Please enter the search related information in the fields below. Partial information works, e.g. "SP-21
" in the "tdoc" field lists all TSG SA documents from 2021. Regular expressions mostly work in all fields (e.g. "2[34].501
" in the "Spec" field lists all documents related to 23.501 and 24.501. Capitalization is disregarded, i.e. "3GPP
" gives the same results as "3gpp
".
Download results in JSON format
tdoc | Title | Type / Revs | Source | Spec / CR | S/WID | Release | Meeting | Status | Links |
---|---|---|---|---|---|---|---|---|---|
GP-150672 | Draft Agenda for TSG GERAN #67 in Yinchuan, P. R. China | agenda | GERAN Chairman |
GP-67 AI: 2 |
approved | [WTS] [JSN] | |||
GP-150673 | Draft Agenda for TSG GERAN WG1 during TSG GERAN #67 in Yinchuan, P. R. China | agenda | GERAN WG1 Chairman |
GP-67 AI: 7.1.2 |
approved | [WTS] [JSN] | |||
GP-150674 | Draft Agenda for TSG GERAN WG2 during TSG GERAN #67 in Yinchuan, P. R. China (revised to GP-150706) |
agenda revised to GP-150706 |
GERAN WG2 Chairperson |
GP-67 AI: 7.2.2 |
revised | [WTS] [JSN] | |||
GP-150675 | Draft Agenda for TSG GERAN WG3new #67 (electronic meeting) | agenda | GERAN WG3 Chairman |
GP-67 AI: 7.3.2 |
approved | [WTS] [JSN] | |||
GP-150676 | CR 51.010-5-0144 Update for the latest version of TTCN (Rel-10) | CR | TF 160 | 51.010-5 10.13.0 CR#144 catF | TEI_Test | Rel-10 |
GP-67 AI: 8.3.2 |
approved | [WTS] [JSN] |
GP-150677 | CR 51.010-1-5074 47.4.1 APN Operator Identifier incorrect (Rel-12) | CR | ROHDE & SCHWARZ | 51.010-1 12.5.0 CR#5074 catF | TEI8_Test | Rel-12 |
GP-67 AI: 8.3.2 |
approved | [WTS] [JSN] |
GP-150678 | CR 51.010-7-0035 Corrections to the GANSS additional ionospheric model for A-BDS (Rel-12) | CR | CATR | 51.010-7 12.4.0 CR#35 catF | TEI12_Test | Rel-12 |
GP-67 AI: 8.3.2 |
approved | [WTS] [JSN] |
GP-150679 | CR 51.010-7-0036 Corrections to the IOD in GANSS Navigation Model for A-BDS Scenario #2 (Rel-12) | CR | CATR | 51.010-7 12.4.0 CR#36 catF | TEI12_Test | Rel-12 |
GP-67 AI: 8.3.2 |
approved | [WTS] [JSN] |
GP-150680 | CR 51.010-2-0860 Corrections to the condition definations of A-BDS (Rel-12) | CR | CATR | 51.010-2 12.5.0 CR#860 catF | TEI12_Test | Rel-12 |
GP-67 AI: 8.3.2 |
approved | [WTS] [JSN] |
GP-150681 | CR 51.010-2-0861 PICS applicability condition correction (Rel-12) | CR | ROHDE & SCHWARZ | 51.010-2 12.5.0 CR#861 catF | TEI8_Test | Rel-12 |
GP-67 AI: 8.3.2 |
approved | [WTS] [JSN] |
GP-150682 | LS on Way Forward to Test Optimisation |
LS in source LS: R5-151996 |
TSG RAN WG5 |
GP-67 AI: 7.3.4.1 |
noted | [WTS] [JSN] | |||
GP-150683 | CR 51.010-7-0037 Galileo and BDS updates and corrections (Rel-12) | CR | Spirent Communications | 51.010-7 12.4.0 CR#37 catF | TEI12_Test | Rel-12 |
GP-67 AI: 8.3.2 |
approved | [WTS] [JSN] |
GP-150684 | TSG GERAN WG3new#68 Electronic Meeting time schedule | other | TSG GERAN WG3 Chair |
GP-67 AI: 7.3.7 |
noted | [WTS] [JSN] | |||
GP-150685 | GERAN3#67 Chair's meeting report | report | TSG WG GERAN3 Chair |
GP-67 AI: 8.3.1 |
approved | [WTS] [JSN] | |||
GP-150686 | GERAN3#67 meeting report | report | ETSI Secretariat |
GP-67 AI: 8.3.1 |
noted | [WTS] [JSN] | |||
GP-150687 | Narrowband LTE Downlink Design (updated in GP-150844) |
other revised to GP-150844 |
Samsung Electronics Co., Ltd |
GP-67 AI: 7.1.5.3.5.7 |
revised | [WTS] [JSN] | |||
GP-150688 | Narrowband LTE Uplink Design (updated in GP-150845) |
other revised to GP-150845 |
Samsung Electronics Co., Ltd |
GP-67 AI: 7.1.5.3.5.7 |
revised | [WTS] [JSN] | |||
GP-150689 | Narrowband LTE MAC Design | other | Samsung Electronics Co., Ltd |
GP-67 AI: 7.2.5.3.4.7 |
noted | [WTS] [JSN] | |||
GP-150690 | pCR 45.820 Narrowband LTE (revised in GP-150846) |
pCR revised to GP-150846 |
Samsung Electronics Co., Ltd |
GP-67 AI: 7.1.5.3.5.7 |
revised | [WTS] [JSN] | |||
GP-150691 | pCR 45.820 Corrections to NB-CIoT – Energy consumption evaluation (revised in GP-150903) |
pCR revised to GP-150903 |
Neul Limited, u-blox AG, Huawei Technologies Co., Ltd., HiSilicon Technologies Co. Ltd, Qualcomm Incorporated |
GP-67 AI: 7.2.5.3.4.5 |
revised | [WTS] [JSN] | |||
GP-150692 | pCR TR45-820 - C-UNB - General Description (revised in GP-150910) |
pCR revised to GP-150910 |
SIGFOX |
GP-67 AI: 7.2.5.3.4.6 |
revised | [WTS] [JSN] | |||
GP-150693 | pCR TR45-820 - C-UNB - Physical Layer Design (revised in GP-150993) |
pCR revised to GP-150993 |
SIGFOX |
GP-67 AI: 7.1.5.3.5.6 |
revised | [WTS] [JSN] | |||
GP-150694 | pCR TR45-820 - C-UNB - Link Layer Aspects (revised in GP-150912) |
pCR revised to GP-150912 |
SIGFOX |
GP-67 AI: 7.2.5.3.4.6 |
revised | [WTS] [JSN] | |||
GP-150695 | pCR TR45-820 - C-UNB - Radio Resource Management (revised in GP-150923) |
pCR revised to GP-150923 |
SIGFOX |
GP-67 AI: 7.2.5.3.4.6 |
revised | [WTS] [JSN] | |||
GP-150696 | pCR TR45-820 - C-UNB - Latency Evaluation (revised in GP-150925) |
pCR revised to GP-150925 |
SIGFOX |
GP-67 AI: 7.2.5.3.4.6 |
revised | [WTS] [JSN] | |||
GP-150697 | pCR TR45-820 - C-UNB - Battery Life Evaluation (revised in GP-150914) |
pCR revised to GP-150914 |
SIGFOX |
GP-67 AI: 7.2.5.3.4.6 |
revised | [WTS] [JSN] | |||
GP-150698 | pCR TR45-820 - C-UNB - Capacity Evaluation (revised in GP-150916) |
pCR revised to GP-150916 |
SIGFOX |
GP-67 AI: 7.1.5.3.5.6 |
revised | [WTS] [JSN] | |||
GP-150699 | Narrowband LTE (NB-LTE) Cost/Complexity (updated in GP-150945) |
other revised to GP-150945 |
Sierra Wireless, S.A |
GP-67 AI: 7.1.5.3.5.7 |
revised | [WTS] [JSN] | |||
GP-150700 | Channel coding performance with different rate matching patterns (updated in GP-150847) |
other revised to GP-150847 |
LG Electronics Inc. |
GP-67 AI: 7.1.5.3.5.5 |
revised | [WTS] [JSN] | |||
GP-150701 | pCR to TR45.820, rate matching patterns | pCR | LG Electronics Inc. |
GP-67 AI: 7.1.5.3.5.5 |
noted | [WTS] [JSN] | |||
GP-150702 | Frequency re-use factor indication with PSCH | other | LG Electronics Inc. |
GP-67 AI: 7.1.5.3.5.5 |
noted | [WTS] [JSN] | |||
GP-150703 | On resource mapping of narrowband LTE based CioT (updated in GP-150876) |
other revised to GP-150876 |
ZTE Corporation |
GP-67 AI: 7.1.5.3.5.7 |
revised | [WTS] [JSN] | |||
GP-150704 | CR 43.013-0001 Introduction of Power Efficient Operation for MTC devices (Rel-13) |
CR revised to GP-150894 |
Ericsson LM | 43.013 12.0.0 CR#1 catB | eDRX_GSM | Rel-13 |
GP-67 AI: 7.1.5.2.1 |
revised | [WTS] [JSN] |
GP-150705 | CR 43.022-0034 Introduction of Power Efficient Operation (Rel-13) |
CR revised to GP-150895 |
Ericsson LM | 43.022 12.0.0 CR#34 catB | eDRX_GSM | Rel-13 |
GP-67 AI: 7.1.5.2.1 |
revised | [WTS] [JSN] |
GP-150706 | Draft Agenda for TSG GERAN WG2 during TSG GERAN #67 in Yinchuan, P. R. China (revision of GP-150674) |
agenda revision of GP-150674 |
GERAN WG2 Chairperson |
GP-67 AI: 7.2.2 |
approved | [WTS] [JSN] | |||
GP-150707 | Report of Ad-hoc GERAN1 meeting CIoT#3, version 0.0.2 | report | GERAN WG1 Secretary |
GP-67 AI: 7.1.3.1 |
approved | [WTS] [JSN] | |||
GP-150708 | C-UNB General Description (revision of GPC150588, revised in GP-150909) |
other revised to GP-150909 |
SIGFOX |
GP-67 AI: 7.2.5.3.4.6 |
revised | [WTS] [JSN] | |||
GP-150709 | C-UNB Downlink Physical Layer Design (revision of GPC150309) | other | SIGFOX |
GP-67 AI: 7.1.5.3.5 |
noted | [WTS] [JSN] | |||
GP-150710 | C-UNB Uplink Physical Layer Design (revision of GPC150601) | other | SIGFOX |
GP-67 AI: 7.1.5.3.5.6 |
noted | [WTS] [JSN] | |||
GP-150711 | C-UNB Link Layer Aspects (update of GPC150544, updated in GP-150911) |
other revised to GP-150911 |
SIGFOX |
GP-67 AI: 7.2.5.3.4.6 |
revised | [WTS] [JSN] | |||
GP-150712 | C-UNB Radio Resource management (revision of GPC150602, revised in GP-150922) |
other revised to GP-150922 |
SIGFOX |
GP-67 AI: 7.2.5.3.4.6 |
revised | [WTS] [JSN] | |||
GP-150713 | C-UNB Latency Evaluation (update of GPC150546, updated in GP-150924) |
other revised to GP-150924 |
SIGFOX |
GP-67 AI: 7.2.5.3.4.6 |
revised | [WTS] [JSN] | |||
GP-150714 | C-UNB Battery Life Evaluation (update of GPC150313, updated in GP-150913) |
other revised to GP-150913 |
SIGFOX |
GP-67 AI: 7.2.5.3.4.6 |
revised | [WTS] [JSN] | |||
GP-150715 | C-UNB Capacity Evaluation (update of GPC150312, updated in GP-150915) |
other revised to GP-150915 |
SIGFOX |
GP-67 AI: 7.2.5.3.4.6 |
revised | [WTS] [JSN] | |||
GP-150716 | G2-66 Meeting Report | report | MCC |
GP-67 AI: 7.2.3.1 |
approved | [WTS] [JSN] | |||
GP-150717 | TSG GERAN WG2 ad-hoc #3 on CIoT Meeting Report | report | MCC |
GP-67 AI: 7.2.3.1 |
approved | [WTS] [JSN] | |||
GP-150718 | Reply LS on Introduction of extended EARFCN value range in GERAN |
LS in source LS: C1-152463 |
TSG CT WG1 |
GP-67 AI: 7.2.4.1 |
noted | [WTS] [JSN] | |||
GP-150719 | LS on Establishment of new Focus Group on "IMT-2020" |
LS in source LS: COM13-LS107 |
ITU-T Study Group 13 |
GP-67 AI: 5.3 |
noted | [WTS] [JSN] | |||
GP-150720 | LIAISON STATEMENT TO EXTERNAL ORGANIZATIONS ON THE UPDATED SCHEDULE FOR RECOMMENDATION ITU-R M.1457 TO REVISION 13 |
LS in source LS: 5D_1042 |
ITU-R Working Party 5D |
GP-67 AI: 5.3 |
noted | [WTS] [JSN] | |||
GP-150721 | LS on Outstanding audio scenarios |
LS in source LS: GCF PAG-15-025r1 |
GCF PAG |
GP-67 AI: 5.3 |
noted | [WTS] [JSN] | |||
GP-150722 | Reply LS RAN assumptions from SA2 for FS_eDRX |
LS in source LS: R2-152917 |
TSG RAN WG2 |
GP-67 AI: 7.1.4.1 |
noted | [WTS] [JSN] | |||
GP-150723 | LS on architecture for Clean Slate CIOT |
LS in source LS: RP-151087 |
TSG RAN |
GP-67 AI: 7.1.4.1 |
noted | [WTS] [JSN] | |||
