Please enter the search related information in the fields below. Partial information works, e.g. "SP-21" in the "tdoc" field lists all TSG SA documents from 2021. Regular expressions mostly work in all fields (e.g. "2[34].501" in the "Spec" field lists all documents related to 23.501 and 24.501. Capitalization is disregarded, i.e. "3GPP" gives the same results as "3gpp".
Download results in JSON format
| tdoc | Title | Type / Revs | Source | Spec / CR | S/WID | Release | Meeting | Status | Links |
|---|---|---|---|---|---|---|---|---|---|
| R1-135000 | Draft Agenda for RAN1#75 meeting | other | RAN1 Chairman | R1-75 | - | [WTS] [JSN] | |||
| R1-135001 | Final Report of RAN1#74bis meeting | other | MCC | R1-75 | - | [WTS] [JSN] | |||
| R1-135002 | LS on Rel-12 L1 parameters | other | RAN2, NSN | R1-75 | - | [WTS] [JSN] | |||
| R1-135003 | LS on Public Safety UE-Network Relays | other | RAN2, Vodafone | R1-75 | - | [WTS] [JSN] | |||
| R1-135004 | LS on text proposal for TR 36.843 on D2D including RAN2 agreements | other | RAN2, Qualcomm | R1-75 | - | [WTS] [JSN] | |||
| R1-135005 | Response LS on GCSE with eMBMS | other | RAN2, Qualcomm | R1-75 | - | [WTS] [JSN] | |||
| R1-135006 | Reply LS on Public Safety UE-to-Network Relays | other | RAN3, Vodafone | R1-75 | - | [WTS] [JSN] | |||
| R1-135007 | Reply LS on GCSE with eMBMS | other | RAN3, NSN | R1-75 | - | [WTS] [JSN] | |||
| R1-135008 | Reply LS on maximum UL timing difference between TAGs | other | RAN4, Huawei | R1-75 | - | [WTS] [JSN] | |||
| R1-135009 | 3GPP internal LS on update submission for IMT-2000 CDMA DS and IMT-2000 CDMA TDD toward Rev. 12 of Rec. ITU-R M.1457 “Detailed specifications of the terrestrial radio interfaces of International Mobile Telecommunications-2000 (IMT-2000)” | other | ITU-R Ad-Hoc, Telecom Italia | R1-75 | - | [WTS] [JSN] | |||
| R1-135010 | Further study on open loop power control for TDD eIMTA | other | Huawei, HiSilicon | R1-75 | - | [WTS] [JSN] | |||
| R1-135011 | Signalling on closed loop power control for TDD eIMTA | other | Huawei, HiSilicon | R1-75 | - | [WTS] [JSN] | |||
| R1-135012 | CSI enhancements for TDD eIMTA | other | Huawei, HiSilicon | R1-75 | - | [WTS] [JSN] | |||
| R1-135013 | Physical layer signaling design for TDD eIMTA | other | Huawei, HiSilicon | R1-75 | - | [WTS] [JSN] | |||
| R1-135014 | Discussion on HARQ operation related issues for TDD eIMTA | other | Huawei, HiSilicon | R1-75 | - | [WTS] [JSN] | |||
| R1-135015 | HARQ-ACK PUCCH resource allocation | other | Huawei, HiSilicon | R1-75 | - | [WTS] [JSN] | |||
| R1-135016 | HARQ-ACK feedback on PUSCH | other | Huawei, HiSilicon | R1-75 | - | [WTS] [JSN] | |||
| R1-135017 | Discussion on network coordination/signaling and specification impact for advanced receivers | other | Huawei, HiSilicon | R1-75 | - | [WTS] [JSN] | |||
| R1-135018 | Discussion on remaining issues for new UE category | other | Huawei, Hisilicon | R1-75 | - | [WTS] [JSN] | |||
| R1-135019 | Further evaluations on PBCH coverage enhancement | other | Huawei, Hisilicon | R1-75 | - | [WTS] [JSN] | |||
| R1-135020 | Considerations on the random access of MTC UEs with coverage improvement | other | Huawei, Hisilicon | R1-75 | - | [WTS] [JSN] | |||
| R1-135021 | Discussion on (E)PDCCH and PUCCH coverage improvement for MTC UEs | other | Huawei, HiSilicon | R1-75 | - | [WTS] [JSN] | |||
| R1-135022 | Timing relationship between PDCCH and PDSCH for coverage improvement | other | Huawei, HiSilicon | R1-75 | - | [WTS] [JSN] | |||
| R1-135023 | PUCCH transmission for TDD-FDD CA | other | Huawei, HiSilicon | R1-75 | - | [WTS] [JSN] | |||
| R1-135024 | Details for TDD-FDD CA with PUCCH on FDD Pcell | other | Huawei, HiSilicon | R1-75 | - | [WTS] [JSN] | |||
| R1-135025 | Details for TDD-FDD CA with PUCCH on TDD Pcell | other | Huawei, HiSilicon | R1-75 | - | [WTS] [JSN] | |||
| R1-135026 | Restriction on combinations of FDD/TDD serving cells for TDD-FDD CA | other | Huawei, HiSilicon | R1-75 | - | [WTS] [JSN] | |||
| R1-135027 | Further analysis on TTI bundling enhancements for UL VoIP for FDD | other | Huawei, HiSilicon | R1-75 | - | [WTS] [JSN] | |||
| R1-135028 | Discussion on TTI bundling extension for TDD | other | Huawei, HiSilicon | R1-75 | - | [WTS] [JSN] | |||
| R1-135029 | Remaining issues on enhanced TTI bundling | other | Huawei, HiSilicon | R1-75 | - | [WTS] [JSN] | |||
| R1-135030 | Measurements for PMCH MCS adaptation | other | Huawei, HiSilicon | R1-75 | - | [WTS] [JSN] | |||
| R1-135031 | Details of MBMS measurements | other | Huawei, HiSilicon | R1-75 | - | [WTS] [JSN] | |||
| R1-135032 | Further evaluation on 256QAM | other | Huawei, HiSilicon | R1-75 | - | [WTS] [JSN] | |||
| R1-135033 | Standard impacts of 256QAM | other | Huawei, HiSilicon | R1-75 | - | [WTS] [JSN] | |||
| R1-135034 | Discovery signals for energy-efficient small cell discovery | other | Huawei, HiSilicon | R1-75 | - | [WTS] [JSN] | |||
| R1-135035 | Small cell on/off transition time reduction | other | Huawei, Hisilicon | R1-75 | - | [WTS] [JSN] | |||
| R1-135036 | Discovery and measurement enhancements | other | Huawei, HiSilicon | R1-75 | - | [WTS] [JSN] | |||
| R1-135037 | Evaluation results for network listening | other | Huawei, HiSilicon | R1-75 | - | [WTS] [JSN] | |||
| R1-135038 | Enhanced mechanisms for network listening | other | Huawei, HiSilicon | R1-75 | - | [WTS] [JSN] | |||
| R1-135039 | Simulation assumptions for baseline performance evaluation | other | Huawei, HiSilicon | R1-75 | - | [WTS] [JSN] | |||
| R1-135040 | Initial calibration results of 3D channel modeling | other | Huawei, HiSilicon | R1-75 | - | [WTS] [JSN] | |||
| R1-135041 | System considerations for D2D synchronization | other | Huawei, HiSilicon | R1-75 | - | [WTS] [JSN] | |||
| R1-135042 | Resource assignment for D2D communication | other | Huawei, HiSilicon | R1-75 | - | [WTS] [JSN] | |||
| R1-135043 | System-level performance of D2D communication | other | Huawei, HiSilicon | R1-75 | - | [WTS] [JSN] | |||
| R1-135044 | D2D discovery message design | other | Huawei, HiSilicon | R1-75 | - | [WTS] [JSN] | |||
| R1-135045 | Benefits of type-2 discovery | other | Huawei, HiSilicon | R1-75 | - | [WTS] [JSN] | |||
| R1-135046 | Resource allocation for type-1 discovery | other | Huawei, HiSilicon | R1-75 | - | [WTS] [JSN] | |||
| R1-135047 | Considerations on timing for D2D | other | Huawei, HiSilicon | R1-75 | - | [WTS] [JSN] | |||
| R1-135048 | Further performance evaluation of CoMP with non-ideal backhaul | other | Huawei, HiSilicon | R1-75 | - | [WTS] [JSN] | |||
| R1-135049 | Inter-eNB signaling for supporting CoMP with non-ideal backhaul | other | Huawei, Hisilicon | R1-75 | - | [WTS] [JSN] | |||
| R1-135050 | 25.222 CR0213r1 (Rel-12, B) Introduction of HSPA signalling enhancements for more efficient resource usage for LCR TDD | CR | CATT, TD Tech, Potevio, New Postcom, CATR | R1-75 | - | [WTS] [JSN] | |||
| R1-135051 | 25.224 CR0273r1 (Rel-12, B) Introduction of HSPA signalling enhancements for more efficient resource usage for LCR TDD | CR | CATT, TD Tech, Potevio, New Postcom, CATR | R1-75 | - | [WTS] [JSN] | |||
| R1-135052 | Remaining details of uplink power control in TDD eIMTA | other | CATT | R1-75 | - | [WTS] [JSN] | |||
| R1-135053 | PHR in TDD eIMTA | other | CATT | R1-75 | - | [WTS] [JSN] | |||
| R1-135054 | Summary of email discussion [74bis-02] CSI measurement and report for eIMTA | other | CATT | R1-75 | - | [WTS] [JSN] | |||
| R1-135055 | CSI feedback in TDD eIMTA | other | CATT | R1-75 | - | [WTS] [JSN] | |||
| R1-135056 | Further discussion on backhaul signaling details in TDD eIMTA | other | CATT | R1-75 | - | [WTS] [JSN] | |||
| R1-135057 | Remaining details of L1 signaling for UL-DL reconfiguration | other | CATT | R1-75 | - | [WTS] [JSN] | |||
| R1-135058 | Remaining issues on HARQ in TDD eIMTA | other | CATT | R1-75 | - | [WTS] [JSN] | |||
| R1-135059 | PUCCH resource allocation for TDD eIMTA | other | CATT | R1-75 | - | [WTS] [JSN] | |||
| R1-135060 | CRS in reconfigurable subframes | other | CATT | R1-75 | - | [WTS] [JSN] | |||
| R1-135061 | On reconfiguration between special subframe and downlink subframe | other | CATT | R1-75 | - | [WTS] [JSN] | |||
| R1-135062 | Discussion on bandwidth reduction for new category UE | other | CATT | R1-75 | - | [WTS] [JSN] | |||
| R1-135063 | PBCH coverage improvement for MTC UEs | other | CATT | R1-75 | - | [WTS] [JSN] | |||
| R1-135064 | SIB coverage improvement for MTC UEs | other | CATT | R1-75 | - | [WTS] [JSN] | |||
| R1-135065 | Random access design for UEs in enhanced coverage mode | other | CATT | R1-75 | - | [WTS] [JSN] | |||
| R1-135066 | (E)PDCCH coverage improvement for MTC UEs | other | CATT | R1-75 | - | [WTS] [JSN] | |||
| R1-135067 | PUCCH coverage improvement for MTC UEs | other | CATT | R1-75 | - | [WTS] [JSN] | |||
| R1-135068 | Timing relationship between (E)PDCCH and PDSCH for UEs in enhanced coverage mode | other | CATT | R1-75 | - | [WTS] [JSN] | |||
| R1-135069 | PCFICH and PHICH coverage improvement for MTC UEs | other | CATT | R1-75 | - | [WTS] [JSN] | |||
| R1-135070 | Half duplex UE operation for FDD-TDD CA | other | CATT | R1-75 | - | [WTS] [JSN] | |||
| R1-135071 | HARQ/scheduling timing with FDD as PCell for FDD-TDD CA | other | CATT | R1-75 | - | [WTS] [JSN] | |||
| R1-135072 | PDSCH timing with TDD as PCell for FDD-TDD CA | other | CATT | R1-75 | - | [WTS] [JSN] | |||
| R1-135073 | PUSCH timing with TDD as PCell for FDD-TDD CA | other | CATT | R1-75 | - | [WTS] [JSN] | |||
| R1-135074 | UCI transmission for FDD-TDD carrier aggregation | other | CATT | R1-75 | - | [WTS] [JSN] | |||
| R1-135075 | PUCCH on Scell for FDD-TDD CA | other | CATT | R1-75 | - | [WTS] [JSN] | |||
| R1-135076 | Coverage enhancement for TDD | other | CATT | R1-75 | - | [WTS] [JSN] | |||
| R1-135077 | Measurement for MBMS | other | CATT | R1-75 | - | [WTS] [JSN] | |||
| R1-135078 | Further evaluations of higher order modulation | other | CATT | R1-75 | - | [WTS] [JSN] | |||
| R1-135079 | Analysis on specification impact of higher order modulation | other | CATT | R1-75 | - | [WTS] [JSN] | |||
| R1-135080 | Discussion on mechanisms for small cell ON/OFF | other | CATT | R1-75 | - | [WTS] [JSN] | |||
| R1-135081 | Further evaluations of small cell ON/OFF with 2Mbytes packet size | other | CATT | R1-75 | - | [WTS] [JSN] | |||
| R1-135082 | (Non)-Backward compatibility of small cell ON/OFF | other | CATT | R1-75 | - | [WTS] [JSN] | |||
| R1-135083 | RRM measurement for small cells | other | CATT | R1-75 | - | [WTS] [JSN] | |||
| R1-135084 | Air interface based synchronization for small cells | other | CATT | R1-75 | - | [WTS] [JSN] | |||
| R1-135085 | Discussion on simulation assumptions for calibration | other | CATT | R1-75 | - | [WTS] [JSN] | |||
| R1-135086 | Phase I calibration results for 3D channel modeling | other | CATT | R1-75 | - | [WTS] [JSN] | |||
| R1-135087 | Initial calibration results for 3D fast fading channel modeling | other | CATT | R1-75 | - | [WTS] [JSN] | |||
| R1-135088 | Details of discovery sequence and message design | other | CATT | R1-75 | - | [WTS] [JSN] | |||
| R1-135089 | Further discussion on resource allocation for D2D discovery | other | CATT | R1-75 | - | [WTS] [JSN] | |||
| R1-135090 | The value of T2 for D2D transmission timing | other | CATT | R1-75 | - | [WTS] [JSN] | |||
| R1-135091 | Discussion on synchronization for D2D operation | other | CATT | R1-75 | - | [WTS] [JSN] | |||
| R1-135092 | Discussion on physical channel types for D2D communication | other | CATT | R1-75 | - | [WTS] [JSN] | |||
| R1-135093 | Multiplexing between cellular link and D2D link | other | CATT | R1-75 | - | [WTS] [JSN] | |||
| R1-135094 | Resource allocation for D2D communication | other | CATT | R1-75 | - | [WTS] [JSN] | |||
| R1-135095 | Evaluation of coordinated scheduling with non-ideal backhaul for inter-eNB CoMP | other | CATT | R1-75 | - | [WTS] [JSN] | |||
| R1-135096 | Considerations on coordination signaling for inter-eNB CoMP | other | CATT | R1-75 | - | [WTS] [JSN] | |||
| R1-135097 | Clarification on Downlink Assignment using EPDCCH | other | Intel Corporation | R1-75 | - | [WTS] [JSN] | |||
| R1-135098 | Discussion on remaining details of UL PC for eIMTA support | other | Intel Corporation | R1-75 | - | [WTS] [JSN] | |||
| R1-135099 | Discussion on CSI enhancements for eIMTA support | other | Intel Corporation | R1-75 | - | [WTS] [JSN] | |||
| R1-135100 | Discussion on the remaining details of backhaul signaling for eIMTA Support | other | Intel Corporation | R1-75 | - | [WTS] [JSN] | |||
| R1-135101 | On remaining details of signaling design and HARQ feedback for eIMTA | other | Intel Corporation | R1-75 | - | [WTS] [JSN] | |||
| R1-135102 | Further Discussions on new UE category/type for low cost MTC UE | other | Intel Corporation | R1-75 | - | [WTS] [JSN] | |||
| R1-135103 | Coverage enhancement of PBCH for low cost MTC | other | Intel Corporation | R1-75 | - | [WTS] [JSN] | |||
| R1-135104 | Coverage enhancement of PRACH for low cost MTC | other | Intel Corporation | R1-75 | - | [WTS] [JSN] | |||
| R1-135105 | Coverage enhancement of DL/UL control channels for low cost MTC | other | Intel Corporation | R1-75 | - | [WTS] [JSN] | |||
| R1-135106 | On support of TDD-FDD Carrier Aggregation | other | Intel Corporation | R1-75 | - | [WTS] [JSN] | |||
| R1-135107 | On TTI Bundling Enhancements for UL VoIP | other | Intel Corporation | R1-75 | - | [WTS] [JSN] | |||
| R1-135108 | Discussion on Coverage Enhancement for TDD | other | Intel Corporation | R1-75 | - | [WTS] [JSN] | |||
| R1-135109 | Evaluation on small cell discovery signal | other | Intel Corporation | R1-75 | - | [WTS] [JSN] | |||
| R1-135110 | EPDCCH ICIC in Small Cell Environment | other | Intel Corporation | R1-75 | - | [WTS] [JSN] | |||
| R1-135111 | On baseline simulation assumption for 3D beamforming | other | Intel Corporation | R1-75 | - | [WTS] [JSN] | |||
| R1-135112 | Phase one calibration results for 3D channel model | other | Intel Corporation | R1-75 | - | [WTS] [JSN] | |||
| R1-135113 | Discussion on D2D synchronization | other | Intel Corporation | R1-75 | - | [WTS] [JSN] | |||
| R1-135114 | Preliminary performance analysis of D2D synchronization | other | Intel Corporation | R1-75 | - | [WTS] [JSN] | |||
| R1-135115 | Discussion on D2D resource allocation method | other | Intel Corporation | R1-75 | - | [WTS] [JSN] | |||
| R1-135116 | System level analysis of the D2D broadcast communication in out of network coverage scenarios | other | Intel Corporation | R1-75 | - | [WTS] [JSN] | |||
| R1-135117 | On message-based D2D discovery signal design | other | Intel Corporation | R1-75 | - | [WTS] [JSN] | |||
| R1-135118 | D2D discovery resource size and mapping to physical resources | other | Intel Corporation | R1-75 | - | [WTS] [JSN] | |||
| R1-135119 | On resource allocation for D2D discovery | other | Intel Corporation | R1-75 | - | [WTS] [JSN] | |||
| R1-135120 | D2D discovery resource selection for Type 1 discovery | other | Intel Corporation | R1-75 | - | [WTS] [JSN] | |||
| R1-135121 | On D2D discovery transmission timing | other | Intel Corporation | R1-75 | - | [WTS] [JSN] | |||
| R1-135122 | Discussion on backhaul link signalling for downlink CoMP | other | Intel Corporation | R1-75 | - | [WTS] [JSN] | |||
| R1-135123 | Discussion on evaluation methodology for SLIC receiver | other | Intel Corporation | R1-75 | - | [WTS] [JSN] | |||
| R1-135124 | System-level performance evaluation of R-ML/ML receivers with and without signalling assistance | other | Intel Corporation | R1-75 | - | [WTS] [JSN] | |||
| R1-135125 | Discussion on network signaling for NAICS receivers | other | Intel Corporation | R1-75 | - | [WTS] [JSN] | |||
| R1-135126 | On network assisted reception of dual-connectivity | other | Intel Corporation | R1-75 | - | [WTS] [JSN] | |||
| R1-135127 | NAICS receivers for downlink control channel | other | Intel Corporation | R1-75 | - | [WTS] [JSN] | |||
| R1-135128 | Signalling options for TDD UL-DL reconfiguration | other | Fujitsu | R1-75 | - | [WTS] [JSN] | |||
| R1-135129 | PBCH support for Deep Hole MTC devices | other | Fujitsu | R1-75 | - | [WTS] [JSN] | |||
| R1-135130 | PRACH Support for Deep Hole Devices | other | Fujitsu | R1-75 | - | [WTS] [JSN] | |||
| R1-135131 | Coverage Hole Depth Signaling supporting Low Cost MTC devices | other | Fujitsu | R1-75 | - | [WTS] [JSN] | |||
| R1-135132 | (e)PDCCH Support for Coverage Deficit MTC Devices | other | Fujitsu | R1-75 | - | [WTS] [JSN] | |||
| R1-135133 | MTC Band clarifications | other | Fujitsu | R1-75 | - | [WTS] [JSN] | |||
| R1-135134 | System Information Support for Deep Hole Low Cost MTC Devices | other | Fujitsu | R1-75 | - | [WTS] [JSN] | |||
| R1-135135 | PCFICH related issues of Low Cost MTC UEs based on LTE | other | Fujitsu | R1-75 | - | [WTS] [JSN] | |||
| R1-135136 | Alt.6 for TTI bundling enhancements for UL VoIP | other | Fujitsu | R1-75 | - | [WTS] [JSN] | |||
| R1-135137 | Backwards compatibility of small cell on/off | other | Fujitsu | R1-75 | - | [WTS] [JSN] | |||
| R1-135138 | Specification support for UL based cell discovery | other | Fujitsu | R1-75 | - | [WTS] [JSN] | |||
| R1-135139 | Initial calibration results for 3D channel modeling | other | Fujitsu | R1-75 | - | [WTS] [JSN] | |||
