Please enter the search related information in the fields below. Partial information works, e.g. "SP-21
" in the "tdoc" field lists all TSG SA documents from 2021. Regular expressions mostly work in all fields (e.g. "2[34].501
" in the "Spec" field lists all documents related to 23.501 and 24.501. Capitalization is disregarded, i.e. "3GPP
" gives the same results as "3gpp
".
Download results in JSON format
tdoc | Title | Type / Revs | Source | Spec / CR | S/WID | Release | Meeting | Status | Links |
---|---|---|---|---|---|---|---|---|---|
GP-101091 | Draft Agenda for TSG GERAN no. 47 in Kunming | other | GERAN Chairman | GP-47 | - | [WTS] [JSN] | |||
GP-101092 | Draft Agenda for TSG GERAN WG1 during TSG GERAN no. 47 in Kunming | other | GERAN WG1 Chairman | GP-47 | - | [WTS] [JSN] | |||
GP-101093 | Draft Agenda for TSG GERAN WG2 during TSG GERAN no. 47 in Kunming | other | GERAN WG2 Chairman | GP-47 | - | [WTS] [JSN] | |||
GP-101094 | Draft Agenda for TSG GERAN WG3new during TSG GERAN no. 47 in Kunming | other | GERAN WG3 Chairman | GP-47 | - | [WTS] [JSN] | |||
GP-101095 | CR 51.010-5-0099 Update for the latest version of TTCN (Rel-9) | CR | TF 160 | GP-47 | - | [WTS] [JSN] | |||
GP-101096 | CR 51.010-2-0658 New PICS required for UE capability testing (Rel-9) | CR | TF 160 | GP-47 | - | [WTS] [JSN] | |||
GP-101097 | CR 51.010-5-0100 Correction to GCF WI-010 IR_G test cases (Rel-9) | CR | TF 160 | GP-47 | - | [WTS] [JSN] | |||
GP-101098 | CR 51.010-5-0101 Correction to the IR_G Test Suite (Rel-9) | CR | TF 160 | GP-47 | - | [WTS] [JSN] | |||
GP-101099 | CR 51-010-1-4443 42.3.4 P-Channels removal clean up (Rel-9) | CR | Rohde & Schwarz | GP-47 | - | [WTS] [JSN] | |||
GP-101100 | CR 51-010-1-4444 52.3.4 P-Channels removal clean up (Rel-9) | CR | Rohde & Schwarz | GP-47 | - | [WTS] [JSN] | |||
GP-101101 | CR 51-010-1-4445 TC 42.4.1.2 P-Channels removal corrections (Rel-9) | CR | Rohde & Schwarz | GP-47 | - | [WTS] [JSN] | |||
GP-101102 | CR 51-010-1-4446 TC 42.4.1.4 P-Channels removal corrections (Rel-9) | CR | Rohde & Schwarz | GP-47 | - | [WTS] [JSN] | |||
GP-101103 | CR 51-010-1-4447 TC 42.4.1.5 P-Channels removal corrections (Rel-9) | CR | Rohde & Schwarz | GP-47 | - | [WTS] [JSN] | |||
GP-101104 | CR 51-010-1-4448 TC 42.4.2.2.2 Comments in test sequence corrected (Rel-9) | CR | Rohde & Schwarz | GP-47 | - | [WTS] [JSN] | |||
GP-101105 | CR 51-010-1-4449 TC 42.4.8.2.2 P-Channels removal corrections (Rel-9) | CR | Rohde & Schwarz | GP-47 | - | [WTS] [JSN] | |||
GP-101106 | CR 51-010-1-4450 TC 42.4.8.2.3 P-Channels removal corrections (Rel-9) | CR | Rohde & Schwarz | GP-47 | - | [WTS] [JSN] | |||
GP-101107 | CR 51-010-1-4451 TC 42.4.8.3.2 Establishment Cause corrected (Rel-9) | CR | Rohde & Schwarz | GP-47 | - | [WTS] [JSN] | |||
GP-101108 | CR 51-010-1-4452 TC 42.4.8.3.3 Establishment Cause corrected (Rel-9) | CR | Rohde & Schwarz | GP-47 | - | [WTS] [JSN] | |||
GP-101109 | CR 51-010-1-4453 TC 42.4.8.3.5 Establishment Cause corrected (Rel-9) | CR | Rohde & Schwarz | GP-47 | - | [WTS] [JSN] | |||
GP-101110 | CR 51-010-1-4454 TC 42.4.8.3.6 Establishment Cause corrected (Rel-9) | CR | Rohde & Schwarz | GP-47 | - | [WTS] [JSN] | |||
GP-101111 | CR 51-010-1-4455 TC 42.4.8.4.4 P-Channels removal corrections (Rel-9) | CR | Rohde & Schwarz | GP-47 | - | [WTS] [JSN] | |||
GP-101112 | CR 51-010-1-4456 TC 42.4.8.4.5 P-Channels removal corrections (Rel-9) | CR | Rohde & Schwarz | GP-47 | - | [WTS] [JSN] | |||
GP-101113 | CR 51-010-1-4457 TC 42.4.8.4.7 PBCCH removal (Rel-9) | CR | Rohde & Schwarz | GP-47 | - | [WTS] [JSN] | |||
GP-101114 | CR 51-010-1-4458 42.5.5 TA not relevant and inconsistent (Rel-9) | CR | Rohde & Schwarz | GP-47 | - | [WTS] [JSN] | |||
GP-101115 | CR 51-010-1-4459 52.5.5 TA not relevant and inconsistent (Rel-9) | CR | Rohde & Schwarz | GP-47 | - | [WTS] [JSN] | |||
GP-101116 | CR 51-010-1-4460 TC 53.1.2.19 P-Channels removal (Rel-9) | CR | Rohde & Schwarz | GP-47 | - | [WTS] [JSN] | |||
GP-101117 | CR 51-010-1-4461 TC 51.3.6.6 P-Channels removal corrections (Rel-9) | CR | Rohde & Schwarz | GP-47 | - | [WTS] [JSN] | |||
GP-101118 | CR 51-010-1-4462 TC 51.3.6.7 P-Channels removal corrections (Rel-9) | CR | Rohde & Schwarz | GP-47 | - | [WTS] [JSN] | |||
GP-101119 | CR 51-010-1-4463 TC 51.3.6.8 P-Channels removal corrections (Rel-9) | CR | Rohde & Schwarz | GP-47 | - | [WTS] [JSN] | |||
GP-101120 | CR 51-010-1-4464 TC 51.3.6.9 P-Channels removal corrections (Rel-9) | CR | Rohde & Schwarz | GP-47 | - | [WTS] [JSN] | |||
GP-101121 | CR 51-010-1-4465 TC 41.3.6.6 P-Channels removal corrections (Rel-9) | CR | Rohde & Schwarz | GP-47 | - | [WTS] [JSN] | |||
GP-101122 | CR 51-010-1-4466 TC 41.3.6.7 P-Channels removal corrections (Rel-9) | CR | Rohde & Schwarz | GP-47 | - | [WTS] [JSN] | |||
GP-101123 | CR 51-010-1-4467 TC 41.3.6.8 P-Channels removal corrections (Rel-9) | CR | Rohde & Schwarz | GP-47 | - | [WTS] [JSN] | |||
GP-101124 | CR 51-010-1-4468 41.3.7 P-Channels removal clean up (Rel-9) | CR | Rohde & Schwarz | GP-47 | - | [WTS] [JSN] | |||
GP-101125 | CR 51-010-1-4469 51.3.7 P-Channels removal clean up (Rel-9) | CR | Rohde & Schwarz | GP-47 | - | [WTS] [JSN] | |||
GP-101126 | CR 51-010-1-4470 TC 42.1.2.2.5.1 Removal of test case (Rel-9) | CR | Rohde & Schwarz | GP-47 | - | [WTS] [JSN] | |||
GP-101127 | CR 51-010-1-4471 TC 52.1.2.2.5.1 Removal of test case (Rel-9) | CR | Rohde & Schwarz | GP-47 | - | [WTS] [JSN] | |||
GP-101128 | CR 51-010-1-4472 TC 42.3.2.1.2 Power parameters not used in macro Uplink dynamic allocation two phase access (Rel-9) | CR | Rohde & Schwarz | GP-47 | - | [WTS] [JSN] | |||
GP-101129 | CR 51-010-1-4473 TC 52.3.2.1.2 Power parameters not used in macro Uplink dynamic allocation two phase access (Rel-9) | CR | Rohde & Schwarz | GP-47 | - | [WTS] [JSN] | |||
GP-101130 | CR 51-010-2-0659 P-Channels removal changes to applicability table (Rel-9) | CR | Rohde & Schwarz | GP-47 | - | [WTS] [JSN] | |||
GP-101131 | CR 51.010-1-4474 Correction to message sequence in TC 31.4.4.2 Disconnect all calls (Rel-9) | CR | Samsung | GP-47 | - | [WTS] [JSN] | |||
GP-101132 | CR 51-010-1-4475 42.4.8.1.x P-Channel conversion / removal (Rel-9) | CR | Rohde & Schwarz, Bureau Veritas ADT | GP-47 | - | [WTS] [JSN] | |||
GP-101133 | CR 51-010-1-4476 TC 41.1.5.3 PCCCH removal (Rel-9) | CR | Rohde & Schwarz | GP-47 | - | [WTS] [JSN] | |||
GP-101134 | CR 51-010-1-4477 TC 51.1.5.3 PCCCH removal (Rel-9) | CR | Rohde & Schwarz | GP-47 | - | [WTS] [JSN] | |||
GP-101135 | CR 51-010-1-4478 51.1.3-4 Removal of PCCCH test cases (Rel-9) | CR | Rohde & Schwarz | GP-47 | - | [WTS] [JSN] | |||
GP-101136 | CR 51-010-1-4479 51.1.6 Removal of PCCCH test case (Rel-9) | CR | Rohde & Schwarz | GP-47 | - | [WTS] [JSN] | |||
GP-101137 | CR 51-010-1-4480 42.7.3.x Triggering and procedures for uplink transfer adjusted (Rel-9) | CR | Rohde & Schwarz | GP-47 | - | [WTS] [JSN] | |||
GP-101138 | CR 51-010-1-4481 26.7.4.5.5 Additionnal Information added for EFloci coding (Rel-9) | CR | Rohde & Schwarz | GP-47 | - | [WTS] [JSN] | |||
GP-101139 | CR 51-010-1-4482 42.4.2.1.3 P-Channel removal corrections (Rel-9) | CR | Rohde & Schwarz | GP-47 | - | [WTS] [JSN] | |||
GP-101140 | CR 51-010-1-4483 42.4.2.1.4 P-Channel removal corrections (Rel-9) | CR | Rohde & Schwarz | GP-47 | - | [WTS] [JSN] | |||
GP-101141 | CR 51.010-1-4484 Location area update type corrected in Section 26.9.6a.1.X (Rel-9) | CR | Qualcomm Incorporated | GP-47 | - | [WTS] [JSN] | |||
GP-101142 | eCall Work Plan | other | Qualcomm Incorporated | GP-47 | - | [WTS] [JSN] | |||
GP-101143 | CR 51.010-1-4485 26.7.2.3 - Authentication accepted with USIM (Rel-9) | CR | Sierra Wireless UK | GP-47 | - | [WTS] [JSN] | |||
GP-101144 | CR 51.010-1-4486 26.7.2.4 - Authentication not accepted by MS with USIM (MAC Failure) (Rel-9) | CR | Sierra Wireless UK | GP-47 | - | [WTS] [JSN] | |||
GP-101145 | CR 51.010-1-4487 26.7.2.5 - Authentication not accepted by MS with USIM (Synch Failure) (Rel-9) | CR | Sierra Wireless UK | GP-47 | - | [WTS] [JSN] | |||
GP-101146 | CR 51.010-1-4488 44.2.5.1.3 - Authentication accepted with USIM (Rel-9) | CR | Sierra Wireless UK | GP-47 | - | [WTS] [JSN] | |||
GP-101147 | CR 51.010-2-0660 Additions following USIM Authentication introduction (Rel-9) | CR | Sierra Wireless UK | GP-47 | - | [WTS] [JSN] | |||
GP-101148 | Discussion Paper: USIM and UMTS authentication challenge in TS 51.010 (Rel-9) | other | Sierra Wireless UK | GP-47 | - | [WTS] [JSN] | |||
GP-101149 | CR 51010-1-4489 New Test Case 6.2.3.23 - Inter-RAT Cell Reselection from GPRS Packet transfer to E-UTRA in CCN mode (PACKET CELL CHANGE CONTINUE) (Rel-9) | CR | Research In Motion UK Ltd | GP-47 | - | [WTS] [JSN] | |||
GP-101150 | CR 51010-1-4490 Correction to test case 14.18.10.1 (Rel-9) | CR | Research In Motion UK Ltd | GP-47 | - | [WTS] [JSN] | |||
GP-101151 | VAMOS Work Item Description | other | Research In Motion UK Ltd | GP-47 | - | [WTS] [JSN] | |||
GP-101152 | VAMOS Work plan | other | Research In Motion UK Ltd | GP-47 | - | [WTS] [JSN] | |||
GP-101153 | CR 51.010-1-4491 Addition of Part 7 (Rel-9) | CR | Spirent | GP-47 | - | [WTS] [JSN] | |||
GP-101154 | CR 51.010-2-0661 Addition of Part 7 (Rel-9) | CR | Spirent | GP-47 | - | [WTS] [JSN] | |||
GP-101155 | CR 51.010-5-0102 Addition of Part 7 (Rel-9) | CR | Spirent | GP-47 | - | [WTS] [JSN] | |||
GP-101156 | CR 51.010-1-4492 Clarification to default conditions during A-GNSS signalling tests (Rel-9) | CR | Spirent | GP-47 | - | [WTS] [JSN] | |||
GP-101157 | CR 51.010-1-4493 Addition of references for A-GNSS Assistance data (Rel-9) | CR | Spirent | GP-47 | - | [WTS] [JSN] | |||
GP-101158 | CR 51.010-1-4494 Addition of values for Galileo (Rel-9) | CR | Spirent | GP-47 | - | [WTS] [JSN] | |||
GP-101159 | Additional assistance data information for TS 51.010-7 | other | Spirent | GP-47 | - | [WTS] [JSN] | |||
GP-101160 | A-GNSS Work plan | other | Spirent | GP-47 | - | [WTS] [JSN] | |||
GP-101161 | Work Items for the TSG WG meeting GERAN3#47 | other | ETSI MCC | GP-47 | - | [WTS] [JSN] | |||
GP-101162 | CR 51.010-1-4495 Correction to Multiband Support IE in Table 26.6.11b (Rel-9) | CR | Anite, SGS UK | GP-47 | - | [WTS] [JSN] | |||
GP-101163 | CR 51.010-1-4496 Correction to section 26.11.3.1.X (Rel-9) | CR | Anite, SGS UK | GP-47 | - | [WTS] [JSN] | |||
GP-101164 | CR 51.010-1-4497 20.22.30.3 – P Channel removal correction (Rel-9) | CR | Anite | GP-47 | - | [WTS] [JSN] | |||
GP-101165 | CR 51.010-1-4498 Test Cases 42.5.x – Correction to the specific message contents (Rel-9) | CR | Anite | GP-47 | - | [WTS] [JSN] | |||
