Please enter the search related information in the fields below. Partial information works, e.g. "SP-21
" in the "tdoc" field lists all TSG SA documents from 2021. Regular expressions mostly work in all fields (e.g. "2[34].501
" in the "Spec" field lists all documents related to 23.501 and 24.501. Capitalization is disregarded, i.e. "3GPP
" gives the same results as "3gpp
".
Download results in JSON format
tdoc | Title | Type / Revs | Source | Spec / CR | S/WID | Release | Meeting | Status | Links |
---|---|---|---|---|---|---|---|---|---|
R1-141900 | Draft Agenda for RAN1#77 meeting | other | RAN1 Chairman | R1-77 | - | [WTS] [JSN] | |||
R1-141901 | Final Report of RAN1#76bis meeting | other | MCC | R1-77 | - | [WTS] [JSN] | |||
R1-141902 | LS on RAN2 agreements and working assumptions on E-DCH decoupling | other | RAN2, NSN | R1-77 | - | [WTS] [JSN] | |||
R1-141903 | LS on DCH enhancements | other | RAN2, Qualcomm | R1-77 | - | [WTS] [JSN] | |||
R1-141904 | LS on TTI switching indication from UE | other | RAN2, Ericsson | R1-77 | - | [WTS] [JSN] | |||
R1-141905 | LS on TTI switching | other | RAN2, Ericsson | R1-77 | - | [WTS] [JSN] | |||
R1-141906 | Reply LS on identifier in scheduling assignment for D2D communication | other | RAN2, Ericsson | R1-77 | - | [WTS] [JSN] | |||
R1-141907 | LS on prioritizing MCG uplink transmission | other | RAN2, Samsung | R1-77 | - | [WTS] [JSN] | |||
R1-141908 | LS on SFN handling in the dual connectivity | other | RAN2, Samsung | R1-77 | - | [WTS] [JSN] | |||
R1-141909 | LS on Activation/deactivation for Dual Connectivity | other | RAN2, NSN | R1-77 | - | [WTS] [JSN] | |||
R1-141910 | Reply LS on subframe #6 in LTE_TDD_eIMTA | other | RAN2, CATT | R1-77 | - | [WTS] [JSN] | |||
R1-141911 | Reply LS on Identification of TBS/bandwidth limited UE by eNB | other | RAN3, Huawei | R1-77 | - | [WTS] [JSN] | |||
R1-141912 | Reply LS on GCSE QCIs and connected mode DRX | other | RAN3, Samsung | R1-77 | - | [WTS] [JSN] | |||
R1-141913 | Reply LS on consolidated operator view on eCoMP standardization | other | RAN3, Samsung | R1-77 | - | [WTS] [JSN] | |||
R1-141914 | LS on maxumum relative propagation delay difference among the component carriers in intra-band non-contiguous CA | other | RAN4, NTT DoCoMo | R1-77 | - | [WTS] [JSN] | |||
R1-141915 | LS on defining the new RSRQ measurements definition | other | RAN4, Nokia | R1-77 | - | [WTS] [JSN] | |||
R1-141916 | LS on parameter synchronization | other | SA3, Qualcomm | R1-77 | - | [WTS] [JSN] | |||
R1-141917 | RRM measurement procedures with DRS | other | Huawei, HiSilicon | R1-77 | - | [WTS] [JSN] | |||
R1-141918 | New L1 procedure for small cell on/off transition time further reduction | other | Huawei, HiSilicon | R1-77 | - | [WTS] [JSN] | |||
R1-141919 | Resource allocation for D2D synchronization signals | other | Huawei, HiSilicon | R1-77 | - | [WTS] [JSN] | |||
R1-141920 | Scheduling assignment design for D2D | other | Huawei, HiSilicon | R1-77 | - | [WTS] [JSN] | |||
R1-141921 | D2D discovery signal design | other | Huawei, HiSilicon | R1-77 | - | [WTS] [JSN] | |||
R1-141922 | D2D communication data channel design | other | Huawei, HiSilicon | R1-77 | - | [WTS] [JSN] | |||
R1-141923 | Resource allocation for type-1 discovery | other | Huawei, HiSilicon | R1-77 | - | [WTS] [JSN] | |||
R1-141924 | eNB resource allocation for mode-1 D2D communication | other | Huawei, HiSilicon | R1-77 | - | [WTS] [JSN] | |||
R1-141925 | D2D synchronization procedure for out-of-coverage | other | Huawei, HiSilicon | R1-77 | - | [WTS] [JSN] | |||
R1-141926 | D2D synchronization procedure for in-coverage | other | Huawei, HiSilicon | R1-77 | - | [WTS] [JSN] | |||
R1-141927 | Scheduling assignment content for D2D | other | Huawei, HiSilicon | R1-77 | - | [WTS] [JSN] | |||
R1-141928 | Power control for D2D signals | other | Huawei, HiSilicon | R1-77 | - | [WTS] [JSN] | |||
R1-141929 | Distributed resource allocation from mode-2 | other | Huawei, HiSilicon | R1-77 | - | [WTS] [JSN] | |||
R1-141930 | Timing signaling for D2D communication | other | Huawei, HiSilicon | R1-77 | - | [WTS] [JSN] | |||
R1-141931 | Power headroom report in dual connectivity | other | Huawei, Hisilicon | R1-77 | - | [WTS] [JSN] | |||
R1-141932 | CQI/MCS table design for 256QAM | other | Huawei, HiSilicon | R1-77 | - | [WTS] [JSN] | |||
R1-141933 | Discussion on UE category with introduction of 256QAM | other | Huawei, HiSilicon | R1-77 | - | [WTS] [JSN] | |||
R1-141934 | Summary of performance evaluations of DRS | other | Huawei, HiSilicon | R1-77 | - | [WTS] [JSN] | |||
R1-141935 | DRS functions and design options | other | Huawei, HiSilicon | R1-77 | - | [WTS] [JSN] | |||
R1-141936 | RSSI measurements for small cell on/off operation | other | Huawei, HiSilicon | R1-77 | - | [WTS] [JSN] | |||
R1-141937 | Evaluation of listening RS patterns | other | Huawei, HiSilicon | R1-77 | - | [WTS] [JSN] | |||
R1-141938 | Discussion on listening RS design | other | Huawei, HiSilicon | R1-77 | - | [WTS] [JSN] | |||
R1-141939 | Discussion on network listening with eIMTA | other | Huawei, HiSilicon | R1-77 | - | [WTS] [JSN] | |||
R1-141940 | Discussion on network listening for intra/inter-operator deployment | other | Huawei, HiSilicon | R1-77 | - | [WTS] [JSN] | |||
R1-141941 | On necessity of differentiating Cat 0 UEs and legacy UEs | other | Huawei, HiSilicon | R1-77 | - | [WTS] [JSN] | |||
R1-141942 | Discussion on HD-FDD operation of low cost MTC UEs | other | Huawei, HiSilicon | R1-77 | - | [WTS] [JSN] | |||
R1-141943 | Transmission modes supported by low cost MTC UEs | other | Huawei, HiSilicon | R1-77 | - | [WTS] [JSN] | |||
R1-141944 | The remaining open issues for low cost MTC UEs | other | Huawei, HiSilicon | R1-77 | - | [WTS] [JSN] | |||
R1-141945 | Draft LS to RAN2 on 36.306 for low cost MTC UE | other | Huawei, HiSilicon | R1-77 | - | [WTS] [JSN] | |||
R1-141946 | Discussion on network assistance signalling parameters | other | Huawei, HiSilicon | R1-77 | - | [WTS] [JSN] | |||
R1-141947 | Discussion on remaining details for HARQ-ACK transmission | other | Huawei, HiSilicon | R1-77 | - | [WTS] [JSN] | |||
R1-141948 | Draft 36.213 CR Clarification on SRS colliding with PUCCH in the same cell under mTAG | other | Qualcomm Inc., Fujitsu | R1-77 | - | [WTS] [JSN] | |||
R1-141949 | CSI measurement and reporting in eIMTA | other | Qualcomm Inc. | R1-77 | - | [WTS] [JSN] | |||
R1-141950 | HARQ-ACK feedback for eIMTA | other | Qualcomm Inc. | R1-77 | - | [WTS] [JSN] | |||
R1-141951 | Remaining issues for eIMTA | other | Qualcomm Inc. | R1-77 | - | [WTS] [JSN] | |||
R1-141952 | Remaining details of UE category type | other | Qualcomm Inc. | R1-77 | - | [WTS] [JSN] | |||
R1-141953 | Half-duplex operation for MTC | other | Qualcomm Inc. | R1-77 | - | [WTS] [JSN] | |||
R1-141954 | Higher order modulation | other | Qualcomm Inc. | R1-77 | - | [WTS] [JSN] | |||
R1-141955 | UE Category handling for 256QAM | other | Qualcomm Inc. | R1-77 | - | [WTS] [JSN] | |||
R1-141956 | Small cell on/off time reduction | other | Qualcomm Inc. | R1-77 | - | [WTS] [JSN] | |||
R1-141957 | Performance Evaluation on Discovery signals | other | Qualcomm Inc. | R1-77 | - | [WTS] [JSN] | |||
R1-141958 | Detailed design of DRS | other | Qualcomm Inc. | R1-77 | - | [WTS] [JSN] | |||
R1-141959 | Discovery signal-based RRM measurement procedures | other | Qualcomm Inc. | R1-77 | - | [WTS] [JSN] | |||
R1-141960 | Discovery signal-based RSRQ-like measurement | other | Qualcomm Inc. | R1-77 | - | [WTS] [JSN] | |||
R1-141961 | Network synchronization by network listening | other | Qualcomm Inc. | R1-77 | - | [WTS] [JSN] | |||
R1-141962 | Physical layer aspects of dual-connectivity | other | Qualcomm Inc. | R1-77 | - | [WTS] [JSN] | |||
R1-141963 | Reference signal design for D2D | other | Qualcomm Inc. | R1-77 | - | [WTS] [JSN] | |||
R1-141964 | Link level simulation results for D2D discovery | other | Qualcomm Inc. | R1-77 | - | [WTS] [JSN] | |||
R1-141965 | Link level simulation results for D2D broadcast communication | other | Qualcomm Inc. | R1-77 | - | [WTS] [JSN] | |||
R1-141966 | Control for D2D broadcast communication | other | Qualcomm Inc. | R1-77 | - | [WTS] [JSN] | |||
R1-141967 | Resource allocation for Type 1 D2D discovery | other | Qualcomm Inc. | R1-77 | - | [WTS] [JSN] | |||
R1-141968 | D2D discovery for asynchronous networks | other | Qualcomm Inc. | R1-77 | - | [WTS] [JSN] | |||
R1-141969 | Resource allocation for Mode 2 D2D broadcast communication | other | Qualcomm Inc. | R1-77 | - | [WTS] [JSN] | |||
R1-141970 | Resource allocation for Type 2B D2D discovery | other | Qualcomm Inc. | R1-77 | - | [WTS] [JSN] | |||
R1-141971 | Resource allocation for Mode 1 D2D broadcast communication | other | Qualcomm Inc. | R1-77 | - | [WTS] [JSN] | |||
R1-141972 | On SRS antenna switching | other | Qualcomm Inc. | R1-77 | - | [WTS] [JSN] | |||
R1-141973 | Resource allocation for D2D Synchronization | other | Qualcomm Inc. | R1-77 | - | [WTS] [JSN] | |||
R1-141974 | Signal Design for D2D Synchronization | other | Qualcomm Inc. | R1-77 | - | [WTS] [JSN] | |||
R1-141975 | Procedures for D2D synchronization | other | Qualcomm Inc. | R1-77 | - | [WTS] [JSN] | |||
R1-141976 | Simulation results for D2D and WAN coexistence | other | Qualcomm Inc. | R1-77 | - | [WTS] [JSN] | |||
R1-141977 | Network assistance signaling | other | Qualcomm Inc. | R1-77 | - | [WTS] [JSN] | |||
R1-141978 | CSI measurement and reporting for NAICS | other | Qualcomm Inc. | R1-77 | - | [WTS] [JSN] | |||
R1-141979 | 25.225 CR0103 (Rel-12, C) New E-UTRA RSRQ measurements definition | CR | CATT | R1-77 | - | [WTS] [JSN] | |||
R1-141980 | Discussion on the number of DL HARQ processes for TDD SCell with FDD PCell | other | CATT | R1-77 | - | [WTS] [JSN] | |||
R1-141981 | Remaining details on aperiodic CSI feedback for eIMTA | other | CATT | R1-77 | - | [WTS] [JSN] | |||
R1-141982 | Remaining details on periodic CSI feedback for eIMTA | other | CATT | R1-77 | - | [WTS] [JSN] | |||
R1-141983 | Remaining details on HARQ-ACK on PUSCH | other | CATT | R1-77 | - | [WTS] [JSN] | |||
R1-141984 | Remaining details on HARQ-ACK on PUCCH | other | CATT | R1-77 | - | [WTS] [JSN] | |||
R1-141985 | Other remaining issues for TDD eIMTA | other | CATT | R1-77 | - | [WTS] [JSN] | |||
R1-141986 | Other remaining issues on low complexity MTC UEs | other | CATT | R1-77 | - | [WTS] [JSN] | |||
R1-141987 | Discussion on the transmission modes supported by low complexity MTC UEs | other | CATT | R1-77 | - | [WTS] [JSN] | |||
R1-141988 | Remaining issues on low complexity HD-FDD UEs | other | CATT | R1-77 | - | [WTS] [JSN] | |||
R1-141989 | Remaining details in support of 256QAM | other | CATT | R1-77 | - | [WTS] [JSN] | |||
R1-141990 | Procedures for small cell on/off transition time reduction | other | CATT | R1-77 | - | [WTS] [JSN] | |||
R1-141991 | Evaluation on small cell discovery signal | other | CATT | R1-77 | - | [WTS] [JSN] | |||
R1-141992 | Design of small cell discovery signal | other | CATT | R1-77 | - | [WTS] [JSN] | |||
R1-141993 | RSRQ measurement based on discovery signal | other | CATT | R1-77 | - | [WTS] [JSN] | |||
R1-141994 | Remaining details of RIBS for small cell | other | CATT | R1-77 | - | [WTS] [JSN] | |||
R1-141995 | UL power control for dual connectivity | other | CATT | R1-77 | - | [WTS] [JSN] | |||
R1-141996 | UL power scaling for dual connectivity | other | CATT | R1-77 | - | [WTS] [JSN] | |||
R1-141997 | PDCCH common search space in SCG | other | CATT | R1-77 | - | [WTS] [JSN] | |||
R1-141998 | Data transmission in D2D communication | other | CATT | R1-77 | - | [WTS] [JSN] | |||
R1-141999 | Details of D2D signal design | other | CATT | R1-77 | - | [WTS] [JSN] | |||
R1-142000 | Control signaling in SA | other | CATT | R1-77 | - | [WTS] [JSN] | |||
R1-142001 | Contention method for mode 2 resource allocation | other | CATT | R1-77 | - | [WTS] [JSN] | |||
R1-142002 | Linkage between SA and data resource of D2D communication | other | CATT | R1-77 | - | [WTS] [JSN] | |||
R1-142003 | Resource allocation for Type 1 D2D discovery | other | CATT | R1-77 | - | [WTS] [JSN] | |||
R1-142004 | On mode 1 resource allocation for broadcast communication | other | CATT | R1-77 | - | [WTS] [JSN] | |||
R1-142005 | Resource pool allocation for D2D communication | other | CATT | R1-77 | - | [WTS] [JSN] | |||
R1-142006 | Resource allocation for D2D synchronization | other | CATT | R1-77 | - | [WTS] [JSN] | |||
R1-142007 | Design of D2DSS and PD2DSCH | other | CATT | R1-77 | - | [WTS] [JSN] | |||
R1-142008 | Discussion on D2D synchronization source | other | CATT | R1-77 | - | [WTS] [JSN] | |||
R1-142009 | Discussion on D2D synchronization procedure | other | CATT | R1-77 | - | [WTS] [JSN] | |||
R1-142010 | Further consideration on higher-layer signalling for NAICS receiver | other | CATT | R1-77 | - | [WTS] [JSN] | |||
R1-142011 | On CSI enhancement for NAICS receiver | other | CATT | R1-77 | - | [WTS] [JSN] | |||
R1-142012 | Discussion on the remaining details of MCS / TBS table for 256QAM | other | Intel Corporation | R1-77 | - | [WTS] [JSN] | |||
R1-142013 | Discussion on UE category for 256QAM | other | Intel Corporation | R1-77 | - | [WTS] [JSN] | |||
R1-142014 | Discussion on higher layer signaling for NAICS | other | Intel Corporation | R1-77 | - | [WTS] [JSN] | |||
