Please enter the search related information in the fields below. Partial information works, e.g. "SP-21" in the "tdoc" field lists all TSG SA documents from 2021. Regular expressions mostly work in all fields (e.g. "2[34].501" in the "Spec" field lists all documents related to 23.501 and 24.501. Capitalization is disregarded, i.e. "3GPP" gives the same results as "3gpp".

Download results in JSON format

tdoc Title Type / Revs Source Spec / CR S/WID Release Meeting Status Links
S6-221514 Discussion of Service-Based Multi-Access Edge Computing discussion Xidian University S6-49-bis-e

AI: 9.8

not pursued [WTS] [JSN]
S6-221524 pCR to resolve EN in Annexure B pCR Intel Technology India Pvt Ltd 23.700-98 1.0.1 FS_eEDGEAPP Rel-18 S6-49-bis-e

AI: 9.8

approved [WTS] [JSN]
S6-221525 pCR to change EN to NOTE in Annexure B pCR Intel Technology India Pvt Ltd 23.700-98 1.0.1 FS_eEDGEAPP Rel-18 S6-49-bis-e

AI: 9.8

approved [WTS] [JSN]
S6-221526 Pseudo-CR on Update to Solution #29 for Key issue #17: Discovery of a common EAS pCR

revised to S6-221773

Apple GmbH 23.700-98 1.0.1 FS_eEDGEAPP Rel-18 S6-49-bis-e

AI: 9.8

revised [WTS] [JSN]
S6-221527 Update to Solution #32 for evaluation pCR

revised to S6-221775

ETRI, Uangel 23.700-98 1.0.1 FS_eEDGEAPP Rel-18 S6-49-bis-e

AI: 9.8

revised [WTS] [JSN]
S6-221530 Pseudo-CR on Solution#25 update for CAS initiated ACR procedure pCR

revised to S6-221945

KPN N.V. 23.700-98 1.0.1 FS_eEDGEAPP Rel-18 S6-49-bis-e

AI: 9.8

revised [WTS] [JSN]
S6-221531 Pseudo-CR on ACR request trigger timing and prediction expiration time (Option 1 – with AC dependent timer) pCR

revised to S6-221946

KPN N.V., Ericsson 23.700-98 1.0.1 FS_eEDGEAPP Rel-18 S6-49-bis-e

AI: 9.8

revised [WTS] [JSN]
S6-221532 FS_eEDGEAPP Key Issue #10 Overall Evaluation and Conclusion pCR

revised to S6-221880

InterDigital 23.700-98 1.0.1 FS_eEDGEAPP Rel-18 S6-49-bis-e

AI: 9.8

revised [WTS] [JSN]
S6-221533 Pseudo-CR on Solution #33 – Resolving editor’s note pCR

revised to S6-221881

InterDigital 23.700-98 1.0.1 FS_eEDGEAPP Rel-18 S6-49-bis-e

AI: 9.8

revised [WTS] [JSN]
S6-221534 Pseudo-CR on Solution #33 Evaluation pCR

revised to S6-221882

InterDigital 23.700-98 1.0.1 FS_eEDGEAPP Rel-18 S6-49-bis-e

AI: 9.8

revised [WTS] [JSN]
S6-221535 Resolution of Editor’s Notes on solution #28 pCR

revised to S6-221891

InterDigital 23.700-98 1.0.1 FS_eEDGEAPP Rel-18 S6-49-bis-e

AI: 9.8

revised [WTS] [JSN]
S6-221536 Pseudo-CR on Solution #35 – Resolving editor’s note pCR

revised to S6-222033

InterDigital 23.700-98 1.0.1 FS_eEDGEAPP Rel-18 S6-49-bis-e

AI: 9.8

postponed [WTS] [JSN]
S6-221537 Pseudo-CR on Solution #35 evaluation pCR

revised to S6-221892

InterDigital 23.700-98 1.0.1 FS_eEDGEAPP Rel-18 S6-49-bis-e

AI: 9.8

revised [WTS] [JSN]
S6-221538 Pseudo-CR on Key Issue #19 Overall evaluation pCR

revised to S6-221893

InterDigital 23.700-98 1.0.1 FS_eEDGEAPP Rel-18 S6-49-bis-e

AI: 9.8

revised [WTS] [JSN]
S6-221554 Abbreviation clarification for CAS pCR

revised to S6-221792

NTT DOCOMO 23.700-98 1.0.1 FS_eEDGEAPP Rel-18 S6-49-bis-e

AI: 9.8

revised [WTS] [JSN]
S6-221555 Resolving an Editor's Note in clause 7.24 pCR NTT DOCOMO 23.700-98 1.0.1 FS_eEDGEAPP Rel-18 S6-49-bis-e

AI: 9.8

merged [WTS] [JSN]
S6-221556 Avoiding duplication of the architecture with CAS pCR

revised to S6-221793

NTT DOCOMO 23.700-98 1.0.1 FS_eEDGEAPP Rel-18 S6-49-bis-e

AI: 9.8

revised [WTS] [JSN]
S6-221578 Pseudo-CR on evaluation and clarification for Solution #23 pCR

revised to S6-221820

China Mobile 23.700-98 1.0.1 FS_eEDGEAPP Rel-18 S6-49-bis-e

AI: 9.8

merged [WTS] [JSN]
S6-221579 New solution to initiate AF guidance to URSP determination pCR Samsung 23.700-98 1.0.1 FS_eEDGEAPP Rel-18 S6-49-bis-e

