Please enter the search related information in the fields below. Partial information works, e.g. "SP-21
" in the "tdoc" field lists all TSG SA documents from 2021. Regular expressions mostly work in all fields (e.g. "2[34].501
" in the "Spec" field lists all documents related to 23.501 and 24.501. Capitalization is disregarded, i.e. "3GPP
" gives the same results as "3gpp
".
Download results in JSON format
tdoc | Title | Type / Revs | Source | Spec / CR | S/WID | Release | Meeting | Status | Links |
---|---|---|---|---|---|---|---|---|---|
G2-050341 | other | G2-26 | - | [WTS] [JSN] | |||||
G2-050342 | other | G2-26 | - | [WTS] [JSN] | |||||
G2-050343 | Reply on LS on exchange of radio capabilities in CSI | other | RAN 2 | G2-26 | - | [WTS] [JSN] | |||
G2-050344 | Liaison Statement response on IP packet sizes for MBMS | other | RAN2 | G2-26 | - | [WTS] [JSN] | |||
G2-050345 | Liaison Statement response on NAS actions in support of MBMS reception | other | RAN2 | G2-26 | - | [WTS] [JSN] | |||
G2-050346 | Reply LS on Security key set change on PS handover | other | RAN2 | G2-26 | - | [WTS] [JSN] | |||
G2-050347 | LS on NAS expectations on message delivery during PS Handover | other | RAN2 | G2-26 | - | [WTS] [JSN] | |||
G2-050348 | LS on RIM procedure re-use for PS Handover | other | RAN2 | G2-26 | - | [WTS] [JSN] | |||
G2-050349 | Reply Liaison Statement on SA4 FEC Simulation Assumptions for GERAN and Permeable-Layer Receiver | other | SA4 | G2-26 | - | [WTS] [JSN] | |||
G2-050350 | LS on Alignment of IE encoding for MBMS | other | CT4 | G2-26 | - | [WTS] [JSN] | |||
G2-050351 | LS on Ciphering and PS Handover | other | CT1 | G2-26 | - | [WTS] [JSN] | |||
G2-050352 | LS on peak throughput class | other | CT1 | G2-26 | - | [WTS] [JSN] | |||
G2-050353 | LS on Inter-band mobility and Potential inter-RAT inter-working problem caused by overlapping UTRAN operating bands | other | RAN2 | G2-26 | - | [WTS] [JSN] | |||
G2-050354 | Reply on LS on exchange of radio capabilities in CSI | other | RAN 2 | G2-26 | - | [WTS] [JSN] | |||
G2-050355 | Introduction of the MBMS Session Repetition Number | CR | Telecom Italia S.p.A. | G2-26 | - | [WTS] [JSN] | |||
G2-050356 | Introduction of the MBMS Session Repetition Number | CR | Telecom Italia S.p.A. | G2-26 | - | [WTS] [JSN] | |||
G2-050357 | Introduction of the MBMS Session Repetition Number | CR | Telecom Italia S.p.A. | G2-26 | - | [WTS] [JSN] | |||
G2-050358 | Introduction of the MBMS Session Repetition Number | CR | Telecom Italia S.p.A. | G2-26 | - | [WTS] [JSN] | |||
G2-050359 | Introduction of the MBMS Session Repetition Number | CR | Telecom Italia S.p.A. | G2-26 | - | [WTS] [JSN] | |||
G2-050360 | Correction to the reference for the MBMS Session Identity IE coding | other | Telecom Italia S.p.A. | G2-26 | - | [WTS] [JSN] | |||
G2-050361 | Correction to the reference for the MBMS Session Identity IE coding | other | Telecom Italia S.p.A. | G2-26 | - | [WTS] [JSN] | |||
G2-050362 | Introduction of fast reception resumption for MBMS | CR | Telecom Italia S.p.A. | G2-26 | - | [WTS] [JSN] | |||
G2-050363 | Introduction of fast reception resumption for MBMS | CR | Telecom Italia S.p.A. | G2-26 | - | [WTS] [JSN] | |||
G2-050364 | other | G2-26 | - | [WTS] [JSN] | |||||
G2-050365 | other | G2-26 | - | [WTS] [JSN] | |||||
G2-050366 | Correction of reference to 2G-3G handover IE | CR | Nortel | G2-26 | - | [WTS] [JSN] | |||
G2-050367 | Transparent UMTS specific information in Classmark Change (Rel-5) | CR | Nortel | G2-26 | - | [WTS] [JSN] | |||
