Please enter the search related information in the fields below. Partial information works, e.g. "SP-21
" in the "tdoc" field lists all TSG SA documents from 2021. Regular expressions mostly work in all fields (e.g. "2[34].501
" in the "Spec" field lists all documents related to 23.501 and 24.501. Capitalization is disregarded, i.e. "3GPP
" gives the same results as "3gpp
".
Download results in JSON format
tdoc | Title | Type / Revs | Source | Spec / CR | S/WID | Release | Meeting | Status | Links |
---|---|---|---|---|---|---|---|---|---|
C6-170601 | CT WG6 #86 agenda with document allocation |
agenda revised to C6-170673 |
ETSI |
C6-86 AI: 3.1 |
revised | [WTS] [JSN] | |||
C6-170602 | Call for IPRs and Statement of anti-trust compliance | other | Secretary |
C6-86 AI: 3.2 |
noted | [WTS] [JSN] | |||
C6-170603 | Draft Report of CT6 meeting #85 | report | Secretary |
C6-86 AI: 3.3 |
revised | [WTS] [JSN] | |||
C6-170604 | Approved Report of CT6 meeting #85 | report | CT6 |
C6-86 AI: 3.3 |
approved | [WTS] [JSN] | |||
C6-170605 | Action list before CT6 #86 | other | Secretary |
C6-86 AI: 5.4 |
revised | [WTS] [JSN] | |||
C6-170606 | Action list after CT6 #86 | other | CT6 |
C6-86 AI: 5.4 |
approved | [WTS] [JSN] | |||
C6-170607 | Status of CT6 work items, specifications and rapporteurs before CT6 #86 | other | Secretary |
C6-86 AI: 5.5 |
revised | [WTS] [JSN] | |||
C6-170608 | Status of CT6 work items, specifications and rapporteurs after CT6 #86 | other | CT6 |
C6-86 AI: 5.5 |
approved | [WTS] [JSN] | |||
C6-170609 | Meetings schedule | other | Secretary | C6-86 | revised | [WTS] [JSN] | |||
C6-170610 | Updated meetings schedule | other | Secretary | C6-86 | approved | [WTS] [JSN] | |||
C6-170611 | CT WG6 #86 agenda (checked opening of the meeting) | other | Chairman |
C6-86 AI: 3.1 |
revised | [WTS] [JSN] | |||
C6-170612 | Status report of SCP activities after SCP #86 | other | Secretary |
C6-86 AI: 9 |
withdrawn | [WTS] [JSN] | |||
C6-170613 | Report from CT plenary #75 (status presented to Plenary) | other | Chairman |
C6-86 AI: 5.1 |
withdrawn | [WTS] [JSN] | |||
C6-170614 | LS on confirmation of allocation of values for 3GPP |
LS in LS To: 3GPP WG CT6 |
ETSI TC SCP |
C6-86 AI: 6.2 |
noted | [WTS] [JSN] | |||
C6-170615 | Reply LS on unified Access Control for 5G NR |
LS in LS To: 3GPP CT1, SA2, RAN2 |
3GPP SA1 |
C6-86 AI: 6.2 |
noted | [WTS] [JSN] | |||
C6-170616 | Reply to Reply LSs on PLMN and RAT selection policies for roaming (S2-175286 and C1-173751) |
LS in LS To: 3GPP TSG SA WG2, 3GPP TSG CT WG1, 3GPP CT WG4 |
3GPP TSG SA WG3 |
C6-86 AI: 6.2 |
noted | [WTS] [JSN] | |||
C6-170617 | LS on providing SIP identities to access a partner MC system |
LS in LS To: 3GPP TSG SA WG3, ETSI SCP, 3GPP TSG CT WG6, 3GPP TSG SA WG1 |
3GPP TSG SA WG6 |
C6-86 AI: 6.2 |
noted | [WTS] [JSN] | |||
C6-170618 | Update on the status of the work on SSP (Smart Secure Platform) |
LS in LS To: 3GPP WG SA3 |
ETSI TC SCP REQ, ETSI TC SCP |
C6-86 AI: 6.2 |
noted | [WTS] [JSN] | |||
C6-170619 | TSG Announcing TS.37 V3.0 |
LS in LS To: 3GPP CT4, 3GPP CT6 |
GSMA |
C6-86 AI: 6.2 |
noted | [WTS] [JSN] | |||
C6-170620 | Reply LS on providing SIP identities to access a partner MC system |
LS out LS is reply to S6-171490 LS To: SA6 revised to C6-170676 |
BlackBerry Japan Limited | Rel-15 |
C6-86 AI: 6.3 |
revised | [WTS] [JSN] | ||
C6-170621 | Clarification of requirements for eCall modes |
CR revised to C6-170685 |
Vodafone GmbH, Giesecke & Devrient, Morpho Cards GmbH, Oberthur Technologies, Qualcomm Incorporated | 31.102 14.3.0 CR#742 catF | TEI14 | Rel-14 |
C6-86 AI: 7.9.1 |
revised | [WTS] [JSN] |
C6-170622 | Correction of DFV2X | CR | Qualcomm Incorporated | 31.102 14.3.0 CR#743 catF | V2X-CT | Rel-14 |
