Please enter the search related information in the fields below. Partial information works, e.g. "SP-21
" in the "tdoc" field lists all TSG SA documents from 2021. Regular expressions mostly work in all fields (e.g. "2[34].501
" in the "Spec" field lists all documents related to 23.501 and 24.501. Capitalization is disregarded, i.e. "3GPP
" gives the same results as "3gpp
".
Download results in JSON format
tdoc | Title | Type / Revs | Source | Spec / CR | S/WID | Release | Meeting | Status | Links |
---|---|---|---|---|---|---|---|---|---|
C6-180301 | CT WG6 #89-bis agenda with document allocation | agenda | Chairman |
C6-89 AI: 3.1 |
approved | [WTS] [JSN] | |||
C6-180302 | Call for IPRs and Statement of anti-trust compliance | other | Secretary |
C6-89 AI: 3.2 |
noted | [WTS] [JSN] | |||
C6-180303 | Draft Report of CT6 meeting #89 | report | Secretary |
C6-89 AI: 3.3 |
postponed | [WTS] [JSN] | |||
C6-180304 | Approved Report of CT6 meeting #89 | report | Secretary |
C6-89 AI: 3.3 |
postponed | [WTS] [JSN] | |||
C6-180305 | Action list before CT6 #89-bis | other | Secretary |
C6-89 AI: 5.4 |
noted | [WTS] [JSN] | |||
C6-180306 | Action list after CT6 #89-bis | other | Secretary |
C6-89 AI: 5.4 |
withdrawn | [WTS] [JSN] | |||
C6-180307 | Status of CT6 work items, specifications and rapporteurs before CT6 #89-bis | other | Secretary |
C6-89 AI: 5.5 |
postponed | [WTS] [JSN] | |||
C6-180308 | Status of CT6 work items, specifications and rapporteurs after CT6 #89-bis | other | Secretary |
C6-89 AI: 5.5 |
withdrawn | [WTS] [JSN] | |||
C6-180309 | Meetings schedule | other | Secretary | C6-89 | noted | [WTS] [JSN] | |||
C6-180310 | Updated meetings schedule | other | Secretary | C6-89 | withdrawn | [WTS] [JSN] | |||
C6-180311 | CT WG6 #89-bis agenda (checked opening of the meeting) |
other revised to C6-180358 |
Chairman |
C6-89 AI: 3.1 |
revised | [WTS] [JSN] | |||
C6-180312 | Status report of SCP activities after SCP #84 | other | Secretary |
C6-89 AI: 9 |
postponed | [WTS] [JSN] | |||
C6-180313 | Report from CT plenary #80 (status presented to Plenary) | other | Chairman |
C6-89 AI: 5.1 |
noted | [WTS] [JSN] | |||
C6-180314 | Allow configuration of MCS Access Identity via USIM |
CR revised to C6-180371 |
Qualcomm Incorporated | 31.102 15.1.0 CR#794 catB | 5GS_Ph1-CT | Rel-15 |
C6-89 AI: 7.10.6 |
revised | [WTS] [JSN] |
C6-180315 | Update EF_HPPLMN description to clarify timer T interpretation based on the RAT in use | CR | Qualcomm Incorporated | 31.102 15.1.0 CR#795 catC | TEI15 | Rel-15 |
C6-89 AI: 7.10.1 |
agreed | [WTS] [JSN] |
C6-180316 | Update Data Connection State Change Event_31111 |
CR revised to C6-180356 |
Qualcomm Incorporated | 31.111 15.2.0 CR#689 catB | 5GS_Ph1-CT | Rel-15 |
C6-89 AI: 7.10.6 |
revised | [WTS] [JSN] |
C6-180317 | Remove GET IDENTITY command defined already in ETSI TS 102.221 | CR | Qualcomm Incorporated | 31.101 15.0.0 CR#92 catF | 5GS_Ph1-CT | Rel-15 |
