-18512 AI: 5.1.1.1.1 |
revised | [WTS] [JSN] | |||
R1-1711692 | WF on final PCM selection | other | Nokia, Alcatel-Lucent Shanghai Bell |
R1-ah-18512 AI: 5.1.4.1.2 |
noted | [WTS] [JSN] | |||
R1-1711693 | Base Graph 1 lifting and evaluations |
discussion revision of R1-1711345 |
Intel Corporation |
R1-ah-18512 AI: 5.1.4.1.2 |
available | [WTS] [JSN] | |||
R1-1711694 | Base Graph 2 lifting and evaluations |
discussion revision of R1-1711346 |
Intel Corporation |
R1-ah-18512 AI: 5.1.4.1.2 |
available | [WTS] [JSN] | |||
R1-1711695 | WF on cross-link interference aware UPLC | other | Huawei |
R1-ah-18512 AI: 5.1.6.1 |
available | [WTS] [JSN] | |||
R1-1711696 | On NR LDPC design and performance |
discussion revision of R1-1710829 revised to R1-1711790 |
MediaTek Inc. |
R1-ah-18512 AI: 5.1.4.1.2 |
revised | [WTS] [JSN] | |||
R1-1711697 | WF on rate-matching for Polar codes | other | Qualcomm |
R1-ah-18512 AI: 5.1.4.2.2 |
noted | [WTS] [JSN] | |||
R1-1711698 | WF on interleaver design | other | Qualcomm |
R1-ah-18512 AI: 5.1.4.2.3 |
available | [WTS] [JSN] | |||
R1-1711699 | WF on SRS design in NR |
other revised to R1-1711920 |
LG Electronics |
R1-ah-18512 AI: 5.1.2.4.5 |
revised | [WTS] [JSN] | |||
R1-1711700 | WF on CLI measurement | other | MediaTek Inc. |
R1-ah-18512 AI: 5.1.6.1 |
noted | [WTS] [JSN] | |||
R1-1711701 | Considerations of NR-LTE coexistence in uplink |
discussion revision of R1-1711653 |
ZTE |
R1-ah-18512 AI: 5.1.8 |
noted | [WTS] [JSN] | |||
R1-1711702 | Rate matching for Polar code |
other revision of R1-1710001 |
Huawei, HiSilicon |
R1-ah-18512 AI: 5.1.4.2.3 |
available | [WTS] [JSN] | |||
R1-1711703 | Support of implicit soft combining for PBCH by Polar code construction |
other revision of R1-1710002 |
Huawei, HiSilicon |
R1-ah-18512 AI: 5.1.4.3 |
withdrawn | [WTS] [JSN] | |||
R1-1711704 | Benefits of implicit soft combining for PBCH by Polar code construction |
other revision of R1-1710472 |
Huawei, HiSilicon |
R1-ah-18512 AI: 5.1.4.3 |
withdrawn | [WTS] [JSN] | |||
R1-1711705 | WF on handling of single UL transmision |
other revised to R1-1711848 |
NTT DOCOMO |
R1-ah-18512 AI: 5.1.8 |
revised | [WTS] [JSN] | |||
R1-1711706 | On Hybrid TDD and Signaling for Cross-link Interference Mitigation |
discussion revision of R1-1711562 |
Ericsson |
R1-ah-18512 AI: 5.1.6.1 |
withdrawn | [WTS] [JSN] | |||
R1-1711707 | WF on inter-TRP signaling for UE-to-UE cross-link interference measurement | other | LG Electronics |
R1-ah-18512 AI: 5.1.6.1 |
noted | [WTS] [JSN] | |||
R1-1711708 | WF on REG bundle size in a CORESET with interleaving | other | LG Electronics, ETRI, NTT DOCOMO, Ericsson, InterDigital |
R1-ah-18512 AI: 5.1.3.1.1.1 |
noted | [WTS] [JSN] | |||
R1-1711709 | WF on NR-LTE coexistence in overlapping spectrum | other | AT&T, Deutsche Telekom, Vodafone, Intel, Ericsson, Samsung, Orange, China Unicom, Huawei, HiSilicon, China Telecom |
R1-ah-18512 AI: 5.1.8 |
noted | [WTS] [JSN] | |||
R1-1711710 | WF on NR-LTE coexistence | other | AT&T, Nokia, Ericsson, Vodafone |
R1-ah-18512 AI: 5.1.8 |
noted | [WTS] [JSN] | |||
R1-1711711 | LDPC design for eMBB data |
discussion revision of R1-1711669 |
CATT |
R1-ah-18512 AI: 5.1.4.1.2 |
available | [WTS] [JSN] | |||
R1-1711712 | WF on group-based beam reporting | other | ZTE, ASTRI, Nokia, ASB, NTT DOCOMO, Intel, Qualcomm, Samsung, AT&T |
R1-ah-18512 AI: 5.1.2.2.1 |
available | [WTS] [JSN] | |||
R1-1711713 | WF on beam indication | other | ZTE |
R1-ah-18512 AI: 5.1.2.2.1 |
withdrawn | [WTS] [JSN] | |||
R1-1711714 | WF on DMRS multipexing in time domain | other | ZTE, Xinwei, ASTRI, Spreadtrum |
R1-ah-18512 AI: 5.1.2.4.3 |
noted | [WTS] [JSN] | |||
R1-1711715 | WF on channel reciprocity based CSI | other | ZTE, Nokia, ASB, LG Electronics, ASTRI, Ericsson, NTT DOCOMO |
R1-ah-18512 AI: 5.1.2.3.3 |
available | [WTS] [JSN] | |||
R1-1711716 | WF on partial channel reciprocity based CSI | other | ZTE, CMCC, China Telecom, China Unicom, ASTRI |
R1-ah-18512 AI: 5.1.2.3.3 |
available | [WTS] [JSN] | |||
R1-1711717 | WF on using SS block for beam recovery | other | ZTE, Ericsson, NTT DOCOMO, MediaTek, Spreadtrum, vivo, OPPO, Qualcomm, Xinwei, LG Electronics, AT&T, Lenovo, CMCC, China Unicom, China Telecom, ASTRI, Samsung, Nokia, ASB, III, MTI, Sharp, National Instruments |
R1-ah-18512 AI: 5.1.2.2.2 |
noted | [WTS] [JSN] | |||
R1-1711718 | WF on DL beam indication with beam correspondence | other | ZTE |
R1-ah-18512 AI: 5.1.2.2.1 |
withdrawn | [WTS] [JSN] | |||
R1-1711719 | WF on CSI in PUCCH | other | ZTE, NTT DOCOMO |
R1-ah-18512 AI: 5.1.2.3.4 |
available | [WTS] [JSN] | |||
R1-1711720 | WF on Type II CSI | other | ZTE, MediaTek |
R1-ah-18512 AI: 5.1.2.3.4 |
available | [WTS] [JSN] | |||
R1-1711721 | WF on power control | other | ZTE, NTT DOCOMO |
R1-ah-18512 AI: 5.1.9.2 |
noted | [WTS] [JSN] | |||
R1-1711722 | WF on DMRS multiplexing with data | other | ZTE, Qualcomm, KT Corp., NTT DOCOMO |
R1-ah-18512 AI: 5.1.2.4.3 |
noted | [WTS] [JSN] | |||
R1-1711723 | WF on CSI-RS CDM pattern | other | ZTE |
R1-ah-18512 AI: 5.1.2.4.2 |
available | [WTS] [JSN] | |||
R1-1711724 | Summary of power control | other | ZTE |
R1-ah-18512 AI: 5.1.9.2 |
noted | [WTS] [JSN] | |||
R1-1711725 | Summary of channel reciprocity based CSI | other | ZTE |
R1-ah-18512 AI: 5.1.2.3.3 |
noted | [WTS] [JSN] | |||
R1-1711726 | WF on DMRS port multiplexing in frequency domain | other | MediaTek Inc. |
R1-ah-18512 AI: 5.1.2.4.3 |
withdrawn | [WTS] [JSN] | |||
R1-1711727 | LDPC design for base graph 1 |
other revision of R1-1711436 |
Huawei, HiSilicon |
R1-ah-18512 AI: 5.1.4.1.2 |
available | [WTS] [JSN] | |||
R1-1711728 | WF on CRC Attachment for CBGs | other | Ericsson |
R1-ah-18512 AI: 5.1.4.1.1.1 |
available | [WTS] [JSN] | |||
R1-1711729 | WF on Circular buffer of Polar Code | other | Ericsson, Qualcomm, MediaTek, LGE |
R1-ah-18512 AI: 5.1.4.2.2 |
noted | [WTS] [JSN] | |||
R1-1711730 | WF on the Number of Assistant Bits for Polar Construction | other | Ericsson, NTT DOCOMO, Qualcomm, Intel, Tsofun Algorithm, Samsung, LG, Fujitsu |
R1-ah-18512 AI: 5.1.4.2.1 |
noted | [WTS] [JSN] | |||
R1-1711731 | WF on LDPC Code Usage Scenarios | other | MediaTek, Qualcomm, InterDigital, ZTE |
R1-ah-18512 AI: 5.1.4.1.2 |
noted | [WTS] [JSN] | |||
R1-1711732 | void | other | ETSI |
R1-ah-18512 AI: 5.1.4 |
withdrawn | [WTS] [JSN] | |||
R1-1711733 | void | other | ETSI |
R1-ah-18512 AI: 5.1.4 |
withdrawn | [WTS] [JSN] | |||
R1-1711734 | void | other | ETSI |
R1-ah-18512 AI: 5.1.4 |
withdrawn | [WTS] [JSN] | |||
R1-1711735 | void | other | ETSI |
R1-ah-18512 AI: 5.1.4 |
withdrawn | [WTS] [JSN] | |||
R1-1711736 | void | other | ETSI |
