Please enter the search related information in the fields below. Partial information works, e.g. "SP-21
" in the "tdoc" field lists all TSG SA documents from 2021. Regular expressions mostly work in all fields (e.g. "2[34].501
" in the "Spec" field lists all documents related to 23.501 and 24.501. Capitalization is disregarded, i.e. "3GPP
" gives the same results as "3gpp
".
Download results in JSON format
tdoc | Title | Type / Revs | Source | Spec / CR | S/WID | Release | Meeting | Status | Links |
---|---|---|---|---|---|---|---|---|---|
R1-143680 | Draft Agenda for RAN1#78bis meeting | other | RAN1 Chairman | R1-78 | - | [WTS] [JSN] | |||
R1-143681 | Final Report of RAN1#78 meeting | other | MCC | R1-78 | - | [WTS] [JSN] | |||
R1-143682 | Selected highlights from RAN#65 of relevance to RAN1 | other | RAN1 Chairman | R1-78 | - | [WTS] [JSN] | |||
R1-143683 | LS on Rel-12 capabilities | other | RAN2, Ericsson | R1-78 | - | [WTS] [JSN] | |||
R1-143684 | Response LS on the support of PUCCH on two serving cells in CA | other | RAN2, Huawei | R1-78 | - | [WTS] [JSN] | |||
R1-143685 | Response LS on Maximum Number of Transport Block Bits in Dual-Connectivity | other | RAN2, Huawei | R1-78 | - | [WTS] [JSN] | |||
R1-143686 | LS on DRS measurements | other | RAN2, Huawei | R1-78 | - | [WTS] [JSN] | |||
R1-143687 | LS on eIMTA and eICIC Measurement Subframe Restrictions | other | RAN2, CATT | R1-78 | - | [WTS] [JSN] | |||
R1-143688 | Reply LS on introducing the new RSRQ measurements definition | other | RAN2, NTT DOCOMO | R1-78 | - | [WTS] [JSN] | |||
R1-143689 | Reply LS on radio interface based synchronization | other | RAN3, Nokia Networks | R1-78 | - | [WTS] [JSN] | |||
R1-143690 | Reply LS on eNB knowledge of low complexity UEs | other | RAN3, Huawei | R1-78 | - | [WTS] [JSN] | |||
R1-143691 | Introduction of mobility parameters in RRC IDLE on the new RSRQ measurements definition | other | RAN4, NTT DOCOMO | R1-78 | - | [WTS] [JSN] | |||
R1-143692 | Reply LS on D2D Multicarrier capabilities | other | RAN4, Qualcomm, Ericsson, LGE | R1-78 | - | [WTS] [JSN] | |||
R1-143693 | LS out on RAN4 D2D coexistence study | other | RAN4, Ericsson, Qualcomm | R1-78 | - | [WTS] [JSN] | |||
R1-143694 | LS on MIMO OTA Antenna test Function TR 36.978 | other | RAN5, Keysight | R1-78 | - | [WTS] [JSN] | |||
R1-143695 | Response LS on parameter synchronization for ProSe/D2D | other | SA3, Qualcomm | R1-78 | - | [WTS] [JSN] | |||
R1-143696 | [DRAFT] Reply LS on eIMTA and eICIC Measurement Subframe Restrictions | other | Huawei, HiSilicon | R1-78 | - | [WTS] [JSN] | |||
R1-143697 | 36.212 CR0162 (Rel-12, B) Introduction of D2D feature into 36.212 | CR | Huawei | R1-78 | - | [WTS] [JSN] | |||
R1-143698 | Discussion on application scenarios and standard impacts for UE categories 11 and 12 | other | Huawei, HiSilicon | R1-78 | - | [WTS] [JSN] | |||
R1-143699 | Final details of D2D synchronization signals | other | Huawei, HiSilicon | R1-78 | - | [WTS] [JSN] | |||
R1-143700 | Conditions for D2DSS transmission in- and out-of-coverage | other | Huawei, HiSilicon | R1-78 | - | [WTS] [JSN] | |||
R1-143701 | PD2DSCH content and design | other | Huawei, HiSilicon | R1-78 | - | [WTS] [JSN] | |||
R1-143702 | D2D synchronization procedure | other | Huawei, HiSilicon | R1-78 | - | [WTS] [JSN] | |||
R1-143703 | Remaining issues on scheduling assignment T-RPT | other | Huawei, HiSilicon | R1-78 | - | [WTS] [JSN] | |||
R1-143704 | Remaining issues on scheduling assignment resource hopping | other | Huawei, HiSilicon | R1-78 | - | [WTS] [JSN] | |||
R1-143705 | On the transmission power of D2D communication | other | Huawei, HiSilicon | R1-78 | - | [WTS] [JSN] | |||
R1-143706 | Coverage Definitions | other | Huawei, HiSilicon | R1-78 | - | [WTS] [JSN] | |||
R1-143707 | Priority rule and UCI handling in dual connectivity | other | Huawei, Hisilicon | R1-78 | - | [WTS] [JSN] | |||
R1-143708 | Power allocation in asynchronous dual connectivity | other | Huawei, Hisilicon | R1-78 | - | [WTS] [JSN] | |||
R1-143709 | SRS processing in power allocation for dual connectivity | other | Huawei, Hisilicon | R1-78 | - | [WTS] [JSN] | |||
R1-143710 | On the relationship between re-tuning time and bandwidth reduction | other | Huawei, HiSilicon | R1-78 | - | [WTS] [JSN] | |||
R1-143711 | Relationship between cost and complexity reduction in an LTE modem | other | Huawei, HiSilicon | R1-78 | - | [WTS] [JSN] | |||
R1-143712 | Downlink TM reduction | other | Huawei, HiSilicon | R1-78 | - | [WTS] [JSN] | |||
R1-143713 | Impacts of reducing maximum supported TBS to much less than 1000 bits | other | Huawei, HiSilicon | R1-78 | - | [WTS] [JSN] | |||
R1-143714 | Measurements and reporting for configuring coverage enhancements | other | Huawei, HiSilicon | R1-78 | - | [WTS] [JSN] | |||
R1-143715 | Achieving ultra long battery life with LTE | other | Huawei, HiSilicon | R1-78 | - | [WTS] [JSN] | |||
R1-143716 | Reporting relaxations for power consumption reduction in MTC UEs | other | Huawei, HiSilicon | R1-78 | - | [WTS] [JSN] | |||
R1-143717 | Downlink control channel design for MTC UEs | other | Huawei, HiSilicon | R1-78 | - | [WTS] [JSN] | |||
R1-143718 | Uplink control channel design for MTC UEs | other | Huawei, HiSilicon | R1-78 | - | [WTS] [JSN] | |||
R1-143719 | Coverage enhancement for PDSCH and PUSCH | other | Huawei, HiSilicon | R1-78 | - | [WTS] [JSN] | |||
R1-143720 | Design and transmission of System Information to MTC UEs | other | Huawei, HiSilicon | R1-78 | - | [WTS] [JSN] | |||
R1-143721 | Paging and RAR transmission for MTC and CE UEs | other | Huawei, HiSilicon | R1-78 | - | [WTS] [JSN] | |||
R1-143722 | PBCH/MIB design for MTC UEs | other | Huawei, HiSilicon | R1-78 | - | [WTS] [JSN] | |||
R1-143723 | Reporting UE coverage information via PRACH | other | Huawei, HiSilicon | R1-78 | - | [WTS] [JSN] | |||
R1-143724 | Review of existing unlicensed spectrum regulatory requirements affecting physical layer design | other | Huawei, Hisilicon | R1-78 | - | [WTS] [JSN] | |||
R1-143725 | Design targets of LAA-LTE for co-existence in unlicensed spectrum | other | Huawei, Hisilicon | R1-78 | - | [WTS] [JSN] | |||
R1-143726 | Potential solutions for LAA-LTE design | other | Huawei, Hisilicon | R1-78 | - | [WTS] [JSN] | |||
R1-143727 | Deployment scenarios and evaluation methodology for LAA | other | Huawei, Hisilicon | R1-78 | - | [WTS] [JSN] | |||
R1-143728 | High Level View of Elevation Beamforming/Full-Dimension (FD) MIMO | other | Huawei,HiSilicon | R1-78 | - | [WTS] [JSN] | |||
R1-143729 | Deployment scenarios and evaluation methodologies for 3D MIMO | other | Huawei, HiSilicon | R1-78 | - | [WTS] [JSN] | |||
R1-143730 | Potential enhancements with 2D antenna array | other | Huawei, HiSilicon | R1-78 | - | [WTS] [JSN] | |||
R1-143731 | Discussion on draft reply LS to R2-143981 on eIMTA | other | CATT | R1-78 | - | [WTS] [JSN] | |||
R1-143732 | [Draft]Reply LS to R2-143981 on eIMTA and eICIC Measurement Subframe Restrictions | other | CATT | R1-78 | - | [WTS] [JSN] | |||
R1-143733 | 36.213 CR0473 (Rel-12, F) on independent configuration of Rel-12 CSI subframe sets and EIMTA-MainConfigServCell | CR | CATT | R1-78 | - | [WTS] [JSN] | |||
R1-143734 | UE assumption for DL subframe within a DRS occasion for TDD | other | CATT | R1-78 | - | [WTS] [JSN] | |||
R1-143735 | Resource allocation for D2DSS and PD2DSCH | other | CATT | R1-78 | - | [WTS] [JSN] | |||
R1-143736 | Conditions for D2DSS transmission | other | CATT | R1-78 | - | [WTS] [JSN] | |||
R1-143737 | Remaining issue for PD2DSCH | other | CATT | R1-78 | - | [WTS] [JSN] | |||
R1-143738 | Considerations on D2D synchronization procedure | other | CATT | R1-78 | - | [WTS] [JSN] | |||
R1-143739 | Email summary of [78-14] and remaining issues in [78-11] | other | CATT | R1-78 | - | [WTS] [JSN] | |||
R1-143740 | Resource pool allocation for discovery | other | CATT | R1-78 | - | [WTS] [JSN] | |||
R1-143741 | Resource pool configuration for D2D communication | other | CATT | R1-78 | - | [WTS] [JSN] | |||
R1-143742 | Design of SA hopping pattern | other | CATT | R1-78 | - | [WTS] [JSN] | |||
R1-143743 | Remaining issues on resource allocation and T-RPT design in D2D | other | CATT | R1-78 | - | [WTS] [JSN] | |||
R1-143744 | Remaining issues of D2D power control | other | CATT | R1-78 | - | [WTS] [JSN] | |||
R1-143745 | Remaining issue on repetition transmission for discovery | other | CATT | R1-78 | - | [WTS] [JSN] | |||
R1-143746 | Open issues on dual connectivity power control | other | CATT | R1-78 | - | [WTS] [JSN] | |||
R1-143747 | Other remaining issues of dual connectivity | other | CATT | R1-78 | - | [WTS] [JSN] | |||
R1-143748 | On Rel-12 UE eIMTA UE capabilities | other | CATT | R1-78 | - | [WTS] [JSN] | |||
R1-143749 | UE RF bandwidth reduction | other | CATT | R1-78 | - | [WTS] [JSN] | |||
R1-143750 | Rel-12 agreements review on coverage enhancement | other | CATT | R1-78 | - | [WTS] [JSN] | |||
R1-143751 | Required functionalities for Licensed-Assisted Access Using LTE | other | CATT | R1-78 | - | [WTS] [JSN] | |||
R1-143752 | Deployment scenarios and evaluation methodologies for LAA | other | CATT | R1-78 | - | [WTS] [JSN] | |||
R1-143753 | Views on elevation beamforming and FD-MIMO study | other | CATT | R1-78 | - | [WTS] [JSN] | |||
R1-143754 | Considerations on deployment scenario and evaluation assumptions | other | CATT | R1-78 | - | [WTS] [JSN] | |||
R1-143755 | FD MIMO implementation based on Rel-12 standard | other | CATT | R1-78 | - | [WTS] [JSN] | |||
R1-143756 | Design of primary D2D synchronization signal | other | Intel Corporation | R1-78 | - | [WTS] [JSN] | |||
R1-143757 | Design of secondary D2D synchronization signal | other | Intel Corporation | R1-78 | - | [WTS] [JSN] | |||
R1-143758 | On D2DSS transmissions for inter-cell D2D discovery | other | Intel Corporation | R1-78 | - | [WTS] [JSN] | |||
R1-143759 | On synchronization channel design for D2D operation (PD2DSCH) | other | Intel Corporation | R1-78 | - | [WTS] [JSN] | |||
R1-143760 | Remaining details of transmission timing for D2D discovery | other | Intel Corporation | R1-78 | - | [WTS] [JSN] | |||
R1-143761 | Synchronization Procedure for D2D Communication | other | Intel Corporation | R1-78 | - | [WTS] [JSN] | |||
R1-143762 | Analysis of D2D Multi-Hop Synchronization Procedure | other | Intel Corporation | R1-78 | - | [WTS] [JSN] | |||
R1-143763 | On Remaining Details of Resource Pool Configuration for D2D Communication | other | Intel Corporation | R1-78 | - | [WTS] [JSN] | |||
R1-143764 | On Time Frequency Resources for SA Transmission | other | Intel Corporation | R1-78 | - | [WTS] [JSN] | |||
R1-143765 | On Remaining Details of T-RPT Design for D2D Communication | other | Intel Corporation | R1-78 | - | [WTS] [JSN] | |||
R1-143766 | Remaining details of D2D discovery resource allocation | other | Intel Corporation | R1-78 | - | [WTS] [JSN] | |||
R1-143767 | Remaining physical layer aspects of dual connectivity | other | Intel Corporation | R1-78 | - | [WTS] [JSN] | |||
R1-143768 | Discussion on UE complexity reduction for eMTC | other | Intel Corporation | R1-78 | - | [WTS] [JSN] | |||
R1-143769 | Discussion on coverage enhancement for physical channels | other | Intel Corporation | R1-78 | - | [WTS] [JSN] | |||
R1-143770 | Discussion on UE power consumption reduction | other | Intel Corporation | R1-78 | - | [WTS] [JSN] | |||
R1-143771 | Discussion on data and control channel enhancement for eMTC | other | Intel Corporation | R1-78 | - | [WTS] [JSN] | |||
R1-143772 | Discussion on common control message enhancement for eMTC | other | Intel Corporation | R1-78 | - | [WTS] [JSN] | |||
R1-143773 | Discussion on SCH, PBCH and PRACH enhancement for eMTC | other | Intel Corporation | R1-78 | - | [WTS] [JSN] | |||
R1-143774 | Physical layer regulatory requirements for unlicensed spectrum in the 5 GHz frequency range | other | Intel Corporation | R1-78 | - | [WTS] [JSN] | |||
R1-143775 | Design targets for LAA using LTE | other | Intel Corporation | R1-78 | - | [WTS] [JSN] | |||
R1-143776 | Potential design options for LAA using LTE | other | Intel Corporation | R1-78 | - | [WTS] [JSN] | |||
R1-143777 | Deployment scenarios and evaluation methodologies for LAA using LTE | other | Intel Corporation | R1-78 | - | [WTS] [JSN] | |||
R1-143778 | High level views of elevation beamforming and full dimension MIMO | other | Intel Corporation | R1-78 | - | [WTS] [JSN] | |||
R1-143779 | Initial evaluation of vertical sectorization | other | Intel Corporation | R1-78 | - | [WTS] [JSN] | |||
R1-143780 | Initial evaluation of elevation beamforming and full dimension MIMO | other | Intel Corporation | R1-78 | - | [WTS] [JSN] | |||
R1-143781 | Baseline simulation scenarios for indoor positioning enhancements | other | Intel Corporation | R1-78 | - | [WTS] [JSN] | |||
R1-143782 | Channel model for indoor positioning enhancements | other | Intel Corporation | R1-78 | - | [WTS] [JSN] | |||
R1-143783 | Work plan for MTC | other | Ericsson | R1-78 | - | [WTS] [JSN] | |||
R1-143784 | Rel-12 agreements for MTC | other | Ericsson | R1-78 | - | [WTS] [JSN] | |||
R1-143785 | UE complexity reduction for MTC | other | Ericsson | R1-78 | - | [WTS] [JSN] | |||
R1-143786 | Coverage enhancement targets for MTC | other | Ericsson | R1-78 | - | [WTS] [JSN] | |||
R1-143787 | UE power consumption reduction for MTC | other | Ericsson | R1-78 | - | [WTS] [JSN] | |||
R1-143788 | Data associated channels for MTC | other | Ericsson | R1-78 | - | [WTS] [JSN] | |||
