Please enter the search related information in the fields below. Partial information works, e.g. "SP-21" in the "tdoc" field lists all TSG SA documents from 2021. Regular expressions mostly work in all fields (e.g. "2[34].501" in the "Spec" field lists all documents related to 23.501 and 24.501. Capitalization is disregarded, i.e. "3GPP" gives the same results as "3gpp".
Download results in JSON format
| tdoc | Title | Type / Revs | Source | Spec / CR | S/WID | Release | Meeting | Status | Links |
|---|---|---|---|---|---|---|---|---|---|
| R1-141100 | Draft Agenda for RAN1#76bis meeting | other | RAN1 Chairman | R1-76 | - | [WTS] [JSN] | |||
| R1-141101 | Final Report of RAN1#76 meeting | other | MCC | R1-76 | - | [WTS] [JSN] | |||
| R1-141102 | Highlights from RAN#63 | other | RAN1 Chairman | R1-76 | - | [WTS] [JSN] | |||
| R1-141103 | LS on improvements to EUL coverage by TTI switching | other | RAN2, Ericsson | R1-76 | - | [WTS] [JSN] | |||
| R1-141104 | Reply LS on LTE coverage enhancement | other | RAN2, ZTE | R1-76 | - | [WTS] [JSN] | |||
| R1-141105 | Reply LS to S2-133846 = R2-133066 on GCSE with eMBMS | other | RAN2, Huawei | R1-76 | - | [WTS] [JSN] | |||
| R1-141106 | LS on RACH Aspects with eIMTA | other | RAN2, CATT | R1-76 | - | [WTS] [JSN] | |||
| R1-141107 | Liaison to 3GPP RAN, RAN1 and RAN3 on consolidated operator view on eCoMP standardization | other | NGMN Project RAN Evolution, CMCC | R1-76 | - | [WTS] [JSN] | |||
| R1-141108 | LS on deployment scenario for Intra-band Non-contiguous CA | other | RAN4, NTT DoCoMo | R1-76 | - | [WTS] [JSN] | |||
| R1-141109 | Reply LS on half duplex FDD operation for Low complexity MTC UE | other | RAN4, Huawei | R1-76 | - | [WTS] [JSN] | |||
| R1-141110 | LS on BS classes and maximum BS power on 256QAM | other | RAN4, Huawei | R1-76 | - | [WTS] [JSN] | |||
| R1-141111 | Reply LS to R4-141254 = RP-140024 on BS classes and maximum BS power on 256QAM | other | RAN, Huawei | R1-76 | - | [WTS] [JSN] | |||
| R1-141112 | LS on GCSE QCIs and connected mode DRX | other | SA2, Vodafone | R1-76 | - | [WTS] [JSN] | |||
| R1-141113 | LS on Provisioning of ProSe configuration information in a public safety ProSe enabled UE | other | SA2, Deutsche Telekom | R1-76 | - | [WTS] [JSN] | |||
| R1-141114 | [DRAFT] LS on discovery message | other | Huawei, HiSilicon | R1-76 | - | [WTS] [JSN] | |||
| R1-141115 | Discussion on discovery message size | other | Huawei, HiSilicon | R1-76 | - | [WTS] [JSN] | |||
| R1-141116 | Remaining open issues for eIMTA | other | Huawei, HiSilicon | R1-76 | - | [WTS] [JSN] | |||
| R1-141117 | Frequency location scheduling for low cost MTC UEs | other | Huawei, HiSilicon | R1-76 | - | [WTS] [JSN] | |||
| R1-141118 | HD-FDD operation of low cost UEs based on the LS reply from RAN4 | other | Huawei, HiSilicon | R1-76 | - | [WTS] [JSN] | |||
| R1-141119 | Discussion on the resource allocation for low cost MTC UEs | other | Huawei, HiSilicon | R1-76 | - | [WTS] [JSN] | |||
| R1-141120 | Further discussions on CQI/MCS table design for 256QAM | other | Huawei, HiSilicon | R1-76 | - | [WTS] [JSN] | |||
| R1-141121 | TBS table design for 256QAM | other | Huawei, HiSilicon | R1-76 | - | [WTS] [JSN] | |||
| R1-141122 | Discussion on UE category with introduction of 256QAM | other | Huawei, HiSilicon | R1-76 | - | [WTS] [JSN] | |||
| R1-141123 | UE monitoring behavior with DRS configurations | other | Huawei, HiSilicon | R1-76 | - | [WTS] [JSN] | |||
| R1-141124 | Reference signals for enhanced cell discovery | other | Huawei, HiSilicon | R1-76 | - | [WTS] [JSN] | |||
| R1-141125 | Enhanced reference signals for small cell discovery and performance evaluation | other | Huawei, HiSilicon | R1-76 | - | [WTS] [JSN] | |||
| R1-141126 | Support for DRS-based RRM measurements | other | Huawei, HiSilicon | R1-76 | - | [WTS] [JSN] | |||
| R1-141127 | Network assistance for small cell discovery | other | Huawei, HiSilicon | R1-76 | - | [WTS] [JSN] | |||
| R1-141128 | Standards impacts by supporting muting and not turning off listening RS | other | Huawei, HiSilicon | R1-76 | - | [WTS] [JSN] | |||
| R1-141129 | Network listening RS design options | other | Huawei, HiSilicon | R1-76 | - | [WTS] [JSN] | |||
| R1-141130 | Discussion on network listening with eIMTA | other | Huawei, HiSilicon | R1-76 | - | [WTS] [JSN] | |||
| R1-141131 | Power headroom report for dual connectivity | other | Huawei, HiSilicon | R1-76 | - | [WTS] [JSN] | |||
| R1-141132 | Physical layer impact of Dual Connectivity - Downlink | other | Huawei, HiSilicon | R1-76 | - | [WTS] [JSN] | |||
| R1-141133 | Uplink channel transmission of Dual connectivity | other | Huawei, HiSilicon | R1-76 | - | [WTS] [JSN] | |||
| R1-141134 | Uplink Power allocation in Dual connectivity | other | Huawei, HiSilicon | R1-76 | - | [WTS] [JSN] | |||
| R1-141135 | Issues in Inter-eNB CoMP with non-ideal backhaul | other | Huawei, HiSilicon | R1-76 | - | [WTS] [JSN] | |||
| R1-141136 | On the gap definition | other | Huawei, HiSilicon | R1-76 | - | [WTS] [JSN] | |||
| R1-141137 | Scrambling for D2D Broadcast Communication | other | Huawei, HiSilicon | R1-76 | - | [WTS] [JSN] | |||
| R1-141138 | Resource allocation for type-1 and type-2B discovery | other | Huawei, HiSilicon | R1-76 | - | [WTS] [JSN] | |||
| R1-141139 | Resource allocation for mode-1 communication | other | Huawei, HiSilicon | R1-76 | - | [WTS] [JSN] | |||
| R1-141140 | On the need to support type-2A discovery | other | Huawei, HiSilicon | R1-76 | - | [WTS] [JSN] | |||
| R1-141141 | Definition of coverage zones for D2D communication | other | Huawei, HiSilicon | R1-76 | - | [WTS] [JSN] | |||
| R1-141142 | D2D Synchronization procedure in partial network coverage | other | Huawei, HiSilicon | R1-76 | - | [WTS] [JSN] | |||
| R1-141143 | Discussion on CSI enhancement for NAICS | other | Huawei, HiSilicon | R1-76 | - | [WTS] [JSN] | |||
| R1-141144 | Discussion on UCI multiplexing on PUSCH in measurement gap | other | Intel Corporation | R1-76 | - | [WTS] [JSN] | |||
| R1-141145 | (36.212,F,Rel-10) Correction on UCI multiplexing on PUSCH | other | Intel Corporation | R1-76 | - | [WTS] [JSN] | |||
| R1-141146 | Remaining issues of HARQ feedback for eIMTA | other | Intel Corporation | R1-76 | - | [WTS] [JSN] | |||
| R1-141147 | Details on PDSCH scheduling for low cost MTC UE | other | Intel Corporation | R1-76 | - | [WTS] [JSN] | |||
| R1-141148 | On reduced downlink bandwidth of 1.4MHz for low cost MTC UE | other | Intel Corporation | R1-76 | - | [WTS] [JSN] | |||
| R1-141149 | Remaining aspects for low cost MTC UE | other | Intel Corporation | R1-76 | - | [WTS] [JSN] | |||
| R1-141150 | Remaining aspects for TDD-FDD CA supporting | other | Intel Corporation | R1-76 | - | [WTS] [JSN] | |||
| R1-141151 | CQI Table for 256QAM Support | other | Intel Corporation | R1-76 | - | [WTS] [JSN] | |||
| R1-141152 | MCS and TBS Tables for 256QAM Support | other | Intel Corporation | R1-76 | - | [WTS] [JSN] | |||
| R1-141153 | Discussion on configuration aspects for 256QAM | other | Intel Corporation | R1-76 | - | [WTS] [JSN] | |||
| R1-141154 | Discussion on small cell on/off transition time reduction | other | Intel Corporation | R1-76 | - | [WTS] [JSN] | |||
| R1-141155 | Simulation results for small cell discovery signal candidates | other | Intel Corporation | R1-76 | - | [WTS] [JSN] | |||
| R1-141156 | Discussion on small cell discovery signal | other | Intel Corporation | R1-76 | - | [WTS] [JSN] | |||
| R1-141157 | Physical layer impact due to dual connectivity | other | Intel Corporation | R1-76 | - | [WTS] [JSN] | |||
| R1-141158 | Discussion on X2 signalling for downlink CoMP | other | Intel Corporation | R1-76 | - | [WTS] [JSN] | |||
| R1-141159 | On D2D Discovery Preamble and Reference Signals | other | Intel Corporation | R1-76 | - | [WTS] [JSN] | |||
| R1-141160 | Remaining details of D2D physical structure design | other | Intel Corporation | R1-76 | - | [WTS] [JSN] | |||
| R1-141161 | On D2D Discovery Resource Size | other | Intel Corporation | R1-76 | - | [WTS] [JSN] | |||
| R1-141162 | On Type 1 D2D Discovery Resource Allocation | other | Intel Corporation | R1-76 | - | [WTS] [JSN] | |||
| R1-141163 | Discussion on Multiplexing of Cellular and D2D Transmissions from System Perspective | other | Intel Corporation | R1-76 | - | [WTS] [JSN] | |||
| R1-141164 | Discussion on D2D Operation within Network Coverage (Mode-1) | other | Intel Corporation | R1-76 | - | [WTS] [JSN] | |||
| R1-141165 | On Type 2 D2D Discovery Resource Allocation | other | Intel Corporation | R1-76 | - | [WTS] [JSN] | |||
| R1-141166 | Discussion on D2DSS Physical Structure | other | Intel Corporation | R1-76 | - | [WTS] [JSN] | |||
| R1-141167 | Analysis of the Amount of Timings for D2D Communication | other | Intel Corporation | R1-76 | - | [WTS] [JSN] | |||
| R1-141168 | Discussion on D2D Synchronization Procedure | other | Intel Corporation | R1-76 | - | [WTS] [JSN] | |||
| R1-141169 | Discussion on higher layer signaling for NAICS | other | Intel Corporation | R1-76 | - | [WTS] [JSN] | |||
| R1-141170 | Discussion on CQI enhancement for NAICS | other | Intel Corporation | R1-76 | - | [WTS] [JSN] | |||
| R1-141171 | Summary of email discussion on Low Cost UE scheduling Options | other | Sierra Wireless | R1-76 | - | [WTS] [JSN] | |||
| R1-141172 | Low Complexity UEs PRB Limit Evaluation | other | Sierra Wireless | R1-76 | - | [WTS] [JSN] | |||
| R1-141173 | Reduce PDCCH Blind Decoding Options | other | Sierra Wireless | R1-76 | - | [WTS] [JSN] | |||
| R1-141174 | Remaining details on aperiodic CSI feedback for transmission mode 1~9 | other | CATT | R1-76 | - | [WTS] [JSN] | |||
| R1-141175 | Remaining details on aperiodic CSI feedback for transmission mode 10 | other | CATT | R1-76 | - | [WTS] [JSN] | |||
| R1-141176 | Remaining details on periodic CSI feedback | other | CATT | R1-76 | - | [WTS] [JSN] | |||
| R1-141177 | Remaining details on HARQ-ACK on PUSCH | other | CATT | R1-76 | - | [WTS] [JSN] | |||
| R1-141178 | PUCCH Format 3 for eIMTA | other | CATT | R1-76 | - | [WTS] [JSN] | |||
| R1-141179 | PUCCH Format 1 with channel selection for eIMTA | other | CATT | R1-76 | - | [WTS] [JSN] | |||
| R1-141180 | Other remaining issues for TDD eIMTA | other | CATT | R1-76 | - | [WTS] [JSN] | |||
| R1-141181 | Number of HARQ processes for low complexity HD-FDD UEs | other | CATT | R1-76 | - | [WTS] [JSN] | |||
| R1-141182 | DL bandwidth reduction of low complexity UEs | other | CATT | R1-76 | - | [WTS] [JSN] | |||
| R1-141183 | PDSCH HARQ timing of FDD SCell with TDD as PCell | other | CATT | R1-76 | - | [WTS] [JSN] | |||
| R1-141184 | Support of 256QAM for small cells | other | CATT | R1-76 | - | [WTS] [JSN] | |||
| R1-141185 | Procedures for small cell on/off transition time reduction | other | CATT | R1-76 | - | [WTS] [JSN] | |||
| R1-141186 | Design of discovery signal for small cells | other | CATT | R1-76 | - | [WTS] [JSN] | |||
| R1-141187 | Radio-interface based synchronization for small cells | other | CATT | R1-76 | - | [WTS] [JSN] | |||
| R1-141188 | UCI transmission for dual connectivity | other | CATT | R1-76 | - | [WTS] [JSN] | |||
| R1-141189 | Uplink power control for dual connectivity | other | CATT | R1-76 | - | [WTS] [JSN] | |||
| R1-141190 | Details of discovery signal design | other | CATT | R1-76 | - | [WTS] [JSN] | |||
| R1-141191 | Channel scrambling and DMRS design for D2D communication | other | CATT | R1-76 | - | [WTS] [JSN] | |||
| R1-141192 | Physical channel design for D2D communication | other | CATT | R1-76 | - | [WTS] [JSN] | |||
| R1-141193 | Control for D2D communication | other | CATT | R1-76 | - | [WTS] [JSN] | |||
| R1-141194 | Resource allocation mechanism in mode 2 | other | CATT | R1-76 | - | [WTS] [JSN] | |||
| R1-141195 | Resource allocation for type 1 D2D discovery | other | CATT | R1-76 | - | [WTS] [JSN] | |||
| R1-141196 | Resource allocation for D2DSS and PD2DSCH | other | CATT | R1-76 | - | [WTS] [JSN] | |||
| R1-141197 | Design of D2DSS and PD2DSCH | other | CATT | R1-76 | - | [WTS] [JSN] | |||