R1-ah-18512 AI: 5.1.4 |
withdrawn | [WTS] [JSN] | |||
R1-1711737 | void | other | ETSI |
R1-ah-18512 AI: 5.1.4 |
withdrawn | [WTS] [JSN] | |||
R1-1711738 | void | other | ETSI |
R1-ah-18512 AI: 5.1.4 |
withdrawn | [WTS] [JSN] | |||
R1-1711739 | void | other | ETSI |
R1-ah-18512 AI: 5.1.4 |
withdrawn | [WTS] [JSN] | |||
R1-1711740 | void | other | ETSI |
R1-ah-18512 AI: 5.1.4 |
withdrawn | [WTS] [JSN] | |||
R1-1711741 | void | other | ETSI |
R1-ah-18512 AI: 5.1.4 |
withdrawn | [WTS] [JSN] | |||
R1-1711742 | void | other | ETSI |
R1-ah-18512 AI: 5.1.4 |
withdrawn | [WTS] [JSN] | |||
R1-1711743 | void | other | ETSI |
R1-ah-18512 AI: 5.1.4 |
withdrawn | [WTS] [JSN] | |||
R1-1711744 | void | other | ETSI |
R1-ah-18512 AI: 5.1.4 |
withdrawn | [WTS] [JSN] | |||
R1-1711745 | void | other | ETSI |
R1-ah-18512 AI: 5.1.4 |
withdrawn | [WTS] [JSN] | |||
R1-1711746 | WF on time resource indication | other | OPPO |
R1-ah-18512 AI: 5.1.3.3.1.2 |
withdrawn | [WTS] [JSN] | |||
R1-1711747 | Shift coefficients design for base graph 1 |
discussion revision of R1-1711587 |
ZTE |
R1-ah-18512 AI: 5.1.4.1.2 |
available | [WTS] [JSN] | |||
R1-1711748 | Shift coefficients design for base graph 2 |
discussion revision of R1-1711588 |
ZTE |
R1-ah-18512 AI: 5.1.4.1.2 |
available | [WTS] [JSN] | |||
R1-1711749 | Segmentation of Polar codes |
discussion revision of R1-1710849 |
ZTE |
R1-ah-18512 AI: 5.1.4.2.3 |
available | [WTS] [JSN] | |||
R1-1711750 | WF on UL non-codebook based transmission | other | Huawei, HiSilicon, DOCOMO, Sharp, LGE, Ericsson, China Telecom, Deutsche Telekom, Xinwei, Vodafone, CeWiT, China Unicom, Tejas Networks, CATR, IITH, IITM, Panasonic, ZTE, InterDigital, AT&T, SoftBank, KDDI |
R1-ah-18512 AI: 5.1.2.1.3 |
noted | [WTS] [JSN] | |||
R1-1711751 | On Bit Mapping Design for Polar Codes |
discussion revision of R1-1710493 |
Ericsson |
R1-ah-18512 AI: 5.1.4.2.2 |
available | [WTS] [JSN] | |||
R1-1711752 | Polar Code Performance in Fading Channel |
discussion revision of R1-1710495 |
Ericsson |
R1-ah-18512 AI: 5.1.4.2.2 |
available | [WTS] [JSN] | |||
R1-1711753 | WF on UL resource allocation for PUSCH with DT-s-OFDM waveform in NR | other | NEC, NTT DOCOMO, Panasonic, OPPO, Ericsson, Nokia, ASB |
R1-ah-18512 AI: 5.1.3.3.1.1 |
noted | [WTS] [JSN] | |||
R1-1711754 | WF on NR PDCCH blind decodes | other | vivo, Samsung |
R1-ah-18512 AI: 5.1.3.1.2.2 |
noted | [WTS] [JSN] | |||
R1-1711755 | Open issues on SRS design |
discussion revised to R1-1711837 |
Sony |
R1-ah-18512 AI: 5.1.2.4.5 |
revised | [WTS] [JSN] | |||
R1-1711756 | WF on Polar rate-matching selection | other | MediaTek Inc. |
R1-ah-18512 AI: 5.1.4.2.2 |
withdrawn | [WTS] [JSN] | |||
R1-1711757 | Optimization and comparison of Polar code rate-matching design | discussion | MediaTek Inc. |
R1-ah-18512 AI: 5.1.4.2.2 |
available | [WTS] [JSN] | |||
R1-1711758 | Correction on the formula of AnnexA |
CR revision of R1-1711623 |
ZTE, Ericsson | 38.901 14.1.0 CR#16 catF | NR_newRAT-Core | Rel-14 |
R1-ah-18512 AI: 5.1. |
agreed | [WTS] [JSN] |
R1-1711759 | Summary of offline discussion on CSI-RS | discussion | Samsung |
R1-ah-18512 AI: 5.1.2.4.2 |
noted | [WTS] [JSN] | |||
R1-1711760 | Correction on Procedure A of spatially-consistency UT mobility modeling |
CR revision of R1-1711624 |
ZTE, Ericsson | 38.901 14.1.0 CR#17 catF | NR_newRAT-Core | Rel-14 |
R1-ah-18512 AI: 5.1. |
agreed | [WTS] [JSN] |
R1-1711761 | WF on measurement based on SS block | other | NTT DOCOMO, Ericsson, Huawei, HiSilicon, AT&T |
R1-ah-18512 AI: 5.1.1.5.1 |
noted | [WTS] [JSN] | |||
R1-1711762 | WF on measurement based on CSI-RS | other | NTT DOCOMO, Ericsson, AT&T |
R1-ah-18512 AI: 5.1.1.5.2 |
noted | [WTS] [JSN] | |||
R1-1711763 | WF on radio link monitoring | other | NTT DOCOMO, Ericsson, AT&T |
R1-ah-18512 AI: 5.1.1.5.3 |
noted | [WTS] [JSN] | |||
R1-1711764 | WF on Polar codes construction | other | NTT DOCOMO, Ericsson, Qualcomm, Intel, Tsofun Algorithm, CATT, AT&T |
R1-ah-18512 AI: 5.1.4.2.1 |
noted | [WTS] [JSN] | |||
R1-1711765 | Summary of views on TRS | discussion | MediaTek Inc. |
R1-ah-18512 AI: 5.1.2.4.6 |
noted | [WTS] [JSN] | |||
R1-1711766 | WF on TRS | other | MediaTek, Huawei, HiSilicon, Ericsson, Qualcomm |
R1-ah-18512 AI: 5.1.2.4.6 |
noted | [WTS] [JSN] | |||
R1-1711767 | WF on SRS sequence generation for partial overlapping | other | LG Electronics, Intel Corporation, ZTE |
R1-ah-18512 AI: 5.1.2.4.5 |
noted | [WTS] [JSN] | |||
R1-1711768 | On bandwidth parts and 'RF' requirements |
discussion revised to R1-1711795 |
Ericsson |
R1-ah-18512 AI: 5.1.7 |
revised | [WTS] [JSN] | |||
R1-1711769 | WF on CSI feedback for NCJT | other | LG Electronics, Ericsson, Intel |
R1-ah-18512 AI: 5.1.2.1.6 |
available | [WTS] [JSN] | |||
R1-1711770 | WF on DL DMRS for broadcast/multicast PDSCH | other | LG Electronics, Qualcomm |
R1-ah-18512 AI: 5.1.2.4.3 |
noted | [WTS] [JSN] | |||
R1-1711771 | WF on signaling DMRS configuration | other | LG Electronics, ZTE |
R1-ah-18512 AI: 5.1.2.4.3 |
noted | [WTS] [JSN] | |||
R1-1711772 | WF on processing time requirements |
other revised to R1-1711856 |
Qualcomm |
R1-ah-18512 AI: 5.1.3.3.6 |
revised | [WTS] [JSN] | |||
R1-1711773 | WF on PT-RS collision avoidance | other | LG Electronics, Huawei, CATT, ZTE |
R1-ah-18512 AI: 5.1.2.4.4 |
noted | [WTS] [JSN] | |||
R1-1711774 | Circulant permutation matrix design for LDPC codes |
discussion revision of R1-1710345 revised to R1-1711937 |
LG Electronics | Rel-15 |
R1-ah-18512 AI: 5.1.4.1.2 |
revised | [WTS] [JSN] | ||
R1-1711775 | Circulant permutation matrix design for LDPC codes base graph #2 |
discussion revision of R1-1711578 revised to R1-1711938 |
LG Electronics | Rel-15 |
R1-ah-18512 AI: 5.1.4.1.2 |
revised | [WTS] [JSN] | ||
R1-1711776 | WF on PUCCH resource allocation | other | LG Electronics |
R1-ah-18512 AI: 5.1.3.2.4 |
available | [WTS] [JSN] | |||
R1-1711777 | WF on CW to layer mapping scheme for data channels | other | Qualcomm, ATT, Ericsson, Samsung, Nokia, ASB, CATT, Interdigital, Intel, Sharp, Verizon, BT, CHTTL, Panasonic, NEC, KDDI |
R1-ah-18512 AI: 5.1.2.1.1 |
available | [WTS] [JSN] | |||
R1-1711778 | Remaining issues on NR DM-RS | discussion | Qualcomm |
R1-ah-18512 AI: 5.1.2.4.3 |
noted | [WTS] [JSN] | |||
R1-1711779 | [DRAFT] LS on subcarrier alignment and channel raster |
LS out LS To: RAN4 revised to R1-1711839 |
AT&T, Sprint, T-Mobile USA, Huawei, HiSilicon, Samsung, Deutsche Telekom, Ericsson, Intel, China Telecom | NR_newRAT-Core | Rel-15 |
R1-ah-18512 AI: 5.1.8 |
revised | [WTS] [JSN] | |
R1-1711780 | Summary on DL PRB bundling |
discussion revised to R1-1711960 |
Xinwei |
R1-ah-18512 AI: 5.1.2.1.5 |