GP-101166 | CR 51.010-2-0662 Applicability correction to section 26.8.2.x (Rel-9) | CR | Anite, SGS UK | GP-47 | - | [WTS] [JSN] | |||
GP-101167 | CR 51.010-2-0663 Applicability correction to section 21.1 (Rel-9) | CR | Anite | GP-47 | - | [WTS] [JSN] | |||
GP-101168 | CR 51.010-2-0664 42.4.2.3.3 – Removal of test case from applicability table (Rel-9) | CR | Anite | GP-47 | - | [WTS] [JSN] | |||
GP-101169 | CR 51.010-1-4499 Optional procedure in MM IDLE state for test cases 26.7.4.3.3, 26.7.4.3.4 (Rel-9) | CR | Anite | GP-47 | - | [WTS] [JSN] | |||
GP-101170 | CR 51.010-2-0666 Applicability correction to section 22.1 (Rel-9) | CR | Anite | GP-47 | - | [WTS] [JSN] | |||
GP-101171 | CR 51.010-1-4500 Rel-9 alignment for Audio Testing (Rel-9) | CR | CETECOM | GP-47 | - | [WTS] [JSN] | |||
GP-101172 | CR 51.010-1-4501 Alignment of change PIN and unblock PIN test cases to TS 31.121 (Rel-9) | CR | CETECOM, SCC | GP-47 | - | [WTS] [JSN] | |||
GP-101173 | CR 51.010-2-0665 Rel-9 alignment for Audio Testing (Rel-9) | CR | CETECOM | GP-47 | - | [WTS] [JSN] | |||
GP-101174 | CR 51.010-2-0667 Introduction of new PICS TSPC_PIN_MMI_Strings(Rel-9) | CR | CETECOM, SCC | GP-47 | - | [WTS] [JSN] | |||
GP-101175 | CR 36.523-1-0896 6.2.3.19 : Redirection to E-UTRA upon the release of the CS connection (Rel-9) | CR | NOKIA Corporation | GP-47 | - | [WTS] [JSN] | |||
GP-101176 | CR 36.523-2-0095 6.2.3.19 : Redirection to E-UTRA upon the release of the CS connection (Rel-9) | CR | NOKIA Corporation | GP-47 | - | [WTS] [JSN] | |||
GP-101177 | CR 36.523-1-0897 6.2.3.20: Redirection to E-UTRA upon the release of the CS connection and no suitable cell available (Rel-9) | CR | NOKIA Corporation | GP-47 | - | [WTS] [JSN] | |||
GP-101178 | CR 36.523-2-0096 6.2.3.20: Redirection to E-UTRA upon the release of the CS connection and no suitable cell available (Rel-9) | CR | NOKIA Corporation | GP-47 | - | [WTS] [JSN] | |||
GP-101179 | CR 51.010-1-4502 70.14.1 MO-LR Idle mode for Mobiles Supporting MS-Assisted GNSS (Rel-9) | CR | NOKIA Corporation | GP-47 | - | [WTS] [JSN] | |||
GP-101180 | CR 51.010-2-0668 70.14.1 MO-LR Idle mode for Mobiles Supporting MS-Assisted GNSS (Rel-9) | CR | NOKIA Corporation | GP-47 | - | [WTS] [JSN] | |||
GP-101181 | CR 51.010-1-4503 70.14.2 MO-LR Idle mode for Mobiles Supporting MS-Based GNSS (Rel-9) | CR | NOKIA Corporation | GP-47 | - | [WTS] [JSN] | |||
GP-101182 | CR 51.010-2-0669 70.14.2 MO-LR Idle mode for Mobiles Supporting MS-Based GNSS (Rel-9) | CR | NOKIA Corporation | GP-47 | - | [WTS] [JSN] | |||
GP-101183 | CR 51.010-2-0670 Change Applicability of tests – Conditions definitions C399 (Rel-9) | CR | NOKIA Corporation | GP-47 | - | [WTS] [JSN] | |||
GP-101184 | CR 36.523-1-0898 New test case 6.2.3.14 Inter-RAT Cell Reselection / from GSM_Idle/GPRS Packet_Idle to E-UTRA (priority of E-UTRA cells are higher than the serving cell) (Rel-9) | CR | ST-Ericsson SA | GP-47 | - | [WTS] [JSN] | |||
GP-101185 | CR 36.523-1-0899 New test case 6.2.3.15 Inter-RAT Cell Reselection / from GSM_Idle/GPRS Packet_Idle to E-UTRA (priority of E-UTRA cells are lower than the serving cell) (Rel-9) | CR | ST-Ericsson SA | GP-47 | - | [WTS] [JSN] | |||
GP-101186 | CR 51.010-1-4504 New test case 58c.2.1a – Acknowledged Mode/ Uplink TBF/ Countdown Value, in EGRS2A (Rel-9) | CR | ST-Ericsson SA | GP-47 | - | [WTS] [JSN] | |||
GP-101187 | CR 51.010-1-4505 New test case 58c.2.2a Acknowledged Mode/ Uplink TBF/ Retransmission/ Split RLC Data Block, in EGPRS2A (Rel-9) | CR | ST-Ericsson SA | GP-47 | - | [WTS] [JSN] | |||
GP-101188 | CR 51-010-1-4506 26.9.6a.1.x USIM definitions and other corrections (Rel-9) | CR | Rohde & Schwarz, Qualcomm Incorporated | GP-47 | - | [WTS] [JSN] | |||
GP-101189 | CR 51-010-1-4507 26.9.6a.1.x Alignment of test case titles (Rel-9) | CR | Rohde & Schwarz, Qualcomm Incorporated | GP-47 | - | [WTS] [JSN] | |||
GP-101190 | CR 51-010-1-4508 TC 20.22.2 P-Channels removal problems (Rel-9) | CR | Rohde & Schwarz | GP-47 | - | [WTS] [JSN] | |||
GP-101191 | CR 51-010-1-4509 TC 20.22.3 P-Channels removal problems (Rel-9) | CR | Rohde & Schwarz | GP-47 | - | [WTS] [JSN] | |||
GP-101192 | CR 51-010-1-4510 TC 20.22.5 P-Channels removal problems (Rel-9) | CR | Rohde & Schwarz | GP-47 | - | [WTS] [JSN] | |||
GP-101193 | CR 51-010-1-4511 Generic call setup procedures for ‘Signalling Only MS’ enhancements (Rel-9) | CR | Rohde & Schwarz | GP-47 | - | [WTS] [JSN] | |||
GP-101194 | CR 51-010-1-4512 26.12.3-5 Redundant test execution parameters (Rel-9) | CR | Rohde & Schwarz, 7layers | GP-47 | - | [WTS] [JSN] | |||
GP-101195 | CR 51-010-2-0671 eCall section 26.9.6a.1 Alignment of test case titles (Rel-9) | CR | Rohde & Schwarz, Qualcomm Incorporated | GP-47 | - | [WTS] [JSN] | |||
GP-101196 | CR 51-010-2-0671 Generic call setup procedures for ‘Signalling Only MS’ applicability changes (Rel-9) | CR | Rohde & Schwarz | GP-47 | - | [WTS] [JSN] | |||
GP-101197 | CR 51-010-2-0673 26.12.3-5 Redundant test execution parameters (Rel-9) | CR | Rohde & Schwarz, 7layers | GP-47 | - | [WTS] [JSN] | |||
GP-101198 | CR 51-010-2-0674 Clean-up of not used conditions in Table B1.a (Rel-9) | CR | Rohde & Schwarz, 7layers | GP-47 | - | [WTS] [JSN] | |||
GP-101199 | GCF Briefing | other | WG3 Chairman (Samsung) | GP-47 | - | [WTS] [JSN] | |||
GP-101200 | CR 51-010-1-4513 Correction to TC 20.25.3a (Rel-9) | CR | CMCC | GP-47 | - | [WTS] [JSN] | |||
GP-101201 | L2S Mapping Method and Verification for MUROS | other | ZTE Corporation | GP-47 | - | [WTS] [JSN] | |||
GP-101202 | CR 45.914-0017 Link 2 System Mapping Scheme and Verification for MUROS (Rel-9) | CR | ZTE Corporation | GP-47 | - | [WTS] [JSN] | |||
GP-101203 | System Level Results with MAIO Hopping Scheme for MUROS (revised in GP-101537) | other | ZTE Corporation | GP-47 | - | [WTS] [JSN] | |||
GP-101204 | CR 45.914-0018 System Performance Evaluation with MAIO Hopping Scheme for MUROS (Rel-9) | CR | ZTE Corporation | GP-47 | - | [WTS] [JSN] | |||
GP-101205 | CR 45.008-0480 Reporting rules for hybrid cells (Rel-9) | CR | Nokia Siemens Networks, NOKIA Corporation | GP-47 | - | [WTS] [JSN] | |||
GP-101206 | GELTE Workplan | other | NOKIA Corporation | GP-47 | - | [WTS] [JSN] | |||
GP-101207 | CR 36.523-1-0900 Correction related to GERAN priority, in existing Inter-RAT cell reselection TC between GERAN and E-UTRA (Rel-9) | CR | NOKIA Corporation | GP-47 | - | [WTS] [JSN] | |||
GP-101208 | CR 51.010-1-4514 Transfer of GPS scenarios and assistance data to new specification (Rel-9) | CR | Spirent | GP-47 | - | [WTS] [JSN] | |||
GP-101209 | CR 51.010-1-4515 Adding Specific Message Content for 26.6.11.2 (Rel-9) | CR | Research In Motion UK Ltd., Rohde & Schwarz | GP-47 | - | [WTS] [JSN] | |||
GP-101210 | CR 36.523-1-0901 New Test Case 6.2.3.29 - Inter-RAT cell reselection from GPRS packet_transfer NC1 mode to E-UTRA / Network assisted cell change (Rel-9) | CR | Research In Motion UK Ltd. | GP-47 | - | [WTS] [JSN] | |||
GP-101211 | CR 36.523-1-0902 New Test case 6.2.3.27- Inter-RAT Cell selection from GPRS Packet_transfer to E-UTRA Cell (NC2 mode) (Rel-9) | CR | Research In Motion UK Ltd. | GP-47 | - | [WTS] [JSN] | |||
GP-101212 | CR 36.523-2-0097 Addition of new GELTE test cases- 6.2.3.27 and 6.2.3.29 (Rel-9) | CR | Research In Motion UK Ltd. | GP-47 | - | [WTS] [JSN] | |||
GP-101213 | CR 51.010-1-4516 44.2.9.1.X - Correction to DST settings (Rel-9) | CR | Anite | GP-47 | - | [WTS] [JSN] | |||
GP-101214 | CR 51.010-1-4517 26.7.6.1.1 - Correction to DST settings (Rel-9) | CR | Anite | GP-47 | - | [WTS] [JSN] | |||
GP-101215 | CR 51.010-2-0675 Adding TC 58c.2.1a and 58c.2.2a (Rel-9) | CR | ST-Ericsson | GP-47 | - | [WTS] [JSN] | |||
GP-101216 | CR 36.523-2-0098 Adding TC 6.2.3.14 and 6.2.3.15 (Rel-9) | CR | ST-Ericsson | GP-47 | - | [WTS] [JSN] | |||
GP-101217 | CR 51.010-1-4518 Addition of GNSS ‘MO-LR Location Error: GNSS assistance data missing’ test case (Rel-9) | CR | Thales | GP-47 | - | [WTS] [JSN] | |||
GP-101218 | CR 51.010-1-4519 Addition of GNSS ‘MO-LR Location Error: Requested Method not Supported’ test case (Rel-9) | CR | Thales | GP-47 | - | [WTS] [JSN] | |||
GP-101219 | CR 51.010-1-4520 Addition of GNSS ‘MO-LR : Multiple RRLP Requests with Different Reference Number’ test case (Rel-9) | CR | Thales | GP-47 | - | [WTS] [JSN] | |||
GP-101220 | CR 51.010-1-4521 Addition of GNSS ‘MO-LR : Multiple RRLP Requests with Same Reference Number and Extended Reference Number’ test case (Rel-9) | CR | Thales | GP-47 | - | [WTS] [JSN] | |||
GP-101221 | CR 51.010-2-0676 Correction of release and status information for TSPC_Feat_A53 (Rel-9) | CR | 7 layers AG, Samsung | GP-47 | - | [WTS] [JSN] | |||
GP-101222 | CR 51.010-2-0660 rev 1 Additions following USIM Authentication introduction (Rel-9) | CR | Sierra Wireless UK | GP-47 | - | [WTS] [JSN] | |||
GP-101223 | CR 51.010-1-4487 rev 1 26.7.2.5 - Authentication not accepted by MS with USIM (Synch Failure) (Rel-9) | CR | Sierra Wireless UK | GP-47 | - | [WTS] [JSN] | |||
GP-101224 | CR 51.010-1-4499 rev 1 Optional procedure in MM IDLE state for test cases 26.7.4.3.3, 26.7.4.3.4 (Rel-9) | CR | Anite | GP-47 | - | [WTS] [JSN] | |||
GP-101225 | CR 51.010-1-0677 Optional procedure in MM IDLE state for test cases 26.7.4.3.3, 26.7.4.3.4 (Rel-9) | CR | Anite | GP-47 | - | [WTS] [JSN] | |||
GP-101226 | Discussion paper on GERAN impacts in LCLS TR23.889 (Revised in GP-101458) | other | Nokia Siemens Networks | GP-47 | - | [WTS] [JSN] | |||
GP-101227 | CR 48.103-0005 rev 6 Introduction of Local Call Local Switch support (Revision of GP-100702) (Rel-10) | CR | Nokia Siemens Networks | GP-47 | - | [WTS] [JSN] | |||
GP-101228 | CR 48.008-0319 rev 8 Introduction of Local Call Local Switch support (Revision of GP-100958) (Rel-10) | CR | Nokia Siemens Networks | GP-47 | - | [WTS] [JSN] | |||
GP-101229 | Principles of Network Sharing in GERAN | other | Telefon AB LM Ericsson | GP-47 | - | [WTS] [JSN] | |||
GP-101230 | Meeting Minutes of GERANIMTC Teleconference #1 | other | WI Rapporteur | GP-47 | - | [WTS] [JSN] | |||
GP-101231 | Meeting Minutes of GERANIMTC Teleconference #2 | other | WI Rapporteur | GP-47 | - | [WTS] [JSN] | |||
GP-101232 | Discussion paper on enhancement of Iur-g interface in GERAN | other | CMCC, ZTE Corporation | GP-47 | - | [WTS] [JSN] | |||
GP-101233 | Reduction of inter-RAT reselection duration | other | CMCC | GP-47 | - | [WTS] [JSN] | |||
GP-101234 | TIGHTER - Proposed categorization of the TIGHTER performance requirements | other | NOKIA Corporation | GP-47 | - | [WTS] [JSN] | |||
