Please enter the search related information in the fields below. Partial information works, e.g. "SP-21
" in the "tdoc" field lists all TSG SA documents from 2021. Regular expressions mostly work in all fields (e.g. "2[34].501
" in the "Spec" field lists all documents related to 23.501 and 24.501. Capitalization is disregarded, i.e. "3GPP
" gives the same results as "3gpp
".
Download results in JSON format
tdoc | Title | Type / Revs | Source | Spec / CR | S/WID | Release | Meeting | Status | Links |
---|---|---|---|---|---|---|---|---|---|
R1-2302398 | PDCCH monitoring resumption after UL NACK | discussion | Ericsson | NR_XR_enh-Core | Rel-18 |
R1-112-bis-e AI: 9.8 |
not treated | [WTS] [JSN] | |
R1-2302500 | Draft CR on PDCCH monitoring resumption after NACK | draftCR | vivo, MediaTek, Google, Qualcomm, Panasonic, Meta, Ericsson, China Unicom, Huawei, HiSilicon, Xiaomi, Apple, China Telecom | NR_XR_enh-Core | Rel-18 |
R1-112-bis-e AI: 9.8 |
not treated | [WTS] [JSN] | |
R1-2302676 | PDCCH Skipping interaction with HARQ | discussion | CATT | NR_XR_enh-Core | Rel-18 |
R1-112-bis-e AI: 9.8 |
not treated | [WTS] [JSN] | |
R1-2302946 | Discussion on PDCCH monitoring resumption after reporting NACK | discussion | ZTE, Sanechips | NR_XR_enh-Core | Rel-18 |
R1-112-bis-e AI: 9.8 |
not treated | [WTS] [JSN] | |
R1-2303312 | Draft CR for Introducing PDCCH monitoring resumption after UL NACK | draftCR | Nokia, Nokia Shanghai Bell | NR_XR_enh-Core | Rel-18 |
R1-112-bis-e AI: 9.8 |
not treated | [WTS] [JSN] | |
R1-2303826 | Work Plan for Rel-18 WