Please enter the search related information in the fields below. Partial information works, e.g. "SP-21" in the "tdoc" field lists all TSG SA documents from 2021. Regular expressions mostly work in all fields (e.g. "2[34].501" in the "Spec" field lists all documents related to 23.501 and 24.501. Capitalization is disregarded, i.e. "3GPP" gives the same results as "3gpp".
Download results in JSON format
| tdoc | Title | Type / Revs | Source | Spec / CR | S/WID | Release | Meeting | Status | Links |
|---|---|---|---|---|---|---|---|---|---|
| R1-134035 | Draft Agenda for RAN1#74bis meeting | other | RAN1 Chairman | R1-74 | - | [WTS] [JSN] | |||
| R1-134036 | Final Report of RAN1#74 meeting | other | MCC | R1-74 | - | [WTS] [JSN] | |||
| R1-134037 | Selected highlights from RAN#61 of relevance to RAN1 | other | RAN1 Chairman | R1-74 | - | [WTS] [JSN] | |||
| R1-134038 | LS on current status and observations on NAICS receivers | other | RAN4, MediaTek | R1-74 | - | [WTS] [JSN] | |||
| R1-134039 | LS for PCell interruption for SCell activation | other | RAN4, CATT | R1-74 | - | [WTS] [JSN] | |||
| R1-134040 | LS on CoMP interference averaging | other | RAN4, Samsung | R1-74 | - | [WTS] [JSN] | |||
| R1-134041 | Reply LS on Higher Order Modulation Evaluation Assumptions | other | RAN4, NSN | R1-74 | - | [WTS] [JSN] | |||
| R1-134042 | RAN4 Text Proposal to TR 25.701 | other | RAN4, Qualcomm | R1-74 | - | [WTS] [JSN] | |||
| R1-134043 | LS on Agreements from TSG RAN on work on Public Safety related use cases in Release 12 | other | RAN, Alcatel-Lucent, Vodafone | R1-74 | - | [WTS] [JSN] | |||
| R1-134044 | Reply LS regarding ITU-R WP5A request for input | other | SA1, Alcatel-Lucent | R1-74 | - | [WTS] [JSN] | |||
| R1-134045 | Further discussion on eNB-to-eNB interference indicator | other | Huawei, HiSilicon | R1-74 | - | [WTS] [JSN] | |||
| R1-134046 | Further study on open loop power control for TDD eIMTA | other | Huawei, HiSilicon | R1-74 | - | [WTS] [JSN] | |||
| R1-134047 | Signaling on closed loop power control for TDD eIMTA | other | Huawei, HiSilicon | R1-74 | - | [WTS] [JSN] | |||
| R1-134048 | CSI enhancement for TDD eIMTA | other | Huawei, HiSilicon | R1-74 | - | [WTS] [JSN] | |||
| R1-134049 | Physical layer signaling design for TDD eIMTA | other | Huawei, HiSilicon | R1-74 | - | [WTS] [JSN] | |||
| R1-134050 | HARQ-ACK PUCCH resource allocation | other | Huawei, HiSilicon | R1-74 | - | [WTS] [JSN] | |||
| R1-134051 | Discussion on bandwidth reduction and other issues for low cost MTC UEs | other | Huawei, Hisilicon | R1-74 | - | [WTS] [JSN] | |||
| R1-134052 | Consideration on SIB transmissions for MTC UEs | other | Huawei, Hisilicon | R1-74 | - | [WTS] [JSN] | |||
| R1-134053 | PBCH coverage enhancement for both FDD and TDD systems | other | Huawei, Hisilicon | R1-74 | - | [WTS] [JSN] | |||
| R1-134054 | Discussion on PRACH coverage improvement and mechanism for determining the amount of needed coverage improvement | other | Huawei, HiSilicon | R1-74 | - | [WTS] [JSN] | |||
| R1-134055 | Discussion on control channels for coverage limited MTC Ues | other | Huawei, HiSilicon | R1-74 | - | [WTS] [JSN] | |||
| R1-134056 | Details of TDD-FDD CA | other | Huawei, Hisilicon | R1-74 | - | [WTS] [JSN] | |||
| R1-134057 | Remaining aspects of scenarios and UE requirements | other | Huawei, Hisilicon | R1-74 | - | [WTS] [JSN] | |||
| R1-134058 | Evaluation and analysis on TTI bundling enhancements for UL VoIP for FDD | other | Huawei, HiSilicon | R1-74 | - | [WTS] [JSN] | |||
| R1-134059 | Discussion on TTI bundling enhancements for medium data rate PUSCH | other | Huawei, HiSilicon | R1-74 | - | [WTS] [JSN] | |||
| R1-134060 | Further considerations on 256QAM | other | Huawei, HiSilicon | R1-74 | - | [WTS] [JSN] | |||
| R1-134061 | Standard impacts of 256QAM | other | Huawei, HiSilicon | R1-74 | - | [WTS] [JSN] | |||
| R1-134062 | Design target for discovery enhancement | other | Huawei, HiSilicon | R1-74 | - | [WTS] [JSN] | |||
| R1-134063 | Analysis and comparison of technologies for discovery enhancement | other | Huawei, HiSilicon | R1-74 | - | [WTS] [JSN] | |||
| R1-134064 | Details and enhancements for semi-static small cell on/off schemes | other | Huawei, HiSilicon | R1-74 | - | [WTS] [JSN] | |||
| R1-134065 | Measurement and procedure enhancements for transition time reduction of small cell on/off | other | Huawei, HiSilicon | R1-74 | - | [WTS] [JSN] | |||
| R1-134066 | Evaluation assumptions for network listening | other | Huawei, HiSilicon | R1-74 | - | [WTS] [JSN] | |||
| R1-134067 | Enhanced mechanisms for network listening | other | Huawei, HiSilicon | R1-74 | - | [WTS] [JSN] | |||
| R1-134068 | Initial calibration of 3D channel modeling model | other | Huawei, HiSilicon | R1-74 | - | [WTS] [JSN] | |||
| R1-134069 | Simulation assumptions for calibration and baseline performance evaluation | other | Huawei, HiSilicon | R1-74 | - | [WTS] [JSN] | |||
| R1-134070 | Refinement of 3D UMi NLOS path loss | other | Huawei, HiSilicon | R1-74 | - | [WTS] [JSN] | |||
| R1-134071 | System-level performance of D2D communication | other | Huawei, HiSilicon | R1-74 | - | [WTS] [JSN] | |||
| R1-134072 | Considerations on timing and synchronization for D2D | other | Huawei, HiSilicon | R1-74 | - | [WTS] [JSN] | |||
| R1-134073 | Resource assignment for D2D communication | other | Huawei, HiSilicon | R1-74 | - | [WTS] [JSN] | |||
| R1-134074 | System-level performance of D2D discovery | other | Huawei, HiSilicon | R1-74 | - | [WTS] [JSN] | |||
| R1-134075 | D2D discovery message size | other | Huawei, HiSilicon | R1-74 | - | [WTS] [JSN] | |||
| R1-134076 | Benefits of type-2 discovery | other | Huawei, HiSilicon | R1-74 | - | [WTS] [JSN] | |||
| R1-134077 | Performance evaluation of CoMP with non-ideal backhaul | other | Huawei, HiSilicon | R1-74 | - | [WTS] [JSN] | |||
| R1-134078 | Discussion on the system level modelling methodology for advanced receiver | other | Huawei, HiSilicon | R1-74 | - | [WTS] [JSN] | |||
| R1-134079 | Remaining details of backhaul signaling in TDD eIMTA | other | CATT | R1-74 | - | [WTS] [JSN] | |||
| R1-134080 | Remaining details of uplink power control in TDD eIMTA | other | CATT | R1-74 | - | [WTS] [JSN] | |||
| R1-134081 | CSI feedback in TDD eIMTA | other | CATT | R1-74 | - | [WTS] [JSN] | |||
| R1-134082 | Design of L1 signaling for UL-DL reconfiguration | other | CATT | R1-74 | - | [WTS] [JSN] | |||
| R1-134083 | Remaining HARQ details in TDD eIMTA | other | CATT | R1-74 | - | [WTS] [JSN] | |||
| R1-134084 | CRS in reconfigurable subframes | other | CATT | R1-74 | - | [WTS] [JSN] | |||
| R1-134085 | LBRM in TDD eIMTA | other | CATT | R1-74 | - | [WTS] [JSN] | |||
| R1-134086 | Downlink data channel bandwidth reduction | other | CATT | R1-74 | - | [WTS] [JSN] | |||
| R1-134087 | PBCH coverage improvement for low-cost MTC UEs | other | CATT | R1-74 | - | [WTS] [JSN] | |||
| R1-134088 | PRACH coverage improvement for low-cost MTC UEs | other | CATT | R1-74 | - | [WTS] [JSN] | |||
| R1-134089 | PDSCH coverage improvement for low-cost MTC UEs | other | CATT | R1-74 | - | [WTS] [JSN] | |||
| R1-134090 | (E)PDCCH coverage improvement for low-cost MTC UEs | other | CATT | R1-74 | - | [WTS] [JSN] | |||
| R1-134091 | PUCCH coverage improvement for low-cost MTC UEs | other | CATT | R1-74 | - | [WTS] [JSN] | |||
| R1-134092 | PCFICH and PHICH coverage improvement for low-cost MTC UEs | other | CATT | R1-74 | - | [WTS] [JSN] | |||
| R1-134093 | General discussion on FDD-TDD carrier aggregation | other | CATT | R1-74 | - | [WTS] [JSN] | |||
| R1-134094 | HARQ/scheduling timing with FDD as PCell for FDD-TDD CA | other | CATT | R1-74 | - | [WTS] [JSN] | |||
| R1-134095 | PDSCH timing with TDD as PCell for FDD-TDD CA | other | CATT | R1-74 | - | [WTS] [JSN] | |||
| R1-134096 | PUSCH timing with TDD as PCell for FDD-TDD CA | other | CATT | R1-74 | - | [WTS] [JSN] | |||
| R1-134097 | UCI transmission for FDD-TDD carrier aggregation | other | CATT | R1-74 | - | [WTS] [JSN] | |||
| R1-134098 | Parallel PUCCH transmission for FDD-TDD carrier aggregation | other | CATT | R1-74 | - | [WTS] [JSN] | |||
| R1-134099 | TTI bundling enhancements for UL VoIP | other | CATT | R1-74 | - | [WTS] [JSN] | |||
| R1-134100 | TTI bundling for more TDD UL-DL configurations | other | CATT | R1-74 | - | [WTS] [JSN] | |||
| R1-134101 | Measurement for MBMS | other | CATT | R1-74 | - | [WTS] [JSN] | |||
| R1-134102 | Further evaluations on higher order modulation | other | CATT | R1-74 | - | [WTS] [JSN] | |||
| R1-134103 | Analysis on specification impact of higher order modulation | other | CATT | R1-74 | - | [WTS] [JSN] | |||
| R1-134104 | Discussion on mechanisms for small cell ON/OFF | other | CATT | R1-74 | - | [WTS] [JSN] | |||
| R1-134105 | Further evaluations on small cell ON/OFF with realistic transition time scales | other | CATT | R1-74 | - | [WTS] [JSN] | |||
| R1-134106 | Discussion on efficient small cell discovery | other | CATT | R1-74 | - | [WTS] [JSN] | |||
| R1-134107 | Discussion on air interface based synchronization for small cells | other | CATT | R1-74 | - | [WTS] [JSN] | |||
| R1-134108 | Initial calibration results for 3D channel modeling | other | CATT | R1-74 | - | [WTS] [JSN] | |||
| R1-134109 | Initial calibration results for 3D fast fading channel modeling | other | CATT | R1-74 | - | [WTS] [JSN] | |||
| R1-134110 | Synchronization for D2D communication | other | CATT | R1-74 | - | [WTS] [JSN] | |||
| R1-134111 | Physical channel design for D2D communication | other | CATT | R1-74 | - | [WTS] [JSN] | |||
| R1-134112 | Discussion on physical channel types for D2D communication | other | CATT | R1-74 | - | [WTS] [JSN] | |||
| R1-134113 | Resource allocation for D2D communication | other | CATT | R1-74 | - | [WTS] [JSN] | |||
| R1-134114 | Discussion of discovery signal design for different discovery procedures | other | CATT | R1-74 | - | [WTS] [JSN] | |||
| R1-134115 | Details of discovery signal design | other | CATT | R1-74 | - | [WTS] [JSN] | |||
| R1-134116 | Further discussion on resource allocation for D2D discovery | other | CATT | R1-74 | - | [WTS] [JSN] | |||
| R1-134117 | Evaluation of coordinated scheduling with non-ideal backhaul for inter-eNB CoMP | other | CATT | R1-74 | - | [WTS] [JSN] | |||
| R1-134118 | Considerations on coordination signaling for inter-eNB CoMP | other | CATT | R1-74 | - | [WTS] [JSN] | |||
| R1-134119 | Discussion on non-MBSFN region | other | Intel Corporation | R1-74 | - | [WTS] [JSN] | |||
| R1-134120 | Discussion on Backhaul Signaling for eIMTA Support | other | Intel Corporation | R1-74 | - | [WTS] [JSN] | |||
| R1-134121 | Discussion on Remaining Details of UL PC for eIMTA Support | other | Intel Corporation | R1-74 | - | [WTS] [JSN] | |||
| R1-134122 | Discussion on CSI Enhancements for eIMTA Support | other | Intel Corporation | R1-74 | - | [WTS] [JSN] | |||
| R1-134123 | Discussion on signaling mechanism for TDD UL-DL reconfiguration | other | Intel Corporation | R1-74 | - | [WTS] [JSN] | |||
| R1-134124 | On HARQ aspects for TDD eIMTA | other | Intel Corporation | R1-74 | - | [WTS] [JSN] | |||
| R1-134125 | Views on system-level evaluation methodologies of NAICS receivers | other | Intel Corporation | R1-74 | - | [WTS] [JSN] | |||
| R1-134126 | System-level evaluation of NAICS receivers | other | Intel Corporation | R1-74 | - | [WTS] [JSN] | |||
| R1-134127 | NAICS receivers for downlink control channel | other | Intel Corporation | R1-74 | - | [WTS] [JSN] | |||
| R1-134128 | New UE category/type for low cost MTC | other | Intel Corporation | R1-74 | - | [WTS] [JSN] | |||
| R1-134129 | PBCH coverage enhancement for low cost MTC | other | Intel Corporation | R1-74 | - | [WTS] [JSN] | |||
| R1-134130 | PRACH coverage enhancement for low cost MTC | other | Intel Corporation | R1-74 | - | [WTS] [JSN] | |||
| R1-134131 | Coverage enhancement of DL/UL control channels for low cost MTC | other | Intel Corporation | R1-74 | - | [WTS] [JSN] | |||
| R1-134132 | PSS/SSS coverage enhancement for low cost MTC | other | Intel Corporation | R1-74 | - | [WTS] [JSN] | |||
| R1-134133 | On support of TDD-FDD Carrier Aggregation | other | Intel Corporation | R1-74 | - | [WTS] [JSN] | |||
| R1-134134 | Discussion on small cell on/off mechanism | other | Intel Corporation | R1-74 | - | [WTS] [JSN] | |||
| R1-134135 | Evaluation on small cell discovery signal | other | Intel Corporation | R1-74 | - | [WTS] [JSN] | |||
| R1-134136 | EPDCCH ICIC in Small Cell Environment | other | Intel Corporation | R1-74 | - | [WTS] [JSN] | |||
| R1-134137 | Preliminary calibration results of 3D channel model baseline | other | Intel Corporation | R1-74 | - | [WTS] [JSN] | |||
| R1-134138 | Discussion on Synchronization and Timing for D2D Communication | other | Intel Corporation | R1-74 | - | [WTS] [JSN] | |||
| R1-134139 | Discussion on Resource Allocation Methods for D2D Communication | other | Intel Corporation | R1-74 | - | [WTS] [JSN] | |||
| R1-134140 | On Physical Layer Design for D2D Discovery | other | Intel Corporation | R1-74 | - | [WTS] [JSN] | |||
| R1-134141 | On Resource Allocation and System Operation for D2D Discovery | other | R1-74 | - | [WTS] [JSN] | ||||
| R1-134142 | Evaluation of downlink CSCB CoMP with non-ideal backhaul link | other | Intel Corporation | R1-74 | - | [WTS] [JSN] | |||
| R1-134143 | Evaluation of uplink CoMP with non-ideal backhaul link | other | Intel Corporation | R1-74 | - | [WTS] [JSN] | |||
| R1-134144 | Discussion on backhaul link signalling for downlink CoMP | other | Intel Corporation | R1-74 | - | [WTS] [JSN] | |||
| R1-134145 | Additional Single Receiver Performance Results for the “Keep Trying” PBCH decoding method | other | Sierra Wireless | R1-74 | - | [WTS] [JSN] | |||
| R1-134146 | Evaluation of PBCH Decoding Techniques | other | Sierra Wireless | R1-74 | - | [WTS] [JSN] | |||
| R1-134147 | PRACH Considerations for CAT 0 UE's | other | Sierra Wireless | R1-74 | - | [WTS] [JSN] | |||
| R1-134148 | Discussion on signalling for CoMP with non-ideal backhaul | other | FiberHome | R1-74 | - | [WTS] [JSN] | |||
| R1-134149 | 36.212 CR0155R1 (Rel-11, F) Correction on parameter ue-Category | CR | Samsung, Huawei, HiSilicon | R1-74 | - | [WTS] [JSN] | |||
| R1-134150 | 36.213 CR0440R1 (Rel-11, F) Correction on parameter ue-Category | CR | Samsung, Huawei, HiSilicon | R1-74 | - | [WTS] [JSN] | |||
| R1-134151 | Remainig details of backhaul signaling for eIMTA | other | Samsung | R1-74 | - | [WTS] [JSN] | |||
| R1-134152 | UL power control for eIMTA | other | Samsung | R1-74 | - | [WTS] [JSN] | |||
| R1-134153 | CSI feedback for eIMTA | other | Samsung | R1-74 | - | [WTS] [JSN] | |||
| R1-134154 | Signaling for Adapting TDD UL-DL Configurations | other | Samsung | R1-74 | - | [WTS] [JSN] | |||
| R1-134155 | UCI Payload Aspects for eIMTA | other | Samsung | R1-74 | - | [WTS] [JSN] | |||
| R1-134156 | On HARQ timing for eIMTA | other | Samsung | R1-74 | - | [WTS] [JSN] | |||