C6-86 AI: 7.9.9 |
agreed | [WTS] [JSN] |
C6-170623 | Revised WID on CT aspects of 3GPP PS data off function – Phase 2 |
WID revised revised to C6-170674 |
Ericsson | PS_DATA_OFF2-CT | Rel-15 |
C6-86 AI: 7.9.13 |
revised | [WTS] [JSN] | |
C6-170624 | Registration handling when VoPS not supported node |
CR revision of C6-170269 revised to C6-170708 |
China Mobile | 31.103 15.0.0 CR#1092 catB | IOC_UE_conf | Rel-15 |
C6-86 AI: 7.9.4 |
revised | [WTS] [JSN] |
C6-170625 | PDU session establishment policy node | CR | China Mobile | 31.103 15.0.0 CR#117 catB | 5GS_Ph1-CT | Rel-15 |
C6-86 AI: 7. |
postponed | [WTS] [JSN] |
C6-170626 | Correction of AT Command in test cases for RUN AT COMMAND |
CR revised to C6-170698 |
Qualcomm Incorporated | 31.124 14.2.0 CR#477 catF | TEI14 | Rel-14 |
C6-86 AI: 7.9.1 |
revised | [WTS] [JSN] |
C6-170627 | Correction of AT Command in test cases for RUN AT COMMAND |
CR revised to C6-170699 |
Qualcomm Incorporated | 51.010-4 14.1.0 CR#118 catF | TEI14 | Rel-14 |
C6-86 AI: 7.9.1 |
revised | [WTS] [JSN] |
C6-170628 | Wrong implementation of CR for XCAP Configuration Data | CR | Qualcomm Incorporated | 31.102 14.3.0 CR#744 catF | TEI14 | Rel-14 |
C6-86 AI: 7.9.1 |
agreed | [WTS] [JSN] |
C6-170629 | Correction of file ID for EF-XCAPConfigData |
CR revised to C6-170705 |
Qualcomm Incorporated | 31.103 14.3.0 CR#118 catF | IOC_UE_conf | Rel-14 |
C6-86 AI: 7.9.4 |
revised | [WTS] [JSN] |
C6-170630 | Correction of file ID for EF-XCAPConfigData |
CR revised to C6-170704 |
Qualcomm Incorporated | 31.103 15.0.0 CR#119 catA | IOC_UE_conf | Rel-15 |
C6-86 AI: 7.9.4 |
revised | [WTS] [JSN] |
C6-170631 | Procedure for the eCall mode switch | CR | Qualcomm Incorporated, Vodafone | 31.102 14.3.0 CR#745 catF | TEI14 | Rel-14 |
C6-86 AI: 7.9.1 |
merged | [WTS] [JSN] |
C6-170632 | Propagation of MCPTT fixes to Rel-15 |
CR revised to C6-170707 |
Qualcomm Incorporated | 31.103 15.0.0 CR#120 catA | MCImp-eMCPTT-CT | Rel-15 |
C6-86 AI: 7.9. |
revised | [WTS] [JSN] |
C6-170633 | Fixed typos in table B.1 | CR | Qualcomm Incorporated | 31.121 14.2.0 CR#254 catF | TEI14 | Rel-14 |
C6-86 AI: 7.9.1 |
agreed | [WTS] [JSN] |
C6-170634 | Usage of programmed USIM for execution of test cases | CR | Qualcomm Incorporated, COMPRION | 31.124 14.2.0 CR#478 catB | TEI14 | Rel-14 |
C6-86 AI: 7.9.1 |
agreed | [WTS] [JSN] |
C6-170635 | Fixed conditions for test cases for terminals that supports only E-UTRA |
CR revised to C6-170692 |
Qualcomm Incorporated | 31.121 14.2.0 CR#255 catF | TEI14 | Rel-14 |
C6-86 AI: 7.9.1 |
revised | [WTS] [JSN] |
C6-170636 | Fixed applicability table for Call Control on EPS PDN connection |
CR revised to C6-170693 |
Qualcomm Incorporated | 31.124 14.2.0 CR#479 catF | TEI14 | Rel-14 |
C6-86 AI: 7.9.1 |
revised | [WTS] [JSN] |
C6-170637 | Correction of call flow for CALL CONTROL on EPS PDN Connection | CR | Qualcomm Incorporated | 31.124 14.2.0 CR#480 catF | TEI14 | Rel-14 |
C6-86 AI: 7.9.1 |
agreed | [WTS] [JSN] |
C6-170638 | Updates to the Event Download for Data Connection Status | CR | Qualcomm Incorporated, Gemalto | 31.111 14.4.0 CR#669 catF | TEI14 | Rel-14 |
C6-86 AI: 7.9.1 |
agreed | [WTS] [JSN] |
C6-170639 | Clarification on the number of coordinates in a geographical area |
CR revised to C6-170706 |
Qualcomm Incorporated | 31.102 14.3.0 CR#746 catF | V2X-CT | Rel-14 |
C6-86 AI: 7.9.9 |
revised | [WTS] [JSN] |
C6-170640 | Correction for emergency call handling in case of UICC presence detection fails |
CR revised to C6-170701 |
Intel | 31.102 14.3.0 CR#747 catF | TEI14 | Rel-14 |
C6-86 AI: 7.9.1 |
revised | [WTS] [JSN] |
C6-170641 | Update EF-ICCID reading |
CR revision of C6-170256 |
Intel | 31.102 14.3.0 CR#7411 catF | TEI14 | Rel-14 |
C6-86 AI: 7.9.1 |
withdrawn | [WTS] [JSN] |