R1-143789 | Common control messages for MTC | other | Ericsson | R1-78 | - | [WTS] [JSN] | |||
R1-143790 | Non data associated channels for MTC | other | Ericsson | R1-78 | - | [WTS] [JSN] | |||
R1-143791 | D2D Synchonization Signal Design | other | Sharp | R1-78 | - | [WTS] [JSN] | |||
R1-143792 | PD2DSCH Contents | other | Sharp | R1-78 | - | [WTS] [JSN] | |||
R1-143793 | Remaining issues on D2D transmission timing | other | Sharp | R1-78 | - | [WTS] [JSN] | |||
R1-143794 | Consideration of SA Resource Index Design in D2D Grant | other | Sharp | R1-78 | - | [WTS] [JSN] | |||
R1-143795 | D2D and WAN co-existence considerations and D2D subframe bitmap limitations | other | Sharp | R1-78 | - | [WTS] [JSN] | |||
R1-143796 | PRACH/SRS priority and UL channel dropping/conversion for UCI transmissions in dual connectivity | other | Sharp | R1-78 | - | [WTS] [JSN] | |||
R1-143797 | Synchronous/Asynchronous cases for DC | other | Sharp | R1-78 | - | [WTS] [JSN] | |||
R1-143798 | Remaining issues on Power Control in Dual Connectivity | other | ZTE | R1-78 | - | [WTS] [JSN] | |||
R1-143799 | UE capability for Dual Connectivity | other | ZTE | R1-78 | - | [WTS] [JSN] | |||
R1-143800 | Discussion on channel model for indoor positioning | other | ZTE | R1-78 | - | [WTS] [JSN] | |||
R1-143801 | On evaluation methodology for OTDOA-based positioning | other | ZTE | R1-78 | - | [WTS] [JSN] | |||
R1-143802 | Views on Schemes for Elevation Beamforming and FD-MIMO | other | ZTE | R1-78 | - | [WTS] [JSN] | |||
R1-143803 | Deployment scenarios and evaluation methodology for EB/FD-MIMO | other | ZTE | R1-78 | - | [WTS] [JSN] | |||
R1-143804 | Initial consideration on enhancements targeting 2D antenna array for EB/FD-MIMO | other | ZTE | R1-78 | - | [WTS] [JSN] | |||
R1-143805 | General considerations on UE complexity reduction for MTC | other | ZTE | R1-78 | - | [WTS] [JSN] | |||
R1-143806 | Concepts for coverage improvement for MTC UEs | other | ZTE | R1-78 | - | [WTS] [JSN] | |||
R1-143807 | Power consumption reduction for MTC UEs | other | ZTE | R1-78 | - | [WTS] [JSN] | |||
R1-143808 | Discussion on Physical data channels and associated physical control channels for MTC enhancement | other | ZTE | R1-78 | - | [WTS] [JSN] | |||
R1-143809 | Considerations on common control messages for MTC enhancement | other | ZTE | R1-78 | - | [WTS] [JSN] | |||
R1-143810 | Technical solutions for PRACH for MTC enhancement | other | ZTE | R1-78 | - | [WTS] [JSN] | |||
R1-143811 | Considerations on Physical broadcast channel for MTC enhancement | other | ZTE | R1-78 | - | [WTS] [JSN] | |||
R1-143812 | Resource Allocation for Synchronization Signal and Channel | other | ZTE | R1-78 | - | [WTS] [JSN] | |||
R1-143813 | PD2DSS root indices selection | other | ZTE | R1-78 | - | [WTS] [JSN] | |||
R1-143814 | Discussion on conditions for D2DSS transmission | other | ZTE | R1-78 | - | [WTS] [JSN] | |||
R1-143815 | Discussion on content and usage of PD2DSCH | other | ZTE | R1-78 | - | [WTS] [JSN] | |||
R1-143816 | Remaining issues for D2D transmission timing | other | ZTE | R1-78 | - | [WTS] [JSN] | |||
R1-143817 | D2D Synchronization Procedure | other | ZTE | R1-78 | - | [WTS] [JSN] | |||
R1-143818 | Remaining details of resource pool configuration | other | ZTE | R1-78 | - | [WTS] [JSN] | |||
R1-143819 | Discussion on SA pattern design and signaling | other | ZTE | R1-78 | - | [WTS] [JSN] | |||
R1-143820 | Discussion on T-RPT design | other | ZTE | R1-78 | - | [WTS] [JSN] | |||
R1-143821 | Remaining details of T-RPT design for TDD | other | ZTE | R1-78 | - | [WTS] [JSN] | |||
R1-143822 | Discussion on repetition of discovery transmissions | other | ZTE | R1-78 | - | [WTS] [JSN] | |||
R1-143823 | Remaining details of hopping pattern for discovery type 2B | other | ZTE | R1-78 | - | [WTS] [JSN] | |||
R1-143824 | Evaluation scenarios and assumptions for Licensed-Assisted Access using LTE | other | ZTE | R1-78 | - | [WTS] [JSN] | |||
R1-143825 | Preliminary performance evaluation for Licensed-Assisted Access using LTE | other | ZTE | R1-78 | - | [WTS] [JSN] | |||
R1-143826 | Regulatory requirements affecting RAN1 for licensed-assisted access using LTE | other | ZTE | R1-78 | - | [WTS] [JSN] | |||
R1-143827 | Required functionalities and design targets of LAA | other | ZTE | R1-78 | - | [WTS] [JSN] | |||
R1-143828 | Analysis of LAA candidate solutions for coexistence | other | ZTE | R1-78 | - | [WTS] [JSN] | |||
R1-143829 | Discussion on D2DSS and PD2DSCH resource allocation | other | Fujitsu | R1-78 | - | [WTS] [JSN] | |||
R1-143830 | Discussion on detailed D2DSS design | other | Fujitsu | R1-78 | - | [WTS] [JSN] | |||
R1-143831 | On transmission of D2D synchronization signals | other | Fujitsu | R1-78 | - | [WTS] [JSN] | |||
R1-143832 | Discussion of functions and contents of PD2DSCH | other | Fujitsu | R1-78 | - | [WTS] [JSN] | |||
R1-143833 | Discussion of D2D synchronization procedure | other | Fujitsu | R1-78 | - | [WTS] [JSN] | |||
R1-143834 | Discussion of details of D2D power control mechanism | other | Fujitsu | R1-78 | - | [WTS] [JSN] | |||
R1-143835 | Discussion of remaining details of CP Length | other | Fujitsu | R1-78 | - | [WTS] [JSN] | |||
R1-143836 | Remaining issues for power control priority rules in dual connectivity | other | Fujitsu | R1-78 | - | [WTS] [JSN] | |||
R1-143837 | Configuration of DRS-based measurements | other | Fujitsu | R1-78 | - | [WTS] [JSN] | |||
R1-143838 | Candidate functionalities towards the fairness design target in LAA | other | Fujitsu | R1-78 | - | [WTS] [JSN] | |||
R1-143839 | LAA scenarios and throughput metrics | other | Fujitsu | R1-78 | - | [WTS] [JSN] | |||
R1-143840 | Considerations on schemes for elevation beamforming/Full-dimension MIMO for LTE | other | Fujitsu | R1-78 | - | [WTS] [JSN] | |||
R1-143841 | Discussion on scenarios and simulation assumptions for elevation beamforming/Full-dimension MIMO | other | Fujitsu | R1-78 | - | [WTS] [JSN] | |||
R1-143842 | Work Plan for FS_UTRA_LTE_iPos_enh | other | NextNav | R1-78 | - | [WTS] [JSN] | |||
R1-143843 | 37.857 v0.0.1 (Skeleton) Study on Indoor Positioning Enhancements | other | NextNav | R1-78 | - | [WTS] [JSN] | |||
R1-143844 | Discussion on TR 37.857 channel model | other | NextNav | R1-78 | - | [WTS] [JSN] | |||
R1-143845 | TP for TR 37.857 channel model | other | NextNav | R1-78 | - | [WTS] [JSN] | |||
R1-143846 | Resource allocation for synchronization signal to assist D2D discovery/communication in asynchronous network | other | Samsung | R1-78 | - | [WTS] [JSN] | |||
R1-143847 | Resource structure for D2DSS and PD2DSCH | other | Samsung | R1-78 | - | [WTS] [JSN] | |||
R1-143848 | D2D synchronization signal design, considering information indication | other | Samsung | R1-78 | - | [WTS] [JSN] | |||
R1-143849 | Triggering conditions for D2DSS transmission by in-coverage UEs | other | Samsung | R1-78 | - | [WTS] [JSN] | |||
R1-143850 | D2DSS transmission considering UE's states | other | Samsung | R1-78 | - | [WTS] [JSN] | |||
R1-143851 | PD2DSCH Content and remaining aspects of PD2DSCH design | other | Samsung | R1-78 | - | [WTS] [JSN] | |||
R1-143852 | Utilization of D2D frame number in PD2DSCH | other | Samsung | R1-78 | - | [WTS] [JSN] | |||
R1-143853 | Discussion on D2D transmit timing in Type 2B discovery and Mode 2 communication | other | Samsung | R1-78 | - | [WTS] [JSN] | |||
R1-143854 | Synchronization procedure for D2D discovery and communication | other | Samsung | R1-78 | - | [WTS] [JSN] | |||
R1-143855 | Performance of flat and hierarchical synchronization schemes | other | Samsung | R1-78 | - | [WTS] [JSN] | |||
R1-143856 | On D2D communication resource pool configuration related to out-of-coverage UE with TX timing not from eNB | other | Samsung | R1-78 | - | [WTS] [JSN] | |||
R1-143857 | Remaining details on RRC parameters related to resource pool configuration | other | Samsung | R1-78 | - | [WTS] [JSN] | |||
R1-143858 | Resource pattern for SA transmission | other | Samsung | R1-78 | - | [WTS] [JSN] | |||
R1-143859 | Remaining details of T-RPT design for data | other | Samsung | R1-78 | - | [WTS] [JSN] | |||
R1-143860 | Discussion on CP length for D2D discovery and data channels | other | Samsung | R1-78 | - | [WTS] [JSN] | |||
R1-143861 | Remaining issues for type 2B discovery | other | Samsung | R1-78 | - | [WTS] [JSN] | |||
R1-143862 | Resource allocation for type-1 discovery depening on D2DSS configuration | other | Samsung | R1-78 | - | [WTS] [JSN] | |||
R1-143863 | Soft buffer handling for PDSCH and D2D data | other | Samsung | R1-78 | - | [WTS] [JSN] | |||
R1-143864 | Discussion of TA in D2D SA | other | Samsung | R1-78 | - | [WTS] [JSN] | |||
R1-143865 | Details on scrambling sequence generation | other | Samsung | R1-78 | - | [WTS] [JSN] | |||
R1-143866 | Details on frequency hopping for D2D data transmission | other | Samsung | R1-78 | - | [WTS] [JSN] | |||
R1-143867 | Utilization of multiple resource pools based on RSRP for type-1 discovery | other | Samsung | R1-78 | - | [WTS] [JSN] | |||
R1-143868 | WAN and D2D co-existence for type-1 discovery | other | Samsung | R1-78 | - | [WTS] [JSN] | |||
R1-143869 | Remaining Aspects on Power Control for Dual Connectivity | other | Samsung | R1-78 | - | [WTS] [JSN] | |||
R1-143870 | Remaining Aspects for Dual Connectivity | other | Samsung | R1-78 | - | [WTS] [JSN] | |||
R1-143871 | UE complexity reduction considerations for MTC UEs | other | Samsung | R1-78 | - | [WTS] [JSN] | |||
R1-143872 | Coverage Enhancement Considerations for Rel-13 MTC UEs | other | Samsung | R1-78 | - | [WTS] [JSN] | |||
R1-143873 | UE power consumption reduction considerations for MTC UEs | other | Samsung | R1-78 | - | [WTS] [JSN] | |||
R1-143874 | UE-specific Signaling for MTC UEs | other | Samsung | R1-78 | - | [WTS] [JSN] | |||
R1-143875 | UE-common Signaling for MTC UEs | other | Samsung | R1-78 | - | [WTS] [JSN] | |||
R1-143876 | Broadcast Signaling for MTC UEs | other | Samsung | R1-78 | - | [WTS] [JSN] | |||
R1-143877 | Impact of regulatory requirements for 5GHz band on LAA | other | Samsung | R1-78 | - | [WTS] [JSN] | |||
R1-143878 | Views on required functionalities and design targets for LAA | other | Samsung | R1-78 | - | [WTS] [JSN] | |||
R1-143879 | Discussion on solutions for required functionalities and design targets for LAA | other | Samsung | R1-78 | - | [WTS] [JSN] | |||
R1-143880 | Deployment scenarios and evaluation methodolgoies for LAA | other | Samsung | R1-78 | - | [WTS] [JSN] | |||
R1-143881 | Proposed work plan for EL-BF/FD-MIMO SI | other | Samsung, Nokia Networks | R1-78 | - | [WTS] [JSN] | |||
R1-143882 | TR skeleton for study on EL-BF/FD-MIMO for LTE | other | Samsung, Nokia Networks | R1-78 | - | [WTS] [JSN] | |||
R1-143883 | High-level views on FD-MIMO and elevation beamforming | other | Samsung | R1-78 | - | [WTS] [JSN] | |||
R1-143884 | TXRU Modeling and Antenna Virtualization for FD-MIMO | other | Samsung | R1-78 | - | [WTS] [JSN] | |||
R1-143885 | 2D antenna configurations for FD-MIMO evaluations | other | Samsung | R1-78 | - | [WTS] [JSN] | |||
R1-143886 | Deployment scenarios for FD-MIMO and elevation beamforming | other | Samsung | R1-78 | - | [WTS] [JSN] | |||
R1-143887 | Traffic Models for FD-MIMO and Elevation Beamforming | other | Samsung | R1-78 | - | [WTS] [JSN] | |||
R1-143888 | Prioritization of phase 1 evaluation | other | Samsung | R1-78 | - | [WTS] [JSN] | |||
R1-143889 | Remaining evaluation assumptions for phase 1 | other | Samsung | R1-78 | - | [WTS] [JSN] | |||
R1-143890 | Heterogeneous network modeling for FD-MIMO and EL-BF | other | Samsung | R1-78 | - | [WTS] [JSN] | |||
R1-143891 | DL FD-MIMO with 8-64 TXRU | other | Samsung | R1-78 | - | [WTS] [JSN] | |||
R1-143892 | Operation scenarios for FD-MIMO | other | Samsung | R1-78 | - | [WTS] [JSN] | |||
R1-143893 | Initial uplink system level simulation results for FD-MIMO | other | Samsung | R1-78 | - | [WTS] [JSN] | |||
R1-143894 | Preliminary Results on 2D array with 8 TXRU | other | Samsung | R1-78 | - | [WTS] [JSN] | |||
R1-143895 | Simulation results for vertical sectorization | other | Samsung | R1-78 | - | [WTS] [JSN] | |||
R1-143896 | Consideration of evaluation methodology for indoor positioning | other | Samsung | R1-78 | - | [WTS] [JSN] | |||
R1-143897 | 36.213 CR0474 (Rel-12, F) Clarification on the parameter notations for eIMTA | CR | ITRI | R1-78 | - | [WTS] [JSN] | |||
R1-143898 | Feedback Operation for Multi-User FD-MIMO | other | ITRI | R1-78 | - | [WTS] [JSN] | |||
R1-143899 | A Consideration on PAPR/CM for PD2DSS and SD2DSS | other | ITRI | R1-78 | - | [WTS] [JSN] | |||
R1-143900 | Essentiality of Timing Forward in D2DSS Transmission | other | ITRI | R1-78 | - | [WTS] [JSN] | |||
R1-143901 | Conditions of D2DSS Transmission considering the timing-forward | other | ITRI | R1-78 | - | [WTS] [JSN] | |||
R1-143902 | Design and consideration of T-RPT for D2D communication | other | ITRI | R1-78 | - | [WTS] [JSN] | |||
R1-143903 | Conveying the RA received in the DCI in the SA | other | Huawei, HiSilicon | R1-78 | - | [WTS] [JSN] | |||
R1-143904 | UE D2D capability and soft buffer management | other | Huawei, HiSilicon | R1-78 | - | [WTS] [JSN] | |||
R1-143905 | 36.212 CR0163 (Rel-12, F) Correction for rate matching parameters for UE categories 11 and 12 for 36.212 | CR | Huawei | R1-78 | - | [WTS] [JSN] | |||
R1-143906 | [DRAFT] TP on SCE for 36.300 | other | Huawei, HiSilicon | R1-78 | - | [WTS] [JSN] | |||
R1-143907 | [DRAFT] LS on TP on SCE for 36.300 | other | Huawei | R1-78 | - | [WTS] [JSN] | |||