R1-142015 | Discussion on CQI enhancement for NAICS | other | Intel Corporation | R1-77 | - | [WTS] [JSN] | |||
R1-142016 | Distributed Resource Allocation for D2D Communication | other | Intel Corporation | R1-77 | - | [WTS] [JSN] | |||
R1-142017 | eNB Controlled Resource Allocation for D2D Communication | other | Intel Corporation | R1-77 | - | [WTS] [JSN] | |||
R1-142018 | On D2D Resource Allocation Modes and In/Edge/Out of Coverage Definition | other | Intel Corporation | R1-77 | - | [WTS] [JSN] | |||
R1-142019 | Analysis of Mutual Impact of WAN and D2D Communication | other | Intel Corporation | R1-77 | - | [WTS] [JSN] | |||
R1-142020 | Discussion on D2D Synchronization Channel (PD2DSCH) | other | Intel Corporation | R1-77 | - | [WTS] [JSN] | |||
R1-142021 | On Synchronization Signal Design for D2D Communication | other | Intel Corporation | R1-77 | - | [WTS] [JSN] | |||
R1-142022 | Synchronization Procedure for D2D Communication | other | Intel Corporation | R1-77 | - | [WTS] [JSN] | |||
R1-142023 | Remaining details on HARQ-ACK and CSI feedback for support of eIMTA | other | Intel Corporation | R1-77 | - | [WTS] [JSN] | |||
R1-142024 | Remaining issues for low cost MTC UE | other | Intel Corporation | R1-77 | - | [WTS] [JSN] | |||
R1-142025 | HD-FDD for low cost MTC UE | other | Intel Corporation | R1-77 | - | [WTS] [JSN] | |||
R1-142026 | Transition time reduction for small cell on/off | other | Intel Corporation | R1-77 | - | [WTS] [JSN] | |||
R1-142027 | Simulation results for small cell discovery signals | other | Intel Corporation | R1-77 | - | [WTS] [JSN] | |||
R1-142028 | Details on small cell discovery signal | other | Intel Corporation | R1-77 | - | [WTS] [JSN] | |||
R1-142029 | RRM measurement for small cell discovery signal | other | Intel Corporation | R1-77 | - | [WTS] [JSN] | |||
R1-142030 | Discussion on physical layer aspects for support of dual connectivity | other | Intel Corporation | R1-77 | - | [WTS] [JSN] | |||
R1-142031 | Remaining details of D2D physical channel design | other | Intel Corporation | R1-77 | - | [WTS] [JSN] | |||
R1-142032 | On resource allocation for Type 1 D2D discovery | other | Intel Corporation | R1-77 | - | [WTS] [JSN] | |||
R1-142033 | Discussion on Type 2 D2D discovery procedure | other | Intel Corporation | R1-77 | - | [WTS] [JSN] | |||
R1-142034 | Considerations on introducing a second pilot for HetNet SHO | other | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | R1-77 | - | [WTS] [JSN] | |||
R1-142035 | CIO configuration in HetNet | other | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | R1-77 | - | [WTS] [JSN] | |||
R1-142036 | Details on Low Cost MTC UE | other | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | R1-77 | - | [WTS] [JSN] | |||
R1-142037 | Considerations on Low Cost MTC HD-FDD | other | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | R1-77 | - | [WTS] [JSN] | |||
R1-142038 | Some remaining details of MCS/CQI/TBS Tables to support 256QAM | other | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | R1-77 | - | [WTS] [JSN] | |||
R1-142039 | Configurations Supporting 256QAM | other | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | R1-77 | - | [WTS] [JSN] | |||
R1-142040 | UE Categories supporting 256 QAM | other | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | R1-77 | - | [WTS] [JSN] | |||
R1-142041 | System design for transition time reduction for small cell ON/OFF | other | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | R1-77 | - | [WTS] [JSN] | |||
R1-142042 | Consideration of New L1 signaling for transition time reduction of SCell Activation for Small Cell ON/OFF | other | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | R1-77 | - | [WTS] [JSN] | |||
R1-142043 | CRS-based Discovery Signal design | other | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | R1-77 | - | [WTS] [JSN] | |||
R1-142044 | CRS-based Discovery Signal RRM measurement procedure | other | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | R1-77 | - | [WTS] [JSN] | |||
R1-142045 | CRS-based Discovery Signal RSRQ-like measurement | other | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | R1-77 | - | [WTS] [JSN] | |||
R1-142046 | System analysis of Radio Interface Based Synchronization (RIBS) | other | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | R1-77 | - | [WTS] [JSN] | |||
R1-142047 | UL power control and power scaling for dual connectivity | other | Alcatel-Lucent Shanghai Bell, Alcatel-Lucent | R1-77 | - | [WTS] [JSN] | |||
R1-142048 | Common search space on SeNB for dual connectivity | other | Alcatel-Lucent Shanghai Bell, Alcatel-Lucent | R1-77 | - | [WTS] [JSN] | |||
R1-142049 | UE capability sharing between MeNB and SeNB for dual connectivity | other | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | R1-77 | - | [WTS] [JSN] | |||
R1-142050 | Design of Scheduling Assignment | other | Alcatel-Lucent Shanghai Bell, Alcatel-Lucent | R1-77 | - | [WTS] [JSN] | |||
R1-142051 | Channel design for D2D discovery | other | Alcatel-Lucent Shanghai Bell, Alcatel-Lucent | R1-77 | - | [WTS] [JSN] | |||
R1-142052 | Preamble design for D2D Discovery | other | Alcatel-Lucent Shanghai Bell, Alcatel-Lucent | R1-77 | - | [WTS] [JSN] | |||
R1-142053 | System Control and Security for D2D broadcast communication | other | Alcatel-Lucent, Alcatel-Lucent Shanhai Bell | R1-77 | - | [WTS] [JSN] | |||
R1-142054 | Support of Lawful Intercept of D2D broadcast communication | other | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | R1-77 | - | [WTS] [JSN] | |||
R1-142055 | Resource allocation for D2D Broadcast Communication | other | Alcatel-Lucent Shanghai Bell, Alcatel-Lucent | R1-77 | - | [WTS] [JSN] | |||
R1-142056 | Resource allocation for Scheduling Assignment | other | Alcatel-Lucent Shanghai Bell, Alcatel-Lucent | R1-77 | - | [WTS] [JSN] | |||
R1-142057 | Resource allocation for D2D Discovery | other | Alcatel-Lucent Shanghai Bell, Alcatel-Lucent | R1-77 | - | [WTS] [JSN] | |||
R1-142058 | Definition of in-coverage, out-of-coverage, and edge-of-cell coverage | other | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | R1-77 | - | [WTS] [JSN] | |||
R1-142059 | Evaluation of Impact of D2D to WAN system performance | other | Alcatel-Lucent Shanghai Bell, Alcatel-Lucent | R1-77 | - | [WTS] [JSN] | |||
R1-142060 | Resource allocation for D2D synchronization signals | other | Alcatel-Lucent Shanghai Bell, Alcatel-Lucent | R1-77 | - | [WTS] [JSN] | |||
R1-142061 | Considerations for design of D2D Synchronization | other | Alcatel-Lucent Shanghai Bell, Alcatel-Lucent | R1-77 | - | [WTS] [JSN] | |||
R1-142062 | D2D Synchronization Procedure | other | Alcatel-Lucent Shanghai Bell, Alcatel-Lucent | R1-77 | - | [WTS] [JSN] | |||
R1-142063 | Considerations on higher-layer signalling for NAICS | other | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | R1-77 | - | [WTS] [JSN] | |||
R1-142064 | CSI enhancement for NAICS | other | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | R1-77 | - | [WTS] [JSN] | |||
R1-142065 | Discussion of on/off transitions and related procedures | other | Fujitsu | R1-77 | - | [WTS] [JSN] | |||
R1-142066 | Discussion on options for small cell discovery signals | other | Fujitsu | R1-77 | - | [WTS] [JSN] | |||
R1-142067 | RRM Measurements for small cell on/off | other | Fujitsu | R1-77 | - | [WTS] [JSN] | |||
R1-142068 | Discussion on RSRQ measurement for small cell on/off | other | Fujitsu | R1-77 | - | [WTS] [JSN] | |||
R1-142069 | Dynamic power allocation for power limited UE in dual-connectivity | other | Fujitsu | R1-77 | - | [WTS] [JSN] | |||
R1-142070 | Control signaling for D2D broadcast | other | Fujitsu | R1-77 | - | [WTS] [JSN] | |||
R1-142071 | Discussion of RRM measurement for D2D communication | other | Fujitsu | R1-77 | - | [WTS] [JSN] | |||
R1-142072 | Distributed resource allocation for D2D broadcast | other | Fujitsu | R1-77 | - | [WTS] [JSN] | |||
R1-142073 | eNB controlled resource allocation for D2D broadcast | other | Fujitsu | R1-77 | - | [WTS] [JSN] | |||
R1-142074 | Interference management between D2D and WAN | other | Fujitsu | R1-77 | - | [WTS] [JSN] | |||
R1-142075 | Resource Allocation for Type 1 D2D Discovery | other | Fujitsu | R1-77 | - | [WTS] [JSN] | |||
R1-142076 | Discussion on D2D Synchronization Procedure | other | Fujitsu | R1-77 | - | [WTS] [JSN] | |||
R1-142077 | RPT design for broadcast communication | other | CATT | R1-77 | - | [WTS] [JSN] | |||
R1-142078 | Public safety perspective on multi-carrier operations for D2D group communications | other | U.S. Department Of Commerce | R1-77 | - | [WTS] [JSN] | |||
R1-142079 | CAT 0 Compatibility Mode Standardization | other | Sierra Wireless | R1-77 | - | [WTS] [JSN] | |||
R1-142080 | Input on Remaining Details of CAT 0 | other | Sierra Wireless | R1-77 | - | [WTS] [JSN] | |||
R1-142081 | DL HARQ process for TDD SCell in TDD-FDD CA | other | Samsung | R1-77 | - | [WTS] [JSN] | |||
R1-142082 | Periodic CSI reporting for TDD-FDD CA | other | Samsung | R1-77 | - | [WTS] [JSN] | |||
R1-142083 | SRS transmission for TDD-FDD CA | other | Samsung | R1-77 | - | [WTS] [JSN] | |||
R1-142084 | Remaining Issues for CSI Reporting | other | Samsung | R1-77 | - | [WTS] [JSN] | |||
R1-142085 | HARQ-ACK Transmission in PUSCH | other | Samsung | R1-77 | - | [WTS] [JSN] | |||
R1-142086 | HARQ-ACK feedback procedures for eIMTA | other | Samsung | R1-77 | - | [WTS] [JSN] | |||
R1-142087 | UL Power Control – Remaining Issues | other | Samsung | R1-77 | - | [WTS] [JSN] | |||
R1-142088 | Remaining Issues for New UE Category | other | Samsung | R1-77 | - | [WTS] [JSN] | |||
R1-142089 | Informing an eNB of New UE Category and Capability | other | Samsung | R1-77 | - | [WTS] [JSN] | |||
R1-142090 | HD-FDD for New Category UEs | other | Samsung | R1-77 | - | [WTS] [JSN] | |||
R1-142091 | CQI/MCS table design for 256QAM | other | Samsung | R1-77 | - | [WTS] [JSN] | |||
R1-142092 | UE category/capability for 256QAM | other | Samsung | R1-77 | - | [WTS] [JSN] | |||
R1-142093 | Discussion on 256QAM related signalling/procedure | other | Samsung | R1-77 | - | [WTS] [JSN] | |||
R1-142094 | Procedures for small cell on/off transition time reduction | other | Samsung | R1-77 | - | [WTS] [JSN] | |||
R1-142095 | Performance evaluation on discovery signals | other | Samsung | R1-77 | - | [WTS] [JSN] | |||
R1-142096 | Detailed design of discovery signal | other | Samsung | R1-77 | - | [WTS] [JSN] | |||
R1-142097 | Discovery signal-based RRM measurement procedures | other | Samsung | R1-77 | - | [WTS] [JSN] | |||
R1-142098 | Discovery signal-based RSRQ-like measurement | other | Samsung | R1-77 | - | [WTS] [JSN] | |||
R1-142099 | RIBS solutions and potential standards impact | other | Samsung | R1-77 | - | [WTS] [JSN] | |||
R1-142100 | Parallel random access preamble transmissions in dual connectivity | other | Samsung | R1-77 | - | [WTS] [JSN] | |||
R1-142101 | UL Power Control in Dual Connectivity | other | Samsung | R1-77 | - | [WTS] [JSN] | |||
R1-142102 | UE Capability for MCG and SCG | other | Samsung | R1-77 | - | [WTS] [JSN] | |||
R1-142103 | Prioritization of UL Transmissions under Power Limitation | other | Samsung | R1-77 | - | [WTS] [JSN] | |||
R1-142104 | CP configuration for out-of-coverage | other | Samsung | R1-77 | - | [WTS] [JSN] | |||
R1-142105 | Details on scrambling sequence generation | other | Samsung | R1-77 | - | [WTS] [JSN] | |||
R1-142106 | Control information needed for D2D broadcast communication | other | Samsung | R1-77 | - | [WTS] [JSN] | |||
R1-142107 | Identifier in scheduling assignment for D2D communication | other | Samsung | R1-77 | - | [WTS] [JSN] | |||
R1-142108 | Resource allocation for type-1 discovery | other | Samsung | R1-77 | - | [WTS] [JSN] | |||
R1-142109 | Resource pool configuration for type-1 discovery | other | Samsung | R1-77 | - | [WTS] [JSN] | |||
R1-142110 | WAN and D2D priority handling for type-1 discovery | other | Samsung | R1-77 | - | [WTS] [JSN] | |||
R1-142111 | Mode 2 resource allocation for D2D broadcast communication | other | Samsung | R1-77 | - | [WTS] [JSN] | |||
R1-142112 | Mode 1 resource allocation for D2D broadcast communication | other | Samsung | R1-77 | - | [WTS] [JSN] | |||
R1-142113 | Resource allocation for type 2B discovery | other | Samsung | R1-77 | - | [WTS] [JSN] | |||
R1-142114 | Definitions of in-coverage, out-of-coverage, edge-of-cell coverage | other | Samsung | R1-77 | - | [WTS] [JSN] | |||
R1-142115 | Evaluation of D2D impact on WAN: PUCCH performance | other | Samsung | R1-77 | - | [WTS] [JSN] | |||
R1-142116 | Evaluation of D2D impact on WAN: DL throughput | other | Samsung | R1-77 | - | [WTS] [JSN] | |||
R1-142117 | D2D PUSCH impact on WAN PUCCH | other | Samsung | R1-77 | - | [WTS] [JSN] | |||
R1-142118 | TDM resource allocation for D2D synchronization | other | Samsung | R1-77 | - | [WTS] [JSN] | |||
R1-142119 | D2D synchronization procedure for resource pool configuration | other | Samsung | R1-77 | - | [WTS] [JSN] | |||
R1-142120 | D2D Synchronization Signal and Channel Design | other | Samsung | R1-77 | - | [WTS] [JSN] | |||
R1-142121 | D2D synchronization procedure for partial network coverage | other | Samsung | R1-77 | - | [WTS] [JSN] | |||