revised | [WTS] [JSN] | |||
R1-1711781 | WF on performance comparison of sequences for Polar code | other | Huawei, HiSilicon |
R1-ah-18512 AI: 5.1.4.2.2 |
noted | [WTS] [JSN] | |||
R1-1711782 | WF on UL transmission without grant | other | NEC |
R1-ah-18512 AI: 5.1.3.3.3 |
available | [WTS] [JSN] | |||
R1-1711783 | WF on UL DMRS pattern for DFT-S-OFDM | other | LG Electronics, ZTE, Ericsson, NEC, NTT DOCOMO |
R1-ah-18512 AI: 5.1.2.4.3 |
noted | [WTS] [JSN] | |||
R1-1711784 | WF on DMRS design | other | MediaTek, Huawei, HiSilicon, China Telecom, ZTE, ASUSTek, CeWiT, Spreadtrum, Tejas Networks, CATR, Deutsche Telekom, IITH, Xinwei, MTI, CHTTL, China Unicom, IITM, ITRI |
R1-ah-18512 AI: 5.1.2.4.3 |
noted | [WTS] [JSN] | |||
R1-1711785 | WF on periodic CSI reporting on short PUCCH | other | Ericsson, Samsung, Huawei, HiSilicon, CATT |
R1-ah-18512 AI: 5.1.2.3.4 |
available | [WTS] [JSN] | |||
R1-1711786 | WF on unifying wideband and partial band definitions | other | Ericsson, LGE, Samsung |
R1-ah-18512 AI: 5.1.2.3.4 |
available | [WTS] [JSN] | |||
R1-1711787 | WF on CSI-RS | other | Samsung, Ericsson, NTT DOCOMO, CATT, LGE |
R1-ah-18512 AI: 5.1.2.4.2 |
noted | [WTS] [JSN] | |||
R1-1711788 | Way forward on further details of bandwidth part operation | other | Intel, AT&T, Huawei, HiSilicon |
R1-ah-18512 AI: 5.1.7 |
noted | [WTS] [JSN] | |||
R1-1711789 | Way forward on PRB indexing |
other revised to R1-1711855 |
Intel, Sharp, ETRI |
R1-ah-18512 AI: 5.1.7 |
revised | [WTS] [JSN] | |||
R1-1711790 | On NR LDPC design and performance |
discussion revision of R1-1711696 |
MediaTek Inc. |
R1-ah-18512 AI: 5.1.4.1.2 |
available | [WTS] [JSN] | |||
R1-1711791 | WF on Antenna Switching for SRS Transmission | other | Huawei, HiSilicon, Softbank, CMCC, Deutsche Telekom, CATR, Tejas Networks, OPPO, Qualcomm, CeWiT, Sony, ZTE, Xinwei, IITM, China Unicom, IITH, Ericsson, InterDigital, China Telecom, MediaTek |
R1-ah-18512 AI: 5.1.2.4.5 |
noted | [WTS] [JSN] | |||
R1-1711792 | WF on codebook based UL transmission | other | MediaTek, Nokia, Alcatel-Lucent Shanghai Bell |
R1-ah-18512 AI: 5.1.2.1.2 |
noted | [WTS] [JSN] | |||
R1-1711793 | WF on codeword mapping | other | MediaTek Inc. |
R1-ah-18512 AI: 5.1.2.1.1 |
available | [WTS] [JSN] | |||
R1-1711794 | WF on polar code sequence | other | Samsung |
R1-ah-18512 AI: 5.1.4.2.2 |
noted | [WTS] [JSN] | |||
R1-1711795 | On bandwidth parts and 'RF' requirements |
discussion revision of R1-1711768 |
Ericsson |
R1-ah-18512 AI: 5.1.7 |
noted | [WTS] [JSN] | |||
R1-1711796 | 1-symbol short PUCCH with 1 or 2 bits UCI | other | Qualcomm |
R1-ah-18512 AI: 5.1.3.2.1.1 |
available | [WTS] [JSN] | |||
R1-1711797 | WF on DMRS sequence | other | Samsung, Ericsson, Qualcomm Incorporated, CATT, Nokia, Alcatel-Lucent Shanghai Bell, Intel, AT&T, NTT DOCOMO, INC., LG Electronics, KT Corp., MediaTek Inc., Mitsubishi Electric Co., Spreadtrum, Fujitsu, Xinwei, KDDI, Panasonic, ITL |
R1-ah-18512 AI: 5.1.2.4.3 |
noted | [WTS] [JSN] | |||
R1-1711798 | Summary of CSI Acquisition Details |
other revised to R1-1711924 |
NTT DOCOMO |
R1-ah-18512 AI: 5.1.2.3.2 |
revised | [WTS] [JSN] | |||
R1-1711799 | WF on random access association configuration |
other revised to R1-1711945 |
ZTE |
R1-ah-18512 AI: 5.1.1.4.4 |
revised | [WTS] [JSN] | |||
R1-1711800 | WF on SS block repetition | other | ZTE, Sierra Wireless |
R1-ah-18512 AI: 5.1.1.5.1 |
available | [WTS] [JSN] | |||
R1-1711801 | WF on power offset of NR-PBCH DMRS and NR-SSS | other | MediaTek, Huawei, HiSilicon, NTT DOCOMO |
R1-ah-18512 AI: 5.1.1.5.1 |
noted | [WTS] [JSN] | |||
R1-1711802 | WF on further details for bandwidth part | other | MediaTek, Huawei, HiSilicon |
R1-ah-18512 AI: 5.1.7 |
noted | [WTS] [JSN] | |||
R1-1711803 | WF on configuration of CSI-RS for CSI acquisition | other | LG Electronics, Samsung |
R1-ah-18512 AI: 5.1.2.4.2 |
noted | [WTS] [JSN] | |||
R1-1711804 | WF on CDM-8 in CSI-RS for CSI acquisition | other | LG Electronics, Samsung, CATT, NTT DOCOMO |
R1-ah-18512 AI: 5.1.2.4.2 |
noted | [WTS] [JSN] | |||
R1-1711805 | WF on Single DCI based NCJT | other | LG Electronics, Intel Corporation, ZTE |
R1-ah-18512 AI: 5.1.2.1.6 |
available | [WTS] [JSN] | |||
R1-1711806 | WF on radio link monitoring in NR |
other revised to R1-1711871 |
Huawei, HiSilicon, Qualcomm, ATT |
R1-ah-18512 AI: 5.1.1.5.3 |
noted | [WTS] [JSN] | |||
R1-1711807 | Summary of views on multi-TRP & multi-panel transmission |
other revised to R1-1711857 |
CATT |
R1-ah-18512 AI: 5.1.2.1.6 |
revised | [WTS] [JSN] | |||
R1-1711808 | WF on PDSCH rate matching | other | LG Electronics, Panasonic, NTT DOCOMO, InterDigital, Intel |
R1-ah-18512 AI: 5.1.2.1.7 |
available | [WTS] [JSN] | |||
R1-1711809 | WF on slot format indication with group common PDCCH | other | LG Electronics, InterDigital, … |
R1-ah-18512 AI: 5.1.3.1.4.2 |
available | [WTS] [JSN] | |||
R1-1711810 | Analysis of SSS Proposals |
other revision of R1-1711691 |
Intel Corporation |
R1-ah-18512 AI: 5.1.1.1.1 |
noted | [WTS] [JSN] | |||
R1-1711811 | WF on CSI measurement details | other | NTT DOCOMO, ZTE, Nokia, ASB, NEC |
R1-ah-18512 AI: 5.1.2.3.2 |
available | [WTS] [JSN] | |||
R1-1711812 | WF on configuration of a bandwidth part in wideband bandwidth operation | other | LG Electronics, MediaTek |
R1-ah-18512 AI: 5.1.7 |
noted | [WTS] [JSN] | |||
R1-1711813 | WF on DM-RS | other | NTT DOCOMO, Ericsson, Nokia, ASB, ZTE, KT Corp, Sharp, Qualcomm |
R1-ah-18512 AI: 5.1.2.4.3 |
noted | [WTS] [JSN] | |||
R1-1711814 | WF on PT-RS for DFT-S-OFDM | other | NTT DOCOMO, Ericsson, Nokia, ASB, Panasonic, Spreadtrum, ZTE |
R1-ah-18512 AI: 5.1.2.4.4 |
noted | [WTS] [JSN] | |||
R1-1711815 | WF on PT-RS for CP-OFDM | other | NTT DOCOMO, Mitsubishi Electric, Huawei, HiSilicon, Nokia, ASB |
R1-ah-18512 AI: 5.1.2.4.4 |
noted | [WTS] [JSN] | |||
R1-1711816 | WF on front-loaded DMRS design for slot aggregation | other | vivo, Huawei, HiSilicon |
R1-ah-18512 AI: 5.1.2.4.3 |
noted | [WTS] [JSN] | |||
R1-1711817 | WF on LTE-NR DC deployment scenarios to extend NR UL coverage | other | Orange, Deutsche Telekom, Ericsson, China Unicom, OPPO, Huawei, China Telecom, Nokia, ZTE |
R1-ah-18512 AI: 5.1.8 |
noted | [WTS] [JSN] | |||
R1-1711818 | WF on UL power control | other | LG Electronics, Ericsson, InterDigital |
R1-ah-18512 AI: 5.1.9.2 |
noted | [WTS] [JSN] | |||
R1-1711819 | WF on PHR for different waveforms | other | LG Electronics, NTT DOCOMO, InterDigital |
R1-ah-18512 AI: 5.1.9.2 |
noted | [WTS] [JSN] | |||
R1-1711820 | [DRAFT] LS on support of multi-TRP transmission in NR |
LS out LS To: RAN2 revised to R1-1712000 |
Intel | NR_newRAT-Core | Rel-15 |