| R1-134157 | On PUCCH HARQ-ACK procedure for eIMTA | other | Samsung | R1-74 | - | [WTS] [JSN] | |||
| R1-134158 | CRS handling in flexible subframes | other | Samsung | R1-74 | - | [WTS] [JSN] | |||
| R1-134159 | On other issues for eIMTA | other | Samsung | R1-74 | - | [WTS] [JSN] | |||
| R1-134160 | Discussion on transmission modes to support eIMTA | other | Samsung | R1-74 | - | [WTS] [JSN] | |||
| R1-134161 | Discussion on resource allocation for low cost MTC UE | other | Samsung | R1-74 | - | [WTS] [JSN] | |||
| R1-134162 | PBCH Coverage Enhancements for MTC UEs | other | Samsung | R1-74 | - | [WTS] [JSN] | |||
| R1-134163 | PRACH Coverage Enhancements for MTC UEs | other | Samsung | R1-74 | - | [WTS] [JSN] | |||
| R1-134164 | PDSCH/PUSCH Coverage Enhancements for MTC UEs | other | Samsung | R1-74 | - | [WTS] [JSN] | |||
| R1-134165 | (E)PDCCH Coverage Enhancements for MTC UEs | other | Samsung | R1-74 | - | [WTS] [JSN] | |||
| R1-134166 | PUCCH Coverage Enhancements for MTC UEs | other | Samsung | R1-74 | - | [WTS] [JSN] | |||
| R1-134167 | HARQ operation for TDD plus FDD CA | other | Samsung | R1-74 | - | [WTS] [JSN] | |||
| R1-134168 | Specification support for FDD-TDD CA | other | Samsung | R1-74 | - | [WTS] [JSN] | |||
| R1-134169 | Non-CA Scenarios for FDD-TDD Joint Operation | other | Samsung | R1-74 | - | [WTS] [JSN] | |||
| R1-134170 | Discussion on LTE Coverage Enhancement Methods for VoIP | other | Samsung | R1-74 | - | [WTS] [JSN] | |||
| R1-134171 | Discussion on LTE Coverage Enhancement Methods for Medium Data Rate PUSCH | other | Samsung | R1-74 | - | [WTS] [JSN] | |||
| R1-134172 | Extension of TTI Bundling in TDD | other | Samsung | R1-74 | - | [WTS] [JSN] | |||
| R1-134173 | Discussion on Further MBMS Operations Support | other | Samsung | R1-74 | - | [WTS] [JSN] | |||
| R1-134174 | SLS results for 256QAM in small cell scenario 3 | other | Samsung | R1-74 | - | [WTS] [JSN] | |||
| R1-134175 | Discussion on specification impact of 256QAM | other | Samsung | R1-74 | - | [WTS] [JSN] | |||
| R1-134176 | Discussion on adaptation enhancements and time scales for small cells | other | Samsung | R1-74 | - | [WTS] [JSN] | |||
| R1-134177 | Further discussion on small cell load shifting and cell association | other | Samsung | R1-74 | - | [WTS] [JSN] | |||
| R1-134178 | Further discussion on small cell discovery | other | Samsung | R1-74 | - | [WTS] [JSN] | |||
| R1-134179 | Discussion on solutions for radio-interface based synchronization | other | Samsung | R1-74 | - | [WTS] [JSN] | |||
| R1-134180 | Details of fast fading modeling | other | Samsung | R1-74 | - | [WTS] [JSN] | |||
| R1-134181 | Discussion on simulation assumptions for channel model calibration | other | Samsung | R1-74 | - | [WTS] [JSN] | |||
| R1-134182 | Phase 1 channel modeling calibration results | other | Samsung | R1-74 | - | [WTS] [JSN] | |||
| R1-134183 | Discussion on high-rise scenario | other | Samsung | R1-74 | - | [WTS] [JSN] | |||
| R1-134184 | Discussion on time synchronization for D2D broadcast communication | other | Samsung | R1-74 | - | [WTS] [JSN] | |||
| R1-134185 | Physical channel design for D2D broadcast communication | other | Samsung | R1-74 | - | [WTS] [JSN] | |||
| R1-134186 | Resource allocation for D2D broadcast communication | other | Samsung | R1-74 | - | [WTS] [JSN] | |||
| R1-134187 | Evaluation of resource allocation for D2D broadcast communication | other | Samsung | R1-74 | - | [WTS] [JSN] | |||
| R1-134188 | Network-to-UE relay for D2D communication | other | Samsung | R1-74 | - | [WTS] [JSN] | |||
| R1-134189 | Evaluation of transmit time adjustment for discovery | other | Samsung | R1-74 | - | [WTS] [JSN] | |||
| R1-134190 | Design aspect of D2D discovery | other | Samsung | R1-74 | - | [WTS] [JSN] | |||
| R1-134191 | Evaluation on WAN Impact of D2D discovery | other | Samsung | R1-74 | - | [WTS] [JSN] | |||
| R1-134192 | Evaluation of coordinated scheduling for SCE scenario 1 with non-ideal backhaul | other | Samsung | R1-74 | - | [WTS] [JSN] | |||
| R1-134193 | Evaluation of coordinated scheduling for SCE scenario 2a with non-ideal backhaul | other | Samsung | R1-74 | - | [WTS] [JSN] | |||
| R1-134194 | Evaluation of coordinated scheduling for CoMP scenario 2 with non-ideal backhaul | other | Samsung | R1-74 | - | [WTS] [JSN] | |||
| R1-134195 | Discussion on signalling for inter-eNB operation | other | Samsung | R1-74 | - | [WTS] [JSN] | |||
| R1-134196 | Link abstraction method for SLML receiver | other | Samsung | R1-74 | - | [WTS] [JSN] | |||
| R1-134197 | System level evaluation of ML receiver under NAICS scenario 1 | other | Samsung | R1-74 | - | [WTS] [JSN] | |||
| R1-134198 | System level evaluation of ML receiver under NAICS scenario 2 | other | Samsung | R1-74 | - | [WTS] [JSN] | |||
| R1-134199 | Considerations in E-DCH Decoupling in UMTS HetNet | other | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | R1-74 | - | [WTS] [JSN] | |||
| R1-134200 | Considerations in NAIC in UMTS HetNet | other | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | R1-74 | - | [WTS] [JSN] | |||
| R1-134201 | Remaining details of backhaul signaling for eIMTA | other | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | R1-74 | - | [WTS] [JSN] | |||
| R1-134202 | Remaining details of UL power control for eIMTA | other | Alcatel-Lucent Shanghai Bell, Alcatel-Lucent | R1-74 | - | [WTS] [JSN] | |||
| R1-134203 | On the CSI feedback for eIMTA | other | Alcatel-Lucent Shanghai Bell, Alcatel-Lucent | R1-74 | - | [WTS] [JSN] | |||
| R1-134204 | Details of L1 signalling for TDD UL-DL reconfiguration | other | Alcatel-Lucent Shanghai Bell, Alcatel-Lucent | R1-74 | - | [WTS] [JSN] | |||
| R1-134205 | Further details of HARQ timing for eIMTA | other | Alcatel-Lucent Shanghai Bell, Alcatel-Lucent | R1-74 | - | [WTS] [JSN] | |||
| R1-134206 | Coverage enhancement requirements for MTC UE | other | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | R1-74 | - | [WTS] [JSN] | |||
| R1-134207 | Coverage enhancement techniques for PBCH | other | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | R1-74 | - | [WTS] [JSN] | |||
| R1-134208 | Coverage enhancement techniques for PRACH | other | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | R1-74 | - | [WTS] [JSN] | |||
| R1-134209 | Coverage enhancement techniques for (E)PDCCH | other | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | R1-74 | - | [WTS] [JSN] | |||
| R1-134210 | Simplification of MTC UE operation in coverage enhancement | other | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | R1-74 | - | [WTS] [JSN] | |||
| R1-134211 | Potential specification impact of TDD-FDD carrier aggregation | other | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | R1-74 | - | [WTS] [JSN] | |||
| R1-134212 | Scheduling and HARQ timing for TDD-FDD carrier aggregation | other | Alcatel-Lucent Shanghai Bell, Alcatel-Lucent | R1-74 | - | [WTS] [JSN] | |||
| R1-134213 | On the TTI bundling enhancements for UL VoIP | other | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | R1-74 | - | [WTS] [JSN] | |||
| R1-134214 | On the TTI bundling enhancements for medium data rate PUSCH | other | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | R1-74 | - | [WTS] [JSN] | |||
| R1-134215 | Measurement for further enhancement of MBMS operation | other | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | R1-74 | - | [WTS] [JSN] | |||
| R1-134216 | Performance analysis of 256QAM modulation | other | Alcatel-Lucent Shanghai Bell, Alcatel-Lucent | R1-74 | - | [WTS] [JSN] | |||
| R1-134217 | Procedure and System performance of Small Cell ON/OFF | other | Alcatel-Lucent Shanghai Bell, Alcatel-Lucent | R1-74 | - | [WTS] [JSN] | |||
| R1-134218 | Small Cell Discovery based on UL signals | other | Alcatel-Lucent Shanghai Bell, Alcatel-Lucent | R1-74 | - | [WTS] [JSN] | |||
| R1-134219 | System Analysis of radio interface based synchronization | other | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | R1-74 | - | [WTS] [JSN] | |||
| R1-134220 | Draft text proposal on physical layer support of dual connectivity | other | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | R1-74 | - | [WTS] [JSN] | |||
| R1-134221 | Proposals for Fast Fading Channel Modelling for 3D UMa | other | Alcatel-Lucent Shanghai Bell, Alcatel-Lucent | R1-74 | - | [WTS] [JSN] | |||
| R1-134222 | Proposals for Fast Fading Channel Modelling for 3D UMi | other | Alcatel-Lucent Shanghai Bell, Alcatel-Lucent | R1-74 | - | [WTS] [JSN] | |||
| R1-134223 | Coordinate Systems for 3D MIMO | other | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | R1-74 | - | [WTS] [JSN] | |||
| R1-134224 | Phase 1 Modelling Calibration Results for 3D UMa and 3D UMi | other | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | R1-74 | - | [WTS] [JSN] | |||
| R1-134225 | UE Attachment Modelling for 3D MIMO Calibration | other | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | R1-74 | - | [WTS] [JSN] | |||
| R1-134226 | 3D MIMO Channel Modelling for High-rise Scenario | other | Alcatel-Lucent Shanghai Bell, Alcatel-Lucent | R1-74 | - | [WTS] [JSN] | |||
| R1-134227 | Synchronization for D2D communication | other | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | R1-74 | - | [WTS] [JSN] | |||
| R1-134228 | Physical Channel Design for D2D Communication | other | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | R1-74 | - | [WTS] [JSN] | |||
| R1-134229 | Design considerations and performance evaluation for D2D broadcast/relay | other | Alcatel-Lucent Shanghai Bell, Alcatel-Lucent | R1-74 | - | [WTS] [JSN] | |||
| R1-134230 | Resource allocation for D2D Communication | other | Alcatel-Lucent Shanghai Bell, Alcatel-Lucent | R1-74 | - | [WTS] [JSN] | |||
| R1-134231 | D2D Discovery Signal Design | other | Alcatel-Lucent Shanghai Bell, Alcatel-Lucent | R1-74 | - | [WTS] [JSN] | |||
| R1-134232 | Resource allocation for D2D discovery | other | Alcatel-Lucent Shanghai Bell, Alcatel-Lucent | R1-74 | - | [WTS] [JSN] | |||
| R1-134233 | Performance Evaluation of X2 signalling enhancement for DL eCoMP with NIB | other | Alcatel-Lucent Shanghai Bell, Alcatel-Lucent | R1-74 | - | [WTS] [JSN] | |||
| R1-134234 | Performance Evaluation of X2 signalling enhancement for UL eCoMP with NIB | other | Alcatel-Lucent Shanghai Bell, Alcatel-Lucent | R1-74 | - | [WTS] [JSN] | |||
| R1-134235 | Proposals for X2 signalling enhancement for eCoMP | other | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | R1-74 | - | [WTS] [JSN] | |||
| R1-134236 | Signalling of Network Assistance Information in NAICS | other | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | R1-74 | - | [WTS] [JSN] | |||
| R1-134237 | Reconfiguration signalling for eIMTA system | other | NEC Group | R1-74 | - | [WTS] [JSN] | |||
| R1-134238 | Backward compatibility for TDD eIMTA system | other | NEC Group | R1-74 | - | [WTS] [JSN] | |||
| R1-134239 | UL&DL timing coupling issue for TDD eIMTA system | other | NEC Group | R1-74 | - | [WTS] [JSN] | |||
| R1-134240 | PDSCH frequency allocation methods | other | NEC Group | R1-74 | - | [WTS] [JSN] | |||
| R1-134241 | Aspects of synchronisation for D2D communication | other | NEC Group | R1-74 | - | [WTS] [JSN] | |||
| R1-134242 | Discussion on resource allocation for D2D broadcast communication | other | NEC Group | R1-74 | - | [WTS] [JSN] | |||
| R1-134243 | Synchronisation aspects for inter-cell discovery in asychronous cell deployment | other | NEC Group | R1-74 | - | [WTS] [JSN] | |||
| R1-134244 | Network-assisted device discovery mechanism | other | NEC Group | R1-74 | - | [WTS] [JSN] | |||
| R1-134245 | Candidate for physical layer measurement | other | NEC Group | R1-74 | - | [WTS] [JSN] | |||
| R1-134246 | Consideration on reply from RAN4 | other | NEC Group | R1-74 | - | [WTS] [JSN] | |||
| R1-134247 | Views on interference coordination for semi-static small cell on/off | other | NEC Group | R1-74 | - | [WTS] [JSN] | |||
| R1-134248 | Discussion on small cell on/off mechanisms and configuration for efficient cell detection | other | NEC Group | R1-74 | - | [WTS] [JSN] | |||
| R1-134249 | Legacy scheme as baseline of other solution | other | NEC Group | R1-74 | - | [WTS] [JSN] | |||
| R1-134250 | Initial calibration of Large Scale channel modeling | other | NEC Group | R1-74 | - | [WTS] [JSN] | |||
| R1-134251 | Discussion on UE attachment modeling | other | NEC Group | R1-74 | - | [WTS] [JSN] | |||
| R1-134252 | Uplink Reference Signal Enhancement for Low Cost MTC | other | NEC Group | R1-74 | - | [WTS] [JSN] | |||
| R1-134253 | CA-based aspects for FDD-TDD joint operation | other | NEC Group | R1-74 | - | [WTS] [JSN] | |||
| R1-134254 | On the need to extend TTI bundling to more TDD configurations | other | NEC Group | R1-74 | - | [WTS] [JSN] | |||
| R1-134255 | Discussion on possible small cell discovery schemes | other | NEC Group | R1-74 | - | [WTS] [JSN] | |||
| R1-134256 | Discussion on mechanisms to reduce the transition time for semi-static small cell on/off | other | Fujitsu | R1-74 | - | [WTS] [JSN] | |||
| R1-134257 | Discussion on discovery and measurement of small cells in dormant mode | other | Fujitsu | R1-74 | - | [WTS] [JSN] | |||
| R1-134258 | Initial calibration results for 3D channel modeling | other | Fujitsu | R1-74 | - | [WTS] [JSN] | |||
| R1-134259 | Discussion on Control Information for D2D Communication | other | Fujitsu | R1-74 | - | [WTS] [JSN] | |||
| R1-134260 | Comparison of SC-FDMA and OFDMA for multiple access scheme for D2D link | other | Fujitsu | R1-74 | - | [WTS] [JSN] | |||
| R1-134261 | RRM for D2D communication | other | Fujitsu | R1-74 | - | [WTS] [JSN] | |||
| R1-134262 | D2D discovery and procedure | other | Fujitsu | R1-74 | - | [WTS] [JSN] | |||
| R1-134263 | D2D discovery signals | other | Fujitsu | R1-74 | - | [WTS] [JSN] | |||
| R1-134264 | Discussion on inter-eNB signaling in support of CoMP with non-ideal backhaul | other | Fujitsu | R1-74 | - | [WTS] [JSN] | |||
| R1-134265 | On 3D channel model extension | other | Intel Corporation | R1-74 | - | [WTS] [JSN] | |||
| R1-134266 | Comparison of different UE association methods | other | Intel Corporation | R1-74 | - | [WTS] [JSN] | |||
| R1-134267 | Discussion on the small cell higher order modulation | other | Intel Corporation | R1-74 | - | [WTS] [JSN] | |||
| R1-134268 | Discussion on TTI bundling enhancement for VoIP | other | Intel Corporation | R1-74 | - | [WTS] [JSN] | |||
| R1-134269 | Discussion on TTI bundling enhancement for medium data rate PUSCH | other | Intel Corporation | R1-74 | - | [WTS] [JSN] | |||
| R1-134270 | ProSe device-to-device broadcast operation | other | General Dynamics Broadband UK | R1-74 | - | [WTS] [JSN] | |||
| R1-134271 | ProSe device-to-device broadcast physical channels | other | General Dynamics Broadband UK | R1-74 | - | [WTS] [JSN] | |||
| R1-134272 | ProSe device-to-device discovery link performance | other | General Dynamics Broadband UK | R1-74 | - | [WTS] [JSN] | |||
| R1-134273 | ProSe device-to-device discovery | other | General Dynamics Broadband UK | R1-74 | - | [WTS] [JSN] | |||