C6-89 AI: 7.10.6 |
postponed | [WTS] [JSN] |
C6-180318 | Overview section of Call control by USIM needs to be enhanced for 5GS PDU |
CR revised to C6-180374 |
Qualcomm Incorporated | 31.111 15.2.0 CR#690 catB | 5GS_Ph1-CT | Rel-15 |
C6-89 AI: 7.10.6 |
revised | [WTS] [JSN] |
C6-180319 | Updates regarding LOCI files for 5GS | CR | Qualcomm Incorporated | 31.102 15.1.0 CR#796 catF | 5GS_Ph1-CT | Rel-15 |
C6-89 AI: 7.10.6 |
merged | [WTS] [JSN] |
C6-180320 | CT6 impact from WID MONASTERY | discussion | Nokia, Nokia Shanghai Bell | Rel-15 |
C6-89 AI: 7.11 |
noted | [WTS] [JSN] | ||
C6-180321 | Revised WID on Mobile Communication System for Railways (stage 3) | WID revised | Nokia, Nokia Shanghai Bell | MONASTERY | Rel-15 |
C6-89 AI: 7.11 |
endorsed | [WTS] [JSN] | |
C6-180322 | Update TAC bytes in Location Information for 5GS |
CR revised to C6-180363 |
Qualcomm Incorporated | 31.111 15.3.0 CR#691 catB | 5GS_Ph1-CT | Rel-15 |
C6-89 AI: 7.10.6 |
revised | [WTS] [JSN] |
C6-180323 | Modify structure of SUCI Calc EF and introduce Routing Indicator |
CR revised to C6-180378 |
Qualcomm Incorporated | 31.102 15.1.0 CR#797 catB | 5GS_Ph1-CT | Rel-15 |
C6-89 AI: 7.10.6 |
revised | [WTS] [JSN] |
C6-180324 | Remove the control based SoR related EF and use only the EF-UST |
CR revised to C6-180373 |
Qualcomm Incorporated | 31.102 15.1.0 CR#798 catC | 5GS_Ph1-CT | Rel-15 |
C6-89 AI: 7.10.6 |
revised | [WTS] [JSN] |
C6-180325 | Corrections to the control plane based SoR related EF |
CR revised to C6-180418 |
Qualcomm Incorporated | 31.102 15.1.0 CR#799 catC | 5GS_Ph1-CT | Rel-15 |
C6-89 AI: 7.10.6 |
revised | [WTS] [JSN] |
C6-180326 | Correct EF IDs for 5GS NAS security context EFs | CR | Qualcomm Incorporated | 31.102 15.1.0 CR#800 catF | 5GS_Ph1-CT | Rel-15 |
C6-89 AI: 7.10.6 |
merged | [WTS] [JSN] |
C6-180327 | Subscription Permanent Identifier (SUPI) storage in EF_IMSI | CR | Qualcomm Incorporated | 31.102 15.1.0 CR#801 catB | 5GS_Ph1-CT | Rel-15 |
C6-89 AI: 7.10.6 |
noted | [WTS] [JSN] |
C6-180328 | Introduce 5G NAI EF and procedure | CR | Qualcomm Incorporated | 31.102 15.1.0 CR#802 catB | 5GS_Ph1-CT | Rel-15 |
C6-89 AI: 7.10.6 |
withdrawn | [WTS] [JSN] |
C6-180329 | Revised WID on CT aspects on 5G System - Phase 1 |
WID revised revision of CP-181081 revised to C6-180372 |
Huawei, HiSilicon, Nokia, Nokia Shanghai Bell, Ericsson /Christian | 5GS_Ph1-CT | Rel-15 |
C6-89 AI: 4 |
revised | [WTS] [JSN] | |
C6-180330 | Addition of Terminal Response verification to Test Sequences 1.3, 1.4 and 1.5 under 27.22.7.10 | CR | Comprion GmbH | 31.124 14.5.0 CR#494 catF | TEI14_Test | Rel-14 |
C6-89 AI: 7.9 |
agreed | [WTS] [JSN] |
C6-180331 | Addition of new test case to cl. 27.22.7.12 |
CR revision of C6-180255 |
Comprion GmbH | 31.124 14.5.0 CR#4932 catB | TEI14_Test | Rel-14 |
C6-89 AI: 7.9 |
agreed | [WTS] [JSN] |
C6-180332 | Addition of new test cases for 3GPP PS Data Off |
CR revised to C6-180380 |