| R1-141198 | Discussion on D2D synchronization procedure | other | CATT | R1-76 | - | [WTS] [JSN] | |||
| R1-141199 | Considerations on higher-layer signalling for NAICS receiver | other | CATT | R1-76 | - | [WTS] [JSN] | |||
| R1-141200 | Remaining details on reconfiguration signalling | other | NEC | R1-76 | - | [WTS] [JSN] | |||
| R1-141201 | PDSCH scheduling options for low cost MTC UEs not in enhanced coverage mode | other | NEC | R1-76 | - | [WTS] [JSN] | |||
| R1-141202 | Views on network assistance for cell discovery | other | NEC | R1-76 | - | [WTS] [JSN] | |||
| R1-141203 | Small cell discovery signal design | other | NEC | R1-76 | - | [WTS] [JSN] | |||
| R1-141204 | UL power control and splitting in dual connectivity | other | NEC | R1-76 | - | [WTS] [JSN] | |||
| R1-141205 | On UE capabilities defined as UE category for dual connectivity | other | NEC | R1-76 | - | [WTS] [JSN] | |||
| R1-141206 | Signaling Considerations for Inter-eNB CoMP | other | NEC | R1-76 | - | [WTS] [JSN] | |||
| R1-141207 | Timing analysis for D2D transmission gap requirement | other | NEC | R1-76 | - | [WTS] [JSN] | |||
| R1-141208 | On resource selection for Type 1 discovery message transmission | other | NEC | R1-76 | - | [WTS] [JSN] | |||
| R1-141209 | Further considerations on multiplexing D2D and cellular signals | other | NEC | R1-76 | - | [WTS] [JSN] | |||
| R1-141210 | UL Index and DAI bits in DCI format 0/4 | other | Panasonic | R1-76 | - | [WTS] [JSN] | |||
| R1-141211 | Discussion on MTC scheduling options | other | Panasonic | R1-76 | - | [WTS] [JSN] | |||
| R1-141212 | MCS Indication for 256QAM | other | Panasonic | R1-76 | - | [WTS] [JSN] | |||
| R1-141213 | CQI Table Design for 256QAM | other | Panasonic | R1-76 | - | [WTS] [JSN] | |||
| R1-141214 | The procedure for small cell on/off time transition (handover and DRX) | other | Panasonic | R1-76 | - | [WTS] [JSN] | |||
| R1-141215 | Discussion on RSSI on RSRQ-like measurements | other | Panasonic | R1-76 | - | [WTS] [JSN] | |||
| R1-141216 | Power control on dual connectivity | other | Panasonic | R1-76 | - | [WTS] [JSN] | |||
| R1-141217 | Control signalling/channel design in D2D communication | other | Panasonic | R1-76 | - | [WTS] [JSN] | |||
| R1-141218 | Resource allocation procedure for Mode 2 UE in D2D communication | other | Panasonic | R1-76 | - | [WTS] [JSN] | |||
| R1-141219 | Resource allocation procedure for Mode1 UE in D2D communication | other | Panasonic | R1-76 | - | [WTS] [JSN] | |||
| R1-141220 | Rough synchronization procedure in D2D | other | Panasonic | R1-76 | - | [WTS] [JSN] | |||
| R1-141221 | Feasibility analysis of blind parameter detection on CRS-based transmission scheme | other | Panasonic | R1-76 | - | [WTS] [JSN] | |||
| R1-141222 | UE states and Resource allocation for D2D Communication | other | Panasonic | R1-76 | - | [WTS] [JSN] | |||
| R1-141223 | Discussion on 256QAM configuration | other | Fujitsu | R1-76 | - | [WTS] [JSN] | |||
| R1-141224 | Options for small cell discovery and RRM measurements | other | Fujitsu | R1-76 | - | [WTS] [JSN] | |||
| R1-141225 | Discussion on RSRQ measurement for small cell on/off | other | Fujitsu | R1-76 | - | [WTS] [JSN] | |||
| R1-141226 | Physical layer issues of dual connectivity | other | Fujitsu | R1-76 | - | [WTS] [JSN] | |||
| R1-141227 | Power allocation strategy for power limited UE in dual-connectivity | other | Fujitsu | R1-76 | - | [WTS] [JSN] | |||
| R1-141228 | On D2D discovery signal design details | other | Fujitsu | R1-76 | - | [WTS] [JSN] | |||
| R1-141229 | Futher analysis on control signal and SA for D2D communication | other | Fujitsu | R1-76 | - | [WTS] [JSN] | |||
| R1-141230 | RRM for D2D communication | other | Fujitsu | R1-76 | - | [WTS] [JSN] | |||
| R1-141231 | Discussions on D2D resource allocation | other | Fujitsu | R1-76 | - | [WTS] [JSN] | |||
| R1-141232 | On PD2DSS signal generation | other | Fujitsu | R1-76 | - | [WTS] [JSN] | |||
| R1-141233 | Conflict between DL WAN reception and D2D reception | other | Fujitsu | R1-76 | - | [WTS] [JSN] | |||
| R1-141234 | Signaling of PDSCH and PUSCH usage for “CoMP Hypothesis” and “Enhanced RNTP” | other | IAESI, DAC-UPC | R1-76 | - | [WTS] [JSN] | |||
| R1-141235 | Self-organizing D2D communication using knowledge enforcement | other | IAESI | R1-76 | - | [WTS] [JSN] | |||
| R1-141236 | Discussion on the open issues of small cell discovery | other | Coolpad | R1-76 | - | [WTS] [JSN] | |||
| R1-141237 | Considerations D2D communication scheduling resource | other | Coolpad | R1-76 | - | [WTS] [JSN] | |||
| R1-141238 | Considerations D2D Synchronization | other | Coolpad | R1-76 | - | [WTS] [JSN] | |||
| R1-141239 | Specification impact of schemes to improve reliability of HS-DPCCH | other | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | R1-76 | - | [WTS] [JSN] | |||
| R1-141240 | S-UMTS bandwidth detection | other | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | R1-76 | - | [WTS] [JSN] | |||
| R1-141241 | Remaining details on CSI feedback for eIMTA | other | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | R1-76 | - | [WTS] [JSN] | |||
| R1-141242 | Remaining HARQ details for eIMTA | other | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | R1-76 | - | [WTS] [JSN] | |||
| R1-141243 | Considerations for low cost MTC UE | other | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | R1-76 | - | [WTS] [JSN] | |||
| R1-141244 | Consideration of 256QAM | other | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | R1-76 | - | [WTS] [JSN] | |||
| R1-141245 | System Design for transition time reduction for small cell ON/OFF | other | Aclatel-Lucent Shanghai Bell, Alcatel-Lucent | R1-76 | - | [WTS] [JSN] | |||
| R1-141246 | Discovery signals design | other | Aclatel-Lucent Shanghai Bell, Alcatel-Lucent | R1-76 | - | [WTS] [JSN] | |||
| R1-141247 | System analysis of Radio Interface Based Synchronization (RIBS) | other | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | R1-76 | - | [WTS] [JSN] | |||
| R1-141248 | UL power control and power scaling for dual connectivity | other | Alcatel-Lucent Shanghai Bell, Alcatel-Lucent | R1-76 | - | [WTS] [JSN] | |||
| R1-141249 | Common search space on SeNB for dual connectivity | other | Alcatel-Lucent Shanghai Bell, Alcatel-Lucent | R1-76 | - | [WTS] [JSN] | |||
| R1-141250 | UE capability sharing between MeNB and SeNB for dual connectivity | other | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | R1-76 | - | [WTS] [JSN] | |||
| R1-141251 | Signalling details and procedures supporting eCoMP | other | Aclatel-Lucent Shanghai Bell, Alcatel-Lucent | R1-76 | - | [WTS] [JSN] | |||
| R1-141252 | D2D Channel Design for broadcast communication | other | Alcatel-Lucent Shanghai Bell, Alcatel-Lucent | R1-76 | - | [WTS] [JSN] | |||
| R1-141253 | D2D discovery channel design | other | Aclatel-Lucent Shanghai Bell, Alcatel-Lucent | R1-76 | - | [WTS] [JSN] | |||
| R1-141254 | Preamble design for D2D Discovery | other | Aclatel-Lucent Shanghai Bell, Alcatel-Lucent | R1-76 | - | [WTS] [JSN] | |||
| R1-141255 | D2D control signaling | other | Aclatel-Lucent Shanghai Bell, Alcatel-Lucent | R1-76 | - | [WTS] [JSN] | |||
| R1-141256 | Distributed resource allocation for D2D communication | other | Alcatel-Lucent Shanghai Bell, Alcatel-Lucent | R1-76 | - | [WTS] [JSN] | |||
| R1-141257 | D2D discovery channel resource allocation | other | Alcatel-Lucent Shanghai Bell, Alcatel-Lucent | R1-76 | - | [WTS] [JSN] | |||
| R1-141258 | Discussion on in-coverage, out-of-coverage, and edge-of-cell coverage | other | Aclatel-Lucent, Alcatel-Lucent Shanghai Bell | R1-76 | - | [WTS] [JSN] | |||
| R1-141259 | Resource allocation for synchronization signals and channels | other | Alcatel-Lucent Shanghai Bell, Alcatel-Lucent | R1-76 | - | [WTS] [JSN] | |||
| R1-141260 | Considerations for design of D2D Synchronization and UE Identification | other | Alcatel-Lucent Shanghai Bell, Alcatel-Lucent | R1-76 | - | [WTS] [JSN] | |||
| R1-141261 | D2D synchronization procedure | other | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | R1-76 | - | [WTS] [JSN] | |||
| R1-141262 | Considerations on higher-layer signaling for NAICS | other | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | R1-76 | - | [WTS] [JSN] | |||
| R1-141263 | CQI reporting for NAICS operation | other | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | R1-76 | - | [WTS] [JSN] | |||
| R1-141264 | D2D Transport Block Retransmission | other | ETRI | R1-76 | - | [WTS] [JSN] | |||
| R1-141265 | Remaining issues for TDD-FDD CA | other | ETRI | R1-76 | - | [WTS] [JSN] | |||
| R1-141266 | Discovery signal(s) and measurements | other | ETRI | R1-76 | - | [WTS] [JSN] | |||
| R1-141267 | Discussion on TDD Pcell DL HARQ timing with self-carrier scheduling on FDD Scell | other | China Telecom | R1-76 | - | [WTS] [JSN] | |||
| R1-141268 | Enhanced procedure for activated SCell operating on/off | other | China Telecom | R1-76 | - | [WTS] [JSN] | |||
| R1-141269 | UL Power transmission for dual connectivity | other | China Telecom | R1-76 | - | [WTS] [JSN] | |||
| R1-141270 | Discussion on Resource Allocation for D2D | other | China Telecom | R1-76 | - | [WTS] [JSN] | |||
| R1-141271 | Remaining Issues for P-CSI Reporting | other | Samsung | R1-76 | - | [WTS] [JSN] | |||
| R1-141272 | Discussion on CSI feedback for eIMTA | other | Samsung | R1-76 | - | [WTS] [JSN] | |||
| R1-141273 | UCI Transmission in PUSCH | other | Samsung | R1-76 | - | [WTS] [JSN] | |||
| R1-141274 | Remaining issues on HARQ timings | other | Samsung | R1-76 | - | [WTS] [JSN] | |||
| R1-141275 | HARQ-ACK feedback procedures for eIMTA | other | Samsung | R1-76 | - | [WTS] [JSN] | |||
| R1-141276 | Signaling for Adaptation of TDD UL-DL Configurations in CA | other | Samsung | R1-76 | - | [WTS] [JSN] | |||
| R1-141277 | Remaining Issues with RRC Impact for eIMTA | other | Samsung | R1-76 | - | [WTS] [JSN] | |||
| R1-141278 | Remaining issues of low cost MTC | other | Samsung | R1-76 | - | [WTS] [JSN] | |||
| R1-141279 | CSI feedback for TDD-FDD CA | other | Samsung | R1-76 | - | [WTS] [JSN] | |||
| R1-141280 | SRS transmission for TDD-FDD CA | other | Samsung | R1-76 | - | [WTS] [JSN] | |||
| R1-141281 | DL HARQ timing for FDD Scell in TDD-FDD CA | other | Samsung | R1-76 | - | [WTS] [JSN] | |||
| R1-141282 | DCI format designs for TDD-FDD CA | other | Samsung | R1-76 | - | [WTS] [JSN] | |||
| R1-141283 | Half-duplex UE operation for TDD-FDD CA | other | Samsung | R1-76 | - | [WTS] [JSN] | |||
| R1-141284 | MCS/CQI/TBS table design for 256QAM | other | Samsung | R1-76 | - | [WTS] [JSN] | |||
| R1-141285 | UE category/capability for 256QAM | other | Samsung | R1-76 | - | [WTS] [JSN] | |||
| R1-141286 | Discussion on 256QAM related signalling/procedure | other | Samsung | R1-76 | - | [WTS] [JSN] | |||
| R1-141287 | Discussions on small cell on/off scenarios and procedures | other | Samsung | R1-76 | - | [WTS] [JSN] | |||
| R1-141288 | UE RRM and synchronization procedures with small cell on/off operation | other | Samsung | R1-76 | - | [WTS] [JSN] | |||
| R1-141289 | Discussions on small cell discovery procedure | other | Samsung | R1-76 | - | [WTS] [JSN] | |||
| R1-141290 | Discussions on discovery reference signal based measurements | other | Samsung | R1-76 | - | [WTS] [JSN] | |||
| R1-141291 | Discussions on discovery reference signal design | other | Samsung | R1-76 | - | [WTS] [JSN] | |||
| R1-141292 | Parallel random access preamble transmissions in dual connectivity | other | Samsung | R1-76 | - | [WTS] [JSN] | |||
| R1-141293 | UL Power Control in Dual Connectivity | other | Samsung | R1-76 | - | [WTS] [JSN] | |||
| R1-141294 | UCI Transmission in Dual Connectivity | other | Samsung | R1-76 | - | [WTS] [JSN] | |||
| R1-141295 | Utilization of UE Capabilities in Dual Connectivity | other | Samsung | R1-76 | - | [WTS] [JSN] | |||
| R1-141296 | Signalling for inter-eNB CS/CB operation | other | Samsung | R1-76 | - | [WTS] [JSN] | |||