| R1-134274 | Joint TDD-FDD Carrier Aggregation | other | Texas Instruments | R1-74 | - | [WTS] [JSN] | |||
| R1-134275 | Further discussion on TDD-FDD joint operation | other | Texas Instruments | R1-74 | - | [WTS] [JSN] | |||
| R1-134276 | On UL Power Control Enhancements for eIMTA | other | Texas Instruments | R1-74 | - | [WTS] [JSN] | |||
| R1-134277 | Signaling considerations for dynamic TDD UL/DL reconfiguration | other | Texas Instruments | R1-74 | - | [WTS] [JSN] | |||
| R1-134278 | On the introduction of 256QAM in Rel. 12 | other | Texas Instruments | R1-74 | - | [WTS] [JSN] | |||
| R1-134279 | Further clarifications on semi-static small cell on/off mechanisms | other | Texas Instruments | R1-74 | - | [WTS] [JSN] | |||
| R1-134280 | Consideration on CoMP signaling for non-ideal backhaul | other | Texas Instruments | R1-74 | - | [WTS] [JSN] | |||
| R1-134281 | Corrections to Text proposal on Public Safety ProSe Communication Use Cases | other | U.S. Department Of Commerce | R1-74 | - | [WTS] [JSN] | |||
| R1-134282 | Summary of email discussion on LTE coverage enhancements | other | China Telecom | R1-74 | - | [WTS] [JSN] | |||
| R1-134283 | Views on TTI bundling enhancements for UL VoIP | other | China Telecom | R1-74 | - | [WTS] [JSN] | |||
| R1-134284 | Views on TTI bundling enhancements for medium data rate PUSCH | other | China Telecom | R1-74 | - | [WTS] [JSN] | |||
| R1-134285 | On small cell on/off | other | China Telecom | R1-74 | - | [WTS] [JSN] | |||
| R1-134286 | Discussion on large scale parameters generation | other | China Telecom | R1-74 | - | [WTS] [JSN] | |||
| R1-134287 | SRS resource reused for D2D Discovery | other | III | R1-74 | - | [WTS] [JSN] | |||
| R1-134288 | Small Cell ON/OFF operation | other | III | R1-74 | - | [WTS] [JSN] | |||
| R1-134289 | Code spreading for PUSCH coverage improvement in FDD | other | III | R1-74 | - | [WTS] [JSN] | |||
| R1-134290 | Coverage improvement for PDSCH in FDD | other | III | R1-74 | - | [WTS] [JSN] | |||
| R1-134291 | Coordinated Sounding for CoMP BF (CoMP BF-CoS) exploiting TDD channel reciprocity | other | DAC-UPC, IAESI | R1-74 | - | [WTS] [JSN] | |||
| R1-134292 | Collaborative distributed scheduling | other | IAESI, DAC-UPC | R1-74 | - | [WTS] [JSN] | |||
| R1-134293 | X2 support for collaborative distributed scheduling | other | IAESI | R1-74 | - | [WTS] [JSN] | |||
| R1-134294 | FDD-TDD CA/Dual Connectivity solution for different bands exploiting traffic asymmetry | other | IAESI | R1-74 | - | [WTS] [JSN] | |||
| R1-134295 | FDD-TDD CA/Dual Connectivity solution exploiting traffic asymmetry in duplex-neutral bands | other | IAESI | R1-74 | - | [WTS] [JSN] | |||
| R1-134296 | On Enhanced TTI Bundling for UL VoIP | other | ZTE | R1-74 | - | [WTS] [JSN] | |||
| R1-134297 | Proposal on TTI Bundling Enhancements for Medium Data Rate PUSCH | other | ZTE | R1-74 | - | [WTS] [JSN] | |||
| R1-134298 | Consideration on TTI Bundling Enhancements for TDD | other | ZTE | R1-74 | - | [WTS] [JSN] | |||
| R1-134299 | Evaluation on EVM and Receiver impairment for small cell 256QAM | other | ZTE | R1-74 | - | [WTS] [JSN] | |||
| R1-134300 | Remaining details of new UE category for low cost MTC | other | ZTE | R1-74 | - | [WTS] [JSN] | |||
| R1-134301 | Simplification of PHICH and PCFICH functionalities for coverage improvement MTC Ues | other | ZTE | R1-74 | - | [WTS] [JSN] | |||
| R1-134302 | Coverage Enhancement of Physical Broadcast Channel and SIB Transmission | other | ZTE | R1-74 | - | [WTS] [JSN] | |||
| R1-134303 | Physical Random Access Channel Coverage Enhancement | other | ZTE | R1-74 | - | [WTS] [JSN] | |||
| R1-134304 | Discussion on Traffic Channel Coverage Improvement | other | ZTE | R1-74 | - | [WTS] [JSN] | |||
| R1-134305 | Discussion on control channel coverage improvement | other | ZTE | R1-74 | - | [WTS] [JSN] | |||
| R1-134306 | Synchronization and timing | other | ZTE | R1-74 | - | [WTS] [JSN] | |||
| R1-134307 | Control Channel Design for D2D communication | other | ZTE | R1-74 | - | [WTS] [JSN] | |||
| R1-134308 | Resource Allocation of D2D communication | other | ZTE | R1-74 | - | [WTS] [JSN] | |||
| R1-134309 | Discussion on Resource Allocation for D2D Discovery | other | ZTE | R1-74 | - | [WTS] [JSN] | |||
| R1-134310 | OI enhancement for TDD eIMTA | other | ZTE | R1-74 | - | [WTS] [JSN] | |||
| R1-134311 | UL PC enhancement for TDD eIMTA | other | ZTE | R1-74 | - | [WTS] [JSN] | |||
| R1-134312 | Some Remaining Issues about Uplink Power Control | other | ZTE | R1-74 | - | [WTS] [JSN] | |||
| R1-134313 | CSI feedback enhancement for TDD eIMTA | other | ZTE | R1-74 | - | [WTS] [JSN] | |||
| R1-134314 | Details of Signalling for TDD UL-DL Reconfiguration | other | ZTE | R1-74 | - | [WTS] [JSN] | |||
| R1-134315 | Reference configuration in TDD eIMTA HARQ timing | other | ZTE | R1-74 | - | [WTS] [JSN] | |||
| R1-134316 | Issues on TDD-FDD CA | other | ZTE | R1-74 | - | [WTS] [JSN] | |||
| R1-134317 | Solutions for fast switching in TDD-FDD joint operation | other | ZTE | R1-74 | - | [WTS] [JSN] | |||
| R1-134318 | Considerations on transition procedures of small cell on/off scheme | other | ZTE | R1-74 | - | [WTS] [JSN] | |||
| R1-134319 | Considerations on radio-interface based synchronization | other | ZTE | R1-74 | - | [WTS] [JSN] | |||
| R1-134320 | Signalling to support COMP with non-ideal backhaul | other | ZTE | R1-74 | - | [WTS] [JSN] | |||
| R1-134321 | Evaluation of CoMP with non-ideal backhaul | other | ZTE | R1-74 | - | [WTS] [JSN] | |||
| R1-134322 | System level modelling methodology for E-LMMSE-IRC | other | ZTE | R1-74 | - | [WTS] [JSN] | |||
| R1-134323 | Discussion on Network Signalling and Coordination for NAICS | other | ZTE | R1-74 | - | [WTS] [JSN] | |||
| R1-134324 | Small Cell Discovery Signal - Design and Simulation Results | other | ZTE | R1-74 | - | [WTS] [JSN] | |||
| R1-134325 | Small Cell Discovery Signal - Efficient operation of small cells | other | ZTE | R1-74 | - | [WTS] [JSN] | |||
| R1-134326 | Measurements using Small Cell Discovery Signal | other | ZTE | R1-74 | - | [WTS] [JSN] | |||
| R1-134327 | Initial calibration of 3D channel model | other | ZTE | R1-74 | - | [WTS] [JSN] | |||
| R1-134328 | Discussion on fast fading model for 3D channel | other | ZTE | R1-74 | - | [WTS] [JSN] | |||
| R1-134329 | Discussion on channel model for high rise scenario | other | ZTE | R1-74 | - | [WTS] [JSN] | |||
| R1-134330 | Downlink HARQ timing in TDD-FDD carrier aggregation | other | ETRI | R1-74 | - | [WTS] [JSN] | |||
| R1-134331 | Uplink HARQ timing in TDD-FDD carrier aggregation | other | ETRI | R1-74 | - | [WTS] [JSN] | |||
| R1-134332 | Cell state transition and small cell discovery | other | ETRI | R1-74 | - | [WTS] [JSN] | |||
| R1-134333 | Synchronization channels and procedures for out-of-coverage D2D communications | other | ETRI | R1-74 | - | [WTS] [JSN] | |||
| R1-134334 | Channel design and scheduling for out-of-coverage D2D communications | other | ETRI | R1-74 | - | [WTS] [JSN] | |||
| R1-134335 | Technology down-selection for the work scope of D2D communications | other | ETRI | R1-74 | - | [WTS] [JSN] | |||
| R1-134336 | Resource allocation for D2D discovery | other | ETRI | R1-74 | - | [WTS] [JSN] | |||
| R1-134337 | NAICS baseline receivers | other | ETRI | R1-74 | - | [WTS] [JSN] | |||
| R1-134338 | New UE category/type for MTC operation | other | Fujitsu | R1-74 | - | [WTS] [JSN] | |||
| R1-134339 | Considerations on a new MTC PBCH | other | Fujitsu | R1-74 | - | [WTS] [JSN] | |||
| R1-134340 | On PRACH for MTC | other | Fujitsu | R1-74 | - | [WTS] [JSN] | |||
| R1-134341 | Coverage Hole Depth Signaling supporting Low Cost MTC devices | other | Fujitsu | R1-74 | - | [WTS] [JSN] | |||
| R1-134342 | System Information Support for Deep Hole Low Cost MTC UEs | other | Fujitsu | R1-74 | - | [WTS] [JSN] | |||
| R1-134343 | Discussion on the (E)PDCCH repetition in time domain for MTC UEs | other | Fujitsu | R1-74 | - | [WTS] [JSN] | |||
| R1-134344 | MTC Band clarifications | other | Fujitsu | R1-74 | - | [WTS] [JSN] | |||
| R1-134345 | PCFICH related issues of Low Cost MTC UEs based on LTE | other | Fujitsu | R1-74 | - | [WTS] [JSN] | |||
| R1-134346 | 36.213 CR0441 (F, Rel-11) Clarification on PUCCH reporting payload size | CR | Huawei, HiSilicon | R1-74 | - | [WTS] [JSN] | |||
| R1-134347 | HARQ timing design for TDD eIMTA | other | Huawei, HiSilicon | R1-74 | - | [WTS] [JSN] | |||
| R1-134348 | HARQ-ACK feedback on PUSCH | other | Huawei, HiSilicon | R1-74 | - | [WTS] [JSN] | |||
| R1-134349 | Discussion on TDD-FDD CA with more than two carriers | other | Huawei, Hisilicon | R1-74 | - | [WTS] [JSN] | |||
| R1-134350 | Discussion on TTI bundling extension for TDD | other | Huawei, HiSilicon | R1-74 | - | [WTS] [JSN] | |||
| R1-134351 | Discussion on UE measurements for MBMS | other | Huawei, Hisilicon | R1-74 | - | [WTS] [JSN] | |||
| R1-134352 | Details of high rise scenario | other | Huawei, HiSilicon | R1-74 | - | [WTS] [JSN] | |||
| R1-134353 | On the need of a feedback loop for D2D communication | other | Huawei, HiSilicon | R1-74 | - | [WTS] [JSN] | |||
| R1-134354 | Physical channel design for D2D | other | Huawei, HiSilicon | R1-74 | - | [WTS] [JSN] | |||
| R1-134355 | Link-level simulation results for D2D discovery | other | Huawei, HiSilicon | R1-74 | - | [WTS] [JSN] | |||
| R1-134356 | CoMP schemes for non-ideal backhaul and inter-eNodeB signaling | other | Huawei, Hisilicon | R1-74 | - | [WTS] [JSN] | |||
| R1-134357 | On Aperiodic CSI Reporting in TDD eIMTA Systems | other | HTC | R1-74 | - | [WTS] [JSN] | |||
| R1-134358 | HARQ details in TDD eIMTA systems | other | HTC | R1-74 | - | [WTS] [JSN] | |||
| R1-134359 | UL DMRS enhancement in MBSFN subframes in TDD eIMTA systems | other | HTC | R1-74 | - | [WTS] [JSN] | |||
| R1-134360 | Scenarios and operations in FDD-TDD carrier aggregation | other | HTC | R1-74 | - | [WTS] [JSN] | |||
| R1-134361 | Synchronization in D2D communication | other | HTC | R1-74 | - | [WTS] [JSN] | |||
| R1-134362 | Guard interval estimation considering switch time and propagation delay | other | HTC | R1-74 | - | [WTS] [JSN] | |||
| R1-134363 | Simultaneous UL HARQ and D2D transmission | other | HTC | R1-74 | - | [WTS] [JSN] | |||
| R1-134364 | Resource allocation in D2D communication | other | HTC | R1-74 | - | [WTS] [JSN] | |||
| R1-134365 | Inter-corresponding sets of resources for D2D discovery | other | HTC | R1-74 | - | [WTS] [JSN] | |||
| R1-134366 | Clarification on non-MBSFNregionLength | other | Panasonic | R1-74 | - | [WTS] [JSN] | |||
| R1-134367 | Draft CR 36.213: Correction to CSI Reporting | other | Panasonic | R1-74 | - | [WTS] [JSN] | |||
| R1-134368 | Backhaul signalling enhancement in eIMTA | other | Panasonic | R1-74 | - | [WTS] [JSN] | |||
| R1-134369 | UL Power control enhancement in eIMTA | other | Panasonic | R1-74 | - | [WTS] [JSN] | |||
| R1-134370 | Analysis and proposal for explicit+implicit reconfiguration signalling | other | Panasonic | R1-74 | - | [WTS] [JSN] | |||
| R1-134371 | Reconfiguration message transmission details | other | Panasonic | R1-74 | - | [WTS] [JSN] | |||
| R1-134372 | HARQ Timing Configuration and Mechanisms | other | Panasonic | R1-74 | - | [WTS] [JSN] | |||
| R1-134373 | PBCH coverage enhancement for low cost MTC | other | Panasonic | R1-74 | - | [WTS] [JSN] | |||
| R1-134374 | Clarifications on small cell on/off remaining issues | other | Panasonic | R1-74 | - | [WTS] [JSN] | |||
| R1-134375 | Small cell on/off evaluation related to CRS interference and SIB overhead size | other | Panasonic | R1-74 | - | [WTS] [JSN] | |||
| R1-134376 | Synchronization for D2D communication | other | Panasonic | R1-74 | - | [WTS] [JSN] | |||
| R1-134377 | Consideration on contention based and scheduling based resource allocation schemes in D2D | other | Panasonic | R1-74 | - | [WTS] [JSN] | |||
| R1-134378 | Master-slave structure and OFDMA for D2D communication^^ | other | Panasonic | R1-74 | - | [WTS] [JSN] | |||
| R1-134379 | Evaluation of PDSCH Collision Statistics in NAICS Scenarios | other | Panasonic | R1-74 | - | [WTS] [JSN] | |||
| R1-134380 | Signalling mechanisms for interference information | other | Panasonic | R1-74 | - | [WTS] [JSN] | |||
| R1-134381 | Views on Remaining Details of High Rise Scenario | other | KDDI | R1-74 | - | [WTS] [JSN] | |||
| R1-134382 | Views on Type2 discovery resource allocation | other | KDDI | R1-74 | - | [WTS] [JSN] | |||
| R1-134383 | Correction on determination of modulation order and transport block size | other | LG Electronics | R1-74 | - | [WTS] [JSN] | |||
| R1-134384 | Remaining Details of Backhaul Signaling for Interference Management | other | LG Electronics | R1-74 | - | [WTS] [JSN] | |||
| R1-134385 | Remaining Details of Uplink Power Control | other | LG Electronics | R1-74 | - | [WTS] [JSN] | |||
| R1-134386 | Details of CSI Measurement and Report for TDD eIMTA | other | LG Electronics | R1-74 | - | [WTS] [JSN] | |||
| R1-134387 | Details of UL-DL Reconfiguration Message | other | LG Electronics | R1-74 | - | [WTS] [JSN] | |||
| R1-134388 | Remaining Details of HARQ Timeline and Feedback | other | LG Electronics | R1-74 | - | [WTS] [JSN] | |||
| R1-134389 | Other Design Aspects for TDD eIMTA | other | LG Electronics | R1-74 | - | [WTS] [JSN] | |||
| R1-134390 | Support of low cost features and enhanced coverage for MTC | other | LG Electronics | R1-74 | - | [WTS] [JSN] | |||
| R1-134391 | PBCH transmission for coverage enhancement of MTC UEs | other | LG Electronics | R1-74 | - | [WTS] [JSN] | |||
| R1-134392 | Observation on PBCH coverage enhancement for MTC | other | LG Electronics | R1-74 | - | [WTS] [JSN] | |||
| R1-134393 | RACH procedure for coverage enhancement of MTC UEs | other | LG Electronics | R1-74 | - | [WTS] [JSN] | |||
| R1-134394 | PDSCH/PUSCH coverage enhancement for MTC | other | LG Electronics | R1-74 | - | [WTS] [JSN] | |||
| R1-134395 | PDCCH coverage enhancement for MTC | other | LG Electronics | R1-74 | - | [WTS] [JSN] | |||
| R1-134396 | HARQ timing for FDD-TDD carrier aggregation | other | LG Electronics | R1-74 | - | [WTS] [JSN] | |||
| R1-134397 | UE requirements for TDD-FDD carrier aggregation | other | LG Electronics | R1-74 | - | [WTS] [JSN] | |||
| R1-134398 | Discussion on bundling enhancements for UL VoIP | other | LG Electronics | R1-74 | - | [WTS] [JSN] | |||
| R1-134399 | Discussion on TTI Bundling Extension to other TDD configurations | other | LG Electronics | R1-74 | - | [WTS] [JSN] | |||
| R1-134400 | Considerations on MBSFN UE measurement | other | LG Electronics | R1-74 | - | [WTS] [JSN] | |||
| R1-134401 | Specification impact of 256QAM support in downlink | other | LG Electronics | R1-74 | - | [WTS] [JSN] | |||
| R1-134402 | Views on mechanisms for Small cell on/off | other | LG Electronics | R1-74 | - | [WTS] [JSN] | |||
| R1-134403 | Considerations on small cell discovery | other | LG Electronics | R1-74 | - | [WTS] [JSN] | |||
