Please enter the search related information in the fields below. Partial information works, e.g. "SP-21" in the "tdoc" field lists all TSG SA documents from 2021. Regular expressions mostly work in all fields (e.g. "2[34].501" in the "Spec" field lists all documents related to 23.501 and 24.501. Capitalization is disregarded, i.e. "3GPP" gives the same results as "3gpp".
Download results in JSON format
| tdoc | Title | Type / Revs | Source | Spec / CR | S/WID | Release | Meeting | Status | Links |
|---|---|---|---|---|---|---|---|---|---|
| R1-124675 | Draft Agenda for RAN1#71 meeting | other | RAN1 Chairman | R1-71 | - | [WTS] [JSN] | |||
| R1-124676 | Final Report from RAN1#70bis | other | MCC | R1-71 | - | [WTS] [JSN] | |||
| R1-124677 | Reply LS on synchronisations handling in HSDPA Multiflow | other | RAN2, Ericsson | R1-71 | - | [WTS] [JSN] | |||
| R1-124678 | Reply LS on UE measurements in support of the two-stage MIMO OTA test method | other | RAN2, Nokia | R1-71 | - | [WTS] [JSN] | |||
| R1-124679 | LS on LTE Rel-11 UE capabilities list | other | RAN4, NTT DoCoMo | R1-71 | - | [WTS] [JSN] | |||
| R1-124680 | Reply LS on Granularity of Interference Measurement Resource for CoMP | other | RAN4, Ericsson | R1-71 | - | [WTS] [JSN] | |||
| R1-124681 | LS to RAN2 on wideband RSRQ measurement | other | RAN4, NTT DoCoMo, Huawei | R1-71 | - | [WTS] [JSN] | |||
| R1-124682 | Response LS on Pcmax definition for the partial overlap period between different TAGs | other | RAN4, Huawei | R1-71 | - | [WTS] [JSN] | |||
| R1-124683 | Reply LS on parallel transmission of SRS and PUSCH/PUCCH for multiple TAGs | other | RAN4, CATT | R1-71 | - | [WTS] [JSN] | |||
| R1-124684 | Remaining issues for PUSCH HARQ design on TDD inter-band CA with different UL-DL configurations | other | Huawei, HiSilicon | R1-71 | - | [WTS] [JSN] | |||
| R1-124685 | Half duplex operation for TDD inter-band CA with different UL-DL configurations | other | Huawei, HiSilicon | R1-71 | - | [WTS] [JSN] | |||
| R1-124686 | Soft buffer partitioning for TDD inter-band CA with different UL-DL configurations | other | Huawei, HiSilicon | R1-71 | - | [WTS] [JSN] | |||
| R1-124687 | Remaining issues on multiple TA | other | Huawei, HiSilicon | R1-71 | - | [WTS] [JSN] | |||
| R1-124688 | Quasi co-location aspects of EPDCCH DMRS | other | Huawei, HiSilicon | R1-71 | - | [WTS] [JSN] | |||
| R1-124689 | Quasi co-location aspects between CRS, CSI-RS and DMRS for frequency synchronization | other | Huawei, HiSilicon | R1-71 | - | [WTS] [JSN] | |||
| R1-124690 | PDSCH RE mapping with IMRs and ZP CSI-RS | other | Huawei, HiSilicon | R1-71 | - | [WTS] [JSN] | |||
| R1-124691 | Aperiodic feedback for 1-bit CSI request for CoMP | other | Huawei, HiSilicon | R1-71 | - | [WTS] [JSN] | |||
| R1-124692 | Signaling for PDSCH RE mapping and quasi co-location in DCI format 2D | other | Huawei, HiSilicon | R1-71 | - | [WTS] [JSN] | |||
| R1-124693 | Discussion on RI inheritance for periodic feedback | other | Huawei, HiSilicon | R1-71 | - | [WTS] [JSN] | |||
| R1-124694 | Details of multiplexing for aperiodic CSI feedback | other | Huawei, HiSilicon | R1-71 | - | [WTS] [JSN] | |||
| R1-124695 | Final details of DCI format 1A in TM10 | other | Huawei, HiSilicon | R1-71 | - | [WTS] [JSN] | |||
| R1-124696 | Remaining details for the PDSCH starting symbol in TM10 | other | Huawei, HiSilicon | R1-71 | - | [WTS] [JSN] | |||
| R1-124697 | Mapping of ECCE to EREG for localized and distributed transmission | other | Huawei, HiSilicon | R1-71 | - | [WTS] [JSN] | |||
| R1-124698 | On the EPDCCH starting symbol | other | Huawei, HiSilicon | R1-71 | - | [WTS] [JSN] | |||
| R1-124699 | Antenna port association for EPDCCH | other | Huawei, HiSilicon | R1-71 | - | [WTS] [JSN] | |||
| R1-124700 | DCI formats supported on EPDCCH | other | Huawei, HiSilicon | R1-71 | - | [WTS] [JSN] | |||
| R1-124701 | Scrambling Sequence for EPDCCH | other | Huawei, HiSilicon | R1-71 | - | [WTS] [JSN] | |||
| R1-124702 | PSS/SSS collisions with DM-RS | other | Huawei, HiSilicon | R1-71 | - | [WTS] [JSN] | |||
| R1-124703 | Text proposal for TR 36.888 to align with the updated SID on low cost MTC | other | Huawei, HiSilicon | R1-71 | - | [WTS] [JSN] | |||
| R1-124704 | Text proposal for TR 36.888 on coverage improvement | other | Huawei, HiSilicon | R1-71 | - | [WTS] [JSN] | |||
| R1-124705 | Solutions on coverage improvement for low cost MTC | other | Huawei, HiSilicon | R1-71 | - | [WTS] [JSN] | |||
| R1-124706 | Performance evaluation and analysis on coverage improvement for low cost MTC | other | Huawei, HiSilicon | R1-71 | - | [WTS] [JSN] | |||
| R1-124707 | Discussion on operational carrier selection for carrier based ICIC | other | Huawei, HiSilicon | R1-71 | - | [WTS] [JSN] | |||
| R1-124708 | Draft LS response on operational carrier selection for carrier based ICIC | other | Huawei | R1-71 | - | [WTS] [JSN] | |||
| R1-124709 | Discussion on DL interference mitigation for carrier based ICIC | other | Huawei, HiSilicon | R1-71 | - | [WTS] [JSN] | |||
| R1-124710 | Draft LS response on DL interference mitigation for carrier based ICIC | other | Huawei | R1-71 | - | [WTS] [JSN] | |||
| R1-124711 | Discussion on UL interference mitigation for carrier based ICIC | other | Huawei, HiSilicon | R1-71 | - | [WTS] [JSN] | |||
| R1-124712 | Draft LS response on UL interference mitigation for carrier based ICIC | other | Huawei | R1-71 | - | [WTS] [JSN] | |||
| R1-124713 | Considerations on half-duplex UE operation for TDD inter-band CA | other | Intel Corporation | R1-71 | - | [WTS] [JSN] | |||
| R1-124714 | Further consideration on the PUSCH scheduling/HARQ timing for inter-band TDD CA | other | Intel Corporation | R1-71 | - | [WTS] [JSN] | |||
| R1-124715 | On periodic CSI report for inter-band TDD CA | other | Intel Corporation | R1-71 | - | [WTS] [JSN] | |||
| R1-124716 | Remaining issues with Mutiple TAGs in Rel-11 | other | Intel Corporation | R1-71 | - | [WTS] [JSN] | |||
| R1-124717 | On collision between DM RS and PSS/SSS in new carrier | other | Intel Corporation | R1-71 | - | [WTS] [JSN] | |||
| R1-124718 | Views on synchronized new carrier | other | Intel Corporation | R1-71 | - | [WTS] [JSN] | |||
| R1-124719 | Reduced CRS in frequency domain for new carrier | other | Intel Corporation | R1-71 | - | [WTS] [JSN] | |||
| R1-124720 | Discussion on freqeuncy offset tracking for DL CoMP | other | Intel Corporation | R1-71 | - | [WTS] [JSN] | |||
| R1-124721 | Configuration of semi-persistent scheduling in TM10 | other | Intel Corporation | R1-71 | - | [WTS] [JSN] | |||
| R1-124722 | Remaining details of PDSCH RE mapping | other | Intel Corporation | R1-71 | - | [WTS] [JSN] | |||
| R1-124723 | Remaining details of periodic CSI reporting | other | Intel Corporation | R1-71 | - | [WTS] [JSN] | |||
| R1-124724 | Possible reasons for results difference in DL MIMO enhancement | other | Intel Corporation | R1-71 | - | [WTS] [JSN] | |||
| R1-124725 | Remaining details of search space equations | other | Intel Corporation | R1-71 | - | [WTS] [JSN] | |||
| R1-124726 | UE behaviour for SPS PDSCH in subframe configured for EPDCCH | other | Intel Corporation | R1-71 | - | [WTS] [JSN] | |||
| R1-124727 | Remaining details of AP association | other | Intel Corporation | R1-71 | - | [WTS] [JSN] | |||
| R1-124728 | Remaining details on PUCCH resource allocation for EPDCCH | other | Intel Corporation | R1-71 | - | [WTS] [JSN] | |||
| R1-124729 | Scrambling on DCI contents for EPDCCH | other | Intel Corporation | R1-71 | - | [WTS] [JSN] | |||
| R1-124730 | DM RS orthogonality between two antenna ports within a CDM group | other | Intel Corporation | R1-71 | - | [WTS] [JSN] | |||
| R1-124731 | Blind decoding ambiguity resolution | other | Intel Corporation | R1-71 | - | [WTS] [JSN] | |||
| R1-124732 | UL interference mitigation for CB ICIC | other | Fujitsu | R1-71 | - | [WTS] [JSN] | |||
| R1-124733 | CoMP relevant text inclusion in TS36.300 | other | Fujitsu | R1-71 | - | [WTS] [JSN] | |||
| R1-124734 | Multiplexing of aperiodic CSI feedback for CoMP | other | Fujitsu | R1-71 | - | [WTS] [JSN] | |||
| R1-124735 | EPDCCH Blind decoding candidates | other | Fujitsu | R1-71 | - | [WTS] [JSN] | |||
| R1-124736 | EPDCCH search space function | other | Fujitsu | R1-71 | - | [WTS] [JSN] | |||
| R1-124737 | Port association for distributed ePDCCH | other | Fujitsu | R1-71 | - | [WTS] [JSN] | |||
| R1-124738 | DCI formats to be supported by Rel-11 EPDCCH | other | Fujitsu | R1-71 | - | [WTS] [JSN] | |||
| R1-124739 | CIF inclusion in DCI formats for Rel-11 EPDCCH | other | Fujitsu | R1-71 | - | [WTS] [JSN] | |||
| R1-124740 | Some considerations on Rel-12 NCT | other | Fujitsu | R1-71 | - | [WTS] [JSN] | |||
| R1-124741 | Coverage expansion trade-offs concerning small packet data transmitted by Low-Cost MTC devices | other | Fujitsu | R1-71 | - | [WTS] [JSN] | |||
| R1-124742 | Remaining issues of parallel transmission in multiple TAGs | other | Texas Instruments | R1-71 | - | [WTS] [JSN] | |||
| R1-124743 | Remaining issues of PDSCH rate-matching for CoMP | other | Texas Instruments | R1-71 | - | [WTS] [JSN] | |||
| R1-124744 | On rank reference process configuration on PUCCH | other | Texas Instruments | R1-71 | - | [WTS] [JSN] | |||
| R1-124745 | Aperiodic feedback for DL CoMP | other | Texas Instruments | R1-71 | - | [WTS] [JSN] | |||
| R1-124746 | Outstanding aspects of PUCCH resource allocation for EPDCCH | other | Texas Instruments | R1-71 | - | [WTS] [JSN] | |||
| R1-124747 | On evaluation of DL MIMO enhancement for LTE-A | other | Texas Instruments | R1-71 | - | [WTS] [JSN] | |||
| R1-124748 | Carrier-based HetNet ICIC solutions for the uplink in LTE | other | Texas Instruments | R1-71 | - | [WTS] [JSN] | |||
| R1-124749 | Carrier-based HetNet ICIC solutions for the downlink in LTE | other | Texas Instruments | R1-71 | - | [WTS] [JSN] | |||
| R1-124750 | Operational carrier selection for carrier-based ICIC | other | Texas Instruments | R1-71 | - | [WTS] [JSN] | |||
| R1-124751 | Some issues on synchronization in NCT CCs | other | Sony Corporation | R1-71 | - | [WTS] [JSN] | |||
| R1-124752 | SRS power scaling in UpPTS | other | CATT | R1-71 | - | [WTS] [JSN] | |||
| R1-124753 | Half duplex operations for TDD inter-band CA | other | CATT | R1-71 | - | [WTS] [JSN] | |||
| R1-124754 | PDSCH HARQ timing for cross-carrier scheduling with TDD inter-band carrier aggregation | other | CATT | R1-71 | - | [WTS] [JSN] | |||
| R1-124755 | Soft buffer handling for TDD inter-band CA with different UL-DL configurations | other | CATT | R1-71 | - | [WTS] [JSN] | |||
| R1-124756 | SRS transmission with multiple timing advances in Rel-11 | other | CATT | R1-71 | - | [WTS] [JSN] | |||
| R1-124757 | On QCL behaviour in TM10 | other | CATT | R1-71 | - | [WTS] [JSN] | |||
| R1-124758 | On PDSCH rate-matching for ZP CSI-RS and IMR | other | CATT | R1-71 | - | [WTS] [JSN] | |||
| R1-124759 | Further details of DCI Format 2D | other | CATT | R1-71 | - | [WTS] [JSN] | |||
| R1-124760 | Issues on RI-reference-process for periodic feedback | other | CATT | R1-71 | - | [WTS] [JSN] | |||
| R1-124761 | RE mapping for localized and distributed E-CCE | other | CATT | R1-71 | - | [WTS] [JSN] | |||
| R1-124762 | Blind decoding split between E-PDCCH sets | other | CATT | R1-71 | - | [WTS] [JSN] | |||
| R1-124763 | Resource configuration and search space design for E-PDCCH | other | CATT | R1-71 | - | [WTS] [JSN] | |||
| R1-124764 | E-PDCCH starting symbol configuration | other | CATT | R1-71 | - | [WTS] [JSN] | |||
| R1-124765 | DMRS association issues for E-PDCCH | other | CATT | R1-71 | - | [WTS] [JSN] | |||
| R1-124766 | PUCCH resource for E-PDCCH | other | CATT | R1-71 | - | [WTS] [JSN] | |||
| R1-124767 | Cross carrier scheduling for E-PDCCH | other | CATT | R1-71 | - | [WTS] [JSN] | |||
| R1-124768 | Handling of collision between PSS/SSS and DMRS | other | CATT | R1-71 | - | [WTS] [JSN] | |||
| R1-124769 | Design for synchronized new carrier type | other | CATT | R1-71 | - | [WTS] [JSN] | |||
| R1-124770 | Evaluation results for further enhanced DL MIMO | other | CATT | R1-71 | - | [WTS] [JSN] | |||
| R1-124771 | Analysis of reasons for diverse performance evaluation results | other | CATT | R1-71 | - | [WTS] [JSN] | |||
| R1-124772 | Analysis of coverage improvement for low-cost MTC LTE UEs | other | CATT | R1-71 | - | [WTS] [JSN] | |||