GP-101235 | TIGHTER - Simulation results for AMR NB | other | NOKIA Corporation | GP-47 | - | [WTS] [JSN] | |||
GP-101236 | TIGHTER - Draft Work plan | other | NOKIA Corporation | GP-47 | - | [WTS] [JSN] | |||
GP-101237 | On Further Observations of Legacy DARP Phase I Handsets with VAMOS (revised in GP-101547) | other | ZTE Corporation | GP-47 | - | [WTS] [JSN] | |||
GP-101238 | GERAN IMTC specification work | other | Vodafone Group Plc | GP-47 | - | [WTS] [JSN] | |||
GP-101239 | New Work Item Building Block on Network Improvements for Machine Type Communications | other | Vodafone Group Plc | GP-47 | - | [WTS] [JSN] | |||
GP-101240 | New Work Task on Multi-Standard Radio Base Station RF requirements for non-contiguous spectrum deployments | other | Vodafone Group Plc | GP-47 | - | [WTS] [JSN] | |||
GP-101241 | New Study Item on Solutions for GSM/EDGE BTS Energy Saving | other | Vodafone Group Plc | GP-47 | - | [WTS] [JSN] | |||
GP-101242 | CR 44.018-0863 Alternating between different neighbour cell description formats, etc.(Rel-9) | CR | Vodafone Group Plc | GP-47 | - | [WTS] [JSN] | |||
GP-101243 | Slides to accompany GP-101242 “Alternating between different neighbour cell description formats, etc.” | other | Vodafone Group Plc | GP-47 | - | [WTS] [JSN] | |||
GP-101244 | Open issue on GERAN Sharing: supporting/non-supporting mobiles | other | Vodafone Group Plc | GP-47 | - | [WTS] [JSN] | |||
GP-101245 | CR 43.022-0029 rev 1 Redirection from E-UTRAN to GERAN (Rel-9) | CR | Vodafone Group Plc | GP-47 | - | [WTS] [JSN] | |||
GP-101246 | CR 45.008-0451 rev 1 Redirection from E-UTRAN to GERAN (Rel-9) | CR | Vodafone Group Plc | GP-47 | - | [WTS] [JSN] | |||
GP-101247 | 3GPP TSG GERAN Work Plan | other | Vodafone Group Plc | GP-47 | - | [WTS] [JSN] | |||
GP-101248 | Response LS on introduction of RAN Sharing for GERAN | other | TSG CT WG1 | GP-47 | - | [WTS] [JSN] | |||
GP-101249 | LS on CSG autonomous search function | other | TSG RAN WG2 | GP-47 | - | [WTS] [JSN] | |||
GP-101250 | Reply LS on Handling of Hybrid Cells (GP-101089/R2-103487) | other | TSG RAN WG2 | GP-47 | - | [WTS] [JSN] | |||
GP-101251 | LS on MSR BS RF requirements for non-contiguous spectrum deployments | other | TSG RAN WG4 | GP-47 | - | [WTS] [JSN] | |||
GP-101252 | LS on communications from ITU-R WP5A | other | TSG RAN | GP-47 | - | [WTS] [JSN] | |||
GP-101253 | LS on CSG reselection requirements and testing | other | TSG RAN | GP-47 | - | [WTS] [JSN] | |||
GP-101254 | LS on TS 102 900 European Public Warning System (EU-ALERT) using the Cell Broadcast Service | other | ETSI Special Committee EMTEL | GP-47 | - | [WTS] [JSN] | |||
GP-101255 | Liaison Statement on Harmonised Standards for GSM Mobile Stations | other | ETSI TC MSG | GP-47 | - | [WTS] [JSN] | |||
GP-101256 | Liaison Statement to 3GPP GERAN on GSM-R parameters | other | CEPT SE7 | GP-47 | - | [WTS] [JSN] | |||
GP-101257 | LS on Consent of Recommendation G.9971 “Requirements of transport functions in IP home networks” | other | ITU-T SG15 | GP-47 | - | [WTS] [JSN] | |||
GP-101258 | LS on “Mobile Wireless access systems providing telecommunications for a large number of ubiquitous sensors and/or actuators scattered over wide areas in the land mobile service” | other | TSG RAN ITU-R Ad Hoc | GP-47 | - | [WTS] [JSN] | |||
GP-101259 | LS on Status of European Harmonised Standards for 3GPP technologies | other | ETSI ERM/MSG TFES | GP-47 | - | [WTS] [JSN] | |||
GP-101260 | LS on Follow on to LS response on support for Priority for terminating sessions for MPS | other | TSG SA WG2 | GP-47 | - | [WTS] [JSN] | |||
GP-101261 | Response LS on eCall capability in Test USIM defined in TS 34.108 | other | TSG RAN WG5 | GP-47 | - | [WTS] [JSN] | |||
GP-101262 | LS on OTA conformance testing for devices utilising 3GPP based wireless communication | other | GCF Steering Group | GP-47 | - | [WTS] [JSN] | |||
GP-101263 | LS on Non-inclusion of optional part from 24.008 in conformance test cases | other | GCF FTAG/ Qualcomm | GP-47 | - | [WTS] [JSN] | |||
GP-101264 | LS on Eliminate execution of test cases requiring “Memory Full” condition | other | GCF CAG | GP-47 | - | [WTS] [JSN] | |||
GP-101265 | LS on “REVISION WORK ON RECOMMENDATION ITU-R F.757-3 - Basic system requirements and performance objectives for fixed wireless access using mobile-derived technologies offering telephony and data communication service” | other | TSG RAN ITU-R Ad Hoc | GP-47 | - | [WTS] [JSN] | |||
GP-101266 | Performance of DARP Phase I handsets in VAMOS mode | other | Research In Motion UK Ltd. | GP-47 | - | [WTS] [JSN] | |||
GP-101267 | Receiver performance for VAMOS-I mobile station | other | Research In Motion UK Ltd. | GP-47 | - | [WTS] [JSN] | |||
GP-101268 | CR 45.008-0466 MEAN_BEP performance requirements for 16-QAM and 32-QAM (Rel-7) | CR | Research In Motion UK Ltd. | GP-47 | - | [WTS] [JSN] | |||
GP-101269 | CR 45.008-0467 MEAN_BEP performance requirements for 16-QAM and 32-QAM (Rel-8) | CR | Research In Motion UK Ltd. | GP-47 | - | [WTS] [JSN] | |||
GP-101270 | CR 45.008-0468 MEAN_BEP performance requirements for 16-QAM and 32-QAM (Rel-9) | CR | Research In Motion UK Ltd. | GP-47 | - | [WTS] [JSN] | |||
GP-101271 | CR 48.018-0301 Correction on SPID IE (Rel-8) | CR | Huawei Technologies Co., Ltd. | GP-47 | - | [WTS] [JSN] | |||
GP-101272 | CR 48.018-0302 Correction on SPID IE (Rel-9) | CR | Huawei Technologies Co., Ltd. | GP-47 | - | [WTS] [JSN] | |||
GP-101273 | CR 45.008-0469 Clarification on the measurement report (Rel-8) | CR | Huawei Technologies Co., Ltd., LG Electronics Inc. | GP-47 | - | [WTS] [JSN] | |||
GP-101274 | CR 45.008-0470 Clarification on the measurement report (Rel-9) | CR | Huawei Technologies Co., Ltd., LG Electronics Inc. | GP-47 | - | [WTS] [JSN] | |||
GP-101275 | CR 45.008-0471 Miscellaneous correction (Rel-9) | CR | Huawei Technologies Co., Ltd. | GP-47 | - | [WTS] [JSN] | |||
GP-101276 | CR 44.060-1431 Clarification on E-UTRAN information modified by PMO (Rel-8) | CR | Huawei Technologies Co., Ltd. | GP-47 | - | [WTS] [JSN] | |||
GP-101277 | CR 44.060-1432 Clarification on E-UTRAN information modified by PMO (Rel-9) | CR | Huawei Technologies Co., Ltd. | GP-47 | - | [WTS] [JSN] | |||
GP-101278 | CR 44.060-1433 Clarification on E-UTRAN information modified by PMO (Rel-10) | CR | Huawei Technologies Co., Ltd. | GP-47 | - | [WTS] [JSN] | |||
GP-101279 | Discussion on E-UTRAN information modified by PMO | other | Huawei Technologies Co., Ltd. | GP-47 | - | [WTS] [JSN] | |||
GP-101280 | Discussion on transferring SPID during handover | other | Huawei Technologies Co., Ltd. | GP-47 | - | [WTS] [JSN] | |||
GP-101281 | Handling of Hybrid cells | other | Huawei Technologies Co., Ltd. | GP-47 | - | [WTS] [JSN] | |||
GP-101282 | One solution for GSMEDGE RAN Sharing | other | Huawei Technologies Co., Ltd. | GP-47 | - | [WTS] [JSN] | |||
GP-101283 | Enhancement on CCCH for MTC | other | Huawei Technologies Co., Ltd. | GP-47 | - | [WTS] [JSN] | |||
GP-101284 | Proposals on beta distribution for T2 | other | Huawei Technologies Co., Ltd. | GP-47 | - | [WTS] [JSN] | |||
GP-101285 | Solution for RACH congestion | other | Huawei Technologies Co., Ltd. | GP-47 | - | [WTS] [JSN] | |||
GP-101286 | Some proposals for EMSR | other | Huawei Technologies Co., Ltd. | GP-47 | - | [WTS] [JSN] | |||
GP-101287 | On UL Interferer Profiles for VAMOS | other | Huawei Technologies Co., Ltd. | GP-47 | - | [WTS] [JSN] | |||
GP-101288 | System Simulation Results for WIDER | other | Huawei Technologies Co., Ltd. | GP-47 | - | [WTS] [JSN] | |||
GP-101289 | Improved Precoded EGPRS2 DL | other | Huawei Technologies Co., Ltd. | GP-47 | - | [WTS] [JSN] | |||
GP-101290 | CR 45.008-0472 Specifying the measurement frequency of monitoring cells of inter-RAT frequencies having lower priority than serving cell (Rel-8) | CR | ST-Ericsson SA | GP-47 | - | [WTS] [JSN] | |||
GP-101291 | CR 45.008-0473 Specifying the measurement frequency of monitoring cells of inter-RAT frequencies having lower priority than serving cell (Rel-9) | CR | ST-Ericsson SA | GP-47 | - | [WTS] [JSN] | |||
GP-101292 | On the Precoded EGPRS2 | other | MOTOROLA S.A.S | GP-47 | - | [WTS] [JSN] | |||
GP-101293 | Link Performance of precoded EGPRS2 | other | MOTOROLA S.A.S | GP-47 | - | [WTS] [JSN] | |||
GP-101294 | CR 45.005-0395 DL reference performance requirements for EGPRS2-B, USF (Rel-7) | CR | NOKIA Corporation | GP-47 | - | [WTS] [JSN] | |||
GP-101295 | CR 45.005-0396 DL reference performance requirements for EGPRS2-B, USF (Rel-8) | CR | NOKIA Corporation | GP-47 | - | [WTS] [JSN] | |||
GP-101296 | CR 45.005-0397 DL reference performance requirements for EGPRS2-B, USF (Rel-9) | CR | NOKIA Corporation | GP-47 | - | [WTS] [JSN] | |||
GP-101297 | Correction to priority based inter-RAT cell reselection | other | LG Electronics Inc. | GP-47 | - | [WTS] [JSN] | |||
GP-101298 | CR 45.008-0474 Correction to priority based inter-RAT cell reselection (Rel-8) | CR | LG Electronics Inc. | GP-47 | - | [WTS] [JSN] | |||
GP-101299 | CR 45.008-0475 Correction to priority based inter-RAT cell reselection (Rel-9) | CR | LG Electronics Inc. | GP-47 | - | [WTS] [JSN] | |||
GP-101300 | CR 45.008-0476 Correction to inter-RAT cell reselection enhancement (Rel-9) | other | LG Electronics Inc. | GP-47 | - | [WTS] [JSN] | |||
GP-101301 | CR 44.060-1434 Correction to inter-RAT cell reselection enhancement (Rel-9) | CR | LG Electronics Inc. | GP-47 | - | [WTS] [JSN] | |||
GP-101302 | CR 44.060-1435 Correction to inter-RAT cell reselection enhancement (Rel-10) | CR | LG Electronics Inc. | GP-47 | - | [WTS] [JSN] | |||
GP-101303 | CR 44.060-1436 Signalling CSG dedicated frequencies by PMO (Rel-9) | CR | LG Electronics Inc. | GP-47 | - | [WTS] [JSN] | |||
GP-101304 | CR 44.060-1437 Signalling CSG dedicated frequencies by PMO (Rel-10) | CR | LG Electronics Inc. | GP-47 | - | [WTS] [JSN] | |||
GP-101305 | GERAN to CSG cell mobility other than PS Handover | other | LG Electronics Inc. | GP-47 | - | [WTS] [JSN] | |||
GP-101306 | MTC group handling for overload control | other | LG Electronics Inc. | GP-47 | - | [WTS] [JSN] | |||
GP-101307 | CR 45.008-0472 rev 1 Specifying the measurement frequency of monitoring cells of inter-RAT frequencies having lower priority than serving cell (Rel-8) | CR | ST-Ericsson SA; Telefon AB LM Ericsson | GP-47 | - | [WTS] [JSN] | |||