AI: 9.8

postponed [WTS] [JSN]
S6-221580 pCR_Update solution #13 pCR

revised to S6-221798, S6-222076

Samsung 23.700-98 1.0.1 FS_eEDGEAPP Rel-18 S6-49-bis-e

AI: 9.8

revised [WTS] [JSN]
S6-221581 Remove ENs in solution #12 pCR

revised to S6-221799

Samsung 23.700-98 1.0.1 FS_eEDGEAPP Rel-18 S6-49-bis-e

AI: 9.8

revised [WTS] [JSN]
S6-221582 Resolve EN in solution #4 pCR

revised to S6-221800

Samsung 23.700-98 1.0.1 FS_eEDGEAPP Rel-18 S6-49-bis-e

AI: 9.8

revised [WTS] [JSN]
S6-221584 Resolve ENs related to SA2 in solution #13 pCR

revised to S6-221801

Samsung 23.700-98 1.0.1 FS_eEDGEAPP Rel-18 S6-49-bis-e

AI: 9.8

revised [WTS] [JSN]
S6-221586 Solution #13 evaluation pCR

revised to S6-221802

Samsung 23.700-98 1.0.1 FS_eEDGEAPP Rel-18 S6-49-bis-e

AI: 9.8

revised [WTS] [JSN]
S6-221588 Update solution #34 to support ECS discovery pCR

revised to S6-221803

Samsung 23.700-98 1.0.1 FS_eEDGEAPP Rel-18 S6-49-bis-e

AI: 9.8

revised [WTS] [JSN]
S6-221592 Solution for Reliable Edge computing pCR

revision of S6-221391

Samsung 23.700-98 1.0.1 FS_eEDGEAPP Rel-18 S6-49-bis-e

AI: 9.8

merged [WTS] [JSN]
S6-221593 Solution for Edge Node Sharing pCR

revised to S6-221873

Samsung 23.700-98 1.0.1 FS_eEDGEAPP Rel-18 S6-49-bis-e

AI: 9.8

revised [WTS] [JSN]
S6-221596 Solution for KI #19 – ACR coordination pCR

revised to S6-221875

Samsung 23.700-98 1.0.1 FS_eEDGEAPP Rel-18 S6-49-bis-e

AI: 9.8

revised [WTS] [JSN]
S6-221597 Pseudo-CR on solution to KI#13 - Edge enabler layer support for EAS synchronization pCR

revision of S6-221390

revised to S6-221876

Samsung 23.700-98 1.0.1 FS_eEDGEAPP Rel-18 S6-49-bis-e

AI: 9.8

revised [WTS] [JSN]
S6-221598 Handling of UE Mobility pattern pCR

revision of S6-221393

revised to S6-221877

Samsung 23.700-98 1.0.1 FS_eEDGEAPP Rel-18 S6-49-bis-e

AI: 9.8

revised [WTS] [JSN]
S6-221600 Simultaneous EAS, CAS, and AC connectivity for three level applications pCR

revised to S6-221947

IIT Delhi 23.700-98 1.0.1 FS_eEDGEAPP Rel-18 S6-49-bis-e

AI: 9.8

revised [WTS] [JSN]
S6-221618 EES awareness in CAS pCR

revised to S6-221897

Ericsson 23.700-98 1.0.1 FS_eEDGEAPP Rel-18 S6-49-bis-e

AI: 9.8

revised [WTS] [JSN]
S6-221619 KI#11 overall evaluation pCR

revised to S6-221898

Ericsson 23.700-98 1.0.1 FS_eEDGEAPP Rel-18 S6-49-bis-e

AI: 9.8

revised [WTS] [JSN]
S6-221620 KI#21 overall evaluation pCR Ericsson 23.700-98 1.0.1 FS_eEDGEAPP Rel-18 S6-49-bis-e

AI: 9.8

approved [WTS] [JSN]
S6-221621 KI#7 overall evaluation pCR Ericsson 23.700-98 1.0.1 FS_eEDGEAPP Rel-18 S6-49-bis-e

AI: 9.8

merged [WTS] [JSN]
S6-221622 Reliable Edge computing pCR

revised to S6-221878

Ericsson 23.700-98 1.0.1 FS_eEDGEAPP Rel-18 S6-49-bis-e

AI: 9.8

revised [WTS] [JSN]
S6-221623 Sol#30 evaluation pCR Ericsson 23.700-98 1.0.1 FS_eEDGEAPP Rel-18 S6-49-bis-e

AI: 9.8

postponed [WTS] [JSN]
S6-221624 Solve EN for IP address overlapping in sol#23 pCR Ericsson 23.700-98 1.0.1 FS_eEDGEAPP Rel-18 S6-49-bis-e

AI: 9.8

postponed [WTS] [JSN]
S6-221625 Solve EN in sol#24 pCR

revised to S6-221901

Ericsson 23.700-98 1.0.1 FS_eEDGEAPP Rel-18 S6-49-bis-e

AI: 9.8

revised [WTS] [JSN]
S6-221626 Solve EN for SSC pCR

revised to S6-221930

Ericsson 23.700-98 1.0.1 FS_eEDGEAPP Rel-18 S6-49-bis-e

AI: 9.8

revised [WTS] [JSN]
S6-221627 Solve EN for sol#18 pCR Ericsson 23.700-98 1.0.1 FS_eEDGEAPP Rel-18 S6-49-bis-e

AI: 9.8

approved [WTS] [JSN]
S6-221628 Federated EAS discovery pCR

revised to S6-221943

Ericsson 23.700-98 1.0.1 FS_eEDGEAPP Rel-18 S6-49-bis-e

AI: 9.8

revised [WTS] [JSN]
S6-221630 Pseudo-CR on a new solution for KI16 pCR China Mobile 23.700-98 1.0.1 FS_eEDGEAPP Rel-18 S6-49-bis-e

AI: 9.8

postponed [WTS] [JSN]
S6-221634 Overall evaluation for KI#6 and KI#10 pCR

revised to S6-221852

Huawei, Hisilicon 23.700-98 1.0.1 FS_eEDGEAPP Rel-18 S6-49-bis-e

AI: 9.8

revised [WTS] [JSN]
S6-221635 Resolving the ENs in Solution 4 pCR

revised to S6-221853

Huawei, Hisilicon 23.700-98 1.0.1 FS_eEDGEAPP Rel-18 S6-49-bis-e

AI: 9.8

revised [WTS] [JSN]
S6-221636 Resolving the EN in Solution 5 pCR

revised to S6-221854

Huawei, Hisilicon 23.700-98 1.0.1 FS_eEDGEAPP Rel-18 S6-49-bis-e

AI: 9.8

revised [WTS] [JSN]
S6-221637 Contentious issues of Enhancements to service continuity planning discussion Huawei, Hisilicon FS_eEDGEAPP Rel-18 S6-49-bis-e