R1-ah-18512 AI: 5.1.2.1.6 |
revised | [WTS] [JSN] | |
R1-1711821 | WF on Configuration of UL Transmission without Grant | other | Ericsson |
R1-ah-18512 AI: 5.1.3.3.3 |
withdrawn | [WTS] [JSN] | |||
R1-1711822 | Design of combined-and-Nested polar code sequences |
other revision of R1-1710749 |
Samsung |
R1-ah-18512 AI: 5.1.4.2.2 |
noted | [WTS] [JSN] | |||
R1-1711823 | WF on pre-emption indication |
other revised to R1-1711911 |
Huawei, HiSilicon, MediaTek, Sequans, NTT DOCOMO, Sony, vivo, ZTE, InterDigital, III |
R1-ah-18512 AI: 5.1.3.3.7.1 |
revised | [WTS] [JSN] | |||
R1-1711824 | [DRAFT] LS on non-contiguous CA |
LS out LS To: RAN2, RAN4 |
AT&T | NR_newRAT-Core | Rel-15 |
R1-ah-18512 AI: 5.1.7 |
revised | [WTS] [JSN] | |
R1-1711825 | LS on non-contiguous CA |
LS out LS To: RAN2, RAN4 |
RAN1, AT&T | NR_newRAT-Core | Rel-15 |
R1-ah-18512 AI: 5.1.7 |
approved | [WTS] [JSN] | |
R1-1711826 | WF on interleaver design on NR polar codes | other | LG Electronics |
R1-ah-18512 AI: 5.1.4.2.2 |
withdrawn | [WTS] [JSN] | |||
R1-1711827 | WF on Capacity Enhancement for option 1 of PRACH preamble | other | LG Electronics, ITL |
R1-ah-18512 AI: 5.1.1.4.2 |
noted | [WTS] [JSN] | |||
R1-1711828 | WF on RACH power control | other | LG Electronics, ETRI |
R1-ah-18512 AI: 5.1.1.4.3 |
available | [WTS] [JSN] | |||
R1-1711829 | Offline discussions on UL data transmission without grant | other | NTT DOCOMO |
R1-ah-18512 AI: 5.1.3.3.3 |
noted | [WTS] [JSN] | |||
R1-1711830 | WF on UE-UE CLI measurement | other | Huawei, HiSilicon, ZTE, MediaTek, Intel, CMCC |
R1-ah-18512 AI: 5.1.6.1 |
noted | [WTS] [JSN] | |||
R1-1711831 | WF on pi/2 BPSK with spectrum shaping | other | IITH, ATT, Qualcomm, Deutsche Telekom, IITM, Reliance Jio, Samsung, Thales, INL, CEWiT, Tejas Networks, DISH, Sony |
R1-ah-18512 AI: 5.1.5 |
noted | [WTS] [JSN] | |||
R1-1711832 | WF on Pre-DFT Multiplexing of RS and UCI in short duration PUCCH | other | IITH |
R1-ah-18512 AI: 5.1.3.2.1.2 |
available | [WTS] [JSN] | |||
R1-1711833 | WF on waveform for long duration PUCCH | other | IITH, ATT, Deutsche Telekom, IITM, Reliance Jio, DISH, Thales, CEWiT, Tejas Networks, Sony, INL |
R1-ah-18512 AI: 5.1.3.2.2.2 |
available | [WTS] [JSN] | |||
R1-1711834 | WF on Long PUCCH Format with 1-2 UCI bits |
other revised to R1-1711912 |
Ericsson, Huawei, HiSilicon, LG, ZTE, MediaTek, Panasonic, WILUS Inc., Intel, Vivo,Cohere Technologies, ETRI, Motorola mobility, Lenovo, CATT |
R1-ah-18512 AI: 5.1.3.2.2 |
revised | [WTS] [JSN] | |||
R1-1711835 | WF on Frequency Hopping for Long PUCCH | other | Ericsson, MediaTek, Qualcomm, Panasonic, Intel, LG, NTT DOCOMO, Cohere Technologies, WILUS Inc., Huawei, HiSilicon, Samsung |
R1-ah-18512 AI: 5.1.3.2.2 |
noted | [WTS] [JSN] | |||
R1-1711836 | WF on scheduling request for NR | other | Idaho National Laboratory, KDDI, Lenovo, Motorola Mobility, IITH, CEWIT, IITM, Tejas Networks, Qualcomm |
R1-ah-18512 AI: 5.1.3.3.2 |
available | [WTS] [JSN] | |||
R1-1711837 | Open issues on SRS design |
discussion revision of R1-1711755 revised to R1-1711951 |
Sony |
R1-ah-18512 AI: 5.1.2.4.5 |
revised | [WTS] [JSN] | |||
R1-1711838 | WF on Beam Reporting | other | Intel, Huawei, HiSilicon, InterDigital, CATT |
R1-ah-18512 AI: 5.1.2.2.1 |
available | [WTS] [JSN] | |||
R1-1711839 | LS on subcarrier alignment and channel raster |
LS out LS To: RAN4 revision of R1-1711779 |
RAN1, AT&T | NR_newRAT-Core | Rel-15 |
R1-ah-18512 AI: 5.1.8 |
approved | [WTS] [JSN] | |
R1-1711840 | WF on Frequency Hopping for Multi-slot Long PUCCH | other | LG Electronics |
R1-ah-18512 AI: 5.1.3.2.2.3 |
available | [WTS] [JSN] | |||
R1-1711841 | Summary of views on resource for PDSCH and PUSCH rate matching | other | LG Electronics |
R1-ah-18512 AI: 5.1.2.1.7 |
noted | [WTS] [JSN] | |||
R1-1711842 | WF on UE-to-UE crosslink measurement | other | CMCC, Spreadtrum |
R1-ah-18512 AI: 5.1.6.1 |
noted | [WTS] [JSN] | |||
R1-1711843 | Outputs of offline discussion on RBG size/number determination |
other revision of R1-1711689 |
OPPO, Nokia, LGE, Samsung, vivo, ZTE, CATR |
R1-ah-18512 AI: 5.1.3.3.1.1 |
noted | [WTS] [JSN] | |||
R1-1711844 | WF on the number of CBGs | other | OPPO |
R1-ah-18512 AI: 5.1.3.3.4.1 |
available | [WTS] [JSN] | |||
R1-1711845 | Summary of AI 5.1.2.1.4 Diversity transmission for UL | other | Mitsubishi Electric |
R1-ah-18512 AI: 5.1.2.1.4 |
noted | [WTS] [JSN] | |||
R1-1711846 | WF on NR CA | other | Huawei, HiSilicon, KT, CATR, MediaTek, Nokia, ASB, Ericsson, Intel |
R1-ah-18512 AI: 5.1.3.4.1 |
noted | [WTS] [JSN] | |||
R1-1711847 | WF on SRS switching | other | Huawei, HiSilicon |
R1-ah-18512 AI: 5.1.3.4.1.2 |
available | [WTS] [JSN] | |||
R1-1711848 | WF on handling of single UL transmision |
other revision of R1-1711705 |
NTT DOCOMO, Apple |
R1-ah-18512 AI: 5.1.8 |
noted | [WTS] [JSN] | |||
R1-1711849 | WF on Preamble sequence for capacity enhancement | other | Huawei, HiSilicon |
R1-ah-18512 AI: 5.1.1.4.2 |
noted | [WTS] [JSN] | |||
R1-1711850 | WF for NR RLM | other | CATT |
R1-ah-18512 AI: 5.1.1.5.3 |
noted | [WTS] [JSN] | |||
R1-1711851 | WF on inter-gNB signaling for cross-link interference management | other | LG Electronics |
R1-ah-18512 AI: 5.1.6.1 |
noted | [WTS] [JSN] | |||
R1-1711852 | WF on SRS sequence design | other | Ericsson, Huawei, HiSilicon, Nokia, ASB, Panasonic, NTT DOCOMO |
R1-ah-18512 AI: 5.1.2.4.5 |
noted | [WTS] [JSN] | |||
R1-1711853 | Activation/deactivation of bandwidth parts | other | Ericsson |
R1-ah-18512 AI: 5.1.7 |
noted | [WTS] [JSN] | |||
R1-1711854 | WF on SS Burst set Composition |
other revised to R1-1711906 |
LG Electronics |
R1-ah-18512 AI: 5.1.1.1.2 |
revised | [WTS] [JSN] | |||
R1-1711855 | Way forward on PRB indexing |
other revision of R1-1711789 |
Intel, Sharp, Ericsson, MediaTek, NTT DOCOMO, Panasonic, Nokia, ASB, NEC, KT, ETRI |
R1-ah-18512 AI: 5.1.7 |
noted | [WTS] [JSN] | |||
R1-1711856 | WF on processing time requirements |
other revision of R1-1711772 revised to R1-1711957 |
Qualcomm, ZTE, Deutsche Telekom, Vodafone, Panasonic, Ericsson |
R1-ah-18512 AI: 5.1.3.3.6 |
revised | [WTS] [JSN] | |||
R1-1711857 | Summary of views on multi-TRP & multi-panel transmission |
other revision of R1-1711807 |
CATT |
R1-ah-18512 AI: 5.1.2.1.6 |
noted | [WTS] [JSN] | |||
R1-1711858 | WF on beam failure recovery request | other | LG Electronics, Intel, Huawei, HiSilcon, vivo |
R1-ah-18512 AI: 5.1.2.2.2 |
available | [WTS] [JSN] | |||
R1-1711859 | WF on SRS beam sweeping behavior | other | LG Electronics, Huawei, HiSilicon, Samsung, Ericsson |
R1-ah-18512 AI: 5.1.2.2.1 |
available | [WTS] [JSN] | |||
R1-1711860 | Evaluation of NR-SS | other | Huawei, HiSilicon |