R1-142122 | D2D synchronization procedure for out-of-network coverage | other | Samsung | R1-77 | - | [WTS] [JSN] | |||
R1-142123 | Synchronization source UE determination for in-coverage scenario | other | Samsung | R1-77 | - | [WTS] [JSN] | |||
R1-142124 | Multi-carrier operations for D2D and WAN transmission/reception | other | Samsung | R1-77 | - | [WTS] [JSN] | |||
R1-142125 | Discussion on higher-layer signalling for NAICS | other | Samsung | R1-77 | - | [WTS] [JSN] | |||
R1-142126 | Remaining details on transmission parameters for NAICS | other | Samsung | R1-77 | - | [WTS] [JSN] | |||
R1-142127 | Discussion on CSI enhancement options for NAICS | other | Samsung | R1-77 | - | [WTS] [JSN] | |||
R1-142128 | Summary of discussion on number of DL HARQ processes | other | LG Electronics | R1-77 | - | [WTS] [JSN] | |||
R1-142129 | Remaining Details on CSI Feedback for TDD eIMTA | other | LG Electronics | R1-77 | - | [WTS] [JSN] | |||
R1-142130 | Remaining Details on HARQ-ACK Feedback for TDD eIMTA | other | LG Electronics | R1-77 | - | [WTS] [JSN] | |||
R1-142131 | Remaining Issues for TDD eIMTA | other | LG Electronics | R1-77 | - | [WTS] [JSN] | |||
R1-142132 | Remaining details on low-cost MTC | other | LG Electronics | R1-77 | - | [WTS] [JSN] | |||
R1-142133 | HD-FDD support for low-cost MTC | other | LG Electronics | R1-77 | - | [WTS] [JSN] | |||
R1-142134 | Remaining issues for supporting downlink 256QAM | other | LG Electronics | R1-77 | - | [WTS] [JSN] | |||
R1-142135 | Detailed discussions on new L1 procedure to support fast time-scale on/off operation | other | LG Electronics | R1-77 | - | [WTS] [JSN] | |||
R1-142136 | Cell detection performance with discovery signals | other | LG Electronics | R1-77 | - | [WTS] [JSN] | |||
R1-142137 | DRS design details and considerations | other | LG Electronics | R1-77 | - | [WTS] [JSN] | |||
R1-142138 | DRS-based measurements with network assistance | other | LG Electronics | R1-77 | - | [WTS] [JSN] | |||
R1-142139 | Considerations on DRS-based RSRQ measurement | other | LG Electronics | R1-77 | - | [WTS] [JSN] | |||
R1-142140 | Further discussion on network listening for intra-operator scenarios | other | LG Electronics | R1-77 | - | [WTS] [JSN] | |||
R1-142141 | Uplink power control for dual connectivity | other | LG Electronics | R1-77 | - | [WTS] [JSN] | |||
R1-142142 | Power headroom reporting for dual connectivity | other | LG Electronics | R1-77 | - | [WTS] [JSN] | |||
R1-142143 | Remaining RAN1 issues of dual connectivity | other | LG Electronics | R1-77 | - | [WTS] [JSN] | |||
R1-142144 | Discussion on D2D Communication Physical Layer Design | other | LG Electronics | R1-77 | - | [WTS] [JSN] | |||
R1-142145 | Discussion on D2D Discovery Physical Layer Design | other | LG Electronics | R1-77 | - | [WTS] [JSN] | |||
R1-142146 | Control design for D2D broadcast communication | other | LG Electronics | R1-77 | - | [WTS] [JSN] | |||
R1-142147 | Discussion on signaling for D2D communication resource allocation | other | LG Electronics | R1-77 | - | [WTS] [JSN] | |||
R1-142148 | Resource allocation mode 2 in D2D communication | other | LG Electronics | R1-77 | - | [WTS] [JSN] | |||
R1-142149 | Operation in Type 1 Resource Allocation for D2D discovery | other | LG Electronics | R1-77 | - | [WTS] [JSN] | |||
R1-142150 | Operational procedure in Mode 1 for D2D communication | other | LG Electronics | R1-77 | - | [WTS] [JSN] | |||
R1-142151 | Type 2 resource allocation mechanisms for D2D discovery | other | LG Electronics | R1-77 | - | [WTS] [JSN] | |||
R1-142152 | Multiplexing issues of WAN and D2D | other | LG Electronics | R1-77 | - | [WTS] [JSN] | |||
R1-142153 | Coexistence issues of WAN and D2D on multiple carriers | other | LG Electronics | R1-77 | - | [WTS] [JSN] | |||
R1-142154 | Resource allocation mode decision at D2D UE under eNB controllability | other | LG Electronics | R1-77 | - | [WTS] [JSN] | |||
R1-142155 | Evaluation Results for D2D and WAN Co-existence | other | LG Electronics | R1-77 | - | [WTS] [JSN] | |||
R1-142156 | Discussion on design of D2D synchronization signal | other | LG Electronics | R1-77 | - | [WTS] [JSN] | |||
R1-142157 | Discussion on resource allocation for D2D synchronization | other | LG Electronics | R1-77 | - | [WTS] [JSN] | |||
R1-142158 | On the D2D-related information sharing between in-coverage UEs and out-coverage Ues | other | LG Electronics | R1-77 | - | [WTS] [JSN] | |||
R1-142159 | Discussion on procedures for D2DSS transmission and reception | other | LG Electronics | R1-77 | - | [WTS] [JSN] | |||
R1-142160 | Discussion on D2D signal transmission and reception timing | other | LG Electronics | R1-77 | - | [WTS] [JSN] | |||
R1-142161 | Considerations on supporting inter-cell D2D operations | other | LG Electronics | R1-77 | - | [WTS] [JSN] | |||
R1-142162 | Discussion on higher-layer signalling for NAICS | other | LG Electronics | R1-77 | - | [WTS] [JSN] | |||
R1-142163 | Discussion on CSI enhancement for NAICS | other | LG Electronics | R1-77 | - | [WTS] [JSN] | |||
R1-142164 | Remaining issues for HARQ-ACK feedback on PUSCH | other | NEC | R1-77 | - | [WTS] [JSN] | |||
R1-142165 | Views on remaining issues for Low Cost MTC Ues | other | NEC | R1-77 | - | [WTS] [JSN] | |||
R1-142166 | Impact analysis of eNB not knowing a Category 0 UE with 1 RX antenna | other | NEC | R1-77 | - | [WTS] [JSN] | |||
R1-142167 | UE category to support 256QAM | other | NEC | R1-77 | - | [WTS] [JSN] | |||
R1-142168 | Views on DRS measurement timing configuration | other | NEC | R1-77 | - | [WTS] [JSN] | |||
R1-142169 | UL power allocation scheme in dual connectivity | other | NEC | R1-77 | - | [WTS] [JSN] | |||
R1-142170 | Channel prioritisation and power scaling for dual connectivity | other | NEC | R1-77 | - | [WTS] [JSN] | |||
R1-142171 | UL/DL processing capability of UE in Dual Connectivity | other | NEC | R1-77 | - | [WTS] [JSN] | |||
R1-142172 | Resource selection for Type 1 discovery message transmission | other | NEC | R1-77 | - | [WTS] [JSN] | |||
R1-142173 | D2D and cellular resource multiplexing configuration | other | NEC | R1-77 | - | [WTS] [JSN] | |||
R1-142174 | D2D synchronization procedure for out-of-network coverage | other | NEC | R1-77 | - | [WTS] [JSN] | |||
R1-142175 | Signaling Considerations for NAICS | other | NEC | R1-77 | - | [WTS] [JSN] | |||
R1-142176 | Discussions on network listening for inter-operator scenarios | other | LG Electronics | R1-77 | - | [WTS] [JSN] | |||
R1-142177 | Summary of Email Discussion for Discovery Preamble for D2D | other | ITRI | R1-77 | - | [WTS] [JSN] | |||
R1-142178 | Draft CR on CQI feedback format table in TS 36.212 | other | Panasonic | R1-77 | - | [WTS] [JSN] | |||
R1-142179 | Reconfiguration behaviour | other | Panasonic | R1-77 | - | [WTS] [JSN] | |||
R1-142180 | UL Index and DAI bits in DCI format 0/4 | other | Panasonic | R1-77 | - | [WTS] [JSN] | |||
R1-142181 | Updated views on FFS on new UE category | other | Panasonic | R1-77 | - | [WTS] [JSN] | |||
R1-142182 | Open issues regarding 256QAM | other | Panasonic | R1-77 | - | [WTS] [JSN] | |||
R1-142183 | Small cell on/off using DRX procedure | other | Panasonic | R1-77 | - | [WTS] [JSN] | |||
R1-142184 | Discovery signal based RRM measurement procedures | other | Panasonic | R1-77 | - | [WTS] [JSN] | |||
R1-142185 | Discussion on RSSI on RSRQ-like measurements | other | Panasonic | R1-77 | - | [WTS] [JSN] | |||
R1-142186 | TPC on dual connectivity | other | Panasonic | R1-77 | - | [WTS] [JSN] | |||
R1-142187 | Half duplex issue and solutions in D2D | other | Panasonic | R1-77 | - | [WTS] [JSN] | |||
R1-142188 | MCS report in mode 1 resource allocation |
other revised to R1-164908 |
Panasonic | R1-77 | - | [WTS] [JSN] | |||
R1-142189 | D2D grant design in mode 1 resource allocation | other | Panasonic | R1-77 | - | [WTS] [JSN] | |||
R1-142190 | D2D coverage definition | other | Panasonic | R1-77 | - | [WTS] [JSN] | |||
R1-142191 | Evaluation on spatial interference to WAN by D2D | other | Panasonic | R1-77 | - | [WTS] [JSN] | |||
R1-142192 | Rough synchronization procedure in D2D | other | Panasonic | R1-77 | - | [WTS] [JSN] | |||
R1-142193 | Relationship between higher-layer signaling restriction and blind detection | other | Panasonic | R1-77 | - | [WTS] [JSN] | |||
R1-142194 | CSI reference resource for A-CSI reporting for eIMTA | other | Sharp | R1-77 | - | [WTS] [JSN] | |||
R1-142195 | Remaining issues on periodic CSI reporting during fallback for eIMTA | other | Sharp | R1-77 | - | [WTS] [JSN] | |||
R1-142196 | HARQ-ACK reporting on PUCCH for eIMTA | other | Sharp | R1-77 | - | [WTS] [JSN] | |||
R1-142197 | DL HARQ-ACK in TDD-FDD CA with eIMTA | other | Sharp | R1-77 | - | [WTS] [JSN] | |||
R1-142198 | Details on monitoring subframes for reconfiguration DCI in TDD CA and eIMTA | other | Sharp | R1-77 | - | [WTS] [JSN] | |||
R1-142199 | L1 procedure for small cell on/off | other | Sharp | R1-77 | - | [WTS] [JSN] | |||
R1-142200 | On the design of the discovery signal | other | Sharp | R1-77 | - | [WTS] [JSN] | |||
R1-142201 | UL power control for dual connectivity | other | Sharp | R1-77 | - | [WTS] [JSN] | |||
R1-142202 | Consideration on Configurable CP Length for D2D Transmission | other | Sharp | R1-77 | - | [WTS] [JSN] | |||
R1-142203 | Use a UE-specific RNTI with a D2D grant | other | Sharp | R1-77 | - | [WTS] [JSN] | |||
R1-142204 | CRC scrambling for Scheduling assignment | other | Sharp | R1-77 | - | [WTS] [JSN] | |||
R1-142205 | Collision Avoidance Mechanism with Cellular Network for D2D Communication | other | Sharp | R1-77 | - | [WTS] [JSN] | |||
R1-142206 | Physical Channel Design for D2D SA and Data Transmission | other | Sharp | R1-77 | - | [WTS] [JSN] | |||
R1-142207 | Aspects of resource pool configuration for D2D communication | other | Sharp | R1-77 | - | [WTS] [JSN] | |||
R1-142208 | D2D Network Coverage Definition & Mode Selection | other | Sharp | R1-77 | - | [WTS] [JSN] | |||
R1-142209 | Detailed design of Discovery signal(s) | other | ETRI | R1-77 | - | [WTS] [JSN] | |||
R1-142210 | Uplink power control in dual connectivity | other | ETRI | R1-77 | - | [WTS] [JSN] | |||
R1-142211 | DMRS Structure for Reducing UE Power Consumption | other | ETRI | R1-77 | - | [WTS] [JSN] | |||
R1-142212 | On configuration and design of 256QAM tables in downlink | other | ZTE | R1-77 | - | [WTS] [JSN] | |||
R1-142213 | UE category design for 256 QAM | other | ZTE | R1-77 | - | [WTS] [JSN] | |||
R1-142214 | Parallel random access preamble transmissions in dual connectivity | other | ZTE | R1-77 | - | [WTS] [JSN] | |||
R1-142215 | UCI feedback mechanism for dual connectivity | other | ZTE | R1-77 | - | [WTS] [JSN] | |||
R1-142216 | Physical layer aspects of dual connectivity | other | ZTE | R1-77 | - | [WTS] [JSN] | |||
R1-142217 | Remaining issues for low complexity MTC UEs | other | ZTE | R1-77 | - | [WTS] [JSN] | |||
R1-142218 | Open areas on HD-FDD operation for low cost MTC UEs | other | ZTE | R1-77 | - | [WTS] [JSN] | |||
R1-142219 | Consideration on the remaining issues about higher-layer signalling | other | ZTE | R1-77 | - | [WTS] [JSN] | |||
R1-142220 | Evaluation results of CSI enhancements for NAICS | other | ZTE | R1-77 | - | [WTS] [JSN] | |||
R1-142221 | Remaining details on CSI feedback for TDD eIMTA | other | ZTE | R1-77 | - | [WTS] [JSN] | |||
R1-142222 | UE capabilities for TDD eIMTA | other | ZTE | R1-77 | - | [WTS] [JSN] | |||
R1-142223 | Designing issues of Radio-interface based Synchronization | other | ZTE | R1-77 | - | [WTS] [JSN] | |||
R1-142224 | Detailed design of DRS | other | ZTE | R1-77 | - | [WTS] [JSN] | |||
R1-142225 | On DS measurement configuration | other | ZTE | R1-77 | - | [WTS] [JSN] | |||
R1-142226 | On DS based RSRQ-like measurement | other | ZTE | R1-77 | - | [WTS] [JSN] | |||
R1-142227 | On physical channel design for D2D discovery | other | ZTE | R1-77 | - | [WTS] [JSN] | |||
R1-142228 | SA design for D2D communication | other | ZTE | R1-77 | - | [WTS] [JSN] | |||
R1-142229 | Control signaling for D2D communication | other | ZTE | R1-77 | - | [WTS] [JSN] | |||
R1-142230 | SA and data resource allocation for Mode 2 | other | ZTE | R1-77 | - | [WTS] [JSN] | |||
R1-142231 | Resource Allocation for Type 1 Discovery | other | ZTE | R1-77 | - | [WTS] [JSN] | |||
R1-142232 | SA and data resource allocation for Mode 1 | other | ZTE | R1-77 | - | [WTS] [JSN] | |||
R1-142233 | Resource Allocation for Type 2B Discovery | other | ZTE | R1-77 | - | [WTS] [JSN] | |||
R1-142234 | Performance evaluation of D2D and WAN co-existence | other | ZTE | R1-77 | - | [WTS] [JSN] | |||
R1-142235 | Resource allocation for synchronization signal and channel | other | ZTE | R1-77 | - | [WTS] [JSN] | |||
R1-142236 | D2D Synchronization Signal and Channel Design | other | ZTE | R1-77 | - | [WTS] [JSN] | |||
R1-142237 | D2D Synchronization procedure | other | ZTE | R1-77 | - | [WTS] [JSN] | |||
R1-142238 | Timing and synchronization for D2D Discovery/communication | other | ZTE | R1-77 | - | [WTS] [JSN] | |||
R1-142239 | Procedures for small cell on/off transition time reduction | other | ZTE | R1-77 | - | [WTS] [JSN] | |||
R1-142240 | Reply LS on ProSe Lawful Interception | other | SA3-LI, US Department of Commerce | R1-77 | - | [WTS] [JSN] | |||