R1-143908 | Clarifications on PDSCH and EPDCCH rate matching for CSI-RS in DRS | other | Huawei, HiSilicon | R1-78 | - | [WTS] [JSN] | |||
R1-143909 | [DRAFT] LS on introduction of UE categories 11 and 12 | other | Huawei, HiSilicon | R1-78 | - | [WTS] [JSN] | |||
R1-143910 | Resources for D2D synchronization signals | other | Huawei, HiSilicon | R1-78 | - | [WTS] [JSN] | |||
R1-143911 | Remaining details on data channel design | other | Huawei, HiSilicon | R1-78 | - | [WTS] [JSN] | |||
R1-143912 | Remaining details of CP length | other | Huawei, HiSilicon | R1-78 | - | [WTS] [JSN] | |||
R1-143913 | Type 2B hopping pattern | other | Huawei, HiSilicon | R1-78 | - | [WTS] [JSN] | |||
R1-143914 | Remaining details of discovery resource allocation | other | Huawei, HiSilicon | R1-78 | - | [WTS] [JSN] | |||
R1-143915 | Details of 1 bit resource reservation mechanism for mode 2 | other | Huawei, HiSilicon | R1-78 | - | [WTS] [JSN] | |||
R1-143916 | D2D and WAN coexistence | other | Huawei, HiSilicon | R1-78 | - | [WTS] [JSN] | |||
R1-143917 | Multicarrier support for D2D | other | Huawei, HiSilicon | R1-78 | - | [WTS] [JSN] | |||
R1-143918 | Power allocation for PRACH in dual connectivity | other | Huawei, HiSilicon | R1-78 | - | [WTS] [JSN] | |||
R1-143919 | Power headroom report in in asynchronous case | other | Huawei, HiSilicon | R1-78 | - | [WTS] [JSN] | |||
R1-143920 | Remaing issues on UE processing capabilities in dual connectivity | other | Huawei, HiSilicon | R1-78 | - | [WTS] [JSN] | |||
R1-143921 | On introducing a reduced UE power class | other | Huawei, HiSilicon | R1-78 | - | [WTS] [JSN] | |||
R1-143922 | Coverage enhancement for MTC UEs - capability or mimicry? | other | Huawei, HiSilicon | R1-78 | - | [WTS] [JSN] | |||
R1-143923 | Transmission of small transport blocks | other | Huawei, HiSilicon | R1-78 | - | [WTS] [JSN] | |||
R1-143924 | Discussion on channel model for indoor positioning evaluation | other | Huawei, HiSilicon | R1-78 | - | [WTS] [JSN] | |||
R1-143925 | Discussion on simulation scenarios and assumptions for indoor positioning | other | Huawei, HiSilicon | R1-78 | - | [WTS] [JSN] | |||
R1-143926 | On indoor positioning enhancement schemes | other | Huawei, HiSilicon | R1-78 | - | [WTS] [JSN] | |||
R1-143927 | 36.213 CR0475 (Rel-12, F) Correction on timing relationship between PUSCH and PHICH for FDD-TDD CA | CR | NEC | R1-78 | - | [WTS] [JSN] | |||
R1-143928 | D2D synchronization procedure for out-of-network coverage | other | NEC | R1-78 | - | [WTS] [JSN] | |||
R1-143929 | SA transmission patterns and indexing | other | NEC | R1-78 | - | [WTS] [JSN] | |||
R1-143930 | On resource selection for Type 1 discovery message transmission | other | NEC | R1-78 | - | [WTS] [JSN] | |||
R1-143931 | Summary of email discussion [78-09] PRACH for DC | other | NEC | R1-78 | - | [WTS] [JSN] | |||
R1-143932 | Remaining issues on PRACH handling in dual connectivity | other | NEC | R1-78 | - | [WTS] [JSN] | |||
R1-143933 | Further Low Complexity for MTC UEs in Rel-13 | other | NEC | R1-78 | - | [WTS] [JSN] | |||
R1-143934 | Coverage enhanced MTC UEs in Rel-13 | other | NEC | R1-78 | - | [WTS] [JSN] | |||
R1-143935 | Uplink Reference Signal Enhancement for Low Cost MTC | other | NEC | R1-78 | - | [WTS] [JSN] | |||
R1-143936 | Required functionalities for LTE in unlicensed band | other | NEC | R1-78 | - | [WTS] [JSN] | |||
R1-143937 | Deployment scenarios for Licensed-Assisted Access (LAA) | other | NEC | R1-78 | - | [WTS] [JSN] | |||
R1-143938 | Discussion on evaluation methodology for licensed-assisted access | other | NEC | R1-78 | - | [WTS] [JSN] | |||
R1-143939 | Discussion on potential requirements for Elevation Beamforming/Full-Dimension Beamforming | other | NEC | R1-78 | - | [WTS] [JSN] | |||
R1-143940 | Views on evaluation methodology for Elevation Beamforming/FD MIMO | other | NEC | R1-78 | - | [WTS] [JSN] | |||
R1-143941 | Details on D2DSS transmission in out- of-network coverage scenario | other | CEWiT | R1-78 | - | [WTS] [JSN] | |||
R1-143942 | UL channel dropping and conversion for UCI transmissions in dual connectivity | other | Sharp | R1-78 | - | [WTS] [JSN] | |||
R1-143943 | PRACH/SRS priority and UCI priority in dual connectivity | other | Sharp | R1-78 | - | [WTS] [JSN] | |||
R1-143944 | D2D Synchronization Signal and Channel Design | other | Lenovo | R1-78 | - | [WTS] [JSN] | |||
R1-143945 | PD2DSCH design and content | other | Lenovo | R1-78 | - | [WTS] [JSN] | |||
R1-143946 | On Study of Elevation Beamforming and FD-MIMO | other | ITRI | R1-78 | - | [WTS] [JSN] | |||
R1-143947 | D2D synchronization and re-synchronization procedures in varied coverage | other | HTC | R1-78 | - | [WTS] [JSN] | |||
R1-143948 | Remaining issues on Mode-1 D2D Communication | other | HTC | R1-78 | - | [WTS] [JSN] | |||
R1-143949 | Multiplexing between UL HARQ-ACK and D2D signals | other | HTC | R1-78 | - | [WTS] [JSN] | |||
R1-143950 | Remaining Details on UL Power Control in Dual Connectivity | other | HTC | R1-78 | - | [WTS] [JSN] | |||
R1-143951 | Discussion on UE category with increased peak data rate | other | CMCC | R1-78 | - | [WTS] [JSN] | |||
R1-143952 | Transmission of control signalling in unlicensed band | other | CMCC | R1-78 | - | [WTS] [JSN] | |||
R1-143953 | Deployment scenarios for licensed-assisted access using LTE | other | CMCC | R1-78 | - | [WTS] [JSN] | |||
R1-143954 | Evaluation methodology for licensed-assisted access using LTE | other | CMCC | R1-78 | - | [WTS] [JSN] | |||
R1-143955 | High level view of 3D-MIMO schemes | other | CMCC | R1-78 | - | [WTS] [JSN] | |||
R1-143956 | 3D-MIMO Phase I evaluation assumptions | other | CMCC | R1-78 | - | [WTS] [JSN] | |||
R1-143957 | CRS virtualization for 3D-MIMO | other | CMCC | R1-78 | - | [WTS] [JSN] | |||
R1-143958 | TXRU virtualization and array modeling | other | CMCC | R1-78 | - | [WTS] [JSN] | |||
R1-143959 | Non-full-buffer traffic model for video streaming | other | CMCC | R1-78 | - | [WTS] [JSN] | |||
R1-143960 | Initial 3D-MIMO evaluation results | other | CMCC | R1-78 | - | [WTS] [JSN] | |||
R1-143961 | LAA using LTE operation, compliant to regulatory requirements | other | ETRI | R1-78 | - | [WTS] [JSN] | |||
R1-143962 | Discussion on LTE-LAA hidden node terminal problem | other | ETRI | R1-78 | - | [WTS] [JSN] | |||
R1-143963 | Discussion on channel access mechanism for supporting LAA using LTE | other | ETRI | R1-78 | - | [WTS] [JSN] | |||
R1-143964 | Generalized energy transmission field for LBT and back-off based co-channel coexistence mechanism | other | ETRI | R1-78 | - | [WTS] [JSN] | |||
R1-143965 | LAA using LTE deployment and operational scenarios | other | ETRI | R1-78 | - | [WTS] [JSN] | |||
R1-143966 | High level view on elevation beamforming and FD-MIMO | other | ETRI | R1-78 | - | [WTS] [JSN] | |||
R1-143967 | eNB related D2D Synchronization Procedure | other | Kyocera | R1-78 | - | [WTS] [JSN] | |||
R1-143968 | On MTC Band Allocation | other | Fujitsu | R1-78 | - | [WTS] [JSN] | |||
R1-143969 | PHICH related issues for low cost MTC UEs based on LTE | other | Fujitsu | R1-78 | - | [WTS] [JSN] | |||
R1-143970 | PRACH Support for Devices in Deep Coverage Holes | other | Fujitsu | R1-78 | - | [WTS] [JSN] | |||
R1-143971 | Handling of IMR in eIMTA | other | Qualcomm Inc. | R1-78 | - | [WTS] [JSN] | |||
R1-143972 | Discussion on PUSCH rate matching around SRS symbol | other | Qualcomm Inc. | R1-78 | - | [WTS] [JSN] | |||
R1-143973 | Resource allocation for D2D synchronization | other | Qualcomm Inc. | R1-78 | - | [WTS] [JSN] | |||
R1-143974 | D2DSS signal design | other | Qualcomm Inc. | R1-78 | - | [WTS] [JSN] | |||
R1-143975 | D2DSS transmission procedure | other | Qualcomm Inc. | R1-78 | - | [WTS] [JSN] | |||
R1-143976 | PD2DSCH content and design | other | Qualcomm Inc. | R1-78 | - | [WTS] [JSN] | |||
R1-143977 | Transmission timing for D2D | other | Qualcomm Inc. | R1-78 | - | [WTS] [JSN] | |||
R1-143978 | Details of synchronization procedure | other | Qualcomm Inc. | R1-78 | - | [WTS] [JSN] | |||
R1-143979 | RRC parameters for D2D | other | Qualcomm Inc. | R1-78 | - | [WTS] [JSN] | |||
R1-143980 | Resource pattern for D2D SA transmission | other | Qualcomm Inc. | R1-78 | - | [WTS] [JSN] | |||
R1-143981 | T-RPT for D2D Data | other | Qualcomm Inc. | R1-78 | - | [WTS] [JSN] | |||
R1-143982 | Power control for D2D | other | Qualcomm Inc. | R1-78 | - | [WTS] [JSN] | |||
R1-143983 | CP configuration for D2D | other | Qualcomm Inc. | R1-78 | - | [WTS] [JSN] | |||
R1-143984 | Resource allocation for Type 1 D2D discovery | other | Qualcomm Inc. | R1-78 | - | [WTS] [JSN] | |||
R1-143985 | Simulation results for D2D and WAN coexistence | other | Qualcomm Inc. | R1-78 | - | [WTS] [JSN] | |||
R1-143986 | Multi-carrier aspects of D2D | other | Qualcomm Inc. | R1-78 | - | [WTS] [JSN] | |||
R1-143987 | Power control prioritization for dual-connectivity | other | Qualcomm Inc. | R1-78 | - | [WTS] [JSN] | |||
R1-143988 | Power control processing time requirements for dual-connectivity | other | Qualcomm Inc. | R1-78 | - | [WTS] [JSN] | |||
R1-143989 | Remaining details of physical layer functionalities for Dual Connectivity | other | Qualcomm Inc. | R1-78 | - | [WTS] [JSN] | |||
R1-143990 | Capability signaling for dual-connectivity | other | Qualcomm Inc. | R1-78 | - | [WTS] [JSN] | |||
R1-143991 | NAICS capability signaling | other | Qualcomm Inc. | R1-78 | - | [WTS] [JSN] | |||
R1-143992 | UE complexity reduction | other | Qualcomm Inc. | R1-78 | - | [WTS] [JSN] | |||
R1-143993 | Coverage enhancements | other | Qualcomm Inc. | R1-78 | - | [WTS] [JSN] | |||
R1-143994 | Power consumption reduction | other | Qualcomm Inc. | R1-78 | - | [WTS] [JSN] | |||
R1-143995 | Physical data channels and associated physical control channels | other | Qualcomm Inc. | R1-78 | - | [WTS] [JSN] | |||
R1-143996 | Common control messages | other | Qualcomm Inc. | R1-78 | - | [WTS] [JSN] | |||
R1-143997 | Other physical channels and signals | other | Qualcomm Inc. | R1-78 | - | [WTS] [JSN] | |||
R1-143998 | Regulatory requirements affecting RAN1 | other | Qualcomm Inc. | R1-78 | - | [WTS] [JSN] | |||
R1-143999 | Required functionalities and design targets | other | Qualcomm Inc. | R1-78 | - | [WTS] [JSN] | |||
R1-144000 | Solutions for required functionalities and design targets | other | Qualcomm Inc. | R1-78 | - | [WTS] [JSN] | |||
R1-144001 | Deployment scenarios and evaluation methodology | other | Qualcomm Inc. | R1-78 | - | [WTS] [JSN] | |||
R1-144002 | Views on elevation beamforming and FD-MIMO techniques | other | Qualcomm Inc. | R1-78 | - | [WTS] [JSN] | |||
R1-144003 | Deployment scenarios and evaluation methodology for elevation beamforming and FD-MIMO | other | Qualcomm Inc. | R1-78 | - | [WTS] [JSN] | |||
R1-144004 | 2D antenna array modeling for elevation beamforming and FD-MIMO | other | Qualcomm Inc. | R1-78 | - | [WTS] [JSN] | |||
R1-144005 | Initial results of potential enhancements targeting 2D array | other | Qualcomm Inc. | R1-78 | - | [WTS] [JSN] | |||
R1-144006 | Simulation assumptions and parameters for E-UTRA indoor positioning study | other | Qualcomm Inc. | R1-78 | - | [WTS] [JSN] | |||
R1-144007 | Email discussion summary on [78-04] R1-143599Ā Clarification of PUSCH rate matching with SRS | other | LG Electronics | R1-78 | - | [WTS] [JSN] | |||
R1-144008 | Clarification of PUSCH rate matching with SRS | other | LG Electronics | R1-78 | - | [WTS] [JSN] | |||
R1-144009 | 36.211 CR0195 (Rel-12, F) Clarification of PUSCH rate matching with SRS | CR | LG Electronics | R1-78 | - | [WTS] [JSN] | |||
R1-144010 | 36.212 CR0164 (Rel-12, F) Clarification of PUSCH rate matching with SRS | CR | LG Electronics | R1-78 | - | [WTS] [JSN] | |||
R1-144011 | 36.213 CR0476 (Rel-12, F) Clarification of PUSCH rate matching with SRS | CR | LG Electronics | R1-78 | - | [WTS] [JSN] | |||
R1-144012 | 36.212 CR0165 (Rel-12, F) Correction to the DCI fields of TDD-FDD CA for Rel-12 LTE | CR | LG Electronics | R1-78 | - | [WTS] [JSN] | |||
R1-144013 | 36.213 CR0477 (Rel-12, F) CR on HARQ-ACK transmission for TDD-FDD CA with eIMTA | CR | LG Electronics | R1-78 | - | [WTS] [JSN] | |||
R1-144014 | Details of Resource Allocation for D2D Synchronization | other | LG Electronics | R1-78 | - | [WTS] [JSN] | |||
R1-144015 | Details of D2D synchronization signal design | other | LG Electronics | R1-78 | - | [WTS] [JSN] | |||
R1-144016 | Details of Conditions for D2DSS Transmissions | other | LG Electronics | R1-78 | - | [WTS] [JSN] | |||
R1-144017 | Details of PD2DSCH design | other | LG Electronics | R1-78 | - | [WTS] [JSN] | |||
R1-144018 | Remaining issues on D2D transmission timing | other | LG Electronics | R1-78 | - | [WTS] [JSN] | |||
R1-144019 | Evaluation results on the D2D synchronization procedure | other | LG Electronics | R1-78 | - | [WTS] [JSN] | |||
R1-144020 | Discussion on UE procedures for D2DSS transmission and reception | other | LG Electronics | R1-78 | - | [WTS] [JSN] | |||
R1-144021 | Discussion on Remaining Details of Resource Pool Configuration | other | LG Electronics | R1-78 | - | [WTS] [JSN] | |||
R1-144022 | Resource mapping pattern for SA transmission | other | LG Electronics | R1-78 | - | [WTS] [JSN] | |||
R1-144023 | Remaining Issues on T-RPT Design for D2D Communications | other | LG Electronics | R1-78 | - | [WTS] [JSN] | |||
R1-144024 | Power control for D2D transmission | other | LG Electronics | R1-78 | - | [WTS] [JSN] | |||
R1-144025 | Discussion on Remaining Details of CP Length | other | LG Electronics | R1-78 | - | [WTS] [JSN] | |||