| R1-124773 | Half-duplex operations support with aggregation of TDD carriers with different UL/DL configurations | other | Ericsson, ST-Ericsson | R1-71 | - | [WTS] [JSN] | |||
| R1-124774 | On the soft buffer partitioning operations for interband TDD CA UEs | other | Ericsson, ST-Ericsson | R1-71 | - | [WTS] [JSN] | |||
| R1-124775 | Remaining details of MTA | other | Ericsson, ST-Ericsson | R1-71 | - | [WTS] [JSN] | |||
| R1-124776 | On New Carrier Type | other | Ericsson | R1-71 | - | [WTS] [JSN] | |||
| R1-124777 | PSS/SSS and DM-RS on the new carrier type | other | Ericsson, ST-Ericsson | R1-71 | - | [WTS] [JSN] | |||
| R1-124778 | Design for synchronized and unsynchronized new carriers | other | Ericsson, ST-Ericsson | R1-71 | - | [WTS] [JSN] | |||
| R1-124779 | Soft buffer partitioning for TDD inter-band CA | other | Panasonic | R1-71 | - | [WTS] [JSN] | |||
| R1-124780 | Remaining issues on multiple TAGs | other | Panasonic | R1-71 | - | [WTS] [JSN] | |||
| R1-124781 | Relationship between IMR and ZP CSI-RS | other | Panasonic | R1-71 | - | [WTS] [JSN] | |||
| R1-124782 | RI and Subband Index Constraints for Periodic CSI | other | Panasonic | R1-71 | - | [WTS] [JSN] | |||
| R1-124783 | ECCE/EREG to RE mapping for EPDCCH | other | Panasonic | R1-71 | - | [WTS] [JSN] | |||
| R1-124784 | EPDCCH search space and aggregation levels | other | Panasonic | R1-71 | - | [WTS] [JSN] | |||
| R1-124785 | Remaining details of EPDCCH starting symbol configuration | other | Panasonic | R1-71 | - | [WTS] [JSN] | |||
| R1-124786 | Association between DM-RS port and EPDCCH transmission | other | Panasonic | R1-71 | - | [WTS] [JSN] | |||
| R1-124787 | Discussion on PUCCH resource allocation for EPDCCH | other | Panasonic | R1-71 | - | [WTS] [JSN] | |||
| R1-124788 | Discussion on PUCCH resource allocation for EPDCCH for TDD | other | Panasonic | R1-71 | - | [WTS] [JSN] | |||
| R1-124789 | Cross-carrier scheduling with EPDCCH | other | Panasonic | R1-71 | - | [WTS] [JSN] | |||
| R1-124790 | Target scenarios for new carrier types | other | Panasonic | R1-71 | - | [WTS] [JSN] | |||
| R1-124791 | Discussion on LSs from RAN3 regarding CB ICIC | other | Panasonic | R1-71 | - | [WTS] [JSN] | |||
| R1-124792 | EREG to ECCE mapping in EPDCCH | other | China Telecom | R1-71 | - | [WTS] [JSN] | |||
| R1-124793 | Discussion on coverage improvement for MTC | other | China Telecom | R1-71 | - | [WTS] [JSN] | |||
| R1-124794 | EPDCCH resource allocation | other | New Postcom | R1-71 | - | [WTS] [JSN] | |||
| R1-124795 | Remaining details of search space design for EPDCCH | other | New Postcom | R1-71 | - | [WTS] [JSN] | |||
| R1-124796 | Remaining details of EPDCCH starting symbol configuration | other | New Postcom | R1-71 | - | [WTS] [JSN] | |||
| R1-124797 | Details on antenna port association for EPDCCH transmission | other | New Postcom | R1-71 | - | [WTS] [JSN] | |||
| R1-124798 | Remaining aspects of PUCCH resource allocation for EPDCCH | other | New Postcom | R1-71 | - | [WTS] [JSN] | |||
| R1-124799 | Remaining details of PDSCH rate matching | other | New Postcom | R1-71 | - | [WTS] [JSN] | |||
| R1-124800 | Remaining details of periodic feedback for CoMP | other | New Postcom | R1-71 | - | [WTS] [JSN] | |||
| R1-124801 | Remaining details of aperiodic feedback for CoMP | other | New Postcom | R1-71 | - | [WTS] [JSN] | |||
| R1-124802 | Downlink control signalling for PDSCH RE mapping and QCL indicator | other | New Postcom | R1-71 | - | [WTS] [JSN] | |||
| R1-124803 | Discussion on further downlink MIMO enhancement | other | New Postcom | R1-71 | - | [WTS] [JSN] | |||
| R1-124804 | Discussion on design of PSS and SSS for NCT | other | New Postcom | R1-71 | - | [WTS] [JSN] | |||
| R1-124805 | Discussion on design of synchronised new carriers | other | New Postcom | R1-71 | - | [WTS] [JSN] | |||
| R1-124806 | Discussion on DL interference mitigation for carrier based HetNet ICIC | other | New Postcom | R1-71 | - | [WTS] [JSN] | |||
| R1-124807 | Discussion on operational carrier selection for CB ICIC | other | New Postcom | R1-71 | - | [WTS] [JSN] | |||
| R1-124808 | Correction to the parameter ue-category-v10xy | other | New Postcom | R1-71 | - | [WTS] [JSN] | |||
| R1-124809 | Remaining details of EPDCCH resource mapping | other | New Postcom | R1-71 | - | [WTS] [JSN] | |||
| R1-124810 | CRS design for NCT – discussion on cell-specific frequency shift | other | Intel Corporation | R1-71 | - | [WTS] [JSN] | |||
| R1-124811 | Discussion on coverage improvement for low cost MTC terminals | other | Intel Corporation | R1-71 | - | [WTS] [JSN] | |||
| R1-124812 | Futher details for eCCE/eREG mapping | other | ZTE | R1-71 | - | [WTS] [JSN] | |||
| R1-124813 | Discussion on aggregation levels and BD split for ePDCCH | other | ZTE | R1-71 | - | [WTS] [JSN] | |||
| R1-124814 | Remaining issues of ePDCCH Set configuration | other | ZTE | R1-71 | - | [WTS] [JSN] | |||
| R1-124815 | Discussion on search space design | other | ZTE | R1-71 | - | [WTS] [JSN] | |||
| R1-124816 | Remaining details of EPDCCH starting symbol configuration | other | ZTE | R1-71 | - | [WTS] [JSN] | |||
| R1-124817 | On association between DM-RS ports and EPDCCH transmission | other | ZTE | R1-71 | - | [WTS] [JSN] | |||
| R1-124818 | PUCCH resource allocation for ePDCCH | other | ZTE | R1-71 | - | [WTS] [JSN] | |||
| R1-124819 | Remaining details of DCI formats supported on EPDCCH | other | ZTE | R1-71 | - | [WTS] [JSN] | |||
| R1-124820 | Discussion on UE-specific ePDCCH scrambling sequence | other | ZTE | R1-71 | - | [WTS] [JSN] | |||
| R1-124821 | Possible reasons for diverse evaluation results in DL MIMO enhancement SI | other | ZTE | R1-71 | - | [WTS] [JSN] | |||
| R1-124822 | DCI monitoring in observation of PRS with different CP | other | ZTE | R1-71 | - | [WTS] [JSN] | |||
| R1-124823 | Remaining details of EPDCCH DM-RS quasi-co-location behaviour | other | ZTE | R1-71 | - | [WTS] [JSN] | |||
| R1-124824 | Need for quasi-co-location signaling for CSI-RS and CRS | other | ZTE | R1-71 | - | [WTS] [JSN] | |||
| R1-124825 | Remaining details on PDSCH rate matching behaviour | other | ZTE | R1-71 | - | [WTS] [JSN] | |||
| R1-124826 | Remaining details of downlink control signalling for DL CoMP | other | ZTE | R1-71 | - | [WTS] [JSN] | |||
| R1-124827 | Reference process for rank indicator under periodic CSI feedback modes for CoMP | other | ZTE | R1-71 | - | [WTS] [JSN] | |||
| R1-124828 | Remaining details of aperiodic CSI feedback modes for CoMP | other | ZTE | R1-71 | - | [WTS] [JSN] | |||
| R1-124829 | Coverage improvement techniques for low cost MTC Ues | other | ZTE | R1-71 | - | [WTS] [JSN] | |||
| R1-124830 | synchronization signal and DMRS collision in NCT^^ | other | ZTE | R1-71 | - | [WTS] [JSN] | |||
| R1-124831 | Synchronized New Carrier Type | other | ZTE | R1-71 | - | [WTS] [JSN] | |||
| R1-124832 | Issues for Non-standalone New Carrier Type | other | ZTE | R1-71 | - | [WTS] [JSN] | |||
| R1-124833 | Remaining Issues on Multiple TA | other | ZTE | R1-71 | - | [WTS] [JSN] | |||
| R1-124834 | Offline discussion summary on Parallel Reception of PDSCH on Scell and Msg 2 on Pcell | other | ZTE | R1-71 | - | [WTS] [JSN] | |||
| R1-124835 | Discussion on solutions for UL Interferer Identification | other | ZTE, CMCC | R1-71 | - | [WTS] [JSN] | |||
| R1-124836 | Remaining Issues Regarding Multiple TA | other | NTT DOCOMO | R1-71 | - | [WTS] [JSN] | |||
| R1-124837 | Remaining details for quasi co-location behavior | other | NTT DOCOMO | R1-71 | - | [WTS] [JSN] | |||
| R1-124838 | PDSCH rate matching behaviour in relation to ZP CSI-RS resources and IMRs | other | NTT DOCOMO | R1-71 | - | [WTS] [JSN] | |||
| R1-124839 | Downlink control signaling for Rel-11 CoMP | other | NTT DOCOMO | R1-71 | - | [WTS] [JSN] | |||
| R1-124840 | Remaining Issues Regarding ECCE/EREG-to-RE Mapping for EPDCCH | other | NTT DOCOMO | R1-71 | - | [WTS] [JSN] | |||
| R1-124841 | Views on Search Space Design for Multiple EPDCCH Sets | other | NTT DOCOMO | R1-71 | - | [WTS] [JSN] | |||
| R1-124842 | Search Space Design for Localized E-PDCCH Transmission | other | NTT DOCOMO | R1-71 | - | [WTS] [JSN] | |||
| R1-124843 | Remaining Issues Regarding PUCCH Resource Allocation for EPDCCH | other | NTT DOCOMO | R1-71 | - | [WTS] [JSN] | |||
| R1-124844 | PRB Indication for EPDCCH | other | NTT DOCOMO | R1-71 | - | [WTS] [JSN] | |||
| R1-124845 | Views on DL RS for New Carrier Type | other | NTT DOCOMO | R1-71 | - | [WTS] [JSN] | |||
| R1-124846 | Design for Synchronized New Carrier Type | other | NTT DOCOMO | R1-71 | - | [WTS] [JSN] | |||
| R1-124847 | Further evaluations on feedback enhancement for DL MIMO | other | NTT DOCOMO | R1-71 | - | [WTS] [JSN] | |||
| R1-124848 | Minor editorial corrections to 36.213 | other | NEC Group | R1-71 | - | [WTS] [JSN] | |||
| R1-124849 | ZP-CSI-RS Configuration for IMRs and PDSCH RE matching | other | NEC Group | R1-71 | - | [WTS] [JSN] | |||
| R1-124850 | Details of 1-bit CSI request field | other | NEC Group | R1-71 | - | [WTS] [JSN] | |||
| R1-124851 | Signalling for ePDCCH set configuration | other | NEC Group | R1-71 | - | [WTS] [JSN] | |||
| R1-124852 | Remaining details of ePDCCH search space | other | NEC Group | R1-71 | - | [WTS] [JSN] | |||
| R1-124853 | Remaining details on EPDCCH in MBSFN subframes | other | NEC Group | R1-71 | - | [WTS] [JSN] | |||
| R1-124854 | Details of UE-specific EPDCCH scrambling sequence | other | NEC Group | R1-71 | - | [WTS] [JSN] | |||
| R1-124855 | PSS/SSS time locations on the NCT | other | NEC Group | R1-71 | - | [WTS] [JSN] | |||
| R1-124856 | Requirements and necessary enhancements for Release 12 NCT | other | NEC Group | R1-71 | - | [WTS] [JSN] | |||
| R1-124857 | Remaining simulation assumptions for UMTS Het Net evaluations | other | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | R1-71 | - | [WTS] [JSN] | |||
| R1-124858 | Evaluation of soft reuse in UMTS Heterogeneous Networks | other | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | R1-71 | - | [WTS] [JSN] | |||
| R1-124859 | Signalling of SCell paging configuration | other | Alcatel-Lucent Shanghai Bell, Alcatel-Lucent | R1-71 | - | [WTS] [JSN] | |||
| R1-124860 | Remaining physical layer details of multiple TA | other | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | R1-71 | - | [WTS] [JSN] | |||
| R1-124861 | On the need for CSI-RS – CRS quasi-co-location signalling | other | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | R1-71 | - | [WTS] [JSN] | |||
| R1-124862 | PDSCH rate matching behaviour for ZP CSI-RS resources and IMRs | other | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | R1-71 | - | [WTS] [JSN] | |||
| R1-124863 | Details of DCI Format 2D | other | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | R1-71 | - | [WTS] [JSN] | |||
| R1-124864 | Way Forward on Downlink Control Signaling for PDSCH in TM10 | other | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | R1-71 | - | [WTS] [JSN] | |||
| R1-124865 | Way Forward on Downlink Control Signaling for PDSCH when CIF is configured | other | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | R1-71 | - | [WTS] [JSN] | |||
| R1-124866 | Details of 1-bit CSI request field for CoMP | other | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | R1-71 | - | [WTS] [JSN] | |||
| R1-124867 | CSI references processes for periodic feedback | other | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | R1-71 | - | [WTS] [JSN] | |||
| R1-124868 | UCI Multiplexing on PUSCH for DL CoMP | other | Alcatel-Lucent Shanghai Bell, Alcatel-Lucent | R1-71 | - | [WTS] [JSN] | |||
| R1-124869 | Remaining Issues for CSI Processes in TM10 with Codebook Subset Restriction | other | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | R1-71 | - | [WTS] [JSN] | |||
| R1-124870 | On the total number of CSI processes when CoMP and CA are configured | other | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | R1-71 | - | [WTS] [JSN] | |||
| R1-124871 | Details of ECCE numbering | other | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | R1-71 | - | [WTS] [JSN] | |||
| R1-124872 | Remaining details of search space and aggregation levels | other | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | R1-71 | - | [WTS] [JSN] | |||