C6-170642 | Introduction of test cases for UICC interface during PSM and eDRX |
CR revised to C6-170726 |
Comprion GmbH | 31.121 14.2.0 CR#256 catB | TEI14_Test | Rel-14 |
C6-86 AI: 7.9.1 |
revised | [WTS] [JSN] |
C6-170643 | Introduction of new test case for Call Control on PS PDP connection |
CR revision of C6-170521 revised to C6-170684 |
Gemalto N.V. | 31.124 14.2.0 CR#4763 catB | TEI14_Test | Rel-14 |
C6-86 AI: 7.9.1 |
revised | [WTS] [JSN] |
C6-170644 | Correction of section numbering | CR | Comprion GmbH | 31.101 14.1.0 CR#90 catD | TEI14 | Rel-14 |
C6-86 AI: 7.9.1 |
agreed | [WTS] [JSN] |
C6-170645 | Discussion on impacts of Non-IP data communication on USAT | discussion | Gemalto N.V. | Rel-14 |
C6-86 AI: 7.9.1 |
noted | [WTS] [JSN] | ||
C6-170646 | Support of Non-IP Data Delivery by ME indicator | CR | Gemalto N.V. | 31.111 14.4.0 CR#670 catB | TEI14 | Rel-14 |
C6-86 AI: 7.9.1 |
merged | [WTS] [JSN] |
C6-170647 | Correction of wrong implemention of CR 0471 | CR | Comprion GmbH | 31.124 14.2.0 CR#481 catF | TEI14_Test | Rel-14 |
C6-86 AI: 7.9.1 |
agreed | [WTS] [JSN] |
C6-170648 | USAT pairing for UICC |
CR revised to C6-170702 |
Gemalto N.V. | 31.102 14.3.0 CR#748 catB | TEI14 | Rel-14 |
C6-86 AI: 7.9.1 |
revised | [WTS] [JSN] |
C6-170649 | Correction of applicability condition for TC 27.22.7.10 and 27.22.7.11 |
CR revised to C6-170722 |
MediaTek Inc. | 31.124 14.2.0 CR#482 catF | TEI14 | Rel-14 |
C6-86 AI: 7.9.1 |
revised | [WTS] [JSN] |
C6-170650 | Section number correction of TC 27.22.10 |
CR revised to C6-170724 |
MediaTek Inc. | 31.124 14.2.0 CR#483 catF | TEI14 | Rel-14 |
C6-86 AI: 7.9.1 |
revised | [WTS] [JSN] |
C6-170651 | Introduction of general defination and environment for NB-IoT |
CR revised to C6-170725 |
MediaTek Inc. | 31.124 14.2.0 CR#484 catF | TEI13 | Rel-14 |
C6-86 AI: 7.8.1 |
revised | [WTS] [JSN] |
C6-170652 | Clarification on the requested address during execution of TC 27.22.4.31 and 27.22.7.10 |
CR revised to C6-170721 |
MediaTek Inc. | 31.124 14.2.0 CR#485 catF | TEI14 | Rel-14 |
C6-86 AI: 7.9.1 |
revised | [WTS] [JSN] |
C6-170653 | Revised WID on CT aspects on 5G System – Phase 1 |
WID revised revised to C6-170700 |
Huawei, HiSilicon, Nokia, Nokia Shanghai Bell, Ericsson, ZTE /Christian | 5GS_Ph1-CT | Rel-15 |
C6-86 AI: 7. |
revised | [WTS] [JSN] | |
C6-170654 | Correction of applicability condition for 27.22.4.26 |
CR revised to C6-170697 |
Comprion GmbH | 31.124 14.2.0 CR#486 catF | TEI14_Test | Rel-14 |
C6-86 AI: 7.9.1 |
revised | [WTS] [JSN] |
C6-170655 | Correction of wrong implementation of CR 0114 | CR | Comprion GmbH | 51.010-4 14.1.0 CR#119 catF | TEI14_Test | Rel-14 |
C6-86 AI: 7.9.1 |
agreed | [WTS] [JSN] |
C6-170656 | Clarification on EPS NAS Security Context Storage on USIM | discussion | Comprion GmbH | Rel-14 |
C6-86 AI: 7.9.1 |
noted | [WTS] [JSN] | ||
C6-170657 | Update of reference to ETSI TS 102 241 | CR | G+D MS | 31.130 14.0.0 CR#77 catF | TEI14 | Rel-14 |
C6-86 AI: 7.9.1 |
agreed | [WTS] [JSN] |
C6-170658 | Editorial change of Java Card reference | CR | G+D MS | 31.130 14.0.0 CR#78 catD | TEI14 | Rel-14 |
C6-86 AI: 7.9.1 |
agreed | [WTS] [JSN] |
C6-170659 | Update of reference to ETSI TS 102 241 | CR | G+D MS | 31.133 14.0.0 CR#9 catF | TEI14 | Rel-14 |
C6-86 AI: 7.9.1 |
agreed | [WTS] [JSN] |
C6-170660 | Pseudo-CR on 5G extension of AUTHENTICATION command |
pCR revised to C6-170710 |
Qualcomm Incorporated | 31.890 1.0.0 | 5GS_Ph1-CT | Rel-15 |
C6-86 AI: 7.10.6 |
revised | [WTS] [JSN] |
C6-170661 | Pseudo-CR on 5G EFs on USIM |
pCR revised to C6-170711 |
Qualcomm Incorporated | 31.890 1.0.0 | 5GS_Ph1-CT | Rel-15 |
C6-86 AI: 7.10.6 |
revised | [WTS] [JSN] |
C6-170662 | Pseudo-CR on Access Technology in 5G Toolkit |