GP-150724 | LS on considerations for clean slate CIoT for Rel 13 |
LS in source LS: SP-150366 |
TSG SA |
GP-67 AI: 7.1.4.1 |
noted | [WTS] [JSN] | |||
GP-150725 | EC-GSM: Discussion on the need to start the specification work as soon as possible | other | ORANGE, TeliaSonera AB |
GP-67 AI: 7.1.5.3.5.1 |
noted | [WTS] [JSN] | |||
GP-150726 | pCR 45.820 NB-CIoT – MS Complexity Analysis (revision of GPC150576, revised in GP-150888) |
pCR revised to GP-150888 |
Neul Limited, u-blox AG, Huawei Technologies Co. Ltd., HiSilicon Technologies Co. Ltd, Qualcomm Incorporated |
GP-67 AI: 7.2.5.3.4.5 |
revised | [WTS] [JSN] | |||
GP-150727 | pCR 45.820 General considerations on device complexity | pCR | u-blox AG, Neul Limited |
GP-67 AI: 9.1 |
agreed | [WTS] [JSN] | |||
GP-150728 | pCR 45.820 NB-CIoT - Simulation Results for Coexistence with GSM (revised in GP-150860) |
pCR revised to GP-150860 |
Technologies Co., Ltd., HiSilicon Technologies Co. Ltd, Qualcomm Incorporated |
GP-67 AI: 7.1.5.3.5.5 |
revised | [WTS] [JSN] | |||
GP-150729 | pCR 45.820 NB-CIoT - Simulation Results for Coexistence with UTRA and E-UTRA | pCR | Huawei Technologies Co., Ltd., HiSilicon Technologies Co. Ltd |
GP-67 AI: 9.1 |
agreed | [WTS] [JSN] | |||
GP-150730 | NB-CIoT - Simulation Results for Coexistence with E-UTRA Using Alternative ACLR and ACS Assumptions | other | Huawei Technologies Co., Ltd., HiSilicon Technologies Co. Ltd |
GP-67 AI: 7.1.5.3.5.5 |
noted | [WTS] [JSN] | |||
GP-150731 | pCR 45.820 NB-CIoT - Simulation Results for Coexistence with E-UTRA Using Alternative ACLR and ACS Assumptions | pCR | Huawei Technologies Co., Ltd., HiSilicon Technologies Co. Ltd |
GP-67 AI: 9.1 |
agreed | [WTS] [JSN] | |||
GP-150732 | NB-CIoT - Downlink PAPR | other | Huawei Technologies Co., Ltd., HiSilicon Technologies Co. Ltd |
GP-67 AI: 7.1.5.3.5.5 |
noted | [WTS] [JSN] | |||
GP-150733 | pCR 45.820 NB-CIoT - PAPR Evaluations (revised in GP-150935) |
pCR revised to GP-150935 |
Huawei Technologies Co., Ltd., HiSilicon Technologies Co. Ltd |
GP-67 AI: 7.1.5.3.5.5 |
revised | [WTS] [JSN] | |||
GP-150734 | NB-CIoT - System Level Simulation for Capacity and Latency Evaluation | other | Huawei Technologies Co., Ltd., HiSilicon Technologies Co. Ltd |
GP-67 AI: 7.1.5.3.5 |
noted | [WTS] [JSN] | |||
GP-150735 | pCR 45.820 NB-CIoT - System Level Simulation for Capacity and Latency Evaluation (revised in GP-150940) |
pCR revised to GP-150940 |
Huawei Technologies Co., Ltd., HiSilicon Technologies Co. Ltd |
GP-67 AI: 7.1.5.3.5.5 |
revised | [WTS] [JSN] | |||
GP-150736 | NB-CIoT - Discussions on Frequency Reus | other | Huawei Technologies Co., Ltd., HiSilicon Technologies Co. Ltd |
GP-67 AI: 7.1.5.3.5.5 |
noted | [WTS] [JSN] | |||
GP-150737 | pCR 45.820 NB-CIoT - Evaluations of Frequency Reuse | pCR | Huawei Technologies Co., Ltd., HiSilicon Technologies Co. Ltd |
GP-67 AI: 7.1.5.3.5.5 |
noted | [WTS] [JSN] | |||
GP-150738 | NB-CIoT - Impacts to Legacy Base Stations | other | Huawei Technologies Co., Ltd., HiSilicon Technologies Co. Ltd |
GP-67 AI: 7.1.5.3.5.5 |
noted | [WTS] [JSN] | |||
GP-150739 | pCR 45.820 NB-CIoT - Impacts to Legacy Base Stations (revised in GP-150937) |
pCR revised to GP-150937 |
Huawei Technologies Co., Ltd., HiSilicon Technologies Co. Ltd |
GP-67 AI: 7.1.5.3.5.5 |
revised | [WTS] [JSN] | |||
GP-150740 | NB-CIoT - Proposed Conclusion for the Cellular IoT SI (updated in GP-150905) |
other revised to GP-150905, GP-150986 |
Huawei Technologies Co., Ltd., HiSilicon Technologies Co. Ltd |
GP-67 AI: 7.1.5.3.5.5 |
revised | [WTS] [JSN] | |||
GP-150741 | pCR 45.820 NB-CIoT - Proposed Conclusion for the Cellular IoT SI (updated in GP-150906) |
pCR revised to GP-150906 |
Huawei Technologies Co., Ltd., HiSilicon Technologies Co. Ltd |
GP-67 AI: 7.1.5.3.5.5 |
revised | [WTS] [JSN] | |||
GP-150742 | EC-GSM - Impacts to Legacy Base Stations | other | Huawei Technologies Co., Ltd., HiSilicon Technologies Co. Ltd |
GP-67 AI: 7.1.5.3.5.1 |
noted | [WTS] [JSN] | |||
GP-150743 | Procedures of Synchronization for Paging | other | Huawei Technologies Co., Ltd., HiSilicon Technologies Co., Ltd, Neul Limited |
GP-67 AI: 7.2.5.3.3.2 |
noted | [WTS] [JSN] | |||
GP-150744 | pCR 45.820 Procedures of Synchronization for Paging (revised in GP-150951) |
pCR revised to GP-150951 |
Huawei Technologies Co., Ltd., HiSilicon Technologies Co., Ltd, Neul Limited |
GP-67 AI: 7.2.5.3.4.7 |
revised | [WTS] [JSN] | |||
GP-150745 | CR 44.018-1022 Introduction of Event-triggered Neighbour Cell Measurement in Idle Mode (Rel 13) | CR | Huawei Technologies Co., Ltd., HiSilicon Technologies Co. Ltd | 44.018 12.6.0 CR#1022 catB | eDRX_GSM | Rel-13 |
GP-67 AI: 7.2.5.3.3.2 |
postponed | [WTS] [JSN] |
GP-150746 | CR 45.008-0625 Introduction of Event-triggered Neighbour Cell Measurement in Idle Mode (Rel 13) |
CR revised to GP-150848 |
Huawei Technologies Co., Ltd., HiSilicon Technologies Co., Ltd | 45.008 12.4.0 CR#625 catB | eDRX_GSM | Rel-13 |
GP-67 AI: 7.1.5.2.1 |
revised | [WTS] [JSN] |
GP-150747 | NB-CIoT – Examples of message flows | other | Neul Limited, Huawei Technologies Co., Ltd., HiSilicon Technologies Co., Ltd |
GP-67 AI: 7.2.5.3.4.5 |
noted | [WTS] [JSN] | |||
GP-150748 | pCR 45.820 NB CIoT - Link Layer: Examples of Message Flows (revised in GP-150901) |
pCR revised to GP-150901 |
Neul Limited, Huawei Technologies Co., Ltd., HiSilicon Technologies Co., Ltd |
GP-67 AI: 7.2.5.3.4.5 |
revised | [WTS] [JSN] | |||
GP-150749 | pCR 45.820 NB CIoT - Link Layer: Miscellaneous Corrections | pCR | Neul Limited, Huawei Technologies Co., Ltd., HiSilicon Technologies Co., Ltd, Qualcomm Incorporated |
GP-67 AI: 7.2.5.3.4.5 |
agreed | [WTS] [JSN] | |||
GP-150750 | Updates to the Technical Report TR 45.820 | other | VODAFONE Group Plc (Rapporteur) |
GP-67 AI: 6.4 |
agreed | [WTS] [JSN] | |||
GP-150751 | Telco#13 meeting report (revised in GP-150880) | report | VODAFONE Group Plc (Rapporteur) |
GP-67 AI: 6.4 |
revised | [WTS] [JSN] | |||
GP-150752 | Proposed Workplan update for Cellular IoT (FS_IoT_LC) | WI status report | VODAFONE Group Plc (Rapporteur) |
GP-67 AI: 6.4 |
agreed | [WTS] [JSN] | |||
GP-150753 | Potential Meeting Schedule for Normative Work following FS_IoT_LC | other | VODAFONE Group Plc (Rapporteur) |
GP-67 AI: 14.2 |
noted | [WTS] [JSN] | |||
GP-150754 | Draft WID proposal for clean slate for RAN TSG (updated in GP-150864) |
WID new revised to GP-150864 |
VODAFONE Group Plc |
GP-67 AI: 6.4 |
revised | [WTS] [JSN] | |||
GP-150755 | Correction to EC-GSM battery lifetime estimation | other | VODAFONE Group Plc (Rapporteur) |
GP-67 AI: 7.2.5.3.4.1 |
agreed | [WTS] [JSN] | |||
GP-150756 | EC-GSM, MAR periodic and network command system capacity evaluation (update of GPC150622) | other | Ericsson LM |
GP-67 AI: 7.1.5.3.5 |
noted | [WTS] [JSN] | |||
GP-150757 | pCR 45.820, MAR periodic and network command system capacity evaluation (revision of GPC15062, revised in GP-150898) |
pCR revised to GP-150898 |
Ericsson LM |
GP-67 AI: 7.1.5.3.5.1 |
revised | [WTS] [JSN] | |||
GP-150758 | EC-GSM, Software upgrade system evaluation | other | Ericsson LM |
GP-67 AI: 7.1.5.3.5.1 |
noted | [WTS] [JSN] | |||
GP-150759 | pCR 45.820, EC-GSM, Software upgrade system evaluation (revised in GP-150899) |
pCR revised to GP-150899 |
Ericsson LM |
GP-67 AI: 7.1.5.3.5.1 |
revised | [WTS] [JSN] | |||
GP-150760 | EC-GSM, Random access system capacity evaluation (update of GPC150491) | other | Ericsson LM |
GP-67 AI: 7.1.5.3.5.1 |
noted | [WTS] [JSN] | |||
GP-150761 | pCR 45.820, EC-GSM, Random access system capacity evaluation (update of GPC150632) | pCR | Ericsson LM |
GP-67 AI: 7.1.5.3.5.1 |
agreed | [WTS] [JSN] | |||
GP-150762 | EC-GSM, Link modeling methodology for EC-PDTCH capacity evaluations (update of GPC150441) | other | Ericsson LM |
GP-67 AI: 7.1.5.3.5 |
noted | [WTS] [JSN] | |||
GP-150763 | pCR 45.820, EC-GSM, Miscellaneous corrections and clarifications (revised in GP-150897) |
pCR revised to GP-150897 |
Ericsson LM |
GP-67 AI: 7.1.5.3.5.1 |
revised | [WTS] [JSN] | |||
GP-150764 | EC-GSM – Simulation Results for Coexistence with UTRA and EUTRA | other | Ericsson LM |
GP-67 AI: 7.1.5.3.5 |
noted | [WTS] [JSN] | |||
GP-150765 | pCR 45.820, EC-GSM – Simulation Results for Coexistence with UTRA and EUTRA (revised in GP-150900) |
pCR revised to GP-150900 |
Ericsson LM |
GP-67 AI: 7.1.5.3.5.1 |
revised | [WTS] [JSN] | |||
GP-150766 | EC-GSM, Conclusion to the TR (updated in GP-150918) |
other revised to GP-150918 |
Ericsson LM |
GP-67 AI: 7.1.5.3.5.1 |
revised | [WTS] [JSN] | |||
GP-150767 | pCR 45.820, EC-GSM, Conclusion to the TR (revised in GP-150919) |
pCR revised to GP-150919 |
Ericsson LM |
GP-67 AI: 7.1.5.3.5.1 |
revised | [WTS] [JSN] | |||
GP-150768 | New Work Item on Extended Coverage GSM (EC-GSM) for support of Cellular Internet of Things (revised in GP-150920) |
WID new revised to GP-150920 |
Ericsson LM, Intel, Gemalto N.V., MediaTek Inc., TeliaSonera AB, Sierra Wireless, S.A., Telit Communications S.p.A., ORANGE, Nokia Networks, Alcatel Lucent |
GP-67 AI: 7.2.5.3.4.1 |
revised | [WTS] [JSN] | |||
GP-150769 | EC-GSM, WI meeting schedule (updated in GP-151021) |
WI status report revised to GP-151021 |
Ericsson LM |
GP-67 AI: 14.1 |
revised | [WTS] [JSN] | |||
GP-150770 | CR 43.064-0088 Introduction of Power Efficient Operation (Rel-13) |
CR revised to GP-150891 |
Ericsson LM | 43.064 12.2.0 CR#88 catB | eDRX_GSM | Rel-13 |
GP-67 AI: 7.1.5.2.1 |
revised | [WTS] [JSN] |
GP-150771 | CR 44.018-1023 Introduction of Power Efficient Operation (Rel-13) |