R1-144026 | Remaining Issues on Resource Allocation and Repetition Transmission for Discovery | other | LG Electronics | R1-78 | - | [WTS] [JSN] | |||
R1-144027 | Remaing issues for D2D control and data transmission | other | LG Electronics | R1-78 | - | [WTS] [JSN] | |||
R1-144028 | HARQ-ACK Transmission Shift for D2D and WAN Co-existence | other | LG Electronics | R1-78 | - | [WTS] [JSN] | |||
R1-144029 | Other Remaining Issues for D2D and WAN Co-existence | other | LG Electronics | R1-78 | - | [WTS] [JSN] | |||
R1-144030 | Further Discussion on the Multi-carrier Issues in D2D | other | LG Electronics | R1-78 | - | [WTS] [JSN] | |||
R1-144031 | Summary of email discussion [78-08] : Clarification on synchronous/asynchronous scenario for DC | other | LG Electronics | R1-78 | - | [WTS] [JSN] | |||
R1-144032 | Remaining issues on power control for dual connectivity | other | LG Electronics | R1-78 | - | [WTS] [JSN] | |||
R1-144033 | PRACH handling for dual connectivity | other | LG Electronics | R1-78 | - | [WTS] [JSN] | |||
R1-144034 | SRS handling for dual connectivity | other | LG Electronics | R1-78 | - | [WTS] [JSN] | |||
R1-144035 | Discussion on low cost UEs | other | LG Electronics | R1-78 | - | [WTS] [JSN] | |||
R1-144036 | Considerations on coverage enhancement for MTC | other | LG Electronics | R1-78 | - | [WTS] [JSN] | |||
R1-144037 | Discussions on UE power consumption reduction | other | LG Electronics | R1-78 | - | [WTS] [JSN] | |||
R1-144038 | Data and control channels for MTC | other | LG Electronics | R1-78 | - | [WTS] [JSN] | |||
R1-144039 | Common message and signal transmission for MTC | other | LG Electronics | R1-78 | - | [WTS] [JSN] | |||
R1-144040 | Regulatory requirements for LAA | other | LG Electronics | R1-78 | - | [WTS] [JSN] | |||
R1-144041 | Design target and required functionalities of LAA | other | LG Electronics | R1-78 | - | [WTS] [JSN] | |||
R1-144042 | Candidate solutions for LAA operation | other | LG Electronics | R1-78 | - | [WTS] [JSN] | |||
R1-144043 | Deployment scenarios for LAA | other | LG Electronics | R1-78 | - | [WTS] [JSN] | |||
R1-144044 | Evaluation methodologies for LAA | other | LG Electronics | R1-78 | - | [WTS] [JSN] | |||
R1-144045 | High-level view of EB and FD-MIMO schemes | other | LG Electronics | R1-78 | - | [WTS] [JSN] | |||
R1-144046 | Scenarios and evaluation methodology for EB and FD-MIMO | other | LG Electronics | R1-78 | - | [WTS] [JSN] | |||
R1-144047 | RS design enhancements for supporting EB and FD-MIMO | other | LG Electronics | R1-78 | - | [WTS] [JSN] | |||
R1-144048 | Enhancements on codebook and feedback mechanism | other | LG Electronics | R1-78 | - | [WTS] [JSN] | |||
R1-144049 | Scenarios and evaluation methodology for enhanced indoor positioning | other | LG Electronics | R1-78 | - | [WTS] [JSN] | |||
R1-144050 | Complexity Reduction Targets and General Considerations for MTC UE Types | other | Sony | R1-78 | - | [WTS] [JSN] | |||
R1-144051 | Coverage Enhancement Targets for MTC UE Types | other | Sony | R1-78 | - | [WTS] [JSN] | |||
R1-144052 | Power Consumption Reduction Targets and Strategies for MTC UE Types | other | Sony | R1-78 | - | [WTS] [JSN] | |||
R1-144053 | Physical data and control channel design for MTC UE Types | other | Sony | R1-78 | - | [WTS] [JSN] | |||
R1-144054 | Considerations for LAA functionalities | other | Sony | R1-78 | - | [WTS] [JSN] | |||
R1-144055 | On LAA Deployment Scenarios | other | Sony | R1-78 | - | [WTS] [JSN] | |||
R1-144056 | On Elevation Beamforming/Full-Dimension (FD) MIMO for LTE | other | Sony | R1-78 | - | [WTS] [JSN] | |||
R1-144057 | Public safety D2D communication requirements of multi-carrier for release 12 | other | U.S. Department Of Commerce | R1-78 | - | [WTS] [JSN] | |||
R1-144058 | Scenarios and application characteristics for small data transmission | other | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | R1-78 | - | [WTS] [JSN] | |||
R1-144059 | Requirements for small data transmission enhancements | other | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | R1-78 | - | [WTS] [JSN] | |||
R1-144060 | Resource allocation for D2DSS and PD2DSCH | other | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | R1-78 | - | [WTS] [JSN] | |||
R1-144061 | Remaining details of D2DSS design | other | Alcatel-Lucent Shanghai Bell, Alcatel-Lucent | R1-78 | - | [WTS] [JSN] | |||
R1-144062 | Conditions for D2DSS transmission | other | Alcatel-Lucent Shanghai Bell, Alcatel-Lucent | R1-78 | - | [WTS] [JSN] | |||
R1-144063 | PD2DSCH design for D2D communication | other | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | R1-78 | - | [WTS] [JSN] | |||
R1-144064 | D2D Transmission Timing Setting | other | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | R1-78 | - | [WTS] [JSN] | |||
R1-144065 | D2D Synchronization Procedure | other | Alcatel-Lucent Shanghai Bell, Alcatel-Lucent | R1-78 | - | [WTS] [JSN] | |||
R1-144066 | D2D resource pool configuration | other | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | R1-78 | - | [WTS] [JSN] | |||
R1-144067 | T-RPT design and resource hopping for SA | other | Alcatel-Lucent Shanghai Bell, Alcatel-Lucent | R1-78 | - | [WTS] [JSN] | |||
R1-144068 | T-RPT design for data | other | Alcatel-Lucent Shanghai Bell, Alcatel-Lucent | R1-78 | - | [WTS] [JSN] | |||
R1-144069 | D2D power control details | other | Alcatel-Lucent Shanghai Bell, Alcatel-Lucent | R1-78 | - | [WTS] [JSN] | |||
R1-144070 | Configuration of D2D CP Length | other | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | R1-78 | - | [WTS] [JSN] | |||
R1-144071 | Resource selection for collision avoidance for Type 1 resource allocation | other | Alcatel-Lucent Shanghai Bell, Alcatel-Lucent | R1-78 | - | [WTS] [JSN] | |||
R1-144072 | Remaining details for D2D discovery | other | Alcatel-Lucent Shanghai Bell, Alcatel-Lucent | R1-78 | - | [WTS] [JSN] | |||
R1-144073 | Evaluation of Impact of D2D to WAN system performance | other | Alcatel-Lucent Shanghai Bell, Alcatel-Lucent | R1-78 | - | [WTS] [JSN] | |||
R1-144074 | Remaining Issues on UL Power Control and Power Scaling for Dual Connectivity | other | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | R1-78 | - | [WTS] [JSN] | |||
R1-144075 | UE complexity reduction for MTC | other | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | R1-78 | - | [WTS] [JSN] | |||
R1-144076 | Coverage enhancement for physical data & control channels | other | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | R1-78 | - | [WTS] [JSN] | |||
R1-144077 | Coverage enhancement for common control messages | other | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | R1-78 | - | [WTS] [JSN] | |||
R1-144078 | Coverage enhancement for PSS/SSS, PBCH, PRACH & PMCH | other | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | R1-78 | - | [WTS] [JSN] | |||
R1-144079 | Regulatory Requirements with Physical Layer Impact for Licensed-Assisted Access Using LTE | other | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | R1-78 | - | [WTS] [JSN] | |||
R1-144080 | Required Functionalities and Design Targets for Licensed-Assisted Access Using LTE | other | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | R1-78 | - | [WTS] [JSN] | |||
R1-144081 | High Level Discussion on the Potential Solutions for Licensed-Assisted Access Using LTE | other | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | R1-78 | - | [WTS] [JSN] | |||
R1-144082 | Channel Selection for Licensed-Assisted Access | other | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | R1-78 | - | [WTS] [JSN] | |||
R1-144083 | Considerations on LBT Enhancements for Licensed-Assisted Access | other | Alcatel-Lucent Shanghai Bell, Alcatel-Lucent | R1-78 | - | [WTS] [JSN] | |||
R1-144084 | Hidden node problem and potential solutions for LAA | other | Alcatel-Lucent Shanghai Bell, Alcatel-Lucent | R1-78 | - | [WTS] [JSN] | |||
R1-144085 | Deployment Scenarios and Evaluation Methodology for Licensed-Assisted Access using LTE | other | Alcatel-Lucent Shanghai Bell, Alcatel-Lucent | R1-78 | - | [WTS] [JSN] | |||
R1-144086 | High level overview for Elevation Beamforming and FD MIMO | other | Alcatel-Lucent Shanghai Bell, Alcatel-Lucent | R1-78 | - | [WTS] [JSN] | |||
R1-144087 | Proposals of Scenarios for Elevation Beamforming and FD MIMO | other | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | R1-78 | - | [WTS] [JSN] | |||
R1-144088 | Proposals of Simulation Assumptions for Elevation Beamforming and FD MIMO | other | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | R1-78 | - | [WTS] [JSN] | |||
R1-144089 | Proposals of 2D Antenna Array for Elevation Beamforming and FD MIMO | other | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | R1-78 | - | [WTS] [JSN] | |||
R1-144090 | Initial Evaluation Results for Elevation Beamforming and FD MIMO Schemes | other | Alcatel-Lucent Shanghai Bell, Alcatel-Lucent | R1-78 | - | [WTS] [JSN] | |||
R1-144091 | Deployment Scenarios and Evaluation Methodology for Indoor Positioning | other | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | R1-78 | - | [WTS] [JSN] | |||
R1-144092 | Discussion on UE categories for Rel-12 | other | Intel Corporation | R1-78 | - | [WTS] [JSN] | |||
R1-144093 | Draft LS on UE categories for Rel-12 | other | Intel Corporation | R1-78 | - | [WTS] [JSN] | |||
R1-144094 | Elevation beamforming for SU-MIMO and MU-MIMO | other | Intel Corporation | R1-78 | - | [WTS] [JSN] | |||
R1-144095 | UERS based diversity transmission for large antenna array | other | Intel Corporation | R1-78 | - | [WTS] [JSN] | |||
R1-144096 | On cell association in FD-MIMO systems | other | Intel Corporation | R1-78 | - | [WTS] [JSN] | |||
R1-144097 | Remaining Details of Physical Channel Design for D2D Communication | other | Intel Corporation | R1-78 | - | [WTS] [JSN] | |||
R1-144098 | On the need for interference control for Type 1 discovery | other | Intel Corporation | R1-78 | - | [WTS] [JSN] | |||
R1-144099 | Discussion on PD2DSCH content and design | other | Panasonic | R1-78 | - | [WTS] [JSN] | |||
R1-144100 | Further discussion on timing advance in D2D | other | Panasonic | R1-78 | - | [WTS] [JSN] | |||
R1-144101 | D2D synchronization procedure | other | Panasonic | R1-78 | - | [WTS] [JSN] | |||
R1-144102 | Clarification on resource pool configuration | other | Panasonic | R1-78 | - | [WTS] [JSN] | |||
R1-144103 | Power control method in D2D | other | Panasonic | R1-78 | - | [WTS] [JSN] | |||
R1-144104 | Evaluation of D2D and WAN co-existence with D2D power control | other | Panasonic | R1-78 | - | [WTS] [JSN] | |||
R1-144105 | Views on multi-carrier D2D issues | other | Panasonic | R1-78 | - | [WTS] [JSN] | |||
R1-144106 | Dual connectivity power control related aspect | other | Panasonic | R1-78 | - | [WTS] [JSN] | |||
R1-144107 | Design target and general consideration on MTC | other | Panasonic | R1-78 | - | [WTS] [JSN] | |||
R1-144108 | Multiple subframe code spreading for MTC Ues | other | Panasonic | R1-78 | - | [WTS] [JSN] | |||
R1-144109 | Consideration on data channel and associated control channel for MTC | other | Panasonic | R1-78 | - | [WTS] [JSN] | |||
R1-144110 | Consideration on SIBs/RAR/paging for Rel-13 MTC | other | Panasonic | R1-78 | - | [WTS] [JSN] | |||
R1-144111 | Regulatory framework for 5GHz | other | Panasonic | R1-78 | - | [WTS] [JSN] | |||
R1-144112 | Required functionalities for LAA at 5GHz | other | Panasonic | R1-78 | - | [WTS] [JSN] | |||
R1-144113 | Discussion on LAA deployment scenarios and evaluation methodology | other | Panasonic | R1-78 | - | [WTS] [JSN] | |||
R1-144114 | Initial performance evaluation of unlicensed spectrum opertaion | other | Panasonic | R1-78 | - | [WTS] [JSN] | |||
R1-144115 | Remaining details of D2DSS design | other | General Dynamics UK | R1-78 | - | [WTS] [JSN] | |||
R1-144116 | Remaining aspects of D2D transmission timing | other | General Dynamics UK | R1-78 | - | [WTS] [JSN] | |||
R1-144117 | Issues on FDD-TDD HARQ-ACK reporting procedure for TDD Pcell | other | Sharp | R1-78 | - | [WTS] [JSN] | |||
R1-144118 | Draft stage-2 TP for NAICS in TS36.300 | other | MediaTek Inc. | R1-78 | - | [WTS] [JSN] | |||
R1-144119 | General considerations on complexity reduction for Rel-13 MTC UE | other | MediaTek Inc. | R1-78 | - | [WTS] [JSN] | |||
R1-144120 | General considerations on coverage extension for Rel-13 MTC UE | other | MediaTek Inc. | R1-78 | - | [WTS] [JSN] | |||
R1-144121 | Analysis and potential solutions for UE power consumption reduction | other | MediaTek Inc. | R1-78 | - | [WTS] [JSN] | |||
R1-144122 | Discussion on potential solutions for physical channels for Rel-13 MTC UE | other | MediaTek Inc. | R1-78 | - | [WTS] [JSN] | |||
R1-144123 | Common control messages for Rel-13 MTC UE | other | MediaTek Inc. | R1-78 | - | [WTS] [JSN] | |||
R1-144124 | Motivation for Enhanced MU-MIMO and Network Assisted Interference Cancellation | other | MediaTek Inc. | R1-78 | - | [WTS] [JSN] | |||
R1-144125 | Open issues of LAA using LTE | other | China Telecom | R1-78 | - | [WTS] [JSN] | |||
R1-144126 | On deployment scenarios and evaluation methodology of LAA using LTE | other | China Telecom | R1-78 | - | [WTS] [JSN] | |||
R1-144127 | System Design and Specification Impact of EB/FD-MIMO | other | China Telecom | R1-78 | - | [WTS] [JSN] | |||
R1-144128 | Discussion on the regulatory requirements of LAA | other | Coolpad | R1-78 | - | [WTS] [JSN] | |||
R1-144129 | Discussion on the deployment scenario of LAA | other | Coolpad | R1-78 | - | [WTS] [JSN] | |||
R1-144130 | On the performance of D2DSS selection criteria and D2D synchronization procedures | other | III | R1-78 | - | [WTS] [JSN] | |||