R1-142241 | Draft Agenda for RAN1#77 meeting | other | RAN1 Chairman | R1-77 | - | [WTS] [JSN] | |||
R1-142242 | Maximum number of DL HARQ processes for TDD serving cell with FDD Pcell | other | ITRI | R1-77 | - | [WTS] [JSN] | |||
R1-142243 | Performance of small cell on/off with different CSI assumptions | other | ITRI | R1-77 | - | [WTS] [JSN] | |||
R1-142244 | Radio-interface based synchronization for small cells | other | ITRI | R1-77 | - | [WTS] [JSN] | |||
R1-142245 | Further discussion on the Multiplexing of Cellular and D2D signals | other | ITRI | R1-77 | - | [WTS] [JSN] | |||
R1-142246 | Discussion on High-Layer Signalling for NAICS | other | ITRI | R1-77 | - | [WTS] [JSN] | |||
R1-142247 | Discussion on Mechanism to Support 256QAM in TM 10 | other | Hitachi Ltd. | R1-77 | - | [WTS] [JSN] | |||
R1-142248 | Indication of cell transmission to UEs | other | Hitachi Ltd. | R1-77 | - | [WTS] [JSN] | |||
R1-142249 | Discussion on discovery signal candidates | other | Hitachi Ltd. | R1-77 | - | [WTS] [JSN] | |||
R1-142250 | Listening RS for RIBS | other | Hitachi Ltd. | R1-77 | - | [WTS] [JSN] | |||
R1-142251 | PDCCH common search space on SeNB | other | Hitachi Ltd. | R1-77 | - | [WTS] [JSN] | |||
R1-142252 | Remaining details of new UE category/type | other | NTT DOCOMO | R1-77 | - | [WTS] [JSN] | |||
R1-142253 | Views on half duplex-FDD with single oscillator | other | NTT DOCOMO | R1-77 | - | [WTS] [JSN] | |||
R1-142254 | Remaining issues on 256 CQI/MCS table | other | NTT DOCOMO | R1-77 | - | [WTS] [JSN] | |||
R1-142255 | Views on UE categories for 256QAM | other | NTT DOCOMO | R1-77 | - | [WTS] [JSN] | |||
R1-142256 | New L1 procedure for small cell on/off | other | NTT DOCOMO | R1-77 | - | [WTS] [JSN] | |||
R1-142257 | Views on transition time reduction for small cell on/off | other | NTT DOCOMO | R1-77 | - | [WTS] [JSN] | |||
R1-142258 | Performance evaluation on DRS-based cell/TP identification and RSRP measurement | other | NTT DOCOMO | R1-77 | - | [WTS] [JSN] | |||
R1-142259 | Views on detailed design of discovery signal for Rel-12 discovery procedure | other | NTT DOCOMO | R1-77 | - | [WTS] [JSN] | |||
R1-142260 | Views on discovery signal-based RRM measurement procedures | other | NTT DOCOMO | R1-77 | - | [WTS] [JSN] | |||
R1-142261 | Views on discovery signal-based RSRQ measurement | other | NTT DOCOMO | R1-77 | - | [WTS] [JSN] | |||
R1-142262 | Open issues on dual connectivity | other | NTT DOCOMO | R1-77 | - | [WTS] [JSN] | |||
R1-142263 | Summary of email discussion [76b-08] | other | NTT DOCOMO | R1-77 | - | [WTS] [JSN] | |||
R1-142264 | Power-control mechanisms for dual connectivity | other | NTT DOCOMO | R1-77 | - | [WTS] [JSN] | |||
R1-142265 | RAN1 specification impact of PUCCH on SCell for CA | other | NTT DOCOMO | R1-77 | - | [WTS] [JSN] | |||
R1-142266 | Views on remaining open issues on dual connectivity | other | NTT DOCOMO | R1-77 | - | [WTS] [JSN] | |||
R1-142267 | Discussion on resource selection for type 1 discovery | other | NTT DOCOMO | R1-77 | - | [WTS] [JSN] | |||
R1-142268 | Discussion on Inter-cell type 2B discovery | other | NTT DOCOMO | R1-77 | - | [WTS] [JSN] | |||
R1-142269 | Evaluation of inband emission impact of D2D discovery | other | NTT DOCOMO | R1-77 | - | [WTS] [JSN] | |||
R1-142270 | Views on inter-cell and inter-carrier D2D | other | NTT DOCOMO | R1-77 | - | [WTS] [JSN] | |||
R1-142271 | Remaining issues on higher layer signaling for NAICS | other | NTT DOCOMO | R1-77 | - | [WTS] [JSN] | |||
R1-142272 | Evaluation results of CSI enhancements for NAICS | other | NTT DOCOMO | R1-77 | - | [WTS] [JSN] | |||
R1-142273 | Further views on Rel-12 UE capabilities | other | NTT DOCOMO | R1-77 | - | [WTS] [JSN] | |||
R1-142274 | Remaining Details of 256 QAM | other | Broadcom Corporation | R1-77 | - | [WTS] [JSN] | |||
R1-142275 | Discussions on UE Category with introduction of 256 QAM | other | Broadcom Corporation | R1-77 | - | [WTS] [JSN] | |||
R1-142276 | Small Cell On/Off procedures | other | Broadcom Corporation | R1-77 | - | [WTS] [JSN] | |||
R1-142277 | Performance evaluations for cell detection and RSRP measurement | other | Broadcom Corporation | R1-77 | - | [WTS] [JSN] | |||
R1-142278 | Discovery signal design | other | Broadcom Corporation | R1-77 | - | [WTS] [JSN] | |||
R1-142279 | RSRQ calculation for small cell On/Off | other | Broadcom Corporation | R1-77 | - | [WTS] [JSN] | |||
R1-142280 | Uplink Power Control for Dual Connectivity | other | Broadcom Corporation | R1-77 | - | [WTS] [JSN] | |||
R1-142281 | Power Headroom Reporting to Support UL Power Control in Dual Connectivity | other | Broadcom Corporation | R1-77 | - | [WTS] [JSN] | |||
R1-142282 | D2DSS design | other | Broadcom Corporation | R1-77 | - | [WTS] [JSN] | |||
R1-142283 | Higher-layer signaling for NAICS | other | Broadcom Corporation | R1-77 | - | [WTS] [JSN] | |||
R1-142284 | CSI Enhancements for NAICS | other | Broadcom Corporation | R1-77 | - | [WTS] [JSN] | |||
R1-142285 | Discussion on RSSI definition for DRS based RRM measurement | other | FiberHome | R1-77 | - | [WTS] [JSN] | |||
R1-142286 | Design of discovery signal for small cells | other | FiberHome | R1-77 | - | [WTS] [JSN] | |||
R1-142287 | Discussion on Dynamic Power-sharing of DC UL transmission | other | FiberHome | R1-77 | - | [WTS] [JSN] | |||
R1-142288 | Remaining Details of UL/DL Reconfiguration for eIMTA | other | HTC | R1-77 | - | [WTS] [JSN] | |||
R1-142289 | Discussion on L1 procedure to further reduce the transition time of small cell on/off | other | HTC | R1-77 | - | [WTS] [JSN] | |||
R1-142290 | UL Dynamic Power-Sharing in Dual Connectivity | other | HTC | R1-77 | - | [WTS] [JSN] | |||
R1-142291 | UL Power Control in Unsynchronized Dual Connectivity | other | HTC | R1-77 | - | [WTS] [JSN] | |||
R1-142292 | D2D Synchronization procedure for in and out of coverage UEs | other | HTC | R1-77 | - | [WTS] [JSN] | |||
R1-142293 | Resource allocation scheme for in-coverage D2D communication to support Mode 1 and Mode 2 | other | III | R1-77 | - | [WTS] [JSN] | |||
R1-142294 | Decision metric for D2D communication | other | Czech Technical University in Prague, IAESI | R1-77 | - | [WTS] [JSN] | |||
R1-142295 | D2D physical channels and signals | other | CEA, IAESI | R1-77 | - | [WTS] [JSN] | |||
R1-142296 | Remaining issues for low cost MTC | other | MediaTek Inc. | R1-77 | - | [WTS] [JSN] | |||
R1-142297 | Remaining Issues of Low Cost HD-FDD Operation | other | MediaTek Inc. | R1-77 | - | [WTS] [JSN] | |||
R1-142298 | Layer-1 procedure enhancements for fast small cell on/off operation | other | MediaTek Inc. | R1-77 | - | [WTS] [JSN] | |||
R1-142299 | Performance evaluation of cell detection and RSRP measurement for discovery signal designs | other | MediaTek Inc. | R1-77 | - | [WTS] [JSN] | |||
R1-142300 | Discovery signal designs for small cell discovery enhancements | other | MediaTek Inc. | R1-77 | - | [WTS] [JSN] | |||
R1-142301 | On discovery signal based RRM measurements | other | MediaTek Inc. | R1-77 | - | [WTS] [JSN] | |||
R1-142302 | Analysis and evaluation of discovery signal based RSRQ measurement definitions | other | MediaTek Inc. | R1-77 | - | [WTS] [JSN] | |||
R1-142303 | Higher-layer signaling of interference parameters for NAICS | other | MediaTek Inc. | R1-77 | - | [WTS] [JSN] | |||
R1-142304 | Discussion on CSI feedback for NAICS receivers | other | MediaTek Inc. | R1-77 | - | [WTS] [JSN] | |||
R1-142305 | UL TFCI Discussion | other | MediaTek Inc. | R1-77 | - | [WTS] [JSN] | |||
R1-142306 | Remaining Design Details of DL 10ms Mode Transmission | other | MediaTek Inc. | R1-77 | - | [WTS] [JSN] | |||
R1-142307 | Uplink ACK Transmission in Compressed Mode | other | MediaTek Inc. | R1-77 | - | [WTS] [JSN] | |||
R1-142308 | UE category definitions for 256QAM | other | NVIDIA | R1-77 | - | [WTS] [JSN] | |||
R1-142309 | Small cell on/off transition time reduction | other | NVIDIA | R1-77 | - | [WTS] [JSN] | |||
R1-142310 | Evaluation of discovery signals for RRM measurements | other | NVIDIA | R1-77 | - | [WTS] [JSN] | |||
R1-142311 | Details of discovery signal design | other | NVIDIA | R1-77 | - | [WTS] [JSN] | |||
R1-142312 | Remaining aspects of higher-layer signaling for NAICS | other | NVIDIA | R1-77 | - | [WTS] [JSN] | |||
R1-142313 | Specifying CQI for NAICS | other | NVIDIA | R1-77 | - | [WTS] [JSN] | |||
R1-142314 | On CSI feedback enhancements in support of NAICS | other | NVIDIA | R1-77 | - | [WTS] [JSN] | |||
R1-142315 | Resource Allocation for D2D Synchronization | other | Intel Corporation | R1-77 | - | [WTS] [JSN] | |||
R1-142316 | Discussion on D2D Multicarrier Capabilities | other | Intel Corporation | R1-77 | - | [WTS] [JSN] | |||
R1-142317 | Analysis of Multi-hop Synchronization Procedures with Prioritized Hop Count | other | Intel Corporation | R1-77 | - | [WTS] [JSN] | |||
R1-142318 | Discussion on D2D Control Channel | other | Intel Corporation | R1-77 | - | [WTS] [JSN] | |||
R1-142319 | [DRAFT] LS on UE receiver capability based CIO configuration in UMTS HetNet | other | Alcatel-Lucent | R1-77 | - | [WTS] [JSN] | |||
R1-142320 | Higher-layer signaling for NAICS | other | Ericsson | R1-77 | - | [WTS] [JSN] | |||
R1-142321 | 4 CRS Port Specification Impact and Performance for NAICS | other | Ericsson | R1-77 | - | [WTS] [JSN] | |||
R1-142322 | NAICS functionality, robustness, and configurability | other | Ericsson | R1-77 | - | [WTS] [JSN] | |||
R1-142323 | Higher Layer Signaling of TM10 DMRS Properties for NAICS | other | Ericsson | R1-77 | - | [WTS] [JSN] | |||
R1-142324 | On CSI enhancements for NAICS | other | Ericsson | R1-77 | - | [WTS] [JSN] | |||
R1-142325 | Discussion on reference resource for TM 10 | other | Huawei, HiSilicon, Panasonic, Samsung | R1-77 | - | [WTS] [JSN] | |||
R1-142326 | Correction on reference resource for TM 10 | other | Huawei, HiSilicon | R1-77 | - | [WTS] [JSN] | |||
R1-142327 | Discussion on Rel-12 UE capabilities | other | Huawei, HiSilicon | R1-77 | - | [WTS] [JSN] | |||
R1-142328 | 36.212 DraftCR (Rel-12, B) Introduction of Rel 12 features of TDD-FDD CA and eIMTA | other | Huawei | R1-77 | - | [WTS] [JSN] | |||
R1-142329 | Editor's document for the 36.212 specification for rel-12 | other | Huawei | R1-77 | - | [WTS] [JSN] | |||
R1-142330 | Draft CR on clarification of DL subframes | other | Huawei, HiSilicon | R1-77 | - | [WTS] [JSN] | |||
R1-142331 | Maximum number of DL HARQ processes for TDD SCell with FDD PCell | other | Huawei, HiSilicon | R1-77 | - | [WTS] [JSN] | |||
R1-142332 | Discussion on remaining details for CSI feedback | other | Huawei, HiSilicon | R1-77 | - | [WTS] [JSN] | |||
R1-142333 | Other aspects related to small cell on/off and discovery | other | Huawei, HiSilicon | R1-77 | - | [WTS] [JSN] | |||
R1-142334 | Timing information for energy-efficient small cell discovery and measurements | other | Huawei, HiSilicon | R1-77 | - | [WTS] [JSN] | |||
R1-142335 | Discussion on the UE processing capabilities in dual connectivity | other | Huawei, Hisilicon | R1-77 | - | [WTS] [JSN] | |||
R1-142336 | Discussion on the Transmission power control in dual connectivity | other | Huawei, Hisilicon | R1-77 | - | [WTS] [JSN] | |||
R1-142337 | Extending PUCCH on PCell and pSCell to Carrier Aggregation | other | Huawei, HiSilicon | R1-77 | - | [WTS] [JSN] | |||
R1-142338 | Gap for D2D transmissions | other | Huawei, HiSilicon | R1-77 | - | [WTS] [JSN] | |||
R1-142339 | Evaluation of D2D and cellular coexistence | other | Huawei, HiSilicon | R1-77 | - | [WTS] [JSN] | |||
R1-142340 | D2DSS design | other | Huawei, HiSilicon | R1-77 | - | [WTS] [JSN] | |||
R1-142341 | Discussion on CSI enhancement for NAICS | other | Huawei, HiSilicon | R1-77 | - | [WTS] [JSN] | |||
R1-142342 | Remaining Details on LC-MTC UE | other | InterDigital | R1-77 | - | [WTS] [JSN] | |||
R1-142343 | Discussion on LC-MTC HD-FDD UE | other | InterDigital | R1-77 | - | [WTS] [JSN] | |||
R1-142344 | Small cell on/off transition time reduction | other | InterDigital | R1-77 | - | [WTS] [JSN] | |||
R1-142345 | System-level performance evaluation of discovery signals | other | InterDigital | R1-77 | - | [WTS] [JSN] | |||
R1-142346 | RSSI measurements with small cell on/off operation | other | InterDigital | R1-77 | - | [WTS] [JSN] | |||
R1-142347 | Power sharing in dual connectivity | other | InterDigital | R1-77 | - | [WTS] [JSN] | |||
R1-142348 | Power headroom reporting in dual connectivity | other | InterDigital | R1-77 | - | [WTS] [JSN] | |||
R1-142349 | On CSI Enhancement for NAICS | other | InterDigital | R1-77 | - | [WTS] [JSN] | |||
R1-142350 | On control signaling and scheduling assignments for D2D | other | InterDigital | R1-77 | - | [WTS] [JSN] | |||
R1-142351 | Distributed resource allocation for D2D | other | InterDigital | R1-77 | - | [WTS] [JSN] | |||
R1-142352 | Synchronization signal and channel design for D2D | other | InterDigital | R1-77 | - | [WTS] [JSN] | |||
R1-142353 | Remaining Issues for 256 QAM Configuration and Signalling | other | BlackBerry UK Limited | R1-77 | - | [WTS] [JSN] | |||
R1-142354 | On UE Category/Capability Handling to Support 256 QAM | other | BlackBerry UK Limited | R1-77 | - | [WTS] [JSN] | |||
R1-142355 | UL Transmit Power Control for Dual Connectivity | other | BlackBerry UK Limited | R1-77 | - | [WTS] [JSN] | |||