CR revised to GP-150926 |
Ericsson LM | 44.018 12.6.0 CR#1023 catB | eDRX_GSM | Rel-13 |
GP-67 AI: 7.2.5.3.3.2 |
revised | [WTS] [JSN] |
GP-150772 | CR 44.060-1607 Introduction of Power Efficient Operation (Rel-13) |
CR revised to GP-150927 |
Ericsson LM | 44.060 12.5.0 CR#1607 catB | eDRX_GSM | Rel-13 |
GP-67 AI: 7.2.5.3.3.2 |
revised | [WTS] [JSN] |
GP-150773 | CR 45.002-0182 Introduction of Power Efficient Operation (Rel-13) |
CR revised to GP-150893 |
Ericsson LM | 45.002 12.4.0 CR#182 catB | eDRX_GSM | Rel-13 |
GP-67 AI: 7.1.5.2.1 |
revised | [WTS] [JSN] |
GP-150774 | CR 45.008-0624 Introduction of Power Efficient Operation (Rel-13) |
CR revised to GP-150865 |
Ericsson LM | 45.008 12.4.0 CR#624 catB | eDRX_GSM | Rel-13 |
GP-67 AI: 7.1.5.2.1 |
revised | [WTS] [JSN] |
GP-150775 | CR 48.018-0418 Introduction of Power Efficient Operation (Rel-13) |
CR revised to GP-150928 |
Ericsson LM | 48.018 12.4.0 CR#418 catB | eDRX_GSM | Rel-13 |
GP-67 AI: 7.2.5.3.3.2 |
revised | [WTS] [JSN] |
GP-150776 | CR 48.008-0406 Enhancements to CS/PS coordination in shared networks (Rel-13) | CR | Ericsson LM | 48.008 12.2.0 CR#406 catB | CSPS_Coord_GERAN | Rel-13 |
GP-67 AI: 7.2.5.3.5 |
postponed | [WTS] [JSN] |
GP-150777 | CR 48.018-0419 Enhancements to CS/PS coordination in shared networks (Rel-13) | CR | Ericsson LM | 48.018 12.4.0 CR#419 catB | CSPS_Coord_GERAN | Rel-13 |
GP-67 AI: 7.2.5.3.5 |
postponed | [WTS] [JSN] |
GP-150778 | Enhancements to CS/PS coordination in GERAN shared networks | other | Ericsson LM |
GP-67 AI: 7.2.5.3.5 |
noted | [WTS] [JSN] | |||
GP-150779 | Narrowband LTE – Concept description (updated in GP-150863) |
other revised to GP-150863 |
Ericsson LM, Nokia Networks, AT&T, Alcatel-Lucent, Alcatel-Lucent Shanghai Bell |
GP-67 AI: 6.4 |
revised | [WTS] [JSN] | |||
GP-150780 | Narrowband LTE – Broadcast channel design and performance | other | Ericsson LM, Nokia Networks |
GP-67 AI: 7.1.5.3.5 |
noted | [WTS] [JSN] | |||
GP-150781 | Narrowband LTE – Random access design | other | Ericsson LM, Nokia Networks |
GP-67 AI: 7.1.5.3.5.7 |
noted | [WTS] [JSN] | |||
GP-150782 | Narrowband LTE – PDSCH and PUSCH design and performance | other | Ericsson LM, Nokia Networks |
GP-67 AI: 7.1.5.3.5 |
noted | [WTS] [JSN] | |||
GP-150783 | Narrowband LTE – Cell search design | other | Ericsson LM, Nokia Networks |
GP-67 AI: 7.1.5.3.5 |
noted | [WTS] [JSN] | |||
GP-150784 | Narrowband LTE – DCI Concept | other | Ericsson LM, Nokia Networks |
GP-67 AI: 7.1.5.3.5.7 |
noted | [WTS] [JSN] | |||
GP-150785 | Narrowband LTE – Cell search performance evaluation | other | Ericsson LM, Nokia Networks |
GP-67 AI: 7.1.5.3.5 |
noted | [WTS] [JSN] | |||
GP-150786 | Narrowband LTE – Exception report latency evaluation (updated in GP-150942) |
other revised to GP-150942 |
Ericsson LM, Nokia Networks |
GP-67 AI: 7.1.5.3.5.7 |
revised | [WTS] [JSN] | |||
GP-150787 | Narrowband LTE – Battery lifetime evaluation (updated in GP-150943) |
other revised to GP-150943 |
Ericsson LM, Nokia Networks |
GP-67 AI: 7.1.5.3.5.7 |
revised | [WTS] [JSN] | |||
GP-150788 | Narrowband LTE – Random access performance evaluation | other | Ericsson LM, Nokia Networks |
GP-67 AI: 7.1.5.3.5.7 |
noted | [WTS] [JSN] | |||
GP-150789 | Narrowband LTE – (E)PDCCH coverage performance evaluation | other | Ericsson LM, Nokia Networks |
GP-67 AI: 7.1.5.3.5.7 |
noted | [WTS] [JSN] | |||
GP-150790 | pCR 45.820, Narrowband LTE – Introduction (revised in GP-150877) |
pCR revised to GP-150877 |
Ericsson LM, Nokia Networks |
GP-67 AI: 7.1.5.3.5.7 |
revised | [WTS] [JSN] | |||
GP-150791 | pCR 45.820, Narrowband LTE – Downlink physical layer design (revised in GP-150851) |
pCR revised to GP-150851 |
Ericsson LM, Nokia Networks |
GP-67 AI: 7.1.5.3.5.7 |
revised | [WTS] [JSN] | |||
GP-150792 | pCR 45.820, Narrowband LTE – Uplink physical layer design (revised in GP-150852) |
pCR revised to GP-150852 |
Ericsson LM, Nokia Networks |
GP-67 AI: 7.1.5.3.5.7 |
revised | [WTS] [JSN] | |||
GP-150793 | pCR 45.820, Narrowband LTE – (E)PCCCH design (revised in GP-150878) |
pCR revised to GP-150878 |
Ericsson LM, Nokia Networks |
GP-67 AI: 7.1.5.3.5.7 |
revised | [WTS] [JSN] | |||
GP-150794 | pCR 45.820, Narrowband LTE – Cell search design (revised in GP-150879) |
pCR revised to GP-150879 |
Ericsson LM, Nokia Networks |
GP-67 AI: 7.1.5.3.5.7 |
revised | [WTS] [JSN] | |||
GP-150795 | pCR 45.820, Narrowband LTE – Cell search performance evaluation (revised in GP-150961) |
pCR revised to GP-150961 |
Ericsson LM, Nokia Networks |
GP-67 AI: 7.1.5.3.5.7 |
revised | [WTS] [JSN] | |||
GP-150796 | pCR 45.820, Narrowband LTE – Exception report latency evaluation (revised in GP-150967) |
pCR revised to GP-150967 |
Ericsson LM, Nokia Networks |
GP-67 AI: 7.1.5.3.5.7 |
revised | [WTS] [JSN] | |||
GP-150797 | pCR 45.820, Narrowband LTE – Battery lifetime evaluation (revised in GP-150957) |
pCR revised to GP-150957 |
Ericsson LM, Nokia Networks |
GP-67 AI: 7.1.5.3.5.7 |
revised | [WTS] [JSN] | |||
GP-150798 | pCR 45.820, Narrowband LTE – Random access performance evaluation (revised in GP-150947) |
pCR revised to GP-150947 |
Ericsson LM, Nokia Networks |
GP-67 AI: 7.1.5.3.5.7 |
revised | [WTS] [JSN] | |||
GP-150799 | pCR 45.820, Narrowband LTE – Coverage performance evaluation (revised in GP-150873) |
pCR revised to GP-150873 |
Ericsson LM, Nokia Networks |
GP-67 AI: 7.1.5.3.5.7 |
revised | [WTS] [JSN] | |||
GP-150800 | On SCH coverage extension in GSM legacy systems | other | Friedrich-Alex-Universität |
GP-67 AI: 7.1.5.3.5.1 |
noted | [WTS] [JSN] | |||
GP-150801 | Proposed way forward for CIoT Clean Slate normative phase (updated in GP-150866) |
other revised to GP-150866 |
Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, Ericsson LM, MediaTek Inc., Panasonic Corporation, Sierra Wireless, S.A., ZTE Corporation, AT&T, Nokia Networks |
GP-67 AI: 6.4 |
revised | [WTS] [JSN] | |||
GP-150802 | New WID on “Low Complexity Radio Access Network for Cellular Internet of Things” (updated in GP-150867) |
WID new revised to GP-150867 |
Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, Ericsson LM, MediaTek Inc., Panasonic Corporation, Sierra Wireless, S.A., ZTE Corporation, AT&T, Nokia Networks |
GP-67 AI: 6.4 |
revised | [WTS] [JSN] | |||
GP-150803 | Reuse of LTE L2/L3 layers for Cellular IoT(updated in GP-150868) |
other revised to GP-150868 |
Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, Ericsson LM, MediaTek Inc., Panasonic Corporation, Sierra Wireless, S.A., ZTE Corporation, Nokia Networks |
GP-67 AI: 7.2.5.3.4.7 |
revised | [WTS] [JSN] | |||
GP-150804 | pCR to TR 45.820: Reuse of LTE L2/L3 layers for Cellular IoT (revised in GP-150934) |
pCR revised to GP-150934 |
Alcatel-Lucent |
GP-67 AI: 7.2.5.3.4.7 |
revised | [WTS] [JSN] | |||
GP-150805 | pCR to 45.820 – NB-CIOT- Miscellaneous corrections to section 7.3.2 | pCR | Qualcomm Incorporated, Neul Limited, Huawei Technologies Co., Ltd., HiSilicon Technologies Co., Ltd |
GP-67 AI: 7.1.5.3.5.5 |
agreed | [WTS] [JSN] | |||
GP-150806 | pCR to 45.820 - NB-CIOT- Idle mode procedures (revised in GP-150859) |
pCR revised to GP-150859 |
Qualcomm Incorporated, Deutsche Telekom AG |
GP-67 AI: 7.1.5.3.5.5 |
revised | [WTS] [JSN] | |||
GP-150807 | NB-CIoT- downlink system level simulation results | other | Qualcomm Incorporated |
GP-67 AI: 7.1.5.3.5.5 |
noted | [WTS] [JSN] | |||
GP-150808 | NB-CIoT - software update/reconfiguration simulation results | other | Qualcomm Incorporated |
GP-67 AI: 7.1.5.3.5.5 |
noted | [WTS] [JSN] | |||
GP-150809 | pCR to TR 45.820 –NB-CIoT - software update/reconfiguration simulation results | pCR | Qualcomm Incorporated |
GP-67 AI: 7.1.5.3.5.5 |
agreed | [WTS] [JSN] | |||
GP-150810 | pCR to TR 45.820 - NB CIoT - downlink physical layer design miscellaneous corrections | pCR | Qualcomm Incorporated, Neul Limited, Huawei Technologies Co., Ltd., HiSilicon Technologies Co., Ltd |
GP-67 AI: 7.1.5.3.5.5 |
withdrawn | [WTS] [JSN] | |||
GP-150811 | pCR to TR 45.820 - corrections to NB-CIoT latency evaluation (revised in GP-150938) |
pCR revised to GP-150938 |
Qualcomm Incorporated, Neul Limited, Huawei Technologies Co., Ltd., HiSilicon Technologies Co., Ltd |
GP-67 AI: 7.1.5.3.5.5 |
revised | [WTS] [JSN] | |||
GP-150812 | pCR to TR 45.820 - corrections to NB-CIoT downlink coverage performance | pCR | Qualcomm Incorporated |
GP-67 AI: 7.1.5.3.5.5 |
agreed | [WTS] [JSN] | |||
GP-150813 | NB-CIoT – on downlink PAPR | other | Qualcomm Incorporated |
GP-67 AI: 7.1.5.3.5.5 |
noted | [WTS] [JSN] | |||
GP-150814 | N-GSM: Throughput and Delay Analysis for Uplink Traffic Channel | other | Nokia Networks |
GP-67 AI: 7.1.5.3.5.2 |
noted | [WTS] [JSN] | |||
GP-150815 | pCR 45.820 – N-GSM, Coverage improvement performance for uplink traffic channel (revised in GP-150907) |
pCR revised to GP-150907 |
Nokia Networks |
GP-67 AI: 7.2.5.3.4.2 |
revised | [WTS] [JSN] | |||
GP-150816 | N-GSM: Latency Analysis for Exception Report (updated in GP-150908) |
other revised to GP-150908 |
Nokia Networks |
GP-67 AI: 7.1.5.3.5.2 |
revised | [WTS] [JSN] | |||
GP-150817 | pCR 45.820 – N-GSM, Latency Analysis for Exception Report (revised in GP-150886) |
pCR revised to GP-150886 |
Nokia Networks |
GP-67 AI: 7.1.5.3.5 |
revised | [WTS] [JSN] | |||
GP-150818 | N-GSM: Design and Performance for N-SCH (updated in GP-150968) |
other revised to GP-150968 |
Nokia Networks |
GP-67 AI: 7.1.5.3.5.2 |
revised | [WTS] [JSN] | |||