AI: 9.8

noted [WTS] [JSN]
S6-221638 Resolving the ENs in Solution #21 pCR

revision of S6-221235

revised to S6-221855

Huawei, Hisilicon 23.700-98 1.0.1 FS_eEDGEAPP Rel-18 S6-49-bis-e

AI: 9.8

revised [WTS] [JSN]
S6-221667 Update Solution #8 pCR

revised to S6-221866

China Mobile E-Commerce Co. 23.700-98 1.0.1 FS_eEDGEAPP Rel-18 S6-49-bis-e

AI: 9.8

revised [WTS] [JSN]
S6-221671 Concluding architecture enhancement option#4 pCR

revised to S6-221931

Qualcomm 23.700-98 1.0.1 FS_eEDGEAPP Rel-18 S6-49-bis-e

AI: 9.8

revised [WTS] [JSN]
S6-221672 EAS specific Edge UE ID in Sol#23 pCR Qualcomm 23.700-98 1.0.1 FS_eEDGEAPP Rel-18 S6-49-bis-e

AI: 9.8

approved [WTS] [JSN]
S6-221673 Clean up and Solution Evaluation of Sol#23 pCR

revised to S6-221932

Qualcomm 23.700-98 1.0.1 FS_eEDGEAPP Rel-18 S6-49-bis-e

AI: 9.8

revised [WTS] [JSN]
S6-221674 Overall evaluation and conclusion for KI#16 Support of NAT pCR

revised to S6-221933

Qualcomm 23.700-98 1.0.1 FS_eEDGEAPP Rel-18 S6-49-bis-e

AI: 9.8

revised [WTS] [JSN]
S6-221675 Support for EAS bundles spread across EDNs pCR

revised to S6-221934

Qualcomm 23.700-98 1.0.1 FS_eEDGEAPP Rel-18 S6-49-bis-e

AI: 9.8

revised [WTS] [JSN]
S6-221676 Updates to Sol#26 for EAS discovery response pCR

revised to S6-221935

Qualcomm 23.700-98 1.0.1 FS_eEDGEAPP Rel-18 S6-49-bis-e

AI: 9.8

revised [WTS] [JSN]
S6-221677 Overall evaluation and conclusion for KI#18 Linkage between EASs pCR

revised to S6-221936

Qualcomm 23.700-98 1.0.1 FS_eEDGEAPP Rel-18 S6-49-bis-e

AI: 9.8

revised [WTS] [JSN]
S6-221678 Resolve EN on ACR operations for EDGE-5 pCR

revised to S6-221937

Qualcomm 23.700-98 1.0.1 FS_eEDGEAPP Rel-18 S6-49-bis-e

AI: 9.8

revised [WTS] [JSN]
S6-221679 Resolve EN on User consent for EDGE-5 pCR

revised to S6-221938

Qualcomm 23.700-98 1.0.1 FS_eEDGEAPP Rel-18 S6-49-bis-e

AI: 9.8

revised [WTS] [JSN]
S6-221680 New EDGE-5 APIs pCR

revised to S6-221939

Qualcomm 23.700-98 1.0.1 FS_eEDGEAPP Rel-18 S6-49-bis-e

AI: 9.8

revised [WTS] [JSN]
S6-221681 Solution evaluation and conclusion for Sol#34 EDGE-5 pCR

revised to S6-221940

Qualcomm 23.700-98 1.0.1 FS_eEDGEAPP Rel-18 S6-49-bis-e

AI: 9.8

revised [WTS] [JSN]
S6-221682 Requirements for common EAS pCR

revised to S6-221941

Qualcomm 23.700-98 1.0.1 FS_eEDGEAPP Rel-18 S6-49-bis-e

AI: 9.8

revised [WTS] [JSN]
S6-221683 Enhanced ECS for federation and roaming pCR

revised to S6-221942

Qualcomm 23.700-98 1.0.1 FS_eEDGEAPP Rel-18 S6-49-bis-e

AI: 9.8

revised [WTS] [JSN]
S6-221684 Pseudo-CR on editorials pCR

revised to S6-221883

Samsung 23.700-98 1.0.1 FS_eEDGEAPP Rel-18 S6-49-bis-e

AI: 9.8

revised [WTS] [JSN]
S6-221685 Pseudo-CR on consistency pCR

revised to S6-221884

Samsung 23.700-98 1.0.1 FS_eEDGEAPP Rel-18 S6-49-bis-e

AI: 9.8

revised [WTS] [JSN]
S6-221686 Pseudo-CR on ENs pCR

revised to S6-221885

Samsung 23.700-98 1.0.1 FS_eEDGEAPP Rel-18 S6-49-bis-e

AI: 9.8

revised [WTS] [JSN]
S6-221687 Pseudo-CR on Solution #31 updates pCR

revised to S6-221886

Samsung 23.700-98 1.0.1 FS_eEDGEAPP Rel-18 S6-49-bis-e

AI: 9.8

revised [WTS] [JSN]
S6-221688 Overall evaluation updates pCR Samsung 23.700-98 1.0.1 FS_eEDGEAPP Rel-18 S6-49-bis-e