pCR revised to C6-170712 |
Qualcomm Incorporated | 31.890 1.0.0 | 5GS_Ph1-CT | Rel-15 |
C6-86 AI: 7.10.6 |
revised | [WTS] [JSN] |
C6-170663 | Pseudo-CR on other 5G USIM functionalities |
pCR revised to C6-170713 |
Qualcomm Incorporated | 31.890 1.0.0 | 5GS_Ph1-CT | Rel-15 |
C6-86 AI: 7.10.6 |
revised | [WTS] [JSN] |
C6-170664 | Pseudo-CR on Access Technology in 5G Toolkit |
pCR revised to C6-170714 |
Qualcomm Incorporated | 31.890 1.0.0 | 5GS_Ph1-CT | Rel-15 |
C6-86 AI: 7.10.6 |
revised | [WTS] [JSN] |
C6-170665 | Pseudo-CR on Location Information in 5G Toolkit | pCR | Qualcomm Incorporated | 31.890 1.0.0 | 5GS_Ph1-CT | Rel-15 |
C6-86 AI: 7.10.6 |
approved | [WTS] [JSN] |
C6-170666 | Pseudo-CR on Call control on EPS PDN connection in 5G Toolkit |
pCR revised to C6-170718 |
Qualcomm Incorporated | 31.890 1.0.0 | 5GS_Ph1-CT | Rel-15 |
C6-86 AI: 7.10.6 |
revised | [WTS] [JSN] |
C6-170667 | Pseudo-CR on Data Connection Status Change Event in 5G Toolkit |
pCR revised to C6-170719 |
Qualcomm Incorporated | 31.890 1.0.0 | 5GS_Ph1-CT | Rel-15 |
C6-86 AI: 7.10.6 |
revised | [WTS] [JSN] |
C6-170668 | Solving Editor's note in section 4.4.1.6 |
pCR revised to C6-170738 |
Morpho Cards GmbH | 31.801 1.0.0 | FS_NG_SP2 | Rel-15 |
C6-86 AI: 7.10.2 |
revised | [WTS] [JSN] |
C6-170669 | Solving Editor's note in section 4.5.1.1 | pCR | Morpho Cards GmbH | 31.801 1.0.0 | FS_NG_SP2 | Rel-15 |
C6-86 AI: 7.10.2 |
approved | [WTS] [JSN] |
C6-170670 | Solving Editor's note in section 4.5.1.3 |
pCR revised to C6-170739 |
Morpho Cards GmbH | 31.801 1.0.0 | FS_NG_SP2 | Rel-15 |
C6-86 AI: 7.10.2 |
revised | [WTS] [JSN] |
C6-170671 | Introduction of new test cases on UICC interface in PSM | CR | Comprion GmbH | 31.124 14.2.0 CR#487 catB | TEI14_Test | Rel-14 |
C6-86 AI: 7.9.1 |
postponed | [WTS] [JSN] |
C6-170672 | Reply LS on PLMN and RAT selection policies for roaming | LS in | ETSI | 5GS_Ph1-CT |
C6-86 AI: 6.1 |
noted | [WTS] [JSN] | ||
C6-170673 | CT WG6 #85 agenda with document allocation |
agenda revision of C6-170601 |
ETSI |
C6-86 AI: 3.1 |
approved | [WTS] [JSN] | |||
C6-170674 | Revised WID on CT aspects of 3GPP PS data off function – Phase 2 |
WID revised revision of C6-170623 revised to C6-170717 |
Ericsson | PS_DATA_OFF2-CT | Rel-15 |
C6-86 AI: 7.9.13 |
revised | [WTS] [JSN] | |
C6-170675 | Reply LS on LS on providing SIP identities to access a partner MC system | LS in | ETSI SCP |
C6-86 AI: 6.1 |
noted | [WTS] [JSN] | |||
C6-170676 | Reply LS on providing SIP identities to access a partner MC system |
LS out LS is reply to S6-171490 LS To: SA6 revision of C6-170620 |
BlackBerry Japan Limited | Rel-15 |
C6-86 AI: 6.3 |
approved | [WTS] [JSN] | ||
C6-170677 | Alignment of TS31.111 in regards to LS C6-170614 |
CR revised to C6-170748 |
Qualcomm | 31.111 14.4.0 CR#671 catF | TEI15 | Rel-15 |
C6-86 AI: 7.10.1 |
revised | [WTS] [JSN] |
C6-170678 | Reply LS on providing SIP identities to access a partner MC system |
LS in LS is reply to S6-171490 LS To: SA WG6 |
SA1 | Rel-15 |
C6-86 AI: 6.1 |
noted | [WTS] [JSN] | ||
C6-170679 | USAT support of new IoT Radio Interface Technologies |
CR revision of C6-170237 |
Gemalto N.V. | 31.111 14.4.0 CR#6591 catF | TEI14 | Rel-14 |
C6-86 AI: 7.9.1 |
withdrawn | [WTS] [JSN] |
C6-170680 | Radio Interface Technology support by USIM |
CR revision of C6-170240 |
Gemalto N.V. | 31.102 14.3.0 CR#7391 catF | TEI14 | Rel-14 |
C6-86 AI: 7.9.1 |
withdrawn | [WTS] [JSN] |
C6-170681 | Non-IP data transfer PDP Type |
CR revision of C6-170241 |
Gemalto N.V. | 31.111 14.4.0 CR#6601 catF | TEI14 | Rel-14 |
C6-86 AI: 7.9.1 |
merged | [WTS] [JSN] |
C6-170682 | “Drastic Change in Data Throughput” event definition |
CR revision of C6-170304 |
Gemalto N.V. | 31.111 14.4.0 CR#6624 catF | TEI14 | Rel-14 |