GP-150819 | pCR 45.820 – N-GSM, Network Synchronisation, Performance Evaluation (revised in GP-150885) |
pCR revised to GP-150885 |
Nokia Networks |
GP-67 AI: 7.1.5.3.5 |
revised | [WTS] [JSN] | |||
GP-150820 | N-GSM: Design and performance for N-BCCH | other | Nokia Networks |
GP-67 AI: 7.1.5.3.5.2 |
noted | [WTS] [JSN] | |||
GP-150821 | pCR 45.820 – N-GSM, System Information and Acquisition | pCR | Nokia Networks |
GP-67 AI: 7.1.5.3.5.2 |
agreed | [WTS] [JSN] | |||
GP-150822 | N-GSM: Impact to legacy GSM/EDGE Base Stations (updated in GP-150969) |
other revised to GP-150969 |
Nokia Networks |
GP-67 AI: 7.1.5.3.5.2 |
revised | [WTS] [JSN] | |||
GP-150823 | pCR 45.820 – N-GSM, Impacts to GSM/EDGE Base Station hardware (revised in GP-150887) |
pCR revised to GP-150887 |
Nokia Networks |
GP-67 AI: 7.1.5.3.5 |
revised | [WTS] [JSN] | |||
GP-150824 | pCR 45.820 – EC-GSM, Device complexity | pCR | MediaTek Inc., Intel, Sierra Wireless S.A., Ericsson LM |
GP-67 AI: 9.1 |
agreed | [WTS] [JSN] | |||
GP-150825 | pCR to TR 45.820 - NB-CIoT Changes to downlink common control channel | pCR | Qualcomm Incorporated |
GP-67 AI: 7.1.5.3.5.5 |
agreed | [WTS] [JSN] | |||
GP-150826 | pCR 45.820, Narrowband LTE – Link layer, Scheduling (revised in GP-150964) |
pCR revised to GP-150964 |
Ericsson LM |
GP-67 AI: 7.1.5.3.5.7 |
revised | [WTS] [JSN] | |||
GP-150827 | Narrowband LTE – Conclusion | other | Ericsson LM |
GP-67 AI: 7.1.5.3.5.7 |
noted | [WTS] [JSN] | |||
GP-150828 | pCR 45.820, Narrowband LTE – Conclusion | pCR | Ericsson LM |
GP-67 AI: 9.1 |
noted | [WTS] [JSN] | |||
GP-150829 | Operator requirements on network sharing, cell barring and access control for "clean slate CIoT" systems | other | Deutsche Telekom AG |
GP-67 AI: 7.2.5.3.4.7 |
noted | [WTS] [JSN] | |||
GP-150830 | Random Access Channel Performance of CS-NB CIoT Solutions | other | Intel |
GP-67 AI: 7.1.5.3.5.5 |
noted | [WTS] [JSN] | |||
GP-150831 | Views on the Pilot Designs for Downlink CS-NB-CIoT Systems | other | Intel |
GP-67 AI: 7.1.5.3.5.5 |
noted | [WTS] [JSN] | |||
GP-150832 | UL System Level Simulation Results of GERAN CIoT Solutions: EC-GSM | other | Intel |
GP-67 AI: 7.1.5.3.5.1 |
noted | [WTS] [JSN] | |||
GP-150833 | DL System Level Simulation Results of GERAN CIoT Solutions: EC-GSM | other | Intel |
GP-67 AI: 7.1.5.3.5.1 |
noted | [WTS] [JSN] | |||
GP-150834 | pCR TR 45.820 – EC-GSM, Downlink and Uplink System Level Simulation Results (revised in GP-150931) |
pCR revised to GP-150931 |
Intel |
GP-67 AI: 7.1.5.3.5.1 |
revised | [WTS] [JSN] | |||
GP-150835 | GERAN CIoT Link-to-System Mapping Methodology | other | Intel |
GP-67 AI: 7.1.5.3.5.1 |
noted | [WTS] [JSN] | |||
GP-150836 | Reducing Signaling and Connection Setup Related Overheads for EC-GSM Devices | other | Intel |
GP-67 AI: 7.2.5.3.4.1 |
noted | [WTS] [JSN] | |||
GP-150837 | Ready State DRX for Cellular IoT | other | Intel |
GP-67 AI: 7.2.5.3.4.1 |
noted | [WTS] [JSN] | |||
GP-150838 | pCR TR 45.820 – EC-GSM, Ready State DRX for Cellular IoT | pCR | Intel |
GP-67 AI: 7.2.5.3.4.1 |
noted | [WTS] [JSN] | |||
GP-150839 | Draft TR 43.869 GERAN Study on Power Saving for MTC Devices v. 1.3.0 for FS_UPoD | draft TR | SI Rapporteur (CMCC) |
GP-67 AI: 7.2.5.3.3 |
revised | [WTS] [JSN] | |||
GP-150840 | pCR TR 45.820 - Device Complexity Evaluation Methodology | pCR | Intel |
GP-67 AI: 9.1 |
agreed | [WTS] [JSN] | |||
GP-150841 | G2_FS_IoT_LC_Adhoc#3_uPoD_Adhoc#1_Chairmans_report | report | GERAN WG2 Chairperson |
GP-67 AI: 7.2.3.1 |
approved | [WTS] [JSN] | |||
GP-150842 | GERAN1 chairman's report from FS_IoT_LC Adhoc#3 & uPoD Adhoc#1 | report | GERAN1 chairman |
GP-67 AI: 7.1.3.1 |
approved | [WTS] [JSN] | |||
GP-150843 | LS on the GSMA Mobile IoT initiative to improve time to market of licensed Low Power Use Case solutions operating in licensed spectrum. |
LS in source LS: CLP MIOT 01_004 LS reply in GP-151020 |
GSMA |
GP-67 AI: 5.3 |
noted | [WTS] [JSN] | |||
GP-150844 | Narrowband LTE Downlink Design (update of GP-150687) |
other revision of GP-150687 |
Samsung Electronics Co., Ltd |
GP-67 AI: 7.1.5.3.5.7 |
noted | [WTS] [JSN] | |||
GP-150845 | Narrowband LTE Uplink Design (update of GP-150688) |
other revision of GP-150688 |
Samsung Electronics Co., Ltd |
GP-67 AI: 7.1.5.3.5.7 |
noted | [WTS] [JSN] | |||
GP-150846 | pCR 45.820 Narrowband LTE (revision of GP-150690) |
pCR revision of GP-150690 |
Samsung Electronics Co., Ltd |
GP-67 AI: 7.1.5.3.5.7 |
noted | [WTS] [JSN] | |||
GP-150847 | Channel coding performance with different rate matching patterns (update of GP-150700) |
other revision of GP-150700 |
LG Electronics Inc. |
GP-67 AI: 7.1.5.3.5.5 |
noted | [WTS] [JSN] | |||
GP-150848 | CR 45.008-0625 rev 1 Introduction of Event-triggered Neighbour Cell Measurement in Idle Mode (Rel 13) |
CR revision of GP-150746 revised to GP-150896 |
Huawei Technologies Co., Ltd., HiSilicon Technologies Co., Ltd | 45.008 12.4.0 CR#6251 catB | eDRX_GSM | Rel-13 |
GP-67 AI: 7.1.5.2.1 |
revised | [WTS] [JSN] |
GP-150849 | Discussions on stationary and non-stationary CIoT devices | other | Samsung Research Institute UK |
GP-67 AI: 6.4 |
noted | [WTS] [JSN] | |||
GP-150850 | pCR TR 45.820–Correction on Annex A | pCR | Samsung Research Institute UK |
GP-67 AI: 6.4 |
noted | [WTS] [JSN] | |||
GP-150851 | pCR 45.820, Narrowband LTE – Downlink physical layer design (revision of GP-150791, revised in GP-150962) |
pCR revision of GP-150791 revised to GP-150962 |
Ericsson LM, Nokia Networks |
GP-67 AI: 7.1.5.3.5.7 |
revised | [WTS] [JSN] | |||
GP-150852 | pCR 45.820, Narrowband LTE – Uplink physical layer design (revision of GP-150792, revised in GP-150965) |
pCR revision of GP-150792 revised to GP-150965 |
Ericsson LM, Nokia Networks |
GP-67 AI: 7.1.5.3.5.7 |
revised | [WTS] [JSN] | |||
GP-150853 | N-GSM: Design and Performance for N-PDTCH | other | Nokia Networks |
GP-67 AI: 7.1.5.3.5.2 |
noted | [WTS] [JSN] | |||
GP-150854 | pCR 45.820 – N-GSM, Updates to N-PDTCH Design | pCR | Nokia Networks |
GP-67 AI: 7.1.5.3.5.2 |
agreed | [WTS] [JSN] | |||
GP-150855 | MIMO for Downlink Workplan | WI status report | SI Rapporteur |
GP-67 AI: 7.1.5.3.2 |
agreed | [WTS] [JSN] | |||
GP-150856 | Meeting Minutes of BTS Energy Savings telco#18 | report | SI Rapporteur |
GP-67 AI: 7.1.5.3.1 |
noted | [WTS] [JSN] | |||
GP-150857 | Work plan of SI “Solutions for GSM/EDGE BTS Energy Saving” | WI status report | SI Rapporteur |
GP-67 AI: 7.1.5.3.1 |
agreed | [WTS] [JSN] | |||
GP-150858 | Update of Section 9 of TR 45.926 on Summary and Conclusions | other | Nokia Networks |
GP-67 AI: 7.1.5.3.1 |
agreed | [WTS] [JSN] | |||
GP-150859 | pCR to 45.820 - NB-CIOT- Idle mode procedures (revision of GP-150806, revised in GP-150902) |
pCR revision of GP-150806 revised to GP-150902 |
Qualcomm Incorporated, Deutsche Telekom AG, Huawei Technologies Co., Ltd., HiSilicon, Technologies Co., Ltd, Neul Limited, LG Electronics Inc. |
GP-67 AI: 7.1.5.3.5.5 |
revised | [WTS] [JSN] | |||
GP-150860 | pCR 45.820 NB-CIoT - Simulation Results for Coexistence with GSM (revision of GP-150728, revised in GP-150884) |
pCR revision of GP-150728 revised to GP-150884 |
Huawei Technologies Co., Ltd., HiSilicon Technologies Co. Ltd, Qualcomm Incorporated |
GP-67 AI: 7.1.5.3.5.5 |
revised | [WTS] [JSN] | |||
GP-150861 | Narrowband LTE – System Capacity Evaluation | other | Ericsson LM |
GP-67 AI: 7.1.5.3.5.7 |
noted | [WTS] [JSN] | |||
GP-150862 | pCR 45.820, Narrowband LTE – System Capacity Evaluation | pCR | Ericsson LM |
GP-67 AI: 7.1.5.3.5.7 |
noted | [WTS] [JSN] | |||
GP-150863 | Narrowband LTE – Concept description (update of GP-150779) |
other revision of GP-150779 |
Ericsson LM; Nokia Networks, AT&T, Alcatel-Lucent; Alcatel-Lucent Shanghai Bell, Intel, Sierra Wireless, S.A., Sequans Communications, ZTE Corporation, SHARP Corporation, Gemalto N.V., Sprint Corporation |
GP-67 AI: 7.1.5.3.5.7 |
noted | [WTS] [JSN] | |||
GP-150864 | Draft WID proposal for clean slate for RAN TSG (update of GP-150754) |
WID new revision of GP-150754 |
ASTRI, CATR, China Mobile Com. Corporation, China Telecommunications, China Unicom, Deutsche Telekom AG, ETISALAT, HiSilicon Technologies Co. Ltd, Huawei Technologies Co., Ltd., Lenovo (Beijing) Ltd, LG Uplus, Neul Limited, Qualcomm Incorporated, Spreadtrum Communications, TELECOM ITALIA S.p.A., TELUS, u-blox AG, US Cellular Corporation, VODAFONE Group Plc |
GP-67 AI: 6.4 |
noted | [WTS] [JSN] | |||
GP-150865 | CR 45.008-0624 rev 1 Introduction of Power Efficient Operation (Rel-13) |
CR revision of GP-150774 revised to GP-150892 |
Ericsson LM | 45.008 12.4.0 CR#6241 catB | eDRX_GSM | Rel-13 |
GP-67 AI: 7.1.5.2.1 |
revised | [WTS] [JSN] |
GP-150866 | Proposed way forward for CIoT Clean Slate normative phase (update of GP-150801) |
other revision of GP-150801 |
Alcatel-Lucent, Alcatel-Shanghai Bell, Ericsson LM, Mediatek Inc., Panasonic, Sierra Wireless S.A, ZTE Corporation, AT&T, Nokia Networks, Marvell, Intel Corporation, Verizon Wireless, Sequans, Sharp Corporation, Gemalto N.V., Sprint Corporation |
GP-67 AI: 7.1.5.3.5.7 |
noted | [WTS] [JSN] | |||
GP-150867 | “Low Complexity Radio Access Network for Cellular Internet of Things” (update of GP-150802) |
other revision of GP-150802 |
Alcatel-Lucent, Alcatel-Shanghai Bell, Ericsson LM, Mediatek Inc., Panasonic, Sierra Wireless S.A, ZTE Corporation, Nokia Networks, Marvell, Intel Corporation, Sequans, Sharp Corporation, Gemalto N.V., Sprint Corporation |
GP-67 AI: 7.1.5.3.5.7 |
noted | [WTS] [JSN] | |||