| R1-124873 | Remaining details of EPDCCH starting symbol configuration | other | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | R1-71 | - | [WTS] [JSN] | |||
| R1-124874 | Remaining details of association between DM-RS ports and ePDCCH transmissions | other | Alcatel-Lucent Shanghai Bell, Alcatel-Lucent | R1-71 | - | [WTS] [JSN] | |||
| R1-124875 | Remaining details of PUCCH Resource allocation for EPDCCH | other | Alcatel-Lucent Shanghai Bell, Alcatel-Lucent | R1-71 | - | [WTS] [JSN] | |||
| R1-124876 | Remaining details of DCI formats supported on EPDCCH | other | Alcatel-Lucent Shanghai Bell, Alcatel-Lucent | R1-71 | - | [WTS] [JSN] | |||
| R1-124877 | On the UE-specific EPDCCH scrambling sequence | other | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | R1-71 | - | [WTS] [JSN] | |||
| R1-124878 | Cross scheduling of SCell under EPDCCH operation | other | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | R1-71 | - | [WTS] [JSN] | |||
| R1-124879 | PSS/SSS on New Carrier Type | other | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | R1-71 | - | [WTS] [JSN] | |||
| R1-124880 | On synchronised new carriers | other | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | R1-71 | - | [WTS] [JSN] | |||
| R1-124881 | Evaluation assumptions for Further Downlink MIMO Enhancement | other | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, AT&T | R1-71 | - | [WTS] [JSN] | |||
| R1-124882 | Analysis on Evaluation Assumptions for Further Downlink MIMO Enhancement | other | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | R1-71 | - | [WTS] [JSN] | |||
| R1-124883 | Potential solutions for improved coverage for MTC UEs | other | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | R1-71 | - | [WTS] [JSN] | |||
| R1-124884 | Draft LS reply on UL Interference for CB ICIC | other | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | R1-71 | - | [WTS] [JSN] | |||
| R1-124885 | Draft LS reply on DL Interference mitigation for carrier based HetNet ICIC | other | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | R1-71 | - | [WTS] [JSN] | |||
| R1-124886 | Draft LS reply on operational carrier selection for CB ICIC | other | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | R1-71 | - | [WTS] [JSN] | |||
| R1-124887 | General considerations on coverage enhancements for MTC | other | Ericsson, ST-Ericsson | R1-71 | - | [WTS] [JSN] | |||
| R1-124888 | Required functionality for coverage enhancements for MTC | other | Ericsson, ST-Ericsson | R1-71 | - | [WTS] [JSN] | |||
| R1-124889 | Initial link budget analysis for coverage enhancements for MTC | other | Ericsson, ST-Ericsson | R1-71 | - | [WTS] [JSN] | |||
| R1-124890 | Mapping of ePDCCH to RE | other | Ericsson, ST-Ericsson | R1-71 | - | [WTS] [JSN] | |||
| R1-124891 | ePDCCH Blind decoding | other | Ericsson, ST-Ericsson | R1-71 | - | [WTS] [JSN] | |||
| R1-124892 | ePDCCH Search Space | other | Ericsson, ST-Ericsson | R1-71 | - | [WTS] [JSN] | |||
| R1-124893 | Configuration of ePDCCH resources | other | Ericsson, ST-Ericsson | R1-71 | - | [WTS] [JSN] | |||
| R1-124894 | ePDCCH Start symbol | other | Ericsson, ST-Ericsson | R1-71 | - | [WTS] [JSN] | |||
| R1-124895 | ePDCCH antenna port configuration | other | Ericsson, ST-Ericsson | R1-71 | - | [WTS] [JSN] | |||
| R1-124896 | Remaining details of PUCCH resource allocation for EPDCCH | other | Ericsson, ST-Ericsson | R1-71 | - | [WTS] [JSN] | |||
| R1-124897 | DCI formats supported on ePDCCH | other | Ericsson, ST-Ericsson | R1-71 | - | [WTS] [JSN] | |||
| R1-124898 | On ePDCCH and cross carrier scheduling | other | Ericsson, ST-Ericsson | R1-71 | - | [WTS] [JSN] | |||
| R1-124899 | On ePDCCH data scrambling | other | Ericsson, ST-Ericsson | R1-71 | - | [WTS] [JSN] | |||
| R1-124900 | Clarification of TBS determination for PDSCH scheduled by EPDCCH | other | Ericsson, ST-Ericsson | R1-71 | - | [WTS] [JSN] | |||
| R1-124901 | On evaluation of DL MIMO enhancements | other | Ericsson, ST-Ericsson | R1-71 | - | [WTS] [JSN] | |||
| R1-124902 | Draft CR to 36.211 | other | Ericsson | R1-71 | - | [WTS] [JSN] | |||
| R1-124903 | Draft 36.214 CR (Rel-11, F) Correcting inconsistency between inter-RAT UTRA measurements and requirements | other | Ericsson, CATT, Renesas Mobile Europe Ltd, ST-Ericsson | R1-71 | - | [WTS] [JSN] | |||
| R1-124904 | Potential Improvements for FE_DL-MIMO | other | AT&T | R1-71 | - | [WTS] [JSN] | |||
| R1-124905 | Discussion on the maximum number of aggregated cells | other | Samsung | R1-71 | - | [WTS] [JSN] | |||
| R1-124906 | Soft buffer handling for half duplex case | other | Samsung | R1-71 | - | [WTS] [JSN] | |||
| R1-124907 | Soft buffer handling at UE side | other | Samsung | R1-71 | - | [WTS] [JSN] | |||
| R1-124908 | Remaining Issue on PUSCH Cross-Carrier Scheduling Case D in Inter-band CA | other | Samsung | R1-71 | - | [WTS] [JSN] | |||
| R1-124909 | TP for TS36.300 on Introduction of CoMP | other | Samsung, CHTTL | R1-71 | - | [WTS] [JSN] | |||
| R1-124910 | Draft CR for TS36.300 on Introduction of CoMP | other | Samsung, CHTTL | R1-71 | - | [WTS] [JSN] | |||
| R1-124911 | Review of DL CoMP open issues in RAN1 with impact on ASN.1 | other | Samsung | R1-71 | - | [WTS] [JSN] | |||
| R1-124912 | Remaining issues on EPDCCH DM-RS quasi-co-location behaviour | other | Samsung | R1-71 | - | [WTS] [JSN] | |||
| R1-124913 | Further discussion on quasi co-location of CSI-RS and CRS | other | Samsung | R1-71 | - | [WTS] [JSN] | |||
| R1-124914 | Discussion on PDSCH rate matching and configuration of IMR and ZP-CSI-RS | other | Samsung | R1-71 | - | [WTS] [JSN] | |||
| R1-124915 | Further details on configuration of IMRs | other | Samsung | R1-71 | - | [WTS] [JSN] | |||
| R1-124916 | Remaining issues on quasi co-location assumption for DCI format 1A of TM10 | other | Samsung | R1-71 | - | [WTS] [JSN] | |||
| R1-124917 | Remaining details on DCI format 2D | other | Samsung | R1-71 | - | [WTS] [JSN] | |||
| R1-124918 | Further details of reference process configuration for periodic CSI | other | Samsung | R1-71 | - | [WTS] [JSN] | |||
| R1-124919 | Remaining Details of Aperiodic CSI Multiplexing | other | Samsung | R1-71 | - | [WTS] [JSN] | |||
| R1-124920 | EREG Mapping | other | Samsung | R1-71 | - | [WTS] [JSN] | |||
| R1-124921 | Allocation of EPDCCH Candidates | other | Samsung | R1-71 | - | [WTS] [JSN] | |||
| R1-124922 | ECCE Aggregation Levels and RE Threshold | other | Samsung | R1-71 | - | [WTS] [JSN] | |||
| R1-124923 | Search Space Design for EPDCCH | other | Samsung | R1-71 | - | [WTS] [JSN] | |||
| R1-124924 | EPDCCH starting Symbol | other | Samsung | R1-71 | - | [WTS] [JSN] | |||
| R1-124925 | Association between DMRS port and ePDCCH | other | Samsung | R1-71 | - | [WTS] [JSN] | |||
| R1-124926 | PUCCH Format 1a/1b Resources in Response to EPDCCH Detections | other | Samsung | R1-71 | - | [WTS] [JSN] | |||
| R1-124927 | PUCCH resource allocation for TDD ePDCCH | other | Samsung | R1-71 | - | [WTS] [JSN] | |||
| R1-124928 | DCI Formats for EPDCCH | other | Samsung | R1-71 | - | [WTS] [JSN] | |||
| R1-124929 | Remaining Aspects for EPDCCH Operation | other | Samsung | R1-71 | - | [WTS] [JSN] | |||
| R1-124930 | ECCE Aggregation Level Ambiguity | other | Samsung | R1-71 | - | [WTS] [JSN] | |||
| R1-124931 | PSS/SSS Details on NCT carriers | other | Samsung | R1-71 | - | [WTS] [JSN] | |||
| R1-124932 | Discussion on synchronized new carriers | other | Samsung | R1-71 | - | [WTS] [JSN] | |||
| R1-124933 | Downlink MIMO Enhancements for Release 12 | other | Samsung | R1-71 | - | [WTS] [JSN] | |||
| R1-124934 | Coverage improvement for low-cost MTC UEs based on LTE | other | Samsung | R1-71 | - | [WTS] [JSN] | |||
| R1-124935 | PDSCH rate matching around ZP CSI-RS and IMR | other | MediaTek Inc. | R1-71 | - | [WTS] [JSN] | |||
| R1-124936 | Remaining signaling issues of DCI format 2D | other | MediaTek Inc. | R1-71 | - | [WTS] [JSN] | |||
| R1-124937 | Need and impact of RI-reference process in periodic feedback | other | MediaTek Inc. | R1-71 | - | [WTS] [JSN] | |||
| R1-124938 | Resource mapping of EPDCCH in TM10 | other | MediaTek Inc., CHTTL | R1-71 | - | [WTS] [JSN] | |||
| R1-124939 | Further details of EPDCCH starting symbol configuration | other | MediaTek Inc., CHTTL | R1-71 | - | [WTS] [JSN] | |||
| R1-124940 | Time-frequency location of PSS/SSS in non-synchronized NCT | other | MediaTek Inc. | R1-71 | - | [WTS] [JSN] | |||
| R1-124941 | Discussion on reduced CRS bandwidth for NCT | other | MediaTek Inc. | R1-71 | - | [WTS] [JSN] | |||
| R1-124942 | Coverage enhancement analysis and techniques for MTC devices | other | MediaTek Inc. | R1-71 | - | [WTS] [JSN] | |||
| R1-124943 | Discussion on CRS bandwidth reduction on NCT | other | New Postcom | R1-71 | - | [WTS] [JSN] | |||
| R1-124944 | Discussion on transmission modes on NCT | other | New Postcom | R1-71 | - | [WTS] [JSN] | |||
| R1-124945 | a subset-CRS based tracking RS for unsynchronized new carrier types | other | New Postcom | R1-71 | - | [WTS] [JSN] | |||
| R1-124946 | Frequency hopping for unsynchronized new carrier type TRS | other | New Postcom | R1-71 | - | [WTS] [JSN] | |||
| R1-124947 | CRS based RRM measurement for unsynchronised new carriers | other | New Postcom | R1-71 | - | [WTS] [JSN] | |||
| R1-124948 | CRS subframe configuration for unsynchronised new carriers | other | New Postcom | R1-71 | - | [WTS] [JSN] | |||
| R1-124949 | CSI-RS based RRM measurement for synchronised new carriers | other | New Postcom | R1-71 | - | [WTS] [JSN] | |||
| R1-124950 | Half duplex operation for determining the transimssion direction of overlapped subframes for inter-band CA | other | New Postcom | R1-71 | - | [WTS] [JSN] | |||
| R1-124951 | Discussion on coverage improvement for low cost MTC | other | New Postcom | R1-71 | - | [WTS] [JSN] | |||
| R1-124952 | Discussion on DCI formats supported on EPDCCH | other | New Postcom | R1-71 | - | [WTS] [JSN] | |||
| R1-124953 | (Rel 8)Clarification about the frequency on which UE initiates uplink synchronization in enhanced CELL_PCH state for 1.28Mcps TDD | other | New Postcom, TD-TECH | R1-71 | - | [WTS] [JSN] | |||
| R1-124954 | (Rel 9)Clarification about the frequency on which UE initiates uplink synchronization in enhanced CELL_PCH state for 1.28Mcps TDD | other | New Postcom, TD-TECH | R1-71 | - | [WTS] [JSN] | |||
| R1-124955 | (Rel 10)Clarification about the frequency on which UE initiates uplink synchronization in enhanced CELL_PCH state for 1.28Mcps TDD | other | New Postcom, TD-TECH | R1-71 | - | [WTS] [JSN] | |||
| R1-124956 | (Rel 11)Clarification about the frequency on which UE initiates uplink synchronization in enhanced CELL_PCH state for 1.28Mcps TDD | other | New Postcom, TD-TECH | R1-71 | - | [WTS] [JSN] | |||
| R1-124957 | SRS Transmissions in multiple TA | other | HTC | R1-71 | - | [WTS] [JSN] | |||
| R1-124958 | PRB pair Configuration for EPDCCH Sets | other | HTC | R1-71 | - | [WTS] [JSN] | |||
| R1-124959 | Remaining Details of Search Space and Aggregation Levels of EPDCCH | other | HTC | R1-71 | - | [WTS] [JSN] | |||
| R1-124960 | Remaining details of EPDCCH starting symbol configuration | other | HTC | R1-71 | - | [WTS] [JSN] | |||
| R1-124961 | Remaining Details of Association between DM-RS Ports and EPDCCH Transmission | other | HTC | R1-71 | - | [WTS] [JSN] | |||
| R1-124962 | Remaining details of PUCCH A/N resource allocation for EPDCCH | other | HTC | R1-71 | - | [WTS] [JSN] | |||
| R1-124963 | Transmissions of PSS/SSS and DM-RS in Unsynchronised New Carriers | other | HTC | R1-71 | - | [WTS] [JSN] | |||
| R1-124964 | Synchronised New Carriers in Rel-12 LTE | other | HTC | R1-71 | - | [WTS] [JSN] | |||
| R1-124965 | Low-cost MTC Traffic Models and Characteristics | other | Fujitsu | R1-71 | - | [WTS] [JSN] | |||
| R1-124966 | [Draft] LS on clarification of parallel reception of PDSCH on Scell and Msg2 on Pcell | other | ZTE | R1-71 | - | [WTS] [JSN] | |||
| R1-124967 | Coverage extension for low-cost MTC Ues | other | Institute for Information Industry (III) | R1-71 | - | [WTS] [JSN] | |||
| R1-124968 | Remaining issues on HARQ-ACK for CA with different TDD UL-DL configurations | other | LG Electronics | R1-71 | - | [WTS] [JSN] | |||
| R1-124969 | Support of half-duplex operation based CA with different TDD UL-DL configurations | other | LG Electronics | R1-71 | - | [WTS] [JSN] | |||