C6-86 AI: 7.9.1 |
withdrawn | [WTS] [JSN] |
C6-170683 | Non-IP data transfer PDP Type & ME indicator (Merge of doc646 & doc681) |
CR revised to C6-170727 |
Gemalto N.V. | 31.111 14.4.0 CR#672 catB | TEI14 | Rel-14 |
C6-86 AI: 7.9.1 |
revised | [WTS] [JSN] |
C6-170684 | Introduction of new test case for Call Control on PS PDP connection |
CR revision of C6-170643 revised to C6-170743 |
Gemalto N.V., Qualcomm Incorporated | 31.111 14.4.0 CR#4764 catB | TEI14 | Rel-14 |
C6-86 AI: 7.9.1 |
revised | [WTS] [JSN] |
C6-170685 | Clarification of requirements for eCall modes |
CR revision of C6-170621 revised to C6-170734 |
Vodafone, Qualcomm | 31.102 14.3.0 CR#749 catA | TEI8 | Rel-14 |
C6-86 AI: 7.3.1 |
revised | [WTS] [JSN] |
C6-170686 | Correction of requirements for eCall modes |
CR revised to C6-170728 |
Vodafone, Qualcomm | 31.102 8.21.0 CR#750 catA | TEI8 | Rel-8 |
C6-86 AI: 7.9.1 |
revised | [WTS] [JSN] |
C6-170687 | Correction of requirements for eCall modes |
CR revised to C6-170729 |
Vodafone, Qualcomm | 31.102 9.18.1 CR#751 catF | TEI14 | Rel-9 |
C6-86 AI: 7.9.1 |
revised | [WTS] [JSN] |
C6-170688 | Correction of requirements for eCall modes |
CR revised to C6-170730 |
Vodafone, Qualcomm | 31.102 10.14.1 CR#752 catA | TEI8 | Rel-10 |
C6-86 AI: 7.3.1 |
revised | [WTS] [JSN] |
C6-170689 | Correction of requirements for eCall modes |
CR revised to C6-170731 |
Vodafone, Qualcomm | 31.102 11.11.0 CR#753 catA | TEI8 | Rel-11 |
C6-86 AI: 7.3 |
revised | [WTS] [JSN] |
C6-170690 | Correction of requirements for eCall modes |
CR revised to C6-170732 |
Vodafone, Qualcomm | 31.102 12.12.0 CR#754 catA | TEI8 | Rel-12 |
C6-86 AI: 7.3.1 |
revised | [WTS] [JSN] |
C6-170691 | Correction of requirements for eCall modes |
CR revised to C6-170733 |
Vodafone, Qualcomm | 31.102 13.8.0 CR#755 catF | TEI8 | Rel-13 |
C6-86 AI: 7.3.1 |
revised | [WTS] [JSN] |
C6-170692 | Fixed conditions for test cases for terminals that supports only E-UTRA |
CR revision of C6-170635 revised to C6-170735 |
Qualcomm Incorporated | 31.121 14.2.0 CR#2551 catF | TEI14 | Rel-14 |
C6-86 AI: 7.9.1 |
revised | [WTS] [JSN] |
C6-170693 | Fixed applicability table for Call Control on EPS PDN connection |
CR revision of C6-170636 |
Qualcomm Incorporated | 31.124 14.2.0 CR#4791 catF | TEI14 | Rel-14 |
C6-86 AI: 7.9.1 |
agreed | [WTS] [JSN] |
C6-170694 | LSin on PLMN and RAT selection policies for roaming |
LS in LS To: SA3, CT1, SA1 |
SA2 |
C6-86 AI: 6.1 |
noted | [WTS] [JSN] | |||
C6-170695 | Reply LS to LS on PLMN and RAT selection policies for roaming (S2-175286/C1-172866) |
LS in LS To: 3GPP TSG SA WG2, 3GPP TSG SA WG3 |
CT1 |
C6-86 AI: 6.1 |
noted | [WTS] [JSN] | |||
C6-170696 | Reply LSout to CT1 LS on PLMN and RAT selection policies for roaming (S2-175286/C1-172866) |
LS out LS To: 3GPP WG CT1 |
Vodafone |
C6-86 AI: 6.3 |
approved | [WTS] [JSN] | |||
C6-170697 | Correction of applicability condition for 27.22.4.26 |
CR revision of C6-170654 |
Comprion GmbH | 31.124 14.2.0 CR#4861 catF | TEI14_Test | Rel-14 |
C6-86 AI: 7.9.1 |
postponed | [WTS] [JSN] |
C6-170698 | Correction of AT Command in test cases for RUN AT COMMAND |
CR revision of C6-170626 |
Qualcomm Incorporated | 51.010-4 14.1.0 CR#4771 catF | TEI14 | Rel-14 |
C6-86 AI: 7.9.1 |
agreed | [WTS] [JSN] |
C6-170699 | Correction of AT Command in test cases for RUN AT COMMAND |
CR revision of C6-170627 |
Qualcomm Incorporated | 31.124 14.2.0 CR#1181 catF | TEI14 | Rel-14 |
C6-86 AI: 7.9.1 |
agreed | [WTS] [JSN] |
C6-170700 | Revised WID on CT aspects on 5G System – Phase 1 |
WID revised revision of C6-170653 revised to C6-170716 |
Huawei, HiSilicon, Nokia, Nokia Shanghai Bell, Ericsson, ZTE /Christian | 5GS_Ph1-CT | Rel-15 |
C6-86 AI: 7. |
revised | [WTS] [JSN] | |