GP-150868 | Reuse of LTE L2/L3 layers for Cellular IoT (update of GP-150803, updated in GP-150933) |
other revision of GP-150803 revised to GP-150933 |
Alcatel-Lucent, Alcatel-Shanghai Bell, Ericsson LM, Mediatek Inc., Panasonic, Sierra Wireless S.A, ZTE Corporation, Nokia Networks, Marvell, Intel Corporation, Sequans, Sharp Corporation, Gemalto N.V., Sprint Corporation |
GP-67 AI: 7.2.5.3.4.7 |
revised | [WTS] [JSN] | |||
GP-150869 | Comparison of Downlink PAPR between NB-CIoT and NB-LTE | other | Huawei Technologies Co., Ltd., HiSilicon Technologies Co. Ltd |
GP-67 AI: 7.1.5.3.5.7 |
noted | [WTS] [JSN] | |||
GP-150870 | Comparison of Base Station Complexity between NB-CIoT and NB-LTE (updated in GP-150932) |
other revised to GP-150932 |
Huawei Technologies Co., Ltd., HiSilicon Technologies Co. Ltd |
GP-67 AI: 7.1.5.3.5.7 |
revised | [WTS] [JSN] | |||
GP-150871 | On In-band Deployment of NB-LTE | other | Huawei Technologies Co., Ltd., HiSilicon Technologies Co. Ltd |
GP-67 AI: 7.1.5.3.5.7 |
noted | [WTS] [JSN] | |||
GP-150872 | On M-PDCCH/M-EPDCCH Design in NB-LTE | other | Huawei Technologies Co., Ltd., HiSilicon Technologies Co. Ltd |
GP-67 AI: 7.1.5.3.5.7 |
noted | [WTS] [JSN] | |||
GP-150873 | pCR 45.820, Narrowband LTE – Coverage performance evaluation (revision of GP-150799, revised in GP-151026) |
pCR revision of GP-150799 revised to GP-151026 |
Ericsson LM, Nokia Networks |
GP-67 AI: 9.1 |
revised | [WTS] [JSN] | |||
GP-150874 | Considerations on the way forward for CIoT | other | Huawei Technologies Co., Ltd., HiSilicon Technologies Co. Ltd, Qualcomm Incorporated, Neul Limited |
GP-67 AI: 7.2.5.3.4.7 |
noted | [WTS] [JSN] | |||
GP-150875 | Analysis of L2/L3 reuse of LTE for NB-CIoT | other | Huawei Technologies Co., Ltd., HiSilicon Technologies Co. Ltd, Qualcomm Incorporated, Neul Limited |
GP-67 AI: 7.2.5.3.4.5 |
noted | [WTS] [JSN] | |||
GP-150876 | On resource mapping of narrowband LTE based CioT (update of GP-150703) |
other revision of GP-150703 |
ZTE Corporation |
GP-67 AI: 7.1.5.3.5.7 |
noted | [WTS] [JSN] | |||
GP-150877 | pCR 45.820, Narrowband LTE – Introduction (revision of GP-150790, revised in GP-150953) |
pCR revision of GP-150790 revised to GP-150953 |
Ericsson LM, Nokia Networks |
GP-67 AI: 7.1.5.3.5.7 |
revised | [WTS] [JSN] | |||
GP-150878 | pCR 45.820, Narrowband LTE – (E)PCCCH design (revision of GP-150793, revised in GP-150963) |
pCR revision of GP-150793 revised to GP-150963 |
Ericsson LM, Nokia Networks |
GP-67 AI: 7.1.5.3.5.7 |
revised | [WTS] [JSN] | |||
GP-150879 | pCR 45.820, Narrowband LTE – Cell search design (revision of GP-150794, revised in GP-150950) |
pCR revision of GP-150794 revised to GP-150950 |
Ericsson LM, Nokia Networks |
GP-67 AI: 7.1.5.3.5.7 |
revised | [WTS] [JSN] | |||
GP-150880 | Telco#13 meeting report (revision of GP-150751) | report | VODAFONE Group Plc (Rapporteur) |
GP-67 AI: 7.2.3.1 |
agreed | [WTS] [JSN] | |||
GP-150881 | Response to GP-150742 on impact to GSM/EDGE BTS hardware from EC-GSM | other | Ericsson LM, Nokia Networks, Alcatel Lucent |
GP-67 AI: 7.1.5.3.5.1 |
noted | [WTS] [JSN] | |||
GP-150882 | Overall Conclusion on Architecture Aspects (updated in GP-150930) |
other revised to GP-150930 |
VODAFONE Group Plc (Rapporteur) |
GP-67 AI: 7.1.5.3.5.7 |
revised | [WTS] [JSN] | |||
GP-150883 | NB-LTE - Preliminary MS complexity analysis | other | Qualcomm Incorporated |
GP-67 AI: 7.1.5.3.5.7 |
noted | [WTS] [JSN] | |||
GP-150884 | pCR 45.820 NB-CIoT - Simulation Results for Coexistence with GSM (revision of GP-150860) |
pCR revision of GP-150860 |
Huawei Technologies Co., Ltd., HiSilicon Technologies Co. Ltd, Qualcomm Incorporated |
GP-67 AI: 9.1 |
agreed | [WTS] [JSN] | |||
GP-150885 | pCR 45.820 – N-GSM, Network Synchronisation, Performance Evaluation (revision of GP-150819) |
pCR revision of GP-150819 |
Nokia Networks |
GP-67 AI: 9.1 |
agreed | [WTS] [JSN] | |||
GP-150886 | pCR 45.820 – N-GSM, Latency Analysis for Exception Report (revision of GP-150817) |
pCR revision of GP-150817 |
Nokia Networks |
GP-67 AI: 9.1 |
agreed | [WTS] [JSN] | |||
GP-150887 | pCR 45.820 – N-GSM, Impacts to GSM/EDGE Base Station hardware (revision of GP-150823) |
pCR revision of GP-150823 |
Nokia Networks |
GP-67 AI: 9.1 |
agreed | [WTS] [JSN] | |||
GP-150888 | pCR 45.820 NB-CIoT – MS Complexity Analysis (revision of GP-150726) |
pCR revision of GP-150726 |
Neul Limited, u-blox AG, Huawei Technologies Co. Ltd., HiSilicon Technologies Co. Ltd, Qualcomm Incorporated |
GP-67 AI: 9.1 |
agreed | [WTS] [JSN] | |||
GP-150889 | pCR to TR 45 820- NB-CIoT Miscellaneous corrections to clause 7.3.5 (revised in GP-150917) |
pCR revised to GP-150917 |
Qualcomm Incorporated, Neul Limited, Huawei Technologies Co., Ltd., HiSilicon Technologies Co., Ltd |
GP-67 AI: 7.2.5.3.4.5 |
revised | [WTS] [JSN] | |||
GP-150890 | VAMOS and TIGHTER performance requirements for CA capable MS | other | Qualcomm Incorporated |
GP-67 AI: 7.1.5.1 |
noted | [WTS] [JSN] | |||
GP-150891 | CR 43.064-0088 rev 1 Introduction of Power Efficient Operation (Rel-13) |
CR revision of GP-150770 |
Ericsson LM | 43.064 12.2.0 CR#881 catB | eDRX_GSM | Rel-13 |
GP-67 AI: 7.1.5.2.1 |
postponed | [WTS] [JSN] |
GP-150892 | CR 45.008-0624 rev 2 Introduction of Power Efficient Operation (Rel-13) |
CR revision of GP-150865 |
Ericsson LM | 45.008 12.4.0 CR#6242 catB | eDRX_GSM | Rel-13 |
GP-67 AI: 7.1.5.2.1 |
postponed | [WTS] [JSN] |
GP-150893 | CR 45.002-0182 rev 1 Introduction of Power Efficient Operation (Rel-13) |
CR revision of GP-150773 |
Ericsson LM | 45.002 12.4.0 CR#1821 catB | eDRX_GSM | Rel-13 |
GP-67 AI: 7.1.5.2.1 |
postponed | [WTS] [JSN] |
GP-150894 | CR 43.013-0001 rev 1 Introduction of Power Efficient Operation for MTC devices (Rel-13) |
CR revision of GP-150704 |
Ericsson LM | 43.013 12.0.0 CR#11 catB | eDRX_GSM | Rel-13 |
GP-67 AI: 7.1.5.2.1 |
postponed | [WTS] [JSN] |
GP-150895 | CR 43.022-0034 rev 1 Introduction of Power Efficient Operation (Rel-13) |
CR revision of GP-150705 |
Ericsson LM | 43.022 12.0.0 CR#341 catB | eDRX_GSM | Rel-13 |
GP-67 AI: 7.1.5.2.1 |
postponed | [WTS] [JSN] |
GP-150896 | CR 45.008-0625 rev 2 Introduction of Event-triggered Neighbour Cell Measurement in Idle Mode (Rel 13) |
CR revision of GP-150848 |
Huawei Technologies Co., Ltd., HiSilicon Technologies Co., Ltd | 45.008 12.4.0 CR#6252 catB | eDRX_GSM | Rel-13 |
GP-67 AI: 7.1.5.2.1 |
withdrawn | [WTS] [JSN] |
GP-150897 | pCR 45.820, EC-GSM, Miscellaneous corrections and clarifications (revision of GP-150763, revised in GP-150970) |
pCR revision of GP-150763 revised to GP-150970 |
Ericsson LM |
GP-67 AI: 7.1.5.3.5.1 |
revised | [WTS] [JSN] | |||
GP-150898 | pCR 45.820, MAR periodic and network command system capacity evaluation (revision of GP-150757) |
pCR revision of GP-150757 |
Ericsson LM |
GP-67 AI: 7.1.5.3.5.1 |
agreed | [WTS] [JSN] | |||
GP-150899 | pCR 45.820, EC-GSM, Software upgrade system evaluation (revision of GP-150759) |
pCR revision of GP-150759 |
Ericsson LM |
GP-67 AI: 7.1.5.3.5.1 |
agreed | [WTS] [JSN] | |||
GP-150900 | pCR 45.820, EC-GSM – Simulation Results for Coexistence with UTRA and EUTRA (revision of GP-150765, revised in GP-151029) |
pCR revision of GP-150765 revised to GP-151029 |
Ericsson LM |
GP-67 AI: 9.1 |
revised | [WTS] [JSN] | |||
GP-150901 | pCR 45.820 NB CIoT - Link Layer: Examples of Message Flows (revision of GP-150748) |
pCR revision of GP-150748 |
Neul Limited, Huawei Technologies Co., Ltd., HiSilicon Technologies Co., Ltd |
GP-67 AI: 7.2.5.3.4.5 |
agreed | [WTS] [JSN] | |||
GP-150902 | pCR to 45.820 - NB-CIOT- Idle mode procedures (revision of GP-150859, revised in GP-150936) |
pCR revision of GP-150859 revised to GP-150936 |
Qualcomm Incorporated, Deutsche Telekom AG, Huawei Technologies Co., Ltd., HiSilicon, Technologies Co., Ltd, Neul Limited, LG Electronics Inc. |
GP-67 AI: 7.2.5.3.5 |
revised | [WTS] [JSN] | |||
GP-150903 | pCR 45.820 Corrections to NB-CIoT – Energy consumption evaluation (revision of GP-150691, revised in GP-150939) |
pCR revision of GP-150691 revised to GP-150939 |
Neul Limited, u-blox AG, Huawei Technologies Co., Ltd., HiSilicon Technologies Co. Ltd, Qualcomm Incorporated |
GP-67 AI: 7.2.5.3.4.5 |
revised | [WTS] [JSN] | |||
GP-150904 | pCR 45.820 NB-CIoT - Analysis on the Re-use of LTE L2/L3 (revised in GP-150960) |
pCR revised to GP-150960 |
Huawei Technologies Co., Ltd., HiSilicon Technologies Co. Ltd, Neul Limited |
GP-67 AI: 7.2.5.3.4.5 |
revised | [WTS] [JSN] | |||
GP-150905 | NB-CIoT - Proposed Conclusion for the Cellular IoT SI (update of GP-150740, updated in GP-150986) |
other revision of GP-150740 |
Huawei Technologies Co., Ltd., HiSilicon Technologies Co. Ltd |
GP-67 AI: 7.2.5.3.4.5 |
withdrawn | [WTS] [JSN] | |||
GP-150906 | pCR 45.820 NB-CIoT - Proposed Conclusion for the Cellular IoT SI (revision of GP-150741, revised in GP-151001) |
pCR revision of GP-150741 revised to GP-151001 |
Huawei Technologies Co., Ltd., HiSilicon Technologies Co. Ltd |
GP-67 AI: 7.2.5.3.4.5 |
revised | [WTS] [JSN] | |||
GP-150907 | pCR to TR 45.820 - N-GSM, Coverage improvement performance for uplink traffic channel (revision of GP-150815) |
pCR revision of GP-150815 |
Nokia Networks |
GP-67 AI: 7.2.5.3.4.2 |
agreed | [WTS] [JSN] | |||
GP-150908 | N-GSM: Latency Analysis for Exception Report (update of GP-150816, updated in GP-150991) |
other revision of GP-150816 revised to GP-150991 |
Nokia Networks |
GP-67 AI: 7.2.5.3.4.2 |
revised | [WTS] [JSN] | |||