GP-101308 | CR 45.008-0473 rev 1 Specifying the measurement frequency of monitoring cells of inter-RAT frequencies having lower priority than serving cell (Rel-9) | CR | ST-Ericsson SA, Telefon AB LM Ericsson | GP-47 | - | [WTS] [JSN] | |||
GP-101309 | CR 45.008-0477 Measurement reporting limits for CSG cells (Rel-9) | other | Research in Motion UK Ltd. | GP-47 | - | [WTS] [JSN] | |||
GP-101310 | Measurement Reporting limits for CSG cells | other | Research in Motion UK Ltd. | GP-47 | - | [WTS] [JSN] | |||
GP-101311 | CR 45.005-0398 Introduction of VAMOS performance requirements (Rel-9) | CR | Nokia Siemens Networks, NOKIA Corporation | GP-47 | - | [WTS] [JSN] | |||
GP-101312 | CR 45.001-0071 Introduction of VAMOS performance levels (Rel-9) | CR | Nokia Siemens Networks, NOKIA Corporation | GP-47 | - | [WTS] [JSN] | |||
GP-101313 | CR 24.008-DRAFT MS capability indication of VAMOS (Rel-9) (revision of GP-101552) | other | Nokia Siemens Networks, NOKIA Corporation | GP-47 | - | [WTS] [JSN] | |||
GP-101314 | Collection of VAMOS performance requirements | other | Nokia Siemens Networks, NOKIA Corporation | GP-47 | - | [WTS] [JSN] | |||
GP-101315 | VAMOS TSC pairing | other | Nokia Siemens Networks, NOKIA Corporation | GP-47 | - | [WTS] [JSN] | |||
GP-101316 | CR 45.008-0442 rev 2 Corrections to measurement reporting of inter-RAT cells (Rel-8) | CR | Nokia Siemens Networks, NOKIA Corporation | GP-47 | - | [WTS] [JSN] | |||
GP-101317 | CR 45.008-0443 rev 2 Corrections to measurement reporting of inter-RAT cells (Rel-9) | CR | Nokia Siemens Networks, NOKIA Corporation | GP-47 | - | [WTS] [JSN] | |||
GP-101318 | CR 43.022-0030 Correction to "Camped on any cell" state (Rel-8) | CR | Nokia Siemens Networks, NOKIA Corporation | GP-47 | - | [WTS] [JSN] | |||
GP-101319 | CR 43.022-0031 Correction to "Camped on any cell" state (Rel-9) | CR | Nokia Siemens Networks, NOKIA Corporation | GP-47 | - | [WTS] [JSN] | |||
GP-101320 | CR 45.008-0478 Corrections to CSG requirements (Rel-9) | CR | Nokia Siemens Networks, NOKIA Corporation | GP-47 | - | [WTS] [JSN] | |||
GP-101321 | CR 45.008-0479 Reselection rules for hybrid cells (Rel-9) | CR | Nokia Siemens Networks, NOKIA Corporation | GP-47 | - | [WTS] [JSN] | |||
GP-101322 | CR 51.021-0159 Clarification of applicable modulation in multicarrier tests (Rel-8) | CR | Telefon AB LM Ericsson, Nokia Siemens Networks | GP-47 | - | [WTS] [JSN] | |||
GP-101323 | CR 51.021-0160 Clarification of applicable modulation in multicarrier tests (Rel-9) | CR | Telefon AB LM Ericsson, Nokia Siemens Networks | GP-47 | - | [WTS] [JSN] | |||
GP-101324 | CR 51.021-0161 Aligning the upper measurement frequency for radiated spurious emissions with ERC/REC 74-01 (Rel-8) | CR | Telefon AB LM Ericsson, Nokia Siemens Networks | GP-47 | - | [WTS] [JSN] | |||
GP-101325 | CR 51.021-0162 Aligning the upper measurement frequency for radiated spurious emissions with ERC/REC 74-01 (Rel-9) | CR | Telefon AB LM Ericsson, Nokia Siemens Networks | GP-47 | - | [WTS] [JSN] | |||
GP-101326 | CR 51.021-0163 Definition of the Lowest Static Power Level (Rel-8) | CR | Telefon AB LM Ericsson, Nokia Siemens Networks | GP-47 | - | [WTS] [JSN] | |||
GP-101327 | CR 51.021-0164 Definition of the Lowest Static Power Level (Rel-9) | CR | Telefon AB LM Ericsson, Nokia Siemens Networks | GP-47 | - | [WTS] [JSN] | |||
GP-101328 | CR 51.021-0165 Alignment of measurement bandwidths for receiver spurious emissions with TS 45.005 (Rel-8) | CR | Telefon AB LM Ericsson | GP-47 | - | [WTS] [JSN] | |||
GP-101329 | CR 51.021-0166 Alignment of measurement bandwidths for receiver spurious emissions with TS 45.005 (Rel-9) | CR | Telefon AB LM Ericsson | GP-47 | - | [WTS] [JSN] | |||
GP-101330 | CR 45.005-0359 rev 1 Reduction of the number of multicarrier BTS classes (Rel-8) | CR | Telefon AB LM Ericsson, Nokia Siemens Networks | GP-47 | - | [WTS] [JSN] | |||
GP-101331 | CR 45.005-0360 rev 1 Reduction of the number of multicarrier BTS classes(Rel-9) | CR | Telefon AB LM Ericsson, Nokia Siemens Networks | GP-47 | - | [WTS] [JSN] | |||
GP-101332 | CR 51.021-0136 rev 1 Reduction of the number of multicarrier BTS classes (Rel-8) | CR | Telefon AB LM Ericsson, Nokia Siemens Networks | GP-47 | - | [WTS] [JSN] | |||
GP-101333 | CR 51.021-0137 rev 1 Reduction of the number of multicarrier BTS classes (Rel-9) | CR | Telefon AB LM Ericsson, Nokia Siemens Networks | GP-47 | - | [WTS] [JSN] | |||
GP-101334 | CR 45.005-0399 Clarification of multicarrier BTS receiver requirements (Rel-8) | CR | Telefon AB LM Ericsson | GP-47 | - | [WTS] [JSN] | |||
GP-101335 | CR 45.005-0400 Clarification of multicarrier BTS receiver requirements (Rel-9) | CR | Telefon AB LM Ericsson | GP-47 | - | [WTS] [JSN] | |||
GP-101336 | CR 51.021-0167 Clarification of multicarrier BTS receiver requirements (Rel-8) | CR | Telefon AB LM Ericsson | GP-47 | - | [WTS] [JSN] | |||
GP-101337 | CR 51.021-0168 Clarification of multicarrier BTS receiver requirements (Rel-9) | CR | Telefon AB LM Ericsson | GP-47 | - | [WTS] [JSN] | |||
GP-101338 | CR 51.021-0169 Renumbering of tables and figures to improve maintainability (Rel-9) | CR | Telefon AB LM Ericsson | GP-47 | - | [WTS] [JSN] | |||
GP-101339 | Considerations on Multicarrier receiver performance | other | Telefon AB LM Ericsson | GP-47 | - | [WTS] [JSN] | |||
GP-101340 | CR 45.005-0401 Clarification of receiver characteristics for multicarrier BTS equipped with multicarrier receiver (Rel-9) | CR | Telefon AB LM Ericsson | GP-47 | - | [WTS] [JSN] | |||
GP-101341 | CR 51.021-0170 Modified test of receiver performance for multicarrier BTS equipped with multicarrier receiver (Rel-9) | CR | Telefon AB LM Ericsson | GP-47 | - | [WTS] [JSN] | |||
GP-101342 | Power level when accessing BTS | other | Telefon AB LM Ericsson, ST-Ericsson SA | GP-47 | - | [WTS] [JSN] | |||
GP-101343 | RACH collision simulations | other | Telefon AB LM Ericsson, ST-Ericsson SA | GP-47 | - | [WTS] [JSN] | |||
GP-101344 | CR 45.008-0364 rev 6 Power level for RACH (Rel-9) | CR | Telefon AB LM Ericsson, ST-Ericsson SA | GP-47 | - | [WTS] [JSN] | |||
GP-101345 | VAMOS UL interferer analysis for performance requirements | other | Telefon AB LM Ericsson | GP-47 | - | [WTS] [JSN] | |||
GP-101346 | Coexistence of DARP Phase I handsets with VAMOS | other | Telefon AB LM Ericsson | GP-47 | - | [WTS] [JSN] | |||
GP-101347 | AQPSK Power vs. Time Mask | other | Telefon AB LM Ericsson, ST-Ericsson SA, Nokia Siemens Networks | GP-47 | - | [WTS] [JSN] | |||
GP-101348 | DAS-12 and DBS-12 puncturing and interleaving | other | Telefon AB LM Ericsson, ST-Ericsson SA | GP-47 | - | [WTS] [JSN] | |||
GP-101349 | Aspects of burst formatting of Precoded EGPRS2 DL | other | Telefon AB LM Ericsson, ST-Ericsson SA | GP-47 | - | [WTS] [JSN] | |||
GP-101350 | Training symbol placement in Precoded EGPRS2 DL | other | Telefon AB LM Ericsson, ST-Ericsson SA | GP-47 | - | [WTS] [JSN] | |||
GP-101351 | Precoded EGPRS2 DL – Impact on EGPRS2 performance | other | Telefon AB LM Ericsson, ST-Ericsson SA | GP-47 | - | [WTS] [JSN] | |||
GP-101352 | SPEED working assumptions | other | Telefon AB LM Ericsson, ST-Ericsson SA | GP-47 | - | [WTS] [JSN] | |||
GP-101353 | Meeting minutes – SPEED, telco#1 | other | WI rapporteur | GP-47 | - | [WTS] [JSN] | |||
GP-101354 | Draft TR 45.860 on Signal Precoding Enhancements for EGPRS2 DL | other | WI rapporteur | GP-47 | - | [WTS] [JSN] | |||
GP-101355 | Draft work plan of SI "Signal precoding enhancements for EGPRS2 DL" | other | WI rapporteur | GP-47 | - | [WTS] [JSN] | |||
GP-101356 | WITHDRAWN | other | GP-47 | - | [WTS] [JSN] | ||||
GP-101357 | WITHDRAWN | other | GP-47 | - | [WTS] [JSN] | ||||
GP-101358 | DCDL for EFTA (draft CR to 24.008) (revised in GP-101558) | other | Telefon AB LM Ericsson, ST-Ericsson SA | GP-47 | - | [WTS] [JSN] | |||
GP-101359 | Handling of Hybrid Cells | other | NOKIA Corporation, Nokia Siemens Networks | GP-47 | - | [WTS] [JSN] | |||
GP-101360 | CR 44.060-1438 Removal of Individual Priorities from PCCO (Rel-8) | CR | NOKIA Corporation, Nokia Siemens Networks | GP-47 | - | [WTS] [JSN] | |||
GP-101361 | CR 44.060-1439 Removal of Individual Priorities from PCCO (Rel-9) | CR | NOKIA Corporation, Nokia Siemens Networks | GP-47 | - | [WTS] [JSN] | |||
GP-101362 | CR 44.060-1440 Removal of Individual Priorities from PCCO (Rel-10) | CR | NOKIA Corporation, Nokia Siemens Networks | GP-47 | - | [WTS] [JSN] | |||
GP-101363 | Proposals for the MCBTS intermodulation attenuation requirement in TS 45.005 and the corresponding tests in TS 51.021 | other | Alcatel-Lucent | GP-47 | - | [WTS] [JSN] | |||
GP-101364 | CR 45.005-0404 Corrections of the MCBTS IM requirements (Rel-9) | CR | Alcatel-Lucent | GP-47 | - | [WTS] [JSN] | |||
GP-101365 | CR 51.021-0171 Corrections of the MCBTS IM requirements (Rel-9) | CR | Alcatel-Lucent | GP-47 | - | [WTS] [JSN] | |||
GP-101366 | Modulation types for VAMOS interferer profiles | other | Com-Research | GP-47 | - | [WTS] [JSN] | |||
GP-101367 | Impairment models for VAMOS interferer profiles | other | Com-Research | GP-47 | - | [WTS] [JSN] | |||
GP-101368 | CR 45.008-0481 Output power decrease on the BCCH carrier, GMSK (Rel-10) | CR | Nokia Siemens Networks, NOKIA Corporation, Vodafone | GP-47 | - | [WTS] [JSN] | |||
GP-101369 | UL interference statistics in VAMOS network scenarios | other | Nokia Siemens Networks, NOKIA Corporation | GP-47 | - | [WTS] [JSN] | |||
GP-101370 | VAMOS link to system interface and verification | other | Nokia Siemens Networks, NOKIA Corporation | GP-47 | - | [WTS] [JSN] | |||
GP-101371 | VAMOS system performance (revised in GP-101439) | other | Nokia Siemens Networks, NOKIA Corporation | GP-47 | - | [WTS] [JSN] | |||
GP-101372 | TR 45.913 Optimized transmit pulse shape for downlink Enhanced General Packet Radio Service (EGPRS2-B) v 2.0.0 | other | Rapporteur | GP-47 | - | [WTS] [JSN] | |||
GP-101373 | CR 45.010-0061 Reaction times for DTR (Rel-10) | CR | Research in Motion UK Ltd. | GP-47 | - | [WTS] [JSN] | |||
GP-101374 | Proposed Modified Working Assumptions for VAMOS Performance Requirements | other | Nokia Siemens Networks, NOKIA Corporation, Telefon AB LM Ericsson, ST-Ericsson SA | GP-47 | - | [WTS] [JSN] | |||
GP-101375 | Meeting Minutes of VAMOS telco#10 | other | WI Rapporteur | GP-47 | - | [WTS] [JSN] | |||
GP-101376 | Work Plan for VAMOS | other | WI Rapporteur | GP-47 | - | [WTS] [JSN] | |||
GP-101377 | Work Plan for MUROS | other | WI Rapporteur | GP-47 | - | [WTS] [JSN] | |||
GP-101378 | Common assumptions for MTC simulations on CCCH and PDCH congestion | other | Telefon AB LM Ericsson, ST-Ericsson SA, NOKIA Corporation, Nokia Siemens Networks | GP-47 | - | [WTS] [JSN] | |||