R1-142356 | UE measurement based on discover signal | other | ASUSTeK | R1-77 | - | [WTS] [JSN] | |||
R1-142357 | UL Power Control for Simultaneous UCI Transmission | other | ASUSTeK | R1-77 | - | [WTS] [JSN] | |||
R1-142358 | Discussion of mode 2 resource allocation for D2D communication | other | ASUSTeK | R1-77 | - | [WTS] [JSN] | |||
R1-142359 | Resource allocation/utilization for type-1 discovery | other | ASUSTeK | R1-77 | - | [WTS] [JSN] | |||
R1-142360 | Resource Hopping Mechanism for Type 2B Discovery | other | ASUSTeK | R1-77 | - | [WTS] [JSN] | |||
R1-142361 | Coexistence issues between D2D discovery and WAN | other | CATR | R1-77 | - | [WTS] [JSN] | |||
R1-142362 | Evaluation on D2D distributed resource allocation for discovery | other | CATR | R1-77 | - | [WTS] [JSN] | |||
R1-142363 | Consideration on higher layer signalling of NAIC | other | CATR | R1-77 | - | [WTS] [JSN] | |||
R1-142364 | Considerations on radio-interface based synchronization | other | CATR | R1-77 | - | [WTS] [JSN] | |||
R1-142365 | Discussions on 256QAM | other | CATR | R1-77 | - | [WTS] [JSN] | |||
R1-142366 | Small cell on/off time reduction for activated SCell | other | CATR | R1-77 | - | [WTS] [JSN] | |||
R1-142367 | Views on the design of DRS | other | CATR | R1-77 | - | [WTS] [JSN] | |||
R1-142368 | Enhanced L1 procedure for activated SCell operating on/off | other | China Telecom | R1-77 | - | [WTS] [JSN] | |||
R1-142369 | UL Power transmission for dual connectivity | other | China Telecom | R1-77 | - | [WTS] [JSN] | |||
R1-142370 | UE category parameters for low complexity UE | other | Ericsson | R1-77 | - | [WTS] [JSN] | |||
R1-142371 | Downlink transmission modes for low complexity UE | other | Ericsson | R1-77 | - | [WTS] [JSN] | |||
R1-142372 | Base station knowledge of low complexity UEs | other | Ericsson | R1-77 | - | [WTS] [JSN] | |||
R1-142373 | Guard period for low complexity UE in half-duplex FDD | other | Ericsson | R1-77 | - | [WTS] [JSN] | |||
R1-142374 | Subframe timing conflict in half-duplex FDD | other | Ericsson | R1-77 | - | [WTS] [JSN] | |||
R1-142375 | CQI and MCS table design for downlink 256QAM | other | Ericsson | R1-77 | - | [WTS] [JSN] | |||
R1-142376 | TBS table design for downlink 256QAM | other | Ericsson | R1-77 | - | [WTS] [JSN] | |||
R1-142377 | Gray mapping for 256QAM | other | Ericsson | R1-77 | - | [WTS] [JSN] | |||
R1-142378 | UE category solution for 256QAM support | other | Ericsson | R1-77 | - | [WTS] [JSN] | |||
R1-142379 | On 256QAM configuration | other | Ericsson | R1-77 | - | [WTS] [JSN] | |||
R1-142380 | 256QAM for PMCH transmissions | other | Ericsson | R1-77 | - | [WTS] [JSN] | |||
R1-142381 | Comparison between different New L1 Procedures | other | Ericsson | R1-77 | - | [WTS] [JSN] | |||
R1-142382 | Performance Evaluations of different New L1 Procedures | other | Ericsson | R1-77 | - | [WTS] [JSN] | |||
R1-142383 | Standardization impact to support on/off based on CA activation/deactivation | other | Ericsson | R1-77 | - | [WTS] [JSN] | |||
R1-142384 | Standardization impact to support on/off based on Handover | other | Ericsson | R1-77 | - | [WTS] [JSN] | |||
R1-142385 | Performance evaluations for discovery signals | other | Ericsson | R1-77 | - | [WTS] [JSN] | |||
R1-142386 | Design of discovery signals and procedures | other | Ericsson | R1-77 | - | [WTS] [JSN] | |||
R1-142387 | Discovery signals and small cell on/off | other | Ericsson | R1-77 | - | [WTS] [JSN] | |||
R1-142388 | On network assistance and gap information | other | Ericsson | R1-77 | - | [WTS] [JSN] | |||
R1-142389 | RSSI measurements for discovery signals | other | Ericsson | R1-77 | - | [WTS] [JSN] | |||
R1-142390 | On radio-interface based small cell synchronization | other | Ericsson | R1-77 | - | [WTS] [JSN] | |||
R1-142391 | UE Capability Handling in Dual Connectivity | other | Ericsson | R1-77 | - | [WTS] [JSN] | |||
R1-142392 | Further Discussion on UL Power Control in Dual Connectivity | other | Ericsson | R1-77 | - | [WTS] [JSN] | |||
R1-142393 | Power headroom reporting for dual connectivity | other | Ericsson | R1-77 | - | [WTS] [JSN] | |||
R1-142394 | Simultaneous Rx/Tx support for dual connectivity | other | Ericsson | R1-77 | - | [WTS] [JSN] | |||
R1-142395 | Initialization of TA values | other | Ericsson | R1-77 | - | [WTS] [JSN] | |||
R1-142396 | On Timing and D2D Signals Multiplexing | other | Ericsson | R1-77 | - | [WTS] [JSN] | |||
R1-142397 | On Scrambling of D2D Physical Channels | other | Ericsson | R1-77 | - | [WTS] [JSN] | |||
R1-142398 | D2D Physical Channels Design | other | Ericsson | R1-77 | - | [WTS] [JSN] | |||
R1-142399 | Transmission resource allocation control for D2D communication | other | Ericsson | R1-77 | - | [WTS] [JSN] | |||
R1-142400 | On scheduling assignments | other | Ericsson | R1-77 | - | [WTS] [JSN] | |||
R1-142401 | D2D Broadcast Control Information and Related Procedures | other | Ericsson | R1-77 | - | [WTS] [JSN] | |||
R1-142402 | On resource allocation for communication in Mode 1 and Mode 2 | other | Ericsson | R1-77 | - | [WTS] [JSN] | |||
R1-142403 | Discovery Resource Allocation | other | Ericsson | R1-77 | - | [WTS] [JSN] | |||
R1-142404 | On Metric and Procedures for In/Out of NW coverage detection for D2D | other | Ericsson | R1-77 | - | [WTS] [JSN] | |||
R1-142405 | On inband co-existence of cellular and D2D UEs | other | Ericsson | R1-77 | - | [WTS] [JSN] | |||
R1-142406 | Inter-Carrier and Inter-Cell Aspects of D2D Discovery and Communication | other | Ericsson | R1-77 | - | [WTS] [JSN] | |||
R1-142407 | Discussion on UE Multi-Carrier D2D Capabilities | other | Ericsson | R1-77 | - | [WTS] [JSN] | |||
R1-142408 | Frame Structure for D2D-Enabled LTE Carriers | other | Ericsson | R1-77 | - | [WTS] [JSN] | |||
R1-142409 | Synchronization Signals and Channel Design for D2D | other | Ericsson | R1-77 | - | [WTS] [JSN] | |||
R1-142410 | Synchronization Procedures for D2D | other | Ericsson | R1-77 | - | [WTS] [JSN] | |||
R1-142411 | Draft LS reply on identifier in scheduling assignment for D2D communication | other | Ericsson | R1-77 | - | [WTS] [JSN] | |||
R1-142412 | Discussion on small cell on/off transition time reduction | other | Coolpad | R1-77 | - | [WTS] [JSN] | |||
R1-142413 | Discussion on the DS-based RRM measurement | other | Coolpad | R1-77 | - | [WTS] [JSN] | |||
R1-142414 | On Control Channel Robustness for Secondary Pilot and ILPC Restriction Schemes | other | Ericsson | R1-77 | - | [WTS] [JSN] | |||
R1-142415 | System Level Simulations on Improving the Power Control after DTX on Secondary Carriers | other | Ericsson | R1-77 | - | [WTS] [JSN] | |||
R1-142416 | Link Level Simulations on Improving the Power Control after DTX on Secondary Carriers | other | Ericsson | R1-77 | - | [WTS] [JSN] | |||
R1-142417 | 25.212 CR0327 (Rel-12, B) Introduction of Further EUL Enhancements | CR | Ericsson | R1-77 | - | [WTS] [JSN] | |||
R1-142418 | 25.214 CR0713 (Rel-12, B) Introduction of Further EUL Enhancements | CR | Ericsson | R1-77 | - | [WTS] [JSN] | |||
R1-142419 | 25.211 CR0315 (Rel-12, B) Introduction of Enhanced Broadcast of System Information | CR | Ericsson | R1-77 | - | [WTS] [JSN] | |||
R1-142420 | 25.212 CR0328 (Rel-12, B) Introduction of Enhanced Broadcast of System Information | CR | Ericsson | R1-77 | - | [WTS] [JSN] | |||
R1-142421 | 25.213 CR0117 (Rel-12, B) Introduction of Enhanced Broadcast of System Information | CR | Ericsson | R1-77 | - | [WTS] [JSN] | |||
R1-142422 | 25.214 CR0714 (Rel-12, B) Introduction of Enhanced Broadcast of System Information | CR | Ericsson | R1-77 | - | [WTS] [JSN] | |||
R1-142423 | On the Support of UMTS Features by Scalable UMTS | other | Ericsson | R1-77 | - | [WTS] [JSN] | |||
R1-142424 | Text Proposal on Uplink Signal Characteristics for Scalable UMTS | other | Ericsson | R1-77 | - | [WTS] [JSN] | |||
R1-142425 | Details on CQI/MCS Table Design for 256QAM | other | Microsoft Corporation | R1-77 | - | [WTS] [JSN] | |||
R1-142426 | UE Category Adjustment with 256QAM | other | Microsoft Corporation | R1-77 | - | [WTS] [JSN] | |||
R1-142427 | Issues in D2D Signal Design | other | Microsoft Corporation | R1-77 | - | [WTS] [JSN] | |||
R1-142428 | SA content for D2D broadcast communication | other | Microsoft Corporation | R1-77 | - | [WTS] [JSN] | |||
R1-142429 | Resource allocation for D2D Mode 1 communication | other | Microsoft Corporation | R1-77 | - | [WTS] [JSN] | |||
R1-142430 | Draft 36.214 CR on additional RSRQ measurement definition | other | Nokia, NSN | R1-77 | - | [WTS] [JSN] | |||
R1-142431 | Draft 25.215 CR on additional RSRQ measurement definition | other | Nokia, NSN | R1-77 | - | [WTS] [JSN] | |||
R1-142432 | HARQ-ACK bits ordering for PUCCH format 1b with channel selection | other | NSN, Nokia | R1-77 | - | [WTS] [JSN] | |||
R1-142433 | Usage of UL DAI and UL Index with UL reference configuration #0 | other | NSN, Nokia | R1-77 | - | [WTS] [JSN] | |||
R1-142434 | Remaining Details of Category-0 UE | other | NSN, Nokia | R1-77 | - | [WTS] [JSN] | |||
R1-142435 | Benefits of Knowing about Cat-0 UE during RAR/Paging | other | NSN, Nokia | R1-77 | - | [WTS] [JSN] | |||
R1-142436 | Details of Half-Duplex Cat-0 UE | other | NSN, Nokia | R1-77 | - | [WTS] [JSN] | |||
R1-142437 | On the final CQI table design details | other | Nokia, NSN | R1-77 | - | [WTS] [JSN] | |||
R1-142438 | On UE categories for 256QAM support | other | Nokia, NSN | R1-77 | - | [WTS] [JSN] | |||
R1-142439 | On procedures for small cell on/off transition time reduction | other | NSN, Nokia | R1-77 | - | [WTS] [JSN] | |||
R1-142440 | Small Cell Detection Statistics and Related Considerations | other | NSN, Nokia | R1-77 | - | [WTS] [JSN] | |||
R1-142441 | Discovery Signal Design | other | NSN, Nokia | R1-77 | - | [WTS] [JSN] | |||
R1-142442 | RRM-measurement and related procedures for small cell on/off and discovery | other | NSN, Nokia | R1-77 | - | [WTS] [JSN] | |||
R1-142443 | Remaining design issues of RIBS | other | NSN, Nokia | R1-77 | - | [WTS] [JSN] | |||
R1-142444 | RIBS with Synchronization Accuracy Indication | other | NSN, Nokia | R1-77 | - | [WTS] [JSN] | |||
R1-142445 | Uplink Power Control for Dual Connectivity | other | NSN, Nokia | R1-77 | - | [WTS] [JSN] | |||
R1-142446 | Remaining RAN1 Issues of Dual Connectivity | other | NSN, Nokia | R1-77 | - | [WTS] [JSN] | |||
R1-142447 | Scheduling assignment and related data transmissions | other | Nokia, NSN | R1-77 | - | [WTS] [JSN] | |||
R1-142448 | Timing and resource pools of Type 2B discovery signals | other | Nokia, NSN | R1-77 | - | [WTS] [JSN] | |||
R1-142449 | Dynamic control of D2D discovery resources | other | Nokia, NSN | R1-77 | - | [WTS] [JSN] | |||
R1-142450 | Pattern design and resource allocation for discovery Type 2B | other | NSN, Nokia | R1-77 | - | [WTS] [JSN] | |||
R1-142451 | Relationship between coverage conditions and D2D operation | other | Nokia, NSN | R1-77 | - | [WTS] [JSN] | |||
R1-142452 | D2D synchronization signal design | other | Nokia, NSN | R1-77 | - | [WTS] [JSN] | |||
R1-142453 | Synchronization procedure for D2D communication and discovery | other | Nokia, NSN | R1-77 | - | [WTS] [JSN] | |||
R1-142454 | WAN protection by configurable D2D transmission power control | other | NSN, Nokia | R1-77 | - | [WTS] [JSN] | |||
R1-142455 | Network assistance for NAICS receivers | other | NSN, Nokia | R1-77 | - | [WTS] [JSN] | |||
R1-142456 | On NAICS signalling operation | other | NSN, Nokia | R1-77 | - | [WTS] [JSN] | |||
R1-142457 | On NAICS CSI feedback | other | NSN, Nokia | R1-77 | - | [WTS] [JSN] | |||
R1-142458 | 25.214 CR0716 (Rel-11, F) Clarifications to Multiflow Operation | CR | Qualcomm Incorporated | R1-77 | - | [WTS] [JSN] | |||
R1-142459 | Summary of email discussions in RAN1#76bis on DCH enhancements | other | Qualcomm Incorporated | R1-77 | - | [WTS] [JSN] | |||
R1-142460 | Remaining aspects of DCH enhancements | other | Qualcomm Incorporated | R1-77 | - | [WTS] [JSN] | |||
R1-142461 | DL Compressed mode operation without SF reduction | other | Qualcomm Incorporated | R1-77 | - | [WTS] [JSN] | |||
R1-142462 | UL FET operation for DCH enhancements | other | Qualcomm Incorporated | R1-77 | - | [WTS] [JSN] | |||
R1-142463 | Basic UE Capability Mode of Operation | other | Qualcomm Incorporated | R1-77 | - | [WTS] [JSN] | |||
R1-142464 | 25.211 CR0316 (Rel-12, B) Introduction of DCH Enhancements | CR | Qualcomm Incorporated | R1-77 | - | [WTS] [JSN] | |||
R1-142465 | 25.212 CR0329 (Rel-12, B) Introduction of DCH Enhancements | CR | Qualcomm Incorporated | R1-77 | - | [WTS] [JSN] | |||
R1-142466 | 25.214 CR0715 (Rel-12, B) Introduction of DCH Enhancements | CR | Qualcomm Incorporated | R1-77 | - | [WTS] [JSN] | |||
R1-142467 | 25.300 CR Introduction of DCH Enhancements | other | Qualcomm Incorporated | R1-77 | - | [WTS] [JSN] | |||
R1-142468 | Link Simulation Results for Secondary Pilot | other | Qualcomm Incorporated | R1-77 | - | [WTS] [JSN] | |||
R1-142469 | Common RGCH for Mitigating Interference for Ues not in Soft Handover | other | Qualcomm Incorporated | R1-77 | - | [WTS] [JSN] | |||
R1-142470 | Signaling for CIO Adaptation | other | Qualcomm Incorporated | R1-77 | - | [WTS] [JSN] | |||
R1-142471 | Power Control Enhancements for TDM Operation with DTX | other | Qualcomm Incorporated | R1-77 | - | [WTS] [JSN] | |||