Comprion GmbH | 31.124 14.5.0 CR#495 catB | TEI14_Test | Rel-14 |
C6-89 AI: 7.9 |
revised | [WTS] [JSN] |
C6-180333 | Introduction of new test cases for Data Connection Status Change event |
CR revised to C6-180381 |
Comprion GmbH | 31.124 14.5.0 CR#496 catB | TEI14_Test | Rel-14 |
C6-89 AI: 7.9 |
revised | [WTS] [JSN] |
C6-180334 | Editorial correction to TC 13.2 |
CR revised to C6-180341 |
Comprion GmbH | 31.121 14.5.0 CR#265 catD | TEI14_Test | Rel-14 |
C6-89 AI: 7.9 |
revised | [WTS] [JSN] |
C6-180335 | Corrections to description of Location information |
CR revised to C6-180346 |
MediaTek (Wuhan) Inc. | 31.111 15.3.0 CR#692 catF | 5GS_Ph1-CT | Rel-15 |
C6-89 AI: 7.10.6 |
revised | [WTS] [JSN] |
C6-180336 | Introduction of DF-5GS into USIM ADF |
CR revised to C6-180344 |
MediaTek/Marko | 31.102 15.1.0 CR#803 catB | 5GS_Ph1-CT | Rel-15 |
C6-89 AI: 7.10.6 |
revised | [WTS] [JSN] |
C6-180337 | Corrections to 5GS LOCI files |
CR revised to C6-180343 |
MediaTek/Marko | 31.102 15.1.0 CR#804 catF | 5GS_Ph1-CT | Rel-15 |
C6-89 AI: 7.10.6 |
revised | [WTS] [JSN] |
C6-180338 | Corrections to File Identification numbers |
CR revised to C6-180345 |
MediaTek/Marko | 31.102 15.1.0 CR#805 catF | 5GS_Ph1-CT | Rel-15 |
C6-89 AI: 7.10.6 |
revised | [WTS] [JSN] |
C6-180339 | Updates to USIM management procedures for 5GS |
CR revised to C6-180367 |
MediaTek/Marko | 31.102 15.1.0 CR#806 catF | 5GS_Ph1-CT | Rel-15 |
C6-89 AI: 7.10.6 |
revised | [WTS] [JSN] |
C6-180340 | Modification of test procedures under cl. 13, and cl. 14 | CR | Comprion GmbH | 31.121 14.5.0 CR#266 catF | TEI14_Test | Rel-14 |
C6-89 AI: 7.9 |
agreed | [WTS] [JSN] |
C6-180341 | Editorial correction to TC 13.2 and cl. 3.8 |
CR revision of C6-180334 revised to C6-180368 |
Comprion GmbH | 31.121 14.5.0 CR#2651 catD | TEI14_Test | Rel-14 |
C6-89 AI: 7.9 |
revised | [WTS] [JSN] |
C6-180342 | Correction of wrong implementation of CR#0262 |
CR revised to C6-180382 |
Comprion GmbH | 31.121 14.5.0 CR#267 catF | TEI14_Test | Rel-14 |
C6-89 AI: 7.9 |
revised | [WTS] [JSN] |
C6-180343 | Corrections to 5GS LOCI files |
CR revision of C6-180337 revised to C6-180365 |
MediaTek/Marko | 31.102 15.1.0 CR#8041 catF | 5GS_Ph1-CT | Rel-15 |
C6-89 AI: 7.10.6 |
revised | [WTS] [JSN] |
C6-180344 | Introduction of DF-5GS into USIM ADF |
CR revision of C6-180336 revised to C6-180364 |
MediaTek/Marko | 31.102 15.1.0 CR#8031 catB | 5GS_Ph1-CT | Rel-15 |
C6-89 AI: 7.10.6 |
revised | [WTS] [JSN] |
C6-180345 | Corrections to File Identification numbers |
CR revision of C6-180338 revised to C6-180366 |
MediaTek/Marko | 31.102 15.1.0 CR#8051 catF | 5GS_Ph1-CT | Rel-15 |
C6-89 AI: 7.10.6 |
revised | [WTS] [JSN] |
C6-180346 | Corrections to description of Location information |
CR revision of C6-180335 revised to C6-180362 |
MediaTek/Marko | 31.111 15.3.0 CR#6921 catF | 5GS_Ph1-CT | Rel-15 |
C6-89 AI: 7.10.6 |
revised | [WTS] [JSN] |
C6-180347 | SMS-PP Data download procedure to support SoR using 5G NAS |