| R1-134404 | Discussion on radio-based network synchronization in small cell scenarios | other | LG Electronics | R1-74 | - | [WTS] [JSN] | |||
| R1-134405 | Discussion on 3D-channel fast fading modeling | other | LG Electronics | R1-74 | - | [WTS] [JSN] | |||
| R1-134406 | Issues on UE orientation and antenna pattern in 3D channel model | other | LG Electronics | R1-74 | - | [WTS] [JSN] | |||
| R1-134407 | Purpose and assumptions for the second phase evaluation cases | other | LG Electronics | R1-74 | - | [WTS] [JSN] | |||
| R1-134408 | Discussion on UE attachment modeling details | other | LG Electronics | R1-74 | - | [WTS] [JSN] | |||
| R1-134409 | Discussion on the high rise scenario | other | LG Electronics | R1-74 | - | [WTS] [JSN] | |||
| R1-134410 | Further Discussion on Synchronization for D2D Communications | other | LG Electronics | R1-74 | - | [WTS] [JSN] | |||
| R1-134411 | D2D Communication Signal Format | other | LG Electronics | R1-74 | - | [WTS] [JSN] | |||
| R1-134412 | Resource Allocation and Interference Coordination in D2D Communications | other | LG Electronics | R1-74 | - | [WTS] [JSN] | |||
| R1-134413 | Scheduling and Resource Management for D2D communications | other | LG Electronics | R1-74 | - | [WTS] [JSN] | |||
| R1-134414 | Discussion on multiplexing of Uu and D2D communication | other | LG Electronics | R1-74 | - | [WTS] [JSN] | |||
| R1-134415 | D2D Discovery Signal Format | other | LG Electronics | R1-74 | - | [WTS] [JSN] | |||
| R1-134416 | Discussion on Inter-cell D2D discovery | other | LG Electronics | R1-74 | - | [WTS] [JSN] | |||
| R1-134417 | Resource Allocation and UE Behavior for D2D Discovery | other | LG Electronics | R1-74 | - | [WTS] [JSN] | |||
| R1-134418 | Discussion on multiplexing of Uu and D2D discovery | other | LG Electronics | R1-74 | - | [WTS] [JSN] | |||
| R1-134419 | Issues on D2D Signal Transmission and Receptions across Carriers | other | LG Electronics | R1-74 | - | [WTS] [JSN] | |||
| R1-134420 | Evaluation results for CoMP with non-ideal backhaul | other | LG Electronics | R1-74 | - | [WTS] [JSN] | |||
| R1-134421 | Signaling design considerations for inter-eNB operation in downlink CoMP | other | LG Electronics | R1-74 | - | [WTS] [JSN] | |||
| R1-134422 | Discussion on inter-eNB signaling for uplink CoMP operations | other | LG Electronics | R1-74 | - | [WTS] [JSN] | |||
| R1-134423 | Considerations on system level modeling methodology for NAICS | other | LG Electronics | R1-74 | - | [WTS] [JSN] | |||
| R1-134424 | PBCH Coverage Improvement for MTC Devices | other | HTC | R1-74 | - | [WTS] [JSN] | |||
| R1-134425 | Discussion on the mechanism of small cell on/off | other | HTC | R1-74 | - | [WTS] [JSN] | |||
| R1-134426 | On Radio-interface based Synchronization | other | HTC | R1-74 | - | [WTS] [JSN] | |||
| R1-134427 | View on CSI-RS Resource Coordination for CoMP | other | ITRI | R1-74 | - | [WTS] [JSN] | |||
| R1-134428 | Maximum number of DL HARQ processes for TDD eIMTA | other | ITRI | R1-74 | - | [WTS] [JSN] | |||
| R1-134429 | HARQ resource collision issue in TDD eIMTA system | other | ITRI | R1-74 | - | [WTS] [JSN] | |||
| R1-134430 | UL power control enhancement with dynamic subframe sets for TDD eIMTA | other | ITRI | R1-74 | - | [WTS] [JSN] | |||
| R1-134431 | Evaluation of small cell on/off | other | ITRI | R1-74 | - | [WTS] [JSN] | |||
| R1-134432 | Power Back-off Impact to Discovery Range Evaluation with CFO and CTO Consideration | other | ITRI | R1-74 | - | [WTS] [JSN] | |||
| R1-134433 | AGC and Timing Advance Impact for Discovery Resource Allocation | other | ITRI | R1-74 | - | [WTS] [JSN] | |||
| R1-134434 | Power headroom reporting in TDD eIMTA | other | MediaTek Inc. | R1-74 | - | [WTS] [JSN] | |||
| R1-134435 | Discussion on HARQ-ACK resource in TDD eIMTA systems | other | MediaTek Inc. | R1-74 | - | [WTS] [JSN] | |||
| R1-134436 | Details of HARQ in TDD eIMTA | other | MediaTek Inc. | R1-74 | - | [WTS] [JSN] | |||
| R1-134437 | Discussion on HARQ issues for TDD-FDD CA | other | MediaTek Inc. | R1-74 | - | [WTS] [JSN] | |||
| R1-134438 | Discussion on non-satisfied relevant scenarios and requirements of FDD-TDD joint operation | other | MediaTek Inc. | R1-74 | - | [WTS] [JSN] | |||
| R1-134439 | Text proposal for TR36.847 on study on LTE TDD-FDD joint operation including Carrier Aggregation | other | MediaTek Inc. | R1-74 | - | [WTS] [JSN] | |||
| R1-134440 | Discussion on PDSCH frequency allocation for low cost MTC | other | MediaTek Inc. | R1-74 | - | [WTS] [JSN] | |||
| R1-134441 | Discussion on PBCH and System Information Coverage Enhancement | other | MediaTek Inc. | R1-74 | - | [WTS] [JSN] | |||
| R1-134442 | Coverage report during random access and PRACH formats/configurations | other | MediaTek Inc. | R1-74 | - | [WTS] [JSN] | |||
| R1-134443 | Need of UL HARQ and PHICH enhancement | other | MediaTek Inc. | R1-74 | - | [WTS] [JSN] | |||
| R1-134444 | Analysis of (E)PDCCH enhancements and timing relationship with PDSCH | other | MediaTek Inc. | R1-74 | - | [WTS] [JSN] | |||
| R1-134445 | Functionality and coverage analysis of PUCCH | other | MediaTek Inc. | R1-74 | - | [WTS] [JSN] | |||
| R1-134446 | Performance comparison for small cell on/off with different transition time scales | other | MediaTek Inc. | R1-74 | - | [WTS] [JSN] | |||
| R1-134447 | Performance evaluation for small cell load aggregation | other | MediaTek Inc. | R1-74 | - | [WTS] [JSN] | |||
| R1-134448 | Views on support of small cell on/off | other | MediaTek Inc. | R1-74 | - | [WTS] [JSN] | |||
| R1-134449 | Performance evaluation on new small cell discovery mechanisms based on CRS plus RE muting | other | MediaTek Inc. | R1-74 | - | [WTS] [JSN] | |||
| R1-134450 | TR36.866 v0.4.0 based on previous RAN1 & RAN4 agreements | other | MediaTek Inc. | R1-74 | - | [WTS] [JSN] | |||
| R1-134451 | System modeling methodology for reduced-complexity ML (R-ML) receivers | other | MediaTek Inc. | R1-74 | - | [WTS] [JSN] | |||
| R1-134452 | Network signalling and/or coordination for R-ML receivers | other | MediaTek Inc. | R1-74 | - | [WTS] [JSN] | |||
| R1-134453 | DCH Enhancement Performance Evaluation | other | MediaTek Inc. | R1-74 | - | [WTS] [JSN] | |||
| R1-134454 | DCH Enhancement Performance Evaluation with Non-zero FET-AI Feedback Error Rate | other | MediaTek Inc. | R1-74 | - | [WTS] [JSN] | |||
| R1-134455 | FET-AI Detection Performance Evaluation | other | MediaTek Inc. | R1-74 | - | [WTS] [JSN] | |||
| R1-134456 | ET Gap Consideration under Non-zero FET-AI Feedback Error Rate | other | MediaTek Inc. | R1-74 | - | [WTS] [JSN] | |||
| R1-134457 | Round Trip Delay Analysis for FET-AI Signaling | other | MediaTek Inc. | R1-74 | - | [WTS] [JSN] | |||
| R1-134458 | Consideration onTDD-FDD joint operation | other | New Postcom | R1-74 | - | [WTS] [JSN] | |||
| R1-134459 | Analysis on signalling for inter-eNB CoMP operation | other | New Postcom | R1-74 | - | [WTS] [JSN] | |||
| R1-134460 | Discussion on uplink coverage enhancement for low cost MTC (PRACH &PUCCH) | other | New Postcom | R1-74 | - | [WTS] [JSN] | |||
| R1-134461 | 36.213 draft CR: SCell_Act_Deact_Rel10 | other | New Postcom | R1-74 | - | [WTS] [JSN] | |||
| R1-134462 | 36.213 draft CR: SCell_Act_Deact_Rel11 | other | New Postcom | R1-74 | - | [WTS] [JSN] | |||
| R1-134463 | Necessity of enhanced PC for PUCCH | other | Sharp | R1-74 | - | [WTS] [JSN] | |||
| R1-134464 | Details of signalling mechanism for enhanced UL PC for PUSCH and SRS | other | Sharp | R1-74 | - | [WTS] [JSN] | |||
| R1-134465 | Subframe set specific PHR reporting for eIMTA | other | Sharp | R1-74 | - | [WTS] [JSN] | |||
| R1-134466 | Enhancements of CSI reporting for eIMTA | other | Sharp | R1-74 | - | [WTS] [JSN] | |||
| R1-134467 | Valid window of explicit L1 reconfiguration signaling and fallback operation | other | Sharp | R1-74 | - | [WTS] [JSN] | |||
| R1-134468 | Necessity of explicit L1 signaling transmission on Scell for TDD UL/DL reconfiguration | other | Sharp | R1-74 | - | [WTS] [JSN] | |||
| R1-134469 | Design of CRC mask and search space for explicit L1 signaling of UL/DL reconfiguration | other | Sharp | R1-74 | - | [WTS] [JSN] | |||
| R1-134470 | Determination of reference configurations for eIMTA cell | other | Sharp | R1-74 | - | [WTS] [JSN] | |||
| R1-134471 | Frequency location of reduced DL data bandwidth for low-cost MTC UE | other | Sharp | R1-74 | - | [WTS] [JSN] | |||
| R1-134472 | PRACH coverage enhancement for MTC UE | other | Sharp | R1-74 | - | [WTS] [JSN] | |||
| R1-134473 | TDD-FDD carrier aggregation solution | other | Sharp | R1-74 | - | [WTS] [JSN] | |||
| R1-134474 | Signalling solutions for TDM scheduling | other | Renesas Mobile Europe Ltd | R1-74 | - | [WTS] [JSN] | |||
| R1-134475 | Backhaul Information Exchange between eNBs for Cell-Clustering in Rel-12 eIMTA Framework | other | Renesas Mobile Europe Ltd | R1-74 | - | [WTS] [JSN] | |||
| R1-134476 | CSI measurement and reporting in TDD eIMTA | other | Renesas Mobile Europe Ltd | R1-74 | - | [WTS] [JSN] | |||
| R1-134477 | Signalling of TDD UL-DL reconfiguration | other | Renesas Mobile Europe Ltd | R1-74 | - | [WTS] [JSN] | |||
| R1-134478 | HARQ details | other | Renesas Mobile Europe Ltd | R1-74 | - | [WTS] [JSN] | |||
| R1-134479 | Backwards compatibility in TDD eIMTA | other | Renesas Mobile Europe Ltd | R1-74 | - | [WTS] [JSN] | |||
| R1-134480 | Performance evaluation for semi-static ON/OFF | other | Renesas Mobile Europe Ltd | R1-74 | - | [WTS] [JSN] | |||
| R1-134481 | In-coverage ProSe Synchronization and Timing | other | Renesas Mobile Europe Ltd | R1-74 | - | [WTS] [JSN] | |||
| R1-134482 | System modeling methodology of WLMMSE-IRC receiver | other | Renesas Mobile Europe Ltd | R1-74 | - | [WTS] [JSN] | |||
| R1-134483 | System performance and specification impact of WLMMSE-IRC receiver | other | Renesas Mobile Europe Ltd | R1-74 | - | [WTS] [JSN] | |||
| R1-134484 | SIB delivery for low-complexity MTC UE | other | Sony | R1-74 | - | [WTS] [JSN] | |||
| R1-134485 | [DRAFT] LS on SIB delivery with reduced maximum TBS of 1000 bits for low-complexity MTC UE | other | Sony | R1-74 | - | [WTS] [JSN] | |||
| R1-134486 | Remaining details of bandwidth reduction for MTC UE | other | Sony | R1-74 | - | [WTS] [JSN] | |||
| R1-134487 | [DRAFT] LS on DL data channel baseband bandwidth reduction for low-complexity MTC UE | other | Sony | R1-74 | - | [WTS] [JSN] | |||
| R1-134488 | Considerations for asynchronous discovery in D2D | other | Sony | R1-74 | - | [WTS] [JSN] | |||
| R1-134489 | Further Discussion on Subframe-Set Dependent ICIC | other | NTT DOCOMO | R1-74 | - | [WTS] [JSN] | |||
| R1-134490 | Further Discussion on Backhaul Signaling for eIMTA | other | NTT DOCOMO | R1-74 | - | [WTS] [JSN] | |||
| R1-134491 | Discussion on PUCCH format for eIMTA HARQ-ACK feedback | other | NTT DOCOMO | R1-74 | - | [WTS] [JSN] | |||
| R1-134492 | Discussion on DL bandwidth reduction | other | NTT DOCOMO | R1-74 | - | [WTS] [JSN] | |||
| R1-134493 | Discussion on multi-level PRACH coverage enhancement | other | NTT DOCOMO | R1-74 | - | [WTS] [JSN] | |||
| R1-134494 | RNTI handling in (E)PDCCH coverage enhancement | other | NTT DOCOMO | R1-74 | - | [WTS] [JSN] | |||
| R1-134495 | Design of TDD-FDD carrier aggregation for LTE Rel.12 | other | NTT DOCOMO | R1-74 | - | [WTS] [JSN] | |||
| R1-134496 | Views on Small Cell On/Off with Small Cell Discovery | other | NTT DOCOMO | R1-74 | - | [WTS] [JSN] | |||
| R1-134497 | Views on efficient inter-frequency small cell discovery | other | NTT DOCOMO | R1-74 | - | [WTS] [JSN] | |||
| R1-134498 | Views on efficient intra-frequency small cell discovery | other | NTT DOCOMO | R1-74 | - | [WTS] [JSN] | |||
| R1-134499 | Further Evaluation for Distance and Height Dependency of PAS | other | NTT DOCOMO | R1-74 | - | [WTS] [JSN] | |||
| R1-134500 | Views on Fast Fading Model for 3D-channel | other | NTT DOCOMO | R1-74 | - | [WTS] [JSN] | |||
| R1-134501 | Case 1 Calibration Results for 3D-Channel Model | other | NTT DOCOMO | R1-74 | - | [WTS] [JSN] | |||
| R1-134502 | Discussion on synchronization of D2D discovery | other | NTT DOCOMO | R1-74 | - | [WTS] [JSN] | |||
| R1-134503 | Discussion on resource allocation of inter-cell discovery | other | NTT DOCOMO | R1-74 | - | [WTS] [JSN] | |||
| R1-134504 | Preliminary Evaluation Results for CoMP-NIB | other | NTT DOCOMO | R1-74 | - | [WTS] [JSN] | |||
| R1-134505 | Views on Link-to-System Mapping Scheme for NAICS | other | NTT DOCOMO | R1-74 | - | [WTS] [JSN] | |||
| R1-134506 | Paging for MTC UEs operating in coverage enhancement mode | other | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | R1-74 | - | [WTS] [JSN] | |||
| R1-134507 | On remaining issues of necessary backhaul signalling | other | NSN, Nokia | R1-74 | - | [WTS] [JSN] | |||
| R1-134508 | Power headroom report for enhanced UL power control in TDD eIMTA | other | NSN, Nokia | R1-74 | - | [WTS] [JSN] | |||
| R1-134509 | Remaining details for enhanced UL power control for TDD eIMTA | other | Nokia, NSN | R1-74 | - | [WTS] [JSN] | |||
| R1-134510 | On UL-DL reconfiguration signalling | other | NSN, Nokia | R1-74 | - | [WTS] [JSN] | |||
| R1-134511 | Remaining details on UL and DL reference configurations | other | NSN, Nokia | R1-74 | - | [WTS] [JSN] | |||
| R1-134512 | On HARQ-ACK PUCCH Formats and Resource allocation for TDD eIMTA | other | NSN, Nokia | R1-74 | - | [WTS] [JSN] | |||
| R1-134513 | On Transmission Modes for TDD eIMTA | other | NSN, Nokia | R1-74 | - | [WTS] [JSN] | |||
| R1-134514 | PDSCH Bandwidth Reduction | other | NSN, Nokia | R1-74 | - | [WTS] [JSN] | |||
| R1-134515 | MTC UE Support for Coverage Improvement Mode | other | NSN, Nokia | R1-74 | - | [WTS] [JSN] | |||
| R1-134516 | Coverage Enhancement for MIB and SIBs | other | NSN, Nokia | R1-74 | - | [WTS] [JSN] | |||
| R1-134517 | PRACH Enhancement and Mechanism for Identifying Coverage Shortfall | other | NSN, Nokia | R1-74 | - | [WTS] [JSN] | |||
| R1-134518 | Data Channel Coverage Enhancement | other | NSN, Nokia | R1-74 | - | [WTS] [JSN] | |||
| R1-134519 | PUCCH UCI in Coverage Enhancement Mode | other | NSN, Nokia | R1-74 | - | [WTS] [JSN] | |||
| R1-134520 | PDCCH Coverage Enhancement | other | NSN, Nokia | R1-74 | - | [WTS] [JSN] | |||
| R1-134521 | On TDD-FDD carrier aggregation | other | Nokia, NSN | R1-74 | - | [WTS] [JSN] | |||
| R1-134522 | On LTE coverage enhancements for UL VoIP users | other | NSN, Nokia | R1-74 | - | [WTS] [JSN] | |||
| R1-134523 | On coverage enhancements for medium data rate PUSCH | other | NSN, Nokia | R1-74 | - | [WTS] [JSN] | |||
| R1-134524 | On Further MBMS Operations Support | other | Nokia, NSN | R1-74 | - | [WTS] [JSN] | |||
| R1-134525 | On Standardization Impact of DL Higher Order Modulation | other | Nokia, NSN | R1-74 | - | [WTS] [JSN] | |||
| R1-134526 | Performance of 256QAM with TX and RX impairments | other | Nokia, NSN | R1-74 | - | [WTS] [JSN] | |||
| R1-134527 | On enhancements for small cell on/off operation | other | NSN, Nokia | R1-74 | - | [WTS] [JSN] | |||