| R1-135140 | Analysis of synchronization mechanism for D2D communication | other | Fujitsu | R1-75 | - | [WTS] [JSN] | |||
| R1-135141 | Futher analysis on control Information for D2D communication | other | Fujitsu | R1-75 | - | [WTS] [JSN] | |||
| R1-135142 | RRM for D2D communication | other | Fujitsu | R1-75 | - | [WTS] [JSN] | |||
| R1-135143 | On D2D discovery signal design options | other | Fujitsu | R1-75 | - | [WTS] [JSN] | |||
| R1-135144 | Potential issues of D2D discovery signal transmission timing | other | Fujitsu | R1-75 | - | [WTS] [JSN] | |||
| R1-135145 | Discussion on inter-eNB signaling in support of CoMP with non-ideal backhaul | other | Fujitsu | R1-75 | - | [WTS] [JSN] | |||
| R1-135146 | System level simulation for NAIC in HetNet | other | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | R1-75 | - | [WTS] [JSN] | |||
| R1-135147 | 36.213 CR0444 (Rel-10,F) Correction on CSI reporting type and parameters | CR | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | R1-75 | - | [WTS] [JSN] | |||
| R1-135148 | 36.213 CR0445 (Rel-11,A) Correction on CSI reporting type and parameters | CR | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | R1-75 | - | [WTS] [JSN] | |||
| R1-135149 | Remaining details of UL power control | other | Alcatel-Lucent Shanghai Bell, Alcatel-Lucent | R1-75 | - | [WTS] [JSN] | |||
| R1-135150 | Remaining details of CSI feedback | other | Alcatel-Lucent Shanghai Bell, Alcatel-Lucent | R1-75 | - | [WTS] [JSN] | |||
| R1-135151 | Remaining details of signalling for TDD UL-DL reconfiguration | other | Alcatel-Lucent Shanghai Bell, Alcatel-Lucent | R1-75 | - | [WTS] [JSN] | |||
| R1-135152 | Coverage enhancement requirements for MTC UE | other | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | R1-75 | - | [WTS] [JSN] | |||
| R1-135153 | Considerations on Low Cost MTC UE | other | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | R1-75 | - | [WTS] [JSN] | |||
| R1-135154 | PBCH Coverage Enhancement for MTC UE | other | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | R1-75 | - | [WTS] [JSN] | |||
| R1-135155 | PRACH Coverage Enhancement for MTC UE | other | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | R1-75 | - | [WTS] [JSN] | |||
| R1-135156 | Considerations for (E)PDCCH in coverage enhancement | other | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | R1-75 | - | [WTS] [JSN] | |||
| R1-135157 | Considerations for PUCCH in coverage enhancement | other | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | R1-75 | - | [WTS] [JSN] | |||
| R1-135158 | Considerations for PSS/SSS in coverage enhancement | other | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | R1-75 | - | [WTS] [JSN] | |||
| R1-135159 | Simplification of MTC UE operation in coverage enhancement | other | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | R1-75 | - | [WTS] [JSN] | |||
| R1-135160 | Scheduling and HARQ timing for TDD-FDD carrier aggregation | other | Alcatel-Lucent Shanghai Bell, Alcatel-Lucent | R1-75 | - | [WTS] [JSN] | |||
| R1-135161 | TTI Bundling Enhancement for UL VoIP | other | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | R1-75 | - | [WTS] [JSN] | |||
| R1-135162 | TTI Bundling Enhancement for TDD | other | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | R1-75 | - | [WTS] [JSN] | |||
| R1-135163 | Signaling for TTI Bundling Enhancement for VoIP and PUSCH | other | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | R1-75 | - | [WTS] [JSN] | |||
| R1-135164 | MBMS measurements for further enhancement of MBMS operation | other | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, CHTTL | R1-75 | - | [WTS] [JSN] | |||
| R1-135165 | System analysis of supporting 256 QAM | other | Alcatel-Lucent Shanghai Bell, Alcatel-Lucent | R1-75 | - | [WTS] [JSN] | |||
| R1-135166 | Small Cell Discovery Performance based on UL Signals | other | Alcatel-Lucent Shanghai Bell, Alcatel-Lucent, CHTTL | R1-75 | - | [WTS] [JSN] | |||
| R1-135167 | System Analysis of Transition Time Reduction for Small Cell On/Off | other | Alcatel-Lucent Shanghai Bell, Alcatel-Lucent | R1-75 | - | [WTS] [JSN] | |||
| R1-135168 | System analysis and performance evaluation of radio-interface based synchronization | other | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, CHTTL | R1-75 | - | [WTS] [JSN] | |||
| R1-135169 | Draft text proposal on physical layer support of dual connectivity | other | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, CHTTL | R1-75 | - | [WTS] [JSN] | |||
| R1-135170 | Remaining Details of Fast Fading Channel for 3D UMa | other | Alcatel-Lucent Shanghai Bell, Alcatel-Lucent | R1-75 | - | [WTS] [JSN] | |||
| R1-135171 | Remaining Details of Fast Fading Channel for 3D UMi | other | Alcatel-Lucent Shanghai Bell, Alcatel-Lucent | R1-75 | - | [WTS] [JSN] | |||
| R1-135172 | UE Attachment Modelling for Phase 2 Calibration | other | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | R1-75 | - | [WTS] [JSN] | |||
| R1-135173 | Initial results of 3D MIMO Phase 2 Calibration | other | Alcatel-Lucent Shanghai Bell, Alcatel-Lucent | R1-75 | - | [WTS] [JSN] | |||
| R1-135174 | Proposals for 3D UMa scenario with one high rise building per sector | other | Alcatel-Lucent Shanghai Bell, Alcatel-Lucent | R1-75 | - | [WTS] [JSN] | |||
| R1-135175 | Synchronization design for D2D communication | other | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | R1-75 | - | [WTS] [JSN] | |||
| R1-135176 | Design and performance evaluation for D2D broadcast | other | Alcatel-Lucent Shanghai Bell, Alcatel-Lucent | R1-75 | - | [WTS] [JSN] | |||
| R1-135177 | Discovery signal design details | other | Alcatel-Lucent Shanghai Bell, Alcatel-Lucent | R1-75 | - | [WTS] [JSN] | |||
| R1-135178 | D2D transmission Timing | other | Alcatel-Lucent Shanghai Bell, Alcatel-Lucent | R1-75 | - | [WTS] [JSN] | |||
| R1-135179 | Performance Evaluation of X2 signalling supporting DL eCoMP with NIB | other | Alcatel-Lucent Shanghai Bell, Alcatel-Lucent | R1-75 | - | [WTS] [JSN] | |||
| R1-135180 | Performance Evaluation of X2 signalling supporting UL eCoMP with NIB | other | Alcatel-Lucent Shanghai Bell, Alcatel-Lucent | R1-75 | - | [WTS] [JSN] | |||
| R1-135181 | Proposals for X2 signalling supporting eCoMP with NIB | other | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | R1-75 | - | [WTS] [JSN] | |||
| R1-135182 | Signalling of Network Assistance Information in NAICS | other | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | R1-75 | - | [WTS] [JSN] | |||
| R1-135183 | 36.212 CR0154R3 (Rel-12, B) Introduction of Rel 12 feature for Downlink MIMO Enhancement | CR | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | R1-75 | - | [WTS] [JSN] | |||
| R1-135184 | 36.213 CR0431R4 (Rel-12, B) Introduction of Rel 12 feature for Downlink MIMO Enhancement | CR | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | R1-75 | - | [WTS] [JSN] | |||
| R1-135185 | UL power control for eIMTA | other | Samsung | R1-75 | - | [WTS] [JSN] | |||
| R1-135186 | Discussion on CSI feedback for eIMTA | other | Samsung | R1-75 | - | [WTS] [JSN] | |||
| R1-135187 | Remaining details of backhaul signaling for eIMTA | other | Samsung | R1-75 | - | [WTS] [JSN] | |||
| R1-135188 | Signaling for adapting TDD UL-DL configurations | other | Samsung | R1-75 | - | [WTS] [JSN] | |||
| R1-135189 | UCI payload aspects for eIMTA | other | Samsung | R1-75 | - | [WTS] [JSN] | |||
| R1-135190 | Remaining issues on HARQ timing for eIMTA | other | Samsung | R1-75 | - | [WTS] [JSN] | |||
| R1-135191 | HARQ-ACK feedback procedures for eIMTA | other | Samsung | R1-75 | - | [WTS] [JSN] | |||
| R1-135192 | On other issues for eIMTA | other | Samsung | R1-75 | - | [WTS] [JSN] | |||
| R1-135193 | Discussion on transmission modes to support eIMTA | other | Samsung | R1-75 | - | [WTS] [JSN] | |||
| R1-135194 | PDSCH frequency allocation for MTC UEs | other | Samsung | R1-75 | - | [WTS] [JSN] | |||
| R1-135195 | PBCH coverage enhancements for MTC UEs | other | Samsung | R1-75 | - | [WTS] [JSN] | |||
| R1-135196 | PRACH coverage enhancements for MTC UEs | other | Samsung | R1-75 | - | [WTS] [JSN] | |||
| R1-135197 | PDSCH/PUSCH coverage enhancements for MTC UEs | other | Samsung | R1-75 | - | [WTS] [JSN] | |||
| R1-135198 | PDCCH coverage enhancements for MTC UEs | other | Samsung | R1-75 | - | [WTS] [JSN] | |||
| R1-135199 | PUCCH coverage enhancements for MTC UEs | other | Samsung | R1-75 | - | [WTS] [JSN] | |||
| R1-135200 | PHICH and PCFICH for low cost & enhanced coverage MTC UE | other | Samsung | R1-75 | - | [WTS] [JSN] | |||
| R1-135201 | HARQ operation for TDD-FDD CA with TDD Pcell | other | Samsung | R1-75 | - | [WTS] [JSN] | |||
| R1-135202 | Mulitiple TA for TDD-FDD CA | other | Samsung | R1-75 | - | [WTS] [JSN] | |||
| R1-135203 | Views on open questions for TDD-FDD CA | other | Samsung | R1-75 | - | [WTS] [JSN] | |||
| R1-135204 | Specification support for FDD-TDD CA | other | Samsung | R1-75 | - | [WTS] [JSN] | |||
| R1-135205 | Discussion on LTE coverage enhancement methods for VoIP | other | Samsung | R1-75 | - | [WTS] [JSN] | |||
| R1-135206 | Consideration on coverage enhancement for TDD | other | Samsung | R1-75 | - | [WTS] [JSN] | |||
| R1-135207 | Discussion on measurements for further MBMS operations support | other | Samsung | R1-75 | - | [WTS] [JSN] | |||
| R1-135208 | Discussion on specification impacts of 256QAM | other | Samsung | R1-75 | - | [WTS] [JSN] | |||
| R1-135209 | Discussion on transition time and adaptation enhancements for small cells | other | Samsung | R1-75 | - | [WTS] [JSN] | |||
| R1-135210 | Further discussion on small cell discovery | other | Samsung | R1-75 | - | [WTS] [JSN] | |||
| R1-135211 | Further discussion on small cell load shifting and cell association | other | Samsung | R1-75 | - | [WTS] [JSN] | |||
| R1-135212 | Further discussion on radio-interface based synchronization solutions | other | Samsung | R1-75 | - | [WTS] [JSN] | |||
| R1-135213 | Remaining details of fast fading modelling for 3D channel | other | Samsung | R1-75 | - | [WTS] [JSN] | |||
| R1-135214 | Discussion on UE-side modeling for 3D channel | other | Samsung | R1-75 | - | [WTS] [JSN] | |||
| R1-135215 | Assumptions for baseline simulations | other | Samsung, CHTTL | R1-75 | - | [WTS] [JSN] | |||
| R1-135216 | Phase-1 calibration results for 3D channel model | other | Samsung | R1-75 | - | [WTS] [JSN] | |||
| R1-135217 | Details of 3D UMa with one high rise per sector with 300m ISD | other | Samsung, CHTTL | R1-75 | - | [WTS] [JSN] | |||
| R1-135218 | Discussion on elevation beamforming and FD-MIMO | other | Samsung, CHTTL | R1-75 | - | [WTS] [JSN] | |||
| R1-135219 | Time synchronization for D2D broadcast communication in out of network coverage | other | Samsung | R1-75 | - | [WTS] [JSN] | |||
| R1-135220 | Physical channel design for D2D communication | other | Samsung | R1-75 | - | [WTS] [JSN] | |||
| R1-135221 | Resource allocation for D2D broadcast communication | other | Samsung | R1-75 | - | [WTS] [JSN] | |||
| R1-135222 | Evaluation results of resource allocation scheme for D2D communication | other | Samsung | R1-75 | - | [WTS] [JSN] | |||
| R1-135223 | Physical channel design for D2D discovery | other | Samsung | R1-75 | - | [WTS] [JSN] | |||
| R1-135224 | Resource allocation method for D2D discovery | other | Samsung | R1-75 | - | [WTS] [JSN] | |||
| R1-135225 | In-band emission impact of D2D discovery | other | Samsung | R1-75 | - | [WTS] [JSN] | |||
| R1-135226 | D2D discovery timing impact on PUCCH | other | Samsung | R1-75 | - | [WTS] [JSN] | |||
| R1-135227 | Draft TP for candidate CoMP techniques in CoMP-NIB TR 36.874 | other | Samsung | R1-75 | - | [WTS] [JSN] | |||
| R1-135228 | Evaluation of coordinated scheduling for SCE scenario 1 with non-ideal backhaul | other | Samsung | R1-75 | - | [WTS] [JSN] | |||
| R1-135229 | Evaluation of coordinated scheduling for SCE scenario 2a with non-ideal backhaul | other | Samsung | R1-75 | - | [WTS] [JSN] | |||
| R1-135230 | Evaluation of coordinated scheduling for CoMP scenario 2 with non-ideal backhaul | other | Samsung | R1-75 | - | [WTS] [JSN] | |||
| R1-135231 | Discussion on signalling for inter-eNB operation | other | Samsung | R1-75 | - | [WTS] [JSN] | |||
| R1-135232 | Prediction accuracy of link abstraction method for SLML receiver | other | Samsung | R1-75 | - | [WTS] [JSN] | |||
| R1-135233 | Draft TP on link abstraction method of SLML receiver for TR 36.866 | other | Samsung | R1-75 | - | [WTS] [JSN] | |||
| R1-135234 | Link abstraction method for iterative ML receiver | other | Samsung | R1-75 | - | [WTS] [JSN] | |||
| R1-135235 | System level evaluation of SLML receiver for NAICS scenario 1 | other | Samsung | R1-75 | - | [WTS] [JSN] | |||
| R1-135236 | System level evaluation of SLML receiver for NAICS scenario 2 | other | Samsung | R1-75 | - | [WTS] [JSN] | |||
| R1-135237 | System level evaluation of iterative ML receiver for NAICS scenario 1 | other | Samsung | R1-75 | - | [WTS] [JSN] | |||
| R1-135238 | Discussion on possible specification impacts for NAICS | other | Samsung | R1-75 | - | [WTS] [JSN] | |||
| R1-135239 | Coordinated Sounding for CoMP BF (CoMP BF-CoS) including calibration information | other | DAC-UPC, IAESI | R1-75 | - | [WTS] [JSN] | |||
| R1-135240 | Assessment of differences between centralized and knowledge-based distributed scheduling | other | IAESI, DAC-UPC | R1-75 | - | [WTS] [JSN] | |||
| R1-135241 | Collaborative distributed scheduling - updated information | other | IAESI, DAC-UPC | R1-75 | - | [WTS] [JSN] | |||
| R1-135242 | X2 support for centralized and distributed solutions | other | IAESI | R1-75 | - | [WTS] [JSN] | |||
| R1-135243 | Solution based on traffic asymmetry for avoiding requirements of fast Tx UE switching | other | IAESI | R1-75 | - | [WTS] [JSN] | |||
| R1-135244 | On UL Power Control Enhancements for EIMTA | other | Texas Instruments | R1-75 | - | [WTS] [JSN] | |||
| R1-135245 | Views on CSI measurement for LTE TDD eIMTA | other | Texas Instruments | R1-75 | - | [WTS] [JSN] | |||
| R1-135246 | Outstanding signaling details for TDD UL/DL reconfiguration | other | Texas Instruments | R1-75 | - | [WTS] [JSN] | |||
| R1-135247 | HARQ-ACK feedback for EIMTA | other | Texas Instruments | R1-75 | - | [WTS] [JSN] | |||
| R1-135248 | General Aspects for TDD-FDD Carrier Aggregation | other | Texas Instruments | R1-75 | - | [WTS] [JSN] | |||
| R1-135249 | Standard and other impacts of introducing 256 QAM | other | Texas Instruments | R1-75 | - | [WTS] [JSN] | |||
| R1-135250 | On enhancements for transition time reduction for small cell on/off and discovery | other | Texas Instruments | R1-75 | - | [WTS] [JSN] | |||
| R1-135251 | Discussion on signaling for CoMP with NIB | other | Texas Instruments | R1-75 | - | [WTS] [JSN] | |||
| R1-135252 | MIB and SIB Acquisition Time Guidance Discussion | other | Sierra Wireless | R1-75 | - | [WTS] [JSN] | |||
| R1-135253 | Comparison between Repeating PBCH 3X (a little) or 20X (a lot) | other | Sierra Wireless | R1-75 | - | [WTS] [JSN] | |||
| R1-135254 | Low Cost UE TBS Discussion | other | Sierra Wireless | R1-75 | - | [WTS] [JSN] | |||
| R1-135255 | Further considerations on reconfiguration signalling for eIMTA system | other | NEC | R1-75 | - | [WTS] [JSN] | |||
| R1-135256 | PUCCH and PHICH resource reservation for TDD eIMTA system | other | NEC | R1-75 | - | [WTS] [JSN] | |||
| R1-135257 | UL&DL timing coupling issue for TDD eIMTA system | other | NEC | R1-75 | - | [WTS] [JSN] | |||
| R1-135258 | HARQ timing for TDD-FDD CA | other | NEC | R1-75 | - | [WTS] [JSN] | |||
| R1-135259 | On support of DL and UL cross-carrier scheduling in TDD-FDD CA | other | NEC | R1-75 | - | [WTS] [JSN] | |||
| R1-135260 | On the need to extend coverage enhancement for Configurations #0, #1, #6 | other | NEC | R1-75 | - | [WTS] [JSN] | |||
| R1-135261 | On the need to extend coverage enhancement for Configurations #2, #3, #4, #5 | other | NEC | R1-75 | - | [WTS] [JSN] | |||
| R1-135262 | Small cell on/off mechanism and discovery signal | other | NEC | R1-75 | - | [WTS] [JSN] | |||
| R1-135263 | Views on interference coordination for semi-static small cell on/off | other | NEC | R1-75 | - | [WTS] [JSN] | |||
| R1-135264 | Physical layer aspects for dual layer connectivity | other | NEC | R1-75 | - | [WTS] [JSN] | |||
| R1-135265 | Phase-2 calibration results for fast fading parameters | other | NEC | R1-75 | - | [WTS] [JSN] | |||
| R1-135266 | PDSCH Frequency location of reduced bandwidth for low cost MTC | other | NEC | R1-75 | - | [WTS] [JSN] | |||
| R1-135267 | PDSCH and PUSCH coverage enhancements for low cost MTC | other | NEC | R1-75 | - | [WTS] [JSN] | |||
| R1-135268 | Synchronisation of D2D UEs outside of EUTRAN network coverage | other | NEC | R1-75 | - | [WTS] [JSN] | |||
| R1-135269 | D2D Discovery Resource Allocation under Network Coverage | other | NEC | R1-75 | - | [WTS] [JSN] | |||
| R1-135270 | Considerations of subframe design for D2D communication | other | NEC | R1-75 | - | [WTS] [JSN] | |||
| R1-135271 | Scheduling and Signaling Issues in CoMP-NIB | other | NEC | R1-75 | - | [WTS] [JSN] | |||
| R1-135272 | Discussion on specifications for non-MBSFN region | other | NEC | R1-75 | - | [WTS] [JSN] | |||