| R1-141297 | Further evaluation results for inter-eNB CoMP | other | Samsung | R1-76 | - | [WTS] [JSN] | |||
| R1-141298 | D2D broadcast communication physical channel design details | other | Samsung | R1-76 | - | [WTS] [JSN] | |||
| R1-141299 | Physical channel design for scheduling assignment | other | Samsung | R1-76 | - | [WTS] [JSN] | |||
| R1-141300 | Discussion on CP length for D2D PUSCH | other | Samsung | R1-76 | - | [WTS] [JSN] | |||
| R1-141301 | Discussion on guard perion in D2D PUSCH | other | Samsung | R1-76 | - | [WTS] [JSN] | |||
| R1-141302 | Control information for D2D broadcast communication | other | Samsung | R1-76 | - | [WTS] [JSN] | |||
| R1-141303 | Resource pool configuration for type-1 discovery | other | Samsung | R1-76 | - | [WTS] [JSN] | |||
| R1-141304 | Resource allocation for type-1 discovery and WAN impact | other | Samsung | R1-76 | - | [WTS] [JSN] | |||
| R1-141305 | Collision avoidance mechanism for D2D broadcast communication | other | Samsung | R1-76 | - | [WTS] [JSN] | |||
| R1-141306 | Mode 2 resource allocation for D2D broadcast communication | other | Samsung | R1-76 | - | [WTS] [JSN] | |||
| R1-141307 | Mode 1 resource allocation for D2D broadcast communication | other | Samsung | R1-76 | - | [WTS] [JSN] | |||
| R1-141308 | Resource allocation for type 2B discovery | other | Samsung | R1-76 | - | [WTS] [JSN] | |||
| R1-141309 | Definitions of in-coverage, out-of-coverage, edge-of-cell coverage | other | Samsung | R1-76 | - | [WTS] [JSN] | |||
| R1-141310 | Resource allocation for synchronization signals enabling inter-cluster synchronization | other | Samsung | R1-76 | - | [WTS] [JSN] | |||
| R1-141311 | Synchronization signal design for inter-cluster synchronization | other | Samsung | R1-76 | - | [WTS] [JSN] | |||
| R1-141312 | Signal and channel design for synchronization source selection | other | Samsung | R1-76 | - | [WTS] [JSN] | |||
| R1-141313 | Inter-cluster synchronization procedure | other | Samsung | R1-76 | - | [WTS] [JSN] | |||
| R1-141314 | D2D Synchronization signal relay by UE | other | Samsung | R1-76 | - | [WTS] [JSN] | |||
| R1-141315 | Discussion on transmission parameters for NAICS | other | Samsung | R1-76 | - | [WTS] [JSN] | |||
| R1-141316 | Discussion on CSI enhancement for NAICS | other | Samsung | R1-76 | - | [WTS] [JSN] | |||
| R1-141317 | Aperiodic CSI reporting in TM1-9 for eIMTA | other | Sharp | R1-76 | - | [WTS] [JSN] | |||
| R1-141318 | Remaining issues on periodic CSI reporting during fallback for eIMTA | other | Sharp | R1-76 | - | [WTS] [JSN] | |||
| R1-141319 | PUCCH resource allocation for dynamic HARQ-ACK in eIMTA | other | Sharp | R1-76 | - | [WTS] [JSN] | |||
| R1-141320 | HARQ-ACK reporting on PUCCH for eIMTA | other | Sharp | R1-76 | - | [WTS] [JSN] | |||
| R1-141321 | UL and DL reference UL-DL configurations in TDD CA with eIMTA | other | Sharp | R1-76 | - | [WTS] [JSN] | |||
| R1-141322 | Details on monitoring subframes for recnfiguration DCI in TDD CA and eIMTA | other | Sharp | R1-76 | - | [WTS] [JSN] | |||
| R1-141323 | PDSCH scheduling for low-cost MTC UEs | other | Sharp | R1-76 | - | [WTS] [JSN] | |||
| R1-141324 | DL HARQ-ACK for TDD-FDD CA with TDD Pcell | other | Sharp | R1-76 | - | [WTS] [JSN] | |||
| R1-141325 | Remaining details of Periodic CSI reporting for Rel-12 TDD-FDD Carrier Aggregation | other | Sharp | R1-76 | - | [WTS] [JSN] | |||
| R1-141326 | Discovery signal design for small cell | other | Sharp | R1-76 | - | [WTS] [JSN] | |||
| R1-141327 | Aspects of eNB Scheduling Assignment in D2D for Mode 1 Transmission | other | Sharp | R1-76 | - | [WTS] [JSN] | |||
| R1-141328 | D2D Coverage Definition | other | Sharp | R1-76 | - | [WTS] [JSN] | |||
| R1-141329 | Remaining Details on CSI Measurement and Report for TDD eIMTA | other | LG Electronics | R1-76 | - | [WTS] [JSN] | |||
| R1-141330 | Remaining Details on HARQ Feedback for TDD eIMTA | other | LG Electronics | R1-76 | - | [WTS] [JSN] | |||
| R1-141331 | Other Remaining Issues for TDD eIMTA | other | LG Electronics | R1-76 | - | [WTS] [JSN] | |||
| R1-141332 | Scheduling method for supporting low-cost MTC | other | LG Electronics | R1-76 | - | [WTS] [JSN] | |||
| R1-141333 | (E)PDCCH related issues for low-cost MTC | other | LG Electronics | R1-76 | - | [WTS] [JSN] | |||
| R1-141334 | HD-FDD support for low-cost MTC | other | LG Electronics | R1-76 | - | [WTS] [JSN] | |||
| R1-141335 | Options of DL HARQ timing for TDD PCell self scheduling case | other | LG Electronics | R1-76 | - | [WTS] [JSN] | |||
| R1-141336 | Remaining RAN1 specification details for TDD-FDD CA | other | LG Electronics | R1-76 | - | [WTS] [JSN] | |||
| R1-141337 | CQI/MCS/TBS table design for 256QAM support | other | LG Electronics | R1-76 | - | [WTS] [JSN] | |||
| R1-141338 | Further details on 256QAM operation | other | LG Electronics | R1-76 | - | [WTS] [JSN] | |||
| R1-141339 | Detailed design of small cell on/off operation | other | LG Electronics | R1-76 | - | [WTS] [JSN] | |||
| R1-141340 | Discovery signal design choices and considerations | other | LG Electronics | R1-76 | - | [WTS] [JSN] | |||
| R1-141341 | Performance analysis on discovery signal candidates | other | LG Electronics | R1-76 | - | [WTS] [JSN] | |||
| R1-141342 | Design of radio-based network synchronization for intra-operator scenarios | other | LG Electronics | R1-76 | - | [WTS] [JSN] | |||
| R1-141343 | Design of radio-based network synchronization for inter-operator scenarios | other | LG Electronics | R1-76 | - | [WTS] [JSN] | |||
| R1-141344 | Power control for dual connectivity | other | LG Electronics | R1-76 | - | [WTS] [JSN] | |||
| R1-141345 | Remaining RAN1 issues of dual connectivity | other | LG Electronics | R1-76 | - | [WTS] [JSN] | |||
| R1-141346 | Inter-eNB CoMP signaling with non-ideal backhaul | other | LG Electronics | R1-76 | - | [WTS] [JSN] | |||
| R1-141347 | Discussion on D2D communication physical layer design | other | LG Electronics | R1-76 | - | [WTS] [JSN] | |||
| R1-141348 | Discussion on D2D discovery physical layer design | other | LG Electronics | R1-76 | - | [WTS] [JSN] | |||
| R1-141349 | Control design for D2D broadcast communication | other | LG Electronics | R1-76 | - | [WTS] [JSN] | |||
| R1-141350 | Operation in Mode 2 resource allocation for D2D communication | other | LG Electronics | R1-76 | - | [WTS] [JSN] | |||
| R1-141351 | Operation in Type 1 resource allocation for D2D discovery | other | LG Electronics | R1-76 | - | [WTS] [JSN] | |||
| R1-141352 | Operation in Mode 1 resource allocation for D2D communication | other | LG Electronics | R1-76 | - | [WTS] [JSN] | |||
| R1-141353 | Operation in Type 2 resource allocation for D2D discovery | other | LG Electronics | R1-76 | - | [WTS] [JSN] | |||
| R1-141354 | Issues on multiplexing between WAN and D2D | other | LG Electronics | R1-76 | - | [WTS] [JSN] | |||
| R1-141355 | Definition of coverage in D2D operation perspective | other | LG Electronics | R1-76 | - | [WTS] [JSN] | |||
| R1-141356 | Discussion on resource allocation for D2D synchronization | other | LG Electronics | R1-76 | - | [WTS] [JSN] | |||
| R1-141357 | Discussion on design of D2DSS and PD2DSCH | other | LG Electronics | R1-76 | - | [WTS] [JSN] | |||
| R1-141358 | Discussion on D2D synchronization procedure | other | LG Electronics | R1-76 | - | [WTS] [JSN] | |||
| R1-141359 | Discussion on D2D signal transmission and reception timing | other | LG Electronics | R1-76 | - | [WTS] [JSN] | |||
| R1-141360 | Considerations on supporting inter-cell D2D operations | other | LG Electronics | R1-76 | - | [WTS] [JSN] | |||
| R1-141361 | Discussion on higher-layer signalling for NAICS | other | LG Electronics | R1-76 | - | [WTS] [JSN] | |||
| R1-141362 | Discussion on CSI enhancement for NAICS | other | LG Electronics | R1-76 | - | [WTS] [JSN] | |||
| R1-141363 | PDCCH common search space in SCG | other | CATT | R1-76 | - | [WTS] [JSN] | |||
| R1-141364 | UE category related L1 processing capability for dual connectivity | other | CATT | R1-76 | - | [WTS] [JSN] | |||
| R1-141365 | UE monitoring behaviour with cell on/off operations | other | FiberHome | R1-76 | - | [WTS] [JSN] | |||
| R1-141366 | Discussion on CQI/MCS table design for 256QAM | other | FiberHome | R1-76 | - | [WTS] [JSN] | |||
| R1-141367 | Small cell on-off switching and muting in radio interface based synchronization | other | FiberHome | R1-76 | - | [WTS] [JSN] | |||
| R1-141368 | DL HARQ timing for TDD-FDD CA with self-carrier scheduling when TDD is PCell | other | FiberHome | R1-76 | - | [WTS] [JSN] | |||
| R1-141369 | Discussion on RRC impact of TDD eIMTA | other | New Postcom | R1-76 | - | [WTS] [JSN] | |||
| R1-141370 | Discussion on small cell on off transition time reduction | other | New Postcom | R1-76 | - | [WTS] [JSN] | |||
| R1-141371 | PDSCH scheduling for low cost MTC UE | other | New Postcom | R1-76 | - | [WTS] [JSN] | |||
| R1-141372 | Discussion on physical layer functionalities for Dual Connectivity | other | New Postcom | R1-76 | - | [WTS] [JSN] | |||
| R1-141373 | Consideration on TDD-FDD joint operation | other | New Postcom | R1-76 | - | [WTS] [JSN] | |||
| R1-141374 | Signalling information for inter-eNB CoMP with NIB | other | New Postcom | R1-76 | - | [WTS] [JSN] | |||
| R1-141375 | Remaining Details of UL/DL Reconfiguration for eIMTA | other | HTC | R1-76 | - | [WTS] [JSN] | |||
| R1-141376 | Higher Order Modulation for Small Cell Enhancement | other | HTC | R1-76 | - | [WTS] [JSN] | |||
| R1-141377 | Discussion on small cell on/off | other | HTC | R1-76 | - | [WTS] [JSN] | |||
| R1-141378 | Physical Layer Aspects of Dual Connectivity | other | HTC | R1-76 | - | [WTS] [JSN] | |||
| R1-141379 | D2D Synchronization procedure between in and out of coverage UEs | other | HTC | R1-76 | - | [WTS] [JSN] | |||
| R1-141380 | Synchronization Signals and Channel Design for D2D Discovery and Communication | other | Ericsson | R1-76 | - | [WTS] [JSN] | |||
| R1-141381 | Synchronization Procedures for D2D Discovery and Communication | other | Ericsson | R1-76 | - | [WTS] [JSN] | |||
| R1-141382 | On Scrambling of D2D Physical Channels | other | Ericsson | R1-76 | - | [WTS] [JSN] | |||
| R1-141383 | Discussion on the Association Threshold for D2D Communication | other | Ericsson, Qualcomm, US Department of Commerce | R1-76 | - | [WTS] [JSN] | |||
| R1-141384 | D2D Physical Channels Design | other | Ericsson | R1-76 | - | [WTS] [JSN] | |||
| R1-141385 | Simulation Results for Multihop Synchronization | other | Ericsson | R1-76 | - | [WTS] [JSN] | |||
| R1-141386 | Inter-Carrier and Inter-Cell Aspects of D2D Discovery and Communication | other | Ericsson | R1-76 | - | [WTS] [JSN] | |||
| R1-141387 | Frame Structure for D2D-Enabled LTE Carriers | other | Ericsson | R1-76 | - | [WTS] [JSN] | |||
| R1-141388 | Discovery Resource Allocation | other | Ericsson | R1-76 | - | [WTS] [JSN] | |||
| R1-141389 | On Metric and Procedures for In/Out of NW coverage detection for D2D | other | Ericsson | R1-76 | - | [WTS] [JSN] | |||
| R1-141390 | On resource allocation for D2D communication | other | Ericsson | R1-76 | - | [WTS] [JSN] | |||
| R1-141391 | On Scheduling Assignments and Receiver Behaviour | other | Ericsson | R1-76 | - | [WTS] [JSN] | |||
| R1-141392 | Timing Aspects in D2D Discovery and Communication | other | Ericsson | R1-76 | - | [WTS] [JSN] | |||
| R1-141393 | Discussion on Mechanism to Support 256QAM in TM 10 | other | Hitachi Ltd. | R1-76 | - | [WTS] [JSN] | |||
| R1-141394 | Explicit signaling of cell states to UEs | other | Hitachi Ltd. | R1-76 | - | [WTS] [JSN] | |||
| R1-141395 | Discussion on discovery signal candidates | other | Hitachi Ltd. | R1-76 | - | [WTS] [JSN] | |||
| R1-141396 | Discovery Signal for Small Cells | other | Hitachi Ltd. | R1-76 | - | [WTS] [JSN] | |||
| R1-141397 | Further discussion on CoMP signaling with Non-ideal Backhaul | other | Hitachi Ltd. | R1-76 | - | [WTS] [JSN] | |||
| R1-141398 | Discussion on D2D transmission timing in network coverage | other | KDDI | R1-76 | - | [WTS] [JSN] | |||