| R1-134528 | Small Cell Detection Statistics and Related Consideraions | other | NSN, Nokia | R1-74 | - | [WTS] [JSN] | |||
| R1-134529 | Consideration on Radio-Interface based Synchronization | other | NSN, Nokia | R1-74 | - | [WTS] [JSN] | |||
| R1-134530 | TP for TR on 3D channel model | other | NSN, Nokia | R1-74 | - | [WTS] [JSN] | |||
| R1-134531 | Remaining details of fast fading modelling for 3D-UMa and 3D-UMi | other | NSN, Nokia | R1-74 | - | [WTS] [JSN] | |||
| R1-134532 | Simulation assumptions for calibration/baseline | other | NSN, Nokia | R1-74 | - | [WTS] [JSN] | |||
| R1-134533 | Details of highrise scenario | other | NSN, Nokia | R1-74 | - | [WTS] [JSN] | |||
| R1-134534 | TP for Mechanical tilt | other | NSN, Nokia | R1-74 | - | [WTS] [JSN] | |||
| R1-134535 | D2D Communication without network coverage | other | Nokia, NSN | R1-74 | - | [WTS] [JSN] | |||
| R1-134536 | UE based D2D synchronization scheme | other | Nokia, NSN | R1-74 | - | [WTS] [JSN] | |||
| R1-134537 | D2D synchronization – with network coverage | other | Nokia, NSN | R1-74 | - | [WTS] [JSN] | |||
| R1-134538 | D2D Discovery Signal | other | Nokia, NSN | R1-74 | - | [WTS] [JSN] | |||
| R1-134539 | eCoMP simulation Results | other | NSN, Nokia | R1-74 | - | [WTS] [JSN] | |||
| R1-134540 | Signaling design considerations to support inter-eNB CoMP | other | NSN, Nokia | R1-74 | - | [WTS] [JSN] | |||
| R1-134541 | Considerations on NAICS receivers to be studied in system level evaluations | other | Nokia, NSN | R1-74 | - | [WTS] [JSN] | |||
| R1-134542 | Correction to text concerning codebook subsampling for PUCCH mode 2-1 | other | NSN, Nokia | R1-74 | - | [WTS] [JSN] | |||
| R1-134543 | Synchronization principles for broadcast D2D communication for public safety | other | EADS | R1-74 | - | [WTS] [JSN] | |||
| R1-134544 | Further discussion on solutions for radio-based synchronization | other | BlackBerry UK Limited | R1-74 | - | [WTS] [JSN] | |||
| R1-134545 | Discussion on enhanced mechanisms to assist adaptation with reduced transition time scales | other | BlackBerry UK Limited | R1-74 | - | [WTS] [JSN] | |||
| R1-134546 | Signaling between inter-eNB to support CoMP with NIB | other | BlackBerry UK Limited | R1-74 | - | [WTS] [JSN] | |||
| R1-134547 | NAICS Coordination Performance and Requirements for TM9/10 | other | BlackBerry UK Limited | R1-74 | - | [WTS] [JSN] | |||
| R1-134548 | Direct Discovery Performance and Design using Messages and Sequences | other | BlackBerry UK Limited | R1-74 | - | [WTS] [JSN] | |||
| R1-134549 | Performance Benefits of Coordination in D2D Direct Communication | other | BlackBerry UK Limited | R1-74 | - | [WTS] [JSN] | |||
| R1-134550 | Discussion on backhaul signaling for interference mitigation in TDD eIMTA | other | BlackBerry UK Limited | R1-74 | - | [WTS] [JSN] | |||
| R1-134551 | Solutions for TDD-FDD joint carrier aggregation | other | BlackBerry UK Limited | R1-74 | - | [WTS] [JSN] | |||
| R1-134552 | Review of TR 25.702 v12.0.0 | other | BlackBerry UK Limited | R1-74 | - | [WTS] [JSN] | |||
| R1-134553 | Comments on DPCH TDM | other | BlackBerry UK Limited | R1-74 | - | [WTS] [JSN] | |||
| R1-134554 | Discussion of NAIC Concepts | other | BlackBerry UK Limited | R1-74 | - | [WTS] [JSN] | |||
| R1-134555 | Discussion of E-DCH Decoupling | other | BlackBerry UK Limited | R1-74 | - | [WTS] [JSN] | |||
| R1-134556 | On remaining details for UL power control with eIMTA | other | InterDigital | R1-74 | - | [WTS] [JSN] | |||
| R1-134557 | On HARQ operation and explicit signaling in support of eIMTA | other | InterDigital | R1-74 | - | [WTS] [JSN] | |||
| R1-134558 | On remaining details for the new Low Cost UE category | other | InterDigital | R1-74 | - | [WTS] [JSN] | |||
| R1-134559 | On PBCH coverage enhancements for Low Cost UE's | other | InterDigital | R1-74 | - | [WTS] [JSN] | |||
| R1-134560 | On TDD-FDD joint operation with carrier aggregation | other | InterDigital | R1-74 | - | [WTS] [JSN] | |||
| R1-134561 | Specification impacts of TTI bundling enhancements for VoIP | other | InterDigital | R1-74 | - | [WTS] [JSN] | |||
| R1-134562 | Enhancements in support of Small Cell On/Off Operation | other | InterDigital | R1-74 | - | [WTS] [JSN] | |||
| R1-134563 | Remaining Details on 3D Channel Model | other | InterDigital | R1-74 | - | [WTS] [JSN] | |||
| R1-134564 | Initial Calibration Results for 3D Channel Model | other | InterDigital | R1-74 | - | [WTS] [JSN] | |||
| R1-134565 | On UE Attachment for 3D Channel Model Calibration | other | InterDigital | R1-74 | - | [WTS] [JSN] | |||
| R1-134566 | Synchronization and timing for Broadcast D2D communication | other | InterDigital | R1-74 | - | [WTS] [JSN] | |||
| R1-134567 | Evaluation results for broadcast D2D communication with PUSCH | other | InterDigital | R1-74 | - | [WTS] [JSN] | |||
| R1-134568 | eIMTA signaling design | other | CMCC | R1-74 | - | [WTS] [JSN] | |||
| R1-134569 | Discussion on the design of TDD-FDD carrier aggregation for self-scheduling | other | CMCC | R1-74 | - | [WTS] [JSN] | |||
| R1-134570 | Evolution of UE to support TDD-FDD joint operation | other | CMCC, Huawei, HiSilicon | R1-74 | - | [WTS] [JSN] | |||
| R1-134571 | Enhanced dual mode operation | other | CMCC | R1-74 | - | [WTS] [JSN] | |||
| R1-134572 | Discussion on TTI bundling enhancement | other | CMCC | R1-74 | - | [WTS] [JSN] | |||
| R1-134573 | Initial 3D MIMO large-scale parameter calibration results | other | CMCC | R1-74 | - | [WTS] [JSN] | |||
| R1-134574 | Evaluation and comparison of UE attachment methods | other | CMCC | R1-74 | - | [WTS] [JSN] | |||
| R1-134575 | Discussion on extending TTI bundling to more TDD UL-DL configurations | other | CMCC | R1-74 | - | [WTS] [JSN] | |||
| R1-134576 | Further considerations on high rise scenario | other | CMCC | R1-74 | - | [WTS] [JSN] | |||
| R1-134577 | O2I channel measurement results on elevation related parameters | other | CMCC | R1-74 | - | [WTS] [JSN] | |||
| R1-134578 | Discussion on small cell measurements to assists cell on/off and others | other | CMCC | R1-74 | - | [WTS] [JSN] | |||
| R1-134579 | Discussion on efficient small cell discovery | other | CMCC | R1-74 | - | [WTS] [JSN] | |||
| R1-134580 | Evaluation of air-interface based small cell synchronization | other | CMCC | R1-74 | - | [WTS] [JSN] | |||
| R1-134581 | Modeling of EoD PAS | other | CMCC | R1-74 | - | [WTS] [JSN] | |||
| R1-134582 | Modeling of EoD offset | other | CMCC | R1-74 | - | [WTS] [JSN] | |||
| R1-134583 | Impact of Backhaul Delay on Inter-eNB Signalling | other | CMCC | R1-74 | - | [WTS] [JSN] | |||
| R1-134584 | Further considerations on Small Cell On/Off | other | Motorola Mobility | R1-74 | - | [WTS] [JSN] | |||
| R1-134585 | Choice of 3D-Channel Model Calibration Statistics | other | Motorola Mobility | R1-74 | - | [WTS] [JSN] | |||
| R1-134586 | Evaluation results for CoMP with non-ideal backhaul | other | Motorola Mobility | R1-74 | - | [WTS] [JSN] | |||
| R1-134587 | Signaling considerations for inter-eNB CoMP | other | Motorola Mobility | R1-74 | - | [WTS] [JSN] | |||
| R1-134588 | D2D discovery signal design based on the existing PUSCH format | other | Kyocera | R1-74 | - | [WTS] [JSN] | |||
| R1-134589 | Discussion on Discovery Signals for Small Cell On/Off | other | Broadcom Corporation | R1-74 | - | [WTS] [JSN] | |||
| R1-134590 | Signaling for Inter-eNB CoMP Operation | other | Broadcom Corporation | R1-74 | - | [WTS] [JSN] | |||
| R1-134591 | Remaining Details of Path Loss for High-Rise Scenario | other | Broadcom Corporation | R1-74 | - | [WTS] [JSN] | |||
| R1-134592 | Discussion on Coordination and Signaling in NAICS | other | Broadcom Corporation | R1-74 | - | [WTS] [JSN] | |||
| R1-134593 | Further details on Coordinated scheduling and Restricted Resources Subframe | other | Broadcom Corporation | R1-74 | - | [WTS] [JSN] | |||
| R1-134594 | MIB Content Reduction for PBCH Coverage Extension | other | ITRI | R1-74 | - | [WTS] [JSN] | |||
| R1-134595 | Views on small cell on off | other | New Postcom | R1-74 | - | [WTS] [JSN] | |||
| R1-134596 | Clarification on bandwidth configuration in 36.932 | other | New Postcom | R1-74 | - | [WTS] [JSN] | |||
| R1-134597 | Remaining details of backhaul signaling for eIMTA | other | Qualcomm Inc. | R1-74 | - | [WTS] [JSN] | |||
| R1-134598 | UL power control for eIMTA | other | Qualcomm Inc. | R1-74 | - | [WTS] [JSN] | |||
| R1-134599 | CSI measurement and reporting in eIMTA | other | Qualcomm Inc. | R1-74 | - | [WTS] [JSN] | |||
| R1-134600 | Discussion on signaling details for TDD UL-DL reconfiguration | other | Qualcomm Inc. | R1-74 | - | [WTS] [JSN] | |||
| R1-134601 | HARQ Design for TDD UL-DL reconfiguration | other | Qualcomm Inc. | R1-74 | - | [WTS] [JSN] | |||
| R1-134602 | DRX operation for eIMTA | other | Qualcomm Inc. | R1-74 | - | [WTS] [JSN] | |||
| R1-134603 | Soft buffer management for IMTA | other | Qualcomm Inc. | R1-74 | - | [WTS] [JSN] | |||
| R1-134604 | New UE category for MTC | other | Qualcomm Inc. | R1-74 | - | [WTS] [JSN] | |||
| R1-134605 | PBCH channel design for MTC coverage enhancements | other | Qualcomm Inc. | R1-74 | - | [WTS] [JSN] | |||
| R1-134606 | RACH channel design for MTC coverage enhancements | other | Qualcomm Inc. | R1-74 | - | [WTS] [JSN] | |||
| R1-134607 | Power Consumption Considerations for Coverage Enhancements for MTC | other | Qualcomm Inc. | R1-74 | - | [WTS] [JSN] | |||
| R1-134608 | Draft LS on power saving techniques for MTC | other | Qualcomm Inc. | R1-74 | - | [WTS] [JSN] | |||
| R1-134609 | Implementation Considerations for Coverage Enhancements for MTC | other | Qualcomm Inc. | R1-74 | - | [WTS] [JSN] | |||
| R1-134610 | Solution for TDD-FDD CA | other | Qualcomm Inc. | R1-74 | - | [WTS] [JSN] | |||
| R1-134611 | Possible solutions other than CA for TDD-FDD joint operation | other | Qualcomm Inc. | R1-74 | - | [WTS] [JSN] | |||
| R1-134612 | TTI bundling enhancements for UL VoIP | other | Qualcomm Inc. | R1-74 | - | [WTS] [JSN] | |||
| R1-134613 | TTI bundling enhancements for medium data rate PUSCH | other | Qualcomm Inc. | R1-74 | - | [WTS] [JSN] | |||
| R1-134614 | Discussion of MBSFN measurements | other | Qualcomm Inc. | R1-74 | - | [WTS] [JSN] | |||
| R1-134615 | Initial MBSFN measurement evaluation | other | Qualcomm Inc. | R1-74 | - | [WTS] [JSN] | |||
| R1-134616 | Higher order modulation | other | Qualcomm Inc. | R1-74 | - | [WTS] [JSN] | |||
| R1-134617 | Small cell on/off | other | Qualcomm Inc. | R1-74 | - | [WTS] [JSN] | |||
| R1-134618 | Small cell discovery | other | Qualcomm Inc. | R1-74 | - | [WTS] [JSN] | |||
| R1-134619 | Network synchronization by network listening | other | Qualcomm Inc. | R1-74 | - | [WTS] [JSN] | |||
| R1-134620 | Details of fast fading modeling for elevation beamforming and FD-MIMO | other | Qualcomm Inc. | R1-74 | - | [WTS] [JSN] | |||
| R1-134621 | Discussion on simulation assumptions for 3D channel model calibration | other | Qualcomm Inc. | R1-74 | - | [WTS] [JSN] | |||
| R1-134622 | Initial calibration of channel models for elevation beamforming and FD-MIMO | other | Qualcomm Inc. | R1-74 | - | [WTS] [JSN] | |||
| R1-134623 | Views on high-rise macro cell scenario | other | Qualcomm Inc. | R1-74 | - | [WTS] [JSN] | |||
| R1-134624 | D2D synchronization for out of coverage and partial network coverage | other | Qualcomm Inc. | R1-74 | - | [WTS] [JSN] | |||
| R1-134625 | Signal design for D2D broadcast | other | Qualcomm Inc. | R1-74 | - | [WTS] [JSN] | |||
| R1-134626 | D2D broadcast resource allocation and interference management algorithms | other | Qualcomm Inc. | R1-74 | - | [WTS] [JSN] | |||
| R1-134627 | D2D discovery design with simulation results | other | Qualcomm Inc. | R1-74 | - | [WTS] [JSN] | |||
| R1-134628 | Comparison of sequence and message based D2D Discovery | other | Qualcomm Inc. | R1-74 | - | [WTS] [JSN] | |||
| R1-134629 | Synchronization aspects for in-network D2D discovery | other | Qualcomm Inc. | R1-74 | - | [WTS] [JSN] | |||
| R1-134630 | Resource management for type 1 discovery | other | Qualcomm Inc. | R1-74 | - | [WTS] [JSN] | |||
| R1-134631 | Text Proposal for TR 36.843 | other | Qualcomm Inc. | R1-74 | - | [WTS] [JSN] | |||
| R1-134632 | Draft TR 36.843 v0.2.0 on on LTE Device to Device Proximity services | other | Qualcomm Inc. | R1-74 | - | [WTS] [JSN] | |||
| R1-134633 | Coordinated Scheduling for SCE Scenario 2A | other | Qualcomm Inc. | R1-74 | - | [WTS] [JSN] | |||
| R1-134634 | System level modeling methodology for NAIC | other | Qualcomm Inc. | R1-74 | - | [WTS] [JSN] | |||
| R1-134635 | Evaluation results for NAIC | other | Qualcomm Inc. | R1-74 | - | [WTS] [JSN] | |||
| R1-134636 | Discussion on coverage enhancement in TDD eIMTA systems | other | HTC | R1-74 | - | [WTS] [JSN] | |||
| R1-134637 | UL Power Control for e-IMTA | other | ASUSTeK | R1-74 | - | [WTS] [JSN] | |||
| R1-134638 | Method of resource allocation for D2D discovery | other | ASUSTeK | R1-74 | - | [WTS] [JSN] | |||
| R1-134639 | On remaining details of backhaul signalling | other | Ericsson | R1-74 | - | [WTS] [JSN] | |||
| R1-134640 | Remaining details for enhanced uplink power control | other | Ericsson | R1-74 | - | [WTS] [JSN] | |||
| R1-134641 | Remaining details of CSI enhancement for eIMTA | other | Ericsson | R1-74 | - | [WTS] [JSN] | |||
| R1-134642 | Efficient transmission of explicit reconfiguration signalling | other | Ericsson | R1-74 | - | [WTS] [JSN] | |||
| R1-134643 | Remaining details for HARQ operation | other | Ericsson | R1-74 | - | [WTS] [JSN] | |||
| R1-134644 | Remaining details for HARQ feedback mapping | other | Ericsson | R1-74 | - | [WTS] [JSN] | |||
| R1-134645 | Further details for eIMTA | other | Ericsson | R1-74 | - | [WTS] [JSN] | |||
| R1-134646 | Remaining details of low cost MTC UE | other | Ericsson | R1-74 | - | [WTS] [JSN] | |||
| R1-134647 | System information for enhanced coverage MTC UE | other | Ericsson | R1-74 | - | [WTS] [JSN] | |||
| R1-134648 | Control of amount of coverage enhancement for MTC UE | other | Ericsson | R1-74 | - | [WTS] [JSN] | |||
| R1-134649 | Random access for enhanced coverage MTC UE | other | Ericsson | R1-74 | - | [WTS] [JSN] | |||
| R1-134650 | Data transmission for enhanced coverage MTC UE | other | Ericsson | R1-74 | - | [WTS] [JSN] | |||
| R1-134651 | Control channel aspects for enhanced coverage MTC UE | other | Ericsson | R1-74 | - | [WTS] [JSN] | |||
| R1-134652 | On UE assumption for TDD-FDD CA | other | Ericsson | R1-74 | - | [WTS] [JSN] | |||
| R1-134653 | Discussion on baseline TDD-FDD CA framework | other | Ericsson | R1-74 | - | [WTS] [JSN] | |||
| R1-134654 | On scenarios and requirements for joint TDD-FDD operation | other | Ericsson | R1-74 | - | [WTS] [JSN] | |||
| R1-134655 | On measurements for further MBMS support | other | Ericsson | R1-74 | - | [WTS] [JSN] | |||
| R1-134656 | Discussion on performance of 256QAM for small cells | other | Ericsson | R1-74 | - | [WTS] [JSN] | |||