| R1-135273 | Details of MBMS measurements | other | NEC | R1-75 | - | [WTS] [JSN] | |||
| R1-135274 | Uplink scheduling/HARQ timing in TDD-FDD carrier aggregation | other | ETRI | R1-75 | - | [WTS] [JSN] | |||
| R1-135275 | Downlink HARQ timing in TDD-FDD carrier aggregation | other | ETRI | R1-75 | - | [WTS] [JSN] | |||
| R1-135276 | Small cell discovery and cell state transition | other | ETRI | R1-75 | - | [WTS] [JSN] | |||
| R1-135277 | On the D2DSS and PD2DSCH | other | ETRI | R1-75 | - | [WTS] [JSN] | |||
| R1-135278 | Physical channel design for D2D communications | other | ETRI | R1-75 | - | [WTS] [JSN] | |||
| R1-135279 | Discussion on resource allocation for D2D discovery | other | ETRI | R1-75 | - | [WTS] [JSN] | |||
| R1-135280 | Signaling for NAICS | other | ETRI | R1-75 | - | [WTS] [JSN] | |||
| R1-135281 | Email discussion on remaining issues of LTE coverage enhancements | other | China Telecom | R1-75 | - | [WTS] [JSN] | |||
| R1-135282 | Further views on TTI bundling enhancements for UL VoIP | other | China Telecom | R1-75 | - | [WTS] [JSN] | |||
| R1-135283 | Enabling and disabling of enhanced TTI bundling in Rel-12 | other | China Telecom | R1-75 | - | [WTS] [JSN] | |||
| R1-135284 | Discussion on large scale parameters generation | other | China Telecom | R1-75 | - | [WTS] [JSN] | |||
| R1-135285 | Necessary clarifications for eMBMS reception on SCell | other | Qualcomm Inc. | R1-75 | - | [WTS] [JSN] | |||
| R1-135286 | UL power control for eIMTA | other | Qualcomm Inc. | R1-75 | - | [WTS] [JSN] | |||
| R1-135287 | Configurable UL TPC accumulation | other | Qualcomm Inc. | R1-75 | - | [WTS] [JSN] | |||
| R1-135288 | CSI measurement and reporting in eIMTA | other | Qualcomm Inc. | R1-75 | - | [WTS] [JSN] | |||
| R1-135289 | Remaining details of backhaul signaling for eIMTA | other | Qualcomm Inc. | R1-75 | - | [WTS] [JSN] | |||
| R1-135290 | Discussion on signaling details for TDD UL-DL reconfiguration | other | Qualcomm Inc. | R1-75 | - | [WTS] [JSN] | |||
| R1-135291 | eIMTA PUCCH Resource Allocation | other | Qualcomm Inc. | R1-75 | - | [WTS] [JSN] | |||
| R1-135292 | eIMTA HARQ-ACK transmission | other | Qualcomm Inc. | R1-75 | - | [WTS] [JSN] | |||
| R1-135293 | DRX operation for eIMTA | other | Qualcomm Inc. | R1-75 | - | [WTS] [JSN] | |||
| R1-135294 | Soft buffer management for IMTA | other | Qualcomm Inc. | R1-75 | - | [WTS] [JSN] | |||
| R1-135295 | PBCH channel design for MTC coverage enhancements | other | Qualcomm Inc. | R1-75 | - | [WTS] [JSN] | |||
| R1-135296 | RACH channel design for MTC coverage enhancements | other | Qualcomm Inc. | R1-75 | - | [WTS] [JSN] | |||
| R1-135297 | Coverage enhancements for (E)PDCCH/PUCCH | other | Qualcomm Inc. | R1-75 | - | [WTS] [JSN] | |||
| R1-135298 | Coverage enhancements for PDSCH/PUSCH | other | Qualcomm Inc. | R1-75 | - | [WTS] [JSN] | |||
| R1-135299 | Power Consumption Considerations for Coverage Enhancements for MTC | other | Qualcomm Inc. | R1-75 | - | [WTS] [JSN] | |||
| R1-135300 | Draft LS on power saving techniques for MTC | other | Qualcomm Inc. | R1-75 | - | [WTS] [JSN] | |||
| R1-135301 | Solution for TDD-FDD CA | other | Qualcomm Inc. | R1-75 | - | [WTS] [JSN] | |||
| R1-135302 | TTI bundling enhancements for UL VoIP | other | Qualcomm Inc. | R1-75 | - | [WTS] [JSN] | |||
| R1-135303 | TTI bundling for TDD | other | Qualcomm Inc. | R1-75 | - | [WTS] [JSN] | |||
| R1-135304 | Discussion of MBSFN measurements | other | Qualcomm Inc. | R1-75 | - | [WTS] [JSN] | |||
| R1-135305 | Initial MBSFN measurement evaluation | other | Qualcomm Inc. | R1-75 | - | [WTS] [JSN] | |||
| R1-135306 | Higher order modulation | other | Qualcomm Inc. | R1-75 | - | [WTS] [JSN] | |||
| R1-135307 | Small cell on/off | other | Qualcomm Inc. | R1-75 | - | [WTS] [JSN] | |||
| R1-135308 | Small cell discovery | other | Qualcomm Inc. | R1-75 | - | [WTS] [JSN] | |||
| R1-135309 | Network synchronization by network listening | other | Qualcomm Inc. | R1-75 | - | [WTS] [JSN] | |||
| R1-135310 | Remaining issues of EoD/EoA modeling | other | Qualcomm Inc. | R1-75 | - | [WTS] [JSN] | |||
| R1-135311 | TP for 3D channel model | other | Qualcomm Inc. | R1-75 | - | [WTS] [JSN] | |||
| R1-135312 | Field pattern of cross-polarized antenna | other | Qualcomm Inc. | R1-75 | - | [WTS] [JSN] | |||
| R1-135313 | Discussion on RSRP modeling | other | Qualcomm Inc. | R1-75 | - | [WTS] [JSN] | |||
| R1-135314 | Initial calibration of channel models for elevation beamforming and FD-MIMO | other | Qualcomm Inc. | R1-75 | - | [WTS] [JSN] | |||
| R1-135315 | Views on 3D UMa high-rise macro cell scenario | other | Qualcomm Inc. | R1-75 | - | [WTS] [JSN] | |||
| R1-135316 | Multi-hop D2D synchronization performance | other | Qualcomm Inc. | R1-75 | - | [WTS] [JSN] | |||
| R1-135317 | Signal Design and Resource Allocation for D2D Synchronization | other | Qualcomm Inc. | R1-75 | - | [WTS] [JSN] | |||
| R1-135318 | D2D broadcast link level simulation results for VOIP | other | Qualcomm Inc. | R1-75 | - | [WTS] [JSN] | |||
| R1-135319 | Control for D2D broadcast communication | other | Qualcomm Inc. | R1-75 | - | [WTS] [JSN] | |||
| R1-135320 | Distributed vs. centalized broadcast communication control | other | Qualcomm Inc. | R1-75 | - | [WTS] [JSN] | |||
| R1-135321 | Signal design for D2D broadcast communication | other | Qualcomm Inc. | R1-75 | - | [WTS] [JSN] | |||
| R1-135322 | D2D broadcast resource allocation and interference management algorithms | other | Qualcomm Inc. | R1-75 | - | [WTS] [JSN] | |||
| R1-135323 | D2D discovery signal design | other | Qualcomm Inc. | R1-75 | - | [WTS] [JSN] | |||
| R1-135324 | Reference signal design for discovery | other | Qualcomm Inc. | R1-75 | - | [WTS] [JSN] | |||
| R1-135325 | Resource allocation for D2D discovery | other | Qualcomm Inc. | R1-75 | - | [WTS] [JSN] | |||
| R1-135326 | D2D transmission timing | other | Qualcomm Inc. | R1-75 | - | [WTS] [JSN] | |||
| R1-135327 | Text Proposal for TR 36.843 | other | Qualcomm Inc. | R1-75 | - | [WTS] [JSN] | |||
| R1-135328 | Draft TR 36.843 v0.3.0 on “Study of LTE Device to Device Proximity Services-Radio Aspects” | other | Qualcomm Inc. | R1-75 | - | [WTS] [JSN] | |||
| R1-135329 | Coordinated scheduling under Non Ideal backhaul | other | Qualcomm Inc. | R1-75 | - | [WTS] [JSN] | |||
| R1-135330 | System level modeling methodology for NAIC | other | Qualcomm Inc. | R1-75 | - | [WTS] [JSN] | |||
| R1-135331 | TP for System level modeling methodology for NAIC | other | Qualcomm Inc. | R1-75 | - | [WTS] [JSN] | |||
| R1-135332 | Evaluation results for NAIC | other | Qualcomm Inc. | R1-75 | - | [WTS] [JSN] | |||
| R1-135333 | Network coordination/signaling | other | Qualcomm Inc. | R1-75 | - | [WTS] [JSN] | |||
| R1-135334 | Necessity of enhanced PC for PUCCH | other | Sharp | R1-75 | - | [WTS] [JSN] | |||
| R1-135335 | Signalling mechanism for enhanced UL PC for PUSCH and SRS | other | Sharp | R1-75 | - | [WTS] [JSN] | |||
| R1-135336 | PHR reporting and calculation for eIMTA | other | Sharp | R1-75 | - | [WTS] [JSN] | |||
| R1-135337 | Enhancement of CSI reporting for eIMTA | other | Sharp | R1-75 | - | [WTS] [JSN] | |||
| R1-135338 | CSI subframe measurement set configuration for eIMTA | other | Sharp | R1-75 | - | [WTS] [JSN] | |||
| R1-135339 | PUCCH resoruce of HARQ transmission for eIMTA | other | Sharp | R1-75 | - | [WTS] [JSN] | |||
| R1-135340 | Presence of CRS in reconfigured DL subframes | other | Sharp | R1-75 | - | [WTS] [JSN] | |||
| R1-135341 | Further consideration on the reduced PDSCH frequency allocation for low-cost MTC UE | other | Sharp | R1-75 | - | [WTS] [JSN] | |||
| R1-135342 | Discussion on PRACH coverage enhancement for MTC UE | other | Sharp | R1-75 | - | [WTS] [JSN] | |||
| R1-135343 | DL scheduling and HARQ-ACK feedback for TDD-FDD CA | other | Sharp | R1-75 | - | [WTS] [JSN] | |||
| R1-135344 | UL scheduling and HARQ-ACK feedback for TDD-FDD CA | other | Sharp | R1-75 | - | [WTS] [JSN] | |||
| R1-135345 | Support of non simultaneous Rx/Tx capable UEs for TDD-FDD carrier aggregation | other | Sharp | R1-75 | - | [WTS] [JSN] | |||
| R1-135346 | Parameters related to enhanced TTI bundling | other | ZTE | R1-75 | - | [WTS] [JSN] | |||
| R1-135347 | Proposals on TTI bundling enhancements for UL VoIP | other | ZTE | R1-75 | - | [WTS] [JSN] | |||
| R1-135348 | Evaluation and standard impact on EVM and receiver impairment for small cell 256QAM | other | ZTE | R1-75 | - | [WTS] [JSN] | |||
| R1-135349 | Further evaluations on small cell ON/OFF | other | ZTE | R1-75 | - | [WTS] [JSN] | |||
| R1-135350 | Further considerations on enhanced transition procedures of small cell on/off scheme | other | ZTE | R1-75 | - | [WTS] [JSN] | |||
| R1-135351 | On Measurements based on Companion Discovery Signal (CDS) | other | ZTE | R1-75 | - | [WTS] [JSN] | |||
| R1-135352 | Backwards compatibility of semi-static small cell on/off | other | ZTE | R1-75 | - | [WTS] [JSN] | |||
| R1-135353 | On the benefits of introducing a discovery signal | other | ZTE | R1-75 | - | [WTS] [JSN] | |||
| R1-135354 | Further evaluations on Radio-interface Based Synchronization | other | ZTE | R1-75 | - | [WTS] [JSN] | |||
| R1-135355 | Issues for TDD-FDD CA | other | ZTE | R1-75 | - | [WTS] [JSN] | |||
| R1-135356 | Remaining details of new UE category for low cost MTC | other | ZTE | R1-75 | - | [WTS] [JSN] | |||
| R1-135357 | Evaluation and Analysis on Potential PBCH Coverage Enhancement Solutions | other | ZTE | R1-75 | - | [WTS] [JSN] | |||
| R1-135358 | SIB Coverage Improvement | other | ZTE | R1-75 | - | [WTS] [JSN] | |||
| R1-135359 | PRACH coverage improvement for MTC UEs | other | ZTE | R1-75 | - | [WTS] [JSN] | |||
| R1-135360 | Discussion on Control Channel Coverage Improvement | other | ZTE | R1-75 | - | [WTS] [JSN] | |||
| R1-135361 | Simplification of PHICH and PCFICH functionalities for coverage improvement MTC Ues | other | ZTE | R1-75 | - | [WTS] [JSN] | |||
| R1-135362 | Discussion on Traffic Channel Coverage Improvement | other | ZTE | R1-75 | - | [WTS] [JSN] | |||
| R1-135363 | Summary of email discussion on SIB coverage improvement for MTC UE | other | ZTE | R1-75 | - | [WTS] [JSN] | |||
| R1-135364 | Some Remaining Issues about Uplink Power Control | other | ZTE | R1-75 | - | [WTS] [JSN] | |||
| R1-135365 | Remaining Details of Signalling for TDD UL-DL Reconfiguration | other | ZTE | R1-75 | - | [WTS] [JSN] | |||
| R1-135366 | Remaining Details of HARQ | other | ZTE | R1-75 | - | [WTS] [JSN] | |||
| R1-135367 | CSI feedback enhancement for TDD eIMTA | other | ZTE | R1-75 | - | [WTS] [JSN] | |||
| R1-135368 | Considerations on synchronization of D2D broadcast communication | other | ZTE | R1-75 | - | [WTS] [JSN] | |||
| R1-135369 | Control Channel Design for D2D link | other | ZTE | R1-75 | - | [WTS] [JSN] | |||
| R1-135370 | Study on D2D Resource Allocation | other | ZTE | R1-75 | - | [WTS] [JSN] | |||
| R1-135371 | Performance Aspects of Discovery Signals | other | ZTE | R1-75 | - | [WTS] [JSN] | |||
| R1-135372 | Resource Allocation for D2D Discovery Type 1 | other | ZTE | R1-75 | - | [WTS] [JSN] | |||
| R1-135373 | Discussions on necessity of supporting Discovery Type 2 | other | ZTE | R1-75 | - | [WTS] [JSN] | |||
| R1-135374 | Timing options for D2D | other | ZTE | R1-75 | - | [WTS] [JSN] | |||
| R1-135375 | Further evaluation of SSPS/SSPM with non-ideal backhaul | other | ZTE | R1-75 | - | [WTS] [JSN] | |||
| R1-135376 | Further evaluation of CS with non-ideal backhaul | other | ZTE | R1-75 | - | [WTS] [JSN] | |||
| R1-135377 | Signalling for inter-eNB CoMP with NIB | other | ZTE | R1-75 | - | [WTS] [JSN] | |||
| R1-135378 | System level performance evaluation for E-MMSE-IRC | other | ZTE | R1-75 | - | [WTS] [JSN] | |||
| R1-135379 | Symbol level SIC performance evaluation | other | ZTE | R1-75 | - | [WTS] [JSN] | |||
| R1-135380 | Consideration on Network Signalling and Coordination for NAICS | other | ZTE | R1-75 | - | [WTS] [JSN] | |||
| R1-135381 | Design target for discovery enhancement | other | Huawei, HiSilicon | R1-75 | - | [WTS] [JSN] | |||
| R1-135382 | Determining the repetition level during initial random access and non-initial random access | other | Huawei, HiSilicon | R1-75 | - | [WTS] [JSN] | |||
| R1-135383 | Standard impact of TDD-FDD CA for UEs not supporting simultaneous transmission and reception | other | Huawei, HiSilicon | R1-75 | - | [WTS] [JSN] | |||
| R1-135384 | Modeling of large scale parameters in high rise scenario | other | Huawei, HiSilicon | R1-75 | - | [WTS] [JSN] | |||
| R1-135385 | On the need of a feedback loop for D2D communication | other | Huawei, HiSilicon | R1-75 | - | [WTS] [JSN] | |||
| R1-135386 | Physical channel design for D2D communication | other | Huawei, HiSilicon | R1-75 | - | [WTS] [JSN] | |||
| R1-135387 | UL Power control enhancement in eIMTA | other | Panasonic | R1-75 | - | [WTS] [JSN] | |||
| R1-135388 | Further issues related to email discussion [74bis-02] | other | Panasonic | R1-75 | - | [WTS] [JSN] | |||
| R1-135389 | Analysis and proposal for explicit+implicit reconfiguration signalling | other | Panasonic | R1-75 | - | [WTS] [JSN] | |||
| R1-135390 | Reconfiguration message remaining details | other | Panasonic | R1-75 | - | [WTS] [JSN] | |||
| R1-135391 | Remaining Details for HARQ Timing | other | Panasonic | R1-75 | - | [WTS] [JSN] | |||
| R1-135392 | TBS size and simultaneous receptoin capability on low category UE with enhanced coverage mode | other | Panasonic | R1-75 | - | [WTS] [JSN] | |||
| R1-135393 | Summary of PBCH transmission for MTC | other | Panasonic | R1-75 | - | [WTS] [JSN] | |||
| R1-135394 | (E)PDCCH coverage enhancement for MTC | other | Panasonic | R1-75 | - | [WTS] [JSN] | |||
| R1-135395 | Specification Impact of Introducing 256QAM | other | Panasonic | R1-75 | - | [WTS] [JSN] | |||
| R1-135396 | Definition of backward compatibiltiy | other | Panasonic | R1-75 | - | [WTS] [JSN] | |||
| R1-135397 | Discussion on small cell on/off transition time reduction procedure | other | Panasonic | R1-75 | - | [WTS] [JSN] | |||
| R1-135398 | Clarification on D2D synchronization procedure | other | Panasonic | R1-75 | - | [WTS] [JSN] | |||
| R1-135399 | Physical channel design in D2D communication | other | Panasonic | R1-75 | - | [WTS] [JSN] | |||
| R1-135400 | Consideration on contention based and scheduling based resource allocation schemes in D2D | other | Panasonic | R1-75 | - | [WTS] [JSN] | |||
| R1-135401 | Signalling mechanisms for interference information | other | Panasonic | R1-75 | - | [WTS] [JSN] | |||
| R1-135402 | Public safety usage and impacts on synchronization | other | EADS | R1-75 | - | [WTS] [JSN] | |||
| R1-135403 | Views on Higher Order Modulation in Rel. 12 | other | Hitachi Ltd. | R1-75 | - | [WTS] [JSN] | |||
| R1-135404 | CoMP Schemes and Backhaul Signalling for NIB | other | Hitachi Ltd. | R1-75 | - | [WTS] [JSN] | |||
| R1-135405 | Discussion of transition time in dormant mode on-off switching | other | Hitachi Ltd. | R1-75 | - | [WTS] [JSN] | |||
| R1-135406 | Impact of small cell on-off switching on radio interface-based network synchronization | other | Hitachi Ltd. | R1-75 | - | [WTS] [JSN] | |||
| R1-135407 | Details of 3D UMa with one high rise per sector | other | Hitachi Ltd. | R1-75 | - | [WTS] [JSN] | |||
| R1-135408 | Initial Calibration Results for 3D Channel Modeling | other | Hitachi Ltd. | R1-75 | - | [WTS] [JSN] | |||
| R1-135409 | Remaining Simulation Assumptions for 3D Channel Model Calibration | other | Hitachi Ltd. | R1-75 | - | [WTS] [JSN] | |||
| R1-135410 | UL power control enhancement with dynamic subframe sets for TDD eIMTA | other | ITRI | R1-75 | - | [WTS] [JSN] | |||
| R1-135411 | HARQ resource collision issue in TDD eIMTA system | other | ITRI | R1-75 | - | [WTS] [JSN] | |||
| R1-135412 | View on CSI-RS Resource Coordination for CoMP | other | ITRI | R1-75 | - | [WTS] [JSN] | |||
| R1-135413 | Maximum number of DL HARQ processes for TDD eIMTA | other | ITRI | R1-75 | - | [WTS] [JSN] | |||
| R1-135414 | PBCH coverage improvement technique for MTC devices | other | ITRI | R1-75 | - | [WTS] [JSN] | |||
| R1-135415 | Spectrum utilization model for D2D communications and discovery | other | ITRI | R1-75 | - | [WTS] [JSN] | |||
| R1-135416 | AGC Impact to Discovery Signal Design | other | ITRI | R1-75 | - | [WTS] [JSN] | |||
| R1-135417 | RF Blocking effect evaluation under FDM-based radio resource allocation | other | ITRI | R1-75 | - | [WTS] [JSN] | |||
| R1-135418 | Frequency Reuse for D2D Broadcast Communication | other | ITRI | R1-75 | - | [WTS] [JSN] | |||
| R1-135419 | Power headroom reporting in TDD eIMTA systems | other | MediaTek Inc. | R1-75 | - | [WTS] [JSN] | |||
| R1-135420 | Fallback solution on missing TDD UL-DL configuration | other | MediaTek Inc. | R1-75 | - | [WTS] [JSN] | |||
| R1-135421 | Discussion on HARQ-ACK PUCCH resource for TDD eIMTA | other | MediaTek Inc. | R1-75 | - | [WTS] [JSN] | |||
| R1-135422 | On the need of PDCCH for SIB and other Common Channels | other | MediaTek Inc. | R1-75 | - | [WTS] [JSN] | |||
| R1-135423 | System information transmission in coverage enhancement mode | other | MediaTek Inc. | R1-75 | - | [WTS] [JSN] | |||