R1-ah-18512 AI: 5.1.1.1.1 |
noted | [WTS] [JSN] | |||
R1-1711861 | WF on RACH power control mechanism Msg.1 transmission | other | LG Electronics, NTT DOCOMO |
R1-ah-18512 AI: 5.1.1.4.3 |
noted | [WTS] [JSN] | |||
R1-1711862 | WF on power sharing mechanism | other | NTT DOCOMO, InterDigital |
R1-ah-18512 AI: 5.1.9.1 |
noted | [WTS] [JSN] | |||
R1-1711863 | WF on NR power control framework | other | NTT DOCOMO INC., Nokia, Intel, InterDigital |
R1-ah-18512 AI: 5.1.9.2 |
noted | [WTS] [JSN] | |||
R1-1711864 | Measurement window periodicity, duration and offset of CSI-RS for L3 mobility | other | Qualcomm |
R1-ah-18512 AI: 5.1.1.5.2 |
noted | [WTS] [JSN] | |||
R1-1711865 | Multiple/repeated PRACH preamble transmission with OCC across preambles | other | Qualcomm, Interdigital, Samsung, AT&T, Verizon |
R1-ah-18512 AI: 5.1.1.4.2 |
noted | [WTS] [JSN] | |||
R1-1711866 | WF on RACH configuration in RMSI | other | Huawei, HiSilicon |
R1-ah-18512 AI: 5.1.1.4.4 |
noted | [WTS] [JSN] | |||
R1-1711867 | Observations on PBCH Signaling | other | Qualcomm |
R1-ah-18512 AI: 5.1.4.3 |
withdrawn | [WTS] [JSN] | |||
R1-1711868 | WF on DMRS indication |
other revised to R1-1711946 |
Samsung |
R1-ah-18512 AI: 5.1.1.1.3 |
revised | [WTS] [JSN] | |||
R1-1711869 | WF on collision avoidance between short PUCCH and SRS | other | Mitsubishi Electric, AT&T, Panasonic, Samsung, Huawei, HiSilicon, ZTE |
R1-ah-18512 AI: 5.1.2.4.5 |
noted | [WTS] [JSN] | |||
R1-1711870 | NR PRACH capacity enhancement | other | CATT, Huawei, TCL |
R1-ah-18512 AI: 5.1.1.4.2 |
noted | [WTS] [JSN] | |||
R1-1711871 | WF on radio link monitoring in NR |
other revision of R1-1711806 revised to R1-1711889 |
Huawei, HiSilicon, Qualcomm, ATT, NTT DOCOMO, Intel |
R1-ah-18512 AI: 5.1.1.5.3 |
revised | [WTS] [JSN] | |||
R1-1711872 | LS on UE self-interference |
LS out LS To: RAN4 |
RAN1, vivo | NR_newRAT-Core | Rel-15 |
R1-ah-18512 AI: 5.1.8 |
approved | [WTS] [JSN] | |
R1-1711873 | WF on initial bandwidth part | other | LG Electronics, Ericsson, MediaTek |
R1-ah-18512 AI: 5.1.7 |
noted | [WTS] [JSN] | |||
R1-1711874 | NR UL MIMO Signaling Mechanism | other | Ericsson, Nokia, Alcatel-Lucent Shanghai Bell, Qualcomm, CATT, ZTE |
R1-ah-18512 AI: 5.1.2.1.2 |
noted | [WTS] [JSN] | |||
R1-1711875 | WF on PRACH Preamble Format for Short sequence with Option 1 | other | LG Electronics, NTT DOCOMO |
R1-ah-18512 AI: 5.1.1.4.1 |
noted | [WTS] [JSN] | |||
R1-1711876 | WF on multiple Msg1 transmission for contention free case | other | Samsung, Huawei, Hisilicon, MediaTek, ZTE |
R1-ah-18512 AI: 5.1.1.4.4 |
noted | [WTS] [JSN] | |||
R1-1711877 | [DRAFT] LS on single UL transmission |
LS out LS To: RAN2, RAN3, RAN4 |
NTT DOCOMO | NR_newRAT-Core | Rel-15 |
R1-ah-18512 AI: 5.1.8 |
revised | [WTS] [JSN] | |
R1-1711878 | LS on single UL transmission |
LS out LS To: RAN2, RAN3, RAN4 |
RAN1, NTT DOCOMO | NR_newRAT-Core | Rel-15 |
R1-ah-18512 AI: 5.1.8 |
approved | [WTS] [JSN] | |
R1-1711879 | [DRAFT] LS on Beam Aspects of NR RACH |
LS out LS To: RAN2 revision of R1-1711684 revised to R1-1711880 |
Huawei | NR_newRAT-Core | Rel-15 |
R1-ah-18512 AI: 5.1 |
revised | [WTS] [JSN] | |
R1-1711880 | LS on Beam Aspects of NR RACH |
LS out LS To: RAN2 revision of R1-1711879 |
RAN1, Huawei | NR_newRAT-Core | Rel-15 |
R1-ah-18512 AI: 5.1 |
approved | [WTS] [JSN] | |
R1-1711881 | Summary of Issues and WFs on Codebook based transmission for UL |
discussion revision of R1-1711674 |
Intel |
R1-ah-18512 AI: 5.1.2.1.2 |
noted | [WTS] [JSN] | |||
R1-1711882 | WF on use of SS blocks in beam management | other | Qualcomm |
R1-ah-18512 AI: 5.1.2.2.1 |
withdrawn | [WTS] [JSN] | |||
R1-1711883 | WF on CBG retransmission |
other revised to R1-1711958 |
Samsung |
R1-ah-18512 AI: 5.1.3.3.4 |
revised | [WTS] [JSN] | |||
R1-1711884 | Summary of issues on UL non-codebook based transmission | other | Nokia, Alcatel-Lucent Shanghai Bell |
R1-ah-18512 AI: 5.1.2.1.3 |
noted | [WTS] [JSN] | |||
R1-1711885 | WF on change of SS block frequency position | other | CMCC |
R1-ah-18512 AI: 5.1.7 |
available | [WTS] [JSN] | |||
R1-1711886 | TS38.211 v0.0.2 NR; Physical channels and modulation |
draft TS revision of R1-1711366 revised to R1-1712004 |
Ericsson LM | NR_newRAT-Core | Rel-15 |
R1-ah-18512 AI: 5.1 |
revised | [WTS] [JSN] | |
R1-1711887 | WF on 2-symbol NR-PUCCH | other | LG Electronics |
R1-ah-18512 AI: 5.1.3.2.1.2 |
available | [WTS] [JSN] | |||
R1-1711888 | WF on m0 and m1 for NR-SSS | other | NTT DOCOMO, ITL, Intel, Samsung, InterDigital, Motorola Mobility, Lenovo |
R1-ah-18512 AI: 5.1.1.1.1 |
agreed | [WTS] [JSN] | |||
R1-1711889 | WF on radio link monitoring in NR |
other revision of R1-1711871 |
Huawei, HiSilicon, Qualcomm, ATT, NTT DOCOMO, Intel, Vivo, LGE |
R1-ah-18512 AI: 5.1.1.5.3 |
noted | [WTS] [JSN] | |||
R1-1711890 | WF on UL frequency selective precoding in UL non-codebook based transmission | other | Huawei, HiSilicon, LG Electronics |
R1-ah-18512 AI: 5.1.2.1.3 |
available | [WTS] [JSN] | |||
R1-1711891 | WF on PT-RS for DFT-S-OFDM | other | Samsung, Intel, CATT |
R1-ah-18512 AI: 5.1.2.4.4 |
noted | [WTS] [JSN] | |||
R1-1711892 | Reply LS on PBCH content |
LS in LS is reply to R1-1709789 source LS: R2-1707490 LS To: RAN1 |
RAN2, Huawei | NR_newRAT-Core | Rel-15 |
R1-ah-18512 AI: 4 |
treated | [WTS] [JSN] | |
R1-1711893 | Offline discussions summary on CSI framework | other | AT&T |
R1-ah-18512 AI: 5.1.2.3.1 |
noted | [WTS] [JSN] | |||
R1-1711894 | WF on remaining issues on PTRS for CP-OFDM - Part 1 | other | Huawei, HiSilicon, InterDigital, Xinwei, NI, Panasonic |
R1-ah-18512 AI: 5.1.2.4.4 |
noted | [WTS] [JSN] | |||
R1-1711895 | WF on remaining issues on PTRS for CP-OFDM - Part 2 | other | Huawei, HiSilicon, InterDigital, Xinwei, Intel, NI, Panasonic, Spreadtrum |
R1-ah-18512 AI: 5.1.2.4.4 |
noted | [WTS] [JSN] | |||
R1-1711896 | WF on UE assistance information for UL beam mangement | other | MediaTek, Samsung, Intel |
R1-ah-18512 AI: 5.1.2.2.1 |
available | [WTS] [JSN] | |||
R1-1711897 | Offline discussion summary on beam recovery | other | MediaTek |
R1-ah-18512 AI: 5.1.2.2.2 |
noted | [WTS] [JSN] | |||
R1-1711898 | [DRAFT] LS on power sharing for LTE-NR Dual Connectivity |
LS out LS To: RAN4 revised to R1-1711999 |
Ericsson | NR_newRAT-Core | Rel-15 |
R1-ah-18512 AI: 5.1.9.1 |
revised | [WTS] [JSN] | |
R1-1711899 | Way forward on the mapping of SS blocks |
other revision of R1-1711678 |
Nokia |
R1-ah-18512 AI: 5.1.1.1.2 |
noted | [WTS] [JSN] | |||
R1-1711900 | WF on remaining issues on CSI-RS for mobility with RAN4 impact | other | Ericsson |
R1-ah-18512 AI: 5.1.1.5.2 |
available | [WTS] [JSN] | |||