| R1-141399 | On standard impacts of 256QAM in downlink | other | ZTE | R1-76 | - | [WTS] [JSN] | |||
| R1-141400 | Remaining Issues for TDD-FDD CA | other | ZTE | R1-76 | - | [WTS] [JSN] | |||
| R1-141401 | Physical layer aspects of dual connectivity | other | ZTE | R1-76 | - | [WTS] [JSN] | |||
| R1-141402 | UCI feedback mechanism for dual connectivity | other | ZTE | R1-76 | - | [WTS] [JSN] | |||
| R1-141403 | Parallel random access preamble transmissions in dual connectivity | other | ZTE | R1-76 | - | [WTS] [JSN] | |||
| R1-141404 | Enhanced small cell onoff mechanisms | other | ZTE | R1-76 | - | [WTS] [JSN] | |||
| R1-141405 | Discussion on open issues of small cell on/off and discovery | other | ZTE | R1-76 | - | [WTS] [JSN] | |||
| R1-141406 | Solutions and standard impacts for RIBS | other | ZTE | R1-76 | - | [WTS] [JSN] | |||
| R1-141407 | Issues regarding radio-interface based synchronization | other | ZTE | R1-76 | - | [WTS] [JSN] | |||
| R1-141408 | Remaining issue on inter-eNB CoMP Signalling | other | ZTE | R1-76 | - | [WTS] [JSN] | |||
| R1-141409 | Discussion on Higher-layer signalling for NAICS | other | ZTE | R1-76 | - | [WTS] [JSN] | |||
| R1-141410 | Discussion on CSI enhancement for NAICS | other | ZTE | R1-76 | - | [WTS] [JSN] | |||
| R1-141411 | Analysis on low cost MTC UEs | other | ZTE | R1-76 | - | [WTS] [JSN] | |||
| R1-141412 | PDSCH PRB locations for common and unicast channels for low cost MTC UEs | other | ZTE | R1-76 | - | [WTS] [JSN] | |||
| R1-141413 | On DS design - Including SSS as part of the DS signal | other | ZTE | R1-76 | - | [WTS] [JSN] | |||
| R1-141414 | On DS design - Frequency division multiplexing | other | ZTE | R1-76 | - | [WTS] [JSN] | |||
| R1-141415 | Autonomous time difference detection for extended small cell On/OFF use cases | other | ZTE | R1-76 | - | [WTS] [JSN] | |||
| R1-141416 | Discovery burst indicator for autonomous time difference detection | other | ZTE | R1-76 | - | [WTS] [JSN] | |||
| R1-141417 | On network assisted DS transmissions under uncertain relative time differences | other | ZTE | R1-76 | - | [WTS] [JSN] | |||
| R1-141418 | Inconsistency between reconfiguration signaling and UL grant/PHICH | other | ZTE | R1-76 | - | [WTS] [JSN] | |||
| R1-141419 | Remaining issues in UL power control | other | ZTE | R1-76 | - | [WTS] [JSN] | |||
| R1-141420 | Remaining details of CSI feedback for TDD eIMTA | other | ZTE | R1-76 | - | [WTS] [JSN] | |||
| R1-141421 | Impact of RACH procedure to TDD eIMTA reconfiguration | other | ZTE | R1-76 | - | [WTS] [JSN] | |||
| R1-141422 | Design details of discovery signal and channel | other | ZTE | R1-76 | - | [WTS] [JSN] | |||
| R1-141423 | D2D physical channel design for broadcast communication based on PUSCH structure | other | ZTE | R1-76 | - | [WTS] [JSN] | |||
| R1-141424 | Control signaling for D2D broadcast communication | other | ZTE | R1-76 | - | [WTS] [JSN] | |||
| R1-141425 | Distributed resource allocation for D2D communication | other | ZTE | R1-76 | - | [WTS] [JSN] | |||
| R1-141426 | Resource Allocation for D2D Discovery | other | ZTE | R1-76 | - | [WTS] [JSN] | |||
| R1-141427 | Scheduling-based D2D communication resource allocation | other | ZTE | R1-76 | - | [WTS] [JSN] | |||
| R1-141428 | Discussion on definitions of coverage scenarios | other | ZTE | R1-76 | - | [WTS] [JSN] | |||
| R1-141429 | Resource allocation for D2D synchronization | other | ZTE | R1-76 | - | [WTS] [JSN] | |||
| R1-141430 | D2D Synchronization Signal and Channel Design | other | ZTE | R1-76 | - | [WTS] [JSN] | |||
| R1-141431 | Multi-hop Synchronization Procedure | other | ZTE | R1-76 | - | [WTS] [JSN] | |||
| R1-141432 | Synchronization for D2D discovery | other | ZTE | R1-76 | - | [WTS] [JSN] | |||
| R1-141433 | Draft Rel-12 CR on Clarification on UE port based CRC masking | other | Qualcomm Inc. | R1-76 | - | [WTS] [JSN] | |||
| R1-141434 | CSI measurement and reporting in eIMTA | other | Qualcomm Inc. | R1-76 | - | [WTS] [JSN] | |||
| R1-141435 | HARQ-ACK feedback for eIMTA | other | Qualcomm Inc. | R1-76 | - | [WTS] [JSN] | |||
| R1-141436 | Remaining issues for eIMTA | other | Qualcomm Inc. | R1-76 | - | [WTS] [JSN] | |||
| R1-141437 | SPS operation in TDD eIMTA | other | Qualcomm Inc. | R1-76 | - | [WTS] [JSN] | |||
| R1-141438 | Remaining details of UE category type | other | Qualcomm Inc. | R1-76 | - | [WTS] [JSN] | |||
| R1-141439 | Solution for TDD-FDD CA | other | Qualcomm Inc. | R1-76 | - | [WTS] [JSN] | |||
| R1-141440 | Higher order modulation | other | Qualcomm Inc. | R1-76 | - | [WTS] [JSN] | |||
| R1-141441 | Small cell on/off time reduction | other | Qualcomm Inc. | R1-76 | - | [WTS] [JSN] | |||
| R1-141442 | Small cell discovery | other | Qualcomm Inc. | R1-76 | - | [WTS] [JSN] | |||
| R1-141443 | Network synchronization by network listening | other | Qualcomm Inc. | R1-76 | - | [WTS] [JSN] | |||
| R1-141444 | Physical layer aspects of dual-connectivity | other | Qualcomm Inc. | R1-76 | - | [WTS] [JSN] | |||
| R1-141445 | Parameters for backhaul signaling | other | Qualcomm Inc. | R1-76 | - | [WTS] [JSN] | |||
| R1-141446 | Signal Design for D2D Discovery and Broadcast | other | Qualcomm Inc. | R1-76 | - | [WTS] [JSN] | |||
| R1-141447 | Link level simulation results for D2D broadcast communication | other | Qualcomm Inc. | R1-76 | - | [WTS] [JSN] | |||
| R1-141448 | Control for D2D broadcast communication | other | Qualcomm Inc. | R1-76 | - | [WTS] [JSN] | |||
| R1-141449 | Resource allocation for D2D discovery | other | Qualcomm Inc. | R1-76 | - | [WTS] [JSN] | |||
| R1-141450 | Distributed resource allocation for D2D broadcast communication | other | Qualcomm Inc. | R1-76 | - | [WTS] [JSN] | |||
| R1-141451 | eNB resource allocation for D2D broadcast communication | other | Qualcomm Inc. | R1-76 | - | [WTS] [JSN] | |||
| R1-141452 | Definitions of coverage states and mode switching for D2D | other | Qualcomm Inc. | R1-76 | - | [WTS] [JSN] | |||
| R1-141453 | Signal Design for D2D Synchronization | other | Qualcomm Inc. | R1-76 | - | [WTS] [JSN] | |||
| R1-141454 | Resource allocation for D2D Synchronization | other | Qualcomm Inc. | R1-76 | - | [WTS] [JSN] | |||
| R1-141455 | Procedures for D2D synchronization | other | Qualcomm Inc. | R1-76 | - | [WTS] [JSN] | |||
| R1-141456 | Coexistence of D2D discovery and WAN | other | Qualcomm Inc. | R1-76 | - | [WTS] [JSN] | |||
| R1-141457 | Network assistance signaling | other | Qualcomm Inc. | R1-76 | - | [WTS] [JSN] | |||
| R1-141458 | CSI measurement and reporting for NAICS | other | Qualcomm Inc. | R1-76 | - | [WTS] [JSN] | |||
| R1-141459 | Design details of scheduling assignments | other | Kyocera | R1-76 | - | [WTS] [JSN] | |||
| R1-141460 | Resource allocation for Type 1 discovery | other | Kyocera | R1-76 | - | [WTS] [JSN] | |||
| R1-141461 | Update Views on FFS on new UE category/type | other | Panasonic | R1-76 | - | [WTS] [JSN] | |||
| R1-141462 | Remaining details of bandwidth reduction for low cost MTC | other | NTT DOCOMO | R1-76 | - | [WTS] [JSN] | |||
| R1-141463 | Further design of CQI/MCS table for 256 QAM | other | NTT DOCOMO | R1-76 | - | [WTS] [JSN] | |||
| R1-141464 | Views on transition time reduction for small cell on/off | other | NTT DOCOMO | R1-76 | - | [WTS] [JSN] | |||
| R1-141465 | Views on network assistance for Rel-12 discovery procedure | other | NTT DOCOMO | R1-76 | - | [WTS] [JSN] | |||
| R1-141466 | Views on discovery signal design for Rel-12 discovery procedure | other | NTT DOCOMO | R1-76 | - | [WTS] [JSN] | |||
| R1-141467 | Views on discovery signal-based RSRQ measurement | other | NTT DOCOMO | R1-76 | - | [WTS] [JSN] | |||
| R1-141468 | Open issues on dual connectivity | other | NTT DOCOMO | R1-76 | - | [WTS] [JSN] | |||
| R1-141469 | Transmit power control for dual connectivity | other | NTT DOCOMO | R1-76 | - | [WTS] [JSN] | |||
| R1-141470 | Views on remaining open issues on dual connectivity | other | NTT DOCOMO | R1-76 | - | [WTS] [JSN] | |||
| R1-141471 | Details on Backhaul Signaling for Inter-eNB CoMP | other | NTT DOCOMO | R1-76 | - | [WTS] [JSN] | |||
| R1-141472 | Discussion on resource selection for type 1 discovery | other | NTT DOCOMO | R1-76 | - | [WTS] [JSN] | |||
| R1-141473 | Discussion on resource allocation for Type 2B discovery | other | NTT DOCOMO | R1-76 | - | [WTS] [JSN] | |||
| R1-141474 | Views on Higher Layer Signaling for NAICS | other | NTT DOCOMO | R1-76 | - | [WTS] [JSN] | |||
| R1-141475 | Evaluation results of CSI enhancements for NAICS | other | NTT DOCOMO | R1-76 | - | [WTS] [JSN] | |||
| R1-141476 | DL HARQ Timing for self-carrier scheduling when PCell is TDD and SCell is FDD | other | ITRI | R1-76 | - | [WTS] [JSN] | |||
| R1-141477 | Further discussion on radio-interface based synchronization | other | ITRI | R1-76 | - | [WTS] [JSN] | |||
| R1-141478 | Discussion on the multiplexing of D2D and Cellular signals | other | ITRI | R1-76 | - | [WTS] [JSN] | |||
| R1-141479 | Discovery Preamble Design for AGC Consideration in SC-FDM systems | other | ITRI | R1-76 | - | [WTS] [JSN] | |||
| R1-141480 | Definition of in-coverage, out-of-coverage and edge-of-cell coverage | other | ITRI | R1-76 | - | [WTS] [JSN] | |||
| R1-141481 | D2DSS Timing Misalignment for UE on Edge-of-Cell Coverage | other | ITRI | R1-76 | - | [WTS] [JSN] | |||
| R1-141482 | Analysis on PDSCH resource allocation for low cost MTC | other | MediaTek Inc. | R1-76 | - | [WTS] [JSN] | |||
| R1-141483 | On CA enhancements for fast small cell on/off operation | other | MediaTek Inc. | R1-76 | - | [WTS] [JSN] | |||
| R1-141484 | On dual connectivity enhancements for fast small cell on/off operation | other | MediaTek Inc. | R1-76 | - | [WTS] [JSN] | |||
| R1-141485 | On enhancements for small cell discovery and RRM measureements | other | MediaTek Inc. | R1-76 | - | [WTS] [JSN] | |||
| R1-141486 | Performance evaluation of small cell discovery signal designs | other | MediaTek Inc. | R1-76 | - | [WTS] [JSN] | |||
| R1-141487 | On physical layer support for dual connectivity | other | MediaTek Inc. | R1-76 | - | [WTS] [JSN] | |||
| R1-141488 | Higher-layer signaling for NAICS and system impact analysis | other | MediaTek Inc. | R1-76 | - | [WTS] [JSN] | |||
| R1-141489 | CSI feedback for NAICS receivers | other | MediaTek Inc. | R1-76 | - | [WTS] [JSN] | |||
| R1-141490 | Downlink compressed mode considerations | other | MediaTek Inc. | R1-76 | - | [WTS] [JSN] | |||
| R1-141491 | UL DCH Enhancement solution comparison | other | MediaTek Inc. | R1-76 | - | [WTS] [JSN] | |||
| R1-141492 | System simulation results for uplink FET-less transmission mode switching | other | MediaTek Inc. | R1-76 | - | [WTS] [JSN] | |||
| R1-141493 | Uplink compressed mode design for DCH enhancements | other | MediaTek Inc. | R1-76 | - | [WTS] [JSN] | |||
| R1-141494 | UL ACK design comparison for DL-FET | other | MediaTek Inc. | R1-76 | - | [WTS] [JSN] | |||
| R1-141495 | Uplink TFCI coding considerations | other | MediaTek Inc. | R1-76 | - | [WTS] [JSN] | |||
| R1-141496 | Discussion on small cell on/off transition time reduction | other | III | R1-76 | - | [WTS] [JSN] | |||
| R1-141497 | On the signal design and resource allocation of reply signal for D2D discovery | other | III | R1-76 | - | [WTS] [JSN] | |||
| R1-141498 | Performance of D2D synchronization source selection and D2DSS transmission | other | III | R1-76 | - | [WTS] [JSN] | |||
| R1-141499 | Integrated resource scheduling for in-coverage D2D communication to support Mode 1 and Mode 2 | other | III | R1-76 | - | [WTS] [JSN] | |||
| R1-141500 | Discussions on UE Categories with introduction of 256 QAM | other | Broadcom Corporation | R1-76 | - | [WTS] [JSN] | |||
| R1-141501 | MCS table design for 256 QAM | other | Broadcom Corporation | R1-76 | - | [WTS] [JSN] | |||
| R1-141502 | Small cell On/off procedures | other | Broadcom Corporation | R1-76 | - | [WTS] [JSN] | |||
| R1-141503 | Small cell discovery signal design | other | Broadcom Corporation | R1-76 | - | [WTS] [JSN] | |||