CR revised to C6-180383 |
IDEMIA | 31.111 15.3.0 CR#693 catB | 5GS_Ph1-CT | Rel-15 |
C6-89 AI: 7.10.6 |
revised | [WTS] [JSN] |
C6-180348 | NAS-PP Data download procedure to support SoR using 5G NAS | CR | IDEMIA | 31.111 15.3.0 CR#694 catB | 5GS_Ph1-CT | Rel-15 |
C6-89 AI: 7.10.6 |
postponed | [WTS] [JSN] |
C6-180349 | 31.102 Indication of support of NAS-PP Data download procedure in USIM Service Table | CR | IDEMIA | 31.102 15.1.0 CR#807 catB | 5GS_Ph1-CT | Rel-15 |
C6-89 AI: 7.10.6 |
postponed | [WTS] [JSN] |
C6-180350 | Question on 5G network slices |
LS in LS To: CT6, SA2, SA3 |
GSMA |
C6-89 AI: 6.1 |
noted | [WTS] [JSN] | |||
C6-180351 | Reply LS on Change default exempt status for BIP with respect to 3GPP PS Data Off feature |
LS in LS To: CT6, SA1 |
CT1 | PS_DATA_OFF-CT | Rel-14 |
C6-89 AI: 6.1 |
noted | [WTS] [JSN] | |
C6-180352 | Reply LS on AUSF/UDM instance selection and SUCI parameters |
LS in LS To: SA3, SA2, CT1, CT6 |
CT4 |
C6-89 AI: 6.1 |
noted | [WTS] [JSN] | |||
C6-180353 | LS on clarifications on subscriber privacy |
LS in LS To: CT6 |
SA3 |
C6-89 AI: 6.1 |
noted | [WTS] [JSN] | |||
C6-180354 | Reply LS in response to LS for the need of removal of platform specific test cases from 3GPP TS 31.122 from 3GPP TSG CT WG6 |
LS in LS To: CT6 |
SCP TEST |
C6-89 AI: 6.1 |
noted | [WTS] [JSN] | |||
C6-180355 | LS on Guidance on Way Forward for Steering of Roaming |
LS in LS To: 3GPP SA2, SA3, SA3-LI, CT1, CT4 |
SA |
C6-89 AI: 6.1 |
noted | [WTS] [JSN] | |||
C6-180356 | Update Data Connection State Change Event_31111 |
CR revision of C6-180316 revised to C6-180379 |
Qualcomm Incorporated | 31.111 15.3.0 CR#6891 catB | 5GS_Ph1-CT | Rel-15 |
C6-89 AI: 7.10.6 |
revised | [WTS] [JSN] |
C6-180357 | Reply LS from SA2 |
LS in LS To: GSMA SIM GROUP |
SA2 |
C6-89 AI: 6.1 |
noted | [WTS] [JSN] | |||
C6-180358 | Agenda with document allocation for CT6 # 89bis meeting |
other revision of C6-180311 |
CT#80 |
C6-89 AI: 3.1 |
approved | [WTS] [JSN] | |||
C6-180359 | Contents of EFSUPI | other | Qualcomm Incorporated |
C6-89 AI: 8.2 |
noted | [WTS] [JSN] | |||
C6-180360 | Clarification of GET IDENTITY |
CR revised to C6-180405 |
G+D MS | 31.102 15.1.0 CR#809 catF | 5GS_Ph1-CT | Rel-15 |
C6-89 AI: 7.10.6 |
revised | [WTS] [JSN] |
C6-180361 | Response to “Reply LS on AUSF/UDM instance selection and SUCI parameters” |
LS out LS To: 3GPP CT4 |
CT6 |
C6-89 AI: 6.1 |
approved | [WTS] [JSN] | |||
C6-180362 | Corrections to description of Location information |
CR revision of C6-180346 revised to C6-180409 |
MediaTek/Marko | 31.111 15.3.0 CR#6922 catF | 5GS_Ph1-CT | Rel-15 |
C6-89 AI: 7.10.6 |
revised | [WTS] [JSN] |
C6-180363 | Update TAC bytes in Location Information for 5GS |
CR revision of C6-180322 revised to C6-180415 |
Qualcomm Incorporated | 31.111 15.3.0 CR#6911 catB | 5GS_Ph1-CT | Rel-15 |
C6-89 AI: 7.10.6 |
revised | [WTS] [JSN] |
C6-180364 | Introduction of DF-5GS into USIM ADF |