| R1-135424 | Discussion on PRACH and RACH procedure in coverage enhancement mode | other | MediaTek Inc. | R1-75 | - | [WTS] [JSN] | |||
| R1-135425 | Discussion on (E)PDCCH coverage enhancement | other | MediaTek Inc. | R1-75 | - | [WTS] [JSN] | |||
| R1-135426 | Functionality and coverage analysis of PUCCH | other | MediaTek Inc. | R1-75 | - | [WTS] [JSN] | |||
| R1-135427 | Discussion on timing relationship for (E)PDCCH and PDSCH | other | MediaTek Inc. | R1-75 | - | [WTS] [JSN] | |||
| R1-135428 | On UL HARQ functionality and PHICH enhancement | other | MediaTek Inc. | R1-75 | - | [WTS] [JSN] | |||
| R1-135429 | PUCCH transmission on Scell for TDD-FDD CA | other | MediaTek Inc. | R1-75 | - | [WTS] [JSN] | |||
| R1-135430 | TDM UL transmission for TDD-FDD DL CA capable UE with single transmitter | other | MediaTek Inc. | R1-75 | - | [WTS] [JSN] | |||
| R1-135431 | Further evaluation for small cell on/off with different transition time scales | other | MediaTek Inc. | R1-75 | - | [WTS] [JSN] | |||
| R1-135432 | On RSRP gap requirement for small cell discovery | other | MediaTek Inc. | R1-75 | - | [WTS] [JSN] | |||
| R1-135433 | On detection rate requirement for small cell discovery | other | MediaTek Inc. | R1-75 | - | [WTS] [JSN] | |||
| R1-135434 | New small cell discovery and measurement scheme based on CRS | other | MediaTek Inc. | R1-75 | - | [WTS] [JSN] | |||
| R1-135435 | Details for system level modeling of ML/R-ML receivers and text proposal | other | MediaTek Inc. | R1-75 | - | [WTS] [JSN] | |||
| R1-135436 | System level results for R-ML receivers for scenario #1 | other | MediaTek Inc. | R1-75 | - | [WTS] [JSN] | |||
| R1-135437 | On network coordination/signaling for NAICS and possible specification impact | other | MediaTek Inc. | R1-75 | - | [WTS] [JSN] | |||
| R1-135438 | Discussion on DCH Enhancement Solutions | other | MediaTek Inc. | R1-75 | - | [WTS] [JSN] | |||
| R1-135439 | System Level Performance for FET Design | other | MediaTek Inc. | R1-75 | - | [WTS] [JSN] | |||
| R1-135440 | A Hybrid Design for DCH Enhancements | other | MediaTek Inc. | R1-75 | - | [WTS] [JSN] | |||
| R1-135441 | Remaining Issues of DCH Enhancement | other | MediaTek Inc. | R1-75 | - | [WTS] [JSN] | |||
| R1-135442 | Discussion on PDSCH timing in TDD-FDD CA | other | Potevio | R1-75 | - | [WTS] [JSN] | |||
| R1-135443 | Discussion on PUSCH timing in TDD-FDD CA | other | Potevio | R1-75 | - | [WTS] [JSN] | |||
| R1-135444 | Discussion on CSI feedback for eIMTA | other | Potevio | R1-75 | - | [WTS] [JSN] | |||
| R1-135445 | On remaining details of HARQ for eIMTA | other | Potevio | R1-75 | - | [WTS] [JSN] | |||
| R1-135446 | Simplified functionalities of PCFICH for low-cost MTC UEs | other | ITL Inc. | R1-75 | - | [WTS] [JSN] | |||
| R1-135447 | HARQ and scheduling timing for TDD-FDD CA | other | ITL Inc. | R1-75 | - | [WTS] [JSN] | |||
| R1-135448 | Discussion on Enhancement for Semi-static Small Cell on/off | other | ITL Inc. | R1-75 | - | [WTS] [JSN] | |||
| R1-135449 | Views on Fast Fading Modeling in the 3D-UMa-with-one-high-rise-per-sector-with-300m-ISD Scenario | other | KDDI | R1-75 | - | [WTS] [JSN] | |||
| R1-135450 | Specification Impacts for Higher Order Modulation in DL | other | KDDI | R1-75 | - | [WTS] [JSN] | |||
| R1-135451 | Views on Type2 discovery resource allocation | other | KDDI | R1-75 | - | [WTS] [JSN] | |||
| R1-135452 | Remaining Details of Uplink Power Control for TDD eIMTA | other | LG Electronics | R1-75 | - | [WTS] [JSN] | |||
| R1-135453 | Remaining Details of CSI Measurement and Report for TDD eIMTA | other | LG Electronics | R1-75 | - | [WTS] [JSN] | |||
| R1-135454 | Remaining Details of signalling for TDD eIMTA | other | LG Electronics | R1-75 | - | [WTS] [JSN] | |||
| R1-135455 | Remaining HARQ Details for TDD eIMTA | other | LG Electronics | R1-75 | - | [WTS] [JSN] | |||
| R1-135456 | Other Design Aspects for TDD eIMTA | other | LG Electronics | R1-75 | - | [WTS] [JSN] | |||
| R1-135457 | Support of low cost features and enhanced coverage for MTC UE | other | LG Electronics | R1-75 | - | [WTS] [JSN] | |||
| R1-135458 | PBCH transmission for MTC coverage enhancement | other | LG Electronics | R1-75 | - | [WTS] [JSN] | |||
| R1-135459 | Evaluation on PBCH repetition for MTC coverage enhancement | other | LG Electronics | R1-75 | - | [WTS] [JSN] | |||
| R1-135460 | RACH procedure for MTC coverage enhancement | other | LG Electronics | R1-75 | - | [WTS] [JSN] | |||
| R1-135461 | PDCCH transmission for MTC coverage enhancement | other | LG Electronics | R1-75 | - | [WTS] [JSN] | |||
| R1-135462 | PDSCH/PUSCH transmission for MTC coverage enhancement | other | LG Electronics | R1-75 | - | [WTS] [JSN] | |||
| R1-135463 | Basic assumptions and requirements for TDD-FDD CA | other | LG Electronics | R1-75 | - | [WTS] [JSN] | |||
| R1-135464 | Considerations on HARQ-ACK and DCI for TDD-FDD CA | other | LG Electronics | R1-75 | - | [WTS] [JSN] | |||
| R1-135465 | DL HARQ timing for TDD-FDD carrier aggregation | other | LG Electronics | R1-75 | - | [WTS] [JSN] | |||
| R1-135466 | UL HARQ timing for TDD-FDD carrier aggregation | other | LG Electronics | R1-75 | - | [WTS] [JSN] | |||
| R1-135467 | Discussion on TTI bundling enhancements for UL VoIP | other | LG Electronics | R1-75 | - | [WTS] [JSN] | |||
| R1-135468 | Discussion on TTI Bundling Extension for TDD configurations | other | LG Electronics | R1-75 | - | [WTS] [JSN] | |||
| R1-135469 | Remaining issues on TTI bundling enhancements for VoIP and medium rate PUSCH | other | LG Electronics | R1-75 | - | [WTS] [JSN] | |||
| R1-135470 | Considerations on MBSFN UE measurement | other | LG Electronics | R1-75 | - | [WTS] [JSN] | |||
| R1-135471 | Specification impact on CQI for 256QAM support | other | LG Electronics | R1-75 | - | [WTS] [JSN] | |||
| R1-135472 | Specification impact on DL signaling for 256QAM support | other | LG Electronics | R1-75 | - | [WTS] [JSN] | |||
| R1-135473 | Further discussions on small cell on/off | other | LG Electronics | R1-75 | - | [WTS] [JSN] | |||
| R1-135474 | Considerations on small cell network synchronization based on network listening | other | LG Electronics | R1-75 | - | [WTS] [JSN] | |||
| R1-135475 | UE orientation and antenna pattern in 3D channel model | other | LG Electronics | R1-75 | - | [WTS] [JSN] | |||
| R1-135476 | Phase 2 simulation assumptions for evaluating the baseline performance | other | LG Electronics | R1-75 | - | [WTS] [JSN] | |||
| R1-135477 | Initial results for phase-1 calibration | other | LG Electronics | R1-75 | - | [WTS] [JSN] | |||
| R1-135478 | Discussion on 3D UMa with one high rise per sector with 300m ISD | other | LG Electronics | R1-75 | - | [WTS] [JSN] | |||
| R1-135479 | Discussion on design of D2DSS and PD2DSCH | other | LG Electronics | R1-75 | - | [WTS] [JSN] | |||
| R1-135480 | D2D Communication Physical Channel Design | other | LG Electronics | R1-75 | - | [WTS] [JSN] | |||
| R1-135481 | Discussion on resource allocation in D2D communications | other | LG Electronics | R1-75 | - | [WTS] [JSN] | |||
| R1-135482 | Multiplexing of Uu and D2D communication | other | LG Electronics | R1-75 | - | [WTS] [JSN] | |||
| R1-135483 | Discussion on D2D Communication Scheduling Method | other | LG Electronics | R1-75 | - | [WTS] [JSN] | |||
| R1-135484 | D2D Discovery Signal Format | other | LG Electronics | R1-75 | - | [WTS] [JSN] | |||
| R1-135485 | Resource Allocation and UE Behavior for D2D Discovery | other | LG Electronics | R1-75 | - | [WTS] [JSN] | |||
| R1-135486 | Discussion on multiplexing of Uu and D2D discovery | other | LG Electronics | R1-75 | - | [WTS] [JSN] | |||
| R1-135487 | D2D Discovery Signal Transmission Timing | other | LG Electronics | R1-75 | - | [WTS] [JSN] | |||
| R1-135488 | Discussion on Synchronization for D2D Communications | other | LG Electronics | R1-75 | - | [WTS] [JSN] | |||
| R1-135489 | Issues on D2D Signal Transmissions and Receptions across Carriers | other | LG Electronics | R1-75 | - | [WTS] [JSN] | |||
| R1-135490 | Further evaluation results for DL CoMP with non-ideal backhaul | other | LG Electronics | R1-75 | - | [WTS] [JSN] | |||
| R1-135491 | Considerations on inter-eNB signaling for DL CoMP with non-ideal backhaul | other | LG Electronics | R1-75 | - | [WTS] [JSN] | |||
| R1-135492 | Discussion on inter-eNB signaling for UL CoMP with non-ideal backhaul | other | LG Electronics | R1-75 | - | [WTS] [JSN] | |||
| R1-135493 | Considerations on network coordination and signaling for NAICS | other | LG Electronics | R1-75 | - | [WTS] [JSN] | |||
| R1-135494 | ProSe device-to-device voice communications and impact upon channel design | other | General Dynamics Broadband UK | R1-75 | - | [WTS] [JSN] | |||
| R1-135495 | ProSe device-to-device communication control channel design | other | General Dynamics Broadband UK | R1-75 | - | [WTS] [JSN] | |||
| R1-135496 | ProSe device-to-device discovery sequence design | other | General Dynamics Broadband UK | R1-75 | - | [WTS] [JSN] | |||
| R1-135497 | ProSe device-to-device discovery link performance | other | General Dynamics Broadband UK | R1-75 | - | [WTS] [JSN] | |||
| R1-135498 | ProSe device-to-device discovery system simulations | other | General Dynamics Broadband UK | R1-75 | - | [WTS] [JSN] | |||
| R1-135499 | Remaining Details of UL Power Control in TDD eIMTA | other | HTC | R1-75 | - | [WTS] [JSN] | |||
| R1-135500 | On aperiodic CSI reporting in TDD eIMTA systems | other | HTC | R1-75 | - | [WTS] [JSN] | |||
| R1-135501 | HARQ details in TDD eIMTA systems | other | HTC | R1-75 | - | [WTS] [JSN] | |||
| R1-135502 | PBCH Coverage Improvement for MTC Devices | other | HTC | R1-75 | - | [WTS] [JSN] | |||
| R1-135503 | Discussion on TTI bundling enhancement for TDD | other | HTC | R1-75 | - | [WTS] [JSN] | |||
| R1-135504 | D2D discovery signal and message content | other | HTC | R1-75 | - | [WTS] [JSN] | |||
| R1-135505 | Resource allocation for D2D discovery | other | HTC | R1-75 | - | [WTS] [JSN] | |||
| R1-135506 | Further Discussion on Backhaul Signaling for eIMTA | other | NTT DOCOMO | R1-75 | - | [WTS] [JSN] | |||
| R1-135507 | Some Viewpoints about Reconfiguration Signaling Design | other | NTT DOCOMO | R1-75 | - | [WTS] [JSN] | |||
| R1-135508 | Discussion on Remaining Issues for eIMTA HARQ | other | NTT DOCOMO | R1-75 | - | [WTS] [JSN] | |||
| R1-135509 | Discussion on multi-level PRACH coverage enhancement | other | NTT DOCOMO | R1-75 | - | [WTS] [JSN] | |||
| R1-135510 | RNTI handling in (E)PDCCH coverage enhancement | other | NTT DOCOMO | R1-75 | - | [WTS] [JSN] | |||
| R1-135511 | Views on PDSCH coverage enhancement | other | NTT DOCOMO | R1-75 | - | [WTS] [JSN] | |||
| R1-135512 | Scheduling/HARQ design for TDD-FDD CA other than PUCCH for UL-CA | other | NTT DOCOMO | R1-75 | - | [WTS] [JSN] | |||
| R1-135513 | On the need of PUCCH on multiple UL serving cells for TDD-FDD CA | other | NTT DOCOMO | R1-75 | - | [WTS] [JSN] | |||
| R1-135514 | Details of Small Cell On/Off with Small Cell Discovery | other | NTT DOCOMO | R1-75 | - | [WTS] [JSN] | |||
| R1-135515 | Views on target design for small cell discovery enhancement | other | NTT DOCOMO | R1-75 | - | [WTS] [JSN] | |||
| R1-135516 | Discussion on issues for inter-frequency measurement | other | NTT DOCOMO | R1-75 | - | [WTS] [JSN] | |||
| R1-135517 | Operators' views on efficient inter-frequency small cell discovery | other | NTT DOCOMO | R1-75 | - | [WTS] [JSN] | |||
| R1-135518 | Remaining details on Fast Fading Model for 3D-channel | other | NTT DOCOMO | R1-75 | - | [WTS] [JSN] | |||
| R1-135519 | Phase 1 Calibration Results for 3D-Channel Model | other | NTT DOCOMO | R1-75 | - | [WTS] [JSN] | |||
| R1-135520 | Initial Phase 2 Calibration Results for 3D-Channel Model | other | NTT DOCOMO | R1-75 | - | [WTS] [JSN] | |||
| R1-135521 | Evaluation on PRB size and period of sending discovery signals | other | NTT DOCOMO | R1-75 | - | [WTS] [JSN] | |||
| R1-135522 | Views on D2D discovery resource allocation | other | NTT DOCOMO | R1-75 | - | [WTS] [JSN] | |||
| R1-135523 | Further Evaluation Results for CoMP-NIB | other | NTT DOCOMO | R1-75 | - | [WTS] [JSN] | |||
| R1-135524 | Details on Backhaul Signaling for CoMP-NIB | other | NTT DOCOMO | R1-75 | - | [WTS] [JSN] | |||
| R1-135525 | Evaluation Results on Validation of Link-to-System Mapping for NAICS | other | NTT DOCOMO | R1-75 | - | [WTS] [JSN] | |||
| R1-135526 | Initial phase 2 calibration results of 3D channel model | other | ZTE | R1-75 | - | [WTS] [JSN] | |||
| R1-135527 | Discussion on channel model for high rise scenario | other | ZTE | R1-75 | - | [WTS] [JSN] | |||
| R1-135528 | Views on fast fading modeling for 3D UMA and 3D UMI | other | ZTE | R1-75 | - | [WTS] [JSN] | |||
| R1-135529 | Proposal to support longer D2D discovery message sizes | other | Motorola Solutions | R1-75 | - | [WTS] [JSN] | |||
| R1-135530 | Near-Far Mitigation for D2D Discovery | other | Huawei, HiSilicon | R1-75 | - | [WTS] [JSN] | |||
| R1-135531 | Remaining details of fast fading modeling | other | Huawei, HiSilicon | R1-75 | - | [WTS] [JSN] | |||
| R1-135532 | Design considerations for D2DSS | other | Huawei, HiSilicon | R1-75 | - | [WTS] [JSN] | |||
| R1-135533 | System level simulation results for NAICS in scenario 1 | other | Huawei, HiSilicon | R1-75 | - | [WTS] [JSN] | |||
| R1-135534 | System level modelling methodology for SLIC receiver | other | Huawei, HiSilicon | R1-75 | - | [WTS] [JSN] | |||
| R1-135535 | CSI measurement and reporting in TDD eIMTA | other | Broadcom Corporation | R1-75 | - | [WTS] [JSN] | |||
| R1-135536 | PUCCH resource mapping for TDD eIMTA | other | Broadcom Corporation | R1-75 | - | [WTS] [JSN] | |||
| R1-135537 | Backwards compatibility in TDD eIMTA | other | Broadcom Corporation | R1-75 | - | [WTS] [JSN] | |||
| R1-135538 | Control Channel Coverage Improvement | other | Broadcom Corporation | R1-75 | - | [WTS] [JSN] | |||
| R1-135539 | Small cell semi-static ON/OFF with a discovery signal | other | Broadcom Corporation | R1-75 | - | [WTS] [JSN] | |||
| R1-135540 | Computation of Antenna Fields for 3D System Simulation | other | Broadcom Corporation | R1-75 | - | [WTS] [JSN] | |||
| R1-135541 | Observations on Large Scale Parameter Models for 3D System Simulation | other | Broadcom Corporation | R1-75 | - | [WTS] [JSN] | |||
| R1-135542 | Synchronization Design for D2D communication | other | Broadcom Corporation | R1-75 | - | [WTS] [JSN] | |||
| R1-135543 | D2D communication channel access | other | Broadcom Corporation | R1-75 | - | [WTS] [JSN] | |||
| R1-135544 | In-Coverage ProSe Synchronization and Timing | other | Broadcom Corporation | R1-75 | - | [WTS] [JSN] | |||
| R1-135545 | Signaling aspects for CoMP with non-ideal backhaul | other | Broadcom Corporation | R1-75 | - | [WTS] [JSN] | |||
| R1-135546 | TP for Link to System Modeling of WLMMSE-IRC | other | Broadcom Corporation | R1-75 | - | [WTS] [JSN] | |||
| R1-135547 | Signaling and Coordination in NAICS | other | Broadcom Corporation | R1-75 | - | [WTS] [JSN] | |||
| R1-135548 | Text Proposal for turbo-CWIC receivers System Level Modeling Methodology | other | Orange | R1-75 | - | [WTS] [JSN] | |||
| R1-135549 | Initial results for 3D Channel Model Phase 2 and different UE attachment options | other | Orange | R1-75 | - | [WTS] [JSN] | |||
| R1-135550 | Shadow fading modeling for microcell scenario based on a measurement campaign | other | Orange | R1-75 | - | [WTS] [JSN] | |||
| R1-135551 | On solutions for radio-based synchronization | other | BlackBerry UK Limited | R1-75 | - | [WTS] [JSN] | |||
| R1-135552 | Signaling between inter-eNB to support CoMP with NIB | other | BlackBerry UK Limited | R1-75 | - | [WTS] [JSN] | |||
| R1-135553 | NAICS Coordination Performance and Requirements for TM9/10 | other | BlackBerry UK Limited | R1-75 | - | [WTS] [JSN] | |||
| R1-135554 | Configuration and Reception of D2D Synchronization and Control Channels | other | BlackBerry UK Limited | R1-75 | - | [WTS] [JSN] | |||
| R1-135555 | System level performance of discovery using HARQ combining | other | BlackBerry UK Limited | R1-75 | - | [WTS] [JSN] | |||
| R1-135556 | Solutions for TDD-FDD joint carrier aggregation | other | BlackBerry UK Limited | R1-75 | - | [WTS] [JSN] | |||
| R1-135557 | Summary of email discussion on summary of link results for different IC receivers [74bis-15] | other | BlackBerry UK Limited | R1-75 | - | [WTS] [JSN] | |||
| R1-135558 | Remaining details for enhanced UL power control for TDD eIMTA | other | Nokia, NSN | R1-75 | - | [WTS] [JSN] | |||
| R1-135559 | Power headroom report for enhanced UL power control in TDD eIMTA | other | NSN, Nokia | R1-75 | - | [WTS] [JSN] | |||
| R1-135560 | On the remaining issues of necessary backhaul signalling for TDD eIMTA | other | NSN, Nokia | R1-75 | - | [WTS] [JSN] | |||
| R1-135561 | On details of UL-DL reconfiguration signalling | other | NSN, Nokia | R1-75 | - | [WTS] [JSN] | |||
| R1-135562 | On HARQ-ACK PUCCH Formats and Resource allocation for TDD eIMTA | other | NSN, Nokia | R1-75 | - | [WTS] [JSN] | |||
| R1-135563 | Remaining details on UL and DL reference configurations | other | NSN, Nokia | R1-75 | - | [WTS] [JSN] | |||
| R1-135564 | On Transmission Modes for TDD eIMTA | other | NSN, Nokia | R1-75 | - | [WTS] [JSN] | |||