AI: 9.8

approved [WTS] [JSN]
S6-221689 KI#2 conclusion pCR

revised to S6-221887

Samsung 23.700-98 1.0.1 FS_eEDGEAPP Rel-18 S6-49-bis-e

AI: 9.8

revised [WTS] [JSN]
S6-221690 KI #1 overall evaluation and conclusion pCR

revised to S6-221888

Samsung 23.700-98 1.0.1 FS_eEDGEAPP Rel-18 S6-49-bis-e

AI: 9.8

revised [WTS] [JSN]
S6-221691 KI#7 overall evaluation and conclusion pCR

revised to S6-221889

Samsung 23.700-98 1.0.1 FS_eEDGEAPP Rel-18 S6-49-bis-e

AI: 9.8

revised [WTS] [JSN]
S6-221692 Edge Service Delivery Scenarios discussion

revised to S6-221890

Samsung FS_eEDGEAPP Rel-18 S6-49-bis-e

AI: 9.8

revised [WTS] [JSN]
S6-221698 EAS selection synchronization at registration pCR

revised to S6-221779

Convida Wireless LLC 23.700-98 1.0.1 FS_eEDGEAPP Rel-18 S6-49-bis-e

AI: 9.8

revised [WTS] [JSN]
S6-221699 AC Association aware solution update pCR

revised to S6-221780

Convida Wireless LLC 23.700-98 1.0.1 FS_eEDGEAPP Rel-18 S6-49-bis-e

AI: 9.8

revised [WTS] [JSN]
S6-221700 AC Association aware solution update with CAAR pCR

revised to S6-221781

Convida Wireless LLC 23.700-98 1.0.1 FS_eEDGEAPP Rel-18 S6-49-bis-e

AI: 9.8

revised [WTS] [JSN]
S6-221720 Resolve ENs in Solution #6 pCR

revised to S6-221862

Lenovo Future Communications 23.700-98 1.0.1 FS_eEDGEAPP Rel-18 S6-49-bis-e

AI: 9.8

revised [WTS] [JSN]
S6-221745 Enhancement to Solution on ACR scenario combination pCR

revision of S6-221231

revised to S6-221919

Huawei, Hisilicon 23.700-98 1.0.1 FS_eEDGEAPP Rel-18 S6-49-bis-e

AI: 9.8

revised [WTS] [JSN]
S6-221746 Business relationship for ECSP roaming pCR

revised to S6-221920

Huawei, Hisilicon 23.700-98 1.0.1 FS_eEDGEAPP Rel-18 S6-49-bis-e

AI: 9.8

revised [WTS] [JSN]
S6-221747 Update- Key issue #22: EAS discovery in Edge Node sharing scenario pCR

revised to S6-221921

Huawei, Hisilicon 23.700-98 1.0.1 FS_eEDGEAPP Rel-18 S6-49-bis-e

AI: 9.8

revised [WTS] [JSN]
S6-221748 Solution for EAS discovery in Edge Node sharing scenario pCR

revised to S6-221922

Huawei, Hisilicon 23.700-98 1.0.1 FS_eEDGEAPP Rel-18 S6-49-bis-e

AI: 9.8

revised [WTS] [JSN]
S6-221749 Solution for T-EAS discovery for linkage EAS(s) within EDN pCR

revised to S6-221923

Huawei, Hisilicon 23.700-98 1.0.1 FS_eEDGEAPP Rel-18 S6-49-bis-e

AI: 9.8

revised [WTS] [JSN]
S6-221750 Solution on key issue#22 on T-EAS discovery in Edge Node sharing scenario pCR

revised to S6-221924

Huawei, Hisilicon 23.700-98 1.0.1 FS_eEDGEAPP Rel-18 S6-49-bis-e

AI: 9.8

revised [WTS] [JSN]
S6-221751 Solution on T-EES discovery for roaming scenario pCR Huawei, Hisilicon 23.700-98 1.0.1 FS_eEDGEAPP Rel-18 S6-49-bis-e

AI: 9.8

postponed [WTS] [JSN]
S6-221752 Overall Evaluation of Key Issue #3 pCR

revised to S6-221925

Huawei, Hisilicon 23.700-98 1.0.1 FS_eEDGEAPP Rel-18 S6-49-bis-e

AI: 9.8

revised [WTS] [JSN]
S6-221753 Discussion on roaming between ECSP discussion Huawei, Hisilicon FS_eEDGEAPP Rel-18 S6-49-bis-e

AI: 9.8

noted [WTS] [JSN]
S6-221754 Solution for ACR scenario selection for linkage EAS(s) pCR

revised to S6-221926

Huawei, Hisilicon 23.700-98 1.0.1 FS_eEDGEAPP Rel-18 S6-49-bis-e

AI: 9.8

revised [WTS] [JSN]
S6-221761 SEAL capabilities access for EEL support pCR

revised to S6-221782

Convida Wireless LLC 23.700-98 1.0.1 FS_eEDGEAPP Rel-18 S6-49-bis-e

AI: 9.8

revised [WTS] [JSN]
S6-221762 Pseudo-CR on solution to KI#20 pCR

revision of S6-221410

revised to S6-222221

Samsung Electronics Benelux BV 23.700-98 1.0.1 FS_eEDGEAPP Rel-18 S6-49-bis-e

AI: 9.8

postponed [WTS] [JSN]
S6-221773 Pseudo-CR on Update to Solution #29 for Key issue #17: Discovery of a common EAS pCR