| R1-134657 | Discussion on standard impacts to support 256QAM | other | Ericsson | R1-74 | - | [WTS] [JSN] | |||
| R1-134658 | Semi-static small cell on/off operation | other | Ericsson | R1-74 | - | [WTS] [JSN] | |||
| R1-134659 | IDLE mode support for semi-static small cell on/off operation | other | Ericsson | R1-74 | - | [WTS] [JSN] | |||
| R1-134660 | On similarities of semi-static small cell on/off with dormant mode | other | Ericsson | R1-74 | - | [WTS] [JSN] | |||
| R1-134661 | On efficient small cell discovery for small cell onoff | other | Ericsson | R1-74 | - | [WTS] [JSN] | |||
| R1-134662 | On Radio-Interface Based Small Cell Synchronization | other | Ericsson | R1-74 | - | [WTS] [JSN] | |||
| R1-134663 | Clarification on SRS antenna port | other | Ericsson | R1-74 | - | [WTS] [JSN] | |||
| R1-134664 | Considerations on low cost MTC UE | other | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | R1-74 | - | [WTS] [JSN] | |||
| R1-134665 | 25.214 CR DRAFT (Rel-11, F) Allow (de)activate DRX / DTX with HS-SCCH Order When UE Is Configured in Multiflow Mode | other | ZTE | R1-74 | - | [WTS] [JSN] | |||
| R1-134666 | 25.212 CR DRAFT (Rel-11, F) Modification of (de)activating CPC and HS-SCCH-less operation | other | ZTE | R1-74 | - | [WTS] [JSN] | |||
| R1-134667 | Transmission of TFCI Information in Uplink | other | ZTE | R1-74 | - | [WTS] [JSN] | |||
| R1-134668 | Uplink ACK/NACK Indication for DL FET | other | ZTE | R1-74 | - | [WTS] [JSN] | |||
| R1-134669 | Further Consideration for E-DCH Decoupling in UMTS HetNet | other | ZTE | R1-74 | - | [WTS] [JSN] | |||
| R1-134670 | Initial Simulation Result for E-DCH Decoupling in UMTS HetNet | other | ZTE | R1-74 | - | [WTS] [JSN] | |||
| R1-134671 | Results for 3D Channel UMa Calibration Case 1 | other | Orange | R1-74 | - | [WTS] [JSN] | |||
| R1-134672 | Physical layer abstraction for turbo-CWIC receivers | other | Orange | R1-74 | - | [WTS] [JSN] | |||
| R1-134673 | NAICS: How to coordinate link adaptation for CWIC receivers | other | Orange | R1-74 | - | [WTS] [JSN] | |||
| R1-134674 | Discussion on HARQ issues for eIMTA | other | Potevio | R1-74 | - | [WTS] [JSN] | |||
| R1-134675 | System simulation results for E-DCH decoupling | other | Huawei, HiSilicon | R1-74 | - | [WTS] [JSN] | |||
| R1-134676 | Considerations on E-DCH decoupling | other | Huawei, HiSilicon | R1-74 | - | [WTS] [JSN] | |||
| R1-134677 | Coordinated scheduling with post-decoding IC | other | Huawei, HiSilicon | R1-74 | - | [WTS] [JSN] | |||
| R1-134678 | Coordinated scheduling with pre-decoding IC | other | Huawei, HiSilicon | R1-74 | - | [WTS] [JSN] | |||
| R1-134679 | Considerations on network assisted signalling for IC UE | other | Huawei, HiSilicon | R1-74 | - | [WTS] [JSN] | |||
| R1-134680 | Link level simulation results for NAIC in MIMO | other | Huawei, HiSilicon | R1-74 | - | [WTS] [JSN] | |||
| R1-134681 | TP on Network Assisted IC | other | Huawei, HiSilicon | R1-74 | - | [WTS] [JSN] | |||
| R1-134682 | TP on initial results of successful decoding rate of the interfering signal | other | Huawei, HiSilicon | R1-74 | - | [WTS] [JSN] | |||
| R1-134683 | TP on link level simulation results for NAIC in MIMO | other | Huawei, HiSilicon | R1-74 | - | [WTS] [JSN] | |||
| R1-134684 | Uplink and downlink system simulation results for range expansion in co-channel scenarios | other | Huawei, HiSilicon | R1-74 | - | [WTS] [JSN] | |||
| R1-134685 | TP on uplink and downlink system simulation results for range expansion in co-channel scenarios | other | Huawei, HiSilicon | R1-74 | - | [WTS] [JSN] | |||
| R1-134686 | TP on system level simulation assumptions | other | Huawei, HiSilicon | R1-74 | - | [WTS] [JSN] | |||
| R1-134687 | Further system level evaluations for S-UMTS - full buffer | other | Huawei, HiSilicon | R1-74 | - | [WTS] [JSN] | |||
| R1-134688 | System level evaluation results for Scalable UMTS - bursty traffic | other | Huawei, HiSilicon | R1-74 | - | [WTS] [JSN] | |||
| R1-134689 | TP on system level simulation results | other | Huawei, HiSilicon | R1-74 | - | [WTS] [JSN] | |||
| R1-134690 | Discussion on Scalable UMTS user plane latency | other | Huawei, HiSilicon | R1-74 | - | [WTS] [JSN] | |||
| R1-134691 | TP on Scalable UMTS user plane latency | other | Huawei, HiSilicon | R1-74 | - | [WTS] [JSN] | |||
| R1-134692 | Discussion on Scalable UMTS impacts on network performance | other | Huawei, HiSilicon | R1-74 | - | [WTS] [JSN] | |||
| R1-134693 | TP on Scalable UMTS impacts on network performance | other | Huawei, HiSilicon | R1-74 | - | [WTS] [JSN] | |||
| R1-134694 | S-UMTS coverage analysis for E-DCH voice | other | Huawei, HiSilicon | R1-74 | - | [WTS] [JSN] | |||
| R1-134695 | TP on Scalable UMTS coverage analysis for E-DCH voice | other | Huawei, HiSilicon | R1-74 | - | [WTS] [JSN] | |||
| R1-134696 | Considerations of efficient TDM scheduling | other | Huawei, HiSilicon | R1-74 | - | [WTS] [JSN] | |||
| R1-134697 | Power control aspects for secondary dedicated carrier | other | Huawei, HiSilicon | R1-74 | - | [WTS] [JSN] | |||
| R1-134698 | System evaluation methodology for lean carrier | other | Huawei, HiSilicon | R1-74 | - | [WTS] [JSN] | |||
| R1-134699 | TP on solutions for UL control channel overhead reduction | other | Huawei, HiSilicon, NSN | R1-74 | - | [WTS] [JSN] | |||
| R1-134700 | Updated evaluation results for E-DPCCH less operation | other | Huawei, HiSilicon | R1-74 | - | [WTS] [JSN] | |||
| R1-134701 | Text Proposal on HS-DPCCH evaluation results | other | Huawei, HiSilicon | R1-74 | - | [WTS] [JSN] | |||
| R1-134702 | Views on the standardization of 256QAM | other | CATR | R1-74 | - | [WTS] [JSN] | |||
| R1-134703 | Initial calibration results of 3D channel model | other | CATR | R1-74 | - | [WTS] [JSN] | |||
| R1-134704 | On D2D broadcast communication procedures | other | Ericsson | R1-74 | - | [WTS] [JSN] | |||
| R1-134705 | On resource allocation for D2D broadcast communication | other | Ericsson | R1-74 | - | [WTS] [JSN] | |||
| R1-134706 | Considerations on backhaul signaling | other | Coolpad | R1-74 | - | [WTS] [JSN] | |||
| R1-134707 | Discussion on eIMTA control signaling mechanisms | other | Coolpad | R1-74 | - | [WTS] [JSN] | |||
| R1-134708 | The performance evaluation for legacy and R12 UE hybrid in networking scenario | other | Coolpad | R1-74 | - | [WTS] [JSN] | |||
| R1-134709 | Considerations on TTI bundling for TDD | other | Coolpad | R1-74 | - | [WTS] [JSN] | |||
| R1-134710 | Initial Simulation Results for 3D Channel Model | other | CHTTL | R1-74 | - | [WTS] [JSN] | |||
| R1-134711 | On TTI bundling enhancements for UL VoIP | other | Ericsson | R1-74 | - | [WTS] [JSN] | |||
| R1-134712 | On TTI bundling enhancements for medium data rate PUSCH | other | Ericsson | R1-74 | - | [WTS] [JSN] | |||
| R1-134713 | On system level modeling methodology for NAICS | other | Ericsson | R1-74 | - | [WTS] [JSN] | |||
| R1-134714 | System Level Evaluations of Coordinated Scheduling Using Slow Backhaul | other | Ericsson | R1-74 | - | [WTS] [JSN] | |||
| R1-134715 | Signaling for Inter-eNB Operation of CoMP | other | Ericsson | R1-74 | - | [WTS] [JSN] | |||
| R1-134716 | Antenna Setups and Baseline Performance for 3D-Channel Model Calibration | other | Ericsson | R1-74 | - | [WTS] [JSN] | |||
| R1-134717 | Calibration of 3D-Channel Model | other | Ericsson | R1-74 | - | [WTS] [JSN] | |||
| R1-134718 | Elevation of Departure Characteristics for 3D-Channel Model | other | Ericsson | R1-74 | - | [WTS] [JSN] | |||
| R1-134719 | Considerations on High-Rise Scenario | other | Ericsson | R1-74 | - | [WTS] [JSN] | |||
| R1-134720 | Synchronization Procedures for D2D Discovery and Communication | other | Ericsson | R1-74 | - | [WTS] [JSN] | |||
| R1-134721 | Synchronization Signals Design for D2D Discovery and Communication | other | Ericsson | R1-74 | - | [WTS] [JSN] | |||
| R1-134722 | Physical Channels and Signals Design for D2D | other | Ericsson | R1-74 | - | [WTS] [JSN] | |||
| R1-134723 | Beacon Channel Design for D2D | other | Ericsson | R1-74 | - | [WTS] [JSN] | |||
| R1-134724 | Scenarios and requirements for Public Safety an related TP to 36.843 | other | Telecom Italia | R1-74 | - | [WTS] [JSN] | |||
| R1-134725 | Benefit of Network Assisted Interference Cancellation for Type 3i Receivers | other | Ericsson | R1-74 | - | [WTS] [JSN] | |||
| R1-134726 | Benefit of Network Assisted Interference Cancellation for UEs with Single Receive Antenna | other | Ericsson | R1-74 | - | [WTS] [JSN] | |||
| R1-134727 | Type 3i Receiver Performance in the Spatial Reuse Mode of Combined Cell | other | Ericsson | R1-74 | - | [WTS] [JSN] | |||
| R1-134728 | Text Proposal on Benefit of Network Assisted Interference Cancellation for Type 3i Receivers | other | Ericsson | R1-74 | - | [WTS] [JSN] | |||
| R1-134729 | Text Proposal on Benefit of Network Assisted Interference Cancellation for UEs with Single Receive Antenna | other | Ericsson | R1-74 | - | [WTS] [JSN] | |||
| R1-134730 | Text Proposal on Type 3i Receiver Performance in the Spatial Reuse Mode of Combined Cell | other | Ericsson | R1-74 | - | [WTS] [JSN] | |||
| R1-134731 | System Simulation Assumptions for Evaluation of Time-Dilated UMTS | other | Ericsson | R1-74 | - | [WTS] [JSN] | |||
| R1-134732 | Downlink System Simulation Results for Time-Dilated UMTS Considering Inter-Carrier Leakage - Equal PSD | other | Ericsson | R1-74 | - | [WTS] [JSN] | |||
| R1-134733 | Downlink System Simulation Results for Time-Dilated UMTS Considering Inter-Carrier Leakage - Equal Carrier Power | other | Ericsson | R1-74 | - | [WTS] [JSN] | |||
| R1-134734 | Initial System Simulation Results for Time-Dilated UMTS in Standalone Mode | other | Ericsson | R1-74 | - | [WTS] [JSN] | |||
| R1-134735 | Text Proposal on Downlink System Simulation Results for Time-Dilated UMTS Considering Inter-Carrier Leakage - Equal PSD | other | Ericsson | R1-74 | - | [WTS] [JSN] | |||
| R1-134736 | Text Proposal on Downlink System Simulation Results for Time-Dilated UMTS Considering Inter-Carrier Leakage - Equal Carrier Power | other | Ericsson | R1-74 | - | [WTS] [JSN] | |||
| R1-134737 | Text Proposal on User Plane Latency Impacts of Time Dilation | other | Ericsson | R1-74 | - | [WTS] [JSN] | |||
| R1-134738 | Text Proposal on UE and Network Impacts of Bursty Traffic Handling | other | Ericsson | R1-74 | - | [WTS] [JSN] | |||
| R1-134739 | Text Proposal on Time-Dilated UMTS FDD - Impacts on Network and UE | other | Ericsson | R1-74 | - | [WTS] [JSN] | |||
| R1-134740 | Link Level Evaluations of Lean Carrier | other | Ericsson | R1-74 | - | [WTS] [JSN] | |||
| R1-134741 | System Level Simulation Assumptions for Lean Carrier Performance Evaluation | other | Ericsson | R1-74 | - | [WTS] [JSN] | |||
| R1-134742 | Initial System Level Simulation Results for Lean Carrier | other | Ericsson | R1-74 | - | [WTS] [JSN] | |||
| R1-134743 | SIR Quality Concerns on Rate Adaptation Schemes | other | Ericsson | R1-74 | - | [WTS] [JSN] | |||
| R1-134744 | Text Proposal on Simulation Assumptions for Rate Adaptation | other | Ericsson | R1-74 | - | [WTS] [JSN] | |||
| R1-134745 | SHO Operation in HSUPA with Rate Adaptation | other | Ericsson | R1-74 | - | [WTS] [JSN] | |||
| R1-134746 | Compression and dynamic repetition of enhanced R99 voice services | other | NSN | R1-74 | - | [WTS] [JSN] | |||
| R1-134747 | Analysis of E-DCH decoupling | other | NSN | R1-74 | - | [WTS] [JSN] | |||
| R1-134748 | System level simulation results for E-DCH decoupling evaluation | other | NSN | R1-74 | - | [WTS] [JSN] | |||
| R1-134749 | Network Assistance for Interference Suppressing Receivers | other | NSN | R1-74 | - | [WTS] [JSN] | |||
| R1-134750 | Link Imbalance Information in Neighbour Cell List for HetNet | other | NSN | R1-74 | - | [WTS] [JSN] | |||
| R1-134751 | User plane latency impact on user experience | other | NSN | R1-74 | - | [WTS] [JSN] | |||
| R1-134752 | Text Proposal on Scalable Bandwidth UMTS by Filtering | other | NSN | R1-74 | - | [WTS] [JSN] | |||
| R1-134753 | Text Proposal on uplink performance of Scalable Bandwidth UMTS by Filtering | other | NSN | R1-74 | - | [WTS] [JSN] | |||
| R1-134754 | Further Considerations on Efficient TDM Operation for HSUPA | other | NSN | R1-74 | - | [WTS] [JSN] | |||
| R1-134755 | Link Level Simulation Results for Improved Rate Adaptation | other | NSN | R1-74 | - | [WTS] [JSN] | |||
| R1-134756 | System Level Simulation Results for Improved Rate Adaptation | other | NSN | R1-74 | - | [WTS] [JSN] | |||
| R1-134757 | System Level Simulation Results for E-DPCCH | other | NSN | R1-74 | - | [WTS] [JSN] | |||
| R1-134758 | TP on low complexity load balancing solutions | other | NSN | R1-74 | - | [WTS] [JSN] | |||
| R1-134759 | Multiflow and CLTD with the assisting cell feedback | other | NSN | R1-74 | - | [WTS] [JSN] | |||
| R1-134760 | Discovery Procedures for Small Cell On/Off Switching | other | Hitachi Ltd. | R1-74 | - | [WTS] [JSN] | |||
| R1-134761 | Simulation Assumptions and Initial Calibration Results | other | Hitachi Ltd. | R1-74 | - | [WTS] [JSN] | |||
| R1-134762 | Further Evaluation of the High Rise Scenario | other | Hitachi Ltd. | R1-74 | - | [WTS] [JSN] | |||
| R1-134763 | TDD – FDD carrier aggregation | other | Hitachi Ltd. | R1-74 | - | [WTS] [JSN] | |||
| R1-134764 | Further Evaluation and Discussion on 256QAM | other | Hitachi Ltd. | R1-74 | - | [WTS] [JSN] | |||
| R1-134765 | “Low cost & enhanced coverage MTC UE for LTE” key issues to address & vodafone views on some other aspects | other | Vodafone Group | R1-74 | - | [WTS] [JSN] | |||
| R1-134766 | Discovery signals for energy-efficient small cell discovery | other | Huawei, HiSilicon | R1-74 | - | [WTS] [JSN] | |||
| R1-134767 | Details of fast fading modeling in 3D channel model | other | Huawei, HiSilicon | R1-74 | - | [WTS] [JSN] | |||
| R1-134768 | Overview of Issues in DCH Enhancements | other | Qualcomm Inc. | R1-74 | - | [WTS] [JSN] | |||
| R1-134769 | Design Aspects for DCH Enhancements | other | Qualcomm Inc. | R1-74 | - | [WTS] [JSN] | |||
| R1-134770 | Analysis of Downlink Rate-Matching and Interleaving Enhancements | other | Qualcomm Inc. | R1-74 | - | [WTS] [JSN] | |||
| R1-134771 | Link Analysis of Downlink Design Options | other | Qualcomm Inc. | R1-74 | - | [WTS] [JSN] | |||
| R1-134772 | Ack channel evaluation methodology for uplink and downlink FET | other | Qualcomm Inc. | R1-74 | - | [WTS] [JSN] | |||
| R1-134773 | Performance of Control Channels for E-DCH De-coupling | other | Qualcomm Inc. | R1-74 | - | [WTS] [JSN] | |||
| R1-134774 | System Performance of Post Decoding NAIC | other | Qualcomm Inc. | R1-74 | - | [WTS] [JSN] | |||
| R1-134775 | Performance of Combined Cells with Optimized D-PICH | other | Qualcomm Inc. | R1-74 | - | [WTS] [JSN] | |||
| R1-134776 | System Simulation Results for Time Dilated UMTS with Full Buffer Traffic | other | Qualcomm Inc. | R1-74 | - | [WTS] [JSN] | |||
| R1-134777 | Downlink System Simulation Results for Time Dilated UMTS with Bursty Traffc | other | Qualcomm Inc. | R1-74 | - | [WTS] [JSN] | |||