GP-101379 | CR 44.060-1441 PLMN-ID Signalling for CSG Cells (Rel-9) | CR | Nokia Siemens Networks, NOKIA Corporation | GP-47 | - | [WTS] [JSN] | |||
GP-101380 | CR 44.060-1442 PLMN-ID Signalling for CSG Cells (Rel-10) | CR | Nokia Siemens Networks, NOKIA Corporation | GP-47 | - | [WTS] [JSN] | |||
GP-101381 | CR 44.018-0864 Addition of Packet Cell Change Order for CSG cells (Rel-9) | CR | Nokia Siemens Networks, NOKIA Corporation | GP-47 | - | [WTS] [JSN] | |||
GP-101382 | CR 44.060-1443 Addition of Packet Cell Change Order for CSG cells (Rel-9) | CR | Nokia Siemens Networks, NOKIA Corporation | GP-47 | - | [WTS] [JSN] | |||
GP-101383 | CR 44.060-1444 Addition of Packet Cell Change Order for CSG cells (Rel-10) | CR | Nokia Siemens Networks, NOKIA Corporation | GP-47 | - | [WTS] [JSN] | |||
GP-101384 | Explicit Measurement Command for CSG Reporting | other | Nokia Siemens Networks, NOKIA Corporation | GP-47 | - | [WTS] [JSN] | |||
GP-101385 | CR 44.060-1445 Optimising CSG Cells Signalling in PACKET MEASUREMENT ORDER (Rel-9) | CR | Nokia Siemens Networks, NOKIA Corporation | GP-47 | - | [WTS] [JSN] | |||
GP-101386 | CR 44.060-1446 Optimising CSG Cells Signalling in PACKET MEASUREMENT ORDER (Rel-10) | CR | Nokia Siemens Networks, NOKIA Corporation | GP-47 | - | [WTS] [JSN] | |||
GP-101387 | CR 44.060-1304 rev 5 Enhanced Multiplexing for a Single RLC Entity (EMSR) (Rel-10) | CR | Telefon AB LM Ericsson, ST-Ericsson SA | GP-47 | - | [WTS] [JSN] | |||
GP-101388 | CR 44.018-0807 rev 5 Enhanced Multiplexing for a Single RLC Entity (EMSR) (Rel-10) | CR | Telefon AB LM Ericsson, ST-Ericsson SA | GP-47 | - | [WTS] [JSN] | |||
GP-101389 | Draft CR to 24.008 - Enhanced Multiplexing for a Single RLC Entity (EMSR) (Rel-10) | other | Telefon AB LM Ericsson, ST-Ericsson SA | GP-47 | - | [WTS] [JSN] | |||
GP-101390 | MTC Device Two Stage Access Control | other | Telefon AB LM Ericsson, ST-Ericsson SA | GP-47 | - | [WTS] [JSN] | |||
GP-101391 | MTC Device Layered Access Control | other | Telefon AB LM Ericsson, ST-Ericsson SA | GP-47 | - | [WTS] [JSN] | |||
GP-101392 | MTC Device Pro-active Congestion Control | other | Telefon AB LM Ericsson, ST-Ericsson SA | GP-47 | - | [WTS] [JSN] | |||
GP-101393 | CR 48.049-0006 Missing Cell identification discriminators in Failure List IE (Rel-9) | CR | Telefon AB LM Ericsson | GP-47 | - | [WTS] [JSN] | |||
GP-101394 | Draft New WI proposal: Support of Multi-Operator Core Network by GERAN | other | Alcatel-Lucent, Vodafone Plc Group, Motorola Ltd, Telefónica SA, Telefon AB LM Ericsson | GP-47 | - | [WTS] [JSN] | |||
GP-101395 | Selection of MTC features for Rel-10 | other | Alcatel-Lucent | GP-47 | - | [WTS] [JSN] | |||
GP-101396 | Draft CR 24.008 Introduction of MOCN GERAN | other | Alcatel-Lucent | GP-47 | - | [WTS] [JSN] | |||
GP-101397 | Draft CR 23.251 Introduction of MOCN GERAN | other | Alcatel-Lucent | GP-47 | - | [WTS] [JSN] | |||
GP-101398 | CR 48.008-0324 Clarification about the codec to be used in assignment/handover (Rel-9) | CR | Alcatel-Lucent | GP-47 | - | [WTS] [JSN] | |||
GP-101399 | Removal of Inconsistencies related to Requirements for MCBTS | other | Nokia Siemens Networks | GP-47 | - | [WTS] [JSN] | |||
GP-101400 | CR 44.018-0865 Incorrect position of spare padding in EMR message (Rel-8) | CR | Nokia Siemens Networks, NOKIA Corporation | GP-47 | - | [WTS] [JSN] | |||
GP-101401 | CR 44.018-0866 Incorrect position of spare padding in EMR message (Rel-9) | CR | Nokia Siemens Networks, NOKIA Corporation | GP-47 | - | [WTS] [JSN] | |||
GP-101402 | CR 44.018-0867 Miscellaneous corrections (Rel-9) | CR | Nokia Siemens Networks, NOKIA Corporation | GP-47 | - | [WTS] [JSN] | |||
GP-101403 | CR 44.060-1447 Miscellaneous corrections (Rel-9) | CR | Nokia Siemens Networks, NOKIA Corporation | GP-47 | - | [WTS] [JSN] | |||
GP-101404 | CR 44.060-1448 Miscellaneous corrections (Rel-10) | CR | Nokia Siemens Networks, NOKIA Corporation | GP-47 | - | [WTS] [JSN] | |||
GP-101405 | G2-46 Meeting Report | other | MCC | GP-47 | - | [WTS] [JSN] | |||
GP-101406 | CR 45.002-0146 Shifted USF for EFTA (Rel-9) | CR | Telefon AB LM Ericsson, ST-Ericsson SA | GP-47 | - | [WTS] [JSN] | |||
GP-101407 | CR 45.002-0147 DCDL for EFTA (Rel-9) | CR | Telefon AB LM Ericsson, ST-Ericsson SA | GP-47 | - | [WTS] [JSN] | |||
GP-101408 | Dynamic Timeslot Reduction – way forward | other | Research in Motion UK Ltd. | GP-47 | - | [WTS] [JSN] | |||
GP-101409 | CR 44.060-1449 Removal of DTR Information in RLC data blocks (Rel-10) | CR | Research in Motion UK Ltd. | GP-47 | - | [WTS] [JSN] | |||
GP-101410 | Dynamic Timeslot Reduction/RLC data blocks signalling: behaviour while V(Q) = V(R) pending | other | Research in Motion UK Ltd. | GP-47 | - | [WTS] [JSN] | |||
GP-101411 | Dynamic Timeslot Reduction/RLC data blocks signalling: Keeping MS in DTR, T3190 expiry | other | Research in Motion UK Ltd. | GP-47 | - | [WTS] [JSN] | |||
GP-101412 | Dynamic Timeslot Reduction/RLC data blocks signalling: behaviour while poll response is pending | other | Research in Motion UK Ltd. | GP-47 | - | [WTS] [JSN] | |||
GP-101413 | CR 44.060-1450 Maintaining mobile station in DTR using RLC data block signalling (Rel-10) | CR | Research in Motion UK Ltd. | GP-47 | - | [WTS] [JSN] | |||
GP-101414 | CR 44.060-1451 DTR miscellaneous corrections (Rel-10) | CR | Research in Motion UK Ltd. | GP-47 | - | [WTS] [JSN] | |||
GP-101415 | CR 44.060-1452 Entering DRX when leaving packet transfer mode / dual transfer mode in DTR (Rel-10) | CR | Research in Motion UK Ltd. | GP-47 | - | [WTS] [JSN] | |||
GP-101416 | CR 44.060-1453 Prioritisation of RLC data blocks when MS is in DTR mode (Rel-10) | CR | Research in Motion UK Ltd. | GP-47 | - | [WTS] [JSN] | |||
GP-101417 | CR 44.060-1454 Entering DTR with NACKED uplink blocks (Rel-10) | CR | Research in Motion UK Ltd. | GP-47 | - | [WTS] [JSN] | |||
GP-101418 | CR 44.060-1455 DTR: Mobile indicating that it does not wish to enter DTR (Rel-10) | CR | Research in Motion UK Ltd. | GP-47 | - | [WTS] [JSN] | |||
GP-101419 | CR 44.060-1456 Responding to polls prior to entering DTR mode (Rel-10) | CR | Research in Motion UK Ltd. | GP-47 | - | [WTS] [JSN] | |||
GP-101420 | Dynamic Timeslot Reduction: Entering DTR with outstanding data blocks | other | Research in Motion UK Ltd. | GP-47 | - | [WTS] [JSN] | |||
GP-101421 | CR 44.060-1457 DTR: Entering DTR with pending downlink data (Rel-10 | CR | Research in Motion UK Ltd. | GP-47 | - | [WTS] [JSN] | |||
GP-101422 | CR 44.018-0868 Reporting Rules for Hybrid Cells (Rel-9) | CR | NOKIA Corporation, Nokia Siemens Networks | GP-47 | - | [WTS] [JSN] | |||
GP-101423 | CR 44.060-1458 Reporting Rules for Hybrid Cells (Rel-9) | CR | NOKIA Corporation, Nokia Siemens Networks | GP-47 | - | [WTS] [JSN] | |||
GP-101424 | CR 44.060-1461 Reporting Rules for Hybrid Cells (Rel-10) | CR | NOKIA Corporation, Nokia Siemens Networks | GP-47 | - | [WTS] [JSN] | |||
GP-101425 | CR 44.018-0869 Handover to traffic channel in VAMOS mode (Rel-9) | CR | Nokia Siemens Networks, NOKIA Corporation | GP-47 | - | [WTS] [JSN] | |||
GP-101426 | CR 44.060-1459 Interaction of event-based FANR with polled ack/nack messages (Rel-10) | CR | Research in Motion UK Ltd. | GP-47 | - | [WTS] [JSN] | |||
GP-101427 | CR 44.060-1460 T3192: unclear specification text (Rel-10) | CR | Research in Motion UK Ltd. | GP-47 | - | [WTS] [JSN] | |||
GP-101428 | Data transmission efficiency for Uplink TBFs | other | Research In Motion UK Ltd. | GP-47 | - | [WTS] [JSN] | |||
GP-101429 | Resource constraints for MTC TBFs | other | Research In Motion UK Ltd. | GP-47 | - | [WTS] [JSN] | |||
GP-101430 | CR 44.018-0869 rev 1 Handover to traffic channel in VAMOS mode (Rel-9) | CR | Nokia Siemens Networks, NOKIA Corporation | GP-47 | - | [WTS] [JSN] | |||
GP-101431 | Improved Precoded EGPRS2 DL (update of GP-101289) | other | Huawei Technologies Co., Ltd. | GP-47 | - | [WTS] [JSN] | |||
GP-101432 | TSC assignment for VAMOS mobiles in DTM (reissued in GP-101548.doc) | other | Nokia Siemens Networks, NOKIA Corporation | GP-47 | - | [WTS] [JSN] | |||
GP-101433 | CR 44.018-0870 Indication of power reduction for RACH (Rel-9) | CR | Telefon AB LM Ericsson | GP-47 | - | [WTS] [JSN] | |||
GP-101434 | Proposals for the MCBTS intermodulation attenuation requirement in TS 45.005 and the corresponding tests in TS 51.021 (revision of GP-101363) | other | Alcatel-Lucent | GP-47 | - | [WTS] [JSN] | |||
GP-101435 | CR 45.005-0405 Corrections of the MCBTS IM requirements (Rel-8) | CR | Alcatel-Lucent | GP-47 | - | [WTS] [JSN] | |||
GP-101436 | CR 51.021-0172 Corrections of the MCBTS IM requirements (Rel-8) | CR | Alcatel-Lucent | GP-47 | - | [WTS] [JSN] | |||
GP-101437 | CR 45.005-0404 rev 1 Corrections of the MCBTS IM requirements (Rel-9) (revision of GP-101364) | CR | Alcatel-Lucent | GP-47 | - | [WTS] [JSN] | |||
GP-101438 | CR 51.021-0171 rev 1 Corrections of the MCBTS IM requirements (Rel-9) (revision of GP-101365) | CR | Alcatel-Lucent | GP-47 | - | [WTS] [JSN] | |||
GP-101439 | VAMOS system performance (revision of GP-101371) | other | Nokia Siemens Networks, NOKIA Corporation | GP-47 | - | [WTS] [JSN] | |||
GP-101440 | LS Response on OTA conformance testing for devices utilising 3GPP based wireless communication | other | TSG RAN WG4 | GP-47 | - | [WTS] [JSN] | |||
GP-101441 | LS on Status of the MSR Work Item | other | TSG RAN WG4 | GP-47 | - | [WTS] [JSN] | |||
GP-101442 | LS on Introduction of CSG reselection requirements in RAN4 | other | TSG RAN WG4 | GP-47 | - | [WTS] [JSN] | |||
GP-101443 | New WI proposal: Support of Multi-Operator Core Network by GERAN | other | Alcatel-Lucent, Vodafone Plc Group, Motorola Ltd, Telefónica SA, Telefon AB LM Ericsson, Nokia Siemens Networks, Huawei Technologies Co., Ltd. | GP-47 | - | [WTS] [JSN] | |||
GP-101444 | CR 45.914-0019 Optimised Tx pulse investigation: updated modelling description and system performance results (Rel-9) | CR | Nokia Siemens Networks, NOKIA Corporation | GP-47 | - | [WTS] [JSN] | |||
GP-101445 | CR 45.005-0398 rev 1 Introduction of VAMOS performance requirements (Rel-9) | CR | Nokia Siemens Networks, NOKIA Corporation, Telefon AB LM Ericsson, ST-Ericsson SA | GP-47 | - | [WTS] [JSN] | |||
GP-101446 | Response LS on introduction of RAN Sharing for GERAN | other | TSG SA WG1 | GP-47 | - | [WTS] [JSN] | |||
GP-101447 | LS on Handling of Hybrid cells | other | TSG SA WG1 | GP-47 | - | [WTS] [JSN] | |||