revision of S6-221526

Apple GmbH 23.700-98 1.0.1 FS_eEDGEAPP Rel-18 S6-49-bis-e

AI: 9.8

postponed [WTS] [JSN]
S6-221775 Update to Solution #32 for evaluation pCR

revision of S6-221527

ETRI, Uangel 23.700-98 1.0.1 FS_eEDGEAPP Rel-18 S6-49-bis-e

AI: 9.8

approved [WTS] [JSN]
S6-221779 EAS selection synchronization at registration pCR

revision of S6-221698

Convida Wireless LLC 23.700-98 1.0.1 FS_eEDGEAPP Rel-18 S6-49-bis-e

AI: 9.8

postponed [WTS] [JSN]
S6-221780 AC Association aware solution update pCR

revision of S6-221699

Convida Wireless LLC 23.700-98 1.0.1 FS_eEDGEAPP Rel-18 S6-49-bis-e

AI: 9.8

withdrawn [WTS] [JSN]
S6-221781 AC Association aware solution update pCR

revision of S6-221700

Convida Wireless LLC 23.700-98 1.0.1 FS_eEDGEAPP Rel-18 S6-49-bis-e

AI: 9.8

postponed [WTS] [JSN]
S6-221782 SEAL capabilities access for EEL support pCR

revision of S6-221761

revised to S6-221989

Convida Wireless LLC 23.700-98 1.0.1 FS_eEDGEAPP Rel-18 S6-49-bis-e

AI: 9.8

revised [WTS] [JSN]
S6-221792 Abbreviation clarification for CAS pCR

revision of S6-221554

revised to S6-221980

NTT DOCOMO 23.700-98 1.0.1 FS_eEDGEAPP Rel-18 S6-49-bis-e

AI: 9.8

revised [WTS] [JSN]
S6-221793 Avoiding duplication of the architecture with CAS pCR

revision of S6-221556

NTT DOCOMO 23.700-98 1.0.1 FS_eEDGEAPP Rel-18 S6-49-bis-e

AI: 9.8

approved [WTS] [JSN]
S6-221798 pCR_Update solution #13 pCR

revision of S6-221580

Samsung 23.700-98 1.0.1 FS_eEDGEAPP Rel-18 S6-49-bis-e

AI: 9.8

postponed [WTS] [JSN]
S6-221799 Remove ENs in solution #12 pCR

revision of S6-221581

Samsung 23.700-98 1.0.1 FS_eEDGEAPP Rel-18 S6-49-bis-e

AI: 9.8

approved [WTS] [JSN]
S6-221800 Resolve EN in solution #4 pCR

revision of S6-221582

revised to S6-221976

Samsung 23.700-98 1.0.1 FS_eEDGEAPP Rel-18 S6-49-bis-e

AI: 9.8

revised [WTS] [JSN]
S6-221801 Resolve ENs related to SA2 in solution #13 pCR

revision of S6-221584

Samsung 23.700-98 1.0.1 FS_eEDGEAPP Rel-18 S6-49-bis-e

AI: 9.8

approved [WTS] [JSN]
S6-221802 Solution #13 evaluation pCR

revision of S6-221586

revised to S6-221979

Samsung 23.700-98 1.0.1 FS_eEDGEAPP Rel-18 S6-49-bis-e

AI: 9.8

revised [WTS] [JSN]
S6-221803 Update solution #34 to support ECS discovery pCR

revision of S6-221588

revised to S6-221996

Samsung 23.700-98 1.0.1 FS_eEDGEAPP Rel-18 S6-49-bis-e

AI: 9.8

revised [WTS] [JSN]
S6-221820 Pseudo-CR on evaluation and clarification for Solution #23 pCR

revision of S6-221578

China Mobile 23.700-98 1.0.1 FS_eEDGEAPP Rel-18 S6-49-bis-e

AI: 9.8

withdrawn [WTS] [JSN]
S6-221852 Overall evaluation for KI #6 and KI #10 pCR

revision of S6-221634

revised to S6-221978

Huawei, Hisilicon 23.700-98 1.0.1 FS_eEDGEAPP Rel-18 S6-49-bis-e

AI: 9.8

revised [WTS] [JSN]
S6-221853 Resolving the ENs in Solution #4 pCR

revision of S6-221635

Huawei, Hisilicon 23.700-98 1.0.1 FS_eEDGEAPP Rel-18 S6-49-bis-e

AI: 9.8

merged [WTS] [JSN]
S6-221854 Resolving the EN in Solution #5 pCR

revision of S6-221636

revised to S6-221977

Huawei, Hisilicon 23.700-98 1.0.1 FS_eEDGEAPP Rel-18 S6-49-bis-e

AI: 9.8

revised [WTS] [JSN]
S6-221855 Resolving the ENs in Solution #21 pCR

revision of S6-221638

revised to S6-221973

Huawei, Hisilicon 23.700-98 1.0.1 FS_eEDGEAPP Rel-18 S6-49-bis-e

AI: 9.8

revised [WTS] [JSN]
S6-221862 Resolve ENs in Solution #6 pCR

revision of S6-221720

Lenovo Future Communications 23.700-98 1.0.1 FS_eEDGEAPP Rel-18 S6-49-bis-e

AI: 9.8

approved [WTS] [JSN]
S6-221866 Update Solution #8 pCR

revision of S6-221667

revised to S6-221971

China Mobile E-Commerce Co. 23.700-98 1.0.1 FS_eEDGEAPP Rel-18 S6-49-bis-e

AI: 9.8

revised [WTS] [JSN]
S6-221873 Solution for Edge Node Sharing pCR

revision of S6-221593

revised to S6-222114

Samsung 23.700-98 1.0.1 FS_eEDGEAPP Rel-18 S6-49-bis-e

AI: 9.8

postponed [WTS] [JSN]
S6-221875 Solution for KI #19 – ACR coordination pCR

revision of S6-221596

revised to S6-221986

Samsung 23.700-98 1.0.1 FS_eEDGEAPP Rel-18 S6-49-bis-e

AI: 9.8

revised [WTS] [JSN]
S6-221876 Pseudo-CR on solution to KI#13 - Edge enabler layer support for EAS synchronization pCR

revision of S6-221597

Samsung 23.700-98 1.0.1 FS_eEDGEAPP Rel-18 S6-49-bis-e

AI: 9.8

postponed [WTS] [JSN]
S6-221877 Handling of UE Mobility pattern pCR

revision of S6-221598

revised to S6-222113

Samsung 23.700-98 1.0.1 FS_eEDGEAPP Rel-18 S6-49-bis-e

AI: 9.8

postponed [WTS] [JSN]
S6-221878 Reliable Edge computing pCR

revision of S6-221622

revised to S6-221988

Ericsson, Samsung 23.700-98 1.0.1 FS_eEDGEAPP Rel-18 S6-49-bis-e

AI: 9.8

revised [WTS] [JSN]
S6-221880 FS_eEDGEAPP Key Issue #10 Overall Evaluation and Conclusion pCR