| R1-124970 | Issues on DL HARQ process in case of CA with different TDD UL-DL configurations | other | LG Electronics | R1-71 | - | [WTS] [JSN] | |||
| R1-124971 | PUSCH HARQ timing determination for CA with different TDD UL-DL configurations | other | LG Electronics | R1-71 | - | [WTS] [JSN] | |||
| R1-124972 | Remaining RAN1 issues on multiple TA | other | LG Electronics | R1-71 | - | [WTS] [JSN] | |||
| R1-124973 | Power control for channel selection with SORTD in case of single cell TDD | other | LG Electronics | R1-71 | - | [WTS] [JSN] | |||
| R1-124974 | Signaling for CRS-to-CSI-RS quasi co-location assumptions | other | LG Electronics | R1-71 | - | [WTS] [JSN] | |||
| R1-124975 | PDSCH RE mapping in relation to ZP CSI-RS resources and IMRs | other | LG Electronics | R1-71 | - | [WTS] [JSN] | |||
| R1-124976 | Remaining details on DCI format 2D for CoMP | other | LG Electronics | R1-71 | - | [WTS] [JSN] | |||
| R1-124977 | Fallback operation for TM10 | other | LG Electronics | R1-71 | - | [WTS] [JSN] | |||
| R1-124978 | Remaining issues on reference process | other | LG Electronics | R1-71 | - | [WTS] [JSN] | |||
| R1-124979 | SPS-based PDSCH transmission for TM10 | other | LG Electronics | R1-71 | - | [WTS] [JSN] | |||
| R1-124980 | Remaining Details of ECCE and EREG Mapping | other | LG Electronics | R1-71 | - | [WTS] [JSN] | |||
| R1-124981 | Remaining details on RE mapping | other | LG Electronics | R1-71 | - | [WTS] [JSN] | |||
| R1-124982 | Details on Search space and Aggregation Levels | other | LG Electronics | R1-71 | - | [WTS] [JSN] | |||
| R1-124983 | Remaining details on EPDCCH resource configuration | other | LG Electronics | R1-71 | - | [WTS] [JSN] | |||
| R1-124984 | Details on antenna port association for EPDCCH | other | LG Electronics | R1-71 | - | [WTS] [JSN] | |||
| R1-124985 | PUCCH A/N resource allocation for EPDCCH | other | LG Electronics | R1-71 | - | [WTS] [JSN] | |||
| R1-124986 | DCI formats supported on EPDCCH | other | LG Electronics | R1-71 | - | [WTS] [JSN] | |||
| R1-124987 | Further consideration on EPDCCH design | other | LG Electronics | R1-71 | - | [WTS] [JSN] | |||
| R1-124988 | TBS determination for PDSCH scheduled by EPDCCH | other | LG Electronics | R1-71 | - | [WTS] [JSN] | |||
| R1-124989 | Handling the Conflict of PSS/SSS and DM-RS in NCT | other | LG Electronics | R1-71 | - | [WTS] [JSN] | |||
| R1-124990 | Performance evaluation of DMRS pattern for new carrier type | other | LG Electronics | R1-71 | - | [WTS] [JSN] | |||
| R1-124991 | On synchronized new carrier type | other | LG Electronics | R1-71 | - | [WTS] [JSN] | |||
| R1-124992 | Discussion on evaluation assumptions for downlink MIMO enhancement | other | LG Electronics | R1-71 | - | [WTS] [JSN] | |||
| R1-124993 | Discussion on Coverage Enhancement for a low-cost MTC UE | other | LG Electronics | R1-71 | - | [WTS] [JSN] | |||
| R1-124994 | Discussion on UL interference mitigation solutions for CB-ICIC | other | LG Electronics | R1-71 | - | [WTS] [JSN] | |||
| R1-124995 | Discussion on DL interference mitigation solutions for CB-ICIC | other | LG Electronics | R1-71 | - | [WTS] [JSN] | |||
| R1-124996 | Discussion on operational carrier selection for CB-ICIC | other | LG Electronics | R1-71 | - | [WTS] [JSN] | |||
| R1-124997 | Half duplex operation with inter-band CA with different TDD configurations on different bands | other | Nokia Siemens Networks, Nokia | R1-71 | - | [WTS] [JSN] | |||
| R1-124998 | Remaining issues of the HARQ/scheduling timing for PUSCH with cross-carrier scheduling for inter-band TDD CA | other | Nokia Siemens Networks, Nokia | R1-71 | - | [WTS] [JSN] | |||
| R1-124999 | Remaining Issues on Multiple Timing Advance | other | Nokia Siemens Networks, Nokia | R1-71 | - | [WTS] [JSN] | |||
| R1-125000 | Signaling quasi co-location between CRS and CSI-RS | other | Nokia Siemens Networks, Nokia | R1-71 | - | [WTS] [JSN] | |||
| R1-125001 | Remaining details of PDSCH rate matching behavior in relation to ZP CSI-RS resources, IMRs and NZP CSI-RS resources | other | Nokia Siemens Networks, Nokia | R1-71 | - | [WTS] [JSN] | |||
| R1-125002 | Remaining details of DCI formats | other | Nokia Siemens Networks, Nokia | R1-71 | - | [WTS] [JSN] | |||
| R1-125003 | RI reference process for periodic feedback | other | Nokia Siemens Networks, Nokia | R1-71 | - | [WTS] [JSN] | |||
| R1-125004 | Remaining details of eREG / eCCE definitions for EPDCCH | other | Nokia, Nokia Siemens Networks | R1-71 | - | [WTS] [JSN] | |||
| R1-125005 | On supported aggregation levels for EPDCCH | other | Nokia, Nokia Siemens Networks | R1-71 | - | [WTS] [JSN] | |||
| R1-125006 | On the split of blind decoding candidates | other | Nokia, Nokia Siemens Networks | R1-71 | - | [WTS] [JSN] | |||
| R1-125007 | Localized and distributed search spaces for EPDCCH | other | Nokia, Nokia Siemens Networks | R1-71 | - | [WTS] [JSN] | |||
| R1-125008 | On remaining details on EPDCCH starting symbol configuration | other | Nokia, Nokia Siemens Networks | R1-71 | - | [WTS] [JSN] | |||
| R1-125009 | Association between DM-RS ports and EPDCCH transmission | other | Nokia, Nokia Siemens Networks | R1-71 | - | [WTS] [JSN] | |||
| R1-125010 | Remaining issues on HARQ-ACK resource allocation for data scheduled via EPDCCH: FDD aspects | other | Nokia Siemens Networks, Nokia | R1-71 | - | [WTS] [JSN] | |||
| R1-125011 | Remaining issues on HARQ-ACK resource allocation for data scheduled via EPDCCH: TDD aspects | other | Nokia Siemens Networks, Nokia | R1-71 | - | [WTS] [JSN] | |||
| R1-125012 | On the details of DCI formats for EPDCCH | other | Nokia, Nokia Siemens Networks | R1-71 | - | [WTS] [JSN] | |||
| R1-125013 | Final details of UE-specific EPDCCH scrambling sequence | other | Nokia, Nokia Siemens Networks | R1-71 | - | [WTS] [JSN] | |||
| R1-125014 | Considerations on the need for CIF in DCI carried by EPDCCH | other | Nokia, Nokia Siemens Networks | R1-71 | - | [WTS] [JSN] | |||
| R1-125015 | PSS/SSS location on un-synchronized NCT | other | Nokia Siemens Networks, Nokia | R1-71 | - | [WTS] [JSN] | |||
| R1-125016 | New Carrier Type for Synchronized Carriers | other | Nokia Siemens Networks, Nokia | R1-71 | - | [WTS] [JSN] | |||
| R1-125017 | Downlink MIMO Enhancement for LTE-Advanced | other | Nokia Siemens Networks, Nokia | R1-71 | - | [WTS] [JSN] | |||
| R1-125018 | Coverage Improvement for MTC UEs | other | Nokia Siemens Networks, Nokia | R1-71 | - | [WTS] [JSN] | |||
| R1-125019 | Assessment of uplink solution candidates for CB-ICIC | other | Nokia Siemens Networks, Nokia | R1-71 | - | [WTS] [JSN] | |||
| R1-125020 | Downlink interference mitigation for HetNet CB-ICIC | other | Nokia Siemens Networks, Nokia | R1-71 | - | [WTS] [JSN] | |||
| R1-125021 | Operational Carrier Selection for CB-ICIC | other | Nokia Siemens Networks, Nokia, DAC-UPC | R1-71 | - | [WTS] [JSN] | |||
| R1-125022 | Periodic Feedback for CoMP with RI-Reference-Process | other | ITRI | R1-71 | - | [WTS] [JSN] | |||
| R1-125023 | Power consumption analysis (Methodology for performance evaluation) | other | ITRI | R1-71 | - | [WTS] [JSN] | |||
| R1-125024 | Views on Use Cases of New Carrier Type in Rel-12 | other | KDDI | R1-71 | - | [WTS] [JSN] | |||
| R1-125025 | Views on CSI feedback enhancement toward Rel-12 | other | KDDI | R1-71 | - | [WTS] [JSN] | |||
| R1-125026 | On half duplex UE operation for interband CA TDD | other | Pantech | R1-71 | - | [WTS] [JSN] | |||
| R1-125027 | PUSCH HARQ/scheduling timing for Case B/C/D in inter-band CA TDD with different TDD configuration | other | Pantech | R1-71 | - | [WTS] [JSN] | |||
| R1-125028 | Soft buffer handling issue in inter-band CA TDD with different TDD configuration | other | Pantech | R1-71 | - | [WTS] [JSN] | |||
| R1-125029 | Parallel SRS transmission in multiple TA | other | Pantech | R1-71 | - | [WTS] [JSN] | |||
| R1-125030 | Remaining details of DCI format 2D for DL CoMP | other | Pantech | R1-71 | - | [WTS] [JSN] | |||
| R1-125031 | RI Reference processes for periodic feedback of DL CoMP | other | Pantech | R1-71 | - | [WTS] [JSN] | |||
| R1-125032 | Blind detection candidates splitting for ePDCCH | other | Pantech | R1-71 | - | [WTS] [JSN] | |||
| R1-125033 | Remained issues for DM RS ports association | other | Pantech | R1-71 | - | [WTS] [JSN] | |||
| R1-125034 | Supported DCI formats for ePDCCH | other | Pantech | R1-71 | - | [WTS] [JSN] | |||
| R1-125035 | On PSS/SSS details for NCT | other | Pantech | R1-71 | - | [WTS] [JSN] | |||
| R1-125036 | Synchronized new carrier type | other | Pantech | R1-71 | - | [WTS] [JSN] | |||
| R1-125037 | RRM measurement in new carrier type | other | Pantech | R1-71 | - | [WTS] [JSN] | |||
| R1-125038 | Introduction to coverage aspects of low cost MTC UEs | other | Sony Europe Limited | R1-71 | - | [WTS] [JSN] | |||
| R1-125039 | Coverage improvement techniques for low cost MTC UEs | other | Sony Europe Limited | R1-71 | - | [WTS] [JSN] | |||
| R1-125040 | Simulation Assumptions for Study on Heterogenous Networks | other | Renesas Mobile Europe Ltd | R1-71 | - | [WTS] [JSN] | |||
| R1-125041 | Initial Downlink Full Buffer Simulation Results on Heterogeneous Networks Scenarios with Cell Range Extension | other | Renesas Mobile Europe Ltd | R1-71 | - | [WTS] [JSN] | |||
| R1-125042 | Initial Downlink Bursty Traffic Simulation Results on Heterogeneous Networks Scenarios with Multiflow | other | Renesas Mobile Europe Ltd | R1-71 | - | [WTS] [JSN] | |||
| R1-125043 | Initial Uplink Full Buffer Simulation Results on Heterogeneous Networks Scenarios with Cell Range Extension | other | Renesas Mobile Europe Ltd | R1-71 | - | [WTS] [JSN] | |||
| R1-125044 | Initial Uplink Bursty Traffic Simulation Results on Heterogeneous Networks Scenarios with Cell Range Extension | other | Renesas Mobile Europe Ltd | R1-71 | - | [WTS] [JSN] | |||
| R1-125045 | Discussion on Uplink Control Issues in UMTS Heterogeneous Networks | other | Renesas Mobile Europe Ltd | R1-71 | - | [WTS] [JSN] | |||
| R1-125046 | Remaining Issues for Soft Buffer Handling for CC Specific TDD Configuration | other | Renesas Mobile Europe Ltd | R1-71 | - | [WTS] [JSN] | |||
| R1-125047 | Leftover Issues for Half Duplex Mode of CC specific TDD Configuration | other | Renesas Mobile Europe Ltd | R1-71 | - | [WTS] [JSN] | |||
| R1-125048 | Quasi-colocation between CRS and CSI-RS antenna ports | other | Renesas Mobile Europe Ltd | R1-71 | - | [WTS] [JSN] | |||
| R1-125049 | Remaining details of TM10 DCI formats | other | Renesas Mobile Europe Ltd | R1-71 | - | [WTS] [JSN] | |||
| R1-125050 | Remaining issues on periodic feedback | other | Renesas Mobile Europe Ltd | R1-71 | - | [WTS] [JSN] | |||
| R1-125051 | On CQI definition | other | Renesas Mobile Europe Ltd | R1-71 | - | [WTS] [JSN] | |||
| R1-125052 | Remaining details of ECCE-EREG mapping | other | Renesas Mobile Europe Ltd | R1-71 | - | [WTS] [JSN] | |||
| R1-125053 | On number of blind decoding candidates | other | Renesas Mobile Europe Ltd | R1-71 | - | [WTS] [JSN] | |||
| R1-125054 | Search space definitions for EPDCCH | other | Renesas Mobile Europe Ltd | R1-71 | - | [WTS] [JSN] | |||
| R1-125055 | Details of PRB configuration for EPDCCH sets | other | Renesas Mobile Europe Ltd | R1-71 | - | [WTS] [JSN] | |||
| R1-125056 | Details of EPDCCH antenna port association | other | Renesas Mobile Europe Ltd | R1-71 | - | [WTS] [JSN] | |||
| R1-125057 | Further Discussions On PSS/SSS Mapping in NCT | other | Renesas Mobile Europe Ltd | R1-71 | - | [WTS] [JSN] | |||
| R1-125058 | On Synchronized New Carrier Type | other | Renesas Mobile Europe Ltd | R1-71 | - | [WTS] [JSN] | |||
| R1-125059 | On Release 11 DL MIMO performance | other | Renesas Mobile Europe Ltd | R1-71 | - | [WTS] [JSN] | |||
| R1-125060 | Discussion of scheduling and HARQ timing for cross-carrier scheduling of PUSCH | other | CMCC | R1-71 | - | [WTS] [JSN] | |||
| R1-125061 | Discussion on scenarios for small cell enhancement in Rel-12 | other | CMCC | R1-71 | - | [WTS] [JSN] | |||
| R1-125062 | On Remaining Issues in E-PDCCH Search Sapce Design | other | Research In Motion UK Limited | R1-71 | - | [WTS] [JSN] | |||
| R1-125063 | PUCCH A/N Resource Mapping for MU-MIMO transmission of ePDCCH | other | Research In Motion UK Limited | R1-71 | - | [WTS] [JSN] | |||
| R1-125064 | On Remaining Details of Association between DMRS Port and E-PDCCH Transmission | other | Research In Motion UK Limited | R1-71 | - | [WTS] [JSN] | |||