GP-101448 | Reply LS on “communications from ITU-R WP5A” and on “REVISION WORK ON RECOMMENDATION ITU-R F.757-3 - Basic system requirements and ... (To: ITU-R Ad Hoc, Cc: TSG RAN) | LS out | TSG GERAN | GP-47 | - | [WTS] [JSN] | |||
GP-101449 | CR 43.064-0084 Exclusive allocation support (Rel-10) | CR | NOKIA Corporation | GP-47 | - | [WTS] [JSN] | |||
GP-101450 | Draft reply to TD GP-101256 Liaison Statement to 3GPP GERAN on GSM-R parameters (To: CEPT SE7, Cc: ETSI TC RT, ETSI TC RT EGSM-R) | LS out | TSG GERAN WG1 | GP-47 | - | [WTS] [JSN] | |||
GP-101451 | LS on support for Priority for terminating sessions for MPS | other | GERAN WG2 | GP-47 | - | [WTS] [JSN] | |||
GP-101452 | LS on “Mobile Wireless access systems providing telecommunications for a large number of ubiquitous sensors and/or actuators scattered over wide areas in the land mobile service” | other | TSG GERAN | GP-47 | - | [WTS] [JSN] | |||
GP-101453 | CR 44.060-1431 rev 1: Clarification on E-UTRAN information modified by PMO (Rel-8) | CR | Huawei Technologies Co., Ltd. | GP-47 | - | [WTS] [JSN] | |||
GP-101454 | CR 44.060-1432 rev 1: Clarification on E-UTRAN information modified by PMO (Rel-9) | CR | Huawei Technologies Co., Ltd. | GP-47 | - | [WTS] [JSN] | |||
GP-101455 | CR 44.060-1433 rev 1: Clarification on E-UTRAN information modified by PMO (Rel-10) | CR | Huawei Technologies Co., Ltd. | GP-47 | - | [WTS] [JSN] | |||
GP-101456 | LS on Handling of Hybrid cells | other | GERAN WG2 | GP-47 | - | [WTS] [JSN] | |||
GP-101457 | CR 48.008-0319 rev 9 Introduction of Local Call Local Switch support (Revision of GP-101228) (Rel-10) | CR | Nokia Siemens Networks | GP-47 | - | [WTS] [JSN] | |||
GP-101458 | Discussion paper on GERAN impacts in LCLS TR23.889 (Revision of GP-101226) | other | Nokia Siemens Networks | GP-47 | - | [WTS] [JSN] | |||
GP-101459 | LS on Transfer of SPID during (inter-RAT) handover | LS out | GERAN WG2 | GP-47 | - | [WTS] [JSN] | |||
GP-101460 | CR 44.018-0868 rev 1: Reporting Rules for Hybrid Cells (Rel-9) | CR | Nokia Corp, Nokia Siemens Networks | GP-47 | - | [WTS] [JSN] | |||
GP-101461 | CR 44.060-1458 rev 1: Reporting Rules for Hybrid Cells (Rel-9) | CR | Nokia Corp, Nokia Siemens Networks | GP-47 | - | [WTS] [JSN] | |||
GP-101462 | CR 44.060-1461 rev 1: Reporting Rules for Hybrid Cells (Rel-10) | CR | Nokia Corp, Nokia Siemens Networks | GP-47 | - | [WTS] [JSN] | |||
GP-101463 | CR 48.049-0006 rev 1: Missing Cell identification discriminators in Failure List IE (Rel-9) | CR | Telefon AB LM Ericsson | GP-47 | - | [WTS] [JSN] | |||
GP-101464 | LS on Downlink Dual Carrier for EFTA | LS out | TSG GERAN | GP-47 | - | [WTS] [JSN] | |||
GP-101465 | CR 44.060-1447 rev 1: Miscellaneous corrections (Rel-9) | CR | Nokia Siemens Networks, Nokia Corporation | GP-47 | - | [WTS] [JSN] | |||
GP-101466 | CR 44.060-1448 rev 1: Miscellaneous corrections (Rel-10) | CR | Nokia Siemens Networks, Nokia Corporation | GP-47 | - | [WTS] [JSN] | |||
GP-101467 | Enhancement of Iur-g interface in GERAN WID | other | CMCC | GP-47 | - | [WTS] [JSN] | |||
GP-101468 | LS on Progress of the Local Call Local Switch Feasibility Study | other | TSG CT WG4 | GP-47 | - | [WTS] [JSN] | |||
GP-101469 | LS on Progress of the Local Call Local Switch Feasibility Study (To: TSG CT WG4, Cc: TSG CT, TSG SA WG3, TSG SA3-LI) | other | GERAN WG2 | GP-47 | - | [WTS] [JSN] | |||
GP-101470 | CR 48.103-0005 rev 7: Introduction of Local Call Local Switch support (Rel-10) | CR | Nokia Siemens Networks | GP-47 | - | [WTS] [JSN] | |||
GP-101471 | Draft CR 24.008: Introduction of MOCN GERAN (Rel-10) | other | Alcatel-Lucent | GP-47 | - | [WTS] [JSN] | |||
GP-101472 | Draft CR 23.251: Introduction of MOCN GERAN (Rel-10) | other | Alcatel-Lucent | GP-47 | - | [WTS] [JSN] | |||
GP-101473 | CR 44.018-0869 rev 2: Handover to traffic channel in VAMOS mode (Rel-9) | CR | Nokia Siemens Networks, NOKIA Corporation | GP-47 | - | [WTS] [JSN] | |||
GP-101474 | CR 44.060-1304 rev 6: Enhanced Multiplexing for a Single RLC Entity (EMSR) (Rel-10) | CR | Telefon AB LM Ericsson, ST-Ericsson, | GP-47 | - | [WTS] [JSN] | |||
GP-101475 | LS on Enhanced Multiplexing for a Single RLC Entity (EMSR) | LS out | GERAN WG2 | GP-47 | - | [WTS] [JSN] | |||
GP-101476 | CR 44.060-1460 rev 1: T3192: unclear specification text (Rel-10) | CR | Research in Motion UK Ltd. | GP-47 | - | [WTS] [JSN] | |||
GP-101477 | DTR Description | other | Nokia Corp | GP-47 | - | [WTS] [JSN] | |||
GP-101478 | Enhancement of Iur-g interface in GERAN WID | other | CMCC | GP-47 | - | [WTS] [JSN] | |||
GP-101479 | CR 44.060-1459 rev 1: Interaction of event-based FANR with polled ack/nack messages (Rel-10) | CR | Research in Motion UK Ltd. | GP-47 | - | [WTS] [JSN] | |||
GP-101480 | Reporting PLMN ID for CSG cell | other | Huawei Technologies Co., Ltd. | GP-47 | - | [WTS] [JSN] | |||
GP-101481 | CR 51.010-1-4498 Test Cases 42.5.x – Correction to the specific message contents | CR | Anite | GP-47 | - | [WTS] [JSN] | |||
GP-101482 | LS Response on OTA conformance testing for devices utilising 3GPP based wireless communication | LS out | TSG WG GERAN3 | GP-47 | - | [WTS] [JSN] | |||
GP-101483 | CR 51.010-1-4474 Correction to message sequence in TC 31.4.4.2 Disconnect all calls | CR | Samsung | GP-47 | - | [WTS] [JSN] | |||
GP-101484 | CR 51.010-1-4480 42.7.3.x Triggering and procedures for uplink transfer adjusted | CR | Rohde&Schwarz | GP-47 | - | [WTS] [JSN] | |||
GP-101485 | CR 51.010-1-4481 26.7.4.5.5 Additional Information added for EFloci coding | CR | Rohde&Schwarz | GP-47 | - | [WTS] [JSN] | |||
GP-101486 | CR 51.010-1-4490 Correction to test case 14.18.10.1 | CR | Research In Motion UK Ltd | GP-47 | - | [WTS] [JSN] | |||
GP-101487 | CR 51.010-1-4495 Correction to Multiband Support IE in Table 26.6.11b | CR | Anite, SGS UK | GP-47 | - | [WTS] [JSN] | |||
GP-101488 | CR 51.010-1-4496 Correction to section 26.11.3.1.X | CR | Anite, SGS UK | GP-47 | - | [WTS] [JSN] | |||
GP-101489 | CR 51.010-2-0665 Rel-9 alignment for Audio Testing | CR | CETECOM | GP-47 | - | [WTS] [JSN] | |||
GP-101490 | CR 51.010-1-4499 Optional procedure in MM IDLE state for test cases 26.7.4.3.3, 26.7.4.3.4 | CR | Anite | GP-47 | - | [WTS] [JSN] | |||
GP-101491 | CR 51.010-1-4501 Alignment of change PIN and unblock PIN test cases to TS 31.121 | CR | CETECOM | GP-47 | - | [WTS] [JSN] | |||
GP-101492 | VAMOS Work Item Description | other | Research In Motion UK Ltd | GP-47 | - | [WTS] [JSN] | |||
GP-101493 | CR 51.010-1-4492 Clarification to default conditions during A-GNSS signalling tests | CR | Spirent | GP-47 | - | [WTS] [JSN] | |||
GP-101494 | CR 51.010-1-4493 Addition of references for A-GNSS Assistance data | CR | Spirent | GP-47 | - | [WTS] [JSN] | |||
GP-101495 | Additional assistance data information for TS 51.010-7 | other | Spirent | GP-47 | - | [WTS] [JSN] | |||
GP-101496 | CR 51.010-1-4514 Transfer of GPS scenarios and assistance data to new specification | CR | Spirent | GP-47 | - | [WTS] [JSN] | |||
GP-101497 | CR 51.010-1-4459 52.5.5 TA not relevant and inconsistent | CR | Rohde&Schwarz | GP-47 | - | [WTS] [JSN] | |||
GP-101498 | CR 51.010-2-0658 New PICS required for UE capability testing | CR | TF 160 | GP-47 | - | [WTS] [JSN] | |||
GP-101499 | CR 51.010-2-0663 Applicability correction to section 21.1 | CR | Anite | GP-47 | - | [WTS] [JSN] | |||
GP-101500 | CR 51.010-2-0670 Change Applicability of tests – Conditions definitions C399 | CR | Nokia Corporation | GP-47 | - | [WTS] [JSN] | |||
GP-101501 | CR 51.010-2-0676 Correction of release and status information for TSPC_Feat_A53 | CR | 7 layers AG, Samsung | GP-47 | - | [WTS] [JSN] | |||
GP-101502 | CR 36.523-1-0898 New test case 6.2.3.14 Inter-RAT Cell Reselection / from GSM_Idle/GPRS Packet_Idle to E-UTRA (priority of E-UTRA cells are higher than the serving cell) | CR | ST-Ericsson | GP-47 | - | [WTS] [JSN] | |||
GP-101503 | CR 36.523-1-0899 New test case 6.2.3.15 Inter-RAT Cell Reselection / from GSM_Idle/GPRS Packet_Idle to E-UTRA (priority of E-UTRA cells are lower than the serving cell) | CR | ST-Ericsson | GP-47 | - | [WTS] [JSN] | |||
GP-101504 | CR 51.010-1-4485 26.7.2.3 - Authentication accepted with USIM | CR | Sierra Wireless UK | GP-47 | - | [WTS] [JSN] | |||
GP-101505 | CR 51.010-1-4486 26.7.2.4 - Authentication not accepted by MS with USIM (MAC Failure) | CR | Sierra Wireless UK | GP-47 | - | [WTS] [JSN] | |||
GP-101506 | CR 51.010-1-4487 26.7.2.5 - Authentication not accepted by MS with USIM (Synch Failure) | CR | Sierra Wireless UK | GP-47 | - | [WTS] [JSN] | |||
GP-101507 | CR 51.010-1-4488 44.2.5.1.3 - Authentication accepted with USIM | CR | Sierra Wireless UK | GP-47 | - | [WTS] [JSN] | |||
GP-101508 | CR 51.010-2-0660 Additions following USIM Authentication introduction | CR | Sierra Wireless UK | GP-47 | - | [WTS] [JSN] | |||
GP-101509 | CR 51.010-1-4500 Rel-9 alignment for Audio Testing | CR | CETECOM | GP-47 | - | [WTS] [JSN] | |||
GP-101510 | CR 36.523-1-0896 6.2.3.19 : Redirection to E-UTRA upon the release of the CS connection | CR | Nokia Corporation | GP-47 | - | [WTS] [JSN] | |||
GP-101511 | CR 51.010-1-4489 New Test Case 6.2.3.23 - Inter-RAT Cell Reselection from GPRS Packet transfer to E-UTRA in CCN mode (PACKET CELL CHANGE CONTINUE) | CR | Research In Motion UK Ltd | GP-47 | - | [WTS] [JSN] | |||
GP-101512 | CR 51.010-1-4454 TC 42.4.8.3.6 Establishment Cause corrected | CR | Rohde&Schwarz | GP-47 | - | [WTS] [JSN] | |||
GP-101513 | CR 51.010-1-4460 TC 53.1.2.19 P-Channels removal | CR | Rohde&Schwarz | GP-47 | - | [WTS] [JSN] | |||
GP-101514 | CR 51.010-1-4456 TC 42.4.8.4.5 P-Channels removal corrections | CR | Rohde&Schwarz | GP-47 | - | [WTS] [JSN] | |||
GP-101515 | CR 51.010-2-0659 P-Channels removal changes to applicability table | CR | Rohde&Schwarz | GP-47 | - | [WTS] [JSN] | |||
GP-101516 | CR 51.010-1-4461 TC 51.3.6.6 P-Channels removal corrections | CR | Rohde&Schwarz | GP-47 | - | [WTS] [JSN] | |||
GP-101517 | CR 51.010-1-4462 TC 51.3.6.7 P-Channels removal corrections | CR | Rohde&Schwarz | GP-47 | - | [WTS] [JSN] | |||
GP-101518 | CR 51.010-1-4504 New test case 58c.2.1a – Acknowledged Mode/ Uplink TBF/ Countdown Value, in EGRS2A | CR | ST-Ericsson | GP-47 | - | [WTS] [JSN] | |||
GP-101519 | CR 51.010-1-4505 New test case 58c.2.2a Acknowledged Mode/ Uplink TBF/ Retransmission/ Split RLC Data Block, in EGPRS2A | CR | ST-Ericsson | GP-47 | - | [WTS] [JSN] | |||
GP-101520 | CR 51.010-2-0675 Adding TC 58c.2.1a and 58c.2.2a | CR | ST-Ericsson | GP-47 | - | [WTS] [JSN] | |||