| R1-135565 | Discussion on system level modelling methodology | other | Nokia, NSN | R1-75 | - | [WTS] [JSN] | |||
| R1-135566 | L2S mapping methodology for E-LMMSE-IRC receiver | other | Nokia, NSN | R1-75 | - | [WTS] [JSN] | |||
| R1-135567 | System level performance of E-LMMSE-IRC | other | Nokia, NSN | R1-75 | - | [WTS] [JSN] | |||
| R1-135568 | System performance based on non-linear receivers | other | NSN, Nokia | R1-75 | - | [WTS] [JSN] | |||
| R1-135569 | On the NAICS system and specification impact | other | NSN, Nokia | R1-75 | - | [WTS] [JSN] | |||
| R1-135570 | Number of DL HARQ Processes for Low-Cost MTC UE | other | NSN, Nokia | R1-75 | - | [WTS] [JSN] | |||
| R1-135571 | Performance Evaluation of PBCH With Repetition | other | NSN, Nokia | R1-75 | - | [WTS] [JSN] | |||
| R1-135572 | SIB Coverage Enhancement | other | NSN, Nokia | R1-75 | - | [WTS] [JSN] | |||
| R1-135573 | PRACH Coverage Enhancement | other | NSN, Nokia | R1-75 | - | [WTS] [JSN] | |||
| R1-135574 | PUCCH UCI in Coverage Enhancement Mode | other | NSN, Nokia | R1-75 | - | [WTS] [JSN] | |||
| R1-135575 | PDCCH Coverage Enhancement | other | NSN, Nokia | R1-75 | - | [WTS] [JSN] | |||
| R1-135576 | Data Channel Coverage Enhancement | other | NSN, Nokia | R1-75 | - | [WTS] [JSN] | |||
| R1-135577 | Support of cross-carrier scheduling in TDD-FDD CA | other | Nokia, NSN | R1-75 | - | [WTS] [JSN] | |||
| R1-135578 | HARQ-ACK timing in TDD-FDD CA | other | Nokia, NSN | R1-75 | - | [WTS] [JSN] | |||
| R1-135579 | LTE coverage enhancements for UL VoIP users in FDD mode | other | NSN, Nokia | R1-75 | - | [WTS] [JSN] | |||
| R1-135580 | Coverage enhancements in TDD mode | other | NSN, Nokia | R1-75 | - | [WTS] [JSN] | |||
| R1-135581 | Medium data rate PUSCH enhancements in FDD mode | other | NSN, Nokia | R1-75 | - | [WTS] [JSN] | |||
| R1-135582 | Measurements for further MBMS operations support | other | Nokia, NSN | R1-75 | - | [WTS] [JSN] | |||
| R1-135583 | Effect of eNB power-backoff on 256QAM system performance | other | Nokia, NSN | R1-75 | - | [WTS] [JSN] | |||
| R1-135584 | On Standardization Impact of DL Higher Order Modulation | other | Nokia, NSN | R1-75 | - | [WTS] [JSN] | |||
| R1-135585 | On small cell discovery and on/off enhancements | other | NSN, Nokia | R1-75 | - | [WTS] [JSN] | |||
| R1-135586 | Performance Evaluation of Radio-Interface based Synchronization | other | NSN, Nokia | R1-75 | - | [WTS] [JSN] | |||
| R1-135587 | TP for polarization and mechanical tilt modeling | other | NSN, Nokia | R1-75 | - | [WTS] [JSN] | |||
| R1-135588 | Remaining details of fast-fading for 3D-UMa and 3D-UMa | other | NSN, Nokia | R1-75 | - | [WTS] [JSN] | |||
| R1-135589 | Remaining simulation assumptions for channel model calibration/baseline | other | NSN, Nokia | R1-75 | - | [WTS] [JSN] | |||
| R1-135590 | Summary of Phase-1 calibration results according to [74bis-12] email discussion | other | NSN, Nokia | R1-75 | - | [WTS] [JSN] | |||
| R1-135591 | D2D synchronization and transmission timing | other | Nokia, NSN | R1-75 | - | [WTS] [JSN] | |||
| R1-135592 | Resource allocation, multiplexing and resource access | other | Nokia, NSN | R1-75 | - | [WTS] [JSN] | |||
| R1-135593 | D2D discovery signal design | other | Nokia, NSN | R1-75 | - | [WTS] [JSN] | |||
| R1-135594 | Resource allocation and inter-cell discovery | other | Nokia, NSN | R1-75 | - | [WTS] [JSN] | |||
| R1-135595 | Simulation Results for CoMP scenario.2 with non-ideal backhaul | other | NSN, Nokia | R1-75 | - | [WTS] [JSN] | |||
| R1-135596 | Simulation Results for small cell Scenarios with non-ideal backhaul | other | NSN, Nokia | R1-75 | - | [WTS] [JSN] | |||
| R1-135597 | Signaling design considerations to support inter-eNB CoMP | other | NSN, Nokia | R1-75 | - | [WTS] [JSN] | |||
| R1-135598 | On remaining details for UL power control with eIMTA | other | InterDigital | R1-75 | - | [WTS] [JSN] | |||
| R1-135599 | On HARQ feedback and PUCCH resource allocation for eIMTA | other | InterDigital | R1-75 | - | [WTS] [JSN] | |||
| R1-135600 | Additional considerations for the new Low Cost UE category | other | InterDigital | R1-75 | - | [WTS] [JSN] | |||
| R1-135601 | On PBCH Coverage Enhancement for LC-MTC | other | InterDigital | R1-75 | - | [WTS] [JSN] | |||
| R1-135602 | Recommendations on TTI bundling enhancements for VoIP | other | InterDigital | R1-75 | - | [WTS] [JSN] | |||
| R1-135603 | Remaining Issues on UE Attachment for 3D Channel Model Calibration | other | InterDigital | R1-75 | - | [WTS] [JSN] | |||
| R1-135604 | Phase 2 Calibration Results for 3D Channel Model | other | InterDigital | R1-75 | - | [WTS] [JSN] | |||
| R1-135605 | Synchronization for D2D communication | other | InterDigital | R1-75 | - | [WTS] [JSN] | |||
| R1-135606 | L1 channel design for D2D communication | other | InterDigital | R1-75 | - | [WTS] [JSN] | |||
| R1-135607 | Evaluation results for D2D PUSCH resource allocation methods | other | InterDigital | R1-75 | - | [WTS] [JSN] | |||
| R1-135608 | Enhancements for transition time reduction | other | InterDigital | R1-75 | - | [WTS] [JSN] | |||
| R1-135609 | Code spreading for PUSCH and PDSCH coverage improvement in FDD | other | III | R1-75 | - | [WTS] [JSN] | |||
| R1-135610 | Continuous wave jamming impact on high order modulation small cell transmission | other | III | R1-75 | - | [WTS] [JSN] | |||
| R1-135611 | Clarification on non-MBSFN Region | other | Intel, Panasonic, Fujitsu, Huawei, HiSilicon, NEC, Texas Instruments, Qualcomm Inc., CATT, Interdigital, Ericsson | R1-75 | - | [WTS] [JSN] | |||
| R1-135612 | Evaluation results for 256QAM | other | Intel Corporation | R1-75 | - | [WTS] [JSN] | |||
| R1-135613 | Discussion on D2D data physical channel | other | Intel Corporation | R1-75 | - | [WTS] [JSN] | |||
| R1-135614 | Discussion on D2D transmission timing | other | Intel Corporation | R1-75 | - | [WTS] [JSN] | |||
| R1-135615 | HARQ considerations for TDD-FDD CA | other | Texas Instruments | R1-75 | - | [WTS] [JSN] | |||
| R1-135616 | UL Power Control for e-IMTA | other | ASUSTeK | R1-75 | - | [WTS] [JSN] | |||
| R1-135617 | Method of resource allocation for D2D discovery | other | ASUSTeK | R1-75 | - | [WTS] [JSN] | |||
| R1-135618 | 25.214 CR DRAFT (Rel-11, F) Allow (De)activate DRX / DTX with HS-SCCH Order in Multiflow Mode with Intra-NodeB Operation | other | ZTE | R1-75 | - | [WTS] [JSN] | |||
| R1-135619 | Uplink ACK Channel Design for DL FET | other | ZTE | R1-75 | - | [WTS] [JSN] | |||
| R1-135620 | Evaluation of Uplink ACK Channel Design for DL FET | other | ZTE | R1-75 | - | [WTS] [JSN] | |||
| R1-135621 | E-DCH Decoupling for Legacy UE | other | ZTE | R1-75 | - | [WTS] [JSN] | |||
| R1-135622 | Simulation Result for E-DCH Decoupling combined with CIO in UMTS HetNet | other | ZTE | R1-75 | - | [WTS] [JSN] | |||
| R1-135623 | Further Link Evaluation for HSUPA Rate Adaptation | other | ZTE | R1-75 | - | [WTS] [JSN] | |||
| R1-135624 | Uplink DPCCH Overhead Reduction | other | ZTE | R1-75 | - | [WTS] [JSN] | |||
| R1-135625 | TP on Uplink DPCCH Overhead Reduction | other | ZTE | R1-75 | - | [WTS] [JSN] | |||
| R1-135626 | Draft TR 25.701 of Scalable UMTS | other | China Unicom | R1-75 | - | [WTS] [JSN] | |||
| R1-135627 | TP on overall conclusions for Scalable UMTS | other | China Unicom | R1-75 | - | [WTS] [JSN] | |||
| R1-135628 | Discussion on PUCCH transmission for TDD-FDD CA | other | CMCC | R1-75 | - | [WTS] [JSN] | |||
| R1-135629 | Discussion on full/non-full duplex UE for TDD-FDD CA | other | CMCC | R1-75 | - | [WTS] [JSN] | |||
| R1-135630 | Discussion on the HARQ timing design of TDD-FDD carrier aggregation for full duplex UE | other | CMCC | R1-75 | - | [WTS] [JSN] | |||
| R1-135631 | Discussion on the HARQ timing design of TDD-FDD carrier aggregation for non-full duplex UE | other | CMCC | R1-75 | - | [WTS] [JSN] | |||
| R1-135632 | Discussion on LTE coverage enhancement for TDD | other | CMCC | R1-75 | - | [WTS] [JSN] | |||
| R1-135633 | Further evaluations on radio-interface based small cell synchronization | other | CMCC | R1-75 | - | [WTS] [JSN] | |||
| R1-135634 | Enhancement of Small Cell operation efficiency | other | CMCC | R1-75 | - | [WTS] [JSN] | |||
| R1-135635 | Remaining issues on fast fading modeling of 3D UMa/UMi | other | CMCC | R1-75 | - | [WTS] [JSN] | |||
| R1-135636 | Initial fast fading calibration results | other | CMCC | R1-75 | - | [WTS] [JSN] | |||
| R1-135637 | Details of high rise channel modeling impacts | other | CMCC | R1-75 | - | [WTS] [JSN] | |||
| R1-135638 | Remaining details for enhanced uplink power control | other | Ericsson | R1-75 | - | [WTS] [JSN] | |||
| R1-135639 | Remaining details of CSI enhancement for eIMTA | other | Ericsson | R1-75 | - | [WTS] [JSN] | |||
| R1-135640 | Efficient transmission of explicit reconfiguration signalling | other | Ericsson | R1-75 | - | [WTS] [JSN] | |||
| R1-135641 | Remaining details for HARQ feedback mapping | other | Ericsson | R1-75 | - | [WTS] [JSN] | |||
| R1-135642 | Further details for eIMTA | other | Ericsson | R1-75 | - | [WTS] [JSN] | |||
| R1-135643 | Remaining details of low cost MTC UE | other | Ericsson | R1-75 | - | [WTS] [JSN] | |||
| R1-135644 | System information for enhanced coverage MTC UE | other | Ericsson | R1-75 | - | [WTS] [JSN] | |||
| R1-135645 | Random access for enhanced coverage MTC UE | other | Ericsson | R1-75 | - | [WTS] [JSN] | |||
| R1-135646 | Physical downlink control channel for enhanced coverage MTC UE | other | Ericsson | R1-75 | - | [WTS] [JSN] | |||
| R1-135647 | Physical uplink control channel for enhanced coverage MTC UE | other | Ericsson | R1-75 | - | [WTS] [JSN] | |||
| R1-135648 | Data transmission for enhanced coverage MTC UE | other | Ericsson | R1-75 | - | [WTS] [JSN] | |||
| R1-135649 | HARQ feedback and PUCCH design for TDD-FDD CA | other | Ericsson | R1-75 | - | [WTS] [JSN] | |||
| R1-135650 | Cross-carrier scheduling support for TDD-FDD CA | other | Ericsson | R1-75 | - | [WTS] [JSN] | |||
| R1-135651 | Further discussion on PDSCH timing with TDD as PCell for FDD-TDD | other | Ericsson | R1-75 | - | [WTS] [JSN] | |||
| R1-135652 | CSI reporting for TDD-FDD CA | other | Ericsson | R1-75 | - | [WTS] [JSN] | |||
| R1-135653 | Remaining details of TTI bundling enhancements for UL VoIP | other | Ericsson | R1-75 | - | [WTS] [JSN] | |||
| R1-135654 | On necessity of coverage enhancement for TDD | other | Ericsson | R1-75 | - | [WTS] [JSN] | |||
| R1-135655 | On standard impacts to support 256QAM in downlink | other | Ericsson | R1-75 | - | [WTS] [JSN] | |||
| R1-135656 | On 256QAM based on RAN4 feedback | other | Ericsson | R1-75 | - | [WTS] [JSN] | |||
| R1-135657 | Text Proposal for 256QAM in TR 36.872 | other | Ericsson | R1-75 | - | [WTS] [JSN] | |||
| R1-135658 | Small cell on/off operational modes | other | Ericsson | R1-75 | - | [WTS] [JSN] | |||
| R1-135659 | Evaluation results for different small cell on/off operational modes | other | Ericsson | R1-75 | - | [WTS] [JSN] | |||
| R1-135660 | IDLE mode support for semi-static small cell on/off operation | other | Ericsson | R1-75 | - | [WTS] [JSN] | |||
| R1-135661 | On network signaling support for small cell on/off | other | Ericsson | R1-75 | - | [WTS] [JSN] | |||
| R1-135662 | Use cases for discovery signals | other | Ericsson | R1-75 | - | [WTS] [JSN] | |||
| R1-135663 | On the design of discovery signals | other | Ericsson | R1-75 | - | [WTS] [JSN] | |||
| R1-135664 | Conclusion for small cell on/off and discovery signal | other | Ericsson | R1-75 | - | [WTS] [JSN] | |||
| R1-135665 | Discussion and Conclusions for Radio-Interface Based Small Cell Synchronization | other | Ericsson | R1-75 | - | [WTS] [JSN] | |||
| R1-135666 | Evaluation of Radio-Interface Based Small Cell Synchronization | other | Ericsson | R1-75 | - | [WTS] [JSN] | |||
| R1-135667 | On radio measurements for further MBMS support | other | Ericsson | R1-75 | - | [WTS] [JSN] | |||
| R1-135668 | MBSFN radio measurement definitions | other | Ericsson | R1-75 | - | [WTS] [JSN] | |||
| R1-135669 | Physical channel design for D2D communications | other | HTC | R1-75 | - | [WTS] [JSN] | |||
| R1-135670 | D2D transmission timing considerations | other | HTC | R1-75 | - | [WTS] [JSN] | |||
| R1-135671 | Channel coding considerations for D2D discovery signal | other | Kyocera | R1-75 | - | [WTS] [JSN] | |||
| R1-135672 | Considerations on UL VoIP enhancement for TDD | other | Coolpad | R1-75 | - | [WTS] [JSN] | |||
| R1-135673 | Evaluation of small cell on/off with realistic time scale | other | Coolpad | R1-75 | - | [WTS] [JSN] | |||
| R1-135674 | MTC Coverage improvement for Control Channels | other | Motorola Mobility | R1-75 | - | [WTS] [JSN] | |||
| R1-135675 | MTC Coverage improvement for Data Channels | other | Motorola Mobility | R1-75 | - | [WTS] [JSN] | |||
| R1-135676 | Further Considerations on Small Cell On/Off | other | Motorola Mobility | R1-75 | - | [WTS] [JSN] | |||
| R1-135677 | Evaluation of Small Cell On/Off | other | Motorola Mobility | R1-75 | - | [WTS] [JSN] | |||
| R1-135678 | 3D Channel Model Phase 1 Calibration Results | other | Motorola Mobility | R1-75 | - | [WTS] [JSN] | |||
| R1-135679 | Simulation results on radio-interface based synchronization | other | CATR | R1-75 | - | [WTS] [JSN] | |||
| R1-135680 | Considerations on DL DPCH Slot Format for DCH enhancement | other | Huawei,HiSilicon | R1-75 | - | [WTS] [JSN] | |||
| R1-135681 | DL system performance with E-DCH decoupling | other | Huawei, HiSilicon | R1-75 | - | [WTS] [JSN] | |||
| R1-135682 | UL system performance with E-DCH decoupling | other | Huawei, HiSilicon | R1-75 | - | [WTS] [JSN] | |||
| R1-135683 | Further considerations on E-DCH decoupling | other | Huawei, HiSilicon | R1-75 | - | [WTS] [JSN] | |||
| R1-135684 | TP on simulation results of coordinated scheduling | other | Huawei, HiSilicon | R1-75 | - | [WTS] [JSN] | |||
| R1-135685 | Pre-decoding IC results with fixed MCS interference | other | Huawei, HiSilicon | R1-75 | - | [WTS] [JSN] | |||
| R1-135686 | Performance of MIMO with NAIC | other | Huawei, HiSilicon | R1-75 | - | [WTS] [JSN] | |||
| R1-135687 | TP on MIMO with NAIC | other | Huawei, HiSilicon | R1-75 | - | [WTS] [JSN] | |||
| R1-135688 | On the reliability of F-DPCH from the non-serving LPN | other | Huawei, HiSilicon | R1-75 | - | [WTS] [JSN] | |||
| R1-135689 | Considerations on MIMO enhancements | other | Huawei, HiSilicon | R1-75 | - | [WTS] [JSN] | |||
| R1-135690 | 25.800 CR0001 (Rel-12, B) Update of Technical Report on UMTS Heterogeneous Networks | CR | Huawei, HiSilicon | R1-75 | - | [WTS] [JSN] | |||
| R1-135691 | TP on system level evaluation results for Scalable UMTS - bursty traffic | other | Huawei, HiSilicon | R1-75 | - | [WTS] [JSN] | |||
| R1-135692 | TP on scalable UMTS impacts on network performance | other | Huawei, HiSilicon | R1-75 | - | [WTS] [JSN] | |||
| R1-135693 | Initial link level simulation results for scalable BW UMTS by filtering | other | Huawei, HiSilicon | R1-75 | - | [WTS] [JSN] | |||
| R1-135694 | TP on system level simulation assumptions for lean carrier | other | Huawei, HiSilicon | R1-75 | - | [WTS] [JSN] | |||
| R1-135695 | Link level simulation results for lean carrier | other | Huawei, HiSilicon | R1-75 | - | [WTS] [JSN] | |||
| R1-135696 | TP on link level simulation results for lean carrier | other | Huawei, HiSilicon | R1-75 | - | [WTS] [JSN] | |||
| R1-135697 | Open issues of lean carrier operation | other | Huawei, HiSilicon | R1-75 | - | [WTS] [JSN] | |||
| R1-135698 | TP on specifications and implementation impacts for lean carrier operation | other | Huawei, HiSilicon | R1-75 | - | [WTS] [JSN] | |||
| R1-135699 | System simulation results for uplink rate adaptation | other | Huawei, HiSilicon | R1-75 | - | [WTS] [JSN] | |||
| R1-135700 | TP on updated simulation assumptions for uplink overhead reduction | other | Huawei, HiSilicon | R1-75 | - | [WTS] [JSN] | |||
| R1-135701 | Updated system simulation results for HS-DPCCH overhead reduction | other | Huawei, HiSilicon | R1-75 | - | [WTS] [JSN] | |||
| R1-135702 | TP on system simulation results for HS-DPCCH overhead reduction | other | Huawei, HiSilicon | R1-75 | - | [WTS] [JSN] | |||
| R1-135703 | Updated system simulation results for E-DPCCH overhead reduction | other | Huawei, HiSilicon | R1-75 | - | [WTS] [JSN] | |||
| R1-135704 | TP on system simulation results for E-DPCCH overhead reduction | other | Huawei, HiSilicon | R1-75 | - | [WTS] [JSN] | |||
| R1-135705 | TP on conclusions for reduced UL control channel overhead | other | Huawei, HiSilicon | R1-75 | - | [WTS] [JSN] | |||
| R1-135706 | O2I channel measurement results on elevation related parameters | other | CMCC | R1-75 | - | [WTS] [JSN] | |||
| R1-135707 | Review of TR 36.873 | other | Fraunhofer IIS | R1-75 | - | [WTS] [JSN] | |||
| R1-135708 | Text Proposal on Mechanical and Electrical Antenna Tilting | other | Fraunhofer IIS | R1-75 | - | [WTS] [JSN] | |||
| R1-135709 | An Approach for a 3D Channel Model with Time Evolution (QuaDRiGa) | other | Fraunhofer IIS | R1-75 | - | [WTS] [JSN] | |||
| R1-135710 | Comparison of E-DCH decoupling and early Serving Cell Change towards LPN | other | NSN | R1-75 | - | [WTS] [JSN] | |||
| R1-135711 | HSUPA DL control channels reliability in E-DCH decoupling | other | NSN | R1-75 | - | [WTS] [JSN] | |||