revision of S6-221532

revised to S6-221983

InterDigital, Huawei 23.700-98 1.0.1 FS_eEDGEAPP Rel-18 S6-49-bis-e

AI: 9.8

revised [WTS] [JSN]
S6-221881 Pseudo-CR on Solution #33 – Resolving editor’s note pCR

revision of S6-221533

InterDigital 23.700-98 1.0.1 FS_eEDGEAPP Rel-18 S6-49-bis-e

AI: 9.8

postponed [WTS] [JSN]
S6-221882 Pseudo-CR on Solution #33 Evaluation pCR

revision of S6-221534

revised to S6-222035

InterDigital 23.700-98 1.0.1 FS_eEDGEAPP Rel-18 S6-49-bis-e

AI: 9.8

postponed [WTS] [JSN]
S6-221883 FS_eEDGEAPP_editorials pCR

revision of S6-221684

Samsung 23.700-98 1.0.1 FS_eEDGEAPP Rel-18 S6-49-bis-e

AI: 9.8

approved [WTS] [JSN]
S6-221884 FS_eEDGEAPP_consistency pCR

revision of S6-221685

revised to S6-221969

Samsung 23.700-98 1.0.1 FS_eEDGEAPP Rel-18 S6-49-bis-e

AI: 9.8

revised [WTS] [JSN]
S6-221885 FS_eEDGEAPP_ENs_resolutions pCR

revision of S6-221686

Samsung 23.700-98 1.0.1 FS_eEDGEAPP Rel-18 S6-49-bis-e

AI: 9.8

approved [WTS] [JSN]
S6-221886 FS_eEDGEAPP_Solution #31 EAS updates pCR

revision of S6-221687

revised to S6-222312

Samsung 23.700-98 1.0.1 FS_eEDGEAPP Rel-18 S6-49-bis-e

AI: 9.8

postponed [WTS] [JSN]
S6-221887 FS_eEDGEAPP_KI #2 conclusion pCR

revision of S6-221689

Samsung, ETRI 23.700-98 1.0.1 FS_eEDGEAPP Rel-18 S6-49-bis-e

AI: 9.8

approved [WTS] [JSN]
S6-221888 KI #1 overall evaluation and conclusion pCR

revision of S6-221690

revised to S6-221970

Samsung 23.700-98 1.0.1 FS_eEDGEAPP Rel-18 S6-49-bis-e

AI: 9.8

revised [WTS] [JSN]
S6-221889 FS_eEDGEAPP_KI #7 overall evaluation and conclusion pCR

revision of S6-221691

Samsung, Ericsson 23.700-98 1.0.1 FS_eEDGEAPP Rel-18 S6-49-bis-e

AI: 9.8

approved [WTS] [JSN]
S6-221890 FS_eEDGEAPP_Edge Service Delivery Scenarios discussion

revision of S6-221692

Samsung FS_eEDGEAPP Rel-18 S6-49-bis-e

AI: 9.8

noted [WTS] [JSN]
S6-221891 Resolution of Editor’s Notes on solution #28 pCR

revision of S6-221535

revised to S6-222037

InterDigital 23.700-98 1.0.1 FS_eEDGEAPP Rel-18 S6-49-bis-e

AI: 9.8

postponed [WTS] [JSN]
S6-221892 Pseudo-CR on Solution #35 evaluation pCR

revision of S6-221537

revised to S6-222031

InterDigital 23.700-98 1.0.1 FS_eEDGEAPP Rel-18 S6-49-bis-e

AI: 9.8

postponed [WTS] [JSN]
S6-221893 Pseudo-CR on Key Issue #19 Overall evaluation pCR

revision of S6-221538

revised to S6-221987

InterDigital 23.700-98 1.0.1 FS_eEDGEAPP Rel-18 S6-49-bis-e

AI: 9.8

revised [WTS] [JSN]
S6-221897 EES awareness in CAS pCR

revision of S6-221618

revised to S6-221981

Ericsson 23.700-98 1.0.1 FS_eEDGEAPP Rel-18 S6-49-bis-e

AI: 9.8

revised [WTS] [JSN]
S6-221898 KI#11 overall evaluation pCR

revision of S6-221619

revised to S6-221982

Ericsson 23.700-98 1.0.1 FS_eEDGEAPP Rel-18 S6-49-bis-e

AI: 9.8

revised [WTS] [JSN]
S6-221901 Solve EN in sol#24 pCR

revision of S6-221625

Ericsson, NTT DOCOMO 23.700-98 1.0.1 FS_eEDGEAPP Rel-18 S6-49-bis-e

AI: 9.8

merged [WTS] [JSN]
S6-221919 Enhancement to Solution on ACR scenario combination pCR

revision of S6-221745

Huawei, Hisilicon 23.700-98 1.0.1 FS_eEDGEAPP Rel-18 S6-49-bis-e

AI: 9.8

postponed [WTS] [JSN]
S6-221920 Business relationship for ECSP roaming pCR

revision of S6-221746

Huawei, Hisilicon 23.700-98 1.0.1 FS_eEDGEAPP Rel-18 S6-49-bis-e

AI: 9.8

postponed [WTS] [JSN]
S6-221921 Update- Key issue #22: EAS discovery in Edge Node sharing scenario pCR

revision of S6-221747

Huawei, Hisilicon 23.700-98 1.0.1 FS_eEDGEAPP Rel-18 S6-49-bis-e

AI: 9.8

postponed [WTS] [JSN]
S6-221922 Solution for EAS discovery in Edge Node sharing scenario pCR

revision of S6-221748

revised to S6-222281

Huawei, Hisilicon 23.700-98 1.0.1 FS_eEDGEAPP Rel-18 S6-49-bis-e

AI: 9.8

postponed [WTS] [JSN]
S6-221923 Solution for T-EAS discovery for linkage EAS(s) within EDN pCR