R1-142472 | HARQ Mechanism for TDM Operation | other | Qualcomm Incorporated | R1-77 | - | [WTS] [JSN] | |||
R1-142473 | Low-complexity UE single RX indication | other | Sony | R1-77 | - | [WTS] [JSN] | |||
R1-142474 | Discussion on RRM measurement procedures in small cell on/off operation | other | Sony | R1-77 | - | [WTS] [JSN] | |||
R1-142475 | Synchronisation design for D2D communication and discovery | other | Sony | R1-77 | - | [WTS] [JSN] | |||
R1-142476 | Views on small cell on/off procedures | other | CHTTL | R1-77 | - | [WTS] [JSN] | |||
R1-142477 | Discussion on small cell discovery signal design | other | CHTTL | R1-77 | - | [WTS] [JSN] | |||
R1-142478 | Remaining issues on D2D physical channel design | other | Kyocera | R1-77 | - | [WTS] [JSN] | |||
R1-142479 | Physical resource design for D2D discovery | other | Kyocera | R1-77 | - | [WTS] [JSN] | |||
R1-142480 | Design details of scheduling assignments | other | Kyocera | R1-77 | - | [WTS] [JSN] | |||
R1-142481 | Mode 2 resource allocation for D2D communication | other | Kyocera | R1-77 | - | [WTS] [JSN] | |||
R1-142482 | Resource allocation for Type 1 discovery | other | Kyocera | R1-77 | - | [WTS] [JSN] | |||
R1-142483 | Mode 1 resource allocation for D2D communication | other | Kyocera | R1-77 | - | [WTS] [JSN] | |||
R1-142484 | Multi carrier operations for D2D | other | Kyocera | R1-77 | - | [WTS] [JSN] | |||
R1-142485 | Coexistence of D2D discovery and WAN | other | Kyocera | R1-77 | - | [WTS] [JSN] | |||
R1-142486 | Simulation result on WAN impact of D2D communication | other | Kyocera | R1-77 | - | [WTS] [JSN] | |||
R1-142487 | Synchronization resource allocation | other | Kyocera | R1-77 | - | [WTS] [JSN] | |||
R1-142488 | Synchronization signal and channel design | other | Kyocera | R1-77 | - | [WTS] [JSN] | |||
R1-142489 | Synchronization procedure | other | Kyocera | R1-77 | - | [WTS] [JSN] | |||
R1-142490 | CQI table design for 256QAM | other | KT Corp. | R1-77 | - | [WTS] [JSN] | |||
R1-142491 | MCS/TBS table design for 256QAM | other | KT Corp. | R1-77 | - | [WTS] [JSN] | |||
R1-142492 | Uplink Power Control for Dual Connectivity | other | KT Corp. | R1-77 | - | [WTS] [JSN] | |||
R1-142493 | Remaining issue on UCI transmission for Dual Connectivity | other | KT Corp. | R1-77 | - | [WTS] [JSN] | |||
R1-142494 | Gray mapping for 256QAM | other | Texas Instruments | R1-77 | - | [WTS] [JSN] | |||
R1-142495 | On UL Power Control for Dual Connectivity | other | Texas Instruments | R1-77 | - | [WTS] [JSN] | |||
R1-142496 | Remaining details of MTC UE category | other | Motorola Mobility | R1-77 | - | [WTS] [JSN] | |||
R1-142497 | Remaining details of MCS and TBS signaling for support of 256-QAM | other | Motorola Mobility | R1-77 | - | [WTS] [JSN] | |||
R1-142498 | UE category in support of 256-QAM | other | Motorola Mobility | R1-77 | - | [WTS] [JSN] | |||
R1-142499 | Further discussion on procedures for small cell ON/OFF | other | Motorola Mobility | R1-77 | - | [WTS] [JSN] | |||
R1-142500 | Measurement Gaps for Small cell on/off | other | Motorola Mobility | R1-77 | - | [WTS] [JSN] | |||
R1-142501 | 36.213 Draft CR for Introduction of Rel-12 LTE-Advanced features in 36.213 | other | Motorola Mobility | R1-77 | - | [WTS] [JSN] | |||
R1-142502 | TP on uplink performance for F-UMTS | other | China Unicom, Huawei | R1-77 | - | [WTS] [JSN] | |||
R1-142503 | TP on conclusions of filtered Scalable UMTS | other | China Unicom, Huawei | R1-77 | - | [WTS] [JSN] | |||
R1-142504 | Discussion on Rel-12 UE capabilities | other | CMCC | R1-77 | - | [WTS] [JSN] | |||
R1-142505 | Discussions on UE categories supporting 256QAM | other | CMCC | R1-77 | - | [WTS] [JSN] | |||
R1-142506 | TBS design for 256QAM | other | CMCC | R1-77 | - | [WTS] [JSN] | |||
R1-142507 | Performance evaluation of discovery reference signals | other | CMCC | R1-77 | - | [WTS] [JSN] | |||
R1-142508 | Listening RS design for radio interface based small cell synchronization | other | CMCC | R1-77 | - | [WTS] [JSN] | |||
R1-142509 | RIBS for inter-operator scenario | other | CMCC | R1-77 | - | [WTS] [JSN] | |||
R1-142510 | Discussion on NAICS signaling and operation | other | CMCC | R1-77 | - | [WTS] [JSN] | |||
R1-142511 | Discussion on CSI feedback for NAICS receivers | other | CMCC | R1-77 | - | [WTS] [JSN] | |||
R1-142512 | Resource allocation Mode 2 for D2D communication | other | Potevio | R1-77 | - | [WTS] [JSN] | |||
R1-142513 | 25.214 CR0717 (Rel-11, F) Compressed mode in Multiflow assisting (secondary) serving cell | CR | NSN | R1-77 | - | [WTS] [JSN] | |||
R1-142514 | Hamming distance analysis of Uplink TFCI code variants | other | NSN | R1-77 | - | [WTS] [JSN] | |||
R1-142515 | 25.212 Draft CR (Rel-12, B) Introduction of target HS-SCCH override order in enhanced Serving Cell Change based on Event 1C | other | NSN | R1-77 | - | [WTS] [JSN] | |||
R1-142516 | [draft] RAN1 response to LS on RAN2 agreements and working assumptions on E-DCH decoupling | other | NSN | R1-77 | - | [WTS] [JSN] | |||
R1-142517 | HS-SCCH override order for event 1C | other | NSN | R1-77 | - | [WTS] [JSN] | |||
R1-142518 | Simualation results for Power Control for Long DTX Cycle | other | NSN | R1-77 | - | [WTS] [JSN] | |||
R1-142519 | TDM Operation for multiple simultaneous transmissions | other | NSN | R1-77 | - | [WTS] [JSN] | |||
R1-142520 | Grant Detection and DL DRX | other | NSN | R1-77 | - | [WTS] [JSN] | |||
R1-142521 | Specification Impact for Grant Detection TDM operation | other | NSN | R1-77 | - | [WTS] [JSN] | |||
R1-142522 | Update on HARQ solutions for TDM operation | other | NSN | R1-77 | - | [WTS] [JSN] | |||
R1-142523 | UL TTI switch indication from the UE | other | NSN | R1-77 | - | [WTS] [JSN] | |||
R1-142524 | TP to TR25.701 on PRACH handling | other | NSN | R1-77 | - | [WTS] [JSN] | |||
R1-142525 | TP to TR25.701 on AICH and PICH processing | other | NSN | R1-77 | - | [WTS] [JSN] | |||
R1-142526 | TP to TS25.701 on SCH | other | NSN | R1-77 | - | [WTS] [JSN] | |||
R1-142527 | On RRC filter for S-UMTS | other | NSN | R1-77 | - | [WTS] [JSN] | |||
R1-142528 | Discussion on the number of DL HARQ processes for TDD serving cell with FDD Pcell | other | ITL Inc. | R1-77 | - | [WTS] [JSN] | |||
R1-142529 | The small cell on/off state indication by DCI format | other | ITL Inc. | R1-77 | - | [WTS] [JSN] | |||
R1-142530 | Considerations on D2D synchronization signal design | other | ITL Inc. | R1-77 | - | [WTS] [JSN] | |||
R1-142531 | ProSe device-to-device coverage definitions | other | General Dynamics UK | R1-77 | - | [WTS] [JSN] | |||
R1-142532 | ProSe device-to-device synchronisation signal and channel design | other | General Dynamics UK | R1-77 | - | [WTS] [JSN] | |||
R1-142533 | On dynamic interpretation of UL index and UL DAI | other | Ericsson | R1-77 | - | [WTS] [JSN] | |||
R1-142534 | Remaining issues on CSI feedback for eIMTA | other | Ericsson | R1-77 | - | [WTS] [JSN] | |||
R1-142535 | Considerations on UE capabilities in DuCo | other | Broadcom Corporation | R1-77 | - | [WTS] [JSN] | |||
R1-142536 | Low-complexity and coverage extended MTC in Rel-13 | other | Sony | R1-77 | - | [WTS] [JSN] | |||
R1-142537 | eNB resource allocation for D2D Communication Mode 1 | other | InterDigital | R1-77 | - | [WTS] [JSN] | |||
R1-142538 | 36.211 Draft CR (Rel-12, B) Inclusion of eIMTA, TDD-FDD CA, and coverage enhancements | other | Ericsson | R1-77 | - | [WTS] [JSN] | |||
R1-142539 | 36.211 CR0190 (Rel-12, F) Clarification of downlink subframes | CR | Ericsson | R1-77 | - | [WTS] [JSN] | |||
R1-142540 | Further Enhancements for MTC in LTE Rel-13 | other | Ericsson, NSN | R1-77 | - | [WTS] [JSN] | |||
R1-142541 | On Reduced UE Bandwidth and Enhanced Coverage for MTC | other | Ericsson, NSN | R1-77 | - | [WTS] [JSN] | |||
R1-142542 | Small Cell On Off using UL sensing | other | CEWiT | R1-77 | - | [WTS] [JSN] | |||
R1-142543 | Definition of coverage zones for D2D communication | other | Huawei, HiSilicon | R1-77 | - | [WTS] [JSN] | |||
R1-142544 | Resource allocation for type-2B discovery | other | Huawei, HiSilicon | R1-77 | - | [WTS] [JSN] | |||
R1-142545 | Discussion on DRX operation for Multiflow | other | Huawei, HiSilicon | R1-77 | - | [WTS] [JSN] | |||
R1-142546 | 25.214 CR0718 (Rel-11, F) Correction of DRX operation for Multiflow | CR | Huawei, HiSilicon | R1-77 | - | [WTS] [JSN] | |||
R1-142547 | 25.214 CR0719 (Rel-11, F) Clarification of the power scaling for MIMO dual transport block transmission | CR | Huawei, HiSilicon | R1-77 | - | [WTS] [JSN] | |||
R1-142548 | Coding for Uplink TFCI | other | Huawei, HiSilicon | R1-77 | - | [WTS] [JSN] | |||
R1-142549 | Evaluation of HS-DPCCH solutions | other | Huawei, HiSilicon | R1-77 | - | [WTS] [JSN] | |||
R1-142550 | Considerations on dynamic rate and power adjustment solution | other | Huawei, HiSilicon | R1-77 | - | [WTS] [JSN] | |||
R1-142551 | Further considerations on extended E-HICH solution | other | Huawei, HiSilicon | R1-77 | - | [WTS] [JSN] | |||
R1-142552 | Further discussion on offloading and CIO adaptation in Hetnet | other | Huawei, HiSilicon | R1-77 | - | [WTS] [JSN] | |||
R1-142553 | Response to LS on E-DCH decoupling | other | Huawei, HiSilicon | R1-77 | - | [WTS] [JSN] | |||
R1-142554 | 25.211 Draft CR (Rel-12, B) Introduction of UMTS Heterogeneous Networks Enhancements | other | Huawei, HiSilicon | R1-77 | - | [WTS] [JSN] | |||
R1-142555 | 25.212 Draft CR (Rel-12, B) Introduction of UMTS Heterogeneous Networks Enhancements | other | Huawei, HiSilicon | R1-77 | - | [WTS] [JSN] | |||
R1-142556 | 25.213 Draft CR (Rel-12, B) Introduction of UMTS Heterogeneous Networks Enhancements | other | Huawei, HiSilicon | R1-77 | - | [WTS] [JSN] | |||
R1-142557 | 25.214 Draft CR (Rel-12, B) Introduction of UMTS Heterogeneous Networks Enhancements | other | Huawei, HiSilicon | R1-77 | - | [WTS] [JSN] | |||
R1-142558 | Considerations on improved power control for TDM operation | other | Huawei, HiSilicon | R1-77 | - | [WTS] [JSN] | |||
R1-142559 | Further considerations on transmitting DL control channels for the secondary carrier on the primary carrier | other | Huawei, HiSilicon | R1-77 | - | [WTS] [JSN] | |||
R1-142560 | Removal of synchronization procedure when the secondary carrier is activated | other | Huawei, HiSilicon | R1-77 | - | [WTS] [JSN] | |||
R1-142561 | Support of multi-user scheduling based on grant detection solution | other | Huawei, HiSilicon | R1-77 | - | [WTS] [JSN] | |||
R1-142562 | Retransmission for improved granting for TDM operation | other | Huawei, HiSilicon | R1-77 | - | [WTS] [JSN] | |||
R1-142563 | Remaining details for HS-DPCCH overhead reduction | other | Huawei, HiSilicon | R1-77 | - | [WTS] [JSN] | |||
R1-142564 | TP on cross carrier scheduling for CZ-UMTS carrier aggregation | other | Huawei, HiSilicon | R1-77 | - | [WTS] [JSN] | |||
R1-142565 | Introduction of enhancement to uplink power control algorithm 2 to reduce power consumption of DL TPC commands | other | Huawei, HiSilicon | R1-77 | - | [WTS] [JSN] | |||
R1-142566 | 25.214 Draft CR (Rel-12, B) Introduction of enhancement to uplink power control algorithm 2 to reduce power consumption of DL TPC commands | other | Huawei, HiSilicon | R1-77 | - | [WTS] [JSN] | |||
R1-142567 | UL FET design considerations | other | Qualcomm Incorporated | R1-77 | - | [WTS] [JSN] | |||
R1-142568 | Ack channel design for UL FET | other | Qualcomm Incorporated | R1-77 | - | [WTS] [JSN] | |||
R1-142569 | Discussion on physical layer aspects for support of dual connectivity | other | Intel Corporation | R1-77 | - | [WTS] [JSN] | |||
R1-142570 | On RRC filter for S-UMTS | other | NSN | R1-77 | - | [WTS] [JSN] | |||
R1-142571 | Higher-layer signaling for NAICS | other | Ericsson | R1-77 | - | [WTS] [JSN] | |||
R1-142572 | Remaining aspects of DCH enhancements | other | Qualcomm Incorporated | R1-77 | - | [WTS] [JSN] | |||
R1-142573 | Basic UE Capability Mode of Operation | other | Qualcomm Incorporated | R1-77 | - | [WTS] [JSN] | |||
R1-142574 | Resource allocation for Scheduling Assignment | other | Alcatel-Lucent Shanghai Bell, Alcatel-Lucent | R1-77 | - | [WTS] [JSN] | |||
R1-142575 | Summary of Email discussion [76b-09] D2D signal gap | other | LG Electronics | R1-77 | - | [WTS] [JSN] | |||
R1-142576 | Discussion on design of D2D synchronization signal | other | LG Electronics | R1-77 | - | [WTS] [JSN] | |||
R1-142577 | Power headroom reporting for dual connectivity | other | Ericsson | R1-77 | - | [WTS] [JSN] | |||
R1-142578 | Discussion on the remaining details of MCS / TBS table for 256QAM | other | Intel Corporation | R1-77 | - | [WTS] [JSN] | |||
R1-142579 | Summary of Email Discussion [76b-12] on Multi Carrier Operation for D2D | other | Ericsson | R1-77 | - | [WTS] [JSN] | |||
R1-142580 | LS on discovery message format for ProSe/D2D | other | SA3, Qualcomm | R1-77 | - | [WTS] [JSN] | |||
R1-142581 | Reply LS on Provisioning of ProSe configuration information in a public safety ProSe enabled UE | other | SA3, Qualcomm | R1-77 | - | [WTS] [JSN] | |||
R1-142582 | LS on introducing the EVS codec in MTSI | other | SA4, Panasonic | R1-77 | - | [WTS] [JSN] | |||
R1-142583 | CQI table design for 256QAM | other | KT Corp. | R1-77 | - | [WTS] [JSN] | |||