R1-144131 | Considerations on LAA-LTE designs for fair co-existence | other | KDDI | R1-78 | - | [WTS] [JSN] | |||
R1-144132 | Definition of the resource allocation granularity parameter in NAICS | other | NVIDIA | R1-78 | - | [WTS] [JSN] | |||
R1-144133 | Views on Rel-12 UE capabilities | other | NVIDIA | R1-78 | - | [WTS] [JSN] | |||
R1-144134 | High-level views on 3D MIMO schemes | other | NVIDIA | R1-78 | - | [WTS] [JSN] | |||
R1-144135 | Initial evaluation results on 3D MIMO | other | NVIDIA | R1-78 | - | [WTS] [JSN] | |||
R1-144136 | Discussion on D2DSS configuration | other | NTT DOCOMO | R1-78 | - | [WTS] [JSN] | |||
R1-144137 | Transmission timing of Type 2B discovery | other | NTT DOCOMO | R1-78 | - | [WTS] [JSN] | |||
R1-144138 | Remaining details of Type 2B discovery hopping pattern | other | NTT DOCOMO | R1-78 | - | [WTS] [JSN] | |||
R1-144139 | On intra-pool repetition for discovery | other | NTT DOCOMO | R1-78 | - | [WTS] [JSN] | |||
R1-144140 | Potential issue on parallel transmission of D2D | other | NTT DOCOMO | R1-78 | - | [WTS] [JSN] | |||
R1-144141 | Remaining issues on PRACH handling and its power-control | other | NTT DOCOMO | R1-78 | - | [WTS] [JSN] | |||
R1-144142 | Details of power control for PUCCH/PUSCH | other | NTT DOCOMO | R1-78 | - | [WTS] [JSN] | |||
R1-144143 | SRS handling and its power-control | other | NTT DOCOMO | R1-78 | - | [WTS] [JSN] | |||
R1-144144 | Further details of UE capability aspects | other | NTT DOCOMO | R1-78 | - | [WTS] [JSN] | |||
R1-144145 | Prioritization of UL-SCH if UE capability of max UL-TBS is exceeded | other | NTT DOCOMO | R1-78 | - | [WTS] [JSN] | |||
R1-144146 | Initial views on UE complexity redcution in Rel-13 low cost MTC | other | NTT DOCOMO | R1-78 | - | [WTS] [JSN] | |||
R1-144147 | Design of EPDCCH search space for Rel-13 low cost MTC | other | NTT DOCOMO | R1-78 | - | [WTS] [JSN] | |||
R1-144148 | Japanese ragulatory requirements in 5 GHz band | other | NTT DOCOMO | R1-78 | - | [WTS] [JSN] | |||
R1-144149 | Required functionalities and design targets for LAA using LTE | other | NTT DOCOMO | R1-78 | - | [WTS] [JSN] | |||
R1-144150 | Inter-operator and inter-RAT coexistence techniques for LAA using LTE | other | NTT DOCOMO | R1-78 | - | [WTS] [JSN] | |||
R1-144151 | Deployment scenarios and evaluation assumptions for LAA using LTE | other | NTT DOCOMO | R1-78 | - | [WTS] [JSN] | |||
R1-144152 | High-level view for Elevation beamforming and FD-MIMO | other | NTT DOCOMO | R1-78 | - | [WTS] [JSN] | |||
R1-144153 | Scenarios for Elevation beamforming and FD-MIMO | other | NTT DOCOMO | R1-78 | - | [WTS] [JSN] | |||
R1-144154 | Initial evaluation results of Elevation beamforming and FD-MIMO | other | NTT DOCOMO | R1-78 | - | [WTS] [JSN] | |||
R1-144155 | Precoding schemes for Elevation beamforming and FD-MIMO | other | NTT DOCOMO | R1-78 | - | [WTS] [JSN] | |||
R1-144156 | The Impact of Cell Selection on Elevation beamforming and FD-MIMO | other | NTT DOCOMO | R1-78 | - | [WTS] [JSN] | |||
R1-144157 | Design overview on LAA | other | Kyocera | R1-78 | - | [WTS] [JSN] | |||
R1-144158 | Deployment scenarios and evaluation methodologies for LAA | other | Kyocera | R1-78 | - | [WTS] [JSN] | |||
R1-144159 | 36.213 CR0478 (Rel-12, F) Correction to HARQ-ACK bit codebook size determination for eIMTA | CR | Nokia Networks, Nokia Corporation, CATT | R1-78 | - | [WTS] [JSN] | |||
R1-144160 | 36.213 CR0479 (Rel-12, F) Correction to HARQ-ACK bits ordering for PUCCH format 1b with channel selection for single eIMTA serving cell | CR | Nokia Networks, Nokia Corporation | R1-78 | - | [WTS] [JSN] | |||
R1-144161 | 36.213 CR0480 (Rel-12, F) Corrections to FDD/TDD CA timing advance adjustments | CR | Nokia Networks, Nokia Corporation | R1-78 | - | [WTS] [JSN] | |||
R1-144162 | On DRS based RSRP/RSRQ definitions | other | Nokia Corporation, Nokia Networks | R1-78 | - | [WTS] [JSN] | |||
R1-144163 | Discussion on inter-cell synchronization and conditions for D2DSS transmission | other | Nokia Corporation, Nokia Networks | R1-78 | - | [WTS] [JSN] | |||
R1-144164 | Discussions on PSBCH | other | Nokia Corporation, Nokia Networks | R1-78 | - | [WTS] [JSN] | |||
R1-144165 | Basic synchronization procedure for D2D operation | other | Nokia Corporation, Nokia Networks | R1-78 | - | [WTS] [JSN] | |||
R1-144166 | Scheduling assignment design for D2D communications | other | Nokia Networks, Nokia Corporation | R1-78 | - | [WTS] [JSN] | |||
R1-144167 | Remaining details of T-RPT design | other | Nokia Corporation, Nokia Networks | R1-78 | - | [WTS] [JSN] | |||
R1-144168 | On remaining details of power control for D2D transmissions | other | Nokia Corporation, Nokia Networks | R1-78 | - | [WTS] [JSN] | |||
R1-144169 | Discovery signal repetition | other | Nokia Corporation, Nokia Networks | R1-78 | - | [WTS] [JSN] | |||
R1-144170 | Remaining power control issues in dual connectivity | other | Nokia Networks, Nokia Corporation | R1-78 | - | [WTS] [JSN] | |||
R1-144171 | On TDD eIMTA UE capability to support PUCCH format 3 | other | Nokia Networks, Nokia Corporation | R1-78 | - | [WTS] [JSN] | |||
R1-144172 | Overview of Further Physical Layer Enhancements for MTC | other | Nokia Networks, Nokia Corporation | R1-78 | - | [WTS] [JSN] | |||
R1-144173 | UE Complexity Reduction for MTC | other | Nokia Networks, Nokia Corporation | R1-78 | - | [WTS] [JSN] | |||
R1-144174 | Coverage Enhancement for MTC | other | Nokia Networks, Nokia Corporation | R1-78 | - | [WTS] [JSN] | |||
R1-144175 | UE Power Consumption Reduction for MTC | other | Nokia Networks, Nokia Corporation | R1-78 | - | [WTS] [JSN] | |||
R1-144176 | Control Channel Enhancement for MTC | other | Nokia Networks, Nokia Corporation | R1-78 | - | [WTS] [JSN] | |||
R1-144177 | Data Channel Enhancement for MTC | other | Nokia Networks, Nokia Corporation | R1-78 | - | [WTS] [JSN] | |||
R1-144178 | Common Control Messages for MTC | other | Nokia Networks, Nokia Corporation | R1-78 | - | [WTS] [JSN] | |||
R1-144179 | PSS/SSS Enhancement for MTC | other | Nokia Networks, Nokia Corporation | R1-78 | - | [WTS] [JSN] | |||
R1-144180 | PBCH Enhancement for MTC | other | Nokia Networks, Nokia Corporation | R1-78 | - | [WTS] [JSN] | |||
R1-144181 | PRACH Enhancement for MTC | other | Nokia Networks, Nokia Corporation | R1-78 | - | [WTS] [JSN] | |||
R1-144182 | LTE LAA requirements set based on regulatory requirements | other | Nokia Corporation, Nokia Networks | R1-78 | - | [WTS] [JSN] | |||
R1-144183 | Channel Access Mechanisms according to ETSI regulations | other | Nokia Corporation, Nokia Networks | R1-78 | - | [WTS] [JSN] | |||
R1-144184 | Requirements and design targets for LTE Licensed Assisted Access | other | Nokia Corporation, Nokia Networks | R1-78 | - | [WTS] [JSN] | |||
R1-144185 | On LTE LAA functionalities facilitating co-existence | other | Nokia Networks, Nokia Corporation | R1-78 | - | [WTS] [JSN] | |||
R1-144186 | Short Control Signalling for LTE LAA | other | Nokia Networks, Nokia Corporation | R1-78 | - | [WTS] [JSN] | |||
R1-144187 | Listen Before Talk and Channel Access | other | Nokia Networks, Nokia Corporation | R1-78 | - | [WTS] [JSN] | |||
R1-144188 | Simulation scenarios for LTE Licensed Assisted Access | other | Nokia Networks, Nokia Corporation | R1-78 | - | [WTS] [JSN] | |||
R1-144189 | Simulation Assumptions and Evaluation Methodologies for LTE Licensed Assisted Access | other | Nokia Corporation, Nokia Networks | R1-78 | - | [WTS] [JSN] | |||
R1-144190 | Level View of Schemes for EBF/Full Dimension MIMO | other | Nokia Networks, Nokia Corporation | R1-78 | - | [WTS] [JSN] | |||
R1-144191 | Deployment Scenarios and Evaluation Methodology for EBF/FD-MIMO | other | Nokia Networks, Nokia Corporation | R1-78 | - | [WTS] [JSN] | |||
R1-144192 | Considering potential enhancements targeting 2D antenna array | other | Nokia Networks, Nokia Corporation | R1-78 | - | [WTS] [JSN] | |||
R1-144193 | Channel Model and Scenario Considerations for Indoor Positioning | other | Nokia Networks, Nokia Corporation | R1-78 | - | [WTS] [JSN] | |||
R1-144194 | Public safety requirements of assigned D2D resource allocation for release 12 | other | U.S. Department Of Commerce | R1-78 | - | [WTS] [JSN] | |||
R1-144195 | UTDOA Enhancements for Positioning in LTE | other | TruePosition | R1-78 | - | [WTS] [JSN] | |||
R1-144196 | 25.214 CR0726 (Rel-12, F) Correction of figure reference in uplink radio link failure-restore in CELL_DCH state | CR | Ericsson | R1-78 | - | [WTS] [JSN] | |||
R1-144197 | General considerations for small data transmission enhancements | other | Ericsson | R1-78 | - | [WTS] [JSN] | |||
R1-144198 | Small data transmission enhancements - coverage considerations | other | Ericsson | R1-78 | - | [WTS] [JSN] | |||
R1-144199 | Needs for signalling enhancements for small data transmissions | other | Ericsson | R1-78 | - | [WTS] [JSN] | |||
R1-144200 | Work plan on small data transmission enhancements for UTMS | other | Ericsson | R1-78 | - | [WTS] [JSN] | |||
R1-144201 | 25.705 v0.0.1 (Skeleton) Study on small data transmission enhancements for UMTS | other | Ericsson | R1-78 | - | [WTS] [JSN] | |||
R1-144202 | Initial considerations on DL control channel enhancements | other | Ericsson | R1-78 | - | [WTS] [JSN] | |||
R1-144203 | On Reduced UE Complexity for Rel-13 LC-MTC | other | InterDigital | R1-78 | - | [WTS] [JSN] | |||
R1-144204 | On Coverage Enhancement for Rel-13 LC-MTC | other | InterDigital | R1-78 | - | [WTS] [JSN] | |||
R1-144205 | Physical Channels for Unicast Traffic in Rel-13 LC-MTC | other | InterDigital | R1-78 | - | [WTS] [JSN] | |||
R1-144206 | RAR and Paging for Rel-13 LC-MTC | other | InterDigital | R1-78 | - | [WTS] [JSN] | |||
R1-144207 | PBCH and PRACH for Rel-13 LC-MTC | other | InterDigital | R1-78 | - | [WTS] [JSN] | |||
R1-144208 | Views on 3D MIMO Schemes | other | InterDigital | R1-78 | - | [WTS] [JSN] | |||
R1-144209 | On Deployment Scenario for 3D MIMO | other | InterDigital | R1-78 | - | [WTS] [JSN] | |||
R1-144210 | Initial Evaluation Results for 2D Antenna Array | other | InterDigital | R1-78 | - | [WTS] [JSN] | |||
R1-144211 | Resource Allocation for D2DSS and PD2DSCH | other | InterDigital | R1-78 | - | [WTS] [JSN] | |||
R1-144212 | On PD2DSCH design | other | InterDigital | R1-78 | - | [WTS] [JSN] | |||
R1-144213 | On resource patterns for SA transmission | other | InterDigital | R1-78 | - | [WTS] [JSN] | |||
R1-144214 | Remaining details of T-RPT design for data | other | InterDigital | R1-78 | - | [WTS] [JSN] | |||
R1-144215 | PRACH prioritization and handling | other | InterDigital | R1-78 | - | [WTS] [JSN] | |||
R1-144216 | Power control synchronous and asynchronous operation | other | InterDigital | R1-78 | - | [WTS] [JSN] | |||
R1-144217 | SRS prioritization and handling | other | InterDigital | R1-78 | - | [WTS] [JSN] | |||
R1-144218 | Regulatory requirements affecting L1 design for LTE LAA | other | InterDigital | R1-78 | - | [WTS] [JSN] | |||
R1-144219 | On design targets and supported functionality for LTE LAA | other | InterDigital | R1-78 | - | [WTS] [JSN] | |||
R1-144220 | 36.213 CR0481 (Rel-12, F) Correction on DAI for TDD-FDD CA | CR | Rhode & Schwarz | R1-78 | - | [WTS] [JSN] | |||
R1-144221 | Design Targets for LAA using LTE | other | Hitachi, ltd. | R1-78 | - | [WTS] [JSN] | |||
R1-144222 | High Level Views on FD-MIMO Schemes | other | Hitachi, ltd. | R1-78 | - | [WTS] [JSN] | |||
R1-144223 | Deployment Scenarios and Evaluation Assumptions | other | Hitachi, ltd. | R1-78 | - | [WTS] [JSN] | |||
R1-144224 | 36.889 v0.0.1 (Skeleton) Study on licensed-assisted access using LTE | other | Ericsson, Huawei | R1-78 | - | [WTS] [JSN] | |||
R1-144225 | Work plan proposal for study on licensed-assisted access to unlicensed spectrum | other | Ericsson, Huawei | R1-78 | - | [WTS] [JSN] | |||
R1-144226 | Regulatory Requirements for Unlicensed Spectrum | other | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, Ericsson, Huawei, HiSilicon, IAESI, LG, Nokia Corporation, Nokia Networks, Qualcomm, NTT Docomo | R1-78 | - | [WTS] [JSN] | |||
R1-144227 | UE Categories | other | Sprint | R1-78 | - | [WTS] [JSN] | |||
R1-144228 | Cell association for FD-MIMO evaluation | other | CATT | R1-78 | - | [WTS] [JSN] | |||
R1-144229 | 36.201 CR0008 (Rel-12, B) Introduction of TDD-FDD CA, Small-Cell Enhancements, Dual Connectivity, eIMTA, ProSe, WLAN/3GPP interworking, and miscellaneous minor corrections | CR | Alcatel-Lucent | R1-78 | - | [WTS] [JSN] | |||
R1-144230 | Proposal for Study of Regulatory Requirements for Unlicensed Spectrum Deployments | other | Broadcom | R1-78 | - | [WTS] [JSN] | |||
R1-144231 | [DRAFT] LS on Regulatory Requirements for Unlicensed Spectrum Deployment | other | Broadcom | R1-78 | - | [WTS] [JSN] | |||
R1-144232 | Robust-Coexistence Considerations for LAA-LTE | other | Broadcom | R1-78 | - | [WTS] [JSN] | |||
R1-144233 | PHY enhancement areas & options to support robust coexistence LAA | other | Broadcom | R1-78 | - | [WTS] [JSN] | |||
R1-144234 | Deployment and Evaluation Considerations for LAA-LTE | other | Broadcom | R1-78 | - | [WTS] [JSN] | |||
R1-144235 | 36.213 CR0482 (Rel-12, B) Introduction of D2D (ProSe), Dual Connectivity, Small Cell Enhancements, and NAICS features | CR | Motorola Mobility | R1-78 | - | [WTS] [JSN] | |||
R1-144236 | Physical Layer options for LAA-LTE | other | Motorola Mobility | R1-78 | - | [WTS] [JSN] | |||
R1-144237 | Details of new UE categories | other | Motorola Mobility | R1-78 | - | [WTS] [JSN] | |||