| R1-141504 | System level evaluations for aligned discovery | other | Broadcom Corporation | R1-76 | - | [WTS] [JSN] | |||
| R1-141505 | RSRQ calculation for small cell On/Off | other | Broadcom Corporation | R1-76 | - | [WTS] [JSN] | |||
| R1-141506 | Power scaling for dual connectivity | other | Broadcom Corporation | R1-76 | - | [WTS] [JSN] | |||
| R1-141507 | Uplink power control for dual connectivity | other | Broadcom Corporation | R1-76 | - | [WTS] [JSN] | |||
| R1-141508 | RRC signaling for NAICS | other | Broadcom Corporation | R1-76 | - | [WTS] [JSN] | |||
| R1-141509 | CSI reporting for NAICS | other | Broadcom Corporation | R1-76 | - | [WTS] [JSN] | |||
| R1-141510 | Resource Allocation for Type 1 D2D Discovery | other | Fujitsu | R1-76 | - | [WTS] [JSN] | |||
| R1-141511 | DL HARQ timing for FDD SCell in case of TDD PCell | other | NVIDIA | R1-76 | - | [WTS] [JSN] | |||
| R1-141512 | CQI table design for downlink 256QAM | other | NVIDIA | R1-76 | - | [WTS] [JSN] | |||
| R1-141513 | Procedures for reducing small cell on/off transition time | other | NVIDIA | R1-76 | - | [WTS] [JSN] | |||
| R1-141514 | Discovery signal design | other | NVIDIA | R1-76 | - | [WTS] [JSN] | |||
| R1-141515 | Discussion on higher-layer signaling for NAICS | other | NVIDIA | R1-76 | - | [WTS] [JSN] | |||
| R1-141516 | On CSI feedback in support of NAICS | other | NVIDIA | R1-76 | - | [WTS] [JSN] | |||
| R1-141517 | Synchronization Procedure for D2D Broadcast Communication | other | China Telecom | R1-76 | - | [WTS] [JSN] | |||
| R1-141518 | Remaining issues for TDD-FDD CA | other | ITL Inc. | R1-76 | - | [WTS] [JSN] | |||
| R1-141519 | Discussion on the open issues of the enhanced small Cell on/off procedure | other | ITL Inc. | R1-76 | - | [WTS] [JSN] | |||
| R1-141520 | Considerations on D2D synchronization signal design | other | ITL Inc. | R1-76 | - | [WTS] [JSN] | |||
| R1-141521 | HARQ timing determination in the case of CA | other | NSN, Nokia | R1-76 | - | [WTS] [JSN] | |||
| R1-141522 | Usage of UL DAI and UL Index with UL reference configuration #0 | other | NSN, Nokia | R1-76 | - | [WTS] [JSN] | |||
| R1-141523 | Summary of email discussion [76-06] | other | NSN | R1-76 | - | [WTS] [JSN] | |||
| R1-141524 | PDSCH PRB Limitation for Low Cost MTC UE | other | NSN, Nokia | R1-76 | - | [WTS] [JSN] | |||
| R1-141525 | PDSCH Scheduling for Low Cost MTC UE | other | NSN, Nokia | R1-76 | - | [WTS] [JSN] | |||
| R1-141526 | HD-FDD Low Cost MTC UE | other | NSN, Nokia | R1-76 | - | [WTS] [JSN] | |||
| R1-141527 | DL HARQ timing for self-scheduled FDD Scell in case of TDD Pcell | other | Nokia, NSN | R1-76 | - | [WTS] [JSN] | |||
| R1-141528 | Remaining issues on TDD-FDD CA DCI format | other | Nokia, NSN | R1-76 | - | [WTS] [JSN] | |||
| R1-141529 | Further details on CQI table design | other | Nokia, NSN | R1-76 | - | [WTS] [JSN] | |||
| R1-141530 | On 256QAM PDSCH support scheduled by compact DCI formats | other | Nokia, NSN | R1-76 | - | [WTS] [JSN] | |||
| R1-141531 | On UE categories for 256QAM support | other | Nokia, NSN | R1-76 | - | [WTS] [JSN] | |||
| R1-141532 | Small Cell Detection Statistics and Related Considerations | other | NSN, Nokia | R1-76 | - | [WTS] [JSN] | |||
| R1-141533 | Discovery Signals and Measurements | other | NSN, Nokia | R1-76 | - | [WTS] [JSN] | |||
| R1-141534 | Designing issues of Radio-interface based Synchronization | other | NSN, Nokia | R1-76 | - | [WTS] [JSN] | |||
| R1-141535 | RIBS with Synchronization Accuracy Indication | other | NSN, Nokia | R1-76 | - | [WTS] [JSN] | |||
| R1-141536 | UL power control and power headroom reporting for dual connectivity | other | NSN, Nokia | R1-76 | - | [WTS] [JSN] | |||
| R1-141537 | Control signalling for dual connectivity | other | NSN, Nokia | R1-76 | - | [WTS] [JSN] | |||
| R1-141538 | Inter-eNB signaling design for eCoMP | other | NSN, Nokia | R1-76 | - | [WTS] [JSN] | |||
| R1-141539 | Issues in D2D Discovery Signal Design | other | Nokia, NSN | R1-76 | - | [WTS] [JSN] | |||
| R1-141540 | Control of ProSe resource use | other | Nokia, NSN | R1-76 | - | [WTS] [JSN] | |||
| R1-141541 | D2D synchronization signal design | other | Nokia, NSN | R1-76 | - | [WTS] [JSN] | |||
| R1-141542 | Discussion on D2D synchronization procedure for communication and discovery | other | Nokia, NSN | R1-76 | - | [WTS] [JSN] | |||
| R1-141543 | Network assistance for NAICS receivers | other | NSN, Nokia | R1-76 | - | [WTS] [JSN] | |||
| R1-141544 | On NAICS CSI feedback | other | NSN, Nokia | R1-76 | - | [WTS] [JSN] | |||
| R1-141545 | Discussion on D2D Control Channel | other | Intel Corporation | R1-76 | - | [WTS] [JSN] | |||
| R1-141546 | Discussion on D2D Operation Outside of Network Coverage (Mode-2) | other | Intel Corporation | R1-76 | - | [WTS] [JSN] | |||
| R1-141547 | Discussion on Out of Coverage Definition | other | Intel Corporation | R1-76 | - | [WTS] [JSN] | |||
| R1-141548 | Discussion on D2D Synchronization Channel (PD2DSCH) | other | Intel Corporation | R1-76 | - | [WTS] [JSN] | |||
| R1-141549 | Analysis of different RSRP thresholds for design and evaluation of D2D communication | other | Intel Corporation | R1-76 | - | [WTS] [JSN] | |||
| R1-141550 | On Reduction of Synchronization Source Density | other | Intel Corporation | R1-76 | - | [WTS] [JSN] | |||
| R1-141551 | Discussion on the remaining details of CSI Feedback for eIMTA | other | Intel Corporation | R1-76 | - | [WTS] [JSN] | |||
| R1-141552 | On PDSCH scheduling for LC MTC UE | other | InterDigital | R1-76 | - | [WTS] [JSN] | |||
| R1-141553 | Design considerations for 256QAM | other | InterDigital | R1-76 | - | [WTS] [JSN] | |||
| R1-141554 | Small cell On/Off mechanism | other | InterDigital | R1-76 | - | [WTS] [JSN] | |||
| R1-141555 | RSSI measurements in Small cell On/Off operation | other | InterDigital | R1-76 | - | [WTS] [JSN] | |||
| R1-141556 | Power scaling in Dual Connectivity | other | InterDigital | R1-76 | - | [WTS] [JSN] | |||
| R1-141557 | On physical channel design for D2D broadcast communication and discovery | other | InterDigital | R1-76 | - | [WTS] [JSN] | |||
| R1-141558 | On control signaling for D2D broadcast communication | other | InterDigital | R1-76 | - | [WTS] [JSN] | |||
| R1-141559 | Determination of in-coverage, out-of-coverage, edge-of-coverage for D2D UEs | other | InterDigital | R1-76 | - | [WTS] [JSN] | |||
| R1-141560 | eNB resource allocation for D2D | other | InterDigital | R1-76 | - | [WTS] [JSN] | |||
| R1-141561 | Synchronization signal and channel design for D2D | other | InterDigital | R1-76 | - | [WTS] [JSN] | |||
| R1-141562 | Synchronization procedure for D2D | other | InterDigital | R1-76 | - | [WTS] [JSN] | |||
| R1-141563 | Draft TP on eIMTA for TS 36.300 | other | NSN, Nokia, CATT | R1-76 | - | [WTS] [JSN] | |||
| R1-141564 | Discussion on D2DSS design | other | Broadcom Corporation | R1-76 | - | [WTS] [JSN] | |||
| R1-141565 | CQI table and feedback design for 256 QAM | other | Broadcom Corporation | R1-76 | - | [WTS] [JSN] | |||
| R1-141566 | On forward compatibility of Rel-12 low complexity MTC specification | other | Sony | R1-76 | - | [WTS] [JSN] | |||
| R1-141567 | Views on PDSCH buffering options for low-complexity MTC UEs | other | Sony | R1-76 | - | [WTS] [JSN] | |||
| R1-141568 | Support for contiguous and non-contiguous resource allocation for low-complexity MTC UEs | other | Sony | R1-76 | - | [WTS] [JSN] | |||
| R1-141569 | On reduced baseband bandwidth support of low-complexity MTC UEs | other | Sony | R1-76 | - | [WTS] [JSN] | |||
| R1-141570 | Discussion on small cell discovery signal design | other | Sony | R1-76 | - | [WTS] [JSN] | |||
| R1-141571 | D2D Resource Pool and Scheduling Assignments | other | Sony | R1-76 | - | [WTS] [JSN] | |||
| R1-141572 | D2D Resource Allocation Mode Selection | other | Sony | R1-76 | - | [WTS] [JSN] | |||
| R1-141573 | Synchronization design for D2D discovery and communication | other | Sony | R1-76 | - | [WTS] [JSN] | |||
| R1-141574 | UE measurement based on discover signal | other | ASUSTeK | R1-76 | - | [WTS] [JSN] | |||
| R1-141575 | UL Power Control for Simultaneous UCI Transmission | other | ASUSTeK | R1-76 | - | [WTS] [JSN] | |||
| R1-141576 | D2D communication resource scheduling | other | ASUSTeK | R1-76 | - | [WTS] [JSN] | |||
| R1-141577 | Resource allocation/utilization for type-1 discovery | other | ASUSTeK | R1-76 | - | [WTS] [JSN] | |||
| R1-141578 | Consideration on Remaining Issue to Configure 256 QAM | other | BlackBerry UK Limited | R1-76 | - | [WTS] [JSN] | |||
| R1-141579 | New UE Category to Support 256 QAM | other | BlackBerry UK Limited | R1-76 | - | [WTS] [JSN] | |||
| R1-141580 | UL Power Control for Dual Connectivity | other | BlackBerry UK Limited | R1-76 | - | [WTS] [JSN] | |||
| R1-141581 | Discussion on PUCCH reporting payload size | other | Huawei, HiSilicon | R1-76 | - | [WTS] [JSN] | |||
| R1-141582 | Correction on PUCCH reporting payload size | other | Huawei, HiSilicon | R1-76 | - | [WTS] [JSN] | |||
| R1-141583 | Discussion on remaining details for CSI feedback for eIMTA | other | Huawei, HiSilicon | R1-76 | - | [WTS] [JSN] | |||
| R1-141584 | Remaining issues for HARQ-ACK feedback on PUCCH | other | Huawei, HiSilicon | R1-76 | - | [WTS] [JSN] | |||
| R1-141585 | HARQ-ACK feedback bits on PUSCH for eIMTA | other | Huawei, HiSilicon | R1-76 | - | [WTS] [JSN] | |||
| R1-141586 | Support of TDD as Primary Cell for TDD-FDD CA in Rel-12 | other | Huawei, HiSilicon | R1-76 | - | [WTS] [JSN] | |||
| R1-141587 | Other aspects related to small cell on/off and discovery | other | Huawei, HiSilicon | R1-76 | - | [WTS] [JSN] | |||
| R1-141588 | New L1 procedure for small cell on/off transition time further reduction | other | Huawei, HiSilicon | R1-76 | - | [WTS] [JSN] | |||
| R1-141589 | Mechanisms for energy-efficient small cell discovery and measurements | other | Huawei, HiSilicon | R1-76 | - | [WTS] [JSN] | |||
| R1-141590 | Discussion on network listening for intra/inter-operator deployment | other | Huawei, HiSilicon, CATR | R1-76 | - | [WTS] [JSN] | |||
| R1-141591 | Co-existence of Normal CP OFDM symbol and Extended CP OFDM symbol in D2D communication/discovery | other | Huawei, HiSilicon | R1-76 | - | [WTS] [JSN] | |||
| R1-141592 | Control information for D2D communication | other | Huawei, HiSilicon | R1-76 | - | [WTS] [JSN] | |||
| R1-141593 | Consideration on Mode 2 resource allocation | other | Huawei, HiSilicon | R1-76 | - | [WTS] [JSN] | |||
| R1-141594 | Views on resource allocation for D2D synchronization signals | other | Huawei, HiSilicon | R1-76 | - | [WTS] [JSN] | |||
| R1-141595 | Design considerations for D2DSS | other | Huawei, HiSilicon | R1-76 | - | [WTS] [JSN] | |||
| R1-141596 | Timing signaling for D2D communication | other | Huawei, HiSilicon | R1-76 | - | [WTS] [JSN] | |||
| R1-141597 | Impact of D2D on cellular | other | Huawei, HiSilicon | R1-76 | - | [WTS] [JSN] | |||
| R1-141598 | Discussion on network assistance signalling parameters | other | Huawei, HiSilicon | R1-76 | - | [WTS] [JSN] | |||
| R1-141599 | Consideration onf higher layer signalling of NAIC | other | CATR | R1-76 | - | [WTS] [JSN] | |||
| R1-141600 | Evaluation on D2D distributed resource allocation for discovery | other | CATR | R1-76 | - | [WTS] [JSN] | |||
| R1-141601 | On control information of D2D communication | other | CATR | R1-76 | - | [WTS] [JSN] | |||
| R1-141602 | Remaining details of HARQ self-scheduling for TDD-FDD CA | other | Texas Instruments | R1-76 | - | [WTS] [JSN] | |||
| R1-141603 | Procedures for small cell on/off transition time reduction | other | Texas Instruments | R1-76 | - | [WTS] [JSN] | |||
| R1-141604 | UL Power Control Considerations for Dual Connectivity | other | Texas Instruments | R1-76 | - | [WTS] [JSN] | |||
| R1-141605 | On signalling for CoMP with non-ideal backhaul | other | Texas Instruments | R1-76 | - | [WTS] [JSN] | |||
| R1-141606 | Remaining details of low complexity MTC UE | other | Motorola Mobility | R1-76 | - | [WTS] [JSN] | |||