| R1-134778 | Uplink System Simulation Results for Time Dilated UMTS with Bursty Traffc | other | Qualcomm Inc. | R1-74 | - | [WTS] [JSN] | |||
| R1-134779 | TP on System Simulation Results of Time-Dilated UMTS | other | Qualcomm Inc. | R1-74 | - | [WTS] [JSN] | |||
| R1-134780 | Evaluation of User Plane Latency in Time Dilated UMTS | other | Qualcomm Inc. | R1-74 | - | [WTS] [JSN] | |||
| R1-134781 | TP on User Plane Latency in Time Dilated UMTS | other | Qualcomm Inc. | R1-74 | - | [WTS] [JSN] | |||
| R1-134782 | Link Performance of Time Dilated UMTS with CPC | other | Qualcomm Inc. | R1-74 | - | [WTS] [JSN] | |||
| R1-134783 | TP on Link Performance of Time Dilated UMTS with CPC | other | Qualcomm Inc. | R1-74 | - | [WTS] [JSN] | |||
| R1-134784 | Impact to CPC On-Time Percentage due to Time-Dilated UMTS | other | Qualcomm Inc. | R1-74 | - | [WTS] [JSN] | |||
| R1-134785 | TP on Impact to CPC On-Time Percentage due to Time-Dilated UMTS | other | Qualcomm Inc. | R1-74 | - | [WTS] [JSN] | |||
| R1-134786 | Impact of Time Dilated UMTS on CELL_FACH | other | Qualcomm Inc. | R1-74 | - | [WTS] [JSN] | |||
| R1-134787 | TP on Impact of Time Dilated UMTS on CELL_FACH | other | Qualcomm Inc. | R1-74 | - | [WTS] [JSN] | |||
| R1-134788 | Coverage Analysis for Time Dilated UMTS | other | Qualcomm Inc. | R1-74 | - | [WTS] [JSN] | |||
| R1-134789 | TP on Coverage Analysis for Time Dilated UMTS | other | Qualcomm Inc. | R1-74 | - | [WTS] [JSN] | |||
| R1-134790 | TP on Link Simulation Results of Time Dilated UMTS | other | Qualcomm Inc. | R1-74 | - | [WTS] [JSN] | |||
| R1-134791 | Simulation Results for Rate Adaptation of HSUPA | other | Qualcomm Inc. | R1-74 | - | [WTS] [JSN] | |||
| R1-134792 | Performance of E-DPCCH overhead reduction | other | Qualcomm Inc. | R1-74 | - | [WTS] [JSN] | |||
| R1-134793 | Text Proposal on Mechanical and Electrical Antenna Tilting | other | Fraunhofer IIS | R1-74 | - | [WTS] [JSN] | |||
| R1-134794 | An Approach for a 3D Channel Model with Time Evolution (QuaDRiGa) | other | Fraunhofer IIS | R1-74 | - | [WTS] [JSN] | |||
| R1-134795 | Proposals for Fast Fading Channel Modelling for 3D UMi O-I | other | Alcatel-Lucent Shanghai Bell, Alcatel-Lucent | R1-74 | - | [WTS] [JSN] | |||
| R1-134796 | LS on Public Safety UE-Network Relays | other | SA2, Vodafone | R1-74 | - | [WTS] [JSN] | |||
| R1-134797 | LS on GCSE with eMBMS | other | SA2, NSN | R1-74 | - | [WTS] [JSN] | |||
| R1-134798 | Signaling design considerations to support inter-eNB CoMP | other | NSN, Nokia | R1-74 | - | [WTS] [JSN] | |||
| R1-134799 | Physical layer abstraction for turbo-CWIC receivers | other | Orange | R1-74 | - | [WTS] [JSN] | |||
| R1-134800 | D2D Communication Signal Format | other | LG Electronics | R1-74 | - | [WTS] [JSN] | |||
| R1-134801 | Discussion on Inter-cell D2D discovery | other | LG Electronics | R1-74 | - | [WTS] [JSN] | |||
| R1-134802 | Resource Allocation and UE Behavior for D2D Discovery | other | LG Electronics | R1-74 | - | [WTS] [JSN] | |||
| R1-134803 | Discussion on Public Safety UE-Network Relays | other | LG Electronics | R1-74 | - | [WTS] [JSN] | |||
| R1-134804 | DCH Enhancement Performance Evaluation | other | MediaTek Inc. | R1-74 | - | [WTS] [JSN] | |||
| R1-134805 | Discussion on Public Safety UE-Network Relays | other | Qualcomm Inc. | R1-74 | - | [WTS] [JSN] | |||
| R1-134806 | Draft response LS on Public Safety UE-Network Relays | other | Qualcomm Inc. | R1-74 | - | [WTS] [JSN] | |||
| R1-134807 | Discussion of LS on GCSE with eMBMS | other | Qualcomm Inc. | R1-74 | - | [WTS] [JSN] | |||
| R1-134808 | Draft response LS on GCSE with eMBMS | other | Qualcomm Inc. | R1-74 | - | [WTS] [JSN] | |||
| R1-134809 | Discussion on Coordination and Signaling in NAICS | other | Broadcom Corporation | R1-74 | - | [WTS] [JSN] | |||
| R1-134810 | Scheduling and HARQ timing for TDD-FDD carrier aggregation | other | Alcatel-Lucent Shanghai Bell, Alcatel-Lucent | R1-74 | - | [WTS] [JSN] | |||
| R1-134811 | System Information Support for Deep Hole Low Cost MTC UEs | other | Fujitsu | R1-74 | - | [WTS] [JSN] | |||
| R1-134812 | Clarification of MBMS reception on secondary cell | other | AT&T, Ericsson, Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | R1-74 | - | [WTS] [JSN] | |||
| R1-134813 | Remaining details of fast fading modelling for 3D-UMa and 3D-UMi | other | NSN, Nokia | R1-74 | - | [WTS] [JSN] | |||
| R1-134814 | TP for Mechanical tilt | other | NSN, Nokia | R1-74 | - | [WTS] [JSN] | |||
| R1-134815 | Consideration on contention based and scheduling based resource allocation schemes in D2D | other | Panasonic | R1-74 | - | [WTS] [JSN] | |||
| R1-134816 | Semi-static small cell on/off operation | other | Ericsson | R1-74 | - | [WTS] [JSN] | |||
| R1-134817 | Investigation on UE height dependent LOS probability in real networks | other | Deutsche Telekom AG | R1-74 | - | [WTS] [JSN] | |||
| R1-134818 | Scenarios and requirements for Public Safety an related TP to 36.843 | other | Telecom Italia, KDDI, Orange, Deutsche Telekom AG | R1-74 | - | [WTS] [JSN] | |||
| R1-134819 | 25702 CR0001 (Rel-12, D) Editorial corrections to TR25.702 | CR | BlackBerry UK Limited, Qualcomm Incorporated | R1-74 | - | [WTS] [JSN] | |||
| R1-134820 | TP on system level simulation assumptions | other | Huawei, HiSilicon | R1-74 | - | [WTS] [JSN] | |||
| R1-134821 | Text Proposal on Clarification to System Simulation Assumptions | other | Ericsson | R1-74 | - | [WTS] [JSN] | |||
| R1-134822 | TP on System level evaluation results for Stand-alone Time-Dilated UMTS - bursty traffic | other | Qualcomm Inc., Ericsson | R1-74 | - | [WTS] [JSN] | |||
| R1-134823 | TP on System level evaluation results for Stand-alone Time-Dilated UMTS – full buffer | other | Qualcomm Inc, Huawei, HiSilicon | R1-74 | - | [WTS] [JSN] | |||
| R1-134824 | TP on User Plane Latency in Time Dilated UMTS | other | Qualcomm Inc. | R1-74 | - | [WTS] [JSN] | |||
| R1-134825 | Coverage Analysis for Time Dilated UMTS | other | Qualcomm Inc. | R1-74 | - | [WTS] [JSN] | |||
| R1-134826 | TP on Link Level Simulation Results for Time-Dilated UMTS | other | Qualcomm Inc, Huawei, HiSilicon, ZTE | R1-74 | - | [WTS] [JSN] | |||
| R1-134827 | TP on time-dilated UMTS impact on network performance | other | Huawei, HiSilicon, Ericsson | R1-74 | - | [WTS] [JSN] | |||
| R1-134828 | TP on Network Assisted IC | other | Huawei, HiSilicon | R1-74 | - | [WTS] [JSN] | |||
| R1-134829 | TP on initial results of successful decoding rate of the interfering signal | other | Huawei, HiSilicon | R1-74 | - | [WTS] [JSN] | |||
| R1-134830 | System evaluation methodology for lean carrier | other | Huawei, HiSilicon, Ericsson | R1-74 | - | [WTS] [JSN] | |||
| R1-134831 | TP on TDM scheduling solutions | other | Broadcom Corporation | R1-74 | - | [WTS] [JSN] | |||
| R1-134832 | TP on link level evaluations lean carrier | other | Ericsson | R1-74 | - | [WTS] [JSN] | |||
| R1-134833 | TP on SHO Operation in HSUPA with Rate Adaptation | other | NSN | R1-74 | - | [WTS] [JSN] | |||
| R1-134834 | TP on Simulation Assumptions for Rate Adaptation | other | Ericsson | R1-74 | - | [WTS] [JSN] | |||
| R1-134835 | LS on low complexity load balancing solutions | LS out | RAN1, NSN | R1-74 | - | [WTS] [JSN] | |||
| R1-134836 | TP on Impact of Time Dilated UMTS on CELL_FACH | other | Qualcomm Inc. | R1-74 | - | [WTS] [JSN] | |||
| R1-134837 | TR25.701 v1.0.1 on Scalable UMTS FDD Bandwidth | other | China Unicom | R1-74 | - | [WTS] [JSN] | |||
| R1-134838 | Text Proposal on Summary of Link Simulation Results for Post-Decoding NAIC | other | Ericsson | R1-74 | - | [WTS] [JSN] | |||
| R1-134839 | Text Proposal on Type 3i Receiver Performance in the Spatial Reuse Mode of Combined Cell | other | Ericsson | R1-74 | - | [WTS] [JSN] | |||
| R1-134840 | TP on uplink and downlink system simulation results for range expansion in co-channel scenarios | other | Huawei, HiSilicon | R1-74 | - | [WTS] [JSN] | |||
| R1-134841 | Chairpersons’ summary of the UMTS sessions | other | UMTS Session Chairpersons (Karri Ranta-aho, NSN and Carmela Cozzo, Huawei) | R1-74 | - | [WTS] [JSN] | |||
| R1-134842 | TP on solutions for UL control channel overhead reduction | other | Huawei, HiSilicon, NSN, Ericsson | R1-74 | - | [WTS] [JSN] | |||
| R1-134843 | void | other | R1-74 | - | [WTS] [JSN] | ||||
| R1-134844 | void | other | R1-74 | - | [WTS] [JSN] | ||||
| R1-134845 | void | other | R1-74 | - | [WTS] [JSN] | ||||
| R1-134846 | void | other | R1-74 | - | [WTS] [JSN] | ||||
| R1-134847 | void | other | R1-74 | - | [WTS] [JSN] | ||||
| R1-134848 | void | other | R1-74 | - | [WTS] [JSN] | ||||
| R1-134849 | ET Gap Consideration under Non-zero FET-AI Feedback Error Rate | other | MediaTek Inc. | R1-74 | - | [WTS] [JSN] | |||
| R1-134850 | TP for TR on 3D channel model | other | NSN, Nokia | R1-74 | - | [WTS] [JSN] | |||
| R1-134851 | Issues on TDD-FDD CA | other | ZTE | R1-74 | - | [WTS] [JSN] | |||
| R1-134852 | Elevation of Departure Characteristics for 3D-Channel Model | other | Ericsson | R1-74 | - | [WTS] [JSN] | |||
| R1-134853 | Performance evaluation for semi-static ON/OFF | other | Renesas Mobile Europe Ltd | R1-74 | - | [WTS] [JSN] | |||
| R1-134854 | Evaluation of coordinated scheduling for SCE scenario 1 with non-ideal backhaul | other | Samsung | R1-74 | - | [WTS] [JSN] | |||
| R1-134855 | Evaluation of coordinated scheduling for SCE scenario 2a with non-ideal backhaul | other | Samsung | R1-74 | - | [WTS] [JSN] | |||
| R1-134856 | RRM for D2D communication | other | Fujitsu | R1-74 | - | [WTS] [JSN] | |||
| R1-134857 | eCoMP simulation Results | other | NSN, Nokia | R1-74 | - | [WTS] [JSN] | |||
| R1-134858 | Way Forward on Small Cell Discovery | other | NTT DOCOMO, Huawei, HiSilicon, ZTE, ATR | R1-74 | - | [WTS] [JSN] | |||
| R1-134859 | Way Forward on HARQ timing for TDD-FDD CA | other | LG Electronics, ETRI, Qualcomm, ZTE, Huawei, HiSilicon | R1-74 | - | [WTS] [JSN] | |||
| R1-134860 | Corrections to Text proposal on Public Safety ProSe Communication Use Cases | other | U.S. Department of Commerce, Qualcomm Incorporated, Huawei, Harris, Panasonic, BlackBerry | R1-74 | - | [WTS] [JSN] | |||
| R1-134861 | Way Forward on UE orientation in 3D channel model | other | LG Electronics, Anite, Elektrobit, ETRI, Fraunhofer IIS, KDDI | R1-74 | - | [WTS] [JSN] | |||
| R1-134862 | Way Forward on RSRP-based UE attachment modeling | other | LG Electronics, Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, Broadcom, CATT, Elektrobit, ETRI, InterDigital, KDDI, Nokia, NSN, Qualcomm, ZTE | R1-74 | - | [WTS] [JSN] | |||
| R1-134863 | Way Forward on scenario priority for CoMP-NIB study | other | LG Electronics, Huawei, HiSilicon, Nokia, NSN, ZTE | R1-74 | - | [WTS] [JSN] | |||
| R1-134864 | Draft response LS on Public Safety UE-Network Relays | other | Qualcomm Inc. | R1-74 | - | [WTS] [JSN] | |||
| R1-134865 | Round Trip Delay Analysis for FET-AI Signaling | other | MediaTek Inc. | R1-74 | - | [WTS] [JSN] | |||
| R1-134866 | Text Proposal for TR 36.843 | other | Qualcomm Inc. | R1-74 | - | [WTS] [JSN] | |||
| R1-134867 | Way Forward on general aspects for TDD-FDD CA | other | CMCC, Huawei, HiSilicon, CATT, Sharp, CATR, ZTE | R1-74 | - | [WTS] [JSN] | |||
| R1-134868 | Way Forward on D2D synchronization | other | LG Electronics, Ericsson, CATT, ITL | R1-74 | - | [WTS] [JSN] | |||
| R1-134869 | Way Forward on UCI feedback mechanisms for TDD-FDD CA | other | NTT DOCOMO, Panasonic, SONY, KCME, IIR, Kyocera | R1-74 | - | [WTS] [JSN] | |||
| R1-134870 | Evaluation of coordinated scheduling for CoMP scenario 2 with non-ideal backhaul | other | Samsung | R1-74 | - | [WTS] [JSN] | |||
| R1-134871 | Reply LS to R1-134009 on RRC parameter names with and without extension | other | RAN2, Ericsson | R1-74 | - | [WTS] [JSN] | |||
| R1-134872 | Way Forward on multiple access technique for D2D | other | CATT, Ericsson, Huawei, HiSilicon, Panasonic | R1-74 | - | [WTS] [JSN] | |||
| R1-134873 | Way Forward on AGC foe D2D communication and discovery | other | CATT, LGE | R1-74 | - | [WTS] [JSN] | |||
| R1-134874 | Way Forward on UE requirements for TDD-FDD CA | other | Huawei, HiSilicon, Blackberry, CMCC, Ericsson, ETRI, NEC, Qualcomm, Samsung, Sharp, Texas Instruments | R1-74 | - | [WTS] [JSN] | |||
| R1-134875 | Way Forward on the D2D Synchronization Procedure | other | Ericsson, Qualcomm, Intel, Fujitsu, LGE, DoCoMo | R1-74 | - | [WTS] [JSN] | |||
| R1-134876 | Way Forward on NAICS receiver prioritization for system level simulation | other | LG Electronics, Nokia, NSN, Intel, ZTE, Blackberry, Ericsson | R1-74 | - | [WTS] [JSN] | |||
| R1-134877 | TR 36.843 v0.2.0 on “Study of LTE Device to Device Proximity Services-Radio Aspects” | other | Qualcomm Incorporated | R1-74 | - | [WTS] [JSN] | |||
| R1-134878 | Draft LS on ProSe Lawful Interception | other | Telecom Italia | R1-74 | - | [WTS] [JSN] | |||
| R1-134879 | Revision of Scenarios and requirements for Public Safety an related TP to 36.843 after 1st D2D session | other | [Deutsche Telekom], KDDI, [Orange], Telecom Italia, [Vodafone], [Huawei] | R1-74 | - | [WTS] [JSN] | |||
| R1-134880 | [Draft] LS on Multiple Access Scheme for D2D | other | Broadcom Corporation | R1-74 | - | [WTS] [JSN] | |||
| R1-134881 | Way Forward on control physical channel for D2D communication | other | Samsung, Qualcomm, General Dynamics Broadband, Panasonic, ZTE | R1-74 | - | [WTS] [JSN] | |||
| R1-134882 | Further Evaluation Results of CS for CoMP-NIB | other | Samsung | R1-74 | - | [WTS] [JSN] | |||
| R1-134883 | Way Forward on D2D Terminology for Synchronization | other | Ericsson | R1-74 | - | [WTS] [JSN] | |||
| R1-134884 | Way Forward on resource allocation for type 1 D2D discovery | other | CATT, Ericsson, ETRI, Intel, Huawei, HiSilicon, Samsung, ZTE | R1-74 | - | [WTS] [JSN] | |||
| R1-134885 | Way Forward on Timing Synchronisation of D2D Outside of Network Coverage | other | NEC, Samsung | R1-74 | - | [WTS] [JSN] | |||
| R1-134886 | LS on Multiple Access Scheme for D2D | LS out | RAN1, Broadcom Corporation | R1-74 | - | [WTS] [JSN] | |||
| R1-134887 | Elevation of Departure Characteristics for 3D-Channel Model | other | Ericsson | R1-74 | - | [WTS] [JSN] | |||
| R1-134888 | Way Forward on Resource Allocation for D2D Broadcast Communication | other | ZTE, Qualcomm, Panasonic | R1-74 | - | [WTS] [JSN] | |||
| R1-134889 | Way Forward on NAICS | other | MediaTek, NTT DOCOMO, Orange, Blackberry, Intel, Broadcom, Samsung, Panasonic, ZTE | R1-74 | - | [WTS] [JSN] | |||
| R1-134890 | Way Forward on EOD/EOA generation | other | NSN, Nokia, Samsung, NTT DOCOMO, Huawei, Hisilicon, Intel, KDDI, Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, CATT, LG Electronics, CMCC, InterDigital, Qualcomm, NEC | R1-74 | - | [WTS] [JSN] | |||
| R1-134891 | Way Forward on ESD model | other | NSN, Nokia, NTT DOCOMO, Samsung, KDDI, Huawei, Hisilicon, NEC | R1-74 | - | [WTS] [JSN] | |||