R1-144238 | Overview of 2D antenna array transmission schemes | other | Motorola Mobility | R1-78 | - | [WTS] [JSN] | |||
R1-144239 | Discussion on the Reservation Bit in SA Content for D2D Broadcast Communications | other | ITRI | R1-78 | - | [WTS] [JSN] | |||
R1-144240 | Consideration on scenarios required for licensed-assisted access | other | Potevio | R1-78 | - | [WTS] [JSN] | |||
R1-144241 | Discussion on remaining issues of T-RPT for data | other | Potevio | R1-78 | - | [WTS] [JSN] | |||
R1-144242 | Deployment scenarios for LAA-LTE and simulation assumptions for coexistence evaluation | other | Orange | R1-78 | - | [WTS] [JSN] | |||
R1-144243 | Remaining issues of PD2DSCH content | other | Microsoft Corporation | R1-78 | - | [WTS] [JSN] | |||
R1-144244 | Issues in D2D synchronization procedures | other | Microsoft Corporation | R1-78 | - | [WTS] [JSN] | |||
R1-144245 | HARQ-ACK transmission for UE working in D2D communication Mode 1 | other | Microsoft Corporation | R1-78 | - | [WTS] [JSN] | |||
R1-144246 | Consideration on UE complexity reduction for Rel.13 MTC | other | Microsoft Corporation | R1-78 | - | [WTS] [JSN] | |||
R1-144247 | Consideration on physical control channel design for Rel.13 MTC | other | Microsoft Corporation | R1-78 | - | [WTS] [JSN] | |||
R1-144248 | Discussion on deployment scenarios for licensed-assisted access using LTE | other | Microsoft Corporation | R1-78 | - | [WTS] [JSN] | |||
R1-144249 | SRS Power Control Aspects on Dual Connectivity | other | KT Corp. | R1-78 | - | [WTS] [JSN] | |||
R1-144250 | Consideration on HARQ ACK/NACK feedback for PUSCH | other | KT Corp. | R1-78 | - | [WTS] [JSN] | |||
R1-144251 | Considerations on common control messages | other | KT Corp | R1-78 | - | [WTS] [JSN] | |||
R1-144252 | Details on D2D synchronization signal design | other | ITL Inc. | R1-78 | - | [WTS] [JSN] | |||
R1-144253 | Frequency hopping for SA transmission in D2D communication | other | ITL Inc. | R1-78 | - | [WTS] [JSN] | |||
R1-144254 | Multiplexing between D2D and WAN in a FDD band | other | ITL Inc. | R1-78 | - | [WTS] [JSN] | |||
R1-144255 | Remaining issues of channel priority rule | other | Ericsson | R1-78 | - | [WTS] [JSN] | |||
R1-144256 | Synchronous and asynchronous UE power control behavior | other | Ericsson | R1-78 | - | [WTS] [JSN] | |||
R1-144257 | Further consideration of UE capabilities in dual-connectivity | other | Ericsson | R1-78 | - | [WTS] [JSN] | |||
R1-144258 | Work plan for indoor positioning enhancement | other | Ericsson | R1-78 | - | [WTS] [JSN] | |||
R1-144259 | High-level considerations for indoor positioning enhancement | other | Ericsson | R1-78 | - | [WTS] [JSN] | |||
R1-144260 | Deployment scenarios for indoor positioning evaluations | other | Ericsson | R1-78 | - | [WTS] [JSN] | |||
R1-144261 | Introducing elevation/2D beamforming | other | Ericsson | R1-78 | - | [WTS] [JSN] | |||
R1-144262 | Configuration of 2D antenna arrays | other | Ericsson | R1-78 | - | [WTS] [JSN] | |||
R1-144263 | Simulation scenarios and parameters for EBF/FD-MIMO study | other | Ericsson | R1-78 | - | [WTS] [JSN] | |||
R1-144264 | Enhancements of 2D array antenna requirements | other | Ericsson | R1-78 | - | [WTS] [JSN] | |||
R1-144265 | Initial results on UE specific elevation beamforming | other | Ericsson | R1-78 | - | [WTS] [JSN] | |||
R1-144266 | Initial discussion on identified functionalities for LAA | other | Ericsson | R1-78 | - | [WTS] [JSN] | |||
R1-144267 | Initial discussion on solutions for identified functionalities | other | Ericsson | R1-78 | - | [WTS] [JSN] | |||
R1-144268 | Deployment scenarios for licensed-assisted access to unlicensed spectrum | other | Ericsson | R1-78 | - | [WTS] [JSN] | |||
R1-144269 | Coexistence evaluation methodology and scenarios for LAA | other | Ericsson | R1-78 | - | [WTS] [JSN] | |||
R1-144270 | Remaining issues on UE category design | other | Ericsson | R1-78 | - | [WTS] [JSN] | |||
R1-144271 | Remaining issues on UE capability design | other | Ericsson | R1-78 | - | [WTS] [JSN] | |||
R1-144272 | Discussions on the deployment scenarios of LAA | other | CATR | R1-78 | - | [WTS] [JSN] | |||
R1-144273 | nitial evaluation results of Rel-12 DL MIMO using 3D channel modelling | other | CATR | R1-78 | - | [WTS] [JSN] | |||
R1-144274 | Coexistence objectives for the design of LAA-LTE | other | CableLabs | R1-78 | - | [WTS] [JSN] | |||
R1-144275 | Performance objectives for coexistence between LAA-LTE and other unlicensed spectrum deployments | other | CableLabs, Broadcom | R1-78 | - | [WTS] [JSN] | |||
R1-144276 | In-device coexistence requirements for the design of LAA-LTE | other | CableLabs | R1-78 | - | [WTS] [JSN] | |||
R1-144277 | [Draft] LS on fair spectrum sharing in unlicensed spectrum | other | CableLabs | R1-78 | - | [WTS] [JSN] | |||
R1-144278 | [Draft] LS on real-time services | other | CableLabs | R1-78 | - | [WTS] [JSN] | |||
R1-144279 | Rationale for Selecting Deployment Scenarios for the design of LAA-LTE | other | CableLabs | R1-78 | - | [WTS] [JSN] | |||
R1-144280 | Deployment scenario for the design of LAA-LTE: One LAA-LTE and one Wi-Fi | other | CableLabs | R1-78 | - | [WTS] [JSN] | |||
R1-144281 | Deployment scenario for the design of LAA-LTE: high density outdoor | other | CableLabs | R1-78 | - | [WTS] [JSN] | |||
R1-144282 | Deployment scenario for the design of LAA-LTE: Indoor venue | other | CableLabs | R1-78 | - | [WTS] [JSN] | |||
R1-144283 | Other deployment scenarios for the design of LAA-LTE | other | CableLabs | R1-78 | - | [WTS] [JSN] | |||
R1-144284 | Consideration of an indoor linear cell using a leaky coaxial cable | other | ATR | R1-78 | - | [WTS] [JSN] | |||
R1-144285 | Outstanding aspects of UL power control for Dual Connectivity | other | Texas Instruments | R1-78 | - | [WTS] [JSN] | |||
R1-144286 | Impact of regulatory requirements on LTE License-Assisted Access | other | Texas Instruments | R1-78 | - | [WTS] [JSN] | |||
R1-144287 | Discussion of multiple SA transmission in mode 2 D2D communication | other | ASUSTeK | R1-78 | - | [WTS] [JSN] | |||
R1-144288 | Discussion on Differentiability of D2D grant | other | ASUSTeK | R1-78 | - | [WTS] [JSN] | |||
R1-144289 | Impact on physical channel regardingbandwidth reduction | other | ASUSTeK | R1-78 | - | [WTS] [JSN] | |||
R1-144290 | 25.214 CR0727 (Rel-12, F) Correction to UMTS Hetnet features | CR | Huawei, HiSilicon | R1-78 | - | [WTS] [JSN] | |||
R1-144291 | 25.211 CR0320 (Rel-12, F) Correction of DL FET | CR | Huawei, HiSilicon | R1-78 | - | [WTS] [JSN] | |||
R1-144292 | 25.212 CR0332 (Rel-12, F) Correction of DL FET | CR | Huawei, HiSilicon | R1-78 | - | [WTS] [JSN] | |||
R1-144293 | 25.214 CR0728 (Rel-12, F) Correction of DL FET | CR | Huawei, HiSilicon | R1-78 | - | [WTS] [JSN] | |||
R1-144294 | 25.215 CR0203 (Rel-12, F) Clarification of measurement capability for WLAN interworking | CR | Huawei, HiSilicon | R1-78 | - | [WTS] [JSN] | |||
R1-144295 | 25.214 CR0729 (Rel-11, F) Clarification of HS-SCCH orders for Rel-11 features | CR | Huawei, HiSilicon | R1-78 | - | [WTS] [JSN] | |||
R1-144296 | 25.214 CR0730 (Rel-12, F) Clarification of HS-SCCH orders for Rel-12 features | CR | Huawei, HiSilicon | R1-78 | - | [WTS] [JSN] | |||
R1-144297 | Enabling DTX/DRX for SRB only over DCH | other | Huawei, HiSilicon | R1-78 | - | [WTS] [JSN] | |||
R1-144298 | 25.214 CR0731 (Rel-12, F) Enabling DTX/DRX for SRB only over DCH | CR | Huawei, HiSilicon | R1-78 | - | [WTS] [JSN] | |||
R1-144299 | Target scenarios for Small Data Transmission | other | Huawei, HiSilicon | R1-78 | - | [WTS] [JSN] | |||
R1-144300 | Requirements for Small Data Transmission | other | Huawei, HiSilicon | R1-78 | - | [WTS] [JSN] | |||
R1-144301 | Considerations on Small Data Transmission enhancements for UMTS | other | Huawei, HiSilicon | R1-78 | - | [WTS] [JSN] | |||
R1-144302 | Soft combining of DL TPC commands in consecutive slots | other | Huawei, HiSilicon | R1-78 | - | [WTS] [JSN] | |||
R1-144303 | Text proposal on the TR skeleton of RAN1 aspects for downlink enhancements for UMTS | other | Huawei, HiSilicon | R1-78 | - | [WTS] [JSN] | |||
R1-144304 | Text proposal on evaluation methodology of the downlink enhancements solutions | other | Huawei, HiSilicon | R1-78 | - | [WTS] [JSN] | |||
R1-144305 | Text proposal on solution of downlink enhancements for UMTS | other | Huawei, HiSilicon | R1-78 | - | [WTS] [JSN] | |||
R1-144306 | High level view of schemes for LTE elevation beamforming/full-dimension MIMO | other | CHTTL | R1-78 | - | [WTS] [JSN] | |||
R1-144307 | Discussion on deployment scenario and evaluation methodology of elevation beamforming/full-dimension MIMO for LTE | other | CHTTL | R1-78 | - | [WTS] [JSN] | |||
R1-144308 | 25.214 CR0732 (Rel-12, F) Clarifications to Further EUL Enhancements | CR | Qualcomm Incorporated | R1-78 | - | [WTS] [JSN] | |||
R1-144309 | 25.211 CR0321 (Rel-12, F) Clarifications to Heterogeneous Networks | CR | Qualcomm Incorporated | R1-78 | - | [WTS] [JSN] | |||
R1-144310 | 25.212 CR0333 (Rel-12, F) Correction to TFCI bit mapping index in DCH Enhancements | CR | Qualcomm Incorporated | R1-78 | - | [WTS] [JSN] | |||
R1-144311 | Considerations on deployment scenarios and requirements of LAA using LTE | other | China Unicom | R1-78 | - | [WTS] [JSN] | |||
R1-144312 | Considerations on evaluation scenarios and assumptions of LAA using LTE | other | China Unicom | R1-78 | - | [WTS] [JSN] | |||
R1-144313 | Requirements of high-precision indoor positioning | other | China Unicom | R1-78 | - | [WTS] [JSN] | |||
R1-144314 | Considerations on high-precision indoor positioning | other | China Unicom | R1-78 | - | [WTS] [JSN] | |||
R1-144315 | Evaluation methodologies and Metrics for co-existence performance evaluation on LAA-WiFi and LAA-LAA | other | Sharp | R1-78 | - | [WTS] [JSN] | |||
R1-144316 | On Small Data Transmission Enhancements for UMTS | other | Nokia Networks | R1-78 | - | [WTS] [JSN] | |||
R1-144317 | 36.211 CR0196 (Rel-12, B) Inclusion of ProSe | CR | Ericsson | R1-78 | - | [WTS] [JSN] | |||
R1-144318 | Coexistence scenarios and metrics for Licensed-Assisted Access Using LTE | other | BlackBerry UK Limited | R1-78 | - | [WTS] [JSN] | |||
R1-144319 | Outstanding Issues for Discovery Resource Allocation | other | Ericsson | R1-78 | - | [WTS] [JSN] | |||
R1-144320 | Inter-Carrier Aspects of D2D Discovery and Communication | other | Ericsson | R1-78 | - | [WTS] [JSN] | |||
R1-144321 | Receiver Behaviour for D2D Synchronization | other | Ericsson | R1-78 | - | [WTS] [JSN] | |||
R1-144322 | Transmitter Behaviour for D2D Synchronization | other | Ericsson | R1-78 | - | [WTS] [JSN] | |||
R1-144323 | Synchronization Signals Design for D2D | other | Ericsson | R1-78 | - | [WTS] [JSN] | |||
R1-144324 | Outstanding Issues for D2D Physical Channels, QCL and Timing | other | Ericsson | R1-78 | - | [WTS] [JSN] | |||
R1-144325 | PD2DSCH content | other | Ericsson | R1-78 | - | [WTS] [JSN] | |||
R1-144326 | SA resource allocation | other | Ericsson | R1-78 | - | [WTS] [JSN] | |||
R1-144327 | 36.211 CR0197 (Rel-12, B) Inclusion of small-cell enhancements | CR | Ericsson | R1-78 | - | [WTS] [JSN] | |||
R1-144328 | Remaining issues on D2D transmission timing | other | Sharp | R1-78 | - | [WTS] [JSN] | |||
R1-144329 | Measurements and reporting for configuring coverage enhancements | other | Huawei, HiSilicon | R1-78 | - | [WTS] [JSN] | |||
R1-144330 | Other Remaining Issues for D2D and WAN Co-existence | other | LG Electronics | R1-78 | - | [WTS] [JSN] | |||
R1-144331 | Design target and general consideration on MTC | other | Panasonic | R1-78 | - | [WTS] [JSN] | |||
R1-144332 | Work plan for LAA Study | other | Broadcom | R1-78 | - | [WTS] [JSN] | |||
R1-144333 | Candidate functionalities towards the fairness design target in LAA | other | Fujitsu | R1-78 | - | [WTS] [JSN] | |||
R1-144334 | LAA scenarios and throughput metrics | other | Fujitsu | R1-78 | - | [WTS] [JSN] | |||
R1-144335 | Final Report of RAN1#78 meeting | other | MCC | R1-78 | - | [WTS] [JSN] | |||
R1-144336 | WF on prioritization of UL-SCHs in dual connectivity | other | NTT DOCOMO, Qualcomm, Ericsson, CATT, Nokia Networks, Nokia Corporation, ZTE, Panasonic, LG Electronics, NEC, Hitachi | R1-78 | - | [WTS] [JSN] | |||
R1-144337 | Scheduling assignment design for D2D communications | other | Nokia Networks, Nokia Corporation | R1-78 | - | [WTS] [JSN] | |||
R1-144338 | Cell association for FD-MIMO evaluation | other | CATT | R1-78 | - | [WTS] [JSN] | |||
R1-144339 | Inter-operator and inter-RAT coexistence techniques for LAA using LTE | other | NTT DOCOMO | R1-78 | - | [WTS] [JSN] | |||
R1-144340 | 36.213 CR0478r1 (Rel-12, F) Correction to HARQ-ACK bit codebook size determination for eIMTA | CR | Nokia Networks, Nokia Corporation, CATT | R1-78 | - | [WTS] [JSN] | |||
R1-144341 | WF on synchronization procedure | other | LG Electronics, Qualcomm, NEC, General Dynamics, ETRI | R1-78 | - | [WTS] [JSN] | |||
R1-144342 | WF on PRACH collision handling in dual connectivity | other | NEC | R1-78 | - | [WTS] [JSN] | |||
R1-144343 | 36.213 CR0479r1 (Rel-12, F) Correction to HARQ-ACK bits ordering for PUCCH format 1b with channel selection for single eIMTA serving cell | CR | Nokia Networks, Nokia Corporation | R1-78 | - | [WTS] [JSN] | |||
R1-144344 | 36.213 CR0479r2 (Rel-12, F) Correction to HARQ-ACK bits ordering for PUCCH format 1b with channel selection for single eIMTA serving cell | CR | Nokia Networks, Nokia Corporation | R1-78 | - | [WTS] [JSN] | |||