| R1-141607 | MCS and TBS signaling for support of 256-QAM | other | Motorola Mobility | R1-76 | - | [WTS] [JSN] | |||
| R1-141608 | UE category in support of 256-QAM | other | Motorola Mobility | R1-76 | - | [WTS] [JSN] | |||
| R1-141609 | Further discussion on procedures for small cell on/off | other | Motorola Mobility | R1-76 | - | [WTS] [JSN] | |||
| R1-141610 | Discussion on supporting of TDD Pcell and DL HARQ timing for TDD Pcell | other | CMCC | R1-76 | - | [WTS] [JSN] | |||
| R1-141611 | Configuration and MCS table design for higher order modulation | other | CMCC | R1-76 | - | [WTS] [JSN] | |||
| R1-141612 | Considerations on UE category supporting 256QAM | other | CMCC | R1-76 | - | [WTS] [JSN] | |||
| R1-141613 | Discussion on small cell architectures and procedures for small cell on/off and discovery | other | CMCC | R1-76 | - | [WTS] [JSN] | |||
| R1-141614 | Discussion on discovery signal design | other | CMCC | R1-76 | - | [WTS] [JSN] | |||
| R1-141615 | Radio-interface based synchronization for intra-operator small cells | other | CMCC | R1-76 | - | [WTS] [JSN] | |||
| R1-141616 | Discussion on radio interface based inter-operator synchronization | other | CMCC | R1-76 | - | [WTS] [JSN] | |||
| R1-141617 | Backhaul signaling for CoMP-NIB operation | other | CMCC | R1-76 | - | [WTS] [JSN] | |||
| R1-141618 | Performance analysis of coordination based on RSRP | other | CMCC | R1-76 | - | [WTS] [JSN] | |||
| R1-141619 | CSI enhancement for NAICS receivers | other | CMCC | R1-76 | - | [WTS] [JSN] | |||
| R1-141620 | Discussion on Aperiodic CSI in TM1-9 for eIMTA^^ | other | Potevio | R1-76 | - | [WTS] [JSN] | |||
| R1-141621 | Discussion on self-scheduling PDSCH timing in TDD-FDD CA | other | Potevio | R1-76 | - | [WTS] [JSN] | |||
| R1-141622 | Discussion on multiplexing D2D and cellular signal | other | Potevio | R1-76 | - | [WTS] [JSN] | |||
| R1-141623 | Impact of D2D on cellular traffic - Necessary further evaluations | other | Orange | R1-76 | - | [WTS] [JSN] | |||
| R1-141624 | Design impact of PDCCH and PDSCH scheduling of Rel-12 low complexity MTC UEs | other | Vodafone | R1-76 | - | [WTS] [JSN] | |||
| R1-141625 | Signaling of SRS scheduling for “CoMP Hypothesis” | other | IAESI, DAC-UPC | R1-76 | - | [WTS] [JSN] | |||
| R1-141626 | DL HARQ timing for self-scheduling in case of TDD PCell | other | KT Corp. | R1-76 | - | [WTS] [JSN] | |||
| R1-141627 | Design of CQI/MCS/TBS table for 256QAM | other | KT Corp. | R1-76 | - | [WTS] [JSN] | |||
| R1-141628 | Aperiodic CSI reporting for eIMTA | other | Ericsson | R1-76 | - | [WTS] [JSN] | |||
| R1-141629 | Remaining issues on CSI feedback for eIMTA | other | Ericsson | R1-76 | - | [WTS] [JSN] | |||
| R1-141630 | On the need of new RRC parameters for eIMTA | other | Ericsson | R1-76 | - | [WTS] [JSN] | |||
| R1-141631 | Half duplex FDD for low cost MTC UE | other | Ericsson | R1-76 | - | [WTS] [JSN] | |||
| R1-141632 | Impacts of PRB restriction for low cost MTC UE | other | Ericsson | R1-76 | - | [WTS] [JSN] | |||
| R1-141633 | Resource allocation for low cost MTC UE | other | Ericsson | R1-76 | - | [WTS] [JSN] | |||
| R1-141634 | Views on HARQ timing for TDD Pcell | other | Ericsson | R1-76 | - | [WTS] [JSN] | |||
| R1-141635 | Gray mapping for 256QAM | other | Ericsson | R1-76 | - | [WTS] [JSN] | |||
| R1-141636 | CQI and MCS table design for downlink 256QAM | other | Ericsson | R1-76 | - | [WTS] [JSN] | |||
| R1-141637 | TBS table design for downlink 256QAM | other | Ericsson | R1-76 | - | [WTS] [JSN] | |||
| R1-141638 | On 256QAM UE category handling | other | Ericsson | R1-76 | - | [WTS] [JSN] | |||
| R1-141639 | 256QAM configuration and signaling | other | Ericsson | R1-76 | - | [WTS] [JSN] | |||
| R1-141640 | On transition time reduction for small cell on/off | other | Ericsson | R1-76 | - | [WTS] [JSN] | |||
| R1-141641 | Performance of small cell on/off with different transition times | other | Ericsson | R1-76 | - | [WTS] [JSN] | |||
| R1-141642 | Design of discovery bursts and procedures | other | Ericsson | R1-76 | - | [WTS] [JSN] | |||
| R1-141643 | Performance of discovery burst options | other | Ericsson | R1-76 | - | [WTS] [JSN] | |||
| R1-141644 | Scenarios and solutions for radio-interface based synchronization | other | Ericsson | R1-76 | - | [WTS] [JSN] | |||
| R1-141645 | UL Power control in dual connectivity | other | Ericsson | R1-76 | - | [WTS] [JSN] | |||
| R1-141646 | UE Capability in Dual Connectivity | other | Ericsson | R1-76 | - | [WTS] [JSN] | |||
| R1-141647 | Power headroom reporting for dual connectivity | other | Ericsson | R1-76 | - | [WTS] [JSN] | |||
| R1-141648 | Simultaneous Rx/Tx support for dual connectivity | other | Ericsson | R1-76 | - | [WTS] [JSN] | |||
| R1-141649 | Signaling for Inter-eNB Operation of CoMP | other | Ericsson | R1-76 | - | [WTS] [JSN] | |||
| R1-141650 | Draft CR to 36.211 (Rel-12) | other | Ericsson | R1-76 | - | [WTS] [JSN] | |||
| R1-141651 | ProSe device-to-device discovery link performance | other | General Dynamics | R1-76 | - | [WTS] [JSN] | |||
| R1-141652 | ProSe device-to-device synchronisation signal and channel design | other | General Dynamics | R1-76 | - | [WTS] [JSN] | |||
| R1-141653 | Scenarios and higher-layer signaling for NAICS | other | Ericsson | R1-76 | - | [WTS] [JSN] | |||
| R1-141654 | 4 Tx Antenna Support for NAICS | other | Ericsson | R1-76 | - | [WTS] [JSN] | |||
| R1-141655 | Higher Layer Signaling of TM10 DMRS Properties for NAICS | other | Ericsson | R1-76 | - | [WTS] [JSN] | |||
| R1-141656 | On CSI enhancements for NAICS | other | Ericsson | R1-76 | - | [WTS] [JSN] | |||
| R1-141657 | Compressed mode for enhanced DCH | other | NSN | R1-76 | - | [WTS] [JSN] | |||
| R1-141658 | Analysis on the Solutions for HS-DPCCH Reception Reliability Issue in HetNet | other | NSN | R1-76 | - | [WTS] [JSN] | |||
| R1-141659 | HARQ Solutions for TDM operation | other | NSN | R1-76 | - | [WTS] [JSN] | |||
| R1-141660 | Solution for improved grant handling for TDM operation | other | NSN, Huawei | R1-76 | - | [WTS] [JSN] | |||
| R1-141661 | LLS results for DTX Power Control with Long DTX Cycles | other | NSN | R1-76 | - | [WTS] [JSN] | |||
| R1-141662 | On HS-DPCCH overhead reduction | other | NSN | R1-76 | - | [WTS] [JSN] | |||
| R1-141663 | Link level simulation results for different transport block options for the secondary BCH channel | other | NSN | R1-76 | - | [WTS] [JSN] | |||
| R1-141664 | Achieving coverage with soft combining for BCH2 | other | NSN | R1-76 | - | [WTS] [JSN] | |||
| R1-141665 | PRACH preamble analysis for S-UMTS | other | NSN | R1-76 | - | [WTS] [JSN] | |||
| R1-141666 | On DL processing of AICH, PICH and multiantenna techniques for S-UMTS | other | NSN | R1-76 | - | [WTS] [JSN] | |||
| R1-141667 | SCH for S-UMTS | other | NSN | R1-76 | - | [WTS] [JSN] | |||
| R1-141668 | Consideration on UL ACK for DL Frame Early Termination | other | Huawei, HiSilicon | R1-76 | - | [WTS] [JSN] | |||
| R1-141669 | Evaluation of HS-DPCCH solutions | other | Huawei, HiSilicon | R1-76 | - | [WTS] [JSN] | |||
| R1-141670 | Impact on specifications of HS-DPCCH solutions | other | Huawei, HiSilicon | R1-76 | - | [WTS] [JSN] | |||
| R1-141671 | Discussion on solutions to mitigate interference from non-SHO users | other | Huawei, HiSilicon | R1-76 | - | [WTS] [JSN] | |||
| R1-141672 | Consideration on CIO adaptation | other | Huawei, HiSilicon | R1-76 | - | [WTS] [JSN] | |||
| R1-141673 | Further considerations on DTX enhancements | other | Huawei, HiSilicon | R1-76 | - | [WTS] [JSN] | |||
| R1-141674 | Further considerations on DRX enhancements | other | Huawei, HiSilicon | R1-76 | - | [WTS] [JSN] | |||
| R1-141675 | Considerations on transmitting F-DPCH for the secondary carrier on the primary carrier | other | Huawei, HiSilicon | R1-76 | - | [WTS] [JSN] | |||
| R1-141676 | Solutions for HS-DPCCH overhead reduction to improve capacity and coverage | other | Huawei, HiSilicon | R1-76 | - | [WTS] [JSN] | |||
| R1-141677 | Way Forward on HS-DPCCH Overhead reduction for multi-RAB scenario | other | Huawei, HiSilicon, China Unicom | R1-76 | - | [WTS] [JSN] | |||
| R1-141678 | RAN1 Specification Impact for the introduction of HS-DPCCH overhead reduction | other | Huawei, HiSilicon | R1-76 | - | [WTS] [JSN] | |||
| R1-141679 | Considerations on S-CCPCH design carrying BCH2 | other | Huawei, HiSilicon | R1-76 | - | [WTS] [JSN] | |||
| R1-141680 | Uplink performance for F-UMTS | other | Huawei,HiSilicon | R1-76 | - | [WTS] [JSN] | |||
| R1-141681 | PRACH design for F-UMTS | other | Huawei,HiSilicon | R1-76 | - | [WTS] [JSN] | |||
| R1-141682 | Design for cross carrier scheduling for F-UMTS carrier aggregation | other | Huawei,HiSilicon | R1-76 | - | [WTS] [JSN] | |||
| R1-141683 | On the need of introducing cross carrier scheduling for F-UMTS carrier aggregation | other | Huawei,HiSilicon | R1-76 | - | [WTS] [JSN] | |||
| R1-141684 | Further considerations on enhancement to uplink power control algorithm 2 to reduce power consumption of DL TPC commands | other | Huawei, HiSilicon | R1-76 | - | [WTS] [JSN] | |||
| R1-141685 | On Scheduling Assignment Message Design | other | CEWiT | R1-76 | - | [WTS] [JSN] | |||
| R1-141686 | Transition Time Reduction for Small Cell On/Off | other | CEWiT | R1-76 | - | [WTS] [JSN] | |||
| R1-141687 | On Reliability of Uplink Control Channels in Heterogeneous Network Deployments | other | Ericsson | R1-76 | - | [WTS] [JSN] | |||
| R1-141688 | HS-DPCCH Performance with Secondary Pilot – System Level Results | other | Ericsson | R1-76 | - | [WTS] [JSN] | |||
| R1-141689 | E-DPCCH Performance with Secondary Pilot – Link Level Results | other | Ericsson | R1-76 | - | [WTS] [JSN] | |||
| R1-141690 | On the DTX Parameterization for Secondary Carriers | other | Ericsson | R1-76 | - | [WTS] [JSN] | |||
| R1-141691 | On Increasing the DRX Cycle for Single and Multicarriers | other | Ericsson | R1-76 | - | [WTS] [JSN] | |||
| R1-141692 | Comparative Analysis of TDM Scheduler Schemes for Secondary Carriers | other | Ericsson | R1-76 | - | [WTS] [JSN] | |||
| R1-141693 | On Improving the Power Control for Secondary Carrier after Transmission Gap | other | Ericsson | R1-76 | - | [WTS] [JSN] | |||
| R1-141694 | HS-DPCCH Overhead Reduction for Multi-RAB Coverage Improvement | other | Ericsson | R1-76 | - | [WTS] [JSN] | |||
| R1-141695 | CR on the HS-SCCH Order to Inform the UE to Perform the TTI Switch | other | Ericsson | R1-76 | - | [WTS] [JSN] | |||
| R1-141696 | BCH Enhancements - Detailed Design of BCH2 Mapping to S-CCPCH | other | Ericsson | R1-76 | - | [WTS] [JSN] | |||
| R1-141697 | Scalable UMTS – Uplink Aspects | other | Ericsson | R1-76 | - | [WTS] [JSN] | |||
| R1-141698 | Scalable UMTS – Text Proposal on Uplink Signal Characteristics | other | Ericsson | R1-76 | - | [WTS] [JSN] | |||
| R1-141699 | Draft Rel-12 CR on antenna port definitions | other | Qualcomm Inc., Panasonic | R1-76 | - | [WTS] [JSN] | |||
| R1-141700 | Mechanisms for UL 10ms/20ms TTI switching | other | Qualcomm Incorporated | R1-76 | - | [WTS] [JSN] | |||
| R1-141701 | Design of UL DPCCH ACK channel for DL FET | other | Qualcomm Incorporated | R1-76 | - | [WTS] [JSN] | |||
| R1-141702 | Compressed Mode Aspects of DCH Enhancements | other | Qualcomm Incorporated | R1-76 | - | [WTS] [JSN] | |||
| R1-141703 | UE capabilities and sub-feature dependencies for DCH enhancements | other | Qualcomm Incorporated | R1-76 | - | [WTS] [JSN] | |||
| R1-141704 | DCH Enhancements and CPC | other | Qualcomm Incorporated | R1-76 | - | [WTS] [JSN] | |||
| R1-141705 | Remaining Aspects of DCH Enhancements | other | Qualcomm Incorporated | R1-76 | - | [WTS] [JSN] | |||
| R1-141706 | 25.211 DRAFT CR (Rel-12, B) Introduction of DCH Enhancements | other | Qualcomm Incorporated | R1-76 | - | [WTS] [JSN] | |||
| R1-141707 | 25.212 DRAFT CR (Rel-12, B) Introduction of DCH Enhancements | other | Qualcomm Incorporated | R1-76 | - | [WTS] [JSN] | |||
| R1-141708 | 25.213 DRAFT CR (Rel-12, B) Introduction of DCH Enhancements | other | Qualcomm Incorporated | R1-76 | - | [WTS] [JSN] | |||