GP-150909 | C-UNB General Description (update of GP-150708, updated in GP-150972) |
other revision of GP-150708 revised to GP-150972 |
SIGFOX |
GP-67 AI: 7.2.5.3.4.6 |
revised | [WTS] [JSN] | |||
GP-150910 | pCR TR45-820 - C-UNB - General Description (revision of GP-150692, revised in GP-150973) |
pCR revision of GP-150692 revised to GP-150973 |
SIGFOX |
GP-67 AI: 7.2.5.3.4.6 |
revised | [WTS] [JSN] | |||
GP-150911 | C-UNB Link Layer Aspects (update of GPC150544, update of GP-150711, updated in GP-150974) |
other revision of GP-150711 revised to GP-150974 |
SIGFOX |
GP-67 AI: 7.2.5.3.4.6 |
revised | [WTS] [JSN] | |||
GP-150912 | pCR TR45-820 - C-UNB - Link Layer Aspects (revision of GP-150694, revised in GP-150975) |
pCR revision of GP-150694 revised to GP-150975 |
SIGFOX |
GP-67 AI: 7.2.5.3.4.6 |
revised | [WTS] [JSN] | |||
GP-150913 | C-UNB Battery Life Evaluation (update of GP-150714) |
other revision of GP-150714 revised to GP-150980 |
SIGFOX |
GP-67 AI: 7.2.5.3.4.6 |
noted | [WTS] [JSN] | |||
GP-150914 | pCR TR45-820 - C-UNB - Battery Life Evaluation (revision of GP-150697) |
pCR revision of GP-150697 revised to GP-150981 |
SIGFOX |
GP-67 AI: 7.2.5.3.4.6 |
noted | [WTS] [JSN] | |||
GP-150915 | C-UNB Capacity Evaluation (update of GP-150715) |
other revision of GP-150715 |
SIGFOX |
GP-67 AI: 7.2.5.3.4.6 |
noted | [WTS] [JSN] | |||
GP-150916 | pCR TR45-820 - C-UNB - Capacity Evaluation (revision of GP-150698) |
pCR revision of GP-150698 |
SIGFOX |
GP-67 AI: 7.2.5.3.4.6 |
noted | [WTS] [JSN] | |||
GP-150917 | pCR to TR 45 820- NB-CIoT Miscellaneous corrections to clause 7.3.5 (revision of GP-150889) |
pCR revision of GP-150889 |
Qualcomm Incorporated, Neul Limited, Huawei Technologies Co., Ltd., HiSilicon Technologies Co., Ltd |
GP-67 AI: 7.2.5.3.4.5 |
agreed | [WTS] [JSN] | |||
GP-150918 | EC-GSM, Conclusion to the TR (update of GP-150766) |
other revision of GP-150766 |
Ericsson LM |
GP-67 AI: 7.2.5.3.4.1 |
noted | [WTS] [JSN] | |||
GP-150919 | pCR 45.820, EC-GSM, Conclusion to the TR (revision of GP-150767, revised in GP-150987) |
pCR revision of GP-150767 revised to GP-150987 |
Ericsson LM |
GP-67 AI: 7.2.5.3.4.1 |
revised | [WTS] [JSN] | |||
GP-150920 | New Work Item on Extended Coverage GSM (EC-GSM) for support of Cellular Internet of Things (revision of GP-150768, revised in GP-150994) |
WID new revision of GP-150768 revised to GP-150994 |
Ericsson LM, Intel, Gemalto N.V., MediaTek Inc., TeliaSonera AB, Sierra Wireless, S.A., Telit Communications S.p.A., ORANGE, Nokia Networks, Alcatel Lucent |
GP-67 AI: 7.2.5.3.4.1 |
revised | [WTS] [JSN] | |||
GP-150921 | 3GPP TR 43.869 GERAN Study on Power Saving for MTC Devices (Release 13), v. 2.0.0 | draft TR | TSG GERAN |
GP-67 AI: 8.2.2 |
approved | [WTS] [JSN] | |||
GP-150922 | C-UNB Radio Resource management (update of GPC150602, update of GP-150712, updated in GP-150976) |
other revision of GP-150712 revised to GP-150976 |
SIGFOX |
GP-67 AI: 7.2.5.3.4.6 |
revised | [WTS] [JSN] | |||
GP-150923 | pCR TR45-820 - C-UNB - Radio Resource Management (revision of GP-150695, revised in GP-150977) |
pCR revision of GP-150695 revised to GP-150977 |
SIGFOX |
GP-67 AI: 7.2.5.3.4.6 |
revised | [WTS] [JSN] | |||
GP-150924 | C-UNB Latency Evaluation (update of GP-150713, updated in GP-150978) |
other revision of GP-150713 revised to GP-150978 |
SIGFOX |
GP-67 AI: 7.2.5.3.4.6 |
revised | [WTS] [JSN] | |||
GP-150925 | pCR TR45-820 - C-UNB - Latency Evaluation (revision of GP-150696, revised in GP-150979) |
pCR revision of GP-150696 revised to GP-150979 |
SIGFOX |
GP-67 AI: 7.2.5.3.4.6 |
revised | [WTS] [JSN] | |||
GP-150926 | CR 44.018-1023 rev 1 Introduction of Power Efficient Operation (Rel-13) |
CR revision of GP-150771 |
Ericsson LM | 44.018 12.6.0 CR#10231 catB | eDRX_GSM | Rel-13 |
GP-67 AI: 7.2.5.3.3.2 |
postponed | [WTS] [JSN] |
GP-150927 | CR 44.060-1607 rev 1 Introduction of Power Efficient Operation (Rel-13) |
CR revision of GP-150772 |
Ericsson LM | 44.060 12.5.0 CR#16071 catB | eDRX_GSM | Rel-13 |
GP-67 AI: 7.2.5.3.3.2 |
postponed | [WTS] [JSN] |
GP-150928 | CR 48.018-0418 rev 1 Introduction of Power Efficient Operation (Rel-13) |
CR revision of GP-150775 |
Ericsson LM | 48.018 12.4.0 CR#4181 catB | eDRX_GSM | Rel-13 |
GP-67 AI: 7.2.5.3.3.2 |
postponed | [WTS] [JSN] |
GP-150929 | pCR to capture agreements from GP-150829 (Operator requirements on network sharing, cell barring and access control for "clean slate CIoT" systems) into TR 45.820 | pCR | Deutsche Telekom AG, Huawei Technologies Co., Ltd., HiSilicon Technologies Co. Ltd, Neul Limited, Qualcomm Incorporated |
GP-67 AI: 7.2.5.3.4.7 |
agreed | [WTS] [JSN] | |||
GP-150930 | Overall Conclusion on Architecture Aspects (update of GP-150882) |
other revision of GP-150882 |
VODAFONE Group Plc (Rapporteur) |
GP-67 AI: 7.1.5.3.5.7 |
agreed | [WTS] [JSN] | |||
GP-150931 | pCR TR 45.820 – EC-GSM, Downlink and Uplink System Level Simulation Results (revision of GP-150834, revised in GP-150992) |
pCR revision of GP-150834 revised to GP-150992 |
Intel |
GP-67 AI: 7.1.5.3.5.1 |
revised | [WTS] [JSN] | |||
GP-150932 | Comparison of Base Station Complexity between NB-CIoT and NB-LTE (update of GP-150870) |
other revision of GP-150870 |
Huawei Technologies Co., Ltd., HiSilicon Technologies Co. Ltd |
GP-67 AI: 7.1.5.3.5.7 |
noted | [WTS] [JSN] | |||
GP-150933 | Reuse of LTE L2/L3 layers for Cellular IoT (update of GP-150868) |
other revision of GP-150868 |
Alcatel-Lucent, Alcatel-Shanghai Bell, Ericsson LM, Mediatek Inc., Panasonic, Sierra Wireless S.A, ZTE Corporation, Nokia Networks, Marvell, Intel Corporation, Sequans, Sharp Corporation, Gemalto N.V., Sprint Corporation, Samsung Electronics Co., Ltd |
GP-67 AI: 7.2.5.3.4.7 |
noted | [WTS] [JSN] | |||
GP-150934 | pCR to TR 45.820: Reuse of LTE L2/L3 layers for Cellular IoT (revision of GP-150804, revised in GP-150952) |
pCR revision of GP-150804 revised to GP-150952 |
Alcatel-Lucent, Samsung Electronics Co., Ltd |
GP-67 AI: 7.2.5.3.4.7 |
revised | [WTS] [JSN] | |||
GP-150935 | pCR 45.820 NB-CIoT - PAPR Evaluations (revision of GP-150733) |
pCR revision of GP-150733 |
Huawei Technologies Co., Ltd., HiSilicon Technologies Co. Ltd |
GP-67 AI: 7.1.5.3.5.5 |
agreed | [WTS] [JSN] | |||
GP-150936 | pCR to 45.820 - NB-CIOT- Idle mode procedures (revision of GP-150902) |
pCR revision of GP-150902 |
Qualcomm Incorporated, Deutsche Telekom AG, Huawei Technologies Co., Ltd., HiSilicon, Technologies Co., Ltd, Neul Limited, LG Electronics Inc. |
GP-67 AI: 7.1.5.3.5.5 |
agreed | [WTS] [JSN] | |||
GP-150937 | pCR 45.820 NB-CIoT - Impacts to Legacy Base Stations (revision of GP-150739, revised in GP-150995) |
pCR revision of GP-150739 revised to GP-150995 |
Huawei Technologies Co., Ltd., HiSilicon Technologies Co. Ltd |
GP-67 AI: 7.1.5.3.5.5 |
revised | [WTS] [JSN] | |||
GP-150938 | pCR to TR 45.820 - corrections to NB-CIoT latency evaluation (revision of GP-150811, revised in GP-150996) |
pCR revision of GP-150811 revised to GP-150996 |
Qualcomm Incorporated, Neul Limited, Huawei Technologies Co., Ltd., HiSilicon Technologies Co., Ltd |
GP-67 AI: 7.1.5.3.5.5 |
revised | [WTS] [JSN] | |||
GP-150939 | pCR 45.820 Corrections to NB-CIoT – Energy consumption evaluation (revision of GP-150903) |
pCR revision of GP-150903 |
Neul Limited, u-blox AG, Huawei Technologies Co., Ltd., HiSilicon Technologies Co. Ltd, Qualcomm Incorporated |
GP-67 AI: 7.1.5.3.5.5 |
agreed | [WTS] [JSN] | |||
GP-150940 | pCR 45.820 NB-CIoT - System Level Simulation for Capacity and Latency Evaluation (revision of GP-150735, revised in GP-151008) |
pCR revision of GP-150735 revised to GP-151008 |
Huawei Technologies Co., Ltd., HiSilicon Technologies Co. Ltd |
GP-67 AI: 9.1 |
revised | [WTS] [JSN] | |||
GP-150941 | Updated Narrowband LTE - Cell search design and performance | other | Ericsson LM, Nokia Networks |
GP-67 AI: 7.1.5.3.5.7 |
noted | [WTS] [JSN] | |||
GP-150942 | Narrowband LTE – Exception report latency evaluation (update of GP-150786) |
other revision of GP-150786 |
Ericsson LM, Nokia Networks |
GP-67 AI: 7.2.5.3.4.7 |
withdrawn | [WTS] [JSN] | |||
GP-150943 | Narrowband LTE – Battery lifetime evaluation (update of GP-150787) |
other revision of GP-150787 |
Ericsson LM, Nokia Networks |
GP-67 AI: 7.2.5.3.4.7 |
withdrawn | [WTS] [JSN] | |||
GP-150944 | Draft 3GPP TR 45.926 V1.6.0 on Solutions for GSM/EDGE BTS Energy Saving | draft TR | Editor (Nokia Networks) |
GP-67 AI: 11.1 |
agreed | [WTS] [JSN] | |||
GP-150945 | Narrowband LTE (NB-LTE) Cost/Complexity (update of GP-150699) |
other revision of GP-150699 |
Sierra Wireless, S.A. |
GP-67 AI: 7.2.5.3.4.7 |
noted | [WTS] [JSN] | |||
GP-150946 | pCR TR 45.926 on Introduction of evaluation results of BCCH carrier power reduction (revised in GP-151003) |
pCR revised to GP-151003 |
ZTE Corporation |
GP-67 AI: 9.1 |
revised | [WTS] [JSN] | |||
GP-150947 | pCR 45.820, Narrowband LTE – Random access performance evaluation (revision of GP-150798, revised in GP-150966) |
pCR revision of GP-150798 revised to GP-150966 |
Ericsson LM, Nokia Networks |
GP-67 AI: 7.1.5.3.5.7 |
revised | [WTS] [JSN] | |||
GP-150948 | pCR TR45-820 - Annex E.3: Protocol overhead assumption | pCR | SIGFOX |
GP-67 AI: 7.1.5.3.5.7 |
noted | [WTS] [JSN] | |||
GP-150949 | pCR TR45-820 - Performance evaluation methods | pCR | SIGFOX |
GP-67 AI: 7.1.5.3.5.7 |
noted | [WTS] [JSN] | |||
GP-150950 | pCR 45.820, Narrowband LTE – Cell search design (revision of GP-150879, revised in GP-151027) |
pCR revision of GP-150879 revised to GP-151027 |