C6-170701 | Correction for emergency call handling in case of UICC presence detection fails |
CR revision of C6-170640 |
Intel | 31.102 14.3.0 CR#7471 catF | TEI14 | Rel-14 |
C6-86 AI: 7.9.1 |
agreed | [WTS] [JSN] |
C6-170702 | USAT pairing for UICC |
CR revision of C6-170648 |
Gemalto N.V. | 31.102 14.3.0 CR#7481 catB | TEI14 | Rel-14 |
C6-86 AI: 7.9.1 |
withdrawn | [WTS] [JSN] |
C6-170703 | USAT Pairing by ISIM |
CR revised to C6-170736 |
Gemalto | 31.102 14.3.0 CR#756 catB | TEI14 | Rel-14 |
C6-86 AI: 7.9.1 |
revised | [WTS] [JSN] |
C6-170704 | Correction of file ID for EF-XCAPConfigData |
CR revision of C6-170630 |
Qualcomm Incorporated | 31.103 15.0.0 CR#1191 catA | IOC_UE_conf | Rel-15 |
C6-86 AI: 7.9.4 |
agreed | [WTS] [JSN] |
C6-170705 | Correction of file ID for EF-XCAPConfigData |
CR revision of C6-170629 |
Qualcomm Incorporated | 31.103 14.3.0 CR#1181 catF | IOC_UE_conf | Rel-14 |
C6-86 AI: 7.9.4 |
agreed | [WTS] [JSN] |
C6-170706 | Clarification on the number of coordinates in a geographical area |
CR revision of C6-170639 revised to CP-173163 |
Qualcomm Incorporated | 31.102 14.3.0 CR#7461 catF | V2X-CT | Rel-14 |
C6-86 AI: 7.9.9 |
agreed | [WTS] [JSN] |
C6-170707 | Propagation of MCPTT fixes to Rel-15 |
CR revision of C6-170632 |
Qualcomm Incorporated | 31.103 15.0.0 CR#1201 catA | MCImp-eMCPTT-CT | Rel-15 |
C6-86 AI: 7.9. |
agreed | [WTS] [JSN] |
C6-170708 | Registration handling when VoPS not supported node |
CR revision of C6-170624 revised to C6-170715 |
China Mobile | 31.103 15.0.0 CR#1093 catB | IOC_UE_conf | Rel-15 |
C6-86 AI: 7.9.4 |
revised | [WTS] [JSN] |
C6-170709 | Corrections in Annex C |
CR revision of C6-170511 |
OBERTHUR TECHNOLOGIES | 31.130 14.0.0 CR#763 catD | TEI15 | Rel-15 |
C6-86 AI: 7.10.1 |
agreed | [WTS] [JSN] |
C6-170710 | Pseudo-CR on 5G extension of AUTHENTICATION command |
pCR revision of C6-170660 |
Qualcomm Incorporated | 31.890 1.0.0 | 5GS_Ph1-CT | Rel-15 |
C6-86 AI: 7.10.6 |
approved | [WTS] [JSN] |
C6-170711 | Pseudo-CR on 5G EFs on USIM revision of C6-170661 |
pCR revision of C6-170661 |
Qualcomm Incorporated | 31.890 1.0.0 | 5GS_Ph1-CT | Rel-15 |
C6-86 AI: 7.10.6 |
approved | [WTS] [JSN] |
C6-170712 | Pseudo-CR on Access Technology in 5G Toolkit |
pCR revision of C6-170662 |
Qualcomm Incorporated | 31.890 1.0.0 | 5GS_Ph1-CT | Rel-15 |
C6-86 AI: 7.10.6 |
approved | [WTS] [JSN] |
C6-170713 | Pseudo-CR on other 5G USIM functionalities |
pCR revision of C6-170663 |
Qualcomm Incorporated | 31.890 1.0.0 | 5GS_Ph1-CT | Rel-15 |
C6-86 AI: 7.10.6 |
approved | [WTS] [JSN] |
C6-170714 | Pseudo-CR on Access Technology in 5G Toolkit |
pCR revision of C6-170664 |
Qualcomm Incorporated | 31.890 1.0.0 | 5GS_Ph1-CT | Rel-15 |
C6-86 AI: 7.10.6 |
approved | [WTS] [JSN] |
C6-170715 | Registration handling when VoPS not supported node |
CR revision of C6-170708 |
China Mobile | 31.103 15.0.0 CR#1094 catB | IOC_UE_conf | Rel-15 |
C6-86 AI: 7.9.4 |
agreed | [WTS] [JSN] |
C6-170716 | Revised WID on CT aspects on 5G System – Phase 1 |
WID revised revision of C6-170700 |
Huawei, HiSilicon, Nokia, Nokia Shanghai Bell, Ericsson, ZTE /Christian | 5GS_Ph1-CT | Rel-15 |
C6-86 AI: 7. |
endorsed | [WTS] [JSN] | |
C6-170717 | Revised WID on CT aspects of 3GPP PS data off function – Phase 2 |
WID revised revision of C6-170674 |
Ericsson | PS_DATA_OFF2-CT | Rel-15 |
C6-86 AI: 7.9.13 |
endorsed | [WTS] [JSN] | |
C6-170718 | Pseudo-CR on Call control on EPS PDN connection in 5G Toolkit |
pCR revision of C6-170666 |
Qualcomm Incorporated | 31.890 1.0.0 | 5GS_Ph1-CT | Rel-15 |
C6-86 AI: 7.10.6 |
approved | [WTS] [JSN] |
C6-170719 | Pseudo-CR on Data Connection Status Change Event in 5G Toolkit |
pCR revision of C6-170667 |
Qualcomm Incorporated | 31.890 1.0.0 | 5GS_Ph1-CT | Rel-15 |