| R1-134892 | TR36.866 v0.5.0 | other | MediaTek Inc. | R1-74 | - | [WTS] [JSN] | |||
| R1-134893 | Way Forward on Coverage Improvement Level for Low Cost MTC UE | other | ZTE, InterDigital, Ericsson, Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, Huawei, HiSilicon, Fujitsu, Intel, CATT, CATR, SierraWireless, Sony, Sharp | R1-74 | - | [WTS] [JSN] | |||
| R1-134894 | Way Forward on performance evaluation for CoMP-NIB | other | Huawei, HiSilicon, NSN, Ericsson | R1-74 | - | [WTS] [JSN] | |||
| R1-134895 | Way Forward on PDSCH frequency allocation | other | CATT, Samsung, LGE, InterDigital, Alcatel-Lucent, Alcatel Shanghai Bell | R1-74 | - | [WTS] [JSN] | |||
| R1-134896 | Way Forward on Intermittent PBCH repetition | other | LG Electronics, CATT, Fujitsu, LG Uplus | R1-74 | - | [WTS] [JSN] | |||
| R1-134897 | Way Forward on MTC PRACH coverage enhancement | other | Huawei, HiSilicon, ZTE, Ericsson | R1-74 | - | [WTS] [JSN] | |||
| R1-134898 | Way Forward on Further Progressing High Rise Scenario | other | CMCC, CATT, KDDI, Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, ZTE | R1-74 | - | [WTS] [JSN] | |||
| R1-134899 | Way Forward on remaining details of 3D channel modeling | other | Samsung, NSN, Nokia, Fraunhofer IIS, Intel, Qualcomm, ALU, ASB | R1-74 | - | [WTS] [JSN] | |||
| R1-134900 | Way Forward on phase 2 calibration | other | Samsung, Qualcomm, Intel, NEC, Broadcom, CMCC, NTT DOCOMO, LG Electronics, Interdigital, ZTE | R1-74 | - | [WTS] [JSN] | |||
| R1-134901 | Way Forward on MTC PBCH coverage enhancement | other | Sierra Wireless, Ericsson, ITRI | R1-74 | - | [WTS] [JSN] | |||
| R1-134902 | Considerations on radio-interface based synchronization | other | ZTE | R1-74 | - | [WTS] [JSN] | |||
| R1-134903 | Way Forward on Interference Measurement for eIMTA | other | ZTE, Huawei, HiSilicon | R1-74 | - | [WTS] [JSN] | |||
| R1-134904 | Way Forward on HARQ operation in TDD reconfiguration | other | ZTE, Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, LG Electronics, MediaTek, Sharp | R1-74 | - | [WTS] [JSN] | |||
| R1-134905 | Way Forward on CSI measurement and report in eIMTA | other | LG Electronics, CATT, Samsung, Sharp, Potevio | R1-74 | - | [WTS] [JSN] | |||
| R1-134906 | Way Forward on signalling for TDD UL/DL reconfiguration | other | Panasonic, LGE, Samsung, CATT, Huawei, HiSilicon | R1-74 | - | [WTS] [JSN] | |||
| R1-134907 | Way Forward on the observation of small cell discovery enhancement | other | Panasonic, Samsung, NTT DOCOMO, LG, Fujitsu, Qualcomm, ZTE, Huawei, HiSilicon, ETRI, Interdigital | R1-74 | - | [WTS] [JSN] | |||
| R1-134908 | Way Forward on NAICS receiver prioritization for system level simulation | other | LG Electronics, Nokia, NSN, Intel, ZTE, Blackberry, Ericsson, MediaTek, ETRI, Huawei, HiSilicon, Interdigital | R1-74 | - | [WTS] [JSN] | |||
| R1-134909 | Way forward on coverage enhancement for TDD | other | CATT, CMCC, CATR, Coolpad, Huawei, HiSilicon, Samsung, New Postcom, NEC, Potevio, ZTE | R1-74 | - | [WTS] [JSN] | |||
| R1-134910 | Way forward on TTI bundling enhancements for medium data rate PUSCH | other | Huawei, China Telecom, Ericsson, CATT, NSN, Nokia, Samsung, InterDigital, Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, CMCC, Qualcomm, Intel, Hisilicon | R1-74 | - | [WTS] [JSN] | |||
| R1-134911 | Way Forward on UL HARQ in TDD eIMTA | other | CATT, Ericsson, Mediatek, Panasonic, NSN, Nokia, CATR, Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, InterDigital | R1-74 | - | [WTS] [JSN] | |||
| R1-134912 | Performance evaluation of CoMP with non-ideal backhaul | other | Huawei, HiSilicon | R1-74 | - | [WTS] [JSN] | |||
| R1-134913 | Way Forward on performance evaluation for CoMP-NIB | other | Huawei, HiSilicon, NSN, Nokia, Ericsson, Motorola Mobility | R1-74 | - | [WTS] [JSN] | |||
| R1-134914 | Way Forward on TTI bundling enhancement for UL VoIP | other | ZTE, Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, LG Electronics, CMCC | R1-74 | - | [WTS] [JSN] | |||
| R1-134915 | Way Forward on the unit of the message-based discovery signal | other | LG Electronics, Qualcomm, Intel | R1-74 | - | [WTS] [JSN] | |||
| R1-134916 | Way Forward on CSI Measurements for eIMTA Support | other | Intel, Ericsson, CATT | R1-74 | - | [WTS] [JSN] | |||
| R1-134917 | Way Forward on D2D type-2 discovery | other | Huawei, HiSilicon, LG, ETRI, KDDI, ZTE, Intel, Fujitsu, DoCoMo, Telecom Italia | R1-74 | - | [WTS] [JSN] | |||
| R1-134918 | Way Forward on Resource Allocation for Type 1 Discovery | other | Qualcomm, General Dynamics Broadband UK, Fujistu, LG Electronics, ZTE, Samsung, ETRI, DoCoMo, Kyocera | R1-74 | - | [WTS] [JSN] | |||
| R1-134919 | Way Forward on Timing of Type 1 Discovery | other | Qualcomm, General Dynamics Broadband UK, Samsung, Intel, LG Electronics, ETRI, Kyocera | R1-74 | - | [WTS] [JSN] | |||
| R1-134920 | Draft response LS on Public Safety UE-Network Relays | other | Qualcomm Inc. | R1-74 | - | [WTS] [JSN] | |||
| R1-134921 | Persistency window for explicit L1 signalling and falback operation | other | Sharp, Huawei, HiSilicon, ^^LG Electronics , Samsung, Qualcomm | R1-74 | - | [WTS] [JSN] | |||
| R1-134922 | Response LS on Public Safety UE-Network Relays | LS out | RAN1, Qualcomm Inc | R1-74 | - | [WTS] [JSN] | |||
| R1-134923 | LS on ProSe Lawful Interception | LS out | RAN1, Telecom Italia | R1-74 | - | [WTS] [JSN] | |||
| R1-134924 | Text proposal on synchronization based on updated terminology | other | Qualcomm Incorporated | R1-74 | - | [WTS] [JSN] | |||
| R1-134925 | WF on the D2D Synchronization Procedure | other | Ericsson, Huawei, HiSilicon, LGE, General Dynamics | R1-74 | - | [WTS] [JSN] | |||
| R1-134926 | WF on Timing Synchronization of D2D Outside of Network Coverage | other | NEC, Samsung | R1-74 | - | [WTS] [JSN] | |||
| R1-134927 | Rewritten “edited proposal of R1-134868” | other | LG Electronics, Huawei, HiSilicon, ETRI, ITL, CATT | R1-74 | - | [WTS] [JSN] | |||
| R1-134928 | Draft LS on AGC and Frequency Error for D2D | other | Qualcomm Incorporated | R1-74 | - | [WTS] [JSN] | |||
| R1-134929 | Text proposal on synchronization based on updated terminology | other | Qualcomm Incorporated | R1-74 | - | [WTS] [JSN] | |||
| R1-134930 | LS on AGC and Frequency Error for D2D | LS out | RAN1, Qualcomm Inc | R1-74 | - | [WTS] [JSN] | |||
| R1-134931 | Revision of TP to 36.843 after sessions | other | Telecom Italia, Vodafone | R1-74 | - | [WTS] [JSN] | |||
| R1-134932 | Way Forward on Backhaul Signaling for Dynamic TDD | other | NTT DOCOMO, Panasonic, LG Electronics | R1-74 | - | [WTS] [JSN] | |||
| R1-134933 | Way Forward on interference type indication for subframe (set) dependent OI | other | Huawei, HiSilicon, ZTE, CATT, LGE, CATR | R1-74 | - | [WTS] [JSN] | |||
| R1-134934 | Draft response LS on GCSE with eMBMS | other | Qualcomm Inc | R1-74 | - | [WTS] [JSN] | |||
| R1-134935 | Way Forward on CRS in reconfigured DL subframes | other | CATT, NSN, Nokia, CATR | R1-74 | - | [WTS] [JSN] | |||
| R1-134936 | Design aspect of D2D discovery | other | Samsung | R1-74 | - | [WTS] [JSN] | |||
| R1-134937 | Way Forward on Small Cell On/Off and Discovery | other | Huawei, Blackberry, CATR, CATT, CMCC, ETRI, Fujitsu, HiSilicon, Hitachi, IAESI, InterDigital, MediaTek, Motorola Mobility, NTT DOCOMO, Panasonic, Qualcomm, Samsung, ZTE | R1-74 | - | [WTS] [JSN] | |||
| R1-134938 | Way Forward on UE Capability for TDD-FDD CA | other | Huawei,HiSilicon,Alcatel-Lucent,AlcatelLucentShanghaiBell,BlackBerry,Broadcom,CATT,CMCC,Ericsson,ETRI,IAESI,Intel,InterDigital,KDDI,KT,LG,Mediatek,MotorolaMobility,NEC,Nokia,NSN,Orange,Qualcomm,Samsung,Sharp,TexasInstruments,ZTE | R1-74 | - | [WTS] [JSN] | |||
| R1-134939 | Text Proposal for TR36.843 | other | Qualcomm Inc | R1-74 | - | [WTS] [JSN] | |||
| R1-134940 | On the need for further studies for concluding on a discovery signal | other | Ericsson | R1-74 | - | [WTS] [JSN] | |||
| R1-134941 | Draft CR on higher order modulation for Small cell enhancements- Physical layer aspects | other | Huawei, HiSilicon, CATR, CMCC, ZTE, Samsung, Broadcom, Hitachi, CATT, Qualcomm , Interdigital | R1-74 | - | [WTS] [JSN] | |||
| R1-134942 | Way Forward on SIB coverage improvement for MTC UEs | other | ZTE, Fujitsu, ITRI, LG Electronics | R1-74 | - | [WTS] [JSN] | |||
| R1-134943 | Way Forward on Further Progressing High Rise Scenario | other | CMCC, KDDI, CATT, Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, ZTE, Samsung, CATR, Huawei, HiSilicon, Fraunhofer IIS | R1-74 | - | [WTS] [JSN] | |||
| R1-134944 | Way Forward on mean of ESD model | other | NSN, Nokia | R1-74 | - | [WTS] [JSN] | |||
| R1-134945 | Summary of offline discussion on TDD-FDD CA considering (non-)simultaneous RX/TX UE capabilities | other | Nokia | R1-74 | - | [WTS] [JSN] | |||
| R1-134946 | WF on Cross-correlation Matrix of 3D Channel Modelling | other | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, Huawei, Hisilicon, CMCC | R1-74 | - | [WTS] [JSN] | |||
| R1-134947 | Way Forward on Radio-interface based synchronization | other | Huawei, HiSilicon, CMCC, NTT DOCOMO, Deutsche Telekom, T-Mobile USA, CATR | R1-74 | - | [WTS] [JSN] | |||
| R1-134948 | Text Proposal on Mechanical and Electrical Antenna Tilting | other | Fraunhofer IIS | R1-74 | - | [WTS] [JSN] | |||
| R1-134949 | Half duplex operations for low complexity MTC UE | other | Vodafone Group | R1-74 | - | [WTS] [JSN] | |||
| R1-134950 | Evaluation assumptions for RIBS | other | Huawei, HiSilicon, CATR, CATT, CMCC | R1-74 | - | [WTS] [JSN] | |||
| R1-134951 | Way Forward on MTC PBCH coverage enhancement | other | LG Electronics, Sierra Wireless, Alcatel-Lucent, Alcatel Shanghai Bell, MediaTek, CATT, Samsung, ZTE, Huawei, HiSilicon, Qualcomm | R1-74 | - | [WTS] [JSN] | |||
| R1-134952 | WF on MTC Power Consumption Consideration | other | Qualcomm, CATT, Fujitsu, Huawei, HiSilicon, ITRI, MediaTek, NEC, Panasonic, Sony, ZTE | R1-74 | - | [WTS] [JSN] | |||
| R1-134953 | Way Forward on MTC PRACH coverage enhancement | other | Huawei, HiSilicon, ZTE, Ericsson, CATT, Sierra, Intel, Fujitsu, Qualcomm, NSN, Nokia, Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, CATR, Sharp, NTT Docomo | R1-74 | - | [WTS] [JSN] | |||
| R1-134954 | On Seamless Mobility Support for Low Complexity MTC UEs | other | Vodafone Group | R1-74 | - | [WTS] [JSN] | |||
| R1-134955 | WF on Timing Synchronization of D2D Outside of Network Coverage | other | NEC, SAMSUNG, PANASONIC | R1-74 | - | [WTS] [JSN] | |||
| R1-134956 | [DRAFT] LS on discovery message size | other | Huawei | R1-74 | - | [WTS] [JSN] | |||
| R1-134957 | LS on discovery message size | LS out | RAN1, Huawei | R1-74 | - | [WTS] [JSN] | |||
| R1-134958 | Half duplex FDD operation for Low complexity MTC UE | LS out | RAN1, Vodafone Group | R1-74 | - | [WTS] [JSN] | |||
| R1-134959 | On Seamless Mobility Support for Low Complexity MTC UEs | LS out | RAN1, Vodafone Group | R1-74 | - | [WTS] [JSN] | |||
| R1-134960 | LS on FDD-TDD switching enhancement in FDD-TDD joint operation | LS out | RAN1, CMCC | R1-74 | - | [WTS] [JSN] | |||
| R1-134961 | void | other | R1-74 | - | [WTS] [JSN] | ||||
| R1-134962 | void | other | R1-74 | - | [WTS] [JSN] | ||||
| R1-134963 | void | other | R1-74 | - | [WTS] [JSN] | ||||
| R1-134964 | void | other | R1-74 | - | [WTS] [JSN] | ||||
| R1-134965 | void | other | R1-74 | - | [WTS] [JSN] | ||||
| R1-134966 | Evaluation assumptions for RIBS | other | Huawei, HiSilicon, CATR, CATT, CMCC | R1-74 | - | [WTS] [JSN] | |||
| R1-134967 | Way Forward on FDD-TDD switching enhancement in FDD-TDD joint operation | other | CMCC, Huawei, HiSilicon, MediaTek, CATR, ZTE, KDDI, CHTTL, ITRI, Deutsche Telekom, CATT | R1-74 | - | [WTS] [JSN] | |||
| R1-134968 | Summary of Ad-hoc session on Further Enhancements to LTE TDD for DL-UL Interference Management and Traffic Adaptation | other | Ad-Hoc Chairman (Qualcomm) | R1-74 | - | [WTS] [JSN] | |||
| R1-134969 | Summary of Ad-hoc session on LTE Coverage Enhancements | other | Ad-Hoc Chairman (Qualcomm) | R1-74 | - | [WTS] [JSN] | |||
| R1-134970 | Summary of Ad-hoc session on Further MBMS Operations Support | other | Ad-Hoc Chairman (Alcatel Lucent) | R1-74 | - | [WTS] [JSN] | |||
| R1-134971 | Summary of Ad-hoc session on 3D-channel model for Elevation Beamforming and FD-MIMO | other | Ad-Hoc Chairman (Qualcomm) | R1-74 | - | [WTS] [JSN] | |||
| R1-134972 | Summary of Ad-hoc session on Study on LTE Device to Device Proximity Services | other | Ad-Hoc Chairman (Alcatel Lucent) | R1-74 | - | [WTS] [JSN] | |||
| R1-134973 | Summary of Ad-hoc session on Study on CoMP for LTE with Non-Ideal Backhaul | other | Ad-Hoc Chairman (Alcatel Lucent) | R1-74 | - | [WTS] [JSN] | |||
| R1-134974 | Draft CR on higher order modulation for Small cell enhancements- Physical layer aspects | other | Huawei, HiSilicon, CATR | R1-74 | - | [WTS] [JSN] | |||
| R1-134975 | 36.213 CR0442 (Rel-11, F) Correction on determination of modulation order and transport block size | CR | LG Electronics | R1-74 | - | [WTS] [JSN] | |||
| R1-134976 | Summary of TDD eIMTA work | other | CATT | R1-74 | - | [WTS] [JSN] | |||
| R1-134977 | Proposal on the length of non-MBSFN region | other | Intel Corporation | R1-74 | - | [WTS] [JSN] | |||
| R1-134978 | 36.213 CR0442r1 (Rel-11, F) Correction on determination of modulation order and transport block size | CR | LG Electronics | R1-74 | - | [WTS] [JSN] | |||
| R1-134979 | Draft response LS on GCSE with eMBMS | other | Qualcomm Inc | R1-74 | - | [WTS] [JSN] | |||
| R1-134980 | TR36.873 v1.1.1 on Study on 3D channel model for LTE | other | NSN, Nokia | R1-74 | - | [WTS] [JSN] | |||
| R1-134981 | [Draft] LS on LTE_TDD_eIMTA | other | CATT | R1-74 | - | [WTS] [JSN] | |||
| R1-134982 | Details of Phase-1 Calibration | other | NSN, Nokia | R1-74 | - | [WTS] [JSN] | |||
| R1-134983 | Summary of MBMS discussion | other | Ericsson | R1-74 | - | [WTS] [JSN] | |||
| R1-134984 | 36.213 CR0443 (F, Rel-12) Clarification of search space monitoring for MBMS | CR | Ericsson | R1-74 | - | [WTS] [JSN] | |||
| R1-134985 | Response LS on GCSE with eMBMS | LS out | RAN1, Qualcomm Inc | R1-74 | - | [WTS] [JSN] | |||
| R1-134986 | LS on LTE_TDD_eIMTA | LS out | RAN1, CATT | R1-74 | - | [WTS] [JSN] | |||
| R1-134987 | void | other | R1-74 | - | [WTS] [JSN] | ||||
| R1-134988 | void | other | R1-74 | - | [WTS] [JSN] | ||||
| R1-134989 | void | other | R1-74 | - | [WTS] [JSN] | ||||
| R1-134990 | void | other | R1-74 | - | [WTS] [JSN] | ||||
| R1-134991 | void | other | R1-74 | - | [WTS] [JSN] | ||||
| R1-134992 | void | other | R1-74 | - | [WTS] [JSN] | ||||
| R1-134993 | void | other | R1-74 | - | [WTS] [JSN] | ||||
| R1-134994 | void | other | R1-74 | - | [WTS] [JSN] | ||||
| R1-134995 | void | other | R1-74 | - | [WTS] [JSN] | ||||
| R1-134996 | void | other | R1-74 | - | [WTS] [JSN] | ||||
| R1-134997 | void | other | R1-74 | - | [WTS] [JSN] | ||||
| R1-134998 | void | other | R1-74 | - | [WTS] [JSN] | ||||
| R1-134999 | void | other | R1-74 | - | [WTS] [JSN] |
965 documents (1.266489982605 seconds)