R1-142584 | MCS/TBS table design for 256QAM | other | KT Corp. | R1-77 | - | [WTS] [JSN] | |||
R1-142585 | 36.213 CR0460 (Rel-11, F) Clarification on SRS colliding with PUCCH in the same cell when the UE is configured with multiple TAGs | CR | Qualcomm Inc., Fujitsu | R1-77 | - | [WTS] [JSN] | |||
R1-142586 | 36.213 CR0461 (Rel-12, A) Clarification on SRS colliding with PUCCH in the same cell when the UE is configured with multiple TAGs | CR | Qualcomm Inc., Fujitsu | R1-77 | - | [WTS] [JSN] | |||
R1-142587 | The small cell on/off state indication by DCI format | other | ITL Inc. | R1-77 | - | [WTS] [JSN] | |||
R1-142588 | Remaining aspects of higher-layer signaling for NAICS | other | NVIDIA | R1-77 | - | [WTS] [JSN] | |||
R1-142589 | WF on power sharing for dual connectivity | other | InterDigital, Ericsson, Nokia, Nokia Siemens Networks, NTT DoCoMo, Panasonic, Sharp | R1-77 | - | [WTS] [JSN] | |||
R1-142590 | WF on channel priority for dual connectivity | other | Ericsson | R1-77 | - | [WTS] [JSN] | |||
R1-142591 | void | other | R1-77 | - | [WTS] [JSN] | ||||
R1-142592 | Scheduling assignment content for D2D | other | Huawei, HiSilicon | R1-77 | - | [WTS] [JSN] | |||
R1-142593 | WF on discovery signal | other | NTT DOCOMO, Samsung, Sharp, LG Electronics, Panasonic, Fujitsu, ZTE, ETRI, Huawei, HiSilicon, Sony | R1-77 | - | [WTS] [JSN] | |||
R1-142594 | Summary on performance evaluation results | other | NTT DOCOMO, Huawei, HiSilicon | R1-77 | - | [WTS] [JSN] | |||
R1-142595 | WF on network assistance for discovery procedure | other | LG Electronics, Fujitsu, NTT DOCOMO, Sony, ZTE | R1-77 | - | [WTS] [JSN] | |||
R1-142596 | Way Forward on Discovery based RRM | other | Broadcom, NVIDIA, CATT, Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, NSN, Nokia, Qualcomm, Intel | R1-77 | - | [WTS] [JSN] | |||
R1-142597 | WF on PD2DSCH | other | LG Electronics | R1-77 | - | [WTS] [JSN] | |||
R1-142598 | WF on Mode 1 D2D Grant | other | Qualcomm Incorporated, Huawei, HiSilicon, LGE, General Dynamics, ZTE | R1-77 | - | [WTS] [JSN] | |||
R1-142599 | WF on Relaying Synchronization Signals for Discovery | other | Qualcomm Incorporated, LGE, General Dynamics, ZTE, DoCoMo | R1-77 | - | [WTS] [JSN] | |||
R1-142600 | 25.212 CR0329R1 (Rel-12, B) Introduction of DCH Enhancements | CR | Qualcomm Incorporated | R1-77 | - | [WTS] [JSN] | |||
R1-142601 | On PD2DSS Design and Impact of Large Initial Carrier Frequency Offset | other | Intel Corporation | R1-77 | - | [WTS] [JSN] | |||
R1-142602 | WF on UE feedback in mode 1 resource allocation | other | Panasonic, LG Electronics | R1-77 | - | [WTS] [JSN] | |||
R1-142603 | 25.214 CR0716R1 (Rel-11, F) Clarifications to Multiflow Operation | CR | Qualcomm Incorporated | R1-77 | - | [WTS] [JSN] | |||
R1-142604 | 25.214 CR0717R1 (Rel-11, F) Compressed mode in Multiflow assisting (secondary) serving cell | CR | NSN | R1-77 | - | [WTS] [JSN] | |||
R1-142605 | TP to TR25.701 on PRACH handling | other | NSN | R1-77 | - | [WTS] [JSN] | |||
R1-142606 | TP on cross carrier scheduling for CZ-UMTS carrier aggregation | other | Huawei, HiSilicon | R1-77 | - | [WTS] [JSN] | |||
R1-142607 | TP on conclusions of filtered Scalable UMTS | other | China Unicom, Huawei | R1-77 | - | [WTS] [JSN] | |||
R1-142608 | TP to TR25.701 on PRACH handling | other | NSN | R1-77 | - | [WTS] [JSN] | |||
R1-142609 | Text proposal on the impact of supporting UMTS Features by Scalable UMTS | other | Ericsson | R1-77 | - | [WTS] [JSN] | |||
R1-142610 | TP to TR25.701 on PRACH handling | other | NSN | R1-77 | - | [WTS] [JSN] | |||
R1-142611 | Text proposal on the impact of supporting UMTS Features by Scalable UMTS | other | Ericsson | R1-77 | - | [WTS] [JSN] | |||
R1-142612 | 25.701 CR008 (Rel-12, B) Update of the TR based on agreements done on RAN1#77 meeting | CR | NSN | R1-77 | - | [WTS] [JSN] | |||
R1-142613 | LS on interference management techniques in Hetnet | LS out | RAN1, Huawei | R1-77 | - | [WTS] [JSN] | |||
R1-142614 | RAN1 response to LS on RAN2 agreements and working assumptions on E-DCH decoupling | LS out | RAN1, NSN | R1-77 | - | [WTS] [JSN] | |||
R1-142615 | Response LS on TTI switching indication | other | Qualcomm | R1-77 | - | [WTS] [JSN] | |||
R1-142616 | LS on HS-DPCCH overhead reduction | LS out | RAN1, Huawei | R1-77 | - | [WTS] [JSN] | |||
R1-142617 | LS on Further EUL Enhancements | LS out | RAN1, Ericsson | R1-77 | - | [WTS] [JSN] | |||
R1-142618 | LS on Progress in RAN1 #77 for the UMTS Heterogeneous Networks Enhancements WI | LS out | RAN1, Huawei | R1-77 | - | [WTS] [JSN] | |||
R1-142619 | 25.211 Draft CR (Rel-12, B) Introduction of UMTS Heterogeneous Networks Enhancements | other | Huawei, HiSilicon | R1-77 | - | [WTS] [JSN] | |||
R1-142620 | 25.212 Draft CR (Rel-12, B) Introduction of UMTS Heterogeneous Networks enhancements in 25.212 | other | Huawei, HiSilicon | R1-77 | - | [WTS] [JSN] | |||
R1-142621 | 25.213 Draft CR (Rel-12, B) Introduction of UMTS Heterogeneous Networks Enhancements | other | Huawei, HiSilicon | R1-77 | - | [WTS] [JSN] | |||
R1-142622 | 25.214 Draft CR (Rel-12, B) Introduction of UMTS Heterogeneous Networks Enhancements | other | Huawei, HiSilicon | R1-77 | - | [WTS] [JSN] | |||
R1-142623 | WF on D2D Power Control | other | Qualcomm Incorporated, LGE, Samsung, ITRI, III | R1-77 | - | [WTS] [JSN] | |||
R1-142624 | WF on D2D Transmission Timing for Communication | other | Qualcomm Incorporated, ZTE, Kyocera, III | R1-77 | - | [WTS] [JSN] | |||
R1-142625 | Way forward on the usage of UL DAI or UL index in DCI format 0/4 | other | Huawei, HiSilicon, Panasonic, NEC | R1-77 | - | [WTS] [JSN] | |||
R1-142626 | D2D synchronization procedure for out-of-network coverage | other | Samsung | R1-77 | - | [WTS] [JSN] | |||
R1-142627 | Reply LS on ProSe Lawful Interception | other | SA5, Qualcomm | R1-77 | - | [WTS] [JSN] | |||
R1-142628 | WF on D2D synchronization source for partial coverage | other | LG Electronics, Huawei, HiSilicon | R1-77 | - | [WTS] [JSN] | |||
R1-142629 | Evaluation of listening RS patterns | other | Huawei, HiSilicon | R1-77 | - | [WTS] [JSN] | |||
R1-142630 | WF on Synchronization Signal | other | Qualcomm Incorporated, General Dynamics, LGE, III | R1-77 | - | [WTS] [JSN] | |||
R1-142631 | WF on I_MCS range for P-, SI- and RA- RNTIs | other | Intel Corporation, Nokia, NSN, CATT, Huawei, HiSilicon | R1-77 | - | [WTS] [JSN] | |||
R1-142632 | WF on multiplexing UL HARQ-ACK TX and D2D TX/RX | other | LG Electronics, Huawei, HiSilicon, Potevio, NEC | R1-77 | - | [WTS] [JSN] | |||
R1-142633 | Further discussion on procedures for small cell ON/OFF | other | Motorola Mobility | R1-77 | - | [WTS] [JSN] | |||
R1-142634 | WF on Sensing for mode 2 communication | other | Huawei, HiSilicon, CATT, Panasonic, Potevio, ALU, ALU-Shanghai, Broadcom, Samsung, Fujitsu, LGE | R1-77 | - | [WTS] [JSN] | |||
R1-142635 | WF on Discovery Resource Size | other | Qualcomm Incorporated, Samsung, ZTE, General Dynamics | R1-77 | - | [WTS] [JSN] | |||
R1-142636 | WF on Discovery Period | other | Qualcomm Incorporated, ITRI, General Dynamics, Huawei, HiSilicon | R1-77 | - | [WTS] [JSN] | |||
R1-142637 | WF on 256QAM UE category handling | other | Ericsson, CATT, III, Huawei, HiSilicon, Microsoft, AT&T, CMCC, ZTE | R1-77 | - | [WTS] [JSN] | |||
R1-142638 | WF on 256QAM CQI table design | other | Huawei, HiSilicon, CATR, Panasonic, III, CATT, Broadcom, Nokia, NSN, Microsoft, CMCC, CTC, Intel, Ericsson | R1-77 | - | [WTS] [JSN] | |||
R1-142639 | WF on 256QAM MCS table design | other | Huawei, HiSilicon, CATR, Panasonic, Microsoft, III, CATT, ZTE, CMCC, CTC, KT, Nokia, NSN, ZTE | R1-77 | - | [WTS] [JSN] | |||
R1-142640 | WF on TBS design for 256QAM | other | CMCC, Huawei, Hisilicon, CHTTL, ZTE | R1-77 | - | [WTS] [JSN] | |||
R1-142641 | WF on UE processing capability | other | CMCC, CATT | R1-77 | - | [WTS] [JSN] | |||
R1-142642 | WF on D2D power control for communication Mode 1 | other | LG Electronics, Qualcomm, Panasonic, Kyocera | R1-77 | - | [WTS] [JSN] | |||
R1-142643 | WF on DMRS cyclic shift for Type 1 discovery | other | LG Electronics, Qualcomm, ZTE | R1-77 | - | [WTS] [JSN] | |||
R1-142644 | WF on resource grouping for D2D type-1 discovery | other | Samsung, Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, LGE | R1-77 | - | [WTS] [JSN] | |||
R1-142645 | WF on 256QAM CQI/MCS table configuration | other | ZTE, Qualcomm, Blackberry, LGE, Samsung, China Telcomm | R1-77 | - | [WTS] [JSN] | |||
R1-142646 | [Draft] LS on D2D Multicarrier Capabilities | other | Ericsson | R1-77 | - | [WTS] [JSN] | |||
R1-142647 | Way Forward on 256QAM for PMCH | other | Ericsson, Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, Verizon, AT&T | R1-77 | - | [WTS] [JSN] | |||
R1-142648 | Way Forward of 256QAM configuration | other | Ericsson, Nokia, NSN, Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, Fujitsu, CATT | R1-77 | - | [WTS] [JSN] | |||
R1-142649 | WF on resource allocation for SA and D2D data | other | LG Electronics, Ericsson, ZTE, Kyocera | R1-77 | - | [WTS] [JSN] | |||
R1-142650 | WF on D2D Signal Design | other | Qualcomm Incorporated, Kyocera, ZTE, General Dynamics | R1-77 | - | [WTS] [JSN] | |||
R1-142651 | WF on Lawful Interception for D2D Discovery and Communication | other | Qualcomm Incorporated, ITRI, III, General Dynamics | R1-77 | - | [WTS] [JSN] | |||
R1-142652 | LS on D2D Multicarrier Capabilities | LS out | RAN1, Ericsson | R1-77 | - | [WTS] [JSN] | |||
R1-142653 | WF on SA content and design | other | Qualcomm Incorporated, General Dynamics, III | R1-77 | - | [WTS] [JSN] | |||
R1-142654 | Report of offline discussion on dynamic power sharing | other | InterDigital | R1-77 | - | [WTS] [JSN] | |||
R1-142655 | WF on Synchronization Signal | other | Qualcomm Incorporated, General Dynamics, LG Electronics, Huawei, HiSilicon | R1-77 | - | [WTS] [JSN] | |||
R1-142656 | Offline Discussion on D2D CP Length | other | Qualcomm Incorporated (Rapporteur) | R1-77 | - | [WTS] [JSN] | |||
R1-142657 | Offline discussion summary on RPT | other | Qualcomm Incorporated (Rapporteur) | R1-77 | - | [WTS] [JSN] | |||
R1-142658 | Offline Discussion on SA Transmission | other | Qualcomm Incorporated (Rapporteur) | R1-77 | - | [WTS] [JSN] | |||
R1-142659 | Summary of Offline Discussion Regarding the LS from RAN2 on the L1 ID in the SA | other | Ericsson | R1-77 | - | [WTS] [JSN] | |||
R1-142660 | WF on Type 2B hopping pattern | other | Huawei, HiSilicon, Intel, Qualcomm | R1-77 | - | [WTS] [JSN] | |||
R1-142661 | WF on Triggering Condition(s) of D2DSS Transmission | other | Samsung, Nokia, NSN, Intel | R1-77 | - | [WTS] [JSN] | |||
R1-142662 | WF on Selection and Reselection of Synchronization Source | other | Samsung, LGE | R1-77 | - | [WTS] [JSN] | |||
R1-142663 | WF on Mode 2 Resource Selection | other | Qualcomm Incorporated (Rapporteur) | R1-77 | - | [WTS] [JSN] | |||
R1-142664 | Proposal from offline discussion on D2D synchronization | other | LG Electronics | R1-77 | - | [WTS] [JSN] | |||
R1-142665 | Summary of design goals on Type 2B discovery | other | NSN | R1-77 | - | [WTS] [JSN] | |||
R1-142666 | void | other | R1-77 | - | [WTS] [JSN] | ||||
R1-142667 | void | other | R1-77 | - | [WTS] [JSN] | ||||
R1-142668 | void | other | R1-77 | - | [WTS] [JSN] | ||||
R1-142669 | void | other | R1-77 | - | [WTS] [JSN] | ||||
R1-142670 | void | other | R1-77 | - | [WTS] [JSN] | ||||
R1-142671 | void | other | R1-77 | - | [WTS] [JSN] | ||||
R1-142672 | void | other | R1-77 | - | [WTS] [JSN] | ||||
R1-142673 | void | other | R1-77 | - | [WTS] [JSN] | ||||
R1-142674 | void | other | R1-77 | - | [WTS] [JSN] | ||||
R1-142675 | WF on Power Control for Dual Connectivity | other | LG Electronics, NTT DOCOMO, Panasonic | R1-77 | - | [WTS] [JSN] | |||
R1-142676 | WF on PHR for Dual Connectivity | other | NTT DOCOMO, Panasonic | R1-77 | - | [WTS] [JSN] | |||
R1-142677 | WF on DL-SCH Soft Channel Bits in Dual-Connectivity | other | Ericsson, ALU | R1-77 | - | [WTS] [JSN] | |||
R1-142678 | WF on Maximum number of TB bits in a TTI in Dual-Connectivity | other | Ericsson, Samsung | R1-77 | - | [WTS] [JSN] | |||
R1-142679 | WF on PUCH on Scell | other | Huawei, HiSilicon, NTT DOCOMO | R1-77 | - | [WTS] [JSN] | |||
R1-142680 | [Draft] Reply LS on DL-SCH Soft Channel Bits in Dual-Connectivity | other | Ericsson | R1-77 | - | [WTS] [JSN] | |||
R1-142681 | WF on higher layer signaling for NAICS | other | NTT DOCOMO, Huawei, HiSilicon, LGE, MediaTek, Nvidia, Qualcomm, Samsung, Verizon, CMCC, Broadcom | R1-77 | - | [WTS] [JSN] | |||
R1-142682 | WF on CSI enhancement for NAICS | other | NTT DOCOMO, ALU, ASB, Huawei, HiSilicon, LGE, MediaTek, Qualcomm, Samsung, Verizon, CMCC | R1-77 | - | [WTS] [JSN] | |||
R1-142683 | WF on NAICS Support for 4 Tx Antenna Ports | other | Ericsson, NSN, Nokia, Alcatel Lucent, Alcatel Lucent Shanghai Bell, CATT, Sprint | R1-77 | - | [WTS] [JSN] | |||
R1-142684 | LS on NAICS Parameters | other | RAN4, Qualcomm | R1-77 | - | [WTS] [JSN] | |||
R1-142685 | Analysis of Mutual Impact of WAN and D2D Communication | other | Intel Corporation | R1-77 | - | [WTS] [JSN] | |||
R1-142686 | Reply LS on DL-SCH Soft Channel Bits in Dual-Connectivity | LS out | RAN1, Ericsson | R1-77 | - | [WTS] [JSN] | |||