R1-144345 | WF on PRACH Priorities in Dual-connectivity^^ | other | Ericsson, Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, Huawei, HiSilicon, ZTE | R1-78 | - | [WTS] [JSN] | |||
R1-144346 | WF on Trigger of UL Power Control Mode in Dual-connectivity | other | Ericsson, Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, InterDigital, Nokia Networks, Nokia Corporation, Fujitsu | R1-78 | - | [WTS] [JSN] | |||
R1-144347 | Regulatory requirements for LAA | other | LG Electronics | R1-78 | - | [WTS] [JSN] | |||
R1-144348 | Regulatory Requirements for Unlicensed Spectrum | other | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, Coolpad, Ericsson, ETRI, Huawei, HiSilicon, IAESI, InterDigital, LG, Nokia Corporation, Nokia Networks, Qualcomm, NTT DOCOMO, Panasonic, Samsung, TI, Verizon Wireless, ZTE | R1-78 | - | [WTS] [JSN] | |||
R1-144349 | WF on RRC Resource Pool Configuration | other | Qualcomm Inc., ETRI, General Dynamics, Intel | R1-78 | - | [WTS] [JSN] | |||
R1-144350 | WF on Multi-Carrier Support | other | Qualcomm Inc., General Dynamics, Panasonic, NEC, Sharp, Deutsche Telekom | R1-78 | - | [WTS] [JSN] | |||
R1-144351 | WF on Type 2B Configuration | other | Qualcomm Inc., Intel, General Dynamics, Samsung, NTT DOCOMO | R1-78 | - | [WTS] [JSN] | |||
R1-144352 | WF on PD2DSCH | other | Qualcomm Inc., Sharp, III, General Dynamics | R1-78 | - | [WTS] [JSN] | |||
R1-144353 | WF on CP Configuration | other | Qualcomm Inc., ETRI, General Dynamics, Samsung | R1-78 | - | [WTS] [JSN] | |||
R1-144354 | WF on Discovery D2DSS Relaying | other | Qualcomm Inc., General Dynamics, NTT DOCOMO, Intel | R1-78 | - | [WTS] [JSN] | |||
R1-144355 | Email discussion summary for RRC parameters | other | Qualcomm | R1-78 | - | [WTS] [JSN] | |||
R1-144356 | Email discussion summary on SA resource pattern | other | Qualcomm | R1-78 | - | [WTS] [JSN] | |||
R1-144357 | void | other | R1-78 | - | [WTS] [JSN] | ||||
R1-144358 | Email discussion summary on PD2DSS and PD2DSCH | other | Qualcomm | R1-78 | - | [WTS] [JSN] | |||
R1-144359 | WF On Type-1 Resource Allocation | other | Ericsson, Intel, Sharp, LGE | R1-78 | - | [WTS] [JSN] | |||
R1-144360 | WF on Synchronization for Inter-cell D2D Discovery | other | Ericsson, Qualcomm | R1-78 | - | [WTS] [JSN] | |||
R1-144361 | WF on UE Receiver Behavior for D2D Discovery | other | Ericsson, ETRI, Qualcomm | R1-78 | - | [WTS] [JSN] | |||
R1-144362 | WF on D2DSS Sets | other | Ericsson, Qualcomm, NTT DoCoMo, ZTE | R1-78 | - | [WTS] [JSN] | |||
R1-144363 | WF On TA Granularity for SA | other | Ericsson, Panasonic, Qualcomm, LGE | R1-78 | - | [WTS] [JSN] | |||
R1-144364 | WF on period and offset of resource pool configuration in D2D | other | Panasonic, Samsung, Fujitsu, Qualcomm | R1-78 | - | [WTS] [JSN] | |||
R1-144365 | WF on Data Hopping Parameters | other | Qualcomm Inc. (Rapporteur) | R1-78 | - | [WTS] [JSN] | |||
R1-144366 | WF on Interference Control for Type 1 Discovery | other | Intel, LGE, Huawei, HiSilicon, Nokia Corporation, Nokia Networks, Fujitsu, ETRI, Panasonic, Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | R1-78 | - | [WTS] [JSN] | |||
R1-144367 | WF on SA Resource Transmission | other | Qualcomm Inc. (Rapporteur) | R1-78 | - | [WTS] [JSN] | |||
R1-144368 | void | other | R1-78 | - | [WTS] [JSN] | ||||
R1-144369 | Comparison of Combination Strategies for D2D Discovery | other | Ericsson | R1-78 | - | [WTS] [JSN] | |||
R1-144370 | WF on Communication D2DSS Transmission | other | Qualcomm Inc., III, ITRI | R1-78 | - | [WTS] [JSN] | |||
R1-144371 | WF on D2D on TDD carrier | other | CATT, Ericsson, ZTE, Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | R1-78 | - | [WTS] [JSN] | |||
R1-144372 | WF on multiple discovery resource pools | other | Samsung, Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, LGE | R1-78 | - | [WTS] [JSN] | |||
R1-144373 | WF on Flat and Hierarchical Synchronization Schemes | other | Samsung, CEWiT | R1-78 | - | [WTS] [JSN] | |||
R1-144374 | Details on frequency hopping for D2D data transmission | other | Samsung | R1-78 | - | [WTS] [JSN] | |||
R1-144375 | WF on LAA deployment scenarios for evaluation | other | NTT DOCOMO, SoftBank Mobile, Deutsche Telekom, KDDI, Vodafone, Telecom Italia, T-Mobile USA | R1-78 | - | [WTS] [JSN] | |||
R1-144376 | WF on remaining details of T-RPT design | other | LG Electronics, Qualcomm, Huawei, HiSilicon, General Dynamics | R1-78 | - | [WTS] [JSN] | |||
R1-144377 | WF on multiplexing UL HARQ-ACK TX and D2D TX/RX | other | LG Electronics, Huawei, HiSilicon, NEC, Sharp, HTC, Potevio | R1-78 | - | [WTS] [JSN] | |||
R1-144378 | WF on Conditions for Synchronization Sources | other | Samsung, CEWiT, ITRI | R1-78 | - | [WTS] [JSN] | |||
R1-144379 | WF on Triggering Condition(s) of D2DSS Transmission | other | Samsung, Nokia Corp., Nokia Networks, KDDI, III, ETRI, ITRI, Fujitsu | R1-78 | - | [WTS] [JSN] | |||
R1-144380 | WF on Time-to-Scan in PD2DSCH | other | Samsung, Qualcomm | R1-78 | - | [WTS] [JSN] | |||
R1-144381 | WF on Selection and Reselection of Synchronization Source | other | Samsung, LGE, KDDI, Qualcomm, III, ITRI | R1-78 | - | [WTS] [JSN] | |||
R1-144382 | WF on Flat and Hierarchical Synchronization Schemes | other | Samsung | R1-78 | - | [WTS] [JSN] | |||
R1-144383 | Way Forward on LAA functionalities | other | Ericsson, Panasonic, Huawei, Hisilicon, Samsung, Qualcomm | R1-78 | - | [WTS] [JSN] | |||
R1-144384 | Way Forward on LAA functionalities | other | Ericsson, Panasonic, Huawei, Hisilicon, Samsung, Qualcomm, NTT Docomo, ZTE, Sharp, Kyocera, InterDigital, CHTTL | R1-78 | - | [WTS] [JSN] | |||
R1-144385 | Scenarios and evaluation methodology for EB and FD-MIMO | other | LG Electronics | R1-78 | - | [WTS] [JSN] | |||
R1-144386 | WF on Coexistence Evaluation Scenarios and Methodologies | other | Ericsson, Qualcomm | R1-78 | - | [WTS] [JSN] | |||
R1-144387 | [Draft] LS on Trigger of UL Power Control Mode in Dual-connectivity | other | Ericsson | R1-78 | - | [WTS] [JSN] | |||
R1-144388 | [Draft] LS on UL Power Control in Dual-connectivity | other | Ericsson | R1-78 | - | [WTS] [JSN] | |||
R1-144389 | WF on power control in D2D | other | LG Electronics, Qualcomm, General Dynamics | R1-78 | - | [WTS] [JSN] | |||
R1-144390 | WF on PRACH handling for Dual Connectivity | other | LG Electronics, NEC, Panasonic | R1-78 | - | [WTS] [JSN] | |||
R1-144391 | WF on interpretation of slot number and frame number | other | LG Electronics, Huawei, Hisilicon | R1-78 | - | [WTS] [JSN] | |||
R1-144392 | WF on PD2DSS | other | Intel, LGE | R1-78 | - | [WTS] [JSN] | |||
R1-144393 | WF on SD2DSS PAPR/CM Reduction | other | Intel | R1-78 | - | [WTS] [JSN] | |||
R1-144394 | WF on T-RPT Subset Configuration | other | Intel, Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, CATT, LGE | R1-78 | - | [WTS] [JSN] | |||
R1-144395 | WF on T-RPT Bitmap Extension | other | Intel, LGE | R1-78 | - | [WTS] [JSN] | |||
R1-144396 | Scheduling Assignment design for D2D communications | other | Nokia Networks, Nokia Corporation | R1-78 | - | [WTS] [JSN] | |||
R1-144397 | WF on Sidelink Bandwidth | other | Qualcomm Inc., NEC, CATT, Nokia Network, Nokia Corporation | R1-78 | - | [WTS] [JSN] | |||
R1-144398 | WF on D2DSS & PD2DSCH | other | Qualcomm Inc., LGE, General Dynamics | R1-78 | - | [WTS] [JSN] | |||
R1-144399 | [Draft] LS on D2D Multicarrier Transmitter Capabilities | other | Ericsson | R1-78 | - | [WTS] [JSN] | |||
R1-144400 | WF on Inter-PLMN D2D Receiver Behavior | other | Ericsson, DT, Orange | R1-78 | - | [WTS] [JSN] | |||
R1-144401 | WF on Repeated Transmissions of Discovery Message within a Discovery Period | other | Intel, Alcatel Lucent, Alcatel Lucent Shanghai Bell, Ericsson, LGE, ZTE | R1-78 | - | [WTS] [JSN] | |||
R1-144402 | [Draft] LS on Multi-carrier D2D and WAN operation | other | Qualcomm | R1-78 | - | [WTS] [JSN] | |||
R1-144403 | 36.201 CR0008r1 (Rel-12, B) Introduction of TDD-FDD CA, Small-Cell Enhancements, Dual Connectivity, eIMTA, ProSe, WLAN/3GPP interworking, and miscellaneous minor corrections | CR | Alcatel-Lucent | R1-78 | - | [WTS] [JSN] | |||
R1-144404 | WF on T-RPT Subset Configuration | other | Intel, Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, CATT, LGE, Nokia Networks, Nokia Corp. | R1-78 | - | [WTS] [JSN] | |||
R1-144405 | LS on Multi-carrier D2D and WAN operation | LS out | RAN1, Qualcomm | R1-78 | - | [WTS] [JSN] | |||
R1-144406 | WF on minimising resource repetition collision in Type 1 discovery | other | NEC, [Nokia Corporation, Nokia Networks], [Ericsson] | R1-78 | - | [WTS] [JSN] | |||
R1-144407 | WF on Public Safety Discovery Pools Configuration | other | Ericsson, Qualcomm, GdB | R1-78 | - | [WTS] [JSN] | |||
R1-144408 | LS on RRC parameters for ProSe LTE D2D | other | RAN1, Qualcomm | R1-78 | - | [WTS] [JSN] | |||
R1-144409 | LS on RRC parameters for ProSe LTE D2D | other | RAN1, Qualcomm | R1-78 | - | [WTS] [JSN] | |||
R1-144410 | WF on minimising resource repetition collision in Type 1 discovery | other | NEC, [Nokia Corporation, Nokia Networks], [Ericsson] | R1-78 | - | [WTS] [JSN] | |||
R1-144411 | [Draft] LS on soft-combining of discovery messages within a discovery period | other | Intel | R1-78 | - | [WTS] [JSN] | |||
R1-144412 | WF on SRS handling in dual connectivity | other | NTT DOCOMO, Panasonic | R1-78 | - | [WTS] [JSN] | |||
R1-144413 | 25.214 CR0729r1 (Rel-11, F) Clarification of HS-SCCH orders for Rel-11 features | CR | Huawei, HiSilicon | R1-78 | - | [WTS] [JSN] | |||
R1-144414 | 25.214 CR0730r1 (Rel-12, F) Clarification of HS-SCCH orders for Rel-12 features | CR | Huawei, HiSilicon | R1-78 | - | [WTS] [JSN] | |||
R1-144415 | 25.214 CR0731r1 (Rel-12, F) Correction on DCH Enhancements | CR | Huawei, HiSilicon, Qualcomm | R1-78 | - | [WTS] [JSN] | |||
R1-144416 | 25.211 CR0320r1 (Rel-12, F) Correction of DL FET | CR | Huawei, HiSilicon | R1-78 | - | [WTS] [JSN] | |||
R1-144417 | 25.212 CR0332r1 (Rel-12, F) Correction of DL FET | CR | Huawei, HiSilicon | R1-78 | - | [WTS] [JSN] | |||
R1-144418 | 25.214 CR0728r1 (Rel-12, F) Correction of DL FET | CR | Huawei, HiSilicon | R1-78 | - | [WTS] [JSN] | |||
R1-144419 | 25.214 CR0727r1 (Rel-12, F) Correction to UMTS Hetnet features | CR | Huawei, HiSilicon, Qualcomm | R1-78 | - | [WTS] [JSN] | |||
R1-144420 | 25.214 CR0732r1 (Rel-12, F) Clarifications to Further EUL Enhancements | CR | Qualcomm, Ericsson | R1-78 | - | [WTS] [JSN] | |||
R1-144421 | 25.214 CR0733 (Rel-12, F) Clarifications to Maximum Power Scaling for Hetnets and F-EUL Enhancements power scaling | CR | Qualcomm Incorporated | R1-78 | - | [WTS] [JSN] | |||
R1-144422 | 25.211 CR0321r1 (Rel-12, F) Clarifications to Heterogeneous Networks | CR | Qualcomm Incorporated | R1-78 | - | [WTS] [JSN] | |||
R1-144423 | Text proposal on the TR skeleton of RAN1 aspects for downlink enhancements for UMTS | other | Huawei, HiSilicon | R1-78 | - | [WTS] [JSN] | |||
R1-144424 | Text proposal on solutions of downlink enhancements for UMTS | other | Huawei, HiSilicon | R1-78 | - | [WTS] [JSN] | |||
R1-144425 | Text proposal on evaluation methodology of the downlink enhancements solutions | other | Huawei, HiSilicon | R1-78 | - | [WTS] [JSN] | |||
R1-144426 | Fundamental characteristics of small data transmission enhancements | LS out | RAN1, Ericsson | R1-78 | - | [WTS] [JSN] | |||
R1-144427 | Summary of Ad-hoc sessions on HSPA | other | Ad-Hoc Chairman (Huawei, Ericsson) | R1-78 | - | [WTS] [JSN] | |||
R1-144428 | void | other | R1-78 | - | [WTS] [JSN] | ||||
R1-144429 | void | other | R1-78 | - | [WTS] [JSN] | ||||
R1-144430 | void | other | R1-78 | - | [WTS] [JSN] | ||||
R1-144431 | void | other | R1-78 | - | [WTS] [JSN] | ||||
R1-144432 | void | other | R1-78 | - | [WTS] [JSN] | ||||
R1-144433 | WF on UE complexity reduction for MTC | other | Ericsson | R1-78 | - | [WTS] [JSN] | |||
R1-144434 | WF on coverage enhancement targets for MTC | other | Ericsson | R1-78 | - | [WTS] [JSN] | |||
R1-144435 | WF on UE power consumption reduction for MTC | other | Ericsson | R1-78 | - | [WTS] [JSN] | |||
R1-144436 | WF on simulation assumptions | other | Nokia Networks, Nokia Corporation, CMCC, Samsung | R1-78 | - | [WTS] [JSN] | |||
R1-144437 | WF on antenna modeling | other | Samsung, Nokia Networks, Nokia Corporation, CMCC, Huawei, HiSilicon, Interdigital, LGE, Motorola Mobility, Qualcomm, CHTTL | R1-78 | - | [WTS] [JSN] | |||
R1-144438 | WF on evaluation assumptions on Elevation BF and FD-MIMO Heterogenous Scenarios | other | NTT DOCOMO, Fujitsu, NEC | R1-78 | - | [WTS] [JSN] | |||
R1-144439 | WF on Elevation BF and FD-MIMO scenarios | other | NTT DOCOMO, Deutsche Telekom, KDDI, Softbank, CHTTL | R1-78 | - | [WTS] [JSN] | |||
R1-144440 | WF on D2D resource collision | other | LG Electronics, Qualcomm, ZTE | R1-78 | - | [WTS] [JSN] | |||
R1-144441 | 36.987 v0.0.1 (Skeleton) Study on Elevation Beamforming/Full-Dimension (FD) MIMO for LTE | other | Samsung | R1-78 | - | [WTS] [JSN] | |||
R1-144442 | Work Plan for FS_UTRA_LTE_iPos_enh | other | NextNav | R1-78 | - | [WTS] [JSN] | |||
R1-144443 | Reply LS on Rel-12 NAICS | other | RAN3, MediaTek | R1-78 | - | [WTS] [JSN] | |||
R1-144444 | WF on simulation assumptions | other | Nokia Networks, Nokia Corporation, CMCC, Samsung | R1-78 | - | [WTS] [JSN] | |||
R1-144445 | WF on Remaining on Priority Rule for DC | other | LG Electronics, NTT DOCOMO, Panasonic, InterDigital | R1-78 | - | [WTS] [JSN] | |||
R1-144446 | Proposals on SRS handling in dual connectivity | other | NTT DOCOMO | R1-78 | - | [WTS] [JSN] | |||
R1-144447 | WF on physical downlink control channel for MTC | other | Ericsson, Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, NEC, Huawei | R1-78 | - | [WTS] [JSN] | |||