GP-101521 | CR 36.523-1-0897 6.2.3.20: Redirection to E-UTRA upon the release of the CS connection and no suitable cell available | CR | Nokia Corporation | GP-47 | - | [WTS] [JSN] | |||
GP-101522 | CR 51.010-1-4506 26.9.6a.1.x USIM definitions and other corrections | CR | Rohde&Schwarz, Qualcomm Incorporated | GP-47 | - | [WTS] [JSN] | |||
GP-101523 | LS on GERAN3 Progress on P-channel Removal | LS out | TSG WG GERAN3 | GP-47 | - | [WTS] [JSN] | |||
GP-101524 | LS on SDCCH only devices and TC applicability (To: GCF-CAG, TSG SA WG1, PTCRB, Cc: TSG GERAN) | other | TSG WG GERAN3 | GP-47 | - | [WTS] [JSN] | |||
GP-101525 | LS Response on Eliminate execution of test cases requiring “Memory Full” condition | LS out | TSG WG GERAN3 | GP-47 | - | [WTS] [JSN] | |||
GP-101526 | LS Response on Harmonised Standards for GSM Mobile Stations | LS out | TSG WG GERAN3 | GP-47 | - | [WTS] [JSN] | |||
GP-101527 | LS Response on non-inclusion of optional part from 24.008 in conformance test cases | LS out | TSG WG GERAN3 | GP-47 | - | [WTS] [JSN] | |||
GP-101528 | CR 51.010-2-0662 Applicability correction to section 26.8.2.x | CR | Anite, SGS UK | GP-47 | - | [WTS] [JSN] | |||
GP-101529 | CR 51.010-1-4511 Generic call setup procedures for ‘Signalling Only MS’ enhancements | CR | Rohde&Schwarz | GP-47 | - | [WTS] [JSN] | |||
GP-101530 | CR 51.010-5-0099 Update for the latest version of TTCN | CR | TF 160 | GP-47 | - | [WTS] [JSN] | |||
GP-101531 | CR 45.002-0148 TSC allocation for VAMOS in case of DTM (Rel-9) | CR | Nokia Siemens Networks, NOKIA Corporation | GP-47 | - | [WTS] [JSN] | |||
GP-101532 | CR 45.008-0466 rev 1 MEAN_BEP performance requirements for 16-QAM and 32-QAM (Rel-7) | CR | Research In Motion UK Ltd. | GP-47 | - | [WTS] [JSN] | |||
GP-101533 | CR 45.008-0467 rev 1 MEAN_BEP performance requirements for 16-QAM and 32-QAM (Rel-8) | CR | Research In Motion UK Ltd. | GP-47 | - | [WTS] [JSN] | |||
GP-101534 | CR 45.008-0468 rev 1 MEAN_BEP performance requirements for 16-QAM and 32-QAM (Rel-9) | CR | Research In Motion UK Ltd. | GP-47 | - | [WTS] [JSN] | |||
GP-101535 | CR 51.021-0161 rev 1 Aligning the upper measurement frequency for radiated spurious emissions with ERC/REC 74-01 (Rel-8) | CR | Telefon AB LM Ericsson, Nokia Siemens Networks | GP-47 | - | [WTS] [JSN] | |||
GP-101536 | CR 51.021-0163 rev 1 Definition of the Lowest Static Power Level (Rel-8) | CR | Telefon AB LM Ericsson, Nokia Siemens Networks | GP-47 | - | [WTS] [JSN] | |||
GP-101537 | System Level Results with MAIO Hopping Scheme for MUROS (revision of GP-101203) | other | ZTE Corporation | GP-47 | - | [WTS] [JSN] | |||
GP-101538 | CR 45.914-0018 rev 1 System Performance Evaluation with MAIO Hopping Scheme for MUROS (Rel-9) | CR | ZTE Corporation | GP-47 | - | [WTS] [JSN] | |||
GP-101539 | CR 45.005-0400 rev 1 Clarification of multicarrier BTS receiver requirements (Rel-9) | CR | Telefon AB LM Ericsson | GP-47 | - | [WTS] [JSN] | |||
GP-101540 | CR 51.021-0167 rev 1 Clarification of multicarrier BTS receiver requirements (Rel-8) | CR | Telefon AB LM Ericsson | GP-47 | - | [WTS] [JSN] | |||
GP-101541 | CR 51.021-0168 rev 1 Clarification of multicarrier BTS receiver requirements (Rel-9) | CR | Telefon AB LM Ericsson | GP-47 | - | [WTS] [JSN] | |||
GP-101542 | CR 45.001-0071 rev 1 Introduction of VAMOS performance levels (Rel-9) | CR | Nokia Siemens Networks, NOKIA Corporation | GP-47 | - | [WTS] [JSN] | |||
GP-101543 | System evaluation of wider pulse shapes for VAMOS | other | Telefon AB LM Ericsson, ST-Ericsson SA | GP-47 | - | [WTS] [JSN] | |||
GP-101544 | Link performance methodology for system level evaluations | other | Telefon AB LM Ericsson | GP-47 | - | [WTS] [JSN] | |||
GP-101545 | CR 45.914-0018 rev 2 System Performance Evaluation with MAIO Hopping Scheme for MUROS (Rel-9) | CR | ZTE Corporation | GP-47 | - | [WTS] [JSN] | |||
GP-101546 | CR 45.914-0019 rev 1 Optimised Tx pulse investigation: updated modelling description and system performance results (Rel-9) | CR | Nokia Siemens Networks, NOKIA Corporation | GP-47 | - | [WTS] [JSN] | |||
GP-101547 | On Further Observations of Legacy DARP Phase I Handsets with VAMOS (revision of GP-101237) | other | ZTE Corporation | GP-47 | - | [WTS] [JSN] | |||
GP-101548 | TSC assignment for VAMOS mobiles in DTM (reissued from GP-101432.docx) | other | Nokia Siemens Networks, NOKIA Corporation | GP-47 | - | [WTS] [JSN] | |||
GP-101549 | CR 45.002-0148 rev 1 TSC allocation for VAMOS in case of DTM (Rel-9) | CR | Nokia Siemens Networks, NOKIA Corporation | GP-47 | - | [WTS] [JSN] | |||
GP-101550 | CR 45.005-0398 rev 2 Introduction of VAMOS performance requirements (Rel-9) | CR | Nokia Siemens Networks, NOKIA Corporation, Telefon AB LM Ericsson, ST-Ericsson SA | GP-47 | - | [WTS] [JSN] | |||
GP-101551 | CR 45.001-0071 rev 2 Introduction of VAMOS performance levels (Rel-9) | CR | Nokia Siemens Networks, NOKIA Corporation | GP-47 | - | [WTS] [JSN] | |||
GP-101552 | CR 24.008-DRAFT MS capability indication of VAMOS (Rel-9) (revision of GP-101313) | other | Nokia Siemens Networks, NOKIA Corporation | GP-47 | - | [WTS] [JSN] | |||
GP-101553 | CR 45.008-0471 rev 1 Miscellaneous correction (Rel-9) | CR | Huawei Technologies Co., Ltd. | GP-47 | - | [WTS] [JSN] | |||
GP-101554 | CR 45.008-0478 rev 1 Corrections to CSG requirements (Rel-9) | CR | Nokia Siemens Networks, NOKIA Corporation, Telecom Italia S.p.A. | GP-47 | - | [WTS] [JSN] | |||
GP-101555 | CR 45.008-0482 Corrections to CSG requirements (Rel-8) | CR | Nokia Siemens Networks, NOKIA Corporation, Telecom Italia S.p.A. | GP-47 | - | [WTS] [JSN] | |||
GP-101556 | CR 45.914-0019 rev 2 Optimised Tx pulse investigation: updated modelling description and system performance results (Rel-9) | CR | Nokia Siemens Networks, NOKIA Corporation | GP-47 | - | [WTS] [JSN] | |||
GP-101557 | CR 45.002-0146 rev 1 Shifted USF for EFTA (Rel-9) | CR | Telefon AB LM Ericsson, ST-Ericsson SA | GP-47 | - | [WTS] [JSN] | |||
GP-101558 | DCDL for EFTA (draft CR to 24.008) (revision of GP-101358) | other | Telefon AB LM Ericsson, ST-Ericsson SA | GP-47 | - | [WTS] [JSN] | |||
GP-101559 | CR 45.008-0451 rev 2 Redirection from E-UTRAN to GERAN (Rel-9) | CR | Vodafone Group Plc | GP-47 | - | [WTS] [JSN] | |||
GP-101560 | Reply LS to “LS on Status of the MSR Work Item” (To: TSG RAN, TSG RAN WG4, Cc: ETSI TC MSG, ETSI TC MSG TFES) | LS out | TSG GERAN WG1 | GP-47 | - | [WTS] [JSN] | |||
GP-101561 | CR 36.523-1-0901 New Test Case 6.2.3.29 - Inter-RAT cell reselection from GPRS packet_transfer NC1 mode to E-UTRA / Network assisted cell change. | CR | Research In Motion UK Ltd | GP-47 | - | [WTS] [JSN] | |||
GP-101562 | CR 36.523-1-0902 New Test case 6.2.3.27- Inter-RAT Cell selection from GPRS Packet_transfer to E-UTRA Cell (NC2 mode). | CR | Research In Motion UK Ltd | GP-47 | - | [WTS] [JSN] | |||
GP-101563 | CR 51.010-1-4513 Correction to TC 20.25.3a | CR | CMCC | GP-47 | - | [WTS] [JSN] | |||
GP-101564 | CR 36.523-2-0097 Addition of new GELTE test cases- 6.2.3.27 and 6.2.3.29 | CR | Research In Motion UK Ltd | GP-47 | - | [WTS] [JSN] | |||
GP-101565 | CR 36.523-2-0098 Adding TC 6.2.3.14 and 6.2.3.15 | CR | ST-Ericsson | GP-47 | - | [WTS] [JSN] | |||
GP-101566 | electronic agreement schedule | other | TSG WG GERAN3 Chair (Samsung) | GP-47 | - | [WTS] [JSN] | |||
GP-101567 | Redhot and HUGE work plan | other | Ericsson | GP-47 | - | [WTS] [JSN] | |||
GP-101568 | Work Plan for P-channel changes rev 6.0 | other | Ericsson | GP-47 | - | [WTS] [JSN] | |||
GP-101569 | CR 51.010-1-4491 Addition of Part 7 | CR | Spirent | GP-47 | - | [WTS] [JSN] | |||
GP-101570 | CR 51.010-1-4492 Clarification to default conditions during A-GNSS signalling tests | CR | Spirent | GP-47 | - | [WTS] [JSN] | |||
GP-101571 | CR 51.010-1-4493 Addition of references for A-GNSS Assistance data | CR | Spirent | GP-47 | - | [WTS] [JSN] | |||
GP-101572 | CR 51.010-1-4514 Transfer of GPS scenarios and assistance data to new specification | CR | Spirent | GP-47 | - | [WTS] [JSN] | |||
GP-101573 | CR 51.010-2-0661 Addition of Part 7 | CR | Spirent | GP-47 | - | [WTS] [JSN] | |||
GP-101574 | CR 51.010-5-0102 Addition of Part 7 | CR | Spirent | GP-47 | - | [WTS] [JSN] | |||
GP-101575 | CR 51.010-2-0678 70.14.1,70.14.2, 70.14.3 and applicability clauses | CR | Nokia Corporation | GP-47 | - | [WTS] [JSN] | |||
GP-101576 | CR 51.010-1-4522 70.14.2 MO-LR Idle mode for Mobiles Supporting MS-Based GNSS (Assistance Data Request) and 70.14.3 - MO-LR Idle mode for Mobiles Supporting MS-Based GNSS (Location Estimate Request) | CR | Nokia Corporation | GP-47 | - | [WTS] [JSN] | |||
GP-101577 | CR 51.010-1-4518 Addition of GNSS ‘MO-LR Location Error: GNSS assistance data missing’ test case | CR | Thales | GP-47 | - | [WTS] [JSN] | |||
GP-101578 | CR 51.010-1-4519 Addition of GNSS ‘MO-LR Location Error: Requested Method not Supported’ test case | CR | Thales | GP-47 | - | [WTS] [JSN] | |||
GP-101579 | CR 51.010-1-4520 Addition of GNSS ‘MO-LR : Multiple RRLP Requests with Different Reference Number’ test case | CR | Thales | GP-47 | - | [WTS] [JSN] | |||
GP-101580 | CR 51.010-1-4521 Addition of GNSS ‘MO-LR : Multiple RRLP Requests with Same Reference Number and Extended Reference Number’ test case | CR | Thales | GP-47 | - | [WTS] [JSN] | |||
GP-101581 | CR 44.060-1462: Reporting PLMN ID for CSG cell (Rel-9) | CR | Huawei Technologies Co., Ltd. | GP-47 | - | [WTS] [JSN] | |||
GP-101582 | CR 44.060-1463: Reporting PLMN ID for CSG cell (Rel-10) | CR | Huawei Technologies Co., Ltd. | GP-47 | - | [WTS] [JSN] | |||
GP-101583 | LS on Introduction of MS capability indication for VAMOS | LS out | TSG GERAN | GP-47 | - | [WTS] [JSN] | |||
GP-101584 | LS on Release 10 NIMTC Impacts | other | TSG SA WG2 | GP-47 | - | [WTS] [JSN] | |||
GP-101585 | CR 44.060-1445 rev 1: Optimising CSG Cells Signalling in PACKET MEASUREMENT ORDER (Rel-9) | CR | Nokia Siemens Networks, Nokia Corporation | GP-47 | - | [WTS] [JSN] | |||
GP-101586 | CR 44.060-1446 rev 1: Optimising CSG Cells Signalling in PACKET MEASUREMENT ORDER (Rel-10) | CR | Nokia Siemens Networks, Nokia Corporation | GP-47 | - | [WTS] [JSN] | |||
GP-101587 | CR 44.060-1431 rev 2: Clarification on E-UTRAN information modified by PMO (Rel-8) | CR | Huawei Technologies Co., Ltd. | GP-47 | - | [WTS] [JSN] | |||
GP-101588 | CR 48.103-0005 rev 8: Introduction of Local Call Local Switch support (Rel-10) | CR | Nokia Siemens Networks | GP-47 | - | [WTS] [JSN] | |||