| R1-135712 | System Level Simulation and SI Reliability Results for E-DCH decoupling | other | NSN | R1-75 | - | [WTS] [JSN] | |||
| R1-135713 | Network Assistance for Interference Suppressing Receivers | other | NSN | R1-75 | - | [WTS] [JSN] | |||
| R1-135714 | Scalable Bandwidth UMTS by Filtering | other | NSN | R1-75 | - | [WTS] [JSN] | |||
| R1-135715 | TP on uplink performance of Scalable Bandwidth UMTS by Filtering | other | NSN | R1-75 | - | [WTS] [JSN] | |||
| R1-135716 | TP on Scalable Bandwidth UMTS by Filtering | other | NSN | R1-75 | - | [WTS] [JSN] | |||
| R1-135717 | TP on conlcusions on Novel Rate Adaptation scheme motivation and benefits | other | NSN | R1-75 | - | [WTS] [JSN] | |||
| R1-135718 | Further clarification regarding simulation results for Novel Rate Adaptation schemes | other | NSN | R1-75 | - | [WTS] [JSN] | |||
| R1-135719 | TP on SHO operation descirption in HSUPA with Novel Rate Adaptation | other | NSN | R1-75 | - | [WTS] [JSN] | |||
| R1-135720 | TP on SHO operation simulation results for Novel Rate Adaptation | other | NSN | R1-75 | - | [WTS] [JSN] | |||
| R1-135721 | TP on LLS results for Novel Rate Adaptation | other | NSN | R1-75 | - | [WTS] [JSN] | |||
| R1-135722 | TP on SLS results for Novel Rate Adaptation | other | NSN | R1-75 | - | [WTS] [JSN] | |||
| R1-135723 | LLS results for DPCCH SIR target setting for overhead reduction study | other | NSN | R1-75 | - | [WTS] [JSN] | |||
| R1-135724 | Multiflow and CLTD with the assisting cell feedback | other | NSN | R1-75 | - | [WTS] [JSN] | |||
| R1-135725 | RAN2 impacts for Scalable Bandwidth UMTS by Filtering | other | NSN | R1-75 | - | [WTS] [JSN] | |||
| R1-135726 | RAN4 impacts for Scalable Bandwidth UMTS by Filtering | other | NSN | R1-75 | - | [WTS] [JSN] | |||
| R1-135727 | Remaining issues for explicit L1 reconfiguration signalling | other | Sharp | R1-75 | - | [WTS] [JSN] | |||
| R1-135728 | On UE behavior in Fallback mode for eIMTA | other | Sharp | R1-75 | - | [WTS] [JSN] | |||
| R1-135729 | Restrictions on UL/DL reconfiguration in eIMTA | other | Sharp | R1-75 | - | [WTS] [JSN] | |||
| R1-135730 | Text Proposal on Benefit of Network Assisted Interference Cancellation for UEs with Single Receive Antenna | other | Ericsson | R1-75 | - | [WTS] [JSN] | |||
| R1-135731 | Legacy UE Performance in Combined Cell Accounting for Differential Propagation Delays | other | Ericsson | R1-75 | - | [WTS] [JSN] | |||
| R1-135732 | Performance for Legacy UE in Combined Cell | other | Ericsson | R1-75 | - | [WTS] [JSN] | |||
| R1-135733 | Link Level Analysis of Spatial Reuse Performance for Legacy UE in Combined Cell | other | Ericsson | R1-75 | - | [WTS] [JSN] | |||
| R1-135734 | System Level Analysis of Spatial Reuse Performance for Legacy UE in Combined Cell | other | Ericsson | R1-75 | - | [WTS] [JSN] | |||
| R1-135735 | Text Proposal on Legacy UE Performance in Combined Cell Accounting for Differential Propagation Delays | other | Ericsson | R1-75 | - | [WTS] [JSN] | |||
| R1-135736 | Text Proposal on Performance for Legacy UE in Combined Cell | other | Ericsson | R1-75 | - | [WTS] [JSN] | |||
| R1-135737 | Text Proposal on Link Level Analysis of Spatial Reuse Performance for Legacy UE in Combined Cell | other | Ericsson | R1-75 | - | [WTS] [JSN] | |||
| R1-135738 | Text Proposal on System Level Analysis of Spatial Reuse Performance for Legacy UE in Combined Cell | other | Ericsson | R1-75 | - | [WTS] [JSN] | |||
| R1-135739 | On Uplink System Simulations | other | Ericsson | R1-75 | - | [WTS] [JSN] | |||
| R1-135740 | On the System Simulation Scenarios for Evaluating Time-Dilated UMTS | other | Ericsson | R1-75 | - | [WTS] [JSN] | |||
| R1-135741 | Standalone System Simulation Results for Band I | other | Ericsson | R1-75 | - | [WTS] [JSN] | |||
| R1-135742 | Downlink System Simulation Results for Time-Dilated UMTS Considering Inter-Carrier Leakage - Equal PSD | other | Ericsson | R1-75 | - | [WTS] [JSN] | |||
| R1-135743 | Downlink System Simulation Results for Time-Dilated UMTS Considering Inter-Carrier Leakage - Equal Carrier Power | other | Ericsson | R1-75 | - | [WTS] [JSN] | |||
| R1-135744 | Text Proposal on Downlink System Simulation Results for Time-Dilated UMTS Considering Inter-Carrier Leakage - Equal PSD | other | Ericsson | R1-75 | - | [WTS] [JSN] | |||
| R1-135745 | Text Proposal on Downlink System Simulation Results for Time-Dilated UMTS Considering Inter-Carrier Leakage - Equal Carrier Power | other | Ericsson | R1-75 | - | [WTS] [JSN] | |||
| R1-135746 | Impact of Filtered UMTS on UE Core Requirements | other | Ericsson | R1-75 | - | [WTS] [JSN] | |||
| R1-135747 | Impact of Filtered UMTS on UE Performance Requirements | other | Ericsson | R1-75 | - | [WTS] [JSN] | |||
| R1-135748 | Impact of Filtered UMTS on RRM Requirements | other | Ericsson | R1-75 | - | [WTS] [JSN] | |||
| R1-135749 | Impact of Filtered UMTS on BS Core Requirements | other | Ericsson | R1-75 | - | [WTS] [JSN] | |||
| R1-135750 | Impact of Filtered UMTS on BS Performance Requirements | other | Ericsson | R1-75 | - | [WTS] [JSN] | |||
| R1-135751 | Comparison Between Time-Dilated and Filtered UMTS | other | Ericsson | R1-75 | - | [WTS] [JSN] | |||
| R1-135752 | Comparison Between Time-Dilated and Filtered UMTS - RAN2 Aspects | other | Ericsson | R1-75 | - | [WTS] [JSN] | |||
| R1-135753 | Filtered UMTS - Initial Link Level Simulation Results | other | Ericsson | R1-75 | - | [WTS] [JSN] | |||
| R1-135754 | Conclusions on Scalable UMTS | other | Ericsson, NSN, Broadcom Corporation, MediaTek Inc., Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | R1-75 | - | [WTS] [JSN] | |||
| R1-135755 | Further Link Level Evaluations of Lean Carrier | other | Ericsson | R1-75 | - | [WTS] [JSN] | |||
| R1-135756 | Text Proposal on Link Level Evaluations of Lean Carrier | other | Ericsson | R1-75 | - | [WTS] [JSN] | |||
| R1-135757 | On Improved TDM Scheduling Schemes | other | Ericsson | R1-75 | - | [WTS] [JSN] | |||
| R1-135758 | System Level Evaluations of Lean Carrier | other | Ericsson | R1-75 | - | [WTS] [JSN] | |||
| R1-135759 | Text Proposal on System Level Evaluations of Lean Carrier | other | Ericsson | R1-75 | - | [WTS] [JSN] | |||
| R1-135760 | Text Proposal on Lean Carrier Conclusions | other | Ericsson | R1-75 | - | [WTS] [JSN] | |||
| R1-135761 | Text Proposal on System Level Simulation Assumptions for Lean Carrier | other | Ericsson | R1-75 | - | [WTS] [JSN] | |||
| R1-135762 | Multiflow and Closed Loop TX Diversity | other | Ericsson | R1-75 | - | [WTS] [JSN] | |||
| R1-135763 | PDSCH baseband bandwidth reduction for low complexity MTC UE | other | Sony | R1-75 | - | [WTS] [JSN] | |||
| R1-135764 | Considerations for asynchronous discovery in D2D | other | Sony | R1-75 | - | [WTS] [JSN] | |||
| R1-135765 | Properties of EoD for 3D-Channel Model | other | Ericsson | R1-75 | - | [WTS] [JSN] | |||
| R1-135766 | On RSRP determination for UE to node association | other | Ericsson | R1-75 | - | [WTS] [JSN] | |||
| R1-135767 | Initial calibration results for 3D channel model | other | Ericsson | R1-75 | - | [WTS] [JSN] | |||
| R1-135768 | Considerations on the 3D UMa with one high rise per sector with 300m ISD Scenario | other | Ericsson | R1-75 | - | [WTS] [JSN] | |||
| R1-135769 | System Level Evaluations of Coordinated Scheduling Using Slow Backhaul | other | Ericsson | R1-75 | - | [WTS] [JSN] | |||
| R1-135770 | Signaling for Inter-eNB Operation of CoMP | other | Ericsson | R1-75 | - | [WTS] [JSN] | |||
| R1-135771 | On System Level Evaluations for NAICS | other | Ericsson | R1-75 | - | [WTS] [JSN] | |||
| R1-135772 | Signaling and coordination aspects of NAICS | other | Ericsson | R1-75 | - | [WTS] [JSN] | |||
| R1-135773 | eMBMS on Scell | other | Ericsson | R1-75 | - | [WTS] [JSN] | |||
| R1-135774 | Discussion on DL HARQ operation in TDD-FDD Carrier Aggregation | other | KT Corp. | R1-75 | - | [WTS] [JSN] | |||
| R1-135775 | On the need for Joint Coding of Class-A,B,C vocoder bits | other | Qualcomm Incorporated | R1-75 | - | [WTS] [JSN] | |||
| R1-135776 | Analysis of Rate-Matching and Interleaving Enhancements | other | Qualcomm Incorporated | R1-75 | - | [WTS] [JSN] | |||
| R1-135777 | Design of DL DCH Enhancements | other | Qualcomm Incorporated | R1-75 | - | [WTS] [JSN] | |||
| R1-135778 | DL DPCH slot formats for DCH Enhancements | other | Qualcomm Incorporated | R1-75 | - | [WTS] [JSN] | |||
| R1-135779 | DL ACK Performance in DCH Enhancements | other | Qualcomm Incorporated | R1-75 | - | [WTS] [JSN] | |||
| R1-135780 | System Performance of E-DCH Decoupling | other | Qualcomm Incorporated | R1-75 | - | [WTS] [JSN] | |||
| R1-135781 | Link Performance of Post Decoding NAIC for Single Rx Ues | other | Qualcomm Incorporated | R1-75 | - | [WTS] [JSN] | |||
| R1-135782 | Link Performance of RRS In Hetnet | other | Qualcomm Incorporated | R1-75 | - | [WTS] [JSN] | |||
| R1-135783 | System Performance of RRS in Hetnet | other | Qualcomm Incorporated | R1-75 | - | [WTS] [JSN] | |||
| R1-135784 | TP on System Performance of Post Decoding NAIC | other | Qualcomm Incorporated | R1-75 | - | [WTS] [JSN] | |||
| R1-135785 | Impact of Combined Cells with F-PICH on Legacy Users | other | Qualcomm Incorporated | R1-75 | - | [WTS] [JSN] | |||
| R1-135786 | Performance of Spatial Reuse with F-PICH | other | Qualcomm Incorporated | R1-75 | - | [WTS] [JSN] | |||
| R1-135787 | Performance of Co-located Combined Cells | other | Qualcomm Incorporated | R1-75 | - | [WTS] [JSN] | |||
| R1-135788 | Downlink System Simulation Results for Multicarrier TD-UMTS | other | Qualcomm Incorporated | R1-75 | - | [WTS] [JSN] | |||
| R1-135789 | TP on System Simulation Results for Multicarrier TD-UMTS | other | Qualcomm Incorporated | R1-75 | - | [WTS] [JSN] | |||
| R1-135790 | TP on System level evaluation results for Stand-alone Time-Dilated UMTS - bursty traffic | other | Qualcomm Incorporated, Ericsson | R1-75 | - | [WTS] [JSN] | |||
| R1-135791 | TP on System level evaluation results for Stand-alone Time-Dilated UMTS - full buffer | other | Qualcomm Incorporated, Huawei, HiSilicon | R1-75 | - | [WTS] [JSN] | |||
| R1-135792 | TP on Impact of Time Dilated UMTS on CELL_FACH | other | Qualcomm Incorporated | R1-75 | - | [WTS] [JSN] | |||
| R1-135793 | Coverage Analysis for Time Dilated UMTS | other | Qualcomm Incorporated | R1-75 | - | [WTS] [JSN] | |||
| R1-135794 | TP on Coverage Analysis for Time Dilated UMTS | other | Qualcomm Incorporated | R1-75 | - | [WTS] [JSN] | |||
| R1-135795 | Link analysis of Scalable UMTS with Filtering for HSPA | other | Qualcomm Incorporated | R1-75 | - | [WTS] [JSN] | |||
| R1-135796 | Link Performance of AMR12.2k in Scalable UMTS with Filtering | other | Qualcomm Incorporated | R1-75 | - | [WTS] [JSN] | |||
| R1-135797 | TP on Performance of Scalable UMTS with Filtering | other | Qualcomm Incorporated | R1-75 | - | [WTS] [JSN] | |||
| R1-135798 | TP on Conclusions for Scalable UMTS | other | Qualcomm Incorporated | R1-75 | - | [WTS] [JSN] | |||
| R1-135799 | Updated results for Rate Adaptation in HSUPA | other | Qualcomm Incorporated | R1-75 | - | [WTS] [JSN] | |||
| R1-135800 | Evaluation of uplink CoMP with non-ideal backhaul link | other | Intel Corporation | R1-75 | - | [WTS] [JSN] | |||
| R1-135801 | Further MBMS operations support | other | Intel Corporation | R1-75 | - | [WTS] [JSN] | |||
| R1-135802 | Guidance on delay tolerance level of MTC applications | other | Vodafone Group | R1-75 | - | [WTS] [JSN] | |||
| R1-135803 | Synchronization Procedures for D2D Discovery and Communication | other | Ericsson | R1-75 | - | [WTS] [JSN] | |||
| R1-135804 | Synchronization Signals and Channel Design for D2D Discovery and Communication | other | Ericsson | R1-75 | - | [WTS] [JSN] | |||
| R1-135805 | On Scrambling of D2D Physical Channels | other | Ericsson | R1-75 | - | [WTS] [JSN] | |||
| R1-135806 | Physical Channels Design for D2D | other | Ericsson | R1-75 | - | [WTS] [JSN] | |||
| R1-135807 | On resource allocation for D2D broadcast communication | other | Ericsson | R1-75 | - | [WTS] [JSN] | |||
| R1-135808 | On scheduling for D2D communication | other | Ericsson | R1-75 | - | [WTS] [JSN] | |||
| R1-135809 | On Out of Coverage Definitions for D2D | other | Ericsson | R1-75 | - | [WTS] [JSN] | |||
| R1-135810 | Discovery Channel Design for D2D | other | Ericsson | R1-75 | - | [WTS] [JSN] | |||
| R1-135811 | Phase 1 Calibration Results for 3D Channel Model | other | CHTTL | R1-75 | - | [WTS] [JSN] | |||
| R1-135812 | Phase 2 Calibration Results for 3D Channel Model | other | CHTTL | R1-75 | - | [WTS] [JSN] | |||
| R1-135813 | Solution based on traffic asymmetry for avoiding requirements of fast Tx UE switching | other | IAESI | R1-75 | - | [WTS] [JSN] | |||
| R1-135814 | Remaining details of UL power control | other | Alcatel-Lucent Shanghai Bell, Alcatel-Lucent | R1-75 | - | [WTS] [JSN] | |||
| R1-135815 | Conclusions on Scalable UMTS | other | Ericsson, NSN, Broadcom Corporation, MediaTek Inc., Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, Intel Corporation | R1-75 | - | [WTS] [JSN] | |||
| R1-135816 | Remaining details of uplink power control in TDD eIMTA | other | CATT | R1-75 | - | [WTS] [JSN] | |||
| R1-135817 | D2D transmission timing considerations | other | HTC | R1-75 | - | [WTS] [JSN] | |||
| R1-135818 | Discussion on specifications for non-MBSFN region | other | NEC | R1-75 | - | [WTS] [JSN] | |||
| R1-135819 | Remaining Details of Fast Fading Channel for 3D UMa | other | Alcatel-Lucent Shanghai Bell, Alcatel-Lucent | R1-75 | - | [WTS] [JSN] | |||
| R1-135820 | Remaining Details of Fast Fading Channel for 3D UMi | other | Alcatel-Lucent Shanghai Bell, Alcatel-Lucent | R1-75 | - | [WTS] [JSN] | |||
| R1-135821 | Remaining details on Fast Fading Model for 3D-channel | other | NTT DOCOMO | R1-75 | - | [WTS] [JSN] | |||
| R1-135822 | PRACH Support for Coverage Deficit Devices | other | Fujitsu | R1-75 | - | [WTS] [JSN] | |||
| R1-135823 | MTC Band Allocation Clarifications | other | Fujitsu | R1-75 | - | [WTS] [JSN] | |||
| R1-135824 | Backwards compatibility of small cell on/off | other | Fujitsu | R1-75 | - | [WTS] [JSN] | |||
| R1-135825 | Evaluation of coordinated scheduling for SCE scenario 1 with non-ideal backhaul | other | Samsung | R1-75 | - | [WTS] [JSN] | |||
| R1-135826 | Evaluation of coordinated scheduling for SCE scenario 2a with non-ideal backhaul | other | Samsung | R1-75 | - | [WTS] [JSN] | |||
| R1-135827 | D2D discovery resource size and mapping to physical resources | other | Intel Corporation | R1-75 | - | [WTS] [JSN] | |||
| R1-135828 | D2D discovery resource selection for Type 1 discovery | other | Intel Corporation | R1-75 | - | [WTS] [JSN] | |||
| R1-135829 | Simulation results on radio-interface based synchronization | other | CATR | R1-75 | - | [WTS] [JSN] | |||
| R1-135830 | Response document to R1-135181 on X2 for eCoMP BF with NIB | other | IAESI, DAC-UPC | R1-75 | - | [WTS] [JSN] | |||
| R1-135831 | Response document to R1-135227 on TP for candidate CoMP Techniques in CoMP-NIB TR 36.874 | other | IAESI, DAC-UPC | R1-75 | - | [WTS] [JSN] | |||
| R1-135832 | LS on the UE capabilities regarding support of simultaneous MBMS bearer reception | other | SA4, Samsung | R1-75 | - | [WTS] [JSN] | |||
| R1-135833 | On RSRP gap requirement for small cell discovery | other | MediaTek Inc. | R1-75 | - | [WTS] [JSN] | |||
| R1-135834 | On detection rate requirement for small cell discovery | other | MediaTek Inc. | R1-75 | - | [WTS] [JSN] | |||
| R1-135835 | On support of DL and UL cross-carrier scheduling in TDD-FDD CA | other | NEC | R1-75 | - | [WTS] [JSN] | |||
| R1-135836 | Report on email discussion on "R1-134931 Revision of TP to 36.843 after sessions" | other | Telecom Italia | R1-75 | - | [WTS] [JSN] | |||
| R1-135837 | System level performance of E-LMMSE-IRC | other | Nokia, NSN | R1-75 | - | [WTS] [JSN] | |||
| R1-135838 | On the NAICS system and specification impact | other | NSN, Nokia | R1-75 | - | [WTS] [JSN] | |||
| R1-135839 | MBMS measurements for further enhancement of MBMS operation | other | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, CHTTL | R1-75 | - | [WTS] [JSN] | |||
| R1-135840 | Remaining details of fast fading modeling | other | Huawei, HiSilicon | R1-75 | - | [WTS] [JSN] | |||
| R1-135841 | Modeling of large scale parameters in high rise scenario | other | Huawei, HiSilicon | R1-75 | - | [WTS] [JSN] | |||
| R1-135842 | void | other | R1-75 | - | [WTS] [JSN] | ||||
| R1-135843 | void | other | R1-75 | - | [WTS] [JSN] | ||||
| R1-135844 | void | other | R1-75 | - | [WTS] [JSN] | ||||
| R1-135845 | void | other | R1-75 | - | [WTS] [JSN] | ||||
| R1-135846 | void | other | R1-75 | - | [WTS] [JSN] | ||||
| R1-135847 | void | other | R1-75 | - | [WTS] [JSN] | ||||
| R1-135848 | void | other | R1-75 | - | [WTS] [JSN] | ||||
| R1-135849 | 25.800 CR0001r1 (Rel-12, B) Update of Technical Report on UMTS Heterogeneous Networks | CR | Huawei, HiSilicon | R1-75 | - | [WTS] [JSN] | |||
| R1-135850 | Multiflow and CLTD with the assisting cell feedback | other | NSN | R1-75 | - | [WTS] [JSN] | |||
| R1-135851 | System simulation results for uplink rate adaptation | other | Huawei, HiSilicon | R1-75 | - | [WTS] [JSN] | |||