revision of S6-221749

revised to S6-222283

Huawei, Hisilicon 23.700-98 1.0.1 FS_eEDGEAPP Rel-18 S6-49-bis-e

AI: 9.8

postponed [WTS] [JSN]
S6-221924 Solution on key issue#22 on T-EAS discovery in Edge Node sharing scenario pCR

revision of S6-221750

revised to S6-222282

Huawei, Hisilicon 23.700-98 1.0.1 FS_eEDGEAPP Rel-18 S6-49-bis-e

AI: 9.8

postponed [WTS] [JSN]
S6-221925 Overall Evaluation of Key Issue #3 pCR

revision of S6-221752

revised to S6-221974

Huawei, Hisilicon 23.700-98 1.0.1 FS_eEDGEAPP Rel-18 S6-49-bis-e

AI: 9.8

revised [WTS] [JSN]
S6-221926 Solution for ACR scenario selection for linkage EAS(s) pCR

revision of S6-221754

Huawei, Hisilicon 23.700-98 1.0.1 FS_eEDGEAPP Rel-18 S6-49-bis-e

AI: 9.8

postponed [WTS] [JSN]
S6-221930 Solve EN for SSC pCR

revision of S6-221626

revised to S6-221997

Ericsson 23.700-98 1.0.1 FS_eEDGEAPP Rel-18 S6-49-bis-e

AI: 9.8

revised [WTS] [JSN]
S6-221931 Concluding architecture enhancement option#4 pCR

revision of S6-221671

revised to S6-221975

Qualcomm 23.700-98 1.0.1 FS_eEDGEAPP Rel-18 S6-49-bis-e

AI: 9.8

revised [WTS] [JSN]
S6-221932 Clean up and Solution Evaluation of Sol#23 pCR

revision of S6-221673

revised to S6-221984

Qualcomm, KPN N.V., CMCC 23.700-98 1.0.1 FS_eEDGEAPP Rel-18 S6-49-bis-e

AI: 9.8

revised [WTS] [JSN]
S6-221933 Overall evaluation and conclusion for KI#16 Support of NAT pCR

revision of S6-221674

Qualcomm, KPN N.V. 23.700-98 1.0.1 FS_eEDGEAPP Rel-18 S6-49-bis-e

AI: 9.8

postponed [WTS] [JSN]
S6-221934 Support for EAS bundles spread across EDNs pCR

revision of S6-221675

Qualcomm 23.700-98 1.0.1 FS_eEDGEAPP Rel-18 S6-49-bis-e

AI: 9.8

postponed [WTS] [JSN]
S6-221935 Updates to Sol#26 for EAS discovery response pCR

revision of S6-221676

Qualcomm 23.700-98 1.0.1 FS_eEDGEAPP Rel-18 S6-49-bis-e

AI: 9.8

approved [WTS] [JSN]
S6-221936 Overall evaluation and conclusion for KI#18 Linkage between EASs pCR

revision of S6-221677

revised to S6-221985

Qualcomm 23.700-98 1.0.1 FS_eEDGEAPP Rel-18 S6-49-bis-e

AI: 9.8

revised [WTS] [JSN]
S6-221937 Resolve EN on ACR operations for EDGE-5 pCR

revision of S6-221678

Qualcomm 23.700-98 1.0.1 FS_eEDGEAPP Rel-18 S6-49-bis-e

AI: 9.8

approved [WTS] [JSN]
S6-221938 Resolve EN on User consent for EDGE-5 pCR

revision of S6-221679

Qualcomm 23.700-98 1.0.1 FS_eEDGEAPP Rel-18 S6-49-bis-e

AI: 9.8

approved [WTS] [JSN]
S6-221939 New EDGE-5 APIs pCR

revision of S6-221680

Qualcomm 23.700-98 1.0.1 FS_eEDGEAPP Rel-18 S6-49-bis-e

AI: 9.8

approved [WTS] [JSN]
S6-221940 Solution evaluation and conclusion for Sol#34 EDGE-5 pCR

revision of S6-221681

Qualcomm 23.700-98 1.0.1 FS_eEDGEAPP Rel-18 S6-49-bis-e

AI: 9.8

approved [WTS] [JSN]
S6-221941 Requirements for common EAS pCR

revision of S6-221682

Qualcomm 23.700-98 1.0.1 FS_eEDGEAPP Rel-18 S6-49-bis-e

AI: 9.8

postponed [WTS] [JSN]
S6-221942 Enhanced ECS for federation and roaming pCR

revision of S6-221683

Qualcomm 23.700-98 1.0.1 FS_eEDGEAPP Rel-18 S6-49-bis-e

AI: 9.8

postponed [WTS] [JSN]
S6-221943 Federated EAS discovery pCR

revision of S6-221628

Ericsson 23.700-98 1.0.1 FS_eEDGEAPP Rel-18 S6-49-bis-e

AI: 9.8

postponed [WTS] [JSN]
S6-221945 Pseudo-CR on Solution#25 update for CAS initiated ACR procedure pCR

revision of S6-221530

KPN N.V., Qualcomm 23.700-98 1.0.1 FS_eEDGEAPP Rel-18 S6-49-bis-e

AI: 9.8

postponed [WTS] [JSN]
S6-221946 Pseudo-CR on ACR request trigger timing and prediction expiration time (Option 1 – with AC dependent timer) pCR

revision of S6-221531

revised to S6-221972

KPN N.V. 23.700-98 1.0.1 FS_eEDGEAPP Rel-18 S6-49-bis-e

AI: 9.8

revised [WTS] [JSN]
S6-221947 Simultaneous EAS, CAS, and AC connectivity for three level applications pCR