| R1-141709 | 25.214 DRAFT CR (Rel-12, B) Introduction of DCH Enhancements | other | Qualcomm Incorporated | R1-76 | - | [WTS] [JSN] | |||
| R1-141710 | 25.300 DRAFT CR (Rel-12, B) Introduction of DCH Enhancements | other | Qualcomm Incorporated | R1-76 | - | [WTS] [JSN] | |||
| R1-141711 | Lab Results on E-DCH Decoupling | other | Qualcomm Incorporated | R1-76 | - | [WTS] [JSN] | |||
| R1-141712 | Configuration of CIO based on UE receiver capability | other | Qualcomm Incorporated | R1-76 | - | [WTS] [JSN] | |||
| R1-141713 | Details of DTX/DRX Improvements | other | Qualcomm Incorporated | R1-76 | - | [WTS] [JSN] | |||
| R1-141714 | Power Control Performance due to Long DTX/DRX Cycles | other | Qualcomm Incorporated | R1-76 | - | [WTS] [JSN] | |||
| R1-141715 | HS-DPCCH Overhead Reduction | other | Qualcomm Incorporated | R1-76 | - | [WTS] [JSN] | |||
| R1-141716 | Design Aspects of BCH2 Channel | other | Qualcomm Incorporated | R1-76 | - | [WTS] [JSN] | |||
| R1-141717 | On cross carrier scheduling for S-UMTS carrier aggregation | other | NSN | R1-76 | - | [WTS] [JSN] | |||
| R1-141718 | On standard impacts of 256QAM in downlink | other | ZTE | R1-76 | - | [WTS] [JSN] | |||
| R1-141719 | Discussion on discovery signal design | other | CMCC | R1-76 | - | [WTS] [JSN] | |||
| R1-141720 | Discussion on the open issues of small cell discovery | other | Coolpad | R1-76 | - | [WTS] [JSN] | |||
| R1-141721 | Considerations D2D Synchronization | other | Coolpad | R1-76 | - | [WTS] [JSN] | |||
| R1-141722 | Solution for improved grant handling for TDM operation | other | NSN, Huawei | R1-76 | - | [WTS] [JSN] | |||
| R1-141723 | Multi-hop Synchronization Procedure | other | ZTE | R1-76 | - | [WTS] [JSN] | |||
| R1-141724 | BCH Enhancements – Turbo Coding vs Convolutional Coding | other | Ericsson | R1-76 | - | [WTS] [JSN] | |||
| R1-141725 | Signalling details and procedures supporting eCoMP | other | Alcatel-Lucent Shanghai Bell, Alcatel-Lucent | R1-76 | - | [WTS] [JSN] | |||
| R1-141726 | Draft CR to 36.212 (Rel-12) | other | Huawei | R1-76 | - | [WTS] [JSN] | |||
| R1-141727 | Signal Design for D2D Discovery and Broadcast | other | Qualcomm Inc. | R1-76 | - | [WTS] [JSN] | |||
| R1-141728 | Design of CQI/MCS/TBS table for 256QAM | other | KT Corp. | R1-76 | - | [WTS] [JSN] | |||
| R1-141729 | Evaluation on D2D distributed resource allocation for discovery | other | CATR | R1-76 | - | [WTS] [JSN] | |||
| R1-141730 | Final Report of RAN1#76 meeting | other | MCC | R1-76 | - | [WTS] [JSN] | |||
| R1-141731 | Small cell On/off procedures | other | Broadcom Corporation | R1-76 | - | [WTS] [JSN] | |||
| R1-141732 | 25.211 DRAFT CR (Rel-12, B) Introduction of DCH Enhancements | other | Qualcomm Incorporated | R1-76 | - | [WTS] [JSN] | |||
| R1-141733 | 25.212 DRAFT CR (Rel-12, B) Introduction of DCH Enhancements | other | Qualcomm Incorporated | R1-76 | - | [WTS] [JSN] | |||
| R1-141734 | 25.214 DRAFT CR (Rel-12, B) Introduction of DCH Enhancements | other | Qualcomm Incorporated | R1-76 | - | [WTS] [JSN] | |||
| R1-141735 | Resource allocation for D2D discovery | other | Qualcomm Inc. | R1-76 | - | [WTS] [JSN] | |||
| R1-141736 | Draft CR to 36.213 (Rel-12) | other | Motorola Mobility | R1-76 | - | [WTS] [JSN] | |||
| R1-141737 | UL power control and power scaling for dual connectivity | other | Alcatel-Lucent Shanghai Bell, Alcatel-Lucent | R1-76 | - | [WTS] [JSN] | |||
| R1-141738 | Discussion on D2D discovery physical layer design | other | LG Electronics | R1-76 | - | [WTS] [JSN] | |||
| R1-141739 | RAN1 excel sheet draft on LTE Rel-12 UE capabilities | other | NTT DoCoMo | R1-76 | - | [WTS] [JSN] | |||
| R1-141740 | 36.212 CR0156 (Rel-12, F) Clarification on UE port based CRC masking | CR | Qualcomm | R1-76 | - | [WTS] [JSN] | |||
| R1-141741 | WF on power control for Dual Connectivity | other | LGE, Fujitsu, NEC | R1-76 | - | [WTS] [JSN] | |||
| R1-141742 | WF on D2D Coverage Definitions | other | Ericsson, Huawei, HiSilicon, ZTE | R1-76 | - | [WTS] [JSN] | |||
| R1-141743 | WF on Definition on In-Coverage, Edge-of-Cell Coverage and Out-of-Coverage | other | ITRI, KDDI, Alcatel-Lucent Shanghai Bell, Alcatel-Lucent | R1-76 | - | [WTS] [JSN] | |||
| R1-141744 | WF on Type 2B discovery resource allocation | other | NTT DOCOMO, Ericsson, ZTE, Samsung, Intel, CATT, ITRI | R1-76 | - | [WTS] [JSN] | |||
| R1-141745 | WF on HARQ timing for TDD-FDD CA | other | LG, NTT, NTT DOCOMO, Ericsson, ETRI, KDDI, Samsung, Sharp, NEC, Nokia, NSN, Hitachi, KT Corp., Orange, Telefonica, ZTE, Texas Instruments, Inter Digital, NVIDIA, Telecom Italia, LG Uplus, Vodafone | R1-76 | - | [WTS] [JSN] | |||
| R1-141746 | WF on D2D and Cellular Coexistence | other | Ericsson, Orange, Telecom Italia, Huawei | R1-76 | - | [WTS] [JSN] | |||
| R1-141747 | Collision avoidance mechanism for D2D broadcast communication | other | Samsung | R1-76 | - | [WTS] [JSN] | |||
| R1-141748 | Summary of offline discussion on low complexity MTC UE | other | Vodafone | R1-76 | - | [WTS] [JSN] | |||
| R1-141749 | On Type 2 D2D Discovery Resource Allocation | other | Intel Corporation | R1-76 | - | [WTS] [JSN] | |||
| R1-141750 | WF on WAN protection | other | LG Electronics, NTT Docomo, Samsung, Huawei, HiSilicon, KDDI | R1-76 | - | [WTS] [JSN] | |||
| R1-141751 | WF on multiplexing D2D transmission and reception | other | LG Electronics, Potevio, ETRI | R1-76 | - | [WTS] [JSN] | |||
| R1-141752 | WF on D2D Multicarrier UE Capabilities Assumptions | other | Ericsson, ALU, ASB, ITRI, Panasonic, IDCC | R1-76 | - | [WTS] [JSN] | |||
| R1-141753 | WF on D2D CP length configuration | other | Huawei, HiSilicon, Ericsson, Fujitsu, General Dynamics, LGE, Potevio, Qualcomm, Blackberry, Samsung | R1-76 | - | [WTS] [JSN] | |||
| R1-141754 | WF on eNB (Mode 1) resource allocation for communication | other | Qualcomm Incorporated, LG, ZTE, III, General Dynamics | R1-76 | - | [WTS] [JSN] | |||
| R1-141755 | LS on Enhanced BCH parameters | LS out | RAN1, Ericsson | R1-76 | - | [WTS] [JSN] | |||
| R1-141756 | LS on Further EUL Enhancements | LS out | RAN1, Ericsson | R1-76 | - | [WTS] [JSN] | |||
| R1-141757 | LS on RAN1 Decisions for Enhanced DCH Work Item | LS out | RAN1, Qualcomm | R1-76 | - | [WTS] [JSN] | |||
| R1-141758 | [DRAFT] LS on Progress in RAN1 #76bis for the UMTS Heterogeneous Networks WI | other | Huawei | R1-76 | - | [WTS] [JSN] | |||
| R1-141759 | Chairpersons’ summary of the UMTS sessions | other | UMTS Session Chairpersons (Karri Ranta-aho, NSN, Carmela Cozzo, Huawei, Matthew Baker, Alcatel-Lucent) | R1-76 | - | [WTS] [JSN] | |||
| R1-141760 | Way Forward on Aspects of DCH Enhancements | other | Qualcomm, MediaTek | R1-76 | - | [WTS] [JSN] | |||
| R1-141761 | LS on Progress in RAN1 #76bis for the UMTS Heterogeneous Networks WI | LS out | RAN1, Huawei | R1-76 | - | [WTS] [JSN] | |||
| R1-141762 | Evaluation scenarios for Further EUL Enhancements | other | Ericsson | R1-76 | - | [WTS] [JSN] | |||
| R1-141763 | void | other | R1-76 | - | [WTS] [JSN] | ||||
| R1-141764 | void | other | R1-76 | - | [WTS] [JSN] | ||||
| R1-141765 | void | other | R1-76 | - | [WTS] [JSN] | ||||
| R1-141766 | void | other | R1-76 | - | [WTS] [JSN] | ||||
| R1-141767 | void | other | R1-76 | - | [WTS] [JSN] | ||||
| R1-141768 | void | other | R1-76 | - | [WTS] [JSN] | ||||
| R1-141769 | void | other | R1-76 | - | [WTS] [JSN] | ||||
| R1-141770 | void | other | R1-76 | - | [WTS] [JSN] | ||||
| R1-141771 | void | other | R1-76 | - | [WTS] [JSN] | ||||
| R1-141772 | void | other | R1-76 | - | [WTS] [JSN] | ||||
| R1-141773 | void | other | R1-76 | - | [WTS] [JSN] | ||||
| R1-141774 | void | other | R1-76 | - | [WTS] [JSN] | ||||
| R1-141775 | void | other | R1-76 | - | [WTS] [JSN] | ||||
| R1-141776 | void | other | R1-76 | - | [WTS] [JSN] | ||||
| R1-141777 | void | other | R1-76 | - | [WTS] [JSN] | ||||
| R1-141778 | void | other | R1-76 | - | [WTS] [JSN] | ||||
| R1-141779 | void | other | R1-76 | - | [WTS] [JSN] | ||||
| R1-141780 | void | other | R1-76 | - | [WTS] [JSN] | ||||
| R1-141781 | void | other | R1-76 | - | [WTS] [JSN] | ||||
| R1-141782 | void | other | R1-76 | - | [WTS] [JSN] | ||||
| R1-141783 | void | other | R1-76 | - | [WTS] [JSN] | ||||
| R1-141784 | void | other | R1-76 | - | [WTS] [JSN] | ||||
| R1-141785 | Way Forward on TDD-FDD CA with TDD Pcell | other | Huawei, HiSilicon, CATT, CMCC | R1-76 | - | [WTS] [JSN] | |||
| R1-141786 | WF on MCS indexing for 256QAM Modulation and TBS index table | other | Intel Corporation, Motorola Mobility, CATT, Samsung | R1-76 | - | [WTS] [JSN] | |||
| R1-141787 | WF on SA Resource Allocation | other | Qualcomm Incorporated, Kyocera, III, General Dynamics, ZTE | R1-76 | - | [WTS] [JSN] | |||
| R1-141788 | WF on D2D synchronization signal format | other | LG Electronics, Qualcomm, CATT | R1-76 | - | [WTS] [JSN] | |||
| R1-141789 | WF on PD2DSCH | other | LG Electronics, Qualcomm, CATT, InterDigital | R1-76 | - | [WTS] [JSN] | |||
| R1-141790 | Signaling for Inter-eNB Operation of CoMP | other | Ericsson | R1-76 | - | [WTS] [JSN] | |||
| R1-141791 | WF on Type 2B discovery resource allocation | other | NTT DOCOMO, Ericsson, ZTE, Samsung, Intel, CATT, ITRI | R1-76 | - | [WTS] [JSN] | |||
| R1-141792 | WF on 256QAM configuration | other | LG Electronics, Fujitsu, [RIM], Qualcomm, Alcatel-Lucent, Hitachi, Huawei, HiSilicon, Samsung, Broadcom, Panasonic, InterDigital | R1-76 | - | [WTS] [JSN] | |||
| R1-141793 | [Draft] LS on remaining open RAN1 TDD-FDD CA issues | other | Nokia | R1-76 | - | [WTS] [JSN] | |||
| R1-141794 | WF on Type 1 Discovery and WAN Coexistence | other | Qualcomm Incorporated, ZTE, Huawei, HiSilicon, Fujistu, III | R1-76 | - | [WTS] [JSN] | |||
| R1-141795 | WF on Time Randomization for D2D Transmissions | other | Qualcomm Incorporated, CATT, Ericsson, ALU, ASB, InterDigital | R1-76 | - | [WTS] [JSN] | |||
| R1-141796 | WF on 256QAM UE Category handling | other | Ericsson, CMCC, CATR, Huawei, HiSilicon, Samsung, Blackberry, Fujitsu | R1-76 | - | [WTS] [JSN] | |||
| R1-141797 | WF on 256QAM table design | other | Huawei, HiSilicon, CATR, LGE, Fujitsu, Ericsson, Broadcom, Blackberry, InterDigital, Samsung, CMCC | R1-76 | - | [WTS] [JSN] | |||
| R1-141798 | Resource allocation for synchronization signals enabling inter-cluster synchronization | other | Samsung | R1-76 | - | [WTS] [JSN] | |||
| R1-141799 | Synchronization signal design for inter-cluster synchronization | other | Samsung | R1-76 | - | [WTS] [JSN] | |||
| R1-141800 | Discussions on UE Categories with introduction of 256 QAM | other | Broadcom Corporation | R1-76 | - | [WTS] [JSN] | |||
| R1-141801 | Way Forward on RIBS | other | ZTE, Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, CATT, CHTTL, Ericsson, FiberHome, ITRI, NSN, Samsung | R1-76 | - | [WTS] [JSN] | |||
| R1-141802 | WF on Content of Scheduling Assignment | other | Qualcomm Incorporated, III, CATT, General Dynamics | R1-76 | - | [WTS] [JSN] | |||
| R1-141803 | WF on 256QAM configuration | other | LG Electronics, Fujitsu, Blackberry, Qualcomm, Hitachi, Huawei, HiSilicon, Samsung, Broadcom, Panasonic, InterDigital | R1-76 | - | [WTS] [JSN] | |||
| R1-141804 | WF on Synchronization Procedure | other | Qualcomm Incorporated, LG, III, General Dynamics, CATT, Fujistu | R1-76 | - | [WTS] [JSN] | |||
| R1-141805 | WF on multi-hop for synchronization | other | ZTE, ALU, ASB, Qualcomm | R1-76 | - | [WTS] [JSN] | |||
| R1-141806 | Further evaluation results for inter-eNB CoMP | other | Samsung | R1-76 | - | [WTS] [JSN] | |||
| R1-141807 | WF on CoMP-NIB signalling | other | NSN, Nokia, Ericsson, Hitachi | R1-76 | - | [WTS] [JSN] | |||
| R1-141808 | WF on 256QAM UE Category handling | other | Ericsson, CMCC, CATR, Huawei, HiSilicon, Samsung, Blackberry, Fujitsu, III, FiberHome, CATT | R1-76 | - | [WTS] [JSN] | |||
| R1-141809 | WF on Inter-eNB CoMP for LTE | other | Samsung,Alcatel-Lucent,Alcatel-LucentShanghaiBell,AT&T,CATR,ChinaTelecom,ChinaUnicom,CHTTL,CMCC,DeutscheTelekom,ETRI,KDDI,KTCorp,LGElectronics,LGUplus,NewPostcom, NEC, NTTDOCOMO,Potevio,Qualcomm, SKTelecom,TelecomItalia,ZTE | R1-76 | - | [WTS] [JSN] | |||