G2-050368 | Transparent UMTS specific information in Classmark Change (Rel-6) | CR | Nortel | G2-26 | - | [WTS] [JSN] | |||
G2-050369 | Transparent UMTS specific information in Classmark Change (Rel-7) | CR | Nortel | G2-26 | - | [WTS] [JSN] | |||
G2-050370 | Sending DTM Information after Handover | other | Siemens | G2-26 | - | [WTS] [JSN] | |||
G2-050371 | Permission to access the network during DL TBF | CR | Infineon | G2-26 | - | [WTS] [JSN] | |||
G2-050372 | Draft CR 43.055: SGSNR during DTM (Rel-7) | other | Infineon | G2-26 | - | [WTS] [JSN] | |||
G2-050373 | Clarifications to GAN Stage 2 | other | Ericsson | G2-26 | - | [WTS] [JSN] | |||
G2-050374 | Transferring of UE RAC and START PS from the MS to the BSC | other | Ericsson | G2-26 | - | [WTS] [JSN] | |||
G2-050375 | Handling of START PS and UE RAC during PS handover | CR | Ericsson | G2-26 | - | [WTS] [JSN] | |||
G2-050376 | Handling of START PS and UE RAC during PS handover | CR | Ericsson | G2-26 | - | [WTS] [JSN] | |||
G2-050377 | PFC prioritisation during PS Handover | CR | Ericsson | G2-26 | - | [WTS] [JSN] | |||
G2-050378 | PFC prioritisation during PS Handover | CR | Ericsson | G2-26 | - | [WTS] [JSN] | |||
G2-050379 | Correction of Size and Configuration Procedures for an IP Sub-network | other | Nortel | G2-26 | - | [WTS] [JSN] | |||
G2-050380 | New cause IE for PS Handover | other | Ericsson | G2-26 | - | [WTS] [JSN] | |||
G2-050381 | New cause value for PS Handover | CR | Ericsson | G2-26 | - | [WTS] [JSN] | |||
G2-050382 | New cause value for PS Handover | CR | Ericsson | G2-26 | - | [WTS] [JSN] | |||
G2-050383 | Security clean-up | other | Ericsson | G2-26 | - | [WTS] [JSN] | |||
G2-050384 | Clarification of PS Handover of TBFs (not PFCs) | other | Ericsson | G2-26 | - | [WTS] [JSN] | |||
G2-050385 | Removal of FFSes related to NAS container | other | Ericsson | G2-26 | - | [WTS] [JSN] | |||
G2-050386 | Correction of reference to NAS Container for PS HO IE | CR | Ericsson | G2-26 | - | [WTS] [JSN] | |||
G2-050387 | Correction of reference to NAS Container for PS HO IE | CR | Ericsson | G2-26 | - | [WTS] [JSN] | |||
G2-050388 | Discussion paper for new PS HO triggers | other | Ericsson | G2-26 | - | [WTS] [JSN] | |||
G2-050389 | Less Restrictive PS HO Triggers | CR | Ericsson | G2-26 | - | [WTS] [JSN] | |||
G2-050390 | Less Restrictive PS HO Triggers | CR | Ericsson | G2-26 | - | [WTS] [JSN] | |||
G2-050391 | Description of 8-PSK capability on the uplink in MS Classmark 3 | other | Ericsson | G2-26 | - | [WTS] [JSN] | |||
G2-050392 | other | G2-26 | - | [WTS] [JSN] | |||||
G2-050393 | Packet Loss Measurement Function | CR | Ericsson | G2-26 | - | [WTS] [JSN] | |||
G2-050394 | MBMS Transfer Mode | other | Ericsson | G2-26 | - | [WTS] [JSN] | |||
G2-050395 | MBMS Transfer Mode | other | Ericsson | G2-26 | - | [WTS] [JSN] | |||
G2-050396 | other | G2-26 | - | [WTS] [JSN] | |||||
G2-050397 | Early TBF Allocation | CR | Ericsson | G2-26 | - | [WTS] [JSN] | |||
G2-050398 | other | G2-26 | - | [WTS] [JSN] | |||||
G2-050399 | other | G2-26 | - | [WTS] [JSN] | |||||
G2-050400 | other | G2-26 | - | [WTS] [JSN] | |||||
G2-050401 | Introduction of the DTM HANDOVER | other | Nokia | G2-26 | - | [WTS] [JSN] | |||
G2-050402 | Draft CR -Introduction of the DTM HANDOVER | other | Nokia | G2-26 | - | [WTS] [JSN] | |||
G2-050403 | Draft CR to 23.009- Introduction of the DTM HANDOVER | other | Nokia | G2-26 | - | [WTS] [JSN] | |||