R1-142687 | WF on configuration for discovery procedure | other | LG Electronics, Fujitsu, NTT DOCOMO, Sony, ZTE | R1-77 | - | [WTS] [JSN] | |||
R1-142688 | WF on discovery signal | other | NTT DOCOMO, Sharp, Panasonic, ZTE, NSN, Nokia, Huawei, HiSilicon, LG Electronics, Ericsson, Fujitsu, Sony | R1-77 | - | [WTS] [JSN] | |||
R1-142689 | DRS Evaluation Observation | other | Huawei, HiSilicon, NTT DOCOMO | R1-77 | - | [WTS] [JSN] | |||
R1-142690 | WF on small cell on/off transition time reduction for Scells | other | Ericsson, Panasonic, NTT DOCOMO, Fujitsu, LG Electronics | R1-77 | - | [WTS] [JSN] | |||
R1-142691 | WF on 256QAM CQI/MCS table configuration | other | ZTE, Qualcomm, Blackberry, LGE, Samsung, China Telecomm., Hitachi, CMCC | R1-77 | - | [WTS] [JSN] | |||
R1-142692 | WF on 256QAM UE category handling | other | Ericsson, CATT, III, Huawei, HiSilicon, Microsoft, AT&T, CMCC, ZTE, China Telecom, CATR, Blackberry | R1-77 | - | [WTS] [JSN] | |||
R1-142693 | LS on Introducing the ProSe Authorized IE | other | RAN3, Ericsson | R1-77 | - | [WTS] [JSN] | |||
R1-142694 | [Draft] LS on small cell discovery signal | other | NTT DOCOMO | R1-77 | - | [WTS] [JSN] | |||
R1-142695 | Way Forward on New L1 Procedure for Small Cell ON/OFF | other | NSN, Nokia, Broadcom, Motorola Mobility, NVIDIA | R1-77 | - | [WTS] [JSN] | |||
R1-142696 | Conclusion from NAICS offline discussion | other | MediaTek Inc. | R1-77 | - | [WTS] [JSN] | |||
R1-142697 | LS on response SFN handling issue in dual connectivity | other | RAN4, Huawei | R1-77 | - | [WTS] [JSN] | |||
R1-142698 | LS on small cell discovery signal | LS out | RAN1, NTT DOCOMO | R1-77 | - | [WTS] [JSN] | |||
R1-142699 | Summary of offline discussion on low complexity MTC UE | other | Vodafone | R1-77 | - | [WTS] [JSN] | |||
R1-142700 | Summary of eIMTA offline discussion | other | CATT | R1-77 | - | [WTS] [JSN] | |||
R1-142701 | Draft LS to RAN2 on 36.306 for low cost MTC UE | other | Huawei, HiSilicon | R1-77 | - | [WTS] [JSN] | |||
R1-142702 | LS on NAICS High Layer Signaling | LS out | MediaTek Inc. | R1-77 | - | [WTS] [JSN] | |||
R1-142703 | Draft LS on eNB knowledge of low complexity UEs | other | Ericsson | R1-77 | - | [WTS] [JSN] | |||
R1-142704 | Offline discussion on TBS table design for 256QAM | other | Huawei, HiSilicon | R1-77 | - | [WTS] [JSN] | |||
R1-142705 | Draft LS on eNB knowledge of low complexity UEs | other | Ericsson | R1-77 | - | [WTS] [JSN] | |||
R1-142706 | 25.214 CR0719r1 (Rel-11, F) Clarification of the power scaling for MIMO dual transport block transmission | CR | Huawei, HiSilicon | R1-77 | - | [WTS] [JSN] | |||
R1-142707 | Agreements based on email discussions after RAN1#76bis on DCH enhancements | other | Qualcomm | R1-77 | - | [WTS] [JSN] | |||
R1-142708 | LS on RAN1 Decisions for Enhanced DCH Work Item | LS out | RAN1, Qualcomm | R1-77 | - | [WTS] [JSN] | |||
R1-142709 | Response LS on TTI switching indication | LS out | RAN1, Qualcomm | R1-77 | - | [WTS] [JSN] | |||
R1-142710 | Chairpersons’ summary of the UMTS sessions | other | UMTS Session Chairpersons (NSN, Huawei, Alcatel-Lucent) | R1-77 | - | [WTS] [JSN] | |||
R1-142711 | 25.214 CR0718R1 (Rel-11, F) Correction of DRX operation for Multiflow | CR | Huawei, HiSilicon | R1-77 | - | [WTS] [JSN] | |||
R1-142712 | 25.211 CR0317 (Rel-11, F) Correction of DRX operation for Multiflow | CR | Huawei, HiSilicon | R1-77 | - | [WTS] [JSN] | |||
R1-142713 | 25.214 CR0716R2 (Rel-11, F) Clarifications to Multiflow Operation | CR | Qualcomm Incorporated | R1-77 | - | [WTS] [JSN] | |||
R1-142714 | void | other | R1-77 | - | [WTS] [JSN] | ||||
R1-142715 | void | other | R1-77 | - | [WTS] [JSN] | ||||
R1-142716 | Proposals on Radio Interface based synchronization | other | Huawei, HiSilicon | R1-77 | - | [WTS] [JSN] | |||
R1-142717 | void | other | R1-77 | - | [WTS] [JSN] | ||||
R1-142718 | Offline discussion summary for discovery signal details | other | LG Electronics, NTT DOCOMO, Ericsson, Fujitsu, NEC, Sharp | R1-77 | - | [WTS] [JSN] | |||
R1-142719 | Summary of Ad-hoc session on Further Enhancements to LTE TDD for DL-UL Interference Management and Traffic Adaptation | other | Ad-Hoc Chairman (Qualcomm) | R1-77 | - | [WTS] [JSN] | |||
R1-142720 | Summary of Ad-hoc session on Low Cost & Enhanced Coverage MTC UE for LTE | other | Ad-Hoc Chairman (Qualcomm) | R1-77 | - | [WTS] [JSN] | |||
R1-142721 | Summary of Ad-hoc session on Study on LTE Device to Device Proximity Services | other | Ad-Hoc Chairman (Alcatel Lucent) | R1-77 | - | [WTS] [JSN] | |||
R1-142722 | WF on small cell on/off transition time reduction for Scells | other | Ericsson | R1-77 | - | [WTS] [JSN] | |||
R1-142723 | Draft LS on eNB knowledge of low complexity UEs | other | Ericsson | R1-77 | - | [WTS] [JSN] | |||
R1-142724 | 36.211 CR0190R1 (Rel-12, F) Clarification of downlink subframes | CR | Ericsson | R1-77 | - | [WTS] [JSN] | |||
R1-142725 | [DRAFT] LS on discovery signal details | other | LGE | R1-77 | - | [WTS] [JSN] | |||
R1-142726 | 36.213 CR0462 (Rel-12, F) Clarification on SRS antenna switching | CR | Qualcomm | R1-77 | - | [WTS] [JSN] | |||
R1-142727 | Summary of offline discussion on PHR for dual connectivity | other | NTT DOCOMO | R1-77 | - | [WTS] [JSN] | |||
R1-142728 | WF on PHR for Dual Connectivity | other | NTT DOCOMO, Panasonic | R1-77 | - | [WTS] [JSN] | |||
R1-142729 | WF on Sensing for mode 2 communication | other | Huawei, HiSilicon, Panasonic, Potevio, ALU, ALU-Shanghai, Broadcom, Samsung, Fujitsu, LGE, QC, CATR, Coolpad, [CATT] | R1-77 | - | [WTS] [JSN] | |||
R1-142730 | [DRAFT] LS on RAN1 agreements on Physical layer functionalities required for operation of Dual Connectivity in RAN1#77 | other | NTT DOCOMO | R1-77 | - | [WTS] [JSN] | |||
R1-142731 | Draft WF on DRS RSSI and RSRQ | other | Huawei, HiSilicon, NTT DOCOMO | R1-77 | - | [WTS] [JSN] | |||
R1-142732 | WF on PHR triggerer | other | Broadcom, InterDigital | R1-77 | - | [WTS] [JSN] | |||
R1-142733 | LS on discovery signal details | LS out | RAN1, LGE | R1-77 | - | [WTS] [JSN] | |||
R1-142734 | Summary of Ad-hoc session on Low Cost & Enhanced Coverage MTC UE for LTE | other | Ad-Hoc Chairman (Qualcomm) | R1-77 | - | [WTS] [JSN] | |||
R1-142735 | 256QAM TBS table design | other | Huawei, HiSilicon | R1-77 | - | [WTS] [JSN] | |||
R1-142736 | Reply LS on SFN handling in the dual connectivity | other | RAN3, NSN | R1-77 | - | [WTS] [JSN] | |||
R1-142737 | WF on additional network assistance information | other | NTT DOCOMO, Fujitsu, Sony | R1-77 | - | [WTS] [JSN] | |||
R1-142738 | WF on TA in SA | other | LG Electronics, Ericsson, ALU, ASB, US DoC, Intel, Huawei, HiSilicon, Nokia, NSN, Fujitsu, Samsung, ZTE, General Dynamics, CATT, Broadcom, NEC, Panasonic | R1-77 | - | [WTS] [JSN] | |||
R1-142739 | 36.214 CR0021 (Rel-12, C) New E-UTRA RSRQ measurement definition | CR | Nokia, NSN, CATT | R1-77 | - | [WTS] [JSN] | |||
R1-142740 | 25.215 CR0200 (Rel-12, C) New E-UTRA RSRQ measurement definition | CR | Nokia, NSN, CATT | R1-77 | - | [WTS] [JSN] | |||
R1-142741 | 25.225 CR0103r1 (Rel-12, C) New E-UTRA RSRQ measurement definition | CR | CATT, Nokia, NSN | R1-77 | - | [WTS] [JSN] | |||
R1-142742 | Summary of offline discussion on EPRE assumption for CSI derivation in TM10 without PMI/RI configured | other | Huawei, HiSilicon | R1-77 | - | [WTS] [JSN] | |||
R1-142743 | Way forward on PUCCH on Scell | other | Huawei, HiSilicon, NTT DOCOMO | R1-77 | - | [WTS] [JSN] | |||
R1-142744 | WF on DRS RSSI and RSRQ | other | Huawei, HiSilicon, NTT DOCOMO, Sharp, Broadcom, Samsung, Hitachi | R1-77 | - | [WTS] [JSN] | |||
R1-142745 | LS to RAN2 on 36.306 for low cost MTC UE | LS out | RAN1, HiSilicon | R1-77 | - | [WTS] [JSN] | |||
R1-142746 | Offline discussion on SRS transmission for TDD/FDD CA | other | Samsung | R1-77 | - | [WTS] [JSN] | |||
R1-142747 | Offline discussion on CQI/PMI reporting period for TDD/FDD CA | other | Samsung | R1-77 | - | [WTS] [JSN] | |||
R1-142748 | LS on eNB knowledge of low complexity UEs | LS out | RAN1, Ericsson | R1-77 | - | [WTS] [JSN] | |||
R1-142749 | [DRAFT] LS on simultaneous reception of low complexity UEs | other | Vodafone | R1-77 | - | [WTS] [JSN] | |||
R1-142750 | LS on simultaneous reception of low complexity UEs | LS out | RAN1, Vodafone | R1-77 | - | [WTS] [JSN] | |||
R1-142751 | WF on the remaining TBS table design for 256QAM | other | CMCC, Huawei, Hisilicon, CHTTL, ZTE, CATT, CATR, MediaTek | R1-77 | - | [WTS] [JSN] | |||
R1-142752 | WF on details on discovery signal design | other | LG Electronics, NTT DOCOMO, Huawei, HiSilicon, Samsung | R1-77 | - | [WTS] [JSN] | |||
R1-142753 | WF on Type 2B Transmission Timing | other | Qualcomm Incorporated, DoCoMo, Intel, General Dynamics | R1-77 | - | [WTS] [JSN] | |||
R1-142754 | Draft LS on radio interface based synchronization | other | Huawei, HiSilicon, CMCC, CATT, ZTE, IAESI | R1-77 | - | [WTS] [JSN] | |||
R1-142755 | LS on RAN1 agreements on Physical layer functionalities required for operation of Dual Connectivity in RAN1#77 | LS out | RAN1, NTT DOCOMO | R1-77 | - | [WTS] [JSN] | |||
R1-142756 | WF on TDD-FDD CA support in dual connectivity | other | Huawei, HiSilicon, LG Electronics, NTT DOCOMO | R1-77 | - | [WTS] [JSN] | |||
R1-142757 | [DRAFT] LS on the support of TDD/FDD CA in Dual Connectivity | other | Huawei | R1-77 | - | [WTS] [JSN] | |||
R1-142758 | [DRAFT] LS on 256QAM | other | Huawei | R1-77 | - | [WTS] [JSN] | |||
R1-142759 | Update on RAN1 Excel sheet on LTE Rel-12 UE Capabilities | other | NTT DOCOMO | R1-77 | - | [WTS] [JSN] | |||
R1-142760 | Summary of low complexity LC_MTC_UE agreements after RAN1#77 | other | Vodafone | R1-77 | - | [WTS] [JSN] | |||
R1-142761 | [DRAFT] LS on the support of PUCCH on two serving cells in CA | other | Huawei | R1-77 | - | [WTS] [JSN] | |||
R1-142762 | LS on radio interface based synchronization | LS out | RAN1, Huawei | R1-77 | - | [WTS] [JSN] | |||
R1-142763 | 36.212 DraftCR (Rel-12, B) Introduction of Rel 12 features of TDD-FDD CA and eIMTA | other | Huawei | R1-77 | - | [WTS] [JSN] | |||
R1-142764 | Draft rel-11 CR for Clarification on determination on soft buffer size | other | Huawei | R1-77 | - | [WTS] [JSN] | |||
R1-142765 | 36.212 CR0159 (Rel-12, F) Clarification of downlink subframes | CR | Huawei, HiSilicon | R1-77 | - | [WTS] [JSN] | |||
R1-142766 | 36.212 CR0160 (Rel-11, D) Clarification on determination on soft buffer size | CR | Huawei, HiSilicon | R1-77 | - | [WTS] [JSN] | |||
R1-142767 | LS on 256QAM | LS out | RAN1, Huawei | R1-77 | - | [WTS] [JSN] | |||
R1-142768 | LS on the support of TDD/FDD CA in Dual Connectivity | LS out | RAN1, Huawei | R1-77 | - | [WTS] [JSN] | |||
R1-142769 | LS on the support of PUCCH on two serving cells in CA | LS out | RAN1, Huawei | R1-77 | - | [WTS] [JSN] | |||
R1-142770 | 36.213 CR0462R1 (Rel-12, F) Clarification on SRS antenna switching | CR | Qualcomm | R1-77 | - | [WTS] [JSN] | |||
R1-142771 | 36.211 CR0191 (Rel-12, B) Inclusion of eIMTA, TDD-FDD CA, and coverage enhancements | CR | Ericsson | R1-77 | - | [WTS] [JSN] | |||
R1-142772 | 36.212 CR0158 (Rel-12, B) Introduction of Rel 12 features of TDD-FDD CA and eIMTA | CR | Huawei | R1-77 | - | [WTS] [JSN] | |||
R1-142773 | 36.213 CR0463 (Rel-12, B) Introduction of Rel-12 LTE-Advanced features in 36.213 | CR | Motorola Mobility | R1-77 | - | [WTS] [JSN] | |||
R1-142774 | Update on RAN1 Excel sheet on LTE Rel-12 UE Capabilities | other | NTT DOCOMO | R1-77 | - | [WTS] [JSN] | |||
R1-142775 | LS on RAN1 agreements on DRS design | LS out | RAN1, LGE | R1-77 | - | [WTS] [JSN] | |||
R1-142776 | Summary of email discussion [77-11]: Details of prority rule based on UCI type across CGs for dual connectivity power control | other | LG Electronics | R1-77 | - | [WTS] [JSN] | |||
R1-142777 | LS on updated LTE Rel-12 UE feature list | LS out | RAN1, NTT DOCOMO | R1-77 | - | [WTS] [JSN] | |||
R1-142778 | Summary of email discussion [77-13]: Details of PxeNB for power-control of dual connectivity | other | NTT DOCOMO | R1-77 | - | [WTS] [JSN] | |||
R1-142779 | Summary of proposed schemes for small cells on/off transition time reduction | other | Ericsson | R1-77 | - | [WTS] [JSN] | |||
R1-142780 | Summary of email discussion [77-15]: PHR for dual connectivity | other | NTT DOCOMO | R1-77 | - | [WTS] [JSN] | |||
R1-142781 | Summary of Email Discussion [77-17]: UE Capabilities for Dual Connectivity | other | Ericsson | R1-77 | - | [WTS] [JSN] | |||
R1-142782 | [Draft] LS on Maximum Number of Transport Block Bits in Dual-Connectivity | other | Ericsson | R1-77 | - | [WTS] [JSN] | |||
R1-142783 | Summary of Email Discussion [77-12]: "look-ahead" aspect for Dual Connectivity power control | other | Panasonic | R1-77 | - | [WTS] [JSN] | |||
R1-142784 | LS on Maximum Number of Transport Block Bits in Dual-Connectivity | LS out | RAN1, Ericsson | R1-77 | - | [WTS] [JSN] | |||
R1-142785 | Summary of RAN1 agreements for 256QAM after RAN1 #77 | other | Huawei, HiSilicon | R1-77 | - | [WTS] [JSN] | |||
R1-142786 | Spreadsheet on RRC parameters for ProSe LTE D2D | other | Qualcomm | R1-77 | - | [WTS] [JSN] | |||
R1-142787 | LS on RRC parameters for ProSe LTE D2D | LS out | RAN1, Qualcomm | R1-77 | - | [WTS] [JSN] | |||
R1-142788 | LS on L1 parameters for SCE-PHY on efficient operation | LS out | RAN1, Huawei | R1-77 | - | [WTS] [JSN] |
889 documents (1.0625839233398 seconds)