Ericsson LM, Nokia Networks |
GP-67 AI: 9.1 |
revised | [WTS] [JSN] | |||
GP-150951 | pCR 45.820 Procedures of Synchronization for Paging (revision of GP-150744) |
pCR revision of GP-150744 |
Huawei Technologies Co., Ltd., HiSilicon Technologies Co., Ltd, Neul Limited |
GP-67 AI: 7.2.5.3.4.7 |
agreed | [WTS] [JSN] | |||
GP-150952 | pCR to TR 45.820: Reuse of LTE L2/L3 layers for Cellular IoT (revision of GP-150934, revised in GP-151018) |
pCR revision of GP-150934 revised to GP-151018 |
Alcatel-Lucent, Samsung Electronics Co., Ltd |
GP-67 AI: 7.2.5.3.4.7 |
revised | [WTS] [JSN] | |||
GP-150953 | pCR 45.820, Narrowband LTE – Introduction (revision of GP-150877, revised in GP-151000) |
pCR revision of GP-150877 revised to GP-151000 |
Ericsson LM, Nokia Networks |
GP-67 AI: 7.2.5.3.4.7 |
revised | [WTS] [JSN] | |||
GP-150954 | Document not available | other |
GP-67 AI: 1 |
withdrawn | [WTS] [JSN] | ||||
GP-150955 | Document not available | other |
GP-67 AI: 1 |
withdrawn | [WTS] [JSN] | ||||
GP-150956 | Document not available | other |
GP-67 AI: 1 |
withdrawn | [WTS] [JSN] | ||||
GP-150957 | pCR 45.820, Narrowband LTE – Battery lifetime evaluation (revision of GP-150797) |
pCR revision of GP-150797 |
Ericsson LM, Nokia Networks |
GP-67 AI: 9.1 |
noted | [WTS] [JSN] | |||
GP-150958 | Document not available | other |
GP-67 AI: 1 |
withdrawn | [WTS] [JSN] | ||||
GP-150959 | Document not available | other |
GP-67 AI: 1 |
withdrawn | [WTS] [JSN] | ||||
GP-150960 | pCR 45.820 NB-CIoT - Analysis on the Re-use of LTE L2/L3 (revision of GP-150904) |
other revision of GP-150904 |
Huawei Technologies Co., Ltd., HiSilicon Technologies Co. Ltd, Neul Limited, Qualcomm Incorporated |
GP-67 AI: 7.2.5.3.4.5 |
agreed | [WTS] [JSN] | |||
GP-150961 | pCR 45.820, Narrowband LTE – Cell search performance evaluation (revision of GP-150795) |
pCR revision of GP-150795 |
Ericsson LM, Nokia Networks |
GP-67 AI: 9.1 |
noted | [WTS] [JSN] | |||
GP-150962 | pCR 45.820, Narrowband LTE – Downlink physical layer design (revision of GP-150851, revised in GP-151009) |
pCR revision of GP-150851 revised to GP-151009 |
Ericsson LM, Nokia Networks |
GP-67 AI: 9.1 |
revised | [WTS] [JSN] | |||
GP-150963 | pCR 45.820, Narrowband LTE – (E)PCCCH design (revision of GP-150878, revised in GP-151028) |
pCR revision of GP-150878 revised to GP-151028 |
Ericsson LM, Nokia Networks |
GP-67 AI: 9.1 |
revised | [WTS] [JSN] | |||
GP-150964 | pCR 45.820, Narrowband LTE – Link layer, Scheduling (revision of GP-150826) |
pCR revision of GP-150826 |
Ericsson LM |
GP-67 AI: 9.1 |
noted | [WTS] [JSN] | |||
GP-150965 | pCR 45.820, Narrowband LTE – Uplink physical layer design (revision of GP-150852, revised in GP-151002) |
pCR revision of GP-150852 revised to GP-151002 |
Ericsson LM, Nokia Networks |
GP-67 AI: 7.1.5.3.5.7 |
revised | [WTS] [JSN] | |||
GP-150966 | pCR 45.820, Narrowband LTE – Random access performance evaluation (revision of GP-150947) |
pCR revision of GP-150947 |
Ericsson LM, Nokia Networks |
GP-67 AI: 9.1 |
noted | [WTS] [JSN] | |||
GP-150967 | pCR 45.820, Narrowband LTE – Exception report latency evaluation (revision GP-150796) |
pCR revision of GP-150796 |
Ericsson LM, Nokia Networks |
GP-67 AI: 9.1 |
noted | [WTS] [JSN] | |||
GP-150968 | N-GSM: Design and Performance for N-SCH (update of GP-150818) |
other revision of GP-150818 |
Nokia Networks |
GP-67 AI: 7.1.5.3.5.2 |
noted | [WTS] [JSN] | |||
GP-150969 | N-GSM: Impact to legacy GSM/EDGE Base Stations (update of GP-150822) |
other revision of GP-150822 |
Nokia Networks |
GP-67 AI: 7.1.5.3.5.2 |
noted | [WTS] [JSN] | |||
GP-150970 | pCR 45.820, EC-GSM, Miscellaneous corrections and clarifications (revision of GP-150897) |
pCR revision of GP-150897 |
Ericsson LM |
GP-67 AI: 7.1.5.3.5.1 |
agreed | [WTS] [JSN] | |||
GP-150971 | Withdrawn (wrong document) | other |
GP-67 AI: 1 |
withdrawn | [WTS] [JSN] | ||||
GP-150972 | C-UNB General Description (update of GP-150909, updated in GP-150982) |
other revision of GP-150909 revised to GP-150982 |
SIGFOX |
GP-67 AI: 7.2.5.3.4.6 |
revised | [WTS] [JSN] | |||
GP-150973 | pCR TR45-820 - C-UNB - General Description (revision of GP-150910, revised in GP-150983) |
pCR revision of GP-150910 revised to GP-150983 |
SIGFOX |
GP-67 AI: 7.2.5.3.4.6 |
revised | [WTS] [JSN] | |||
GP-150974 | C-UNB Link Layer Aspects (update of GP-150911) |
other revision of GP-150911 |
SIGFOX |
GP-67 AI: 7.2.5.3.4.6 |
noted | [WTS] [JSN] | |||
GP-150975 | pCR TR45-820 - C-UNB - Link Layer Aspects (revision of GP-150912, revised in GP-150984) |
pCR revision of GP-150912 revised to GP-150984 |
SIGFOX |
GP-67 AI: 7.2.5.3.4.6 |
revised | [WTS] [JSN] | |||
GP-150976 | C-UNB Radio Resource management (update of GP-150922) |
other revision of GP-150922 |
SIGFOX |
GP-67 AI: 7.2.5.3.4.6 |
noted | [WTS] [JSN] | |||
GP-150977 | pCR TR45-820 - C-UNB - Radio Resource Management (revision of GP-150923, revised in GP-150997) |
pCR revision of GP-150923 revised to GP-150997 |
SIGFOX |
GP-67 AI: 7.2.5.3.4.6 |
revised | [WTS] [JSN] | |||
GP-150978 | C-UNB Latency Evaluation (update of GP-150924) |
other revision of GP-150924 |
SIGFOX |
GP-67 AI: 7.2.5.3.4.6 |
noted | [WTS] [JSN] | |||
GP-150979 | pCR TR45-820 - C-UNB - Latency Evaluation (revision of GP-150925) |
other revision of GP-150925 |
SIGFOX |
GP-67 AI: 7.2.5.3.4.6 |
noted | [WTS] [JSN] | |||
GP-150980 | C-UNB Battery Life Evaluation (document not available) |
other revision of GP-150913 |
SIGFOX |
GP-67 AI: 7.2.5.3.4.6 |
withdrawn | [WTS] [JSN] | |||
GP-150981 | pCR TR45.820 - C-UNB - Battery Life Evaluation (document not available) |
pCR revision of GP-150914 |
SIGFOX |
GP-67 AI: 7.2.5.3.4.6 |
withdrawn | [WTS] [JSN] | |||
GP-150982 | C-UNB General Description (revision of GP-150972) (document not available) |
other revision of GP-150972 |
SIGFOX |
GP-67 AI: 7.2.5.3.4.6 |
withdrawn | [WTS] [JSN] | |||
GP-150983 | pCR TR45-820 - C-UNB - General Description (revision of GP-150973, revised in GP-150998) |
pCR revision of GP-150973 revised to GP-150998 |
SIGFOX |
GP-67 AI: 7.2.5.3.4.6 |
revised | [WTS] [JSN] | |||
GP-150984 | pCR TR45.820 - C-UNB - Link Layer Aspects (revision of GP-150975) |
pCR revision of GP-150975 |
SIGFOX |
GP-67 AI: 7.2.5.3.4.6 |
agreed | [WTS] [JSN] | |||
GP-150985 | Follow Up LS on RAN assumptions from SA2 for FS_eDRX (revised in GP-150988) |
LS out LS To: S2 |
GERAN WG2 | eDRX_GSM |
GP-67 AI: 7.2.6 |
revised | [WTS] [JSN] | ||
GP-150986 | NB-CIoT - Proposed Conclusion for the Cellular IoT SI (update of GP-150740) |
other revision of GP-150740 |
Huawei Technologies Co., Ltd., HiSilicon Technologies Co. Ltd |
GP-67 AI: 7.2.5.3.4.5 |
noted | [WTS] [JSN] | |||
GP-150987 | pCR 45.820, EC-GSM, Conclusion to the TR (revision of GP-150919) |
pCR revision of GP-150919 |
Ericsson LM |
GP-67 AI: 9.1 |
noted | [WTS] [JSN] | |||
GP-150988 | Follow Up LS on RAN assumptions from SA2 for FS_eDRX, Source: G2 (revision of GP-150985) |
LS out LS To: S2 |
GERAN WG2 | eDRX_GSM |
GP-67 AI: 8.2.2 |
approved | [WTS] [JSN] | ||
GP-150989 | G2 Chairmans summary of the outcome of G2-67 | report | G2 Chairman |
GP-67 AI: 8.2.1 |
revised | [WTS] [JSN] | |||
GP-150990 | G2-67 Draft Meeting Report | report | MCC |
GP-67 AI: 8.2.1 |
noted | [WTS] [JSN] | |||
GP-150991 | N-GSM: Latency Analysis for Exception Report (update of GP-150908) |
other revision of GP-150908 |
Nokia Networks |
GP-67 AI: 7.2.5.3.4.2 |
noted | [WTS] [JSN] | |||
GP-150992 | pCR TR 45.820 – EC-GSM, Downlink and Uplink System Level Simulation Results (revision of GP-150931, revised in GP-151030) |
pCR revision of GP-150931 revised to GP-151030 |
Intel |
GP-67 AI: 9.1 |
revised | [WTS] [JSN] | |||
GP-150993 | pCR TR45-820 - Physical Layer design (revision of GP-150693, revised in GP-150999) |
pCR revision of GP-150693 revised to GP-150999 |
SIGFOX |
GP-67 AI: 7.1.5.3.5.6 |
revised | [WTS] [JSN] | |||
GP-150994 | New Work Item on Extended Coverage GSM (EC-GSM) for support of Cellular Internet of Things (revision of GP-150920, revised in GP-151039) |
WID new revision of GP-150920 revised to GP-151039 |
Ericsson LM, Intel, Gemalto N.V., MediaTek Inc., TeliaSonera AB, Sierra Wireless, S.A., Telit Communications S.p.A., ORANGE, Nokia Networks, Alcatel Lucent |
GP-67 AI: 11.1 |
revised | [WTS] [JSN] | |||
GP-150995 | pCR 45.820 NB-CIoT - Impacts to Legacy Base Stations (revision of GP-150937) |
pCR revision of GP-150937 |
Huawei Technologies Co., Ltd., HiSilicon Technologies Co. Ltd |
GP-67 AI: 9.1 |
agreed | [WTS] [JSN] | |||
GP-150996 | pCR to TR 45.820 - corrections to NB-CIoT latency evaluation (revision of GP-150938) |
pCR revision of GP-150938 |
Qualcomm Incorporated, Neul Limited, Huawei Technologies Co., Ltd., HiSilicon Technologies Co., Ltd |
GP-67 AI: 7.1.5.3.5.5 |
agreed | [WTS] [JSN] | |||
GP-150997 | pCR TR45-820 - C-UNB - Radio Resource Management (revision of GP-150977) |
pCR revision of GP-150977 |
SIGFOX |
GP-67 AI: 9.1 |
agreed | [WTS] [JSN] | |||
GP-150998 | pCR TR45-820 - C-UNB - General Description (revision of GP-150983, revised in GP-151032) |
pCR revision of GP-150983 revised to GP-151032 |
SIGFOX |
GP-67 AI: 9.1 |
revised | [WTS] [JSN] | |||
GP-150999 | pCR TR45-820 - Physical Layer design (revision of GP-150993, revised in GP-151034) |
pCR revision of GP-150993 revised to GP-151034 |
SIGFOX |
GP-67 AI: 9.1 |
revised | [WTS] [JSN] | |||
GP-151000 | pCR 45.820, Narrowband LTE – Introduction (revision of GP-150953, revised in GP-151023) |
pCR revision of GP-150953 revised to GP-151023 |