| R1-135852 | Text Proposal on Link Level Evaluations of Lean Carrier | other | Ericsson, Huawei | R1-75 | - | [WTS] [JSN] | |||
| R1-135853 | TP on specifications and implementation impacts for lean carrier operation | other | Huawei, HiSilicon | R1-75 | - | [WTS] [JSN] | |||
| R1-135854 | TP on System Level Results for Lean Carrier | other | Ericsson | R1-75 | - | [WTS] [JSN] | |||
| R1-135855 | Text Proposal on Lean Carrier Conclusions | other | Ericsson, NSN | R1-75 | - | [WTS] [JSN] | |||
| R1-135856 | TP on the benefit of improved TDM Scheduling Schemes | other | NSN | R1-75 | - | [WTS] [JSN] | |||
| R1-135857 | TP on conclusions for reduced UL control channel overhead | other | Huawei, HiSilicon, NSN | R1-75 | - | [WTS] [JSN] | |||
| R1-135858 | Link Level Simulation Results for Improved Rate Adaptation | other | NSN, ZTE | R1-75 | - | [WTS] [JSN] | |||
| R1-135859 | TP on System Level Simulation Results for Improved Rate Adaptation | other | NSN, Huawei, HiSilicon, Qualcomm | R1-75 | - | [WTS] [JSN] | |||
| R1-135860 | TP on SHO operation simulation results for Novel Rate Adaptation | other | NSN | R1-75 | - | [WTS] [JSN] | |||
| R1-135861 | TP on Conclusions on Rate Adaptation | other | NSN, Ericsson, Qualcomm | R1-75 | - | [WTS] [JSN] | |||
| R1-135862 | TP on system simulation results for HS-DPCCH overhead reduction | other | Huawei, HiSilicon | R1-75 | - | [WTS] [JSN] | |||
| R1-135863 | TP on conclusions for reduced UL control channel overhead | other | Huawei, HiSilicon, NSN | R1-75 | - | [WTS] [JSN] | |||
| R1-135864 | LS on Multiflow and CLTD with assisting cell feedback | LS out | RAN1, NSN | R1-75 | - | [WTS] [JSN] | |||
| R1-135865 | TP on system simulation results for E-DPCCH overhead reduction | other | Huawei, HiSilicon | R1-75 | - | [WTS] [JSN] | |||
| R1-135866 | Comparison of E-DCH decoupling and early Serving Cell Change towards LPN | other | NSN | R1-75 | - | [WTS] [JSN] | |||
| R1-135867 | Comparison of E-DCH decoupling and early Serving Cell Change towards LPN | other | NSN | R1-75 | - | [WTS] [JSN] | |||
| R1-135868 | System level simulation for NAIC in HetNet | other | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | R1-75 | - | [WTS] [JSN] | |||
| R1-135869 | TP on simulation results of coordinated scheduling | other | Huawei, HiSilicon | R1-75 | - | [WTS] [JSN] | |||
| R1-135870 | Text Proposal on Benefit of Network Assisted Interference Cancellation for UEs with Single Receive Antenna | other | Ericsson | R1-75 | - | [WTS] [JSN] | |||
| R1-135871 | TP on R1-135785 and R1-135786 | other | Qualcomm | R1-75 | - | [WTS] [JSN] | |||
| R1-135872 | Draft Response LS on the UE capabilities regarding support of simultaneous MBMS bearer reception | other | Qualcomm Inc. | R1-75 | - | [WTS] [JSN] | |||
| R1-135873 | Views on Higher Order Modulation in Rel. 12 | other | Hitachi Ltd. | R1-75 | - | [WTS] [JSN] | |||
| R1-135874 | Discussion and Conclusions for Radio-Interface Based Small Cell Synchronization | other | Ericsson | R1-75 | - | [WTS] [JSN] | |||
| R1-135875 | Evaluation of Radio-Interface Based Small Cell Synchronization | other | Ericsson | R1-75 | - | [WTS] [JSN] | |||
| R1-135876 | Evaluation results for different small cell on/off operational modes | other | Ericsson | R1-75 | - | [WTS] [JSN] | |||
| R1-135877 | RF Blocking effect evaluation under FDM-based radio resource allocation | other | ITRI | R1-75 | - | [WTS] [JSN] | |||
| R1-135878 | Frequency Reuse for D2D Broadcast Communication | other | ITRI | R1-75 | - | [WTS] [JSN] | |||
| R1-135879 | On 256QAM based on RAN4 feedback | other | Ericsson | R1-75 | - | [WTS] [JSN] | |||
| R1-135880 | Evaluation results for 256QAM | other | Intel Corporation | R1-75 | - | [WTS] [JSN] | |||
| R1-135881 | Symbol level SIC performance evaluation | other | ZTE | R1-75 | - | [WTS] [JSN] | |||
| R1-135882 | Details for system level modeling of ML/R-ML receivers and text proposal | other | MediaTek Inc. | R1-75 | - | [WTS] [JSN] | |||
| R1-135883 | System level results for R-ML receivers for scenario #1 | other | MediaTek Inc. | R1-75 | - | [WTS] [JSN] | |||
| R1-135884 | On network coordination/signaling for NAICS and possible specification impact | other | MediaTek Inc. | R1-75 | - | [WTS] [JSN] | |||
| R1-135885 | ProSe WID status | other | Qualcomm Incorporated (Rapporteur) | R1-75 | - | [WTS] [JSN] | |||
| R1-135886 | Way Forward on Resource Allocation Procedure for D2D Broadcast Communication | other | Panasonic, Huawei, Hisilicon, LGE, CATT | R1-75 | - | [WTS] [JSN] | |||
| R1-135887 | Further Evaluation Results for CoMP-NIB | other | NTT DOCOMO | R1-75 | - | [WTS] [JSN] | |||
| R1-135888 | 36.213 CR0444r1 (Rel-10,F) Correction on CSI reporting type and parameters | CR | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | R1-75 | - | [WTS] [JSN] | |||
| R1-135889 | 36.213 CR0445r1 (Rel-11,A) Correction on CSI reporting type and parameters | CR | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | R1-75 | - | [WTS] [JSN] | |||
| R1-135890 | Performance Evaluation of X2 signalling supporting DL eCoMP with NIB | other | Alcatel-Lucent Shanghai Bell, Alcatel-Lucent | R1-75 | - | [WTS] [JSN] | |||
| R1-135891 | Performance Evaluation of X2 signalling supporting UL eCoMP with NIB | other | Alcatel-Lucent Shanghai Bell, Alcatel-Lucent | R1-75 | - | [WTS] [JSN] | |||
| R1-135892 | Operator's views on efficient inter-frequency small cell discovery | other | NTT DOCOMO, TeliaSonera | R1-75 | - | [WTS] [JSN] | |||
| R1-135893 | Draft_CR on small cell on/off for small cell enhancements | other | Huawei, HiSilicon | R1-75 | - | [WTS] [JSN] | |||
| R1-135894 | 36.213 CR0431R5 (Rel-12, B) Introduction of Rel 12 feature for Downlink MIMO Enhancement | CR | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | R1-75 | - | [WTS] [JSN] | |||
| R1-135895 | Remaining issues of EoD/EoA modeling | other | Qualcomm Inc. | R1-75 | - | [WTS] [JSN] | |||
| R1-135896 | System level evaluation of SLML receiver for NAICS scenario 2 | other | Samsung | R1-75 | - | [WTS] [JSN] | |||
| R1-135897 | Draft TR 36.843 v0.3.0 on “Study of LTE Device to Device Proximity Services-Radio Aspects” | other | Qualcomm Inc. | R1-75 | - | [WTS] [JSN] | |||
| R1-135898 | Way Forward on HARq timing for TDD FDD CA | other | LG Electronics, Huawei, HiSilicon, Qualcomm, ZTE, ETRI, Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, Nokia, NSN, Sharp, Intel, Samsung, Ericsson, ST-Ericsson, ITL Inc., KT Corp. | R1-75 | - | [WTS] [JSN] | |||
| R1-135899 | Way Forward on cross carrier scheduling for TDD FDD CA | other | LG Electronics, Qualcomm, ETRI, NEC, CATT, ZTE, Sharp, Intel, CMCC | R1-75 | - | [WTS] [JSN] | |||
| R1-135900 | Remaining details of fast fading modelling for 3D channel | other | Samsung | R1-75 | - | [WTS] [JSN] | |||
| R1-135901 | Link abstraction method for iterative ML receiver | other | Samsung | R1-75 | - | [WTS] [JSN] | |||
| R1-135902 | Remaining issues on fast fading modeling of 3D UMa/UMi | other | CMCC | R1-75 | - | [WTS] [JSN] | |||
| R1-135903 | Synchronization Signals and Channel Design for D2D Discovery and Communication | other | Ericsson | R1-75 | - | [WTS] [JSN] | |||
| R1-135904 | On System Level Evaluations for NAICS | other | Ericsson | R1-75 | - | [WTS] [JSN] | |||
| R1-135905 | TP for link to system modeling for E-LMMSE-IRC receiver | other | Nokia, NSN | R1-75 | - | [WTS] [JSN] | |||
| R1-135906 | Draft LS on the need of PUCCH on multiple UL serving cells for non co-located CA | other | NTT DoCoMo, Ericsson, Nokia, NSN | R1-75 | - | [WTS] [JSN] | |||
| R1-135907 | Draft TR 36.874 v1.1.0 on CoMP NIB | other | Samsung | R1-75 | - | [WTS] [JSN] | |||
| R1-135908 | Revision of Scenarios and requirements TP to 36.843 after email discussion | other | Telecom Italia, Orange, KDDI, Huawei, HiSilicon, ALU, ZTE, LGE, Nokia, ITRI | R1-75 | - | [WTS] [JSN] | |||
| R1-135909 | TR36.843 v0.3.0 on Study on LTE Device to Device Proximity Services-Radio | other | Qualcomm | R1-75 | - | [WTS] [JSN] | |||
| R1-135910 | TR36.843 v0.3.1 on Study on LTE Device to Device Proximity Services-Radio | other | Qualcomm | R1-75 | - | [WTS] [JSN] | |||
| R1-135911 | Draft CR on MBSFN radio measurements | other | Ericsson, Alcatel-Lucent, Qualcomm, Broadcom, Samsung | R1-75 | - | [WTS] [JSN] | |||
| R1-135912 | Draft LS on further MBMS operations support for E-UTRAN | other | Qualcomm Incorporated | R1-75 | - | [WTS] [JSN] | |||
| R1-135913 | TR 36.874 V1.1.0 Coordinated multi-point operation for LTE with non-ideal backhaul | other | Samsung | R1-75 | - | [WTS] [JSN] | |||
| R1-135914 | TP on System Simulation Results for Multicarrier TD-UMTS | other | Qualcomm Incorporated | R1-75 | - | [WTS] [JSN] | |||
| R1-135915 | void | other | R1-75 | - | [WTS] [JSN] | ||||
| R1-135916 | TR 25.701 v1.0.3 of Scalable UMTS | other | China Unicom | R1-75 | - | [WTS] [JSN] | |||
| R1-135917 | TP on System level evaluation results for Stand-alone Time-Dilated UMTS - bursty traffic | other | Ericsson, Qualcomm | R1-75 | - | [WTS] [JSN] | |||
| R1-135918 | 36.214 CR0020 (Rel-12, B) MBSFN radio measurements | CR | Ericsson, Alcatel-Lucent, Qualcomm, Broadcom, Samsung, NEC | R1-75 | - | [WTS] [JSN] | |||
| R1-135919 | LS on further MBMS operations support for E-UTRAN | LS out | RAN1, Qualcomm | R1-75 | - | [WTS] [JSN] | |||
| R1-135920 | TR 36.874 V1.1.0 Coordinated multi-point operation for LTE with non-ideal backhaul | other | Samsung | R1-75 | - | [WTS] [JSN] | |||
| R1-135921 | TP on CoMP-NIB Performance | other | Samsung | R1-75 | - | [WTS] [JSN] | |||
| R1-135922 | Draft TR 36.874 V1.2.0 Coordinated multi-point operation for LTE with non-ideal backhaul | other | Samsung | R1-75 | - | [WTS] [JSN] | |||
| R1-135923 | Draft TR 36.874 V1.2.0 Coordinated multi-point operation for LTE with non-ideal backhaul | other | Samsung | R1-75 | - | [WTS] [JSN] | |||
| R1-135924 | Draft TR 36.874 V1.2.0 Coordinated multi-point operation for LTE with non-ideal backhaul | other | Samsung | R1-75 | - | [WTS] [JSN] | |||
| R1-135925 | Way Forward on System level evaluations for Time-Dilated UMTS | other | Qualcomm | R1-75 | - | [WTS] [JSN] | |||
| R1-135926 | TP on System level evaluation results | other | Qualcomm Incorporated | R1-75 | - | [WTS] [JSN] | |||
| R1-135927 | Matthew session | other | R1-75 | - | [WTS] [JSN] | ||||
| R1-135928 | Evaluation of coordinated scheduling for CoMP scenario 2 with non-ideal backhaul | other | Samsung | R1-75 | - | [WTS] [JSN] | |||
| R1-135929 | Way Forward on the D2D Synchronization Procedure | other | Ericsson, Qualcomm, Intel, Huawei, HiSilicon, Fujitsu, LGE, GDB | R1-75 | - | [WTS] [JSN] | |||
| R1-135930 | Way Forward on Broadcast Communication Scheduling Procedure | other | Ericsson, Qualcomm | R1-75 | - | [WTS] [JSN] | |||
| R1-135931 | Way Forward on resource allocation and interference coordination for D2D communication and discovery | other | LG Electronics, Intel, Huawei, HiSilicon | R1-75 | - | [WTS] [JSN] | |||
| R1-135932 | Way Forward on D2D synchronization | other | LG Electronics, Qualcomm, Huawei, HiSilicon, ETRI, CATT | R1-75 | - | [WTS] [JSN] | |||
| R1-135933 | Way Forward on cross-carrier scheduling in TDD/FDD CA | other | Huawei, HiSilicon | R1-75 | - | [WTS] [JSN] | |||
| R1-135934 | Way Forward on D2D PUSCH Transmission | other | Qualcomm Inc., General Dynamics Broadband, ITRI, Samsung | R1-75 | - | [WTS] [JSN] | |||
| R1-135935 | Way Forward on resource allocation for D2D broadcast communication | other | ZTE, Qualcomm Inc., Fujitsu, ETRI, III | R1-75 | - | [WTS] [JSN] | |||
| R1-135936 | Way Forward on resource scheduling for D2D broadcast communication | other | ZTE, Qualcomm Inc., Panasonic, Samsung, III | R1-75 | - | [WTS] [JSN] | |||
| R1-135937 | Way Forward on D2D discovery transmit timing | other | Samsung, Qualcomm, ETRI | R1-75 | - | [WTS] [JSN] | |||
| R1-135938 | Way Forward on resource allocation for type 1 D2D discovery | other | CATT, ETRI, Huawei, HiSilicon, Intel, ITRI, LGE, NTT DoCoMo | R1-75 | - | [WTS] [JSN] | |||
| R1-135939 | Way Forward on multiplexing between cellular signal and D2D signal | other | CATT, ETRI, Fujitsu, Huawei, HiSilicon, Intel, ZTE | R1-75 | - | [WTS] [JSN] | |||
| R1-135940 | Further performance evaluation of CoMP with non-ideal backhaul | other | Huawei, HiSilicon | R1-75 | - | [WTS] [JSN] | |||
| R1-135941 | Draft LS on the need of PUCCH on multiple UL serving cells for non co-located CA | other | NTT DoCoMo, Ericsson, Nokia, NSN | R1-75 | - | [WTS] [JSN] | |||
| R1-135942 | Way Forward on uplink power control in TDD eIMTA | other | ZTE, Potevio, Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | R1-75 | - | [WTS] [JSN] | |||
| R1-135943 | Way forward on P-BCH for MTC enhanced coverage | other | Vodafone Group | R1-75 | - | [WTS] [JSN] | |||
| R1-135944 | Way forward on P-RACH for MTC enhanced coverage | other | Vodafone Group | R1-75 | - | [WTS] [JSN] | |||
| R1-135945 | Way forward on PDCCH/PDSCH timing for MTC enhanced coverage | other | Vodafone Group | R1-75 | - | [WTS] [JSN] | |||
| R1-135946 | Way Forward for (E)PDCCH coverage enhancement | other | MediaTek, Panasonic, CATR, CATT, ZTE, Sony, LGE, Alcatel-Lucent, Alcatel Shanghai Bell, Fujitsu, Sierra Wireless, Samsung | R1-75 | - | [WTS] [JSN] | |||
| R1-135947 | Way Forward on EOD parameters | other | NSN, Nokia | R1-75 | - | [WTS] [JSN] | |||
| R1-135948 | Remaining details of fast-fading for 3D-UMa and 3D-UMa | other | NSN, Nokia | R1-75 | - | [WTS] [JSN] | |||
| R1-135949 | Summary of Phase-1 calibration results according to [74bis-12] email discussion | other | NSN, Nokia | R1-75 | - | [WTS] [JSN] | |||
| R1-135950 | Way Forward on CoMP-NIB | other | Huawei, HiSilicon, NSN, Nokia, Ericsson, Alcatel-Lucent Shanghai Bell, Alcatel-Lucent | R1-75 | - | [WTS] [JSN] | |||
| R1-135951 | Way Forward on UE orientation and UE antenna pattern in 3D-channel | other | LG Electronics, Fraunhofer, Elektrobit, ETRI, Anite, KDDI | R1-75 | - | [WTS] [JSN] | |||
| R1-135952 | Way Forward on RSRP calculation formula | other | LG Electronics, CATR, Huawei, HiSilicon, Ericsson, Qualcomm | R1-75 | - | [WTS] [JSN] | |||
| R1-135953 | Way Forward on CoMP-NIB performance | other | LG Electronics, China Unicom, CMCC, Deutsche Telekom, ETRI, Fujitsu, KDDI, KT Corp., LG Uplus, NTT DOCOMO, Samsung, SK Telecom, ZTE | R1-75 | - | [WTS] [JSN] | |||
| R1-135954 | Way Forward on Interference Measurement for eIMTA | other | ZTE, Huawei, HiSilicon, LG Electronics, Samsung | R1-75 | - | [WTS] [JSN] | |||
| R1-135955 | On D2D discovery transmission timing | other | Intel Corporation | R1-75 | - | [WTS] [JSN] | |||
| R1-135956 | Draft CR on Radio-interface based synchronization for Small cell enhancements | other | Huawei, HiSilicon | R1-75 | - | [WTS] [JSN] | |||
| R1-135957 | Way Forward on Discovery and Measurement Enhancement(s) | other | NTT DOCOMO, ZTE, ETRI, Panasonic, Samsung | R1-75 | - | [WTS] [JSN] | |||
| R1-135958 | Draft CR on higher order modulation for Small cell enhancements | other | Huawei, HiSilicon | R1-75 | - | [WTS] [JSN] | |||
| R1-135959 | Draft_CR on small cell on/off for small cell enhancements | other | Huawei, HiSilicon | R1-75 | - | [WTS] [JSN] | |||
| R1-135960 | Way Forward on backhaul signaling for eIMTA | other | LG Electronics, Nokia, NSN, Alcatel-Lucent Shanghai Bell, Alcatel-Lucent, Potevio | R1-75 | - | [WTS] [JSN] | |||
| R1-135961 | Way Forward on the changeability of UL-DL switching period | other | LG Electronics, CATT, Ericsson, ST-Ericsson | R1-75 | - | [WTS] [JSN] | |||
| R1-135962 | Way Forward on NAICS network signaling/coordination | other | MediaTek, Blackberry | R1-75 | - | [WTS] [JSN] | |||
| R1-135963 | Modification windows for periodic subframe in eIMTA | other | Sharp, Huawei, HiSilicon, Nokia, NSN, Potevio, Samsung, Texas Instruments | R1-75 | - | [WTS] [JSN] | |||
| R1-135964 | Fallback operation without valid UL-DL configuration via reconfiguration DCI | other | Sharp, Huawei, HiSilicon, LG Electronics, Nokia, NSN, Samsung, Qualcomm | R1-75 | - | [WTS] [JSN] | |||
| R1-135965 | Offline discussion summary on signalling for TDD UL/DL reconfiguration | other | Sharp, CATT | R1-75 | - | [WTS] [JSN] | |||
| R1-135966 | Way Forward on subframe set dependent PHR for TDD eIMTA | other | Huawei, HiSilicon, Sharp, Potevio, Interdigital, ZTE, Alcatel Lucent, Alcatel Lucent Shanghai Bell, CATR, TI, MediaTek, LGE, Panasonic | R1-75 | - | [WTS] [JSN] | |||
| R1-135967 | Way Forward on PUCCH resource allocation for eIMTA | other | NEC, Sharp, Nokia, NSN, LGE | R1-75 | - | [WTS] [JSN] | |||
| R1-135968 | Way Forward on NAICS | other | LGE, Ericsson | R1-75 | - | [WTS] [JSN] | |||
| R1-135969 | TR 25.701 v1.0.2 of Scalable UMTS | other | China Unicom | R1-75 | - | [WTS] [JSN] | |||
| R1-135970 | [Draft] TP for link to system modelling for TR36.866 | other | MediaTek | R1-75 | - | [WTS] [JSN] | |||
| R1-135971 | Text Proposal on Mechanical and Electrical Antenna Tilting | other | Fraunhofer IIS | R1-75 | - | [WTS] [JSN] | |||
| R1-135972 | [Draft] TP for link to system modelling for TR36.866 | other | MediaTek | R1-75 | - | [WTS] [JSN] | |||
| R1-135973 | TP for System Level Modeling Methodology for NAIC | other | Qualcomm Incorporated | R1-75 | - | [WTS] [JSN] | |||