C6-86 AI: 7.10.6 |
approved | [WTS] [JSN] |
C6-170720 | Pseudo-CR on Bearer Independent Protocol in 5G Toolkit | pCR | Qualcomm Incorporated | 31.890 1.0.0 | 5GS_Ph1-CT | Rel-15 |
C6-86 AI: 7.10.6 |
approved | [WTS] [JSN] |
C6-170721 | Clarification on the requested address during execution of TC 27.22.4.31 and 27.22.7.10 |
CR revision of C6-170652 |
MediaTek Inc. | 31.124 14.2.0 CR#4851 catF | TEI14 | Rel-14 |
C6-86 AI: 7.9.1 |
agreed | [WTS] [JSN] |
C6-170722 | Correction of applicability condition for TC 27.22.7.10 and 27.22.7.11 |
CR revision of C6-170649 revised to C6-170723 |
MediaTek Inc. | 31.124 14.2.0 CR#4821 catF | TEI14 | Rel-14 |
C6-86 AI: 7.9.1 |
revised | [WTS] [JSN] |
C6-170723 | Correction of applicability condition for TC 27.22.7.10 and 27.22.7.11 |
CR revision of C6-170722 revised to C6-170747 |
MediaTek Inc. | 31.124 14.2.0 CR#4822 catF | TEI14 | Rel-14 |
C6-86 AI: 7.9.1 |
revised | [WTS] [JSN] |
C6-170724 | Section number correction of TC 27.22.10 |
CR revision of C6-170650 |
MediaTek Inc. | 31.124 14.2.0 CR#4831 catF | TEI14 | Rel-14 |
C6-86 AI: 7.9.1 |
agreed | [WTS] [JSN] |
C6-170725 | Introduction of general defination and environment for NB-IoT |
CR revision of C6-170651 |
MediaTek Inc. | 31.124 14.2.0 CR#4841 catF | TEI13 | Rel-14 |
C6-86 AI: 7.8.1 |
agreed | [WTS] [JSN] |
C6-170726 | Introduction of test cases for UICC interface during PSM and eDRX |
CR revision of C6-170642 revised to C6-170744 |
Comprion GmbH | 31.121 14.2.0 CR#2561 catB | TEI14_Test | Rel-14 |
C6-86 AI: 7.9.1 |
revised | [WTS] [JSN] |
C6-170727 | Non-IP data transfer PDP Type & ME indicator (Merge of doc646 & doc681) |
CR revision of C6-170683 |
Gemalto N.V. | 31.111 14.4.0 CR#6722 catB | TEI14 | Rel-14 |
C6-86 AI: 7.9.1 |
agreed | [WTS] [JSN] |
C6-170728 | Correction of requirements for eCall modes |
CR revision of C6-170686 |
Vodafone, Qualcomm | 31.102 8.21.0 CR#7501 catA | TEI8 | Rel-8 |
C6-86 AI: 7.9.1 |
withdrawn | [WTS] [JSN] |
C6-170729 | Correction of requirements for eCall modes |
CR revision of C6-170687 |
Vodafone, Qualcomm | 31.102 9.18.1 CR#7511 catA | TEI8 | Rel-9 |
C6-86 AI: 7.9.1 |
withdrawn | [WTS] [JSN] |
C6-170730 | Correction of requirements for eCall modes |
CR revision of C6-170688 |
Vodafone, Qualcomm | 31.102 10.14.1 CR#7521 catF | TEI14 | Rel-10 |
C6-86 AI: 7.9.1 |
withdrawn | [WTS] [JSN] |
C6-170731 | Correction of requirements for eCall modes |
CR revision of C6-170689 |
Vodafone, Qualcomm | 31.102 11.11.0 CR#7531 catA | TEI8 | Rel-11 |
C6-86 AI: 7.3.1 |
withdrawn | [WTS] [JSN] |
C6-170732 | Correction of requirements for eCall modes |
CR revision of C6-170690 |
Vodafone, Qualcomm | 31.102 12.12.0 CR#7541 catA | TEI8 | Rel-12 |
C6-86 AI: 7.3 |
withdrawn | [WTS] [JSN] |
C6-170733 | Correction of requirements for eCall modes |
CR revision of C6-170691 |
Vodafone, Qualcomm | 31.102 13.8.0 CR#7551 catA | TEI8 | Rel-13 |
C6-86 AI: 7.3.1 |
withdrawn | [WTS] [JSN] |
C6-170734 | Clarification of requirements for eCall modes |
CR revision of C6-170685 |
Vodafone GmbH, Giesecke & Devrient, Morpho Cards GmbH, Oberthur Technologies, Qualcomm Incorporated | 31.102 14.3.0 CR#7491 catF | TEI14 | Rel-14 |
C6-86 AI: 7.9.1 |
agreed | [WTS] [JSN] |
C6-170735 | Fixed conditions for test cases for terminals that supports only E-UTRA |
CR revision of C6-170692 |
Qualcomm Incorporated | 31.121 14.2.0 CR#2552 catF | TEI14 | Rel-14 |
C6-86 AI: 7.9.1 |
agreed | [WTS] [JSN] |
C6-170736 | USAT Pairing by ISIM |
CR revision of C6-170703 |
Gemalto | 31.102 14.3.0 CR#7561 catB | TEI14 | Rel-14 |
C6-86 AI: 7.9.1 |
withdrawn | [WTS] [JSN] |
C6-170737 | Extension of USAT Application Pairing mechanism |
LS out LS To: SA WG3 |
CT6 | TEI15 |
C6-86 AI: 7.10.1 |
approved | [WTS] [JSN] | ||