Ericsson LM, Nokia Networks |
GP-67 AI: 9.1 |
revised | [WTS] [JSN] | |||
GP-151001 | pCR 45.820 NB-CIoT - Proposed Conclusion for the Cellular IoT SI (revision of GP-150906) |
pCR revision of GP-150906 |
Huawei Technologies Co., Ltd., HiSilicon Technologies Co. Ltd |
GP-67 AI: 9.1 |
noted | [WTS] [JSN] | |||
GP-151002 | pCR 45.820, Narrowband LTE – Uplink physical layer design (revision of GP-150965, revised in GP-151024) |
pCR revision of GP-150965 revised to GP-151024 |
Ericsson LM, Nokia Networks |
GP-67 AI: 9.1 |
revised | [WTS] [JSN] | |||
GP-151003 | pCR TR 45.926 on Introduction of evaluation results of BCCH carrier power reduction (revision of GP-150946) |
pCR revision of GP-150946 |
ZTE Corporation |
GP-67 AI: 9.1 |
agreed | [WTS] [JSN] | |||
GP-151004 | Outcome of TSG GERAN WG1 meeting #67 in Yinchuan, P. R. China, 10 - 14 August 2015 (slides) | report | Chairman TSG GERAN WG1 |
GP-67 AI: 8.1.1 |
revised | [WTS] [JSN] | |||
GP-151005 | Draft Report of TSG GERAN WG1 during TSG GERAN #67, version 0.0.1 | report | Secretary TSG GERAN WG1 |
GP-67 AI: 8.1.1 |
noted | [WTS] [JSN] | |||
GP-151006 | 3GPP TSG GERAN Work Plan | Work Plan | Work Plan Editor |
GP-67 AI: 14.1 |
approved | [WTS] [JSN] | |||
GP-151007 | Way Forward on Cellular IoT Study Item Conclusion | other | Huawei Technologies Co. Ltd., HiSilicon Technologies Co. Ltd, Neul Limited, u-blox AG, VODAFONE Group Plc, China Unicom, Qualcomm Incorporated, Deutsche Telekom, TELECOM ITALIA S.p.A, China Mobile Com. Corporation |
GP-67 AI: 9.1 |
noted | [WTS] [JSN] | |||
GP-151008 | pCR 45.820 NB-CIoT - System Level Simulation for Capacity and Latency Evaluation (revision of GP-150940) |
pCR revision of GP-150940 |
Huawei Technologies Co. Ltd., HiSilicon Technologies Co. Ltd |
GP-67 AI: 9.1 |
agreed | [WTS] [JSN] | |||
GP-151009 | pCR 45.820, Narrowband LTE – Downlink physical layer design (revision of GP-150962, revised in GP-151025) |
pCR revision of GP-150962 revised to GP-151025 |
Ericsson LM, Nokia Networks |
GP-67 AI: 9.1 |
revised | [WTS] [JSN] | |||
GP-151010 | Revised Outcome of TSG GERAN WG1 meeting #67 in Yinchuan, P. R. China, 10 - 14 August 2015 (slides) | report | Chairman TSG GERAN WG1 |
GP-67 AI: 8.1.1 |
approved | [WTS] [JSN] | |||
GP-151011 | pCR 45.820 NB-LTE Link Layer - Scheduling | pCR | Huawei Technologies Co. Ltd., HiSilicon Technologies Co. Ltd |
GP-67 AI: 9.2 |
noted | [WTS] [JSN] | |||
GP-151012 | pCR 45.820 Narrowband LTE (E)PDCCH design | pCR | Huawei Technologies Co. Ltd., HiSilicon Technologies Co. Ltd |
GP-67 AI: 9.1 |
noted | [WTS] [JSN] | |||
GP-151013 | pCR 45.820 Narrowband LTE Cell search design | pCR | Huawei Technologies Co. Ltd., HiSilicon Technologies Co. Ltd |
GP-67 AI: 9.1 |
noted | [WTS] [JSN] | |||
GP-151014 | pCR 45.820 Narrowband LTE Downlink physical layer design | pCR | Huawei Technologies Co. Ltd., HiSilicon Technologies Co. Ltd |
GP-67 AI: 9.1 |
noted | [WTS] [JSN] | |||
GP-151015 | pCR 45.820 Narrowband LTE_Uplink physical layer design | pCR | Huawei Technologies Co. Ltd., HiSilicon Technologies Co. Ltd |
GP-67 AI: 9.1 |
noted | [WTS] [JSN] | |||
GP-151016 | pCR 45.820 Narrowband LTE Introduction proposal | pCR | Huawei Technologies Co. Ltd., HiSilicon Technologies Co. Ltd |
GP-67 AI: 9.1 |
noted | [WTS] [JSN] | |||
GP-151017 | Revised G2 Chairmans summary of the outcome of G2-67 | report | G2 Chairperson |
GP-67 AI: 8.2.1 |
approved | [WTS] [JSN] | |||
GP-151018 | pCR to TR 45.820: Reuse of LTE L2/L3 layers for Cellular IoT (revision of GP-150952) |
pCR revision of GP-150952 |
Alcatel-Lucent, Samsung Electronics Co., Ltd |
GP-67 AI: 9.1 |
noted | [WTS] [JSN] | |||
GP-151019 | Cover sheet for TR 45.820 spec submit | TS or TR cover | VODAFONE Group Plc (Rapporteur) |
GP-67 AI: 11.1 |
noted | [WTS] [JSN] | |||
GP-151020 | Reply LS to GSMA Mobile IoT on Time to market improvement of Cellular IoT(To : GSMA Connected Living Programme, Cc: RAN), Source: TSG GERAN |
LS out LS is reply to GP-150843 LS To: GSMA Connected Living Programme revised to GP-151040 |
Editor (ORANGE) |
GP-67 AI: 12 |
revised | [WTS] [JSN] | |||
GP-151021 | EC-GSM, WI meeting schedule (update of GP-150769, updated in GP-151045) |
WI status report revision of GP-150769 revised to GP-151045 |
Ericsson LM |
GP-67 AI: 14.1 |
revised | [WTS] [JSN] | |||
GP-151022 | pCR 45.820 - Over all conclusion the SI "Cellular System Support for Ultra Low Complexity and Low Throughput Internet of Things" study | pCR | VODAFONE Group Plc (Rapporteur) |
GP-67 AI: 9.1 |
agreed | [WTS] [JSN] | |||
GP-151023 | pCR 45.820, Narrowband LTE – Introduction (revision of GP-151000, revised in GP-151031) |
pCR revision of GP-151000 revised to GP-151031 |
Ericsson LM, Nokia Networks |
GP-67 AI: 9.1 |
revised | [WTS] [JSN] | |||
GP-151024 | pCR 45.820, Narrowband LTE – Uplink physical layer design (revision of GP-151002) |
pCR revision of GP-151002 |
Ericsson LM, Nokia Networks |
GP-67 AI: 9.1 |
agreed | [WTS] [JSN] | |||
GP-151025 | pCR 45.820, Narrowband LTE – Downlink physical layer design (revision of GP-151009, revised in GP-151033) |
pCR revision of GP-151009 revised to GP-151033 |
Ericsson LM, Nokia Networks |
GP-67 AI: 9.1 |
revised | [WTS] [JSN] | |||
GP-151026 | pCR 45.820, Narrowband LTE – Coverage performance evaluation (revision of GP-150873) |
pCR revision of GP-150873 |
Ericsson LM, Nokia Networks |
GP-67 AI: 9.1 |
agreed | [WTS] [JSN] | |||
GP-151027 | pCR 45.820, Narrowband LTE – Cell search design (revision of GP-150950) |
pCR revision of GP-150950 |
Ericsson LM, Nokia Networks |
GP-67 AI: 9.1 |
agreed | [WTS] [JSN] | |||
GP-151028 | pCR 45.820, Narrowband LTE – (E)PCCCH design (revision of GP-150963) |
pCR revision of GP-150963 |
Ericsson LM, Nokia Networks |
GP-67 AI: 9.1 |
agreed | [WTS] [JSN] | |||
GP-151029 | pCR 45.820, EC-GSM – Simulation Results for Coexistence with UTRA and EUTRA (revision of GP-150900) |
pCR revision of GP-150900 |
Ericsson LM |
GP-67 AI: 9.1 |
agreed | [WTS] [JSN] | |||
GP-151030 | pCR TR 45.820 – EC-GSM, Downlink and Uplink System Level Simulation Results (revision of GP-150992) |
pCR revision of GP-150992 |
Intel |
GP-67 AI: 9.1 |
agreed | [WTS] [JSN] | |||
GP-151031 | pCR 45.820, Narrowband LTE – Introduction (revision of GP-151023) |
pCR revision of GP-151023 |
Ericsson LM, Nokia Networks |
GP-67 AI: 9.1 |
agreed | [WTS] [JSN] | |||
GP-151032 | pCR TR45-820 - C-UNB - General Description (revision of GP-150998) |
pCR revision of GP-150998 |
SIGFOX |
GP-67 AI: 9.1 |
agreed | [WTS] [JSN] | |||
GP-151033 | pCR 45.820, Narrowband LTE – Downlink physical layer design (revision of GP-151025) |
pCR revision of GP-151025 |
Ericsson LM, Nokia Networks |
GP-67 AI: 9.1 |
agreed | [WTS] [JSN] | |||
GP-151034 | pCR TR45-820 - Physical Layer design (revision of GP-150999) |
pCR revision of GP-150999 |
SIGFOX |
GP-67 AI: 9.1 |
agreed | [WTS] [JSN] | |||
GP-151035 | E-mail approval process of TR 45.820 v. 2.0.0 | other | TSG GERAN |
GP-67 AI: 11.1 |
agreed | [WTS] [JSN] | |||
GP-151036 | TR 45.820 Cellular System Support for Ultra Low Complexity and Low Throughput Internet of Things (Release 13), v. 2.0.0 | draft TR | VODAFONE Group Plc (Rapporteur) |
GP-67 AI: 11.1 |
approved | [WTS] [JSN] | |||
GP-151037 | Draft LS on Completion of Study Item on Cellular System Support for Ultra Low Complexity and Low Throughput Internet of Things (FS_IoT_LC) (To: TSG RAN, RAN WG1, RAN WG2, RAN WG3, RAN WG4, Cc: TSG SA, SA WG2, SA WG3, CT WG1) |
LS out LS To: RAN, R1, R2, R3, R4 revised to GP-151041 |
Vodafone Group plc (rapporteur) |
GP-67 AI: 12 |
revised | [WTS] [JSN] | |||
GP-151038 | pCR TR 45.820- Updates on Annex A | pCR | Samsung Electronics Co., Ltd, Nokia Networks |
GP-67 AI: 11.4 |
agreed | [WTS] [JSN] | |||
GP-151039 | New Work Item on Extended Coverage GSM (EC-GSM) for support of Cellular Internet of Things (CIoT_EC_GSM) (revision of GP-150994) |
WID new revision of GP-150994 |
TSG GERAN |
GP-67 AI: 11.1 |
approved | [WTS] [JSN] | |||
GP-151040 | Reply LS to GSMA Mobile IoT on Time to market improvement of Cellular IoT(To : GSMA Connected Living Programme, Cc: RAN, SA), Source: TSG GERAN |
LS out LS To: GSMA Connected Living Programme revision of GP-151020 revised to GP-151042 |
Editor (ORANGE) |
GP-67 AI: 12 |
revised | [WTS] [JSN] | |||
GP-151041 | LS on Completion of Study Item on Cellular System Support for Ultra Low Complexity and Low Throughput Internet of Things (FS_IoT_LC) (To: TSG RAN, TSG SA, SA WG2, SA WG3, TSG CT, Cc: RAN WG1, RAN WG2, RAN WG3, RAN WG4, CT WG1) |
LS out LS To: RAN, SA, S2, S3, CT revision of GP-151037 |
TSG GERAN |
GP-67 AI: 12 |
approved | [WTS] [JSN] | |||
GP-151042 | Reply LS to GSMA Mobile IoT on Time to market improvement of Cellular IoT(To : GSMA Connected Living Programme, Cc: RAN, SA), Source: TSG GERAN |
LS out LS To: GSMA Connected Living Programme revision of GP-151040 |
TSG GERAN |
GP-67 AI: 12 |
approved | [WTS] [JSN] | |||
GP-151043 | LS from GERAN to SA3 on EC-GSM Progress (To: SA3), Source: TSG GERAN |
LS out LS To: S3 revised to GP-151044 |
TSG GERAN |
GP-67 AI: 12 |
revised | [WTS] [JSN] | |||
GP-151044 | LS from GERAN to SA3 on EC-GSM Progress (To: SA3, TSG SA), Source: TSG GERAN |
LS out LS To: S3, SA revision of GP-151043 |
TSG GERAN |
GP-67 AI: 12 |
approved | [WTS] [JSN] | |||
GP-151045 | EC-GSM, WI meeting schedule (update of GP-151021) |
WI status report revision of GP-151021 |
Ericsson LM |
GP-67 AI: 14.1 |
noted | [WTS] [JSN] |
374 documents (1.0607328414917 seconds)