CR revision of C6-180344 revised to C6-180392 |
MediaTek/Marko | 31.102 15.1.0 CR#8032 catB | 5GS_Ph1-CT | Rel-15 |
C6-89 AI: 7.10.6 |
revised | [WTS] [JSN] |
C6-180365 | Corrections to 5GS LOCI files |
CR revision of C6-180343 revised to C6-180391 |
MediaTek/Marko | 31.102 15.1.0 CR#8042 catF | 5GS_Ph1-CT | Rel-15 |
C6-89 AI: 7.10.6 |
revised | [WTS] [JSN] |
C6-180366 | Corrections to File Identification numbers |
CR revision of C6-180345 |
MediaTek/Marko | 31.102 15.1.0 CR#8052 catF | 5GS_Ph1-CT | Rel-15 |
C6-89 AI: 7.10.6 |
merged | [WTS] [JSN] |
C6-180367 | Updates to USIM management procedures for 5GS |
CR revision of C6-180339 revised to C6-180393 |
MediaTek/Marko | 31.102 15.1.0 CR#8061 catF | 5GS_Ph1-CT | Rel-15 |
C6-89 AI: 7.10.6 |
revised | [WTS] [JSN] |
C6-180368 | Editorial correction to TC 13.2 and cl. 3.8 |
CR revision of C6-180341 |
Comprion GmbH | 31.121 14.5.0 CR#2652 catD | TEI14_Test | Rel-14 |
C6-89 AI: 7.9 |
agreed | [WTS] [JSN] |
C6-180369 | Network Measurement Report update for NR |
CR revised to C6-180528 |
Gemalto | 31.111 15.3.0 CR#6842 catB | 5GS_Ph1-CT | Rel-15 |
C6-89 AI: 7.10.6 |
postponed | [WTS] [JSN] |
C6-180370 | Update the version number of ETSI TS 102223 to latest |
CR revised to C6-180416 |
Qualcomm Incorporated | 31.111 15.3.1 CR#6871 catD | 5GS_Ph1-CT | Rel-15 |
C6-89 AI: 7.10.6 |
revised | [WTS] [JSN] |
C6-180371 | Allow configuration of MCS Access Identity via USIM |
CR revision of C6-180314 |
Qualcomm Incorporated | 31.102 15.1.0 CR#7941 catB | 5GS_Ph1-CT | Rel-15 |
C6-89 AI: 7.10.6 |
agreed | [WTS] [JSN] |
C6-180372 | Revised WID on CT aspects on 5G System - Phase 1 |
WID revised revision of C6-180329 revised to C6-180406 |
Huawei, HiSilicon, Nokia, Nokia Shanghai Bell, Ericsson /Christian | 5GS_Ph1-CT | Rel-15 |
C6-89 AI: 4 |
revised | [WTS] [JSN] | |
C6-180373 | Remove the control based SoR related EF and use only the EF-UST |
CR revision of C6-180324 revised to C6-180535 |
Qualcomm Incorporated | 31.102 15.1.0 CR#7981 catC | 5GS_Ph1-CT | Rel-15 |
C6-89 AI: 7.10.6 |
postponed | [WTS] [JSN] |
C6-180374 | Overview section of Call control by USIM needs to be enhanced for 5GS PDU |
CR revision of C6-180318 revised to C6-180403 |
Qualcomm Incorporated | 31.111 15.3.1 CR#6901 catB | 5GS_Ph1-CT | Rel-15 |
C6-89 AI: 7.10.6 |
revised | [WTS] [JSN] |
C6-180375 | Reply LS on Request for addition of new APDU command in USIM application |
LS in LS To: 3GPP TSG CT WG6 |
CT6 |
C6-89 AI: 6.2 |
noted | [WTS] [JSN] | |||
C6-180376 | Response to “Reply LS on Request for addition of new APDU command in USIM application” |
LS out LS To: ETSI TC SCP |
CT6 |
C6-89 AI: 6.3 |
approved | [WTS] [JSN] | |||
C6-180377 | Correct implementation error for terminal profile bits for non-IP data delivery |
CR revised to C6-180413 |
Qualcomm Incorporated | 31.111 15.3.0 CR#695 catF | TEI15 | Rel-15 |
C6-89 AI: 7.10.6 |
revised | [WTS] [JSN] |