| R1-125065 | Discussion on remainig issues for EPDCCH | other | Research In Motion UK Limited | R1-71 | - | [WTS] [JSN] | |||
| R1-125066 | On remaining details of EPDCCH starting symbol configuration | other | Research In Motion UK Limited | R1-71 | - | [WTS] [JSN] | |||
| R1-125067 | Handling of PSS/SSS collsion with DMRS for new carrier type | other | Research In Motion UK Limited | R1-71 | - | [WTS] [JSN] | |||
| R1-125068 | On uplink interference mitigation for CB HetNet ICIC | other | Research In Motion UK Limited | R1-71 | - | [WTS] [JSN] | |||
| R1-125069 | Efficiency of DCI based PUCCH Resource Allocation Alternatives for ePDCCH | other | Research In Motion UK Limited | R1-71 | - | [WTS] [JSN] | |||
| R1-125070 | Half duplex operation in TDD inter-band CA with different UL/DL configurations | other | Research In Motion UK Limited | R1-71 | - | [WTS] [JSN] | |||
| R1-125071 | Cross-carrier scheduling of PUSCH in TDD inter-band CA | other | Research In Motion UK Limited | R1-71 | - | [WTS] [JSN] | |||
| R1-125072 | Further consideration of PDSCH HARQ-ACK timing linkage with cross-carrier scheduling in TDD inter-band CA | other | Research In Motion UK Limited | R1-71 | - | [WTS] [JSN] | |||
| R1-125073 | Draft 25.211 Rel-11 CR, Correction to common E-RGCH | other | Research In Motion UK Limited | R1-71 | - | [WTS] [JSN] | |||
| R1-125074 | Performance of some solutions relevant to LS R1-123088 | other | DAC-UPC | R1-71 | - | [WTS] [JSN] | |||
| R1-125075 | Proposed NCT enhancements for FDD uplink | other | DAC-UPC, CEA | R1-71 | - | [WTS] [JSN] | |||
| R1-125076 | Correction of SPS operation | other | ASUSTeK | R1-71 | - | [WTS] [JSN] | |||
| R1-125077 | Power control for parallel SRS with multiple timing advances | other | ASUSTeK | R1-71 | - | [WTS] [JSN] | |||
| R1-125078 | PUCCH resource allocation for carrier aggregation for EPDCCH | other | Panasonic | R1-71 | - | [WTS] [JSN] | |||
| R1-125079 | Discussion on reference process configuration for periodic feedback | other | Hitachi Ltd | R1-71 | - | [WTS] [JSN] | |||
| R1-125080 | Discussion on simulation results of DL MIMO enhancement in Rel. 11 | other | Hitachi Ltd | R1-71 | - | [WTS] [JSN] | |||
| R1-125081 | Consideration on the PSS/SSS and DM-RS in NCT | other | Hitachi Ltd | R1-71 | - | [WTS] [JSN] | |||
| R1-125082 | MTC coverage improvement through variable TTI bundling and variable length code spreading | other | Sierra Wireless | R1-71 | - | [WTS] [JSN] | |||
| R1-125083 | PUSCH coverage improvement through limiting the number of sub-carriers per resource block | other | Sierra Wireless | R1-71 | - | [WTS] [JSN] | |||
| R1-125084 | Aperiodic CSI triggering | other | InterDigital | R1-71 | - | [WTS] [JSN] | |||
| R1-125085 | Reference processes for periodic feedback | other | InterDigital | R1-71 | - | [WTS] [JSN] | |||
| R1-125086 | Remaining details of eCCE-to-eREG mapping for EPDCCH | other | InterDigital | R1-71 | - | [WTS] [JSN] | |||
| R1-125087 | Remaining details of EPDCCH search space | other | InterDigital | R1-71 | - | [WTS] [JSN] | |||
| R1-125088 | On EPDCCH candidates and aggregation levels | other | InterDigital | R1-71 | - | [WTS] [JSN] | |||
| R1-125089 | Remaining details of antenna port association for EPDCCH | other | InterDigital | R1-71 | - | [WTS] [JSN] | |||
| R1-125090 | PUCCH resource allocation for EPDCCH based A/N | other | InterDigital | R1-71 | - | [WTS] [JSN] | |||
| R1-125091 | DCI formats and transmission modes supported on EPDCCH | other | InterDigital | R1-71 | - | [WTS] [JSN] | |||
| R1-125092 | On PSS/SSS transmissions for NCT | other | InterDigital | R1-71 | - | [WTS] [JSN] | |||
| R1-125093 | On design for synchronized for NCT | other | InterDigital | R1-71 | - | [WTS] [JSN] | |||
| R1-125094 | Coverage extension techniques with low rate data services for Low-Cost UE's based on LTE | other | InterDigital | R1-71 | - | [WTS] [JSN] | |||
| R1-125095 | Control and user plane operation with low rate data services for Low-cost UE's based on LTE | other | InterDigital | R1-71 | - | [WTS] [JSN] | |||
| R1-125096 | Text proposal to 36.888 on control and user plane protocol aspects with low rate MTC data services | other | InterDigital | R1-71 | - | [WTS] [JSN] | |||
| R1-125097 | CSI-RS dropping rules for Scell | other | Qualcomm Inc. | R1-71 | - | [WTS] [JSN] | |||
| R1-125098 | On remaining details of support of different TDD UL-DL configurations on different bands | other | Qualcomm Inc. | R1-71 | - | [WTS] [JSN] | |||
| R1-125099 | On remaining physical layer aspects of multiple TA | other | Qualcomm Inc. | R1-71 | - | [WTS] [JSN] | |||
| R1-125100 | On EPDCCH DM-RS quasi-co-location behavior | other | Qualcomm Inc. | R1-71 | - | [WTS] [JSN] | |||
| R1-125101 | On the need for CSI-RS CRS quasi-co-location signaling | other | Qualcomm Inc. | R1-71 | - | [WTS] [JSN] | |||
| R1-125102 | Remaining details of PDSCH rate matching behavior | other | Qualcomm Inc. | R1-71 | - | [WTS] [JSN] | |||
| R1-125103 | Remaining details of DCI formats | other | Qualcomm Inc. | R1-71 | - | [WTS] [JSN] | |||
| R1-125104 | Remaining details of periodic feedback | other | Qualcomm Inc. | R1-71 | - | [WTS] [JSN] | |||
| R1-125105 | Remaining details of aperiodic feedback | other | Qualcomm Inc. | R1-71 | - | [WTS] [JSN] | |||
| R1-125106 | Remaining details of ECCE-EREG to RE mapping | other | Qualcomm Inc. | R1-71 | - | [WTS] [JSN] | |||
| R1-125107 | Remaining details of search space and aggregation levels | other | Qualcomm Inc. | R1-71 | - | [WTS] [JSN] | |||
| R1-125108 | Remaining details of EPDCCH starting symbol configuration | other | Qualcomm Inc. | R1-71 | - | [WTS] [JSN] | |||
| R1-125109 | Remaining details of association between DM-RS ports and EPDCCH transmission | other | Qualcomm Inc. | R1-71 | - | [WTS] [JSN] | |||
| R1-125110 | Remaining details of PUCCH resource allocation for EPDCCH | other | Qualcomm Inc. | R1-71 | - | [WTS] [JSN] | |||
| R1-125111 | On UE-specific scrambling sequence for EPDCCH | other | Qualcomm Inc. | R1-71 | - | [WTS] [JSN] | |||
| R1-125112 | On cross-carrier scheduling with EPDCCH | other | Qualcomm Inc. | R1-71 | - | [WTS] [JSN] | |||
| R1-125113 | On collision between PRS and ePDCCH | other | Qualcomm Inc. | R1-71 | - | [WTS] [JSN] | |||
| R1-125114 | PSS/SSS details | other | Qualcomm Inc. | R1-71 | - | [WTS] [JSN] | |||
| R1-125115 | Synchronized new carrier | other | Qualcomm Inc. | R1-71 | - | [WTS] [JSN] | |||
| R1-125116 | Transmission modes for NCT | other | Qualcomm Inc. | R1-71 | - | [WTS] [JSN] | |||
| R1-125117 | Resource allocation methods for NCT | other | Qualcomm Inc. | R1-71 | - | [WTS] [JSN] | |||
| R1-125118 | Design aspects of NCT | other | Qualcomm Inc. | R1-71 | - | [WTS] [JSN] | |||
| R1-125119 | Further downlink MIMO enhancement for LTE-advanced | other | Qualcomm Inc. | R1-71 | - | [WTS] [JSN] | |||
| R1-125120 | Coverage enhancement techniques for MTC | other | Qualcomm Inc. | R1-71 | - | [WTS] [JSN] | |||
| R1-125121 | System evaluation for MTC coverage | other | Qualcomm Inc. | R1-71 | - | [WTS] [JSN] | |||
| R1-125122 | UL Interference for carrier-based Hetnet ICIC | other | Qualcomm Inc. | R1-71 | - | [WTS] [JSN] | |||
| R1-125123 | DL Interference mitigation for carrier-based HetNet ICIC | other | Qualcomm Inc. | R1-71 | - | [WTS] [JSN] | |||
| R1-125124 | Operational carrier selection for carrier-based ICIC | other | Qualcomm Inc. | R1-71 | - | [WTS] [JSN] | |||
| R1-125125 | Remaining details for HARQ timing of PUSCH with cross-scheduling | other | Potevio | R1-71 | - | [WTS] [JSN] | |||
| R1-125126 | 25.214 CR0697 (Rel-11, F) Clarification to the procedure of NodeB Triggered HS-DPCCH | CR | Huawei, HiSilicon | R1-71 | - | [WTS] [JSN] | |||
| R1-125127 | Initial activation status of scheduled non-precoded pilots | other | Huawei, HiSilicon | R1-71 | - | [WTS] [JSN] | |||
| R1-125128 | Remaining details of HS-DPCCH for 4-branch MIMO with Multi-Carrier | other | Huawei, HiSilicon | R1-71 | - | [WTS] [JSN] | |||
| R1-125129 | CR review for DL MIMO | other | Huawei, HiSilicon | R1-71 | - | [WTS] [JSN] | |||
| R1-125130 | Maximum number of HS-SCCH orders for Multiflow | other | Huawei, HiSilicon | R1-71 | - | [WTS] [JSN] | |||
| R1-125131 | 25.214 CR0698 (Rel-11, F) Corrections to the Maximum Number of HS-SCCH Orders | CR | Huawei, HiSilicon | R1-71 | - | [WTS] [JSN] | |||
| R1-125132 | Summary of email discussions on simulation assumptions for HSPA Heterogeneous Networks | other | Huawei, HiSilicon | R1-71 | - | [WTS] [JSN] | |||
| R1-125133 | Initial simulation results for UL co-channel scenarios | other | Huawei, HiSilicon | R1-71 | - | [WTS] [JSN] | |||
| R1-125134 | Initial simulation results for DL co-channel scenarios | other | Huawei, HiSilicon | R1-71 | - | [WTS] [JSN] | |||
| R1-125135 | Considerations on Range Expansion | other | Huawei, HiSilicon | R1-71 | - | [WTS] [JSN] | |||
| R1-125136 | Macro NodeB muting for DL interference coordination | other | ZTE | R1-71 | - | [WTS] [JSN] | |||
| R1-125137 | Downlink performance evaluation for UMTS HetNet, co-channel case without CRE | other | ZTE | R1-71 | - | [WTS] [JSN] | |||
| R1-125138 | Views on how to handle collision between PSS/SSS and DM RS | other | CATR | R1-71 | - | [WTS] [JSN] | |||
| R1-125139 | Simulation results of further enhanced DL MIMO | other | CATR | R1-71 | - | [WTS] [JSN] | |||
| R1-125140 | Discussion on potential solutions for low-cost MTC UEs 20dB coverage enhancement | other | CATR | R1-71 | - | [WTS] [JSN] | |||
| R1-125141 | Text proposal on PUSCH DMRS generation for RACH msg3 | other | Sharp | R1-71 | - | [WTS] [JSN] | |||
| R1-125142 | DCI signalling in DCI format 2D and fallback operation in TM10 | other | Sharp | R1-71 | - | [WTS] [JSN] | |||
| R1-125143 | Details of association between DM-RS ports and EPDCCH | other | Sharp | R1-71 | - | [WTS] [JSN] | |||
| R1-125144 | Remaining aspects of PUCCH resource for EPDCCH | other | Sharp | R1-71 | - | [WTS] [JSN] | |||
| R1-125145 | Remaining details of eCCE and eREG mapping for EPDCCH | other | Motorola Mobility | R1-71 | - | [WTS] [JSN] | |||
| R1-125146 | Remaining details of EPDCCH Search Space | other | Motorola Mobility | R1-71 | - | [WTS] [JSN] | |||
| R1-125147 | Handling of DCI formats with EPDCCH | other | Motorola Mobility | R1-71 | - | [WTS] [JSN] | |||
| R1-125148 | Extended Coverage Mode for LTE | other | Motorola Mobility | R1-71 | - | [WTS] [JSN] | |||
| R1-125149 | PSS/SSS Placement in New Carrier Type | other | Motorola Mobility | R1-71 | - | [WTS] [JSN] | |||
| R1-125150 | Discussion on the number of CSI processes supported for CoMP with CA | other | Huawei, HiSilicon | R1-71 | - | [WTS] [JSN] | |||
| R1-125151 | Resource allocation for EPDCCH sets | other | Huawei, HiSilicon | R1-71 | - | [WTS] [JSN] | |||
| R1-125152 | Number of blind decoding assignment | other | Huawei, HiSilicon | R1-71 | - | [WTS] [JSN] | |||
| R1-125153 | EPDCCH search space design | other | Huawei, HiSilicon | R1-71 | - | [WTS] [JSN] | |||
| R1-125154 | Fallback operation for EPDCCH | other | Huawei, HiSilicon | R1-71 | - | [WTS] [JSN] | |||
| R1-125155 | PUCCH ACK/NACK resource determination for EPDCCH | other | Huawei, HiSilicon | R1-71 | - | [WTS] [JSN] | |||
| R1-125156 | Scenarios and use cases for NCT | other | Huawei, HiSilicon | R1-71 | - | [WTS] [JSN] | |||
| R1-125157 | Overview of non-standalone NCT design | other | Huawei, HiSilicon | R1-71 | - | [WTS] [JSN] | |||
| R1-125158 | PSS/SSS and DMRS collision and NCT identification | other | Huawei, HiSilicon | R1-71 | - | [WTS] [JSN] | |||
| R1-125159 | Aspects of the synchronized carrier case | other | Huawei, HiSilicon | R1-71 | - | [WTS] [JSN] | |||
| R1-125160 | On the backwards compatibility of the new carrier type | other | Huawei, HiSilicon | R1-71 | - | [WTS] [JSN] | |||
| R1-125161 | Uplink new carrier type - channel sounding issues | other | Huawei, HiSilicon | R1-71 | - | [WTS] [JSN] | |||
| R1-125162 | Identification of reasons for diverse evaluation results in the SI | other | Huawei, HiSilicon | R1-71 | - | [WTS] [JSN] | |||
| R1-125163 | Further considerations on reduction of maximum bandwidth for low cost MTC | other | Huawei, HiSilicon | R1-71 | - | [WTS] [JSN] | |||
| R1-125164 | On Release-11 PDSCH RE mapping and quasi-co-location behaviors | other | ETRI | R1-71 | - | [WTS] [JSN] | |||