| R1-135974 | Draft Response LS on the UE capabilities regarding support of simultaneous MBMS bearer reception | other | Qualcomm Inc. | R1-75 | - | [WTS] [JSN] | |||
| R1-135975 | D2D AdHoc Session Outcome | other | Qualcomm Incorporated (Rapporteur) | R1-75 | - | [WTS] [JSN] | |||
| R1-135976 | Discussion/Decision R1-13XXXX Clarification on the baseline for VoIP transmission delay in TDD UL-DL configuration #0, #3, #6 | other | Huawei, HiSilicon, CMCC, CATT | R1-75 | - | [WTS] [JSN] | |||
| R1-135977 | Way Forward on Restricted and Open Discovery | other | Qualcomm, Ericsson, ZTE, Samsung, Intel, General Dynamics Broadband, Fujistu | R1-75 | - | [WTS] [JSN] | |||
| R1-135978 | Way Forward on Message and Sequence for Discovery | other | Qualcomm, Ericsson, ZTE, Intel, Kyocera, General Dynamics Broadband | R1-75 | - | [WTS] [JSN] | |||
| R1-135979 | Way Forward on configuration of TTI bundling enhancement | other | ZTE, CTC, Coolpad , Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | R1-75 | - | [WTS] [JSN] | |||
| R1-135980 | Way forward on coverage enhancement for TDD | other | CATT, CATR, CMCC, Coolpad, Huawei, HiSilicon, Intel | R1-75 | - | [WTS] [JSN] | |||
| R1-135981 | Revision of Scenarios and requirements TP to 36.843 after email discussion | other | Telecom Italia | R1-75 | - | [WTS] [JSN] | |||
| R1-135982 | Way Forward on Resource Allocation for Discovery | other | Huawei, HiSilicon, LGE, KDDI, NTT DoCoMo, ETRI, Intel, Panasonic | R1-75 | - | [WTS] [JSN] | |||
| R1-135983 | Way Forward on configuration of TTI bundling enhancement | other | ZTE, CTC, Coolpad , Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | R1-75 | - | [WTS] [JSN] | |||
| R1-135984 | TP on SHO Operation in HSUPA with Rate Adaptation | other | NSN, Ericsson | R1-75 | - | [WTS] [JSN] | |||
| R1-135985 | TP on system level simulation assumptions for lean carrier | other | Huawei, HiSilicon, Ericsson | R1-75 | - | [WTS] [JSN] | |||
| R1-135986 | LS on HS-SCCH Orders for CPC DTX/DRX Activation / Deactivation in Multiflow Mode | LS out | RAN1, ZTE | R1-75 | - | [WTS] [JSN] | |||
| R1-135987 | LS to RAN2 on RAN1 input on Further EUL enhancements TR25.700 | LS out | RAN1, Ericsson | R1-75 | - | [WTS] [JSN] | |||
| R1-135988 | Text Proposal on Benefit of Network Assisted Interference Cancellation for UEs with Single Receive Antenna | other | Ericsson | R1-75 | - | [WTS] [JSN] | |||
| R1-135989 | TP on summary results for E-DCH decoupling | other | NSN, Huawei, HiSilicon | R1-75 | - | [WTS] [JSN] | |||
| R1-135990 | TP on Conclusions for UMTS HetNet | other | Huawei, HiSilicon | R1-75 | - | [WTS] [JSN] | |||
| R1-135991 | Chairpersons’ summary of the UMTS sessions | other | UMTS Session Chairpersons (Karri Ranta-aho, NSN, Carmela Cozzo, Huawei, Matthew Baker, Alcatel-Lucent) | R1-75 | - | [WTS] [JSN] | |||
| R1-135992 | void | other | R1-75 | - | [WTS] [JSN] | ||||
| R1-135993 | void | other | R1-75 | - | [WTS] [JSN] | ||||
| R1-135994 | void | other | R1-75 | - | [WTS] [JSN] | ||||
| R1-135995 | void | other | R1-75 | - | [WTS] [JSN] | ||||
| R1-135996 | 36.211 CR0184R3 (Rel-12, B) Introduction of Rel 12 feature for Downlink MIMO Enhancement | CR | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | R1-75 | - | [WTS] [JSN] | |||
| R1-135997 | Text proposal on IPICH based solution for Combined Cells | other | QUALCOMM Incorporated | R1-75 | - | [WTS] [JSN] | |||
| R1-135998 | TR36.843 v1.0.0 on Study on LTE Device to Device Proximity Services-Radio | other | QUALCOMM Incorporated | R1-75 | - | [WTS] [JSN] | |||
| R1-135999 | Remaining details of fast fading modelling for 3D channel | other | Samsung | R1-75 | - | [WTS] [JSN] | |||
| R1-136000 | Way Forward on RSRP calculation formula | other | LG Electronics, Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, Broadcom, CATR, CATT, Fraunhofer IIS, Hitachi, Huawei, HiSilicon, InterDigital, Ericsson, NEC, Qualcomm | R1-75 | - | [WTS] [JSN] | |||
| R1-136001 | Way forward on PDCCH, PDSCH, PUCCH and PUSCH for MTC enhanced coverage | other | Vodafone Group, Ericsson, Huawei, HiSilicon, LG Electronics, Samsung, Alcatel-Lucent, ETRI, NSN, Panasonic, Fujitsu, Sony, ZTE, Mediatek, CATT, NEC, Sierra Wireless, u-blox | R1-75 | - | [WTS] [JSN] | |||
| R1-136002 | Summary of offline session on Small Cell Enhancements | other | Huawei, HiSilicon | R1-75 | - | [WTS] [JSN] | |||
| R1-136003 | Summary of offline discussions on cross-carrier scheduling for TDD-FDD CA | other | Huawei | R1-75 | - | [WTS] [JSN] | |||
| R1-136004 | 3GPP internal LS on update submission for IMT-2000 CDMA DS and IMT-2000 CDMA TDD toward Rev. 12 of Rec. ITU-R M.1457 “Detailed specifications of the terrestrial radio interfaces of International Mobile Telecommunications-2000 (IMT-2000)” | other | RAN3, Telecom Italia | R1-75 | - | [WTS] [JSN] | |||
| R1-136005 | Draft_CR on small cell discovery for small cell enhancements | other | NTT DoCoMo | R1-75 | - | [WTS] [JSN] | |||
| R1-136006 | Way forward on the remaining details of new UE category/type | other | Huawei, HiSilicon, CATT, CATR, ZTE, Alcatel-Lucent, Alcatel Shanghai Bell, Ericsson, ST-Ericsson | R1-75 | - | [WTS] [JSN] | |||
| R1-136007 | Way Forward on CoMP NIB performance | other | Samsung, China Unicom, CMCC, Deutsche Telekom, SK Telecom, Telecom Italia | R1-75 | - | [WTS] [JSN] | |||
| R1-136008 | Way Forward on CoMP NIB signalling | other | Samsung, China Unicom, DAC-UPT, Deutsche Telekom, IAESI, SK Telecom, Telecom Italia | R1-75 | - | [WTS] [JSN] | |||
| R1-136009 | Offline discussion on self-scheduling for TDD-FDD CA | other | LGE, Ericsson | R1-75 | - | [WTS] [JSN] | |||
| R1-136010 | Way Forward on eCoMP | other | NSN, Nokia | R1-75 | - | [WTS] [JSN] | |||
| R1-136011 | Way Forward on ZOD offset and ZOD generation | other | NSN, Nokia, Samsung, CMCC | R1-75 | - | [WTS] [JSN] | |||
| R1-136012 | Way forward on 256QAM | other | Huawei,HiSilicon,ACER,AT&T,CATR,CATT,CHTTL,CMCC,Coolpad,ChinaUnicom,DeutscheTelekom,DISH,ETRI,Hitachi,HTC,III,ITRI,Interdigital,KDDI,Kyocera, LGE,NewPostcom,Panasonic,Potevio,Qualcomm,Samsung,SK,TelecomItalia,T-mobile,Verizon,ZTE | R1-75 | - | [WTS] [JSN] | |||
| R1-136013 | Draft CR on higher order modulation for Small cell enhancements | other | Huawei, HiSilicon | R1-75 | - | [WTS] [JSN] | |||
| R1-136014 | Draft LS on the need of PUCCH on multiple UL serving cells for non-co-located CA | other | NTT DOCOMO, Ericsson, Nokia, NSN | R1-75 | - | [WTS] [JSN] | |||
| R1-136015 | Way Forward on High-Rise Scenario | other | CMCC, Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, Broadcom, CATR, CATT, CHTTL, Huawei, HiSilicon, KDDI, Qualcomm, Samsung, ZTE | R1-75 | - | [WTS] [JSN] | |||
| R1-136016 | Way Forward on TDD/FDD CA when the Pcell is TDD | other | Huawei, HiSilicon, ETRI, HTC, ITL Inc., KT Corporation, LG Electronics, Samsung, Sharp, ZTE | R1-75 | - | [WTS] [JSN] | |||
| R1-136017 | Alternative HARQ timing proposal for TDD PCell and FDD Scell | other | Ericsson | R1-75 | - | [WTS] [JSN] | |||
| R1-136018 | Way Forward on simulation assumptions of baseline performance simulation | other | Huawei, HiSilicon, CATR, CATT, CMCC, Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, InterDigital, Intel, Samsung, LGE, KDDI | R1-75 | - | [WTS] [JSN] | |||
| R1-136019 | Further evaluation of SSPS/SSPM with non-ideal backhaul | other | ZTE | R1-75 | - | [WTS] [JSN] | |||
| R1-136020 | Draft_CR on small cell on/off for small cell enhancements | other | Huawei, HiSilicon | R1-75 | - | [WTS] [JSN] | |||
| R1-136021 | TP for mechanical tilt | other | NSN, Nokia | R1-75 | - | [WTS] [JSN] | |||
| R1-136022 | Draft LS on introduction of LTE coverage enhancement | other | ZTE | R1-75 | - | [WTS] [JSN] | |||
| R1-136023 | Simulation Results for CoMP scenario.2 with non-ideal backhaul | other | NSN, Nokia | R1-75 | - | [WTS] [JSN] | |||
| R1-136024 | LS on the need of PUCCH on multiple UL serving cells for non-co-located CA | LS out | RAN1, NTT DOCOMO | R1-75 | - | [WTS] [JSN] | |||
| R1-136025 | Configuration of subframes for explicit UL-DL reconfiguration DCI | other | CATT | R1-75 | - | [WTS] [JSN] | |||
| R1-136026 | Some Remaining Details for 3D channel modeling, | other | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, Samsung, LG Electronics, Huawei, Hisilicon, NSN, Nokia | R1-75 | - | [WTS] [JSN] | |||
| R1-136027 | Corrections on Radio-interface based synchronization for small cell enhancements | other | Huawei, HiSilicon, CATR | R1-75 | - | [WTS] [JSN] | |||
| R1-136028 | Summary of Ad-hoc session on Further Enhancements to LTE TDD for DL-UL Interference Management and Traffic Adaptation | other | Ad-Hoc Chairman (Qualcomm) | R1-75 | - | [WTS] [JSN] | |||
| R1-136029 | Summary of Ad-hoc session on LTE Coverage Enhancements | other | Ad-Hoc Chairman (Qualcomm) | R1-75 | - | [WTS] [JSN] | |||
| R1-136030 | Summary of Ad-hoc session on Further MBMS Operations Support | other | Ad-Hoc Chairman (Alcatel Lucent) | R1-75 | - | [WTS] [JSN] | |||
| R1-136031 | Summary of Ad-hoc session on 3D-channel model for Elevation Beamforming and FD-MIMO | other | Ad-Hoc Chairman (Qualcomm) | R1-75 | - | [WTS] [JSN] | |||
| R1-136032 | Summary of Ad-hoc session on Study on LTE Device to Device Proximity Services | other | Ad-Hoc Chairman (Alcatel Lucent) | R1-75 | - | [WTS] [JSN] | |||
| R1-136033 | Summary of Ad-hoc session on Study on CoMP for LTE with Non-Ideal Backhaul | other | Ad-Hoc Chairman (Alcatel Lucent) | R1-75 | - | [WTS] [JSN] | |||
| R1-136034 | [Draft] 3GPP internal LS on update submission for IMT-2000 CDMA DS and IMT-2000 CDMA TDD toward Rev. 12 of Rec. ITU-R M.1457 “Detailed specifications of the terrestrial radio interfaces of International Mobile Telecommunications-2000 (IMT-2000)” | other | Telecom Italia | R1-75 | - | [WTS] [JSN] | |||
| R1-136035 | Corrections on the summary of RIBS for small cell enhancements | other | Huawei, HiSilicon, Ericsson, CATR | R1-75 | - | [WTS] [JSN] | |||
| R1-136036 | WF on Modeling Field Pattern of Polarized Antenna | other | Qualcomm | R1-75 | - | [WTS] [JSN] | |||
| R1-136037 | Way forward on 256QAM | other | Huawei,HiSilicon,ACER,AT&T,CATR,CATT,CHTTL,CMCC,Coolpad,ChinaUnicom,DeutscheTelekom,DISH,ETRI,Hitachi,HTC,III,ITRI,Interdigital,KDDI,Kyocera, LGE,NewPostcom,Panasonic,Potevio,Qualcomm,Samsung,SK,TelecomItalia,T-mobile,Verizon,ZTE | R1-75 | - | [WTS] [JSN] | |||
| R1-136038 | Draft CR on higher order modulation for Small cell enhancements | other | Huawei, HiSilicon | R1-75 | - | [WTS] [JSN] | |||
| R1-136039 | Text Proposal on uplink performance of Scalable Bandwidth UMTS by Filtering | other | NSN | R1-75 | - | [WTS] [JSN] | |||
| R1-136040 | Text Proposal on Scalable Bandwidth UMTS by Filtering | other | NSN | R1-75 | - | [WTS] [JSN] | |||
| R1-136041 | TR25.701 v1.1.0 of Scalable UMTS | other | China Unicom | R1-75 | - | [WTS] [JSN] | |||
| R1-136042 | Conclusions on Scalable UMTS | other | Ericsson, NSN, Broadcom Corporation, MediaTek Inc., Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, Qualcomm | R1-75 | - | [WTS] [JSN] | |||
| R1-136043 | Conclusions on Scalable UMTS | other | Ericsson, NSN, Broadcom Corporation, MediaTek Inc., Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, Qualcomm, China Unicom, ZTE | R1-75 | - | [WTS] [JSN] | |||
| R1-136044 | TR25.701 v1.2.0 of Scalable UMTS | other | China Unicom | R1-75 | - | [WTS] [JSN] | |||
| R1-136045 | 3GPP internal LS on update submission for IMT-2000 CDMA DS and IMT-2000 CDMA TDD toward Rev. 12 of Rec. ITU-R M.1457 “Detailed specifications of the terrestrial radio interfaces of International Mobile Telecommunications-2000 (IMT-2000)” | LS out | RAN1, Telecom Italia | R1-75 | - | [WTS] [JSN] | |||
| R1-136046 | TR25.701 v2.0.0 of Scalable UMTS | other | China Unicom | R1-75 | - | [WTS] [JSN] | |||
| R1-136047 | void | other | R1-75 | - | [WTS] [JSN] | ||||
| R1-136048 | void | other | R1-75 | - | [WTS] [JSN] | ||||
| R1-136049 | [Draft] TP for TR 36.866 (Spec impact) | other | MediaTek | R1-75 | - | [WTS] [JSN] | |||
| R1-136050 | [Draft] TP for TR36.866 (System level evaluation results) | other | MediaTek | R1-75 | - | [WTS] [JSN] | |||
| R1-136051 | 36.872 CR0002 (Rel-12, F) CR on higher order modulation for Small cell enhancements | CR | Huawei, HiSilicon | R1-75 | - | [WTS] [JSN] | |||
| R1-136052 | 36.872 CR0003 (Rel-12, F) CR on small cell on/off for Small cell enhancements | CR | Huawei, HiSilicon | R1-75 | - | [WTS] [JSN] | |||
| R1-136053 | 36.872 CR0004 (Rel-12, F) Corrections on Radio-interface based synchronization for small cell enhancements | CR | Huawei, HiSilicon, CATR | R1-75 | - | [WTS] [JSN] | |||
| R1-136054 | 36.872 CR0005 (Rel-12, F) Corrections on the summary of RIBS for small cell enhancements | CR | Huawei, HiSilicon, Ericsson, CATR | R1-75 | - | [WTS] [JSN] | |||
| R1-136055 | LS on introduction of LTE coverage enhancement | other | RAN1, ZTE | R1-75 | - | [WTS] [JSN] | |||
| R1-136056 | Draft_CR on small cell discovery for small cell enhancements | other | NTT DoCoMo | R1-75 | - | [WTS] [JSN] | |||
| R1-136057 | Offline report on the handling on PRACH for enhanced coverage mode | other | Panasonic | R1-75 | - | [WTS] [JSN] | |||
| R1-136058 | Draft CR on higher order modulation conclusion | other | Huawei, HiSilicon | R1-75 | - | [WTS] [JSN] | |||
| R1-136059 | 36.872 CR0006 (Rel-12, F) CR on small cell discovery for Small cell enhancements | CR | NTT DoCoMo | R1-75 | - | [WTS] [JSN] | |||
| R1-136060 | HARQ support for enhanced coverage mode | other | Panasonic | R1-75 | - | [WTS] [JSN] | |||
| R1-136061 | Way forward on the remaining details of new UE category/type | other | Huawei, HiSilicon, CATT, CATR, ZTE, Alcatel-Lucent, Alcatel Shanghai Bell, Ericsson, ST-Ericsson | R1-75 | - | [WTS] [JSN] | |||
| R1-136062 | void | other | R1-75 | - | [WTS] [JSN] | ||||
| R1-136063 | void | other | R1-75 | - | [WTS] [JSN] | ||||
| R1-136064 | void | other | R1-75 | - | [WTS] [JSN] | ||||
| R1-136065 | LS on introduction of LTE coverage enhancement | LS out | RAN1, ZTE | R1-75 | - | [WTS] [JSN] | |||
| R1-136066 | Configuration of subframes for explicit UL-DL reconfiguration DCI | other | CATT | R1-75 | - | [WTS] [JSN] | |||
| R1-136067 | LS on D2D proximity criteria | LS out | RAN1, Qualcomm, Telecom Italia | R1-75 | - | [WTS] [JSN] | |||
| R1-136068 | void | other | R1-75 | - | [WTS] [JSN] | ||||
| R1-136069 | void | other | R1-75 | - | [WTS] [JSN] | ||||
| R1-136070 | void | other | R1-75 | - | [WTS] [JSN] | ||||
| R1-136071 | TP for link to system modelling for TR36.866 | other | MediaTek | R1-75 | - | [WTS] [JSN] | |||
| R1-136072 | Response LS on the UE capabilities regarding support of simultaneous MBMS bearer reception | LS out | RAN1, Qualcomm | R1-75 | - | [WTS] [JSN] | |||
| R1-136073 | 36.213 CR0445r2 (Rel-11,A) Correction on CSI reporting type and parameters | CR | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | R1-75 | - | [WTS] [JSN] | |||
| R1-136074 | Proposal on PMCH mapping in an MBSFN subframe | other | Intel | R1-75 | - | [WTS] [JSN] | |||
| R1-136075 | 36.211 CR0186 (Rel-11, F) Correction on the derivation of the non-MBSFN region by PCFICH | CR | Intel, Panasonic, Fujitsu, Huawei, HiSilicon, NEC, Texas Instruments, Qualcomm Inc., CATT, Interdigital, Ericsson, Samsung, BlackBerry | R1-75 | - | [WTS] [JSN] | |||
| R1-136076 | 36.213 CR0446 (Rel-11, F) Correction on deriving the length of the non-MBSFN region | CR | Intel, Panasonic, Fujitsu, Huawei, HiSilicon, NEC, Texas Instruments, Qualcomm Inc., CATT, Interdigital, Ericsson, Samsung, BlackBerry | R1-75 | - | [WTS] [JSN] | |||
| R1-136077 | Draft TR 36.874 V1.2.0 Coordinated multi-point operation for LTE with non-ideal backhaul | other | Samsung | R1-75 | - | [WTS] [JSN] | |||
| R1-136078 | TR 36.874 V1.2.0 Coordinated multi-point operation for LTE with non-ideal backhaul | other | Samsung | R1-75 | - | [WTS] [JSN] | |||
| R1-136079 | 36.872 CR0007 (Rel-12, F) CR on higher order modulation conclusion | CR | Huawei, HiSilicon | R1-75 | - | [WTS] [JSN] | |||
| R1-136080 | TR 36.866 v0.6.0 Network-Assisted Interference Cancellation and Suppression for LTE | other | MediaTek | R1-75 | - | [WTS] [JSN] | |||
| R1-136081 | Further performance evaluation of CoMP with non-ideal backhaul | other | Huawei, HiSilicon | R1-75 | - | [WTS] [JSN] | |||
| R1-136082 | TR 36.866 v0.7.0 Network-Assisted Interference Cancellation and Suppression for LTE | other | MediaTek | R1-75 | - | [WTS] [JSN] | |||
| R1-136083 | TR 36.866 v1.0.0 Network-Assisted Interference Cancellation and Suppression for LTE | other | MediaTek | R1-75 | - | [WTS] [JSN] | |||
| R1-136084 | TR 36.873 v1.2.0 on 3D channel model for LTE | other | NSN | R1-75 | - | [WTS] [JSN] | |||
| R1-136085 | TR 36.874 V1.3.0 Coordinated multi-point operation for LTE with non-ideal backhaul | other | Samsung | R1-75 | - | [WTS] [JSN] | |||
| R1-136086 | TR 36.847 v2.0.0 Study on LTE TDD - FDD joint operation including Carrier Aggregation | other | CMCC | R1-75 | - | [WTS] [JSN] | |||
| R1-136087 | TR 36.874 V1.4.0 Coordinated multi-point operation for LTE with non-ideal backhaul | other | Samsung | R1-75 | - | [WTS] [JSN] | |||
| R1-136088 | TR 36.874 V2.0.0 Coordinated multi-point operation for LTE with non-ideal backhaul | other | Samsung | R1-75 | - | [WTS] [JSN] |
1089 documents (1.2748401165009 seconds)