C6-180378 | Modify structure of SUCI Calc EF and introduce Routing Indicator |
CR revision of C6-180323 |
Qualcomm Incorporated | 31.102 15.1.0 CR#7971 catB | 5GS_Ph1-CT | Rel-15 |
C6-89 AI: 7.10.6 |
revised | [WTS] [JSN] |
C6-180379 | Update Data Connection State Change Event_31111 |
CR revision of C6-180356 revised to C6-180386 |
Qualcomm Incorporated | 31.111 15.3.0 CR#6892 catB | 5GS_Ph1-CT | Rel-15 |
C6-89 AI: 7.10.6 |
revised | [WTS] [JSN] |
C6-180380 | Addition of new test cases for 3GPP PS Data Off |
CR revision of C6-180332 |
Comprion GmbH | 31.124 14.5.0 CR#4951 catB | TEI14_Test | Rel-14 |
C6-89 AI: 7.9 |
agreed | [WTS] [JSN] |
C6-180381 | Introduction of new test cases for Data Connection Status Change event |
CR revision of C6-180333 |
Comprion GmbH | 31.124 14.5.0 CR#4961 catB | TEI14_Test | Rel-14 |
C6-89 AI: 7.9 |
agreed | [WTS] [JSN] |
C6-180382 | Correction of wrong implementation of CR#0262 |
CR revision of C6-180342 |
Comprion GmbH | 31.121 14.5.0 CR#2671 catF | TEI14_Test | Rel-14 |
C6-89 AI: 7.9 |
agreed | [WTS] [JSN] |
C6-180383 | SMS-PP Data download procedure to support SoR using 5G NAS |
CR revision of C6-180347 revised to C6-180410 |
Idemia, BlackBerry UK Ltd., Intel | 31.111 15.3.0 CR#6931 catB | 5GS_Ph1-CT | Rel-15 |
C6-89 AI: 7.10.6 |
revised | [WTS] [JSN] |
C6-180384 | Mission Critical Services configuration data update |
CR revised to C6-180388 |
Gemalto, G+D MS | 31.102 15.1.0 CR#808 catB | TEI15 | Rel-15 |
C6-89 AI: 7.10.6 |
revised | [WTS] [JSN] |
C6-180385 | Tdoc not used | other | xx |
C6-89 AI: 7.10.6 |
withdrawn | [WTS] [JSN] | |||
C6-180386 | Update Data Connection State Change Event_31111 |
CR revision of C6-180379 revised to C6-180414 |
Qualcomm Incorporated | 31.111 15.3.0 CR#6893 catB | 5GS_Ph1-CT | Rel-15 |
C6-89 AI: 7.10.6 |
revised | [WTS] [JSN] |
C6-180387 | Modify structure of SUCI Calc EF and introduce Routing Indicator |
CR revised to C6-180404 |
Qualcomm Incorporated, G+D MS | 31.102 15.1.0 CR#7972 catB | 5GS_Ph1-CT | Rel-15 |
C6-89 AI: 7.10.6 |
revised | [WTS] [JSN] |
C6-180388 | Mission Critical Services configuration data update to USIM |
CR revision of C6-180384 revised to C6-180538 |
Gemalto, G+D MS | 31.102 15.1.0 CR#8081 catB | TEI15 | Rel-15 |
C6-89 AI: 7.10.6 |
agreed | [WTS] [JSN] |
C6-180389 | Mission Critical Services configuration data update to ISIM |
CR revised to C6-180395 |
Gemalto, G+D MS | 31.103 15.2.0 CR#126 catB | TEI15 | Rel-15 |
C6-89 AI: 7.10.6 |
revised | [WTS] [JSN] |
C6-180390 | Comparison of reading files with SFIs from a DF vs from USIM ADF | other | MediaTek Inc. |
C6-89 AI: 8.2 |
noted | [WTS] [JSN] | |||
C6-180391 | Corrections to 5GS LOCI files |
CR revision of C6-180365 |
MediaTek/Marko | 31.102 15.1.0 CR#8043 catF | 5GS_Ph1-CT | Rel-15 |
C6-89 AI: 7.10.6 |
withdrawn | [WTS] [JSN] |
C6-180392 | Introduction of DF-5GS into USIM ADF |
CR revision of C6-180364 revised to C6-180419 |
MediaTek/Marko | 31.102 15.1.0 CR#8033 catB | 5GS_Ph1-CT | Rel-15 |