| R1-125165 | Considerations on Scalable Bandwidth Support for UMTS FDD | other | China Unicom | R1-71 | - | [WTS] [JSN] | |||
| R1-125166 | Introduction of Scalable Bandwidth Support for UMTS FDD | other | China Unicom | R1-71 | - | [WTS] [JSN] | |||
| R1-125167 | 25.211 CR0302 (Rel-8, F) Removal of the relative amplitude weighting factor between EAI and AI | CR | ZTE | R1-71 | - | [WTS] [JSN] | |||
| R1-125168 | 25.211 CR0303 (Rel-9, A) Removal of the relative amplitude weighting factor between EAI and AI | other | ZTE | R1-71 | - | [WTS] [JSN] | |||
| R1-125169 | 25.211 CR0304 (Rel-10, A) Removal of the relative amplitude weighting factor between EAI and AI | other | ZTE | R1-71 | - | [WTS] [JSN] | |||
| R1-125170 | 25.211 CR0305 (Rel-11, A) Removal of the relative amplitude weighting factor between EAI and AI | CR | ZTE | R1-71 | - | [WTS] [JSN] | |||
| R1-125171 | Remaining details for HARQ timing of PUSCH with cross-scheduling | other | Potevio | R1-71 | - | [WTS] [JSN] | |||
| R1-125172 | 25.214CR0694r1 (Rel-11, F) Multiflow Out-of-sync handling | CR | Nokia Siemens Networks | R1-71 | - | [WTS] [JSN] | |||
| R1-125173 | 25.211CR0306 (Rel-11, F), Clarifications and corrections to HSDPA Multiflow | CR | Nokia Siemens Networks, Qualcomm Incorporated | R1-71 | - | [WTS] [JSN] | |||
| R1-125174 | 25.212CR0317 (Rel-11, F), Clarifications and corrections to HSDPA Multiflow | CR | Nokia Siemens Networks, Qualcomm Incorporated | R1-71 | - | [WTS] [JSN] | |||
| R1-125175 | 25.214CR0699 (Rel-11, F), Clarifications and corrections to HSDPA Multiflow | CR | Nokia Siemens Networks, Qualcomm Incorporated | R1-71 | - | [WTS] [JSN] | |||
| R1-125176 | 25.211CR0296r4 (Rel-11,B), Introduction of UL MIMO with 64QAM | CR | Nokia Siemens Networks, Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, Ericsson, HiSilicon, Huawei, InterDigital Communications LLC, Qualcomm Incorporated, Renesas Mobile Europe Ltd, Research in Motion, ST-Ericsson, ZTE | R1-71 | - | [WTS] [JSN] | |||
| R1-125177 | 25.212CR0312r4 (Rel-11, B), Introduction of UL MIMO with 64QAM | CR | Nokia Siemens Networks, Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, Ericsson, HiSilicon, Huawei, InterDigital Communications LLC, Qualcomm Incorporated, Renesas Mobile Europe Ltd, Research in Motion, ST-Ericsson, ZTE | R1-71 | - | [WTS] [JSN] | |||
| R1-125178 | 25.213CR0115r5 (Rel-11, B) Introduction of UL MIMO with 64QAM | CR | Nokia Siemens Networks, Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, Ericsson, HiSilicon, Huawei, InterDigital Communications LLC, Qualcomm Incorporated, Renesas Mobile Europe Ltd, Research in Motion, ST-Ericsson, ZTE | R1-71 | - | [WTS] [JSN] | |||
| R1-125179 | 25.214CR0688r4 (Rel-11, B), Introduction of UL MIMO with 64QAM | CR | Nokia Siemens Networks, Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, Ericsson, HiSilicon, Huawei, InterDigital Communications LLC, Qualcomm Incorporated, Renesas Mobile Europe Ltd, Research in Motion, ST-Ericsson, ZTE | R1-71 | - | [WTS] [JSN] | |||
| R1-125180 | Text proposal for HetNet deployment scenarios | other | Nokia Siemens Networks | R1-71 | - | [WTS] [JSN] | |||
| R1-125181 | On enhancements of CS voice services in UMTS | other | Nokia Siemens Networks | R1-71 | - | [WTS] [JSN] | |||
| R1-125182 | 25.211 CR0307 (Rel-11, F) Clarification of TTI Alignment | CR | Qualcomm Incorporated | R1-71 | - | [WTS] [JSN] | |||
| R1-125183 | 25.212 CR0318 (Rel-11, F) Clarification of HS-SCCH order information | CR | Qualcomm Incorporated | R1-71 | - | [WTS] [JSN] | |||
| R1-125184 | 25.214 CR0700 (Rel-11, F) Clarification of the random access procedure for Concurrent TTI Deployment | CR | Qualcomm Incorporated | R1-71 | - | [WTS] [JSN] | |||
| R1-125185 | Boosting with UL 64QAM | other | Qualcomm Incorporated | R1-71 | - | [WTS] [JSN] | |||
| R1-125186 | Mobility issues in Co-channel Hetnet deployments | other | Qualcomm Incorporated | R1-71 | - | [WTS] [JSN] | |||
| R1-125187 | System Performance of Hetnets in co-channel deployments | other | Qualcomm Incorporated | R1-71 | - | [WTS] [JSN] | |||
| R1-125188 | Uplink Interference Issues and Solutions in Co-channel Scenarios | other | Qualcomm Incorporated | R1-71 | - | [WTS] [JSN] | |||
| R1-125189 | TP on Uplink Interference Issues in Co-channel Hetnet Scenarios | other | Qualcomm Incorporated | R1-71 | - | [WTS] [JSN] | |||
| R1-125190 | Uplink/Downlink Imbalance Issues and Solutions in Co-channel Scenarios | other | Qualcomm Incorporated | R1-71 | - | [WTS] [JSN] | |||
| R1-125191 | TP on Uplink/Downlink Imbalance Issues in Co-channel Hetnet Scenarios | other | Qualcomm Incorporated | R1-71 | - | [WTS] [JSN] | |||
| R1-125192 | Range Expansion in Multicarrier and Multiflow Deployments | other | Qualcomm Incorporated | R1-71 | - | [WTS] [JSN] | |||
| R1-125193 | TP on Range Expansion in Multicarrier and Multiflow Deployments | other | Qualcomm Incorporated | R1-71 | - | [WTS] [JSN] | |||
| R1-125194 | Flexible Bandwidth Usage for UMTS FDD | other | Qualcomm Incorporated | R1-71 | - | [WTS] [JSN] | |||
| R1-125195 | Coverage Enhancement for Low-cost MTC Ues | other | HTC | R1-71 | - | [WTS] [JSN] | |||
| R1-125196 | Outstanding Aspects of Antenna Ports Quasi Co-location | other | Ericsson, ST-Ericsson | R1-71 | - | [WTS] [JSN] | |||
| R1-125197 | Relation Between Configured ZP CSI-RS Resources and IMRs | other | Ericsson, ST-Ericsson | R1-71 | - | [WTS] [JSN] | |||
| R1-125198 | Details of PDSCH Resource Element Mapping | other | Ericsson, ST-Ericsson | R1-71 | - | [WTS] [JSN] | |||
| R1-125199 | Transmission of PDSCH in the First OFDM Symbol | other | Ericsson, ST-Ericsson | R1-71 | - | [WTS] [JSN] | |||
| R1-125200 | On Interference Measurements Based on CSI-IM | other | Ericsson, ST-Ericsson | R1-71 | - | [WTS] [JSN] | |||
| R1-125201 | Remaining Details of Joint Operation of CoMP and CA | other | Ericsson, ST-Ericsson | R1-71 | - | [WTS] [JSN] | |||
| R1-125202 | CSI Process Inheritance for Periodic Feedback Modes | other | Ericsson, ST-Ericsson | R1-71 | - | [WTS] [JSN] | |||
| R1-125203 | Correction to assumed CSI-RS transmissions in secondary cells | other | Ericsson, ST-Ericsson | R1-71 | - | [WTS] [JSN] | |||
| R1-125204 | Coverage Extenssion for MTC UEs | other | General Dynamics Broadband | R1-71 | - | [WTS] [JSN] | |||
| R1-125205 | Requirements for coverage improvement to MTC devices | other | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | R1-71 | - | [WTS] [JSN] | |||
| R1-125206 | On UL Interference for CB ICIC | other | Ericsson | R1-71 | - | [WTS] [JSN] | |||
| R1-125207 | On operational carrier selection for CB ICIC | other | Ericsson | R1-71 | - | [WTS] [JSN] | |||
| R1-125208 | DRAFT Response LS on SCell Paging Configuration | other | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | R1-71 | - | [WTS] [JSN] | |||
| R1-125209 | Revision to 3GPP TR 36.888 to include aspects for of coverage improvement study. | other | Vodafone Group | R1-71 | - | [WTS] [JSN] | |||
| R1-125210 | Power scaling handling for Multi-RAB | other | Ericsson, ST-Ericsson | R1-71 | - | [WTS] [JSN] | |||
| R1-125211 | Correction to the Multiflow Channel Coding for HS-DPCCH | other | Ericsson, ST-Ericsson | R1-71 | - | [WTS] [JSN] | |||
| R1-125212 | 25.211 CR0297R4 (Rel-11, B) Introduction of 4Tx_HSDPA in 25.211 | CR | Ericsson | R1-71 | - | [WTS] [JSN] | |||
| R1-125213 | 25.212 CR0313R3 (Rel-11, B) Introduction of 4Tx_HSDPA in 25.212 | CR | Ericsson | R1-71 | - | [WTS] [JSN] | |||
| R1-125214 | 25.213 CR0116R4 (Rel-11, B) Introduction of 4Tx_HSDPA in 25.213 | CR | Ericsson | R1-71 | - | [WTS] [JSN] | |||
| R1-125215 | 25.214 CR0689R3 (Rel-11, B) Introduction of 4Tx_HSDPA in 25.214 | CR | Ericsson | R1-71 | - | [WTS] [JSN] | |||
| R1-125216 | Link Simulation Assumptions for Evaluating Heterogeneous Networks | other | Ericsson, ST-Ericsson | R1-71 | - | [WTS] [JSN] | |||
| R1-125217 | Performance Impact on Legacy UE with Co-Channel Deployment in Heterogeneous Networks | other | Ericsson, ST-Ericsson | R1-71 | - | [WTS] [JSN] | |||
| R1-125218 | Initial System Level Simulation Results with Co-Channel Deployment in Heterogeneous Networks | other | Ericsson, ST-Ericsson | R1-71 | - | [WTS] [JSN] | |||
| R1-125219 | Range Expansion in Co-Channel Deployment in Heterogeneous Networks | other | Ericsson, ST-Ericsson | R1-71 | - | [WTS] [JSN] | |||
| R1-125220 | Combined Cell Deployment Scenarios in Heterogeneous Networks | other | Ericsson, ST-Ericsson | R1-71 | - | [WTS] [JSN] | |||
| R1-125221 | Link Level Performance with Combined Cell in Heterogeneous Networks | other | Ericsson, ST-Ericsson | R1-71 | - | [WTS] [JSN] | |||
| R1-125222 | Uplink Performance with Combined Cell in Heterogeneous Networks | other | Ericsson, ST-Ericsson | R1-71 | - | [WTS] [JSN] | |||
| R1-125223 | On Control Channel Robustness for Heterogeneous Networks | other | Ericsson, ST-Ericsson | R1-71 | - | [WTS] [JSN] | |||
| R1-125224 | Remaining details of aperiodic CSI triggering | other | Texas Instruments | R1-71 | - | [WTS] [JSN] | |||
| R1-125225 | Location of PSS/SSS on the New Carrier Type | other | Texas Instruments | R1-71 | - | [WTS] [JSN] | |||
| R1-125226 | Considerations on Scalable Bandwidth Support for UMTS FDD | other | China Unicom, Huawei, HiSilicon | R1-71 | - | [WTS] [JSN] | |||
| R1-125227 | Resource Efficient Implicit PUCCH Resource Allocation for ePDCCH | other | Research In Motion UK Limited | R1-71 | - | [WTS] [JSN] | |||
| R1-125228 | draft CR for 36.212 for rel-11 | other | Huawei | R1-71 | - | [WTS] [JSN] | |||
| R1-125229 | draft CR for 36.213 for rel-11 | other | Motorola Mobility | R1-71 | - | [WTS] [JSN] | |||
| R1-125230 | 25.214CR0699r1 (Rel-11, F), Clarifications and corrections to HSDPA Multiflow | CR | Nokia Siemens Networks, Qualcomm Incorporated | R1-71 | - | [WTS] [JSN] | |||
| R1-125231 | Remaining details on PUCCH resource allocation for EPDCCH | other | Intel Corporation | R1-71 | - | [WTS] [JSN] | |||
| R1-125232 | Discussion on design of PSS and SSS for NCT | other | New Postcom | R1-71 | - | [WTS] [JSN] | |||
| R1-125233 | PUCCH resource for E-PDCCH | other | CATT | R1-71 | - | [WTS] [JSN] | |||
| R1-125234 | ePDCCH Blind decoding | other | Ericsson, ST-Ericsson | R1-71 | - | [WTS] [JSN] | |||
| R1-125235 | ePDCCH Search Space | other | Ericsson, ST-Ericsson | R1-71 | - | [WTS] [JSN] | |||
| R1-125236 | Configuration of ePDCCH resources | other | Ericsson, ST-Ericsson | R1-71 | - | [WTS] [JSN] | |||
| R1-125237 | On synchronised new carriers | other | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, AT&T | R1-71 | - | [WTS] [JSN] | |||
| R1-125238 | On association between DM-RS ports and EPDCCH transmission | other | ZTE | R1-71 | - | [WTS] [JSN] | |||
| R1-125239 | Low-cost MTC Traffic Models and Characteristics | other | Fujitsu | R1-71 | - | [WTS] [JSN] | |||
| R1-125240 | Details on antenna port association for EPDCCH | other | LG Electronics | R1-71 | - | [WTS] [JSN] | |||
| R1-125241 | PUCCH A/N resource allocation for EPDCCH | other | LG Electronics | R1-71 | - | [WTS] [JSN] | |||
| R1-125242 | DCI signalling in DCI format 2D and fallback operation in TM10 | other | Sharp | R1-71 | - | [WTS] [JSN] | |||
| R1-125243 | Draft_CR(36.213 Rel-8 CatF) correction on UE procedure for reporting HARQ-ACK | other | Intel Corporation | R1-71 | - | [WTS] [JSN] | |||
| R1-125244 | Frequency hopping for unsynchronized new carrier type TRS | other | New Postcom | R1-71 | - | [WTS] [JSN] | |||
| R1-125245 | On collision between DM RS and PSS/SSS in new carrier | other | Intel Corporation | R1-71 | - | [WTS] [JSN] | |||
| R1-125246 | Draft CR for TS36.300 on Introduction of CoMP | other | Samsung, Fujitsu, CHTTL, Alcatel Lucent, Alcatel-Lucent Shanghai Bell, Ericsson, ST-Ericsson, Huawei, HiSilicon | R1-71 | - | [WTS] [JSN] | |||
| R1-125247 | Analysis of coverage improvement for low-cost MTC LTE UEs | other | CATT | R1-71 | - | [WTS] [JSN] | |||
| R1-125248 | Remaining details for quasi co-location behavior | other | NTT DOCOMO | R1-71 | - | [WTS] [JSN] | |||
| R1-125249 | Remaining details on PDSCH rate matching behaviour | other | ZTE | R1-71 | - | [WTS] [JSN] | |||
| R1-125250 | Remaining details of downlink control signalling for DL CoMP | other | ZTE | R1-71 | - | [WTS] [JSN] | |||
| R1-125251 | On power scaling in Multi-RAB | other | Ericsson, ST-Ericsson | R1-71 | - | [WTS] [JSN] | |||