R1-1711901 | WF on remaining RLM issues with RAN4 impact | other | Ericsson |
R1-ah-18512 AI: 5.1.1.5.3 |
available | [WTS] [JSN] | |||
R1-1711902 | WF on CSI-RS resources for L3 mobility | other | Ericsson |
R1-ah-18512 AI: 5.1.1.5.2 |
available | [WTS] [JSN] | |||
R1-1711903 | WF on SRS for UL beam management | other | OPPO, Intel, Samsung, Xinwei |
R1-ah-18512 AI: 5.1.2.2.1 |
available | [WTS] [JSN] | |||
R1-1711904 | Summary of views on CSI feedback for Type I and Type II | other | Ericsson |
R1-ah-18512 AI: 5.1.2.3.4 |
noted | [WTS] [JSN] | |||
R1-1711905 | Summary of CSI Feedback for Open-loop/Semi-open-loop | other | Ericsson |
R1-ah-18512 AI: 5.1.2.3.4 |
noted | [WTS] [JSN] | |||
R1-1711906 | WF on SS Burst set Composition |
other revision of R1-1711854 |
LG Electronics, Nokia, InterDigital, British Telecom |
R1-ah-18512 AI: 5.1.1.1.2 |
noted | [WTS] [JSN] | |||
R1-1711907 | Draft Reply LS on reading time index indication for RRM measurements |
LS out LS is reply to R2-170215 LS To: RAN2 revision of R1-1710500 revised to R1-1711966 |
Intel Corporation | NR_newRAT-Core | Rel-15 |
R1-ah-18512 AI: 4 |
revised | [WTS] [JSN] | |
R1-1711908 | Reserved resource for forward compatibility | other | Ericsson |
R1-ah-18512 AI: 5.1.11 |
available | [WTS] [JSN] | |||
R1-1711909 | [DRAFT] LS response on required parameters from RAN4 perspective |
LS out LS To: RAN4 revised to R1-1711975 |
Ericsson | NR_newRAT-Core | Rel-15 |
R1-ah-18512 AI: 5.1.5 |
revised | [WTS] [JSN] | |
R1-1711910 | [DRAFT] Reply LS on PDCCH design |
LS out LS To: RAN2 revised to R1-1711931 |
Ericsson, CATT | NR_newRAT-Core | Rel-15 |
R1-ah-18512 AI: 5.1.3.1 |
revised | [WTS] [JSN] | |
R1-1711911 | WF on pre-emption indication |
other revision of R1-1711823 |
Huawei, HiSilicon, MediaTek, Sequans, NTT DOCOMO, Sony, vivo, ZTE, InterDigital, III, Intel, LGE, Samsung |
R1-ah-18512 AI: 5.1.3.3.7.1 |
noted | [WTS] [JSN] | |||
R1-1711912 | WF on Long PUCCH Format with 1-2 UCI bits |
other revision of R1-1711834 |
Ericsson, Huawei, HiSilicon, LG, ZTE, MediaTek, Panasonic, WILUS Inc., Intel, Vivo,Cohere Technologies, ETRI, Motorola mobility, Lenovo, CATT, Qualcomm |
R1-ah-18512 AI: 5.1.3.2.2 |
noted | [WTS] [JSN] | |||
R1-1711913 | WF on introduction indication in SS block for cell update | other | CMCC |
R1-ah-18512 AI: 5.1.7 |
noted | [WTS] [JSN] | |||
R1-1711914 | Overview of WFs on PTRS | other | Ericsson |
R1-ah-18512 AI: 5.1.2.4.4 |
noted | [WTS] [JSN] | |||
R1-1711915 | WF on PTRS multiplexing with other RSs for CP-OFDM |
other revised to R1-1711986 |
ZTE |
R1-ah-18512 AI: 5.1.2.4.1 |
revised | [WTS] [JSN] | |||
R1-1711916 | Chairman's notes of AI 5.1.2 MIMO | other | Ad-Hoc chair (Qualcomm) |
R1-ah-18512 AI: 5.1.2 |
endorsed | [WTS] [JSN] | |||
R1-1711917 | Chairman's notes of AI 5.1.4 Channel coding | other | Ad-Hoc chair (Nokia) |
R1-ah-18512 AI: 5.1.4 |
endorsed | [WTS] [JSN] | |||
R1-1711918 | Chairman's notes of AI 5.1.6 Duplexing | other | Ad-Hoc chair (Qualcomm) |
R1-ah-18512 AI: 5.1.6 |
endorsed | [WTS] [JSN] | |||
R1-1711919 | Chairman's notes of AI 5.1.8 NR-LTE co-existence | other | Ad-Hoc chair (Qualcomm) |
R1-ah-18512 AI: 5.1.8 |
endorsed | [WTS] [JSN] | |||
R1-1711920 | WF on SRS design in NR |
other revision of R1-1711699 |
LG Electronics, CATT, Intel Corp., KT Corp., Qualcomm |
R1-ah-18512 AI: 5.1.2.4.5 |
noted | [WTS] [JSN] | |||
R1-1711921 | WF on PDCCH and PDSCH resource sharing | other | ZTE, Nokia, Ericsson, LG, Panasonic, Qualcomm, Sharp |
R1-ah-18512 AI: 5.1.3.1.3 |
noted | [WTS] [JSN] | |||
R1-1711922 | WF on CSI-RS for BM | other | Intel, Ericsson, CATT, Samsung, MediaTek, AT&T, NTT Docomo, KT |
R1-ah-18512 AI: 5.1.2.4.2 |
noted | [WTS] [JSN] | |||
R1-1711923 | WF on CSI-RS for BM | other | Samsung, Intel, AT&T, NTT DOCOMO, ZTE |
R1-ah-18512 AI: 5.1.2.4.2 |
noted | [WTS] [JSN] | |||
R1-1711924 | Summary of CSI Acquisition Details |
other revision of R1-1711798 |
NTT DOCOMO |
R1-ah-18512 AI: 5.1.2.3.2 |
noted | [WTS] [JSN] | |||
R1-1711925 | Remaining part of email summary for UL transmission without UL grant | other | LG Electronics |
R1-ah-18512 AI: 5.1.3.3.3 |
withdrawn | [WTS] [JSN] | |||
R1-1711926 | WF on PT-RS pattern in the frequency domain |
other revised to R1-1711932 |
LG Electronics |
R1-ah-18512 AI: 5.1.2.4.4 |
revised | [WTS] [JSN] | |||
R1-1711927 | WF on gNB response for beam failure request | other | Huawei, HiSilicon, LG Electronics, Intel |
R1-ah-18512 AI: 5.1.2.2.2 |
available | [WTS] [JSN] | |||
R1-1711928 | WF on PRACH for beam failure recovery request transmission | other | Huawei, HiSilicon, LG Electronics, Ericsson, CATT, NTT DOCOMO |
R1-ah-18512 AI: 5.1.2.2.2 |
available | [WTS] [JSN] | |||
R1-1711929 | WF on Beam Reporting | other | Huawei, HiSilicon, Samsung, Intel, Nokia, Oppo, National Instruments |
R1-ah-18512 AI: 5.1.2.2.1 |
available | [WTS] [JSN] | |||
R1-1711930 | WF on SRS Configuration | other | Huawei, HiSilicon, OPPO |
R1-ah-18512 AI: 5.1.2.4.5 |
noted | [WTS] [JSN] | |||
R1-1711931 | [DRAFT] Reply LS on PDCCH design |
LS out LS To: RAN2 revision of R1-1711910 revised to R1-1711972 |
Ericsson, CATT | NR_newRAT-Core | Rel-15 |
R1-ah-18512 AI: 5.1.3.1 |
revised | [WTS] [JSN] | |
R1-1711932 | WF on PT-RS pattern in the frequency domain |
other revision of R1-1711926 |
LG Electronics |
R1-ah-18512 AI: 5.1.2.4.4 |
noted | [WTS] [JSN] | |||
R1-1711933 | WF on HARQ-ACK multiplexing for NR | other | LG Electronics |
R1-ah-18512 AI: 5.1.3.3.5.2 |
available | [WTS] [JSN] | |||
R1-1711934 | WF on HARQ-ACK bundling for NR | other | LG Electronics |
R1-ah-18512 AI: 5.1.3.3.5.2 |
available | [WTS] [JSN] | |||
R1-1711935 | Summary of Open Issues on Layer Mapping |
discussion revision of R1-1711635 |
Samsung | Rel-15 |
R1-ah-18512 AI: 5.1.2.1.1 |
noted | [WTS] [JSN] | ||
R1-1711936 | WF on CSI-RS based RACH configuration | other | Samsung, Ericsson, ZTE, Mediatek Mitsubishi, MTI |
R1-ah-18512 AI: 5.1.1.4.4 |
noted | [WTS] [JSN] | |||
R1-1711937 | Circulant permutation matrix design for LDPC codes |
discussion revision of R1-1711774 |
LG Electronics | Rel-15 |
R1-ah-18512 AI: 5.1.4.1.2 |
withdrawn | [WTS] [JSN] | ||
R1-1711938 | Circulant permutation matrix design for LDPC codes base graph #2 |
discussion revision of R1-1711775 |
LG Electronics | Rel-15 |
R1-ah-18512 AI: 5.1.4.1.2 |
withdrawn | [WTS] [JSN] | ||
R1-1711939 | WF on the mapping of SS blocks with 30kHz SCS | other | Huawei, HiSilicon, CATT, CATR, OPPO, MediaTek, Vivo |
R1-ah-18512 AI: 5.1.1.1.2 |
noted | [WTS] [JSN] | |||
R1-1711940 | LS to RAN1 on NR basic handover |
LS in source LS: R2-1707503 LS To: RAN1 |
RAN2, Ericsson | NR_newRAT-Core | Rel-15 |