R1-144448 | Summary of offline discussion on link simulations for MTC | other | Ericsson | R1-78 | - | [WTS] [JSN] | |||
R1-144449 | WF on PUCCH for MTC | other | Ericsson | R1-78 | - | [WTS] [JSN] | |||
R1-144450 | WF on PRACH for MTC | other | Ericsson | R1-78 | - | [WTS] [JSN] | |||
R1-144451 | RRC Parameter for UL Power Control Mode in Dual-connectivity | other | Ericsson | R1-78 | - | [WTS] [JSN] | |||
R1-144452 | WF on evaluation scenarios for indoor positioning study | other | LG Electronics, China Unicom, Huawei, HiSilicon, Intel | R1-78 | - | [WTS] [JSN] | |||
R1-144453 | [Draft] LS on UL Power Control in Dual-connectivity | other | Ericsson | R1-78 | - | [WTS] [JSN] | |||
R1-144454 | LS on UL Power Control in Dual-connectivity | LS out | RAN1, Ericsson | R1-78 | - | [WTS] [JSN] | |||
R1-144455 | RRC Parameter for UL Power Control Mode in Dual-connectivity | other | Ericsson | R1-78 | - | [WTS] [JSN] | |||
R1-144456 | [Draft] LS on soft buffer management for D2D communications | other | LGE | R1-78 | - | [WTS] [JSN] | |||
R1-144457 | Remaining details of T-RPT design | other | Nokia Corporation, Nokia Networks | R1-78 | - | [WTS] [JSN] | |||
R1-144458 | void | other | R1-78 | - | [WTS] [JSN] | ||||
R1-144459 | WF on D2DSS | other | Qualcomm, ALU, ASB, Ericsson, Huawei, HiSilicon, General Dynamics | R1-78 | - | [WTS] [JSN] | |||
R1-144460 | [Draft] LS on D2D Synchronization | other | Qualcomm | R1-78 | - | [WTS] [JSN] | |||
R1-144461 | WF on T-RPT Subset Configuration | other | Intel, Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, LGE, Nokia Networks, Nokia Corp., ZTE, Samsung, General Dynamics | R1-78 | - | [WTS] [JSN] | |||
R1-144462 | void | other | R1-78 | - | [WTS] [JSN] | ||||
R1-144463 | void | other | R1-78 | - | [WTS] [JSN] | ||||
R1-144464 | void | other | R1-78 | - | [WTS] [JSN] | ||||
R1-144465 | void | other | R1-78 | - | [WTS] [JSN] | ||||
R1-144466 | Reply LS on DRS based measurements | other | RAN2, Huawei | R1-78 | - | [WTS] [JSN] | |||
R1-144467 | WF on UE complexity reduction for broadcast for MTC | other | Panasonic, Qualcomm, Ericsson, MediaTek, Fujitsu, Sierra Wireless, Sony, NEC, ZTE, Nokia Networks, Nokia Corporation, Samsung, LGE, NTT DOCOMO | R1-78 | - | [WTS] [JSN] | |||
R1-144468 | [Draft]Reply LS to R2-143981 on eIMTA and eICIC Measurement Subframe Restrictions | other | CATT | R1-78 | - | [WTS] [JSN] | |||
R1-144469 | Text proposal on Rel-13 LAA deployment scenarios for 36.889 | other | NTT DOCOMO | R1-78 | - | [WTS] [JSN] | |||
R1-144470 | Summary of offline discussion on detailed coexistence evaluation assumptions for LAA | other | Ericsson | R1-78 | - | [WTS] [JSN] | |||
R1-144471 | WF on Coexistence Evaluation Methodologies for LAA | other | Ericsson, Qualcomm, Intel Corp., NTT DOCOMO, Samsung, Nokia Networks, Nokia Corporation, Huawei, HiSilicon, Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | R1-78 | - | [WTS] [JSN] | |||
R1-144472 | WF on UE complexity reduction for broadcast for MTC | other | Panasonic, [Qualcomm, Ericsson, MediaTek, Fujitsu, Sierra Wireless, Sony, NEC, ZTE, Nokia Networks, Nokia Corporation, Samsung, LGE, NTT DOCOMO] | R1-78 | - | [WTS] [JSN] | |||
R1-144473 | Summary of Offline Discussions on Small Cell Discovery Signal | other | Huawei | R1-78 | - | [WTS] [JSN] | |||
R1-144474 | WF on simulation assumptions for co-channel HetNet for EBF/FD MIMO evaluations | other | AT&T | R1-78 | - | [WTS] [JSN] | |||
R1-144475 | Way forward on baseline technologies for indoor positioning evaluation | other | Huawei, LGE, Qualcomm, ALU, ASB, China Unicom, Intel, HiSilicon | R1-78 | - | [WTS] [JSN] | |||
R1-144476 | Way forward on technologies for indoor positioning evaluations | other | NextNav, TruePosition, Polaris | R1-78 | - | [WTS] [JSN] | |||
R1-144477 | 36.214 CR0023 (Rel-12, F) Measurement definitions for measurements with discovery reference signals | CR | Ericsson, Huawei, HiSilicon, Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, Nokia Corporation, Nokia Networks, Fujitsu | R1-78 | - | [WTS] [JSN] | |||
R1-144478 | [DRAFT] TP on SCE for 36.300 | other | Huawei, HiSilicon | R1-78 | - | [WTS] [JSN] | |||
R1-144479 | [DRAFT] LS on TP on SCE for 36.300 | other | Huawei | R1-78 | - | [WTS] [JSN] | |||
R1-144480 | [DRAFT] LS on introduction of UE categories 11 and 12 | other | Huawei, HiSilicon | R1-78 | - | [WTS] [JSN] | |||
R1-144481 | [DRAFT] LS on zero-power CSI-RS for small cell discovery signal | other | Huawei | R1-78 | - | [WTS] [JSN] | |||
R1-144482 | 36.211 CR0195r1 (Rel-12, F) Clarification of PUSCH rate matching with SRS | CR | LG Electronics | R1-78 | - | [WTS] [JSN] | |||
R1-144483 | 36.212 CR0164r1 (Rel-12, F) Clarification of PUSCH rate matching with SRS | CR | LG Electronics | R1-78 | - | [WTS] [JSN] | |||
R1-144484 | 36.889 v0.0.2 Study on licensed-assisted access using LTE | other | Ericsson, Huawei | R1-78 | - | [WTS] [JSN] | |||
R1-144485 | Summary of offline discussion on clarification of PUSCH rate matching with SRS | other | LG Electronics | R1-78 | - | [WTS] [JSN] | |||
R1-144486 | LS on zero-power CSI-RS for small cell discovery signal | LS out | RAN1, Huawei | R1-78 | - | [WTS] [JSN] | |||
R1-144487 | Chairmanās Notes of Agenda Item 7.2.1 LTE Device to Device Proximity Services | other | Ad-Hoc Chairman (Alcatel Lucent) | R1-78 | - | [WTS] [JSN] | |||
R1-144488 | Summary of Ad-hoc session on Study on Indoor Positioning Enhancements for UTRA and LTE | other | Ad-Hoc Chairman (Qualcomm) | R1-78 | - | [WTS] [JSN] | |||
R1-144489 | Summary of Offline Discussion on Detailed Coexistence Evaluations for LAA | other | Ericsson | R1-78 | - | [WTS] [JSN] | |||
R1-144490 | 36.213 CR0483 (Rel-12, F) Clarification of the resource allocation and precoding granularity parameter in NAICS | CR | NVIDIA, Intel, MediaTek | R1-78 | - | [WTS] [JSN] | |||
R1-144491 | Way Forward on Number of Carriers In Coexistence Evaluation Scenarios for LAA and Wi-Fi | other | CableLabs, Broadcom, Ruckus Wireless, KDDI, Orange, BlackBerry, Cisco Systems, Sony, Hitachi | R1-78 | - | [WTS] [JSN] | |||
R1-144492 | [DRAFT] LS on introduction of UE categories 11 and 12 | other | Huawei, HiSilicon | R1-78 | - | [WTS] [JSN] | |||
R1-144493 | WF on simulation assumptions for co-channel HetNet for EBF/FD MIMO evaluations | other | AT&T, Orange, CHTTL, ALU, ASB, CEWIT, Ericsson, ZTE, Samsung | R1-78 | - | [WTS] [JSN] | |||
R1-144494 | Way Forward on Number of Carriers In Coexistence Evaluation Scenarios for LAA and Wi-Fi | other | CableLabs, Broadcom, Ruckus Wireless, KDDI, Orange, BlackBerry, Cisco Systems, Sony, Hitachi, AT&T | R1-78 | - | [WTS] [JSN] | |||
R1-144495 | WF on remaining details of WAN & D2D multiplexing | other | LG Electronics, Qualcomm | R1-78 | - | [WTS] [JSN] | |||
R1-144496 | WF on D2D TX UE behavior in eIMTA | other | LG Electronics, NEC | R1-78 | - | [WTS] [JSN] | |||
R1-144497 | [Draft] LS for Rel-12 NAICS Stage-2 TP | other | MediaTek Inc. | R1-78 | - | [WTS] [JSN] | |||
R1-144498 | [Draft] Reply LS for Rel-12 NAICS | other | MediaTek Inc. | R1-78 | - | [WTS] [JSN] | |||
R1-144499 | Draft Stage-2 TP for NAICS in TS36.300 | other | MediaTek Inc. | R1-78 | - | [WTS] [JSN] | |||
R1-144500 | WF on Evaluation Assumptions on Elevation BF and FD-MIMO in co-channel heterogenous scenario | other | Huawei, HiSilicon, Telecom Italia, Deutsche Telekom, China Unicom, ITR | R1-78 | - | [WTS] [JSN] | |||
R1-144501 | WF on physical downlink control channel for MTC | other | Ericsson, Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, ASUSTeK, AT&T, Huawei, HiSilicon, Intel, InterDigital, MediaTek, NEC, Nokia Corporation, Nokia Networks, Panasonic, Qualcomm, Samsung, Sierra Wireless, Sony | R1-78 | - | [WTS] [JSN] | |||
R1-144502 | WF on Additional Triggering Condition(s) of D2DSS Transmission | other | Nokia Corporation, Nokia Networks, Samsung, ITRI, Fujitsu | R1-78 | - | [WTS] [JSN] | |||
R1-144503 | 37.857 v0.0.2 Study on Indoor Positioning Enhancements | other | NextNav | R1-78 | - | [WTS] [JSN] | |||
R1-144504 | Reply LS on the structure of the discovery reference signal for small cell discovery | other | RAN4, Huawei | R1-78 | - | [WTS] [JSN] | |||
R1-144505 | 36.212 CR0162r1 (Rel-12, B) Introduction of D2D feature into 36.212 | CR | Huawei | R1-78 | - | [WTS] [JSN] | |||
R1-144506 | 36.212 CR0163r1 (Rel-12, F) Correction for rate matching parameters for UE categories 11 and 12 for 36.212 | CR | Huawei | R1-78 | - | [WTS] [JSN] | |||
R1-144507 | WF on Remaining Issues on HetNet Scenario with separate frequency bands | other | NTT DOCOMO, NEC | R1-78 | - | [WTS] [JSN] | |||
R1-144508 | WF on Multicarrier Tx Capability | other | Ericsson | R1-78 | - | [WTS] [JSN] | |||
R1-144509 | WF on DL Measurements for D2D | other | Ericsson, LGE | R1-78 | - | [WTS] [JSN] | |||
R1-144510 | Summary of Open Issues on Detailed Coexistence Evaluation Assumptions for LAA | other | Ericsson | R1-78 | - | [WTS] [JSN] | |||
R1-144511 | 36.213 CR0477r1 (Rel-12, F) CR on HARQ-ACK transmission for TDD-FDD CA with eIMTA | CR | LG Electronics, CATT, Samsung | R1-78 | - | [WTS] [JSN] | |||
R1-144512 | Way Forward on unmanaged Wi-Fi | other | CableLabs, Broadcom, Telecom Italia, Ruckus Wireless | R1-78 | - | [WTS] [JSN] | |||
R1-144513 | Simulation assumptions for reference cases for MTC | other | Nokia Networks, Nokia Corporation, Ericsson | R1-78 | - | [WTS] [JSN] | |||
R1-144514 | Proposals on SRS handling for Dual-Connectivity, | other | LG Electronics | R1-78 | - | [WTS] [JSN] | |||
R1-144515 | WF on simulation assumptions for co-channel HetNet for EBF/FD MIMO evaluations | other | AT&T, Orange, CHTTL, ALU, ASB, CEWIT, Ericsson, ZTE, Samsung, Nokia Networks, Nokia Corporation | R1-78 | - | [WTS] [JSN] | |||
R1-144516 | 36.211 CR0195r2 (Rel-12, F) Clarification of PUSCH rate matching with SRS | CR | LG Electronics | R1-78 | - | [WTS] [JSN] | |||
R1-144517 | 36.212 CR0164r2 (Rel-12, F) Clarification of PUSCH rate matching with SRS | CR | LG Electronics | R1-78 | - | [WTS] [JSN] | |||
R1-144518 | WF on remaining details of repeated transmissions of discovery message within a discovery period | other | Intel, LGE, Alcatel Lucent, Alcatel Lucent Shanghai Bell, ZTE, Qualcomm | R1-78 | - | [WTS] [JSN] | |||
R1-144519 | [Draft] LS on D2D Multicarrier Transmitter Capabilities | other | Ericsson | R1-78 | - | [WTS] [JSN] | |||
R1-144520 | 36.213 CR0482r1 (Rel-12, B) Introduction of D2D (ProSe), Dual Connectivity, Small Cell Enhancements, and NAICS features | CR | Motorola Mobility | R1-78 | - | [WTS] [JSN] | |||
R1-144521 | 36.211 CR0196r1 (Rel-12, B) Inclusion of ProSe | CR | Ericsson | R1-78 | - | [WTS] [JSN] | |||
R1-144522 | 36.211 CR0197r1 (Rel-12, B) Inclusion of small-cell enhancements | CR | Ericsson | R1-78 | - | [WTS] [JSN] | |||
R1-144523 | LS on soft-combining of discovery messages within a discovery period | LS out | RAN1, Intel | R1-78 | - | [WTS] [JSN] | |||
R1-144524 | LS on soft buffer management for D2D communications | LS out | RAN1, LGE | R1-78 | - | [WTS] [JSN] | |||
R1-144525 | WF on simulation assumptions for co-channel HetNet for EBF/FD MIMO evaluations | other | AT&T, Orange, CHTTL, ALU, ASB, CEWIT, Ericsson, ZTE, Samsung, Nokia Networks, Nokia Corporation | R1-78 | - | [WTS] [JSN] | |||
R1-144526 | WF on Evaluation Assumptions on Elevation BF and FD-MIMO in co-channel heterogenous scenario | other | Huawei, HiSilicon, Telecom Italia, Deutsche Telekom, China Unicom, ITR | R1-78 | - | [WTS] [JSN] | |||
R1-144527 | LS on D2D Synchronization | LS out | RAN1, Qualcomm | R1-78 | - | [WTS] [JSN] | |||
R1-144528 | [Draft] LS reply on DRS measurements | other | Huawei | R1-78 | - | [WTS] [JSN] | |||
R1-144529 | [Draft] LS on updated LTE Rel-12 UE feature list | other | NTT DOCOMO | R1-78 | - | [WTS] [JSN] | |||
R1-144530 | [Draft ] LS on introduction of UE Categories 11 and 12 | other | Huawei | R1-78 | - | [WTS] [JSN] | |||
R1-144531 | Reply LS to R2-143981 on eIMTA and eICIC Measurement Subframe Restrictions | LS out | RAN1, CATT | R1-78 | - | [WTS] [JSN] | |||
R1-144532 | LS for Rel-12 NAICS Stage-2 TP | LS out | RAN1, MediaTek | R1-78 | - | [WTS] [JSN] | |||
R1-144533 | [Draft] LS on D2D Multicarrier Transmitter Capabilities | other | Ericsson | R1-78 | - | [WTS] [JSN] | |||
R1-144534 | [Draft ] LS on introduction of UE Categories 11 and 12 | other | Huawei | R1-78 | - | [WTS] [JSN] | |||
R1-144535 | LS on updated LTE Rel-12 UE feature list | LS out | RAN1, NTT DOCOMO | R1-78 | - | [WTS] [JSN] | |||
R1-144536 | LS on introduction of UE Categories 11 and 12 | LS out | RAN1, Huawei | R1-78 | - | [WTS] [JSN] | |||
R1-144537 | 36.213 CR0482r2 (Rel-12, B) Introduction of D2D (ProSe), Dual Connectivity, Small Cell Enhancements, NAICS, eIMTA, and TDD-FDD CA features | CR | Motorola Mobility | R1-78 | - | [WTS] [JSN] | |||
R1-144538 | Clarification of PUSCH rate matching with SRS | other | LG Electronics | R1-78 | - | [WTS] [JSN] | |||
R1-144539 | TP on SCE for 36.300 | other | Huawei, HiSilicon | R1-78 | - | [WTS] [JSN] | |||
R1-144540 | LS onĀ TP on SCE for 36.300 | other | RAN1, Huawei | R1-78 | - | [WTS] [JSN] | |||
R1-144541 | LS on handling of collisions between PRS and DRS | other | RAN1, Huawei | R1-78 | - | [WTS] [JSN] | |||
R1-144542 | LS reply on DRS measurements | other | RAN1, Huawei | R1-78 | - | [WTS] [JSN] | |||
R1-144543 | LS on D2D Multicarrier Transmitter Capabilities | other | RAN1, Ericsson | R1-78 | - | [WTS] [JSN] | |||
R1-144544 | void | other | R1-78 | - | [WTS] [JSN] |
865 documents (1.0876400470734 seconds)