C6-89 AI: 7.10.6 |
revised | [WTS] [JSN] |
C6-180393 | Updates to USIM management procedures for 5GS |
CR revision of C6-180367 |
MediaTek/Marko | 31.102 15.1.0 CR#8062 catF | 5GS_Ph1-CT | Rel-15 |
C6-89 AI: 7.10.6 |
agreed | [WTS] [JSN] |
C6-180394 | Fix implementation error for USIM Call Control procedure and allow updating only the operator specific ePCOs. |
CR revised to C6-180412 |
Qualcomm Incorporated | 31.111 15.3.1 CR#703 catB | 5GS_Ph1-CT | Rel-15 |
C6-89 AI: 7.10.6 |
revised | [WTS] [JSN] |
C6-180395 | Mission Critical Services configuration data update to ISIM |
CR revision of C6-180389 revised to C6-180537 |
Gemalto, G+D MS | 31.103 15.2.0 CR#1261 catB | TEI15 | Rel-15 |
C6-89 AI: 7.9 |
agreed | [WTS] [JSN] |
C6-180396 | Overview section of Call control by USIM missing PDN related overview. | CR | Qualcomm Incorporated | 31.111 8.14.0 CR#696 catF | TEI8 | Rel-8 |
C6-89 AI: 7.3.1 |
agreed | [WTS] [JSN] |
C6-180397 | Overview section of Call control by USIM missing PDN related overview. | CR | Qualcomm Incorporated | 31.111 9.11.0 CR#697 catA | TEI8 | Rel-9 |
C6-89 AI: 7.3.1 |
agreed | [WTS] [JSN] |
C6-180398 | Overview section of Call control by USIM missing PDN related overview. | CR | Qualcomm Incorporated | 31.111 10.16.0 CR#698 catA | TEI8 | Rel-10 |
C6-89 AI: 7.3.1 |
agreed | [WTS] [JSN] |
C6-180399 | Overview section of Call control by USIM missing PDN related overview. | CR | Qualcomm Incorporated | 31.111 11.13.0 CR#699 catA | TEI8 | Rel-11 |
C6-89 AI: 7.3.1 |
agreed | [WTS] [JSN] |
C6-180400 | Overview section of Call control by USIM missing PDN related overview. | CR | Qualcomm Incorporated | 31.111 12.11.0 CR#700 catA | TEI8 | Rel-12 |
C6-89 AI: 7.3.1 |
agreed | [WTS] [JSN] |
C6-180401 | Overview section of Call control by USIM missing PDN related overview. | CR | Qualcomm Incorporated | 31.111 13.7.0 CR#701 catA | TEI8 | Rel-13 |
C6-89 AI: 7.3.1 |
agreed | [WTS] [JSN] |
C6-180402 | Overview section of Call control by USIM missing PDN related overview. | CR | Qualcomm Incorporated | 31.111 14.6.1 CR#702 catA | TEI8 | Rel-14 |
C6-89 AI: 7.3.1 |
agreed | [WTS] [JSN] |
C6-180403 | Overview section of Call control by USIM needs to be enhanced for 5GS PDU |
CR revision of C6-180374 |
Qualcomm Incorporated | 31.111 15.3.1 CR#6902 catB | 5GS_Ph1-CT | Rel-15 |
C6-89 AI: 7.10.6 |
agreed | [WTS] [JSN] |
C6-180404 | Modify structure of SUCI Calc EF and introduce Routing Indicator |
CR revision of C6-180387 |
Qualcomm Incorporated, G+D MS | 31.102 15.1.0 CR#7973 catB | 5GS_Ph1-CT | Rel-15 |
C6-89 AI: 7.10.6 |
agreed | [WTS] [JSN] |
C6-180405 | CR on get identity command |
other revision of C6-180360 |
G+D MS | 5GS_Ph1-CT | Rel-15 |
C6-89 AI: 7.10.6 |
agreed | [WTS] [JSN] | |
C6-180406 | Revised WID on CT aspects on 5G System - Phase 1 |
WID revised revision of C6-180372 |
Huawei, HiSilicon, Nokia, Nokia Shanghai Bell, Ericsson /Christian | 5GS_Ph1-CT | Rel-15 |
C6-89 AI: 4 |