R1-ah-18512 AI: 4 |
treated | [WTS] [JSN] | |
R1-1711941 | Way Forward on PTRS |
other revision of R1-1711688 |
Intel, Huawei, HiSilicon, National Instruments, MediaTek |
R1-ah-18512 AI: 5.1.2.4.4 |
noted | [WTS] [JSN] | |||
R1-1711942 | WF on periodic CSI reporting on short PUCCH | other | Ericsson, Samsung, Huawei, HiSilicon, CATT |
R1-ah-18512 AI: 5.1.2.3.4 |
available | [WTS] [JSN] | |||
R1-1711943 | Discussion on DMRS sequence for NR PBCH | other | Intel |
R1-ah-18512 AI: 5.1.1.2.3 |
noted | [WTS] [JSN] | |||
R1-1711944 | Observations on LDPC Shift Coefficients | other | Qualcomm |
R1-ah-18512 AI: 5.1.4.1.2 |
noted | [WTS] [JSN] | |||
R1-1711945 | WF on random access association configuration |
other revision of R1-1711799 |
ZTE |
R1-ah-18512 AI: 5.1.1.4.4 |
noted | [WTS] [JSN] | |||
R1-1711946 | WF on DMRS indication |
other revision of R1-1711868 |
Samsung |
R1-ah-18512 AI: 5.1.1.1.3 |
noted | [WTS] [JSN] | |||
R1-1711947 | Chairman's notes of AI 5.1.9 UL Power Control | other | Ad-Hoc chair (Qualcomm) |
R1-ah-18512 AI: 5.1.9 |
endorsed | [WTS] [JSN] | |||
R1-1711948 | [Draft] LS on bandwidth part operation in NR |
LS out LS To: RAN2, RAN4 revised to R1-1711989 |
MediaTek | NR_newRAT-Core | Rel-15 |
R1-ah-18512 AI: 5.1.7 |
revised | [WTS] [JSN] | |
R1-1711949 | Reply LS to RAN1 on UL data transmission without UL grant for NR |
LS in LS is reply to R1-1709805 source LS: R2-1707499 LS To: RAN1 |
RAN2, Huawei | NR_newRAT-Core | Rel-15 |
R1-ah-18512 AI: 4 |
postponed | [WTS] [JSN] | |
R1-1711950 | LS to RAN1 on Random Access |
LS in source LS: R2-1707504 LS To: RAN1 LS reply in R1-1714227, R1-1715258, R1-1715314, R1-1715315 |
RAN2, Samsung | NR_newRAT-Core | Rel-15 |
R1-ah-18512 AI: 4 |
treated | [WTS] [JSN] | |
R1-1711951 | Open issues on SRS design |
discussion revision of R1-1711837 |
Sony |
R1-ah-18512 AI: 5.1.2.4.5 |
noted | [WTS] [JSN] | |||
R1-1711952 | Performance evaluation of interference randomization | discussion | Qualcomm Inc. |
R1-ah-18512 AI: 5.1.1.1.3 |
noted | [WTS] [JSN] | |||
R1-1711953 | Evaluation of proposed PCMs for BG#1 | discussion | Huawei, HiSilicon |
R1-ah-18512 AI: 5.1.4.1.2 |
withdrawn | [WTS] [JSN] | |||
R1-1711954 | Evaluation of proposed PCMs for BG#2 | discussion | Huawei, HiSilicon |
R1-ah-18512 AI: 5.1.4.1.2 |
withdrawn | [WTS] [JSN] | |||
R1-1711955 | Ranking of proposed PCMs for BG#1 and BG#2 based on evaluation results | discussion | Huawei, HiSilicon |
R1-ah-18512 AI: 5.1.4.1.2 |
withdrawn | [WTS] [JSN] | |||
R1-1711956 | On Pi/2-BPSK with spectrum shaping | discussion | Ericsson |
R1-ah-18512 AI: 5.1.5 |
noted | [WTS] [JSN] | |||
R1-1711957 | WF on processing time requirements |
other revision of R1-1711856 |
Qualcomm |
R1-ah-18512 AI: 5.1.3.3.6 |
noted | [WTS] [JSN] | |||
R1-1711958 | WF on CBG retransmission |
other revision of R1-1711883 |
Samsung, ZTE |
R1-ah-18512 AI: 5.1.3.3.4 |
noted | [WTS] [JSN] | |||
R1-1711959 | WF on DL PRB bundling |
other revised to R1-1711990 |
Xinwei |
R1-ah-18512 AI: 5.1.2.1.5 |
revised | [WTS] [JSN] | |||
R1-1711960 | Summary on DL PRB bundling |
discussion revision of R1-1711780 |
Xinwei |
R1-ah-18512 AI: 5.1.2.1.5 |
noted | [WTS] [JSN] | |||
R1-1711961 | WF on the false alarm rate target of eMBB DCI | other | Panasonic, Qualcomm, Intel, NTT DOCOMO |
R1-ah-18512 AI: 5.1.3.1.1 |
withdrawn | [WTS] [JSN] | |||
R1-1711962 | Way Forward on network-based beam failure recovery | other | Huawei, HiSilicon |
R1-ah-18512 AI: 5.1.2.2.3 |
available | [WTS] [JSN] | |||
R1-1711963 | Crosscheck Results for PCM of BG1 | discussion | Samsung |
R1-ah-18512 AI: 5.1.4.1.2 |
available | [WTS] [JSN] | |||
R1-1711964 | Crosscheck Results for PCM of BG2 | discussion | Samsung |
R1-ah-18512 AI: 5.1.4.1.2 |
available | [WTS] [JSN] | |||
R1-1711965 | Beam management offline summary | discussion | Qualcomm |
R1-ah-18512 AI: 5.1.2.2.1 |
noted | [WTS] [JSN] | |||
R1-1711966 | Reply LS on reading time index indication for RRM measurements |
LS out LS is reply to R2-1706160 LS To: RAN2 revision of R1-1711907 |
RAN1, Intel | NR_newRAT-Core | Rel-15 |
R1-ah-18512 AI: 4 |
approved | [WTS] [JSN] | |
R1-1711967 | Timing information indicated by DMRS | other | ZTE |
R1-ah-18512 AI: 5.1.1.1.3 |
noted | [WTS] [JSN] | |||
R1-1711968 | [DRAFT] Reply LS response on NR basic handover |
LS out LS is reply to R2-1707503 LS To: RAN2 revised to R1-1711987 |
Samsung | NR_newRAT-Core | Rel-15 |
R1-ah-18512 AI: 4 |
revised | [WTS] [JSN] | |
R1-1711969 | Offline discussions on UL data transmission without grant | discussion | NTT DOCOMO |
R1-ah-18512 AI: 5.1.3.3.3 |
noted | [WTS] [JSN] | |||
R1-1711970 | WF on RACH preamble format for short sequence with 1 and 2 OFDM symbols | other | Nokia, Alcatel-Lucent Shanghai Bell |
R1-ah-18512 AI: 5.1.1.4.1 |
available | [WTS] [JSN] | |||
R1-1711971 | WF on QCL assumption in NR | other | ZTE, ASTRI, Nokia, ASB |
R1-ah-18512 AI: 5.1.2.4.7 |
available | [WTS] [JSN] | |||
R1-1711972 | [DRAFT] Reply LS on PDCCH design |
LS out LS To: RAN2 revision of R1-1711931 revised to R1-1711992 |
Ericsson, CATT | NR_newRAT-Core | Rel-15 |
R1-ah-18512 AI: 5.1.3.1 |
revised | [WTS] [JSN] | |
R1-1711973 | WF on CSI-RS for BM | other | Intel, Ericsson, Spreadtrum, MediaTek, Samsung, Verizon |
R1-ah-18512 AI: 5.1.2.4.2 |
available | [WTS] [JSN] | |||
R1-1711974 | Summary of views on multiplexing of different types of RS | other | Huawei, HiSilicon |
R1-ah-18512 AI: 5.1.2.4.1 |
noted | [WTS] [JSN] | |||
R1-1711975 | LS response on required parameters from RAN4 perspective |
LS out LS is reply to R4-1704216 LS To: RAN4 revision of R1-1711909 |
RAN1, Ericsson | NR_newRAT-Core | Rel-15 |
R1-ah-18512 AI: 5.1.5 |
approved | [WTS] [JSN] | |
R1-1711976 | WF on CSI-RS for beam management | other | NTT DOCOMO, Ericsson, Samsung |
R1-ah-18512 AI: 5.1.2.4.2 |
noted | [WTS] [JSN] | |||
R1-1711977 | Sequence construction of Polar codes for control channel |
other revision of R1-1711218 |
Qualcomm Incorporated | NR_newRAT-Core | Rel-15 |
R1-ah-18512 AI: 5.1.4.2.2 |
withdrawn | [WTS] [JSN] | |
R1-1711978 | LDPC rate compatible design |
other revision of R1-1711213 |
Qualcomm Incorporated | NR_newRAT-Core | Rel-15 |
R1-ah-18512 AI: 5.1.4.1.2 |
available | [WTS] [JSN] | |
R1-1711979 | Performance cross-check for PCMs of NR LDPC BG1 and BG2 | other | MediaTek |
R1-ah-18512 AI: 5.1.4.1.2 |
withdrawn | [WTS] [JSN] | |||
R1-1711980 | Performance with L1 CRC polynomial | other | Qualcomm Incorporated |
R1-ah-18512 AI: 5.1.4.2.1 |
noted | [WTS] [JSN] | |||
R1-1711981 | WF on group common pre-emption indication | other | Huawei, HiSilicon, Sharp, ZTE, LGE, Sony, Panasonic, MediaTek, InterDigital |