C6-170738 | Solving Editor's note in section 4.4.1.6 |
pCR revision of C6-170668 |
Morpho Cards GmbH | 31.801 1.0.0 | FS_NG_SP2 | Rel-15 |
C6-86 AI: 7.10.2 |
approved | [WTS] [JSN] |
C6-170739 | Solving Editor's note in section 4.5.1.3 |
pCR revision of C6-170670 revised to C6-170742 |
Morpho Cards GmbH | 31.801 1.0.0 | FS_NG_SP2 | Rel-15 |
C6-86 AI: 7.10.2 |
revised | [WTS] [JSN] |
C6-170740 | Presentation of Specification/Report to TSG: TR 31.801, Version 2.0.0 |
TS or TR cover revised to C6-170746 |
CT6 | FS_NG_SP2 | Rel-15 |
C6-86 AI: 7.9.5 |
revised | [WTS] [JSN] | |
C6-170741 | Technical Specification Group CT; Study on technical requirements for the secure platform for 3GPP applications; (Release 15) | draft TR | CT6 | FS_NG_SP2 | Rel-15 |
C6-86 AI: 7.9.5 |
approved | [WTS] [JSN] | |
C6-170742 | Solving Editor's note in section 4.5.1.3 |
pCR revision of C6-170739 |
Morpho Cards GmbH | 31.801 1.0.0 | FS_NG_SP2 | Rel-15 |
C6-86 AI: 7.10.2 |
approved | [WTS] [JSN] |
C6-170743 | Introduction of new test case for Call Control on PS PDP connection |
CR revision of C6-170684 |
Gemalto N.V. | 31.124 14.2.0 CR#4765 catB | TEI14_Test | Rel-14 |
C6-86 AI: 7.9.1 |
agreed | [WTS] [JSN] |
C6-170744 | Introduction of test cases for UICC interface during PSM and eDRX |
CR revision of C6-170726 |
Comprion GmbH | 31.121 14.2.0 CR#2562 catB | TEI14_Test | Rel-14 |
C6-86 AI: 7.9.1 |
agreed | [WTS] [JSN] |
C6-170745 | CT WG6 aspects of 5G System Phase 1 (Release 15) | draft TS | CT6 | 5GS_Ph1-CT | Rel-15 |
C6-86 AI: 7.10.6 |
approved | [WTS] [JSN] | |
C6-170746 | Presentation of Specification/Report to TSG: TR 31.801, Version 2.0.0 |
TS or TR cover revision of C6-170740 |
CT6 | FS_NG_SP2 | Rel-15 |
C6-86 AI: 7.9.5 |
approved | [WTS] [JSN] | |
C6-170747 | Correction of applicability condition for TC 27.22.7.10 and 27.22.7.11 |
CR revision of C6-170723 |
MediaTek Inc. | 31.124 14.2.0 CR#4823 catF | TEI14 | Rel-14 |
C6-86 AI: 7.9.1 |
agreed | [WTS] [JSN] |
C6-170748 | Alignment of TS31.111 in regards to LS C6-170614 |
CR revision of C6-170677 |
Qualcomm | 31.111 14.4.0 CR#6711 catF | TEI15 | Rel-15 |
C6-86 AI: 7.10.1 |
agreed | [WTS] [JSN] |
C6-170749 | Presentation of Specification/Report to TSG: TR 31.890, Version 2.0.0 |
TS or TR cover revised to C6-170750 |
CT6 | 5GS_Ph1-CT | Rel-15 |
C6-86 AI: 7.10.6 |
revised | [WTS] [JSN] | |
C6-170750 | Presentation of Specification/Report to TSG: TR 31.890, Version 2.0.0 |
TS or TR cover revision of C6-170749 |
CT6 | 5GS_Ph1-CT | Rel-15 |
C6-86 AI: 7.10.6 |
approved | [WTS] [JSN] | |
C6-170751 | Correction of requirements for eCall modes | CR | Vodafone, Qualcomm | 31.102 8.21.0 CR#757 catF | EData | Rel-8 |
C6-86 AI: 7.3.1 |
agreed | [WTS] [JSN] |
C6-170752 | Correction of requirements for eCall modes | CR | Vodafone, Qualcomm | 31.102 9.18.1 CR#758 catA | EData | Rel-9 |
C6-86 AI: 7.9.1 |
agreed | [WTS] [JSN] |
C6-170753 | Correction of requirements for eCall modes | CR | Vodafone, Qualcomm | 31.102 10.14.1 CR#759 catA | EData | Rel-10 |
C6-86 AI: 7.9.1 |
agreed | [WTS] [JSN] |
C6-170754 | Correction of requirements for eCall modes | CR | Vodafone, Qualcomm | 31.102 11.11.0 CR#760 catA | EData | Rel-11 |
C6-86 AI: 7.9.1 |
agreed | [WTS] [JSN] |
C6-170755 | Correction of requirements for eCall modes | CR | Vodafone, Qualcomm | 31.102 12.12.0 CR#761 catA | EData | Rel-12 |
C6-86 AI: 7.9.1 |
agreed | [WTS] [JSN] |
C6-170756 | Correction of requirements for eCall modes | CR | Vodafone, Qualcomm | 31.102 13.8.0 CR#762 catA | EData | Rel-13 |
C6-86 AI: 7.9.1 |
agreed | [WTS] [JSN] |
C6-170757 | USAT Pairing by ISIM | CR | Gemalto | 31.103 15.0.0 CR#121 catB | TEI15 | Rel-15 |
C6-86 AI: 7.10.1 |
postponed | [WTS] [JSN] |
157 documents (1.127110004425 seconds)