| R1-125252 | Parallel SRS transmission in multiple TA | other | Pantech | R1-71 | - | [WTS] [JSN] | |||
| R1-125253 | Way Forward on PDCCH order for Scell | other | LG Electronics, Panasonic, Texas Instruments | R1-71 | - | [WTS] [JSN] | |||
| R1-125254 | Proposed procedure to decide BD trials | other | Panasonic | R1-71 | - | [WTS] [JSN] | |||
| R1-125255 | Release 11 Feature Lists – Testing and Certification Aspects | other | RAN5, NTT DoCoMo | R1-71 | - | [WTS] [JSN] | |||
| R1-125256 | Reply LS on UE measurements in support of the two-stage MIMO OTA test method | other | RAN5, Agilent | R1-71 | - | [WTS] [JSN] | |||
| R1-125257 | Signaling quasi co-location between CRS and CSI-RS | other | Nokia Siemens Networks, Nokia | R1-71 | - | [WTS] [JSN] | |||
| R1-125258 | Way Forward on half duplex UEs for TDD inter-band CA in Rel-11 | other | CATT, CATR, CMCC, HiSilicon, Huawei, Intel, LGE, New Postcom, Nokia, Nokia Siemens Networks, Pantech, Potevio, RIM | R1-71 | - | [WTS] [JSN] | |||
| R1-125259 | 25.224 CR0272 (Rel-11, F) Clarification about the frequency on which UE initiates uplink synchronization in enhanced CELL_PCH state for 1.28Mcps TDD | CR | New Postcom, TD-TECH | R1-71 | - | [WTS] [JSN] | |||
| R1-125260 | 25.211 CR0308 (Rel-11, F) Correction to common E-RGCH | CR | Research In Motion UK Limited | R1-71 | - | [WTS] [JSN] | |||
| R1-125261 | 25.214 CR0697r1 (Rel-11, F) Clarification to the procedure of NodeB Triggered HS-DPCCH | CR | Huawei, HiSilicon | R1-71 | - | [WTS] [JSN] | |||
| R1-125262 | 25.211 CR0307r1 (Rel-11, F) Clarification of TTI Alignment | CR | Qualcomm Incorporated | R1-71 | - | [WTS] [JSN] | |||
| R1-125263 | 25.212 CR0318r1 (Rel-11, F) Clarification of HS-SCCH order information | CR | Qualcomm Incorporated | R1-71 | - | [WTS] [JSN] | |||
| R1-125264 | 25.214 CR0700r1 (Rel-11, F) Clarification of the random access procedure for Concurrent TTI Deployment | CR | Qualcomm Incorporated | R1-71 | - | [WTS] [JSN] | |||
| R1-125265 | 25.224 CR0272r2 (Rel 11, F), Clarification about the frequency on which UE initiates uplink synchronization in enhanced CELL_PCH state for 1.28Mcps TDD | CR | New Postcom, TD-TECH | R1-71 | - | [WTS] [JSN] | |||
| R1-125266 | 25.211 CR0297R5 (Rel-11, B) Introduction of 4Tx_HSDPA in 25.211 | CR | Ericsson | R1-71 | - | [WTS] [JSN] | |||
| R1-125267 | 25.212 CR0313R4 (Rel-11, B) Introduction of 4Tx_HSDPA in 25.212 | CR | Ericsson | R1-71 | - | [WTS] [JSN] | |||
| R1-125268 | 25.213 CR0116R5 (Rel-11, B) Introduction of 4Tx_HSDPA in 25.213 | CR | Ericsson | R1-71 | - | [WTS] [JSN] | |||
| R1-125269 | 25.214 CR0689R4 (Rel-11, B) Introduction of 4Tx_HSDPA in 25.214 | CR | Ericsson | R1-71 | - | [WTS] [JSN] | |||
| R1-125270 | 25.211CR0296r5 (Rel-11,B), Introduction of UL MIMO with 64QAM | CR | Nokia Siemens Networks, Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, Ericsson, HiSilicon, Huawei, InterDigital Communications LLC, Qualcomm Incorporated, Renesas Mobile Europe Ltd, Research in Motion, ST-Ericsson, ZTE | R1-71 | - | [WTS] [JSN] | |||
| R1-125271 | 25.212CR0312r5 (Rel-11, B), Introduction of UL MIMO with 64QAM | CR | Nokia Siemens Networks, Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, Ericsson, HiSilicon, Huawei, InterDigital Communications LLC, Qualcomm Incorporated, Renesas Mobile Europe Ltd, Research in Motion, ST-Ericsson, ZTE | R1-71 | - | [WTS] [JSN] | |||
| R1-125272 | 25.213CR0115r6 (Rel-11, B) Introduction of UL MIMO with 64QAM | CR | Nokia Siemens Networks, Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, Ericsson, HiSilicon, Huawei, InterDigital Communications LLC, Qualcomm Incorporated, Renesas Mobile Europe Ltd, Research in Motion, ST-Ericsson, ZTE | R1-71 | - | [WTS] [JSN] | |||
| R1-125273 | 25.214CR0688r5 (Rel-11, B), Introduction of UL MIMO with 64QAM | CR | Nokia Siemens Networks, Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, Ericsson, HiSilicon, Huawei, InterDigital Communications LLC, Qualcomm Incorporated, Renesas Mobile Europe Ltd, Research in Motion, ST-Ericsson, ZTE | R1-71 | - | [WTS] [JSN] | |||
| R1-125274 | 25.211CR0306r1 (Rel-11, F), Clarifications and corrections to HSDPA Multiflow | CR | Nokia Siemens Networks, Qualcomm Incorporated | R1-71 | - | [WTS] [JSN] | |||
| R1-125275 | 25.212CR0317r1 (Rel-11, F), Clarifications and corrections to HSDPA Multiflow | CR | Nokia Siemens Networks, Qualcomm Incorporated | R1-71 | - | [WTS] [JSN] | |||
| R1-125276 | 25.214CR0699r2 (Rel-11, F), Clarifications and corrections to HSDPA Multiflow | CR | Nokia Siemens Networks, Qualcomm Incorporated | R1-71 | - | [WTS] [JSN] | |||
| R1-125277 | 25.211 CR0305r1 (Rel-11, F) Removal of the relative amplitude weighting factor between EAI and AI | CR | ZTE | R1-71 | - | [WTS] [JSN] | |||
| R1-125278 | 21.214CR0697r2 (Rel-11, F) Clarification to the procedure of NodeB Triggered HS-DPCCH | CR | Huawei, HiSilicon | R1-71 | - | [WTS] [JSN] | |||
| R1-125279 | 25.214 CR0701 (Rel-11, F) Power scaling handling for Multi-RAB | other | Ericsson, ST-Ericsson | R1-71 | - | [WTS] [JSN] | |||
| R1-125280 | Chairman’s notes of the UTRA maintenance, Multiflow and MIMO with 64QAM for HSUPA sessions | other | HSPA session chairman (Nokia Siemens Networks) | R1-71 | - | [WTS] [JSN] | |||
| R1-125281 | Summary of 4-branch MIMO for HSPA session | other | HSPA session chairman (Huawei) | R1-71 | - | [WTS] [JSN] | |||
| R1-125282 | void | other | R1-71 | - | [WTS] [JSN] | ||||
| R1-125283 | void | other | R1-71 | - | [WTS] [JSN] | ||||
| R1-125284 | Discussion on further downlink MIMO enhancement | other | New Postcom | R1-71 | - | [WTS] [JSN] | |||
| R1-125285 | Way Forward on ECCE to EREG Mapping | other | LG Electronics, Panasonic, CATT, NTT DOCOMO, New Postcom, Huawei, HiSilicon, Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | R1-71 | - | [WTS] [JSN] | |||
| R1-125286 | Coverage improvement for low-cost MTC UEs based on LTE | other | Samsung | R1-71 | - | [WTS] [JSN] | |||
| R1-125287 | 36.211 CR0174 (Rel-10, F) Correction to assumed CSI-RS transmissions in secondary cells | CR | Ericsson, ST-Ericsson | R1-71 | - | [WTS] [JSN] | |||
| R1-125288 | 36.211 CR0175 (Rel-11, A) Correction to assumed CSI-RS transmissions in secondary cells | CR | Ericsson, ST-Ericsson | R1-71 | - | [WTS] [JSN] | |||
| R1-125289 | 36.214 CR0019 (Rel-11, F) Correcting inconsistency between inter-RAT UTRA measurements and requirements | CR | Ericsson, CATT, Renesas Mobile Europe Ltd, ST-Ericsson | R1-71 | - | [WTS] [JSN] | |||
| R1-125290 | Remaining details of eREG / eCCE definitions for EPDCCH | other | Nokia, Nokia Siemens Networks | R1-71 | - | [WTS] [JSN] | |||
| R1-125291 | Localized and distributed search spaces for EPDCCH | other | Nokia, Nokia Siemens Networks | R1-71 | - | [WTS] [JSN] | |||
| R1-125292 | Way Forward on Parallel reception of PDSCH on Scell and Msg2 on Pcell for Rel-11 | other | ZTE, Texas Instruments, Qualcomm, China Telecom, CATR, Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | R1-71 | - | [WTS] [JSN] | |||
| R1-125293 | TP for TS36.300 on Introduction of CoMP | other | Samsung, Fujitsu, CHTTL | R1-71 | - | [WTS] [JSN] | |||
| R1-125294 | Investigation of UL power control for carrier based ICIC | other | NTT DOCOMO | R1-71 | - | [WTS] [JSN] | |||
| R1-125295 | On Interference Measurements Based on CSI-IM | other | Ericsson, ST-Ericsson | R1-71 | - | [WTS] [JSN] | |||
| R1-125296 | [DRAFT] Response LS on Pcmax definition for the partial overlap period between different TAGs | other | Ericsson | R1-71 | - | [WTS] [JSN] | |||
| R1-125297 | Way Forwards on EPDCCH related to AI 6.2.3.3 | other | Ericsson, ST-Ericsson, Samsung, CATT, Qualcomm, New Postcom, Panasonic | R1-71 | - | [WTS] [JSN] | |||
| R1-125298 | Way Forward on Cross-Carrier scheduling of SCell under EPDCCH operation | other | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, Qualcomm, Ericsson, ST-Ericsson, Research in Motion, Panasonic, Mediatek | R1-71 | - | [WTS] [JSN] | |||
| R1-125299 | [Draft] LS on agreement of parallel reception of PDSCH on SCell and Msg 2 on Pcell | other | ZTE | R1-71 | - | [WTS] [JSN] | |||
| R1-125300 | On the need for CSI-RS – CRS quasi-co-location signalling | other | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | R1-71 | - | [WTS] [JSN] | |||
| R1-125301 | Outcome of Offline Discussions on Indication of PRB Pairs for an EPDCCH Set | other | Samsung | R1-71 | - | [WTS] [JSN] | |||
| R1-125302 | Way Forward on UE soft buffer handling for TDD inter-band CA with different UL-DL configurations | other | CATT, CATR, Ericsson, HiSilicon, Huawei , LG Electronics, Pantech, Potevio, Renesas Mobile Europe Ltd, ST-Ericsson | R1-71 | - | [WTS] [JSN] | |||
| R1-125303 | Way forward on dynamic PUCCH resource allocation for FDD EPDCCH | other | Alcatel Lucent, Alcatel Lucent Shanghai Bell, CATT, Interdigital, Intel, New Postcom, Nokia, Nokia Siemens Networks, Panasonic, Research In Motion, Samsung, Sharp, Texas Instruments | R1-71 | - | [WTS] [JSN] | |||
| R1-125304 | Way Forward for PUCCH resource allocation for EPDCCH in TDD | other | Nokia Siemens Networks, Nokia, Research In Motion, Samsung | R1-71 | - | [WTS] [JSN] | |||
| R1-125305 | Way Forward on PUSCH Case D | other | Samsung, CATR, CMCC, Intel, ITRI, Nokia, NSN, Potevio, Renesas | R1-71 | - | [WTS] [JSN] | |||
| R1-125306 | Way Forward on soft buffer handling | other | Samsung, CMCC, ITRI, New Postcom, Panasonic, ZTE | R1-71 | - | [WTS] [JSN] | |||
| R1-125307 | Way Forward on PDSCH mapping in relation to ZP CSI-RS resources and IMRs | other | LG Electronics, Alcatel-Lucent, Alcatel-Lucent Shanghai-Bell, CATT, CHTTL, Ericsson, ST-Ericsson, ETRI, Nokia, Nokia Siemens Networks, Texas Instruments, ZTE | R1-71 | - | [WTS] [JSN] | |||
| R1-125308 | Way Forward on fallback operation in TM10 | other | LG Electronics, Alcatel-Lucent, Alcatel-Lucent Shanghai-Bell, MediaTek, Nokia, Nokia Siemens Networks, Pantech, Qualcomm, Research In Motion | R1-71 | - | [WTS] [JSN] | |||
| R1-125309 | Way Forward on semi-persistent scheduling in TM10 | other | LG Electronics, ETRI, Intel, Samsung | R1-71 | - | [WTS] [JSN] | |||
| R1-125310 | TP to TR 36.888 for clause introduction, requirements and concepts | other | Vodafone Group | R1-71 | - | [WTS] [JSN] | |||
| R1-125311 | Way Forward on CSI-RS and CRS quasi co-location | other | NSN, Nokia, Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, Ericsson, ST-Ericsson, MediaTek, Qualcomm | R1-71 | - | [WTS] [JSN] | |||
| R1-125312 | TP on Simulation Assumptions for Evaluation of HSPA Heterogeneous Networks | other | Huawei | R1-71 | - | [WTS] [JSN] | |||
| R1-125313 | Way Forward on Quasi Co-location | other | NTT DOCOMO, I2R, Intel, Hitachi, Panasonic, SEQUANS, Fujitsu, NEC, Deutsche Telekom, CMCC, Nokia, NSN | R1-71 | - | [WTS] [JSN] | |||
| R1-125314 | Downlink Control Signaling for Rel. 11 CoMP | other | NTT DOCOMO | R1-71 | - | [WTS] [JSN] | |||
| R1-125315 | Way Forward on Downlink Control Signaling for DCI format 2D | other | NTT DOCOMO, ETRI, Hitachi, I2R, Intel, Sony Corporation | R1-71 | - | [WTS] [JSN] | |||
| R1-125316 | Way Forward on DCI signalling in format 2D for PDSCH RE mapping and quasi-co-location of CSI-RS and DMRS | other | ZTE, Huawei, Hi Silicon, Panasonic, Qualcomm, Samsung, Sharp | R1-71 | - | [WTS] [JSN] | |||
| R1-125317 | Way Forward on PDSCH RE mapping and rate matching for CoMP | other | Huawei, HiSilicon, Panasonic, Qualcomm | R1-71 | - | [WTS] [JSN] | |||
| R1-125318 | Reply LS on Multiflow Timing | other | RAN4, Nokia Siemens Networks | R1-71 | - | [WTS] [JSN] | |||
| R1-125319 | On UL Interference for CB ICIC | other | Ericsson, Kyocera | R1-71 | - | [WTS] [JSN] | |||
| R1-125320 | Way forward on half duplex operation for TDD inter-band CA with different UL-DL configurations | other | CATT | R1-71 | - | [WTS] [JSN] | |||
| R1-125321 | Way Forward on Downlink Control Signaling for PDSCH in TM10 | other | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, Nokia, Nokia Siemens Networks, Mediatek, Pantech, Renesas | R1-71 | - | [WTS] [JSN] | |||
| R1-125322 | Way Forward on Downlink Control Signaling for PDSCH when CIF is configured | other | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, Intel, Nokia, Nokia Siemens, NTT Docomo | R1-71 | - | [WTS] [JSN] | |||
| R1-125323 | Way forwards on EPDCCH blind decode split | other | Ericsson, ST-Ericsson, Huawei, HiSilicon, New Postcom, Renesas | R1-71 | - | [WTS] [JSN] | |||
