Please enter the search related information in the fields below. Partial information works, e.g. "SP-21" in the "tdoc" field lists all TSG SA documents from 2021. Regular expressions mostly work in all fields (e.g. "2[34].501" in the "Spec" field lists all documents related to 23.501 and 24.501. Capitalization is disregarded, i.e. "3GPP" gives the same results as "3gpp".

Download results in JSON format

tdoc Title Type / Revs Source Spec / CR S/WID Release Meeting Status Links
R4-2207775 TC for PUCCH SCell activation and deactivation delay requirements of FR1 unknown PUCCH SCell and one FR1 unknown SCell (All NR cells in FR1) R17 draftCR Apple NR_RRM_enh2-Perf Rel-17 R4-103-e

AI: 9.9.2.3

postponed [WTS] [JSN]
R4-2207957 Performance requirements discussion Qualcomm Incorporated NR_RRM_enh2-Perf Rel-17 R4-103-e

AI: 9.9.2.3

noted [WTS] [JSN]
R4-2208089 draftCR on TC3 PUCCH SCell activation of FR2 known cell in SA draftCR Nokia, Nokia Shanghai Bell NR_RRM_enh2-Perf Rel-17 R4-103-e

AI: 9.9.2.3

postponed [WTS] [JSN]
R4-2208107 CR on TC for PUCCH SCell activation and deactivation delay requirements CR Xiaomi 38.133 17.5.0 CR#2298 catB NR_RRM_enh2-Perf Rel-17 R4-103-e

AI: 9.9.2.3

postponed [WTS] [JSN]
R4-2208178 Discussion on test for PUCCH SCell activation discussion CATT NR_RRM_enh2 Rel-17 R4-103-e

AI: 9.9.2.3

noted [WTS] [JSN]
R4-2208179 Test case for PUCCH SCell activation and deactivation delay requirements draftCR CATT NR_RRM_enh2 Rel-17 R4-103-e

AI: 9.9.2.3

postponed [WTS] [JSN]
R4-2208352 Maintenance to requirements for PUCCH SCell activationdeactivation discussion OPPO NR_RRM_enh2-Perf Rel-17 R4-103-e

AI: 9.9.2.3

noted [WTS] [JSN]
R4-2208353 draft CR for PUCCH SCell activation and deactivation delay requirements of FR1 known cell for EN-DC (TC10) draftCR OPPO NR_RRM_enh2-Perf Rel-17 R4-103-e

AI: 9.9.2.3

postponed [WTS] [JSN]
R4-2208463 Draft CR on TC for PUCCH SCell activation and deactivation delay requirements of FR1 unknown cell draftCR MediaTek Inc. NR_RRM_enh2-Perf Rel-17 R4-103-e

AI: 9.9.2.3

postponed [WTS] [JSN]
R4-2208519 Discussion on test cases for PUCCH SCell activation/deactivation discussion CMCC NR_RRM_enh2-Perf R4-103-e

AI: 9.9.2.3

noted [WTS] [JSN]
R4-2208944 Discussion on performance requirements for PUCCH SCell activation discussion Huawei, Hisilicon NR_RRM_enh2-Perf R4-103-e

AI: 9.9.2.3

noted [WTS] [JSN]
R4-2208945 Draft CR on TC for PUCCH SCell activation and deactivation draftCR Huawei, Hisilicon NR_RRM_enh2-Perf Rel-17 R4-103-e

AI: 9.9.2.3

postponed [WTS] [JSN]
R4-2210137 TC for PUCCH SCell activation and deactivation delay requirements of FR2 known cell with FR1 PCell draftCR Ericsson NR_RRM_enh2-Perf Rel-17 R4-103-e

AI: 9.9.2.3

postponed [WTS] [JSN]

13 documents (0.36199617385864 seconds)