G2-050404 | other | G2-26 | - | [WTS] [JSN] | |||||
G2-050405 | On the upper layer aspects of the Permeable Layer Receiver | other | QUALCOMM Europe | G2-26 | - | [WTS] [JSN] | |||
G2-050406 | Re-assembly of upper layer PDUs in RLC non-persistent mode | CR | Siemens | G2-26 | - | [WTS] [JSN] | |||
G2-050407 | Re-assembly of upper layer PDUs in RLC non-persistent mode | CR | Siemens | G2-26 | - | [WTS] [JSN] | |||
G2-050408 | Additional pre-configured IP endpoint in BSS | CR | Siemens | G2-26 | - | [WTS] [JSN] | |||
G2-050409 | Additional pre-configured IP endpoint in BSS | CR | Siemens | G2-26 | - | [WTS] [JSN] | |||
G2-050410 | Extension of “Service UTRAN CCO” meaning to cover PS Handover | other | Siemens | G2-26 | - | [WTS] [JSN] | |||
G2-050411 | Extension of “Service UTRAN CCO” meaning to cover PS Handover | other | Siemens | G2-26 | - | [WTS] [JSN] | |||
G2-050412 | Reply on LS on exchange of radio capabilities in CSI | other | RAN 2 | G2-26 | - | [WTS] [JSN] | |||
G2-050413 | Introduction of the MBMS Session Repetition Number | CR | Telecom Italia S.p.A. | G2-26 | - | [WTS] [JSN] | |||
G2-050414 | Miscellaneous corrections and clean-up | other | Nortel Networks | G2-26 | - | [WTS] [JSN] | |||
G2-050415 | LB_MS_TXPWR_MAX_CCH to PSI13 and PSI14 on PACCH | CR | Nokia | G2-26 | - | [WTS] [JSN] | |||
G2-050416 | LB_MS_TXPWR_MAX_CCH to PSI13 and PSI14 on PACCH | CR | Nokia | G2-26 | - | [WTS] [JSN] | |||
G2-050417 | RR connection establishment using enhanced DTM CS establishment in response to an encapsulated DTM ASSIGNMENT message | CR | Nokia | G2-26 | - | [WTS] [JSN] | |||
G2-050418 | RR connection establishment using enhanced DTM CS establishment in response to an encapsulated DTM ASSIGNMENT message | CR | Nokia | G2-26 | - | [WTS] [JSN] | |||
G2-050419 | Reply LS on RIM procedure re-use for PS Handover | other | GERAN2 | G2-26 | - | [WTS] [JSN] | |||
G2-050420 | Reply LS on Inter-band mobility and Potential inter-RAT inter-working problem caused by overlapping UTRAN operating bands | other | GERAN2 | G2-26 | - | [WTS] [JSN] | |||
G2-050421 | Transparent UMTS specific information in Classmark Change (Rel-5) | other | Nortel | G2-26 | - | [WTS] [JSN] | |||
G2-050422 | Transparent UMTS specific information in Classmark Change (Rel-6) | other | Nortel | G2-26 | - | [WTS] [JSN] | |||
G2-050423 | Transparent UMTS specific information in Classmark Change (Rel-7) | other | Nortel | G2-26 | - | [WTS] [JSN] | |||
G2-050424 | Transparent UMTS specific information in Classmark Change (Rel-4) | other | Nortel | G2-26 | - | [WTS] [JSN] | |||
G2-050425 | RR connection establishment using enhanced DTM CS establishment in response to an encapsulated DTM ASSIGNMENT message | CR | Nokia | G2-26 | - | [WTS] [JSN] | |||
G2-050426 | RR connection establishment using enhanced DTM CS establishment in response to an encapsulated DTM ASSIGNMENT message | CR | Nokia | G2-26 | - | [WTS] [JSN] | |||
G2-050427 | other | G2-26 | - | [WTS] [JSN] | |||||
G2-050428 | RR connection establishment using enhanced DTM CS establishment in response to an encapsulated DTM ASSIGNMENT message | CR | Nokia | G2-26 | - | [WTS] [JSN] | |||
G2-050429 | RR connection establishment using enhanced DTM CS establishment in response to an encapsulated DTM ASSIGNMENT message | CR | Nokia | G2-26 | - | [WTS] [JSN] | |||
G2-050430 | Introduction of the MBMS Session Repetition Number | other | Telecom Italia S.p.A. | G2-26 | - | [WTS] [JSN] | |||
G2-050431 | Introduction of the MBMS Session Repetition Number | CR | Telecom Italia S.p.A. | G2-26 | - | [WTS] [JSN] | |||