endorsed | [WTS] [JSN] | |
C6-180407 | Correct Kseaf and Kausf length in EF5GAUTHKEYS to align with SA3 specification |
CR revised to C6-180408 |
Qualcomm Incorporated | 31.102 15.1.0 CR#810 catB | 5GS_Ph1-CT | Rel-15 |
C6-89 AI: 7.10.6 |
revised | [WTS] [JSN] |
C6-180408 | Qualcomm CR fixing the length of the authentication |
CR revision of C6-180407 |
Qualcomm Incorporated | 31.102 15.1.0 CR#8101 catB | 5GS_Ph1-CT | Rel-15 |
C6-89 AI: 7.10.6 |
agreed | [WTS] [JSN] |
C6-180409 | Corrections to description of Location information |
CR revision of C6-180362 revised to C6-180411 |
MediaTek/Marko | 31.111 15.3.0 CR#6923 catF | 5GS_Ph1-CT | Rel-15 |
C6-89 AI: 7.10.6 |
revised | [WTS] [JSN] |
C6-180410 | SMS-PP Data download procedure to support SoR using 5G NAS |
CR revision of C6-180383 revised to C6-180417 |
Idemia, BlackBerry UK Ltd., Intel | 31.111 15.3.0 CR#6932 catB | 5GS_Ph1-CT | Rel-15 |
C6-89 AI: 7.10.6 |
revised | [WTS] [JSN] |
C6-180411 | Corrections to description of Location information |
CR revision of C6-180409 |
MediaTek/Marko | 31.111 15.3.0 CR#6924 catF | 5GS_Ph1-CT | Rel-15 |
C6-89 AI: 7.10.6 |
agreed | [WTS] [JSN] |
C6-180412 | Fix implementation error for USIM Call Control procedure and allow updating only the operator specific ePCOs. |
CR revision of C6-180394 |
Qualcomm Incorporated | 31.111 15.3.1 CR#7031 catB | 5GS_Ph1-CT | Rel-15 |
C6-89 AI: 7.10.6 |
agreed | [WTS] [JSN] |
C6-180413 | Correct implementation error for terminal profile bits for non-IP data delivery |
CR revision of C6-180377 |
Qualcomm Incorporated | 31.111 15.3.0 CR#6951 catF | TEI15 | Rel-15 |
C6-89 AI: 7.10.6 |
agreed | [WTS] [JSN] |
C6-180414 | Update Data Connection State Change Event_31111 |
CR revision of C6-180386 |
Qualcomm Incorporated | 31.111 15.3.0 CR#6894 catB | 5GS_Ph1-CT | Rel-15 |
C6-89 AI: 7.10.6 |
agreed | [WTS] [JSN] |
C6-180415 | Update TAC bytes in Location Information for 5GS |
CR revision of C6-180363 |
Qualcomm Incorporated | 31.111 15.3.0 CR#6912 catB | 5GS_Ph1-CT | Rel-15 |
C6-89 AI: 7.10.6 |
agreed | [WTS] [JSN] |
C6-180416 | Update the version number of ETSI TS 102223 to latest |
CR revision of C6-180370 |
Qualcomm Incorporated | 31.111 15.3.1 CR#6872 catB | 5GS_Ph1-CT | Rel-15 |
C6-89 AI: 7.10.6 |
agreed | [WTS] [JSN] |
C6-180417 | SMS-PP Data download procedure to support SoR using 5G NAS |
CR revision of C6-180410 |
Idemia, BlackBerry UK Ltd., Intel | 31.111 15.3.1 CR#6933 catB | 5GS_Ph1-CT | Rel-15 |
C6-89 AI: 7.10.6 |
agreed | [WTS] [JSN] |
C6-180418 | Corrections to the control plane based SoR related EF |
CR revision of C6-180325 |
Qualcomm Incorporated | 31.102 15.1.0 CR#7991 catC | 5GS_Ph1-CT | Rel-15 |
C6-89 AI: 7.10.6 |
agreed | [WTS] [JSN] |
C6-180419 | Introduction of DF-5GS into USIM ADF |
CR revision of C6-180392 |
MediaTek/Marko | 31.102 15.1.0 CR#8034 catB | 5GS_Ph1-CT | Rel-15 |
C6-89 AI: 7.10.6 |
agreed | [WTS] [JSN] |
119 documents (1.0849320888519 seconds)