GP-101589 | CR 44.060-1304 rev 7: Enhanced Multiplexing for a Single RLC Entity (EMSR) (Rel-10) | CR | Telefon AB LM Ericsson, ST-Ericsson, | GP-47 | - | [WTS] [JSN] | |||
GP-101590 | Draft CR 24.008: Introduction of MOCN GERAN (Rel-10) | other | Alcatel-Lucent | GP-47 | - | [WTS] [JSN] | |||
GP-101591 | Draft CR 23.251: Introduction of MOCN GERAN (Rel-10) | other | Alcatel-Lucent | GP-47 | - | [WTS] [JSN] | |||
GP-101592 | LS on Introduction of MOCN GERAN | other | TSG GERAN | GP-47 | - | [WTS] [JSN] | |||
GP-101593 | LS on “Mobile Wireless access systems providing telecommunications for a large number of ubiquitous sensors and/or actuators scattered over wide areas in the land mobile service” | other | TSG GERAN | GP-47 | - | [WTS] [JSN] | |||
GP-101594 | Enhancement of Iur-g interface in GERAN WID | other | CMCC | GP-47 | - | [WTS] [JSN] | |||
GP-101595 | LS on Enhancement of Iur-g interface in GERAN WID | other | TSG GERAN | GP-47 | - | [WTS] [JSN] | |||
GP-101596 | LS on Introduction of MOCN GERAN | other | TSG GERAN | GP-47 | - | [WTS] [JSN] | |||
GP-101597 | CR 44.060-1431 rev 3: Clarification on E-UTRAN information modified by PMO (Rel-8) | CR | Huawei Technologies Co., Ltd. | GP-47 | - | [WTS] [JSN] | |||
GP-101598 | LS on Introduction of MOCN GERAN | LS out | TSG GERAN | GP-47 | - | [WTS] [JSN] | |||
GP-101599 | CR 44.060-1431 rev 4: Clarification on E-UTRAN information modified by PMO (Rel-8) | CR | Huawei Technologies Co., Ltd. | GP-47 | - | [WTS] [JSN] | |||
GP-101600 | G2-47 Chairman's Summary | other | Chairman | GP-47 | - | [WTS] [JSN] | |||
GP-101601 | LS on USIM introduction in TS 51.010 | LS out | TSG WG GERAN3 | GP-47 | - | [WTS] [JSN] | |||
GP-101602 | Progress on LTE interworking test cases | LS out | TSG WG GERAN3 | GP-47 | - | [WTS] [JSN] | |||
GP-101603 | CR 36.523-1-1016 New Test Case 6.2.3.23 - Inter-RAT Cell Reselection from GPRS Packet transfer to E-UTRA in CCN mode (PACKET CELL CHANGE CONTINUE) | CR | Research In Motion UK Ltd | GP-47 | - | [WTS] [JSN] | |||
GP-101604 | VAMOS Work Item Description | other | Research In Motion UK Ltd | GP-47 | - | [WTS] [JSN] | |||
GP-101605 | Additional assistance data information for TS 51.010-7 | other | Spirent | GP-47 | - | [WTS] [JSN] | |||
GP-101606 | GERAN3#47 Chair's report | other | GERAN3 Chair | GP-47 | - | [WTS] [JSN] | |||
GP-101607 | Draft GERAN3#47 meeting report (revised in GP-101634) | other | ETSI Secretariat | GP-47 | - | [WTS] [JSN] | |||
GP-101608 | Presentation of TS 51.010-7 | other | Spirent | GP-47 | - | [WTS] [JSN] | |||
GP-101609 | CR 45.008-0479 rev 1 Reselection rules for hybrid cells (Rel-9) | CR | Nokia Siemens Networks, Nokia Corporation, Qualcomm Inc., Vodafone Group plc, Motorola Ltd, LG Electronics Inc., Huawei Technologies Co., Ltd | GP-47 | - | [WTS] [JSN] | |||
GP-101610 | CR 45.008-0480 rev 1 Reporting rules for hybrid cells (Rel-9) | CR | Nokia Siemens Networks, NOKIA Corporation | GP-47 | - | [WTS] [JSN] | |||
GP-101611 | TR 45.913 Optimized transmit pulse shape for downlink Enhanced General Packet Radio Service (EGPRS2-B) v 2.1.0 | other | Rapporteur | GP-47 | - | [WTS] [JSN] | |||
GP-101612 | CR 45.005-0398 rev 3 Introduction of VAMOS performance requirements (Rel-9) | CR | Nokia Siemens Networks, NOKIA Corporation, Telefon AB LM Ericsson, ST-Ericsson SA | GP-47 | - | [WTS] [JSN] | |||
GP-101613 | CR 51.021-0173 Removal of inconsistencies related to frequency ranges for multicarrier BTS tests in single carrier and multicarrier operation (Rel-8) | CR | Nokia Siemens Networks | GP-47 | - | [WTS] [JSN] | |||
GP-101614 | CR 51.021-0174 Removal of inconsistencies related to frequency ranges for multicarrier BTS tests in single carrier and multicarrier operation (Rel-9) | CR | Nokia Siemens Networks | GP-47 | - | [WTS] [JSN] | |||
GP-101615 | CR 45.008-0478 rev 2 Corrections to CSG requirements (Rel-9) | CR | Nokia Siemens Networks, NOKIA Corporation, Telecom Italia S.p.A. | GP-47 | - | [WTS] [JSN] | |||
GP-101616 | CR 45.008-0479 rev 2 Reselection rules for hybrid cells (Rel-9) | CR | Nokia Siemens Networks, Nokia Corporation, Qualcomm Inc., Vodafone Group plc, Motorola Ltd, LG Electronics Inc., Huawei Technologies Co., Ltd | GP-47 | - | [WTS] [JSN] | |||
GP-101617 | Draft New Work Item Building Block on Network Improvements for Machine Type Communications (revised in GP-101640) | other | Vodafone Group Plc et al | GP-47 | - | [WTS] [JSN] | |||
GP-101618 | New Work Task on Multi-Standard Radio Base Station RF requirements for non-contiguous spectrum deployments | other | Vodafone Group Plc et al | GP-47 | - | [WTS] [JSN] | |||
GP-101619 | Draft New Study Item on Solutions for GSM/EDGE BTS Energy Saving | other | Vodafone Group Plc et al | GP-47 | - | [WTS] [JSN] | |||
GP-101620 | 3GPP TSG GERAN Work Plan | other | Vodafone Group Plc | GP-47 | - | [WTS] [JSN] | |||
GP-101621 | Proposal for additional VAMOS downlink tests | other | Com-Research | GP-47 | - | [WTS] [JSN] | |||
GP-101622 | Draft Reply LS to "MSR BS RF requirements for non-contiguous spectrum deployments (To: TSG RAN, TSG RAN WG4) | other | TSG GERAN WG1 | GP-47 | - | [WTS] [JSN] | |||
GP-101623 | Working Assumptions for VAMOS Performance Requirements | other | WI Rapporteur | GP-47 | - | [WTS] [JSN] | |||
GP-101624 | Draft TR 48.860 on Signal Precoding Enhancements for EGPRS2 DL | other | WI Rapporteur | GP-47 | - | [WTS] [JSN] | |||
GP-101625 | CR 45.005-0398 rev 4 Introduction of VAMOS performance requirements (Rel-9) | CR | Nokia Siemens Networks, NOKIA Corporation, Telefon AB LM Ericsson, ST-Ericsson SA | GP-47 | - | [WTS] [JSN] | |||
GP-101626 | Working Assumptions for VAMOS Performance Requirements (revised in GP-101644) | other | WI Rapporteur | GP-47 | - | [WTS] [JSN] | |||
GP-101627 | Outcome of TSG GERAN WG1 meeting # 47, 31st August to 2nd September, 2010, Kunming, P. R. China (revised in GP-101635) | other | TSG GERAN WG1 Chairman | GP-47 | - | [WTS] [JSN] | |||
GP-101628 | Draft Report of TSG GERAN WG1 meeting during TSG GERAN #47, v. 0.0.1 | other | TSG GERAN WG1 Secretary | GP-47 | - | [WTS] [JSN] | |||
GP-101629 | Draft TR 48.xxx GERAN IMTC v.0.0.4 | other | Rapporteur | GP-47 | - | [WTS] [JSN] | |||
GP-101630 | Work Plan for GERAN IMTC | other | Rapporteur | GP-47 | - | [WTS] [JSN] | |||
GP-101631 | LS on support for Priority for terminating sessions for MPS | LS out | GERAN WG2 | GP-47 | - | [WTS] [JSN] | |||
GP-101632 | Proposed working assumption on interference profiles for VAMOS uplink performance | other | Nokia Siemens Networks, Telefon AB LM Ericsson, Vodafone Group, CMCC | GP-47 | - | [WTS] [JSN] | |||
GP-101633 | Working Assumptions for VAMOS Performance Requirements | other | WI Rapporteur | GP-47 | - | [WTS] [JSN] | |||
GP-101634 | GERAN3#47 meeting report | other | ETSI Secretariat | GP-47 | - | [WTS] [JSN] | |||
GP-101635 | Outcome of TSG GERAN WG1 meeting # 47, 31st August to 2nd September, 2010, Kunming, P. R. China | other | TSG GERAN WG1 Chairman | GP-47 | - | [WTS] [JSN] | |||
GP-101636 | Alternative text proposal to LS in GP-101469 (revised in GP-101639) | other | Telefon AB LM Ericsson | GP-47 | - | [WTS] [JSN] | |||
GP-101637 | LS on SDCCH only devices and TC applicability (To: GCF-CAG, GERAN WG2, PTCRB) | LS out | TSG WG GERAN3 | GP-47 | - | [WTS] [JSN] | |||
GP-101638 | New Study Item on Solutions for GSM/EDGE BTS Energy Saving | other | Vodafone Group Plc et al | GP-47 | - | [WTS] [JSN] | |||
GP-101639 | Alternative text proposal to LS in GP-101469 (revision of GP-101636) | other | Telefon AB LM Ericsson | GP-47 | - | [WTS] [JSN] | |||
GP-101640 | New Work Item Building Block on Network Improvements for Machine Type Communications (revision of GP-101617) (revised in GP-101647) | other | Vodafone Group Plc et al | GP-47 | - | [WTS] [JSN] | |||
GP-101641 | CR 51.021-0172 rev 1 Corrections of the MCBTS IM requirements (Rel-8) | CR | Alcatel-Lucent, Telefon AB LM Ericsson | GP-47 | - | [WTS] [JSN] | |||
GP-101642 | CR 51.021-0171 rev 2 Corrections of the MCBTS IM requirements (Rel-9) (revision of GP-101365) | CR | Alcatel-Lucent, Telefon AB LM Ericsson | GP-47 | - | [WTS] [JSN] | |||
GP-101643 | CR 45.914-0018 rev 3 System Performance Evaluation with MAIO Hopping Scheme for MUROS (Rel-9) | CR | ZTE Corporation | GP-47 | - | [WTS] [JSN] | |||
GP-101644 | Working Assumptions for VAMOS Performance Requirements (revision of GP-101626) | other | WI Rapporteur | GP-47 | - | [WTS] [JSN] | |||
GP-101645 | CR 45.008-0478 rev 3 Corrections to CSG requirements (Rel-9) | CR | Nokia Siemens Networks, NOKIA Corporation, Telecom Italia S.p.A. | GP-47 | - | [WTS] [JSN] | |||
GP-101646 | Draft Reply LS to "MSR BS RF requirements for non-contiguous spectrum deployments (To: TSG RAN, TSG RAN WG4) | LS out | TSG GERAN WG1 | GP-47 | - | [WTS] [JSN] | |||
GP-101647 | New Work Item Building Block on Network Improvements for Machine Type Communications (revision of GP-101640) | other | Vodafone Group Plc et al | GP-47 | - | [WTS] [JSN] | |||
GP-101648 | Not used | other | GP-47 | - | [WTS] [JSN] | ||||
GP-101649 | Not used | other | GP-47 | - | [WTS] [JSN] | ||||
GP-101650 | Not used | other | GP-47 | - | [WTS] [JSN] | ||||
GP-101651 | Enhancement of Iur-g interface in GERAN WID (revised in GP-101657) | other | CMCC et al. | GP-47 | - | [WTS] [JSN] | |||
GP-101652 | LS on Enhancement of Iur-g interface in GERAN WID (revised in GP-101658) | other | TSG GERAN | GP-47 | - | [WTS] [JSN] | |||
GP-101653 | LS on “Mobile Wireless access systems providing telecommunications for a large number of ubiquitous sensors and/or actuators scattered over wide areas in the land mobile service” | LS out | TSG GERAN | GP-47 | - | [WTS] [JSN] | |||
GP-101654 | Revised RT-100052 attachment to GP-101653. | other | TSG GERAN | GP-47 | - | [WTS] [JSN] | |||
GP-101655 | G2-47 Draft Meeting Report | other | MCC | GP-47 | - | [WTS] [JSN] | |||
GP-101656 | G2-47 Chairman's Summary | other | Chairman | GP-47 | - | [WTS] [JSN] | |||
GP-101657 | Enhancement of Iur-g interface in GERAN WID (revision of GP-101651) (revised in GP-101659) | other | CMCC et al. | GP-47 | - | [WTS] [JSN] | |||
GP-101658 | LS on Enhancement of Iur-g interface in GERAN WID (revision of GP-101652) (revised in GP-101660) | other | TSG GERAN | GP-47 | - | [WTS] [JSN] | |||
GP-101659 | Enhancement of Iur-g interface in GERAN WID (revision of GP-101657) | other | CMCC et al. | GP-47 | - | [WTS] [JSN] | |||
GP-101660 | LS on Enhancement of Iur-g interface in GERAN WID (revision of GP-101658) | LS out | TSG GERAN | GP-47 | - | [WTS] [JSN] |
570 documents (1.1008598804474 seconds)