G2-050432 | Introduction of the MBMS Session Repetition Number | other | Telecom Italia S.p.A. | G2-26 | - | [WTS] [JSN] | |||
G2-050433 | Introduction of the MBMS Session Repetition Number | other | Telecom Italia S.p.A. | G2-26 | - | [WTS] [JSN] | |||
G2-050434 | Introduction of the MBMS Session Repetition Number | other | Telecom Italia S.p.A. | G2-26 | - | [WTS] [JSN] | |||
G2-050435 | Introduction of the MBMS Session Repetition Number | other | Telecom Italia S.p.A. | G2-26 | - | [WTS] [JSN] | |||
G2-050436 | Condition for sending DTM INFORMATION message | other | Nortel Networks | G2-26 | - | [WTS] [JSN] | |||
G2-050437 | Condition for sending DTM INFORMATION message | other | Nortel Networks | G2-26 | - | [WTS] [JSN] | |||
G2-050438 | Introduction of fast reception resumption for MBMS | other | Telecom Italia S.p.A. | G2-26 | - | [WTS] [JSN] | |||
G2-050439 | Introduction of fast reception resumption for MBMS | other | Telecom Italia S.p.A. | G2-26 | - | [WTS] [JSN] | |||
G2-050440 | Liaison Statement on Permeable-Layer Receiver and Upper Layers | other | GERAN2 | G2-26 | - | [WTS] [JSN] | |||
G2-050441 | Handling of START PS and UE RAC during PS handover | other | Ericsson | G2-26 | - | [WTS] [JSN] | |||
G2-050442 | Handling of START PS and UE RAC during PS handover | CR | Ericsson | G2-26 | - | [WTS] [JSN] | |||
G2-050443 | Security clean-up | other | Ericsson | G2-26 | - | [WTS] [JSN] | |||
G2-050444 | Correction of reference to NAS Container for PS HO IE | other | Ericsson | G2-26 | - | [WTS] [JSN] | |||
G2-050445 | Correction of reference to NAS Container for PS HO IE | other | Ericsson | G2-26 | - | [WTS] [JSN] | |||
G2-050446 | CR 48.018-0163 rev 1: PFC prioritisation during PS Handover (Rel-6) | CR | Ericsson | G2-26 | - | [WTS] [JSN] | |||
G2-050447 | CR 48.018-0164 rev 1: PFC prioritisation during PS Handover (Rel-7) | CR | Ericsson | G2-26 | - | [WTS] [JSN] | |||
G2-050448 | Less Restrictive PS HO Triggers | CR | Ericsson | G2-26 | - | [WTS] [JSN] | |||
G2-050449 | Less Restrictive PS HO Triggers | CR | Ericsson | G2-26 | - | [WTS] [JSN] | |||
G2-050450 | LS on BSSGP cause in FORWARD RELOCATION REQUEST message | LS out | GERAN2 | G2-26 | - | [WTS] [JSN] | |||
G2-050451 | Additional pre-configured IP endpoint in BSS | other | Siemens | G2-26 | - | [WTS] [JSN] | |||
G2-050452 | Additional pre-configured IP endpoint in BSS | other | Siemens | G2-26 | - | [WTS] [JSN] | |||
G2-050453 | LB_MS_TXPWR_MAX_CCH to PSI13 and PSI14 on PACCH | other | Nokia | G2-26 | - | [WTS] [JSN] | |||
G2-050454 | LB_MS_TXPWR_MAX_CCH to PSI13 and PSI14 on PACCH | other | Nokia | G2-26 | - | [WTS] [JSN] | |||
G2-050455 | Sending DTM Information after Handover | other | Siemens | G2-26 | - | [WTS] [JSN] | |||
G2-050456 | Permission to access the network during DL TBF | other | Infineon | G2-26 | - | [WTS] [JSN] | |||
G2-050457 | Draft CR 43.055: SGSNR during DTM (Rel-7) | other | Infineon | G2-26 | - | [WTS] [JSN] | |||
G2-050458 | Correction of reference to 2G-3G handover IE | CR | Nortel | G2-26 | - | [WTS] [JSN] | |||
G2-050459 | Introduction of the MBMS Session Repetition Number | other | Telecom Italia S.p.A. | G2-26 | - | [WTS] [JSN] | |||
G2-050460 | Handling of START PS and UE RAC during PS handover | other | Ericsson | G2-26 | - | [WTS] [JSN] | |||
G2-050461 | Description of 8-PSK capability on the uplink in MS Classmark 3 | other | Siemens | G2-26 | - | [WTS] [JSN] | |||