| R1-125324 | Draft LS on RAN1 Endorsed CR for Introduction of CoMP in TS 36.300 | other | Samsung | R1-71 | - | [WTS] [JSN] | |||
| R1-125325 | Way Forward on triggering mechanism for a 1-bit CSI request field | other | Huawei, HiSilicon, Alcatel Lucent, Alcatel Lucent Shanghai Bell, Fujitsu, InterDigital, NEC, New Postcom, Nokia Siemens Networks, Nokia, Qualcomm, ZTE | R1-71 | - | [WTS] [JSN] | |||
| R1-125326 | Way Forward on multiplexing for aperiodic CSI feedback | other | Huawei, HiSilicon, Alcatel Lucent, Alcatel Lucent Shanghai Bell, Ericsson, Intel, NEC, Qualcomm, Samsung, ST-Ericsson, Texas Instruments | R1-71 | - | [WTS] [JSN] | |||
| R1-125327 | LS on RAN1 Endorsed CR for Introduction of CoMP in TS 36.300 | LS out | RAN1, Samsung | R1-71 | - | [WTS] [JSN] | |||
| R1-125328 | Way Forward on Reference Process for Periodic CSI | other | Samsung, ZTE, LG Electronics, InterDigital, Intel, ETRI, KT | R1-71 | - | [WTS] [JSN] | |||
| R1-125329 | Views on how to handle collision between PSS/SSS and DM RS | other | CATR | R1-71 | - | [WTS] [JSN] | |||
| R1-125330 | Way Forward on eCCE index mapping for PUCCH resource | other | ZTE, LGE, CATT, China Telecom | R1-71 | - | [WTS] [JSN] | |||
| R1-125331 | Way Forward on UE complexity handling for CoMP and CA | other | Huawei, HiSilicon | R1-71 | - | [WTS] [JSN] | |||
| R1-125332 | Draft LS on Additional Agreements on RRC Signaling for CoMP | other | Samsung | R1-71 | - | [WTS] [JSN] | |||
| R1-125333 | Way Forward on EPDCCH BD split | other | Panasonic, Samsung, LG Electronics | R1-71 | - | [WTS] [JSN] | |||
| R1-125334 | Investigation of UL power control for carrier based ICIC | other | NTT DOCOMO | R1-71 | - | [WTS] [JSN] | |||
| R1-125335 | PRB indication for EPDCCH | other | NTT DoCoMO, HTC, Huawei | R1-71 | - | [WTS] [JSN] | |||
| R1-125336 | Way Forward on CSI Process Definition | other | Samsung, Intel, Qualcomm, NEC, LG Electronics | R1-71 | - | [WTS] [JSN] | |||
| R1-125337 | 36.212 CR0142 (Rel-10, F) Correction to the parameter ue-category-v10xy | CR | New Postcom, NEC Group, Potevio | R1-71 | - | [WTS] [JSN] | |||
| R1-125338 | 36.212 CR0143 (Rel-11, A) Correction to the parameter ue-category-v10xy | CR | New Postcom, NEC Group, Potevio | R1-71 | - | [WTS] [JSN] | |||
| R1-125339 | 36.213 CR0392 (Rel-10, F) Correction to the parameter ue-category-v10xy | CR | New Postcom, NEC Group, Potevio | R1-71 | - | [WTS] [JSN] | |||
| R1-125340 | 36.213 CR0393 (Rel-11, A) Correction to the parameter ue-category-v10xy | CR | New Postcom, NEC Group, Potevio | R1-71 | - | [WTS] [JSN] | |||
| R1-125341 | Draft LS on Additional Agreements on RRC Signaling for CoMP | other | Samsung | R1-71 | - | [WTS] [JSN] | |||
| R1-125342 | Outcome of offline EPDCCH BD split | other | Offline rapporteur (Panasonic) | R1-71 | - | [WTS] [JSN] | |||
| R1-125343 | LS on signalling of PRB pairs in an EPDCCH set | other | RAN1, NTT DoCoMo | R1-71 | - | [WTS] [JSN] | |||
| R1-125344 | LS on signalling of PRB pairs in an EPDCCH set | LS out | RAN1, NTT DoCoMo | R1-71 | - | [WTS] [JSN] | |||
| R1-125345 | LS on signalling of the starting OFDM symbol and rate matching parameters for EPDCCH | LS out | RAN1, Alcatel-Lucent | R1-71 | - | [WTS] [JSN] | |||
| R1-125346 | Way Forward on rank inheritance between CSI Processes for Periodic CSI Modes | other | Ericsson, ST-Ericsson, Samsung, LGE | R1-71 | - | [WTS] [JSN] | |||
| R1-125347 | NCT and Band Filling | other | AT&T | R1-71 | - | [WTS] [JSN] | |||
| R1-125348 | Way Forward on CB-ICIC | other | Huawei, Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, Ericsson, HiSilicon, NTT DOCOMO, Qualcomm, Samsung, ST-Ericsson | R1-71 | - | [WTS] [JSN] | |||
| R1-125349 | Way Forward for PSS/SSS on NCT cells | other | Samsung | R1-71 | - | [WTS] [JSN] | |||
| R1-125350 | Way Forward on PSS/SSS Details | other | Intel, CATT, HTC, MediaTek, Hitachi, CATR, CMCC, New Postcom, Pantech | R1-71 | - | [WTS] [JSN] | |||
| R1-125351 | Way Forward on Synchronized Carrier | other | Intel, CMCC, Ericsson, ST-Ericsson, CATR, Texas Instruments, CATT, Mediatek, Nokia Siemens Networks, Nokia, Renesas Mobile Europe Ltd, Interdigital, KDDI, NEC, Qualcomm | R1-71 | - | [WTS] [JSN] | |||
| R1-125352 | Proposal on data service and latency for coverage enhancement study | other | Vodafone Group | R1-71 | - | [WTS] [JSN] | |||
| R1-125353 | LS on Additional Agreements on RRC Signaling for CoMP | LS out | RAN1, Samsung | R1-71 | - | [WTS] [JSN] | |||
| R1-125354 | Way Forward on DMRS and PSS/SSS collisions for NCT | other | Huawei, HiSilicon, Ericsson, ST-Ericsson, LGE, NTT DoCoMo, Texas Instruments | R1-71 | - | [WTS] [JSN] | |||
| R1-125355 | Way Forward on CB-ICIC LS reply to RAN3 | other | Nokia Siemens Networks, Nokia, DAC-UPC, Fujitsu, New Postcom | R1-71 | - | [WTS] [JSN] | |||
| R1-125356 | Outcome of offline discussion on the TBS determination | other | LGE | R1-71 | - | [WTS] [JSN] | |||
| R1-125357 | On New Carrier Type | other | Ericsson | R1-71 | - | [WTS] [JSN] | |||
| R1-125358 | 25.211 CR0297R6 (Rel-11, B) Introduction of 4Tx_HSDPA in 25.211 | CR | Ericsson | R1-71 | - | [WTS] [JSN] | |||
| R1-125359 | 25.212 CR0313R5 (Rel-11, B) Introduction of 4Tx_HSDPA in 25.212 | CR | Ericsson | R1-71 | - | [WTS] [JSN] | |||
| R1-125360 | 25.213 CR0116R6 (Rel-11, B) Introduction of 4Tx_HSDPA in 25.213 | CR | Ericsson | R1-71 | - | [WTS] [JSN] | |||
| R1-125361 | 25.214 CR0689R5 (Rel-11, B) Introduction of 4Tx_HSDPA in 25.214 | CR | Ericsson | R1-71 | - | [WTS] [JSN] | |||
| R1-125362 | Text proposal for TR 36.888 to align with the updated SID on low cost MTC | other | Huawei, HiSilicon | R1-71 | - | [WTS] [JSN] | |||
| R1-125363 | Text proposal for TR 36.888 on coverage improvement | other | Huawei, HiSilicon | R1-71 | - | [WTS] [JSN] | |||
| R1-125364 | Offline MTC discussion notes | other | Huawei | R1-71 | - | [WTS] [JSN] | |||
| R1-125365 | Way Forward on Synchronized Carrier in NCT | other | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, Huawei, HiSilicon, LG Electronics, New Postcom, Pantech, Sony Corporation, ZTE | R1-71 | - | [WTS] [JSN] | |||
| R1-125366 | Way Forward on Evaluation Assumptions for Downlink MIMO Enhancement | other | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, AT&T | R1-71 | - | [WTS] [JSN] | |||
| R1-125367 | Details on Search space and Aggregation Levels | other | LG Electronics | R1-71 | - | [WTS] [JSN] | |||
| R1-125368 | Way Forward on SPS PDSCH in TM10 | other | LG Electronics, Intel, Samsung | R1-71 | - | [WTS] [JSN] | |||
| R1-125369 | Way Forward on Quasi Co-location | other | NTT DOCOMO, I2R, Intel, Hitachi, Panasonic, SEQUANS, Fujitsu, NEC, Deutsche Telekom, CMCC, Nokia, NSN | R1-71 | - | [WTS] [JSN] | |||
| R1-125370 | Way Forward on Interference Averaging for CSI-IM | other | Renesas, Ericsson, ST-Ericsson, Texas Instruments, Interdigital, Huawei, HiSilicon, Samsung, AT&T, ZTE | R1-71 | - | [WTS] [JSN] | |||
| R1-125371 | Summary of CoMP QCL APs Session | other | Ad-hoc chairman (Ericsson) | R1-71 | - | [WTS] [JSN] | |||
| R1-125372 | Summary of carrier-based HetNet ICIC Session | other | Ad-hoc chairman (NTT DOCOMO) | R1-71 | - | [WTS] [JSN] | |||
| R1-125373 | Summary of CA TDD Session | other | Ad-hoc chairman (Samsung) | R1-71 | - | [WTS] [JSN] | |||
| R1-125374 | Summary of CoMP CSI Feedback Modes Session | other | Ad-hoc chairman (Samsung) | R1-71 | - | [WTS] [JSN] | |||
| R1-125375 | Summary of Low-cost MTC LTE UE Session | other | Ad-hoc chairman (NTT DOCOMO) | R1-71 | - | [WTS] [JSN] | |||
| R1-125376 | [DRAFT] LS on Possibility for Overlap between PDSCH and PDCCH Control Region | other | Ericsson | R1-71 | - | [WTS] [JSN] | |||
| R1-125377 | Search space equation offline results | other | Ad-hoc chairman (Panasonic) | R1-71 | - | [WTS] [JSN] | |||
| R1-125378 | WF on EPDCCH BD split | other | Huawei, HiSilicon, Ericsson, ST-Ericsson | R1-71 | - | [WTS] [JSN] | |||
| R1-125379 | Hashing function for localised ePDCCH | other | Nokia, Nokia Siemens Networks | R1-71 | - | [WTS] [JSN] | |||
| R1-125380 | Joint proposal on PUSCH rate matching with SRS | other | LG Electronics, CATT, Panasonic, Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, Qualcomm, Ericsson, ST-Ericsson, Intel Corporation | R1-71 | - | [WTS] [JSN] | |||
| R1-125381 | Simulations assumptions for SCH and data channel | other | Huawei, Ericsson, Qualcomm, MediaTek, CATT, LG Electronics, HiSilicon, ST-Ericsson | R1-71 | - | [WTS] [JSN] | |||
| R1-125382 | Outcome of Ad-hoc offline on PUCCH resource allocation for TDD | other | Ad-hoc chairman (NSN) | R1-71 | - | [WTS] [JSN] | |||
| R1-125383 | Draft LS response on carrier based ICIC | other | Huawei | R1-71 | - | [WTS] [JSN] | |||
| R1-125384 | Proposed changes on periodic RI-reference-process | other | CATT | R1-71 | - | [WTS] [JSN] | |||
| R1-125385 | Draft LS on Further Agreements on RRC Signaling for CoMP | other | Samsung | R1-71 | - | [WTS] [JSN] | |||
| R1-125386 | 36.213 CR0394 (Rel-10, F) Correction of reference signal scrambling sequence initialization for SPS in transmission mode 7 | CR | ASUSTeK, Intel, Samsung, NEC, Texas Instruments, Huawei, Hi-Silicon | R1-71 | - | [WTS] [JSN] | |||
| R1-125387 | LS on Further Agreements on RRC Signaling for CoMP | LS out | RAN1, Samsung | R1-71 | - | [WTS] [JSN] | |||
| R1-125388 | WF on UE capability for the joint operation of downlink CoMP and CA | other | Huawei, HiSilicon, Qualcomm, Samsung, Renesas | R1-71 | - | [WTS] [JSN] | |||
| R1-125389 | Draft LS on UE capability for the joint operation of downlink CoMP and CA | other | Huawei | R1-71 | - | [WTS] [JSN] | |||
| R1-125390 | Way Forward on antenna port association for EPDCCH | other | CATT | R1-71 | - | [WTS] [JSN] | |||
| R1-125391 | Way Forward on UE capability for CoMP with CA | other | LG Electronics, Nokia, Nokia Siemens Networks | R1-71 | - | [WTS] [JSN] | |||
| R1-125392 | LS on UE capability for the joint operation of downlink CoMP and CA | LS out | RAN1, Huawei | R1-71 | - | [WTS] [JSN] | |||
| R1-125393 | LS on Possibility for Overlap between PDSCH and PDCCH Control Region | LS out | RAN1, Ericsson | R1-71 | - | [WTS] [JSN] | |||
| R1-125394 | LS response on antenna ports co-location | LS out | RAN1, Ericsson | R1-71 | - | [WTS] [JSN] | |||
| R1-125395 | Response LS on Pcmax definition for the partial overlap period between different TAGs | LS out | RAN1, Ericsson | R1-71 | - | [WTS] [JSN] | |||
| R1-125396 | LS on agreement of parallel reception of PDSCH on SCell and Msg 2 on Pcell | LS out | RAN1, ZTE | R1-71 | - | [WTS] [JSN] | |||
| R1-125397 | 36.213 CR0395 (Rel-11, A) Correction of reference signal scrambling sequence initialization for SPS in transmission mode 7 | CR | ASUSTeK, Intel, Samsung, NEC, Texas Instruments, Huawei, Hi-Silicon | R1-71 | - | [WTS] [JSN] | |||
| R1-125398 | LS response on carrier based ICIC | LS out | RAN1, Huawei | R1-71 | - | [WTS] [JSN] | |||
| R1-125399 | 36.214 CR0019R1 (Rel-11, F) Correcting inconsistency between inter-RAT UTRA measurements and requirements | CR | Ericsson, CATT, Renesas Mobile Europe Ltd, ST-Ericsson | R1-71 | - | [WTS] [JSN] | |||
| R1-125400 | 25.201 CR0040 (Rel-11, B) Introduction of uplink MIMO and 64QAM | CR | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | R1-71 | - | [WTS] [JSN] | |||
| R1-125401 | 36.201 CR0007 (Rel-11, B) Introduction of Rel-11 features | CR | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | R1-71 | - | [WTS] [JSN] | |||
| R1-125402 | 36.211 CR0176 (Rel-11, C) Finalisation for introducing Rel-11 features | CR | Editor (Ericsson) | R1-71 | - | [WTS] [JSN] | |||
| R1-125403 | 36.212 CR0144 (Rel-11, C) Finalisation for introducing Rel-11 features | CR | Editor (Huawei) | R1-71 | - | [WTS] [JSN] | |||
| R1-125404 | 36.213 CR0396 (Rel-11, C) Finalisation for introducing Rel-11 features | CR | Editor (Motorola Mobility) | R1-71 | - | [WTS] [JSN] | |||
| R1-125405 | Conclusion of offline EPDCCH BD split | other | Offline rapporteur (Panasonic) | R1-71 | - | [WTS] [JSN] | |||
| R1-125406 | Text proposal for TR 36.888 to align with the updated SID on low cost MTC | other | Huawei (email rapporteur) | R1-71 | - | [WTS] [JSN] | |||
| R1-125407 | Link Simulation Assumptions for Modeling HS-DPCCH Performance | other | Qualcomm Incorporated | R1-71 | - | [WTS] [JSN] |
733 documents (1.2763328552246 seconds)