R1-ah-18512 AI: 5.1.3.3.7.1 |
noted | [WTS] [JSN] | |||
R1-1711982 | WF on LDPC parity check matrices | other | Nokia |
R1-ah-18512 AI: 5.1.4.1.2 |
noted | [WTS] [JSN] | |||
R1-1711983 | WF on Polar Code Construction With PC bits | other | Huawei, HiSilicon, CATT, MTK, ZTE, DCM, Accelercomm, Coherentlogix, LG, Spreadtrum, Interdigital, Nokia |
R1-ah-18512 AI: 5.1.4.2.1 |
noted | [WTS] [JSN] | |||
R1-1711984 | [DRAFT] LS on NR initial access and mobility |
LS out LS To: RAN2 revised to R1-1712001 |
NTT DOCOMO | NR_newRAT-Core | Rel-15 |
R1-ah-18512 AI: 5.1.1 |
revised | [WTS] [JSN] | |
R1-1711985 | [DRAFT] LS on NR initial access and mobility |
LS out LS To: RAN4 revised to R1-1712002 |
NTT DOCOMO | NR_newRAT-Core | Rel-15 |
R1-ah-18512 AI: 5.1.1 |
revised | [WTS] [JSN] | |
R1-1711986 | WF on PTRS multiplexing with other RSs for CP-OFDM |
other revision of R1-1711915 |
ZTE |
R1-ah-18512 AI: 5.1.2.4.1 |
available | [WTS] [JSN] | |||
R1-1711987 | Reply LS response on NR basic handover |
LS out LS is reply to R2-1707503 LS To: RAN2 revision of R1-1711968 |
RAN1, Samsung | NR_newRAT-Core | Rel-15 |
R1-ah-18512 AI: 4 |
approved | [WTS] [JSN] | |
R1-1711988 | WF on beam indication for PDCCH | other | Samsung |
R1-ah-18512 AI: 5.1.2.2.3 |
available | [WTS] [JSN] | |||
R1-1711989 | [Draft] LS on bandwidth part operation in NR |
LS out LS To: RAN2, RAN4 revision of R1-1711948 revised to R1-1711998 |
MediaTek | NR_newRAT-Core | Rel-15 |
R1-ah-18512 AI: 5.1.7 |
revised | [WTS] [JSN] | |
R1-1711990 | WF on DL PRB bundling |
other revision of R1-1711959 |
Xinwei |
R1-ah-18512 AI: 5.1.2.1.5 |
noted | [WTS] [JSN] | |||
R1-1711991 | WF on contents of the group-common PDCCH | other | CATT, NEC |
R1-ah-18512 AI: 5.1.3.1.4 |
noted | [WTS] [JSN] | |||
R1-1711992 | [DRAFT] Reply LS on PDCCH design |
LS out LS To: RAN2 revision of R1-1711972 revised to R1-1712005 |
Ericsson, CATT | NR_newRAT-Core | Rel-15 |
R1-ah-18512 AI: 5.1.3.1 |
revised | [WTS] [JSN] | |
R1-1711993 | WF on UE behavior for reserved resource |
other revised to R1-1712006 |
Samsung |
R1-ah-18512 AI: 5.1.3.1.1 |
revised | [WTS] [JSN] | |||
R1-1711994 | WF on UE power saving with PDCCH monitoring in CDRX | other | Qualcomm |
R1-ah-18512 AI: 5.1.3.1.6 |
available | [WTS] [JSN] | |||
R1-1711995 | WF on the content of the long PUCCH resource configuration | other | Ericsson |
R1-ah-18512 AI: 5.1.3.2.4 |
available | [WTS] [JSN] | |||
R1-1711996 | WF on long PUCCH Format for more than 2 UCI bits with multi-user multiplexing | other | Ericsson |
R1-ah-18512 AI: 5.1.3.2.2 |
available | [WTS] [JSN] | |||
R1-1711997 | Response LS on Support for fake gNB detection mechanisms |
LS out LS is reply to S3-171568 LS To: SA3 revision of R1-1711657 |
RAN1, Nokia | NR_newRAT-Core | Rel-15 |
R1-ah-18512 AI: 4 |
approved | [WTS] [JSN] | |
R1-1711998 | LS on bandwidth part operation in NR |
LS out LS To: RAN2, RAN4 revision of R1-1711989 |
RAN1, MediaTek | NR_newRAT-Core | Rel-15 |
R1-ah-18512 AI: 5.1.7 |
approved | [WTS] [JSN] | |
R1-1711999 | LS on power sharing for LTE-NR Dual Connectivity |
LS out LS To: RAN4 revision of R1-1711898 |
RAN1, Ericsson | NR_newRAT-Core | Rel-15 |
R1-ah-18512 AI: 5.1.9.1 |
approved | [WTS] [JSN] | |
R1-1712000 | LS on support of multi-TRP transmission in NR |
LS out LS To: RAN2 revision of R1-1711820 |
RAN1, Intel | NR_newRAT-Core | Rel-15 |
R1-ah-18512 AI: 5.1.2.1.6 |
approved | [WTS] [JSN] | |
R1-1712001 | LS on NR initial access and mobility |
LS out LS To: RAN2 revision of R1-1711984 |
RAN1, NTT DOCOMO | NR_newRAT-Core | Rel-15 |
R1-ah-18512 AI: 5.1.1 |
approved | [WTS] [JSN] | |
R1-1712002 | LS on NR initial access and mobility |
LS out LS To: RAN4 LS reply in R4-1708275 revision of R1-1711985 |
RAN1, NTT DOCOMO | NR_newRAT-Core | Rel-15 |
R1-ah-18512 AI: 5.1.1 |
approved | [WTS] [JSN] | |
R1-1712003 | [DRAFT] Reply LS on CSI-RS design for beam management |
LS out LS is reply to R4-1704216 LS To: RAN4 revised to R1-1712009 |
NTT DOCOMO | NR_newRAT-Core | Rel-15 |
R1-ah-18512 AI: 5.1.2.4.2 |
revised | [WTS] [JSN] | |
R1-1712004 | TS38.211 v0.1.0 NR; Physical channels and modulation |
draft TS revision of R1-1711886 revised to R1-1712011 |
Ericsson LM | NR_newRAT-Core | Rel-15 |
R1-ah-18512 AI: 5.1 |
endorsed | [WTS] [JSN] | |
R1-1712005 | Reply LS on PDCCH design |
LS out LS To: RAN2 revision of R1-1711992 |
RAN1, Ericsson, CATT | NR_newRAT-Core | Rel-15 |
R1-ah-18512 AI: 5.1.3.1 |
approved | [WTS] [JSN] | |
R1-1712006 | WF on UE behavior for reserved resource |
other revision of R1-1711993 |
Samsung |
R1-ah-18512 AI: 5.1.3.1.1 |
noted | [WTS] [JSN] | |||
R1-1712007 | LS on NR Beam Management |
LS out LS To: RAN2 revision of R1-1711683 |
RAN1, Qualcomm | NR_newRAT-Core | Rel-15 |
R1-ah-18512 AI: 5.1 |
approved | [WTS] [JSN] | |
R1-1712008 | LS on HARQ operation |
LS out LS To: RAN2 revision of R1-1711685 |
RAN1, Nokia | NR_newRAT-Core | Rel-15 |
R1-ah-18512 AI: 5.1 |
approved | [WTS] [JSN] | |
R1-1712009 | Reply LS on CSI-RS design for beam management |
LS out LS is reply to R4-1704216 LS To: RAN4 revision of R1-1712003 |
RAN1, NTT DOCOMO | NR_newRAT-Core | Rel-15 |
R1-ah-18512 AI: 5.1.2.4.2 |
approved | [WTS] [JSN] | |
R1-1712010 | LS on a correction to the applicable UL modulation schemes |
LS out LS To: RAN4 |
RAN1, Huawei | NR_newRAT-Core | Rel-15 |
R1-ah-18512 AI: 5.1.5 |
approved | [WTS] [JSN] | |
R1-1712011 | TS38.211 v0.1.1 NR; Physical channels and modulation |
draft TS revision of R1-1712004 |
Ericsson LM | NR_newRAT-Core | Rel-15 |
R1-ah-18512 AI: 5.1 |
available | [WTS] [JSN] | |
R1-1712012 | TS38.201 v0.0.1 NR; Physical layer; General description | draft TS | NTT DOCOMO | NR_newRAT-Core | Rel-15 |
R1-ah-18512 AI: 5.1 |
available | [WTS] [JSN] | |
R1-1712013 | TS38.202 v0.0.1 NR; Physical layer services provided by the physical layer | draft TS | Qualcomm | NR_newRAT-Core | Rel-15 |
R1-ah-18512 AI: 5.1 |
available | [WTS] [JSN] | |
R1-1712014 | TS38.212 v0.0.1 NR; Multiplexing and channel coding |
draft TS revised to R1-1714564 |
Huawei | NR_newRAT-Core | Rel-15 |
R1-ah-18512 AI: 5.1 |
available | [WTS] [JSN] | |
R1-1712015 | TS38.213 v0.0.1 NR; Physical layer procedures for control | draft TS | Samsung | NR_newRAT-Core | Rel-15 |
R1-ah-18512 AI: 5.1 |
available | [WTS] [JSN] | |
R1-1712016 | TS38.214 v0.0.1 NR; Physical layer procedures for data | draft TS | Nokia | NR_newRAT-Core | Rel-15 |
R1-ah-18512 AI: 5.1 |
available | [WTS] [JSN] | |
R1-1712017 | TS38.215 v0.0.1 NR; Physical layer measurements | draft TS | Intel | NR_newRAT-Core | Rel-15 |
R1-ah-18512 AI: 5.1 |
available | [WTS] [JSN] |
2138 documents (1.1256191730499 seconds)