G2-050462 | Less Restrictive PS HO Triggers | other | Ericsson | G2-26 | - | [WTS] [JSN] | |||
G2-050463 | Less Restrictive PS HO Triggers | other | Ericsson | G2-26 | - | [WTS] [JSN] | |||
G2-050464 | Correction of reference to 2G-3G handover IE | other | Nortel | G2-26 | - | [WTS] [JSN] | |||
G2-050465 | Description of 8-PSK capability on the uplink in MS Classmark 3 | other | Siemens | G2-26 | - | [WTS] [JSN] | |||
G2-050466 | Description of 8-PSK capability on the uplink in MS Classmark 3 | other | Siemens | G2-26 | - | [WTS] [JSN] | |||
G2-050467 | Description of 8-PSK capability on the uplink in MS Classmark 3 | other | Siemens | G2-26 | - | [WTS] [JSN] | |||
G2-050468 | Description of 8-PSK capability on the uplink in MS Classmark 3 | other | Siemens | G2-26 | - | [WTS] [JSN] | |||
G2-050469 | Description of 8-PSK capability on the uplink in MS Classmark 3 | other | Siemens | G2-26 | - | [WTS] [JSN] | |||
G2-050470 | Draft Liaison Statement on indication of 8-PSK support in the uplink in MS Classmark 3 | other | GERAN2 | G2-26 | - | [WTS] [JSN] | |||
G2-050471 | RR connection establishment using enhanced DTM CS establishment in response to an encapsulated DTM ASSIGNMENT message | CR | Nokia | G2-26 | - | [WTS] [JSN] | |||
G2-050472 | RR connection establishment using enhanced DTM CS establishment in response to an encapsulated DTM ASSIGNMENT message | CR | Nokia | G2-26 | - | [WTS] [JSN] | |||
G2-050473 | other | G2-26 | - | [WTS] [JSN] | |||||
G2-050474 | RR connection establishment using enhanced DTM CS establishment in response to an encapsulated DTM ASSIGNMENT message | other | Nokia | G2-26 | - | [WTS] [JSN] | |||
G2-050475 | RR connection establishment using enhanced DTM CS establishment in response to an encapsulated DTM ASSIGNMENT message | other | Nokia | G2-26 | - | [WTS] [JSN] | |||
G2-050476 | Reply LS on Inter-band mobility and Potential inter-RAT inter-working problem caused by overlapping UTRAN operating bands | LS out | GERAN2 | G2-26 | - | [WTS] [JSN] | |||
G2-050477 | Liaison Statement on Permeable-Layer Receiver and Upper Layers | LS out | GERAN2 | G2-26 | - | [WTS] [JSN] | |||
G2-050478 | RR connection establishment using enhanced DTM CS establishment in response to an encapsulated DTM ASSIGNMENT message | other | Nokia | G2-26 | - | [WTS] [JSN] | |||
G2-050479 | RR connection establishment using enhanced DTM CS establishment in response to an encapsulated DTM ASSIGNMENT message | other | Nokia | G2-26 | - | [WTS] [JSN] | |||
G2-050480 | Description of 8-PSK capability on the uplink in MS Classmark 3 | other | Siemens | G2-26 | - | [WTS] [JSN] | |||
G2-050481 | Description of 8-PSK capability on the uplink in MS Classmark 3 | other | Siemens | G2-26 | - | [WTS] [JSN] | |||
G2-050482 | Description of 8-PSK capability on the uplink in MS Classmark 3 | other | Siemens | G2-26 | - | [WTS] [JSN] | |||
G2-050483 | Description of 8-PSK capability on the uplink in MS Classmark 3 | other | Siemens | G2-26 | - | [WTS] [JSN] | |||
G2-050484 | Description of 8-PSK capability on the uplink in MS Classmark 3 | other | Siemens | G2-26 | - | [WTS] [JSN] | |||
G2-050485 | Liaison Statement on indication of 8-PSK support in the uplink in MS Classmark 3 | LS out | GERAN2 | G2-26 | - | [WTS] [JSN] | |||
G2-050486 | Reply LS on RIM procedure re-use for PS Handover | LS out | GERAN2 | G2-26 | - | [WTS] [JSN] | |||
G2-050487 | Draft Chairman's presentation to GERAN 27. | other | Chairman | G2-26 | - | [WTS] [JSN] |
147 documents (1.0878469944 seconds)