| R1-141810 | [draft] LS on Inter-eNB CoMP for LTE | other | Samsung | R1-76 | - | [WTS] [JSN] | |||
| R1-141811 | WF on D2D Discovery Preamble | other | ITRI, ALU, ASB, LG Electronics, III, Nokia, NSN, Broadcom, Fujitsu | R1-76 | - | [WTS] [JSN] | |||
| R1-141812 | Draft LS on identifier in scheduling assignment for D2D communication | other | Qualcomm | R1-76 | - | [WTS] [JSN] | |||
| R1-141813 | LS on identifier in scheduling assignment for D2D communication | LS out | RAN1, Qualcomm | R1-76 | - | [WTS] [JSN] | |||
| R1-141814 | WF on D2D Synchronization Source | other | Qualcomm Incorporated, LG, III, Huawei, HiSilicon, General Dynamics, Kyocera | R1-76 | - | [WTS] [JSN] | |||
| R1-141815 | WF on D2D Synchronization Resources | other | Qualcomm Incorporated, LG, Kyocera, General Dynamics | R1-76 | - | [WTS] [JSN] | |||
| R1-141816 | LS on Inter-eNB CoMP for LTE | LS out | RAN1, Samsung | R1-76 | - | [WTS] [JSN] | |||
| R1-141817 | LS to RAN2 on Modes 1&2 | other | Ericsson | R1-76 | - | [WTS] [JSN] | |||
| R1-141818 | LS to RAN2 on D2D resource allocation Modes 1&2 | LS out | RAN1, Ericsson | R1-76 | - | [WTS] [JSN] | |||
| R1-141819 | WF on Distributed (Mode 2) resource allocation for communication | other | Qualcomm Incorporated, Kyocera, General Dynamics | R1-76 | - | [WTS] [JSN] | |||
| R1-141820 | Simulation assumptions for impact of D2D on WAN - agreements from [76b-11] | other | Qualcomm Incorporated (rapporteur) | R1-76 | - | [WTS] [JSN] | |||
| R1-141821 | void | other | R1-76 | - | [WTS] [JSN] | ||||
| R1-141822 | void | other | R1-76 | - | [WTS] [JSN] | ||||
| R1-141823 | void | other | R1-76 | - | [WTS] [JSN] | ||||
| R1-141824 | void | other | R1-76 | - | [WTS] [JSN] | ||||
| R1-141825 | Draft TP on eIMTA for TS 36.300 | other | NSN, Nokia, CATT | R1-76 | - | [WTS] [JSN] | |||
| R1-141826 | LS on TP on eIMTA for TS 36.300 | LS out | RAN1, NSN | R1-76 | - | [WTS] [JSN] | |||
| R1-141827 | LS on RAN1 TDD-FDD CA outcome | LS out | RAN1, Nokia | R1-76 | - | [WTS] [JSN] | |||
| R1-141828 | LS on updates of RRC parameters for LTE_TDD_eIMTA | LS out | RAN1, CATT | R1-76 | - | [WTS] [JSN] | |||
| R1-141829 | void | other | R1-76 | - | [WTS] [JSN] | ||||
| R1-141830 | void | other | R1-76 | - | [WTS] [JSN] | ||||
| R1-141831 | void | other | R1-76 | - | [WTS] [JSN] | ||||
| R1-141832 | void | other | R1-76 | - | [WTS] [JSN] | ||||
| R1-141833 | void | other | R1-76 | - | [WTS] [JSN] | ||||
| R1-141834 | void | other | R1-76 | - | [WTS] [JSN] | ||||
| R1-141835 | LS on parameter synchronization | other | SA3, Qualcomm | R1-76 | - | [WTS] [JSN] | |||
| R1-141836 | Inter-eNB CoMP signaling with non-ideal backhaul | other | LG Electronics | R1-76 | - | [WTS] [JSN] | |||
| R1-141837 | Summary of D2D ad-hoc session | other | Ericsson | R1-76 | - | [WTS] [JSN] | |||
| R1-141838 | On NAICS CSI feedback | other | NSN, Nokia | R1-76 | - | [WTS] [JSN] | |||
| R1-141839 | Way Forward on CSI process and CSI-IMR for TDD eIMTA | other | ZTE, Ericsson, Intel | R1-76 | - | [WTS] [JSN] | |||
| R1-141840 | WF on D2D Coverage Definitions | other | Ericsson, ALU, ASB, ITRI, Huawei, HiSilicon, Qualcomm, ZTE, LGE, USDoC, IDCC, GDB, DT | R1-76 | - | [WTS] [JSN] | |||
| R1-141841 | WF on CSI enhancement for NAICS | other | LG Electronics, Ericsson, Intel, NTT DoCoMo | R1-76 | - | [WTS] [JSN] | |||
| R1-141842 | Outcome of the offline discussion on eIMTA | other | CATT | R1-76 | - | [WTS] [JSN] | |||
| R1-141843 | WF on NAICS Functionality Definition | other | Ericsson, NSN, Nokia, CATT, Nvidia, Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | R1-76 | - | [WTS] [JSN] | |||
| R1-141844 | WF on NAICS Signaling for 4 CRS Ports | other | Ericsson, Sprint, NSN, Nokia, CATT, NTT DoCoMo | R1-76 | - | [WTS] [JSN] | |||
| R1-141845 | WF on CSI reference definition for eIMTA | other | LG Electronics, Ericsson, Samsung, CATT, Potevio | R1-76 | - | [WTS] [JSN] | |||
| R1-141846 | Way Forward on aperiodic CSI feedback for TM10 with eIMTA | other | Huawei, HiSilicon, Qualcomm, Samsung | R1-76 | - | [WTS] [JSN] | |||
| R1-141847 | WF on Discovery Preamble for Asynchronous Deployments | other | Qualcomm Incorporated, General Dynamics, Fujistu, ZTE | R1-76 | - | [WTS] [JSN] | |||
| R1-141848 | WF on D2D PUSCH Structure | other | Qualcomm Incorporated, ZTE, General Dynamics, CATT | R1-76 | - | [WTS] [JSN] | |||
| R1-141849 | WF on D2D Signal Gap | other | Qualcomm Incorporated, General Dynamics, CATT, Fujistu | R1-76 | - | [WTS] [JSN] | |||
| R1-141850 | Summary of eIMTA open issues | other | CATT | R1-76 | - | [WTS] [JSN] | |||
| R1-141851 | Physical channel design for scheduling assignment | other | Samsung | R1-76 | - | [WTS] [JSN] | |||
| R1-141852 | WF on measurement assumptions with network assistance | other | LG Electronics, Broadcom, CMCC, Coolpad, ETRI, InterDigital, NEC, NTT DOCOMO, Panasonic, Qualcomm, ZTE | R1-76 | - | [WTS] [JSN] | |||
| R1-141853 | Summary of D2D ad-hoc session | other | Ericsson | R1-76 | - | [WTS] [JSN] | |||
| R1-141854 | WF on Small Cell Discovery Reference Signals | other | Intel, NSN, Nokia, MediaTek, ETRI, NVIDIA, NEC, InterDigital, Fujitsu, BlackBerry, Qualcomm, CATT | R1-76 | - | [WTS] [JSN] | |||
| R1-141855 | LS on RAN1 progress on NAICS higher-layer signalling | LS out | RAN1, MediaTek | R1-76 | - | [WTS] [JSN] | |||
| R1-141856 | Way forward on RIBS | other | Huawei, HiSilicon, CMCC, Deutsche Telekom, AT&T, Telecom Italia, CATR, IAESI, T-Mobile USA | R1-76 | - | [WTS] [JSN] | |||
| R1-141857 | Summary of offline discussions on CSI enhancement evaluations | other | Ericsson | R1-76 | - | [WTS] [JSN] | |||
| R1-141858 | WF on Reduced Transition Times for Small Cells on/off | other | Ericsson, Qualcomm , InterDigital, CATT, NTT DoCoMo, LG Electronics | R1-76 | - | [WTS] [JSN] | |||
| R1-141859 | WF on discovery signal design and network assistance | other | NTT DOCOMO, Huawei, HiSilicon, Samsung, Sony, Sharp, ZTE, LG Electronics, Hitachi, ETRI, MediaTek | R1-76 | - | [WTS] [JSN] | |||
| R1-141860 | Conclusions of the offline discussion on SR on pSCell PUCCH | other | NSN | R1-76 | - | [WTS] [JSN] | |||
| R1-141861 | Proposal on maximum power definition in dual connectivity | other | LG Electronics | R1-76 | - | [WTS] [JSN] | |||
| R1-141862 | Resource allocation restriction and identification of low complexity MTC Ues | other | RAN2, Vodafone | R1-76 | - | [WTS] [JSN] | |||
| R1-141863 | Outcome of the offline discussion on TPC aspects of Dual Connectivity | other | NTT DoCoMo | R1-76 | - | [WTS] [JSN] | |||
| R1-141864 | [Draft] LS on the scheduling request transmission on the pSCell | other | NSN | R1-76 | - | [WTS] [JSN] | |||
| R1-141865 | WF on DRS measurement configuration | other | LG Electronics, CATT, ETRI, NEC, Qualcomm, ZTE | R1-76 | - | [WTS] [JSN] | |||
| R1-141866 | Reply LS on Resource allocation restriction and identification of low complexity MTC UEs | other | Vodafone | R1-76 | - | [WTS] [JSN] | |||
| R1-141867 | Further evaluation study and IMR configuration for inter-eNB CoMP | other | Samsung | R1-76 | - | [WTS] [JSN] | |||
| R1-141868 | WF on Small Cell on/off and Discovery enhancements | other | Huawei, HiSilicon, NTT DOCOMO, Samsung, ZTE, Sony, Sharp, Hitachi, ETRI, Mediatek | R1-76 | - | [WTS] [JSN] | |||
| R1-141869 | LS on the scheduling request transmission on the pSCell | LS out | RAN1, NSN | R1-76 | - | [WTS] [JSN] | |||
| R1-141870 | WF on Small Cell Discovery Reference Signals | other | Intel, NSN, Nokia, MediaTek, ETRI, NVIDIA, NEC, InterDigital, Fujitsu, BlackBerry, Qualcomm, CATT, Broadcom | R1-76 | - | [WTS] [JSN] | |||
| R1-141871 | Summary of Ad-hoc session on Further Enhancements to LTE TDD for DL-UL Interference Management and Traffic Adaptation | other | Ad-Hoc Chairman (Qualcomm) | R1-76 | - | [WTS] [JSN] | |||
| R1-141872 | Summary of Ad-hoc session on Low Cost & Enhanced Coverage MTC UE for LTE | other | Ad-Hoc Chairman (Qualcomm) | R1-76 | - | [WTS] [JSN] | |||
| R1-141873 | Summary of Ad-hoc session on Inter-eNB CoMP for LTE | other | Ad-Hoc Chairman (Alcatel Lucent) | R1-76 | - | [WTS] [JSN] | |||
| R1-141874 | Summary of Ad-hoc session on Study on LTE Device to Device Proximity Services | other | Ad-Hoc Chairman (Alcatel Lucent) | R1-76 | - | [WTS] [JSN] | |||
| R1-141875 | Draft Rel-12 CR on antenna port definitions | other | Qualcomm Inc., Panasonic, Ericsson, Fujitsu | R1-76 | - | [WTS] [JSN] | |||
| R1-141876 | WF on TDD FDD CA | other | CATT | R1-76 | - | [WTS] [JSN] | |||
| R1-141877 | WF on HARQ timing for TDD-FDD CA | other | LGE | R1-76 | - | [WTS] [JSN] | |||
| R1-141878 | WF on Reduced Transition Times for Small Cells on/off | other | Ericsson, Qualcomm , InterDigital, CATT, NTT DoCoMo, LG Electronics, ITL. Inc. | R1-76 | - | [WTS] [JSN] | |||
| R1-141879 | WF on 256QAM UE Category handling | other | Ericsson, CMCC, CATR, Huawei, HiSilicon, Samsung, Blackberry, Fujitsu, III, FiberHome, CATT, Coolpad, China Unicom | R1-76 | - | [WTS] [JSN] | |||
| R1-141880 | Proposals on RIBS for inter-operator synchronization | other | CMCC, Huawei, HiSilicon, Potevio, Deutsche Telekom, CATR, IAESI, CHTTL | R1-76 | - | [WTS] [JSN] | |||
| R1-141881 | WF on Discovery Signals functions | other | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, Broadcom, CATT,CHTTL, Intel, Nokia, NSN, NVIDIA, Qualcomm | R1-76 | - | [WTS] [JSN] | |||
| R1-141882 | WF on DRS design | other | NTT DOCOMO, Huawei, HiSilicon, Samsung, Hitachi, ETRI, Sharp, Sony, NTT, New Postcom, CATR, ZTE, InterDigital, KCME | R1-76 | - | [WTS] [JSN] | |||
| R1-141883 | [DRAFT] LS on status of Radio-interface based synchronization | other | ZTE, Huawei | R1-76 | - | [WTS] [JSN] | |||
| R1-141884 | WF on Reduced Transition Times for Small Cells on/off | other | Ericsson, Qualcomm , InterDigital, CATT, NTT DoCoMo, LG Electronics, ITL. Inc | R1-76 | - | [WTS] [JSN] | |||
| R1-141885 | Summary of D2D ad-hoc session | other | Ericsson | R1-76 | - | [WTS] [JSN] | |||
| R1-141886 | 36.213 CR0459 (Rel-12, F) Clarification on PUCCH reporting type payload size | CR | Huawei, HiSilicon, Ericsson | R1-76 | - | [WTS] [JSN] | |||
| R1-141887 | Summary of Thursday offline eIMTA discussion | other | CATT | R1-76 | - | [WTS] [JSN] | |||
| R1-141888 | [Draft] LS on LTE Rel-12 UE feature list | other | NTT DoCoMo | R1-76 | - | [WTS] [JSN] | |||
| R1-141889 | RAN1 excel sheet draft on LTE Rel-12 UE capabilities | other | NTT DoCoMo | R1-76 | - | [WTS] [JSN] | |||
| R1-141890 | Reply LS on Resource allocation restriction and identification of low complexity MTC UEs | LS out | RAN1, Vodafone | R1-76 | - | [WTS] [JSN] | |||
| R1-141891 | 36.212 CR0157 (Rel-12, F) Correction on UCI multiplexing on PUSCH | CR | Intel Corporation | R1-76 | - | [WTS] [JSN] | |||
| R1-141892 | LS on status of Radio-interface based synchronization | LS out | RAN1, ZTE, Huawei | R1-76 | - | [WTS] [JSN] | |||
| R1-141893 | RAN1 excel sheet draft on LTE Rel-12 UE capabilities | other | R1-76 | - | [WTS] [JSN] | ||||
| R1-141894 | 36.213 CR0459r1 (Rel-12, F) Clarification on PUCCH reporting type payload size | CR | Huawei, HiSilicon, Ericsson | R1-76 | - | [WTS] [JSN] | |||
| R1-141895 | 36.211 CR0189 (Rel-12, F) CR on antenna port definitions | CR | Qualcomm Incorporated, Panasonic, Ericsson, Fujitsu | R1-76 | - | [WTS] [JSN] | |||
| R1-141896 | RAN1 excel sheet draft on LTE Rel-12 UE capabilities | other | NTT DoCoMo | R1-76 | - | [WTS] [JSN] | |||
| R1-141897 | LS on LTE Rel-12 UE feature list | LS out | RAN1, NTT DoCoMo | R1-76 | - | [WTS] [JSN] | |||
| R1-141898 | 36.212 CR0157r1 (Rel-12, F) Correction on UCI multiplexing on PUSCH | CR | Intel Corporation, NEC, Qualcomm Inc., Texas Instruments, Panasonic | R1-76 | - | [WTS] [JSN] | |||
| R1-141899 | Outcome of the email discussion [76b-08] on TPC aspects of Dual Connectivity | other | NTT DoCoMo | R1-76 | - | [WTS] [JSN] |
800 documents (1.2376291751862 seconds)