revision of S6-221600

IIT Delhi 23.700-98 1.0.1 FS_eEDGEAPP Rel-18 S6-49-bis-e

AI: 9.8

postponed [WTS] [JSN]
S6-221969 Pseudo-CR on consistency pCR

revision of S6-221884

Samsung 23.700-98 1.0.1 FS_eEDGEAPP Rel-18 S6-49-bis-e

AI: 9.8

approved [WTS] [JSN]
S6-221970 KI #1 overall evaluation and conclusion pCR

revision of S6-221888

Samsung 23.700-98 1.0.1 FS_eEDGEAPP Rel-18 S6-49-bis-e

AI: 9.8

approved [WTS] [JSN]
S6-221971 Update Solution 8 pCR

revision of S6-221866

China Mobile E-Commerce Co. 23.700-98 1.0.1 FS_eEDGEAPP Rel-18 S6-49-bis-e

AI: 9.8

approved [WTS] [JSN]
S6-221972 Pseudo-CR on ACR request trigger timing and prediction expiration time (Option 1 – with AC dependent timer) pCR

revision of S6-221946

KPN N.V. 23.700-98 1.0.1 FS_eEDGEAPP Rel-18 S6-49-bis-e

AI: 9.8

approved [WTS] [JSN]
S6-221973 Resolving the ENs in Solution #21 pCR

revision of S6-221855

Huawei, Hisilicon 23.700-98 1.0.1 FS_eEDGEAPP Rel-18 S6-49-bis-e

AI: 9.8

approved [WTS] [JSN]
S6-221974 Overall Evaluation of Key Issue #3 pCR

revision of S6-221925

Huawei, Hisilicon 23.700-98 1.0.1 FS_eEDGEAPP Rel-18 S6-49-bis-e

AI: 9.8

approved [WTS] [JSN]
S6-221975 Concluding architecture enhancement option#4 pCR

revision of S6-221931

Qualcomm 23.700-98 1.0.1 FS_eEDGEAPP Rel-18 S6-49-bis-e

AI: 9.8

approved [WTS] [JSN]
S6-221976 Resolve EN in solution #4 pCR

revision of S6-221800

Samsung, Huawei 23.700-98 1.0.1 FS_eEDGEAPP Rel-18 S6-49-bis-e

AI: 9.8

approved [WTS] [JSN]
S6-221977 Resolving the EN in Solution 5 pCR

revision of S6-221854

Huawei, Hisilicon 23.700-98 1.0.1 FS_eEDGEAPP Rel-18 S6-49-bis-e

AI: 9.8

approved [WTS] [JSN]
S6-221978 Overall evaluation for KI#6 and KI#10 pCR

revision of S6-221852

Huawei, Hisilicon 23.700-98 1.0.1 FS_eEDGEAPP Rel-18 S6-49-bis-e

AI: 9.8

approved [WTS] [JSN]
S6-221979 Solution #13 evaluation pCR

revision of S6-221802

Samsung 23.700-98 1.0.1 FS_eEDGEAPP Rel-18 S6-49-bis-e

AI: 9.8

approved [WTS] [JSN]
S6-221980 Abbreviation clarification for CAS pCR

revision of S6-221792

NTT DOCOMO, Ericsson 23.700-98 1.0.1 FS_eEDGEAPP Rel-18 S6-49-bis-e

AI: 9.8

approved [WTS] [JSN]
S6-221981 EES awareness in CAS pCR

revision of S6-221897

Ericsson 23.700-98 1.0.1 FS_eEDGEAPP Rel-18 S6-49-bis-e

AI: 9.8

approved [WTS] [JSN]
S6-221982 KI#11 overall evaluation pCR

revision of S6-221898

Ericsson 23.700-98 1.0.1 FS_eEDGEAPP Rel-18 S6-49-bis-e

AI: 9.8

approved [WTS] [JSN]
S6-221983 FS_eEDGEAPP Key Issue #10 Overall Evaluation and Conclusion pCR

revision of S6-221880

InterDigital 23.700-98 1.0.1 FS_eEDGEAPP Rel-18 S6-49-bis-e

AI: 9.8

approved [WTS] [JSN]
S6-221984 Clean up and Solution Evaluation of Sol#23 pCR

revision of S6-221932

Qualcomm, KPN N.V., CMCC 23.700-98 1.0.1 FS_eEDGEAPP Rel-18 S6-49-bis-e

AI: 9.8

approved [WTS] [JSN]
S6-221985 Overall evaluation and conclusion for KI#18 Linkage between EASs pCR

revision of S6-221936

Qualcomm 23.700-98 1.0.1 FS_eEDGEAPP Rel-18 S6-49-bis-e

AI: 9.8

approved [WTS] [JSN]
S6-221986 Solution for KI #19 – ACR coordination pCR

revision of S6-221875

Samsung 23.700-98 1.0.1 FS_eEDGEAPP Rel-18 S6-49-bis-e

AI: 9.8

approved [WTS] [JSN]
S6-221987 Pseudo-CR on Key Issue #19 Overall evaluation pCR

revision of S6-221893

revised to S6-222032

InterDigital 23.700-98 1.0.1 FS_eEDGEAPP Rel-18 S6-49-bis-e

AI: 9.8

postponed [WTS] [JSN]
S6-221988 Reliable Edge computing pCR

revision of S6-221878

Ericsson 23.700-98 1.0.1 FS_eEDGEAPP Rel-18 S6-49-bis-e

AI: 9.8

approved [WTS] [JSN]
S6-221989 SEAL capabilities access for EEL support pCR

revision of S6-221782

Convida Wireless LLC 23.700-98 1.0.1 FS_eEDGEAPP Rel-18 S6-49-bis-e

AI: 9.8

approved [WTS] [JSN]
S6-221996 Update solution #34 to support ECS discovery pCR

revision of S6-221803

Samsung 23.700-98 1.0.1 FS_eEDGEAPP Rel-18 S6-49-bis-e

AI: 9.8

approved [WTS] [JSN]
S6-221997 Solve EN for SSC pCR

revision of S6-221930

Ericsson 23.700-98 1.0.1 FS_eEDGEAPP Rel-18 S6-49-bis-e

AI: 9.8

approved [WTS] [JSN]

178 documents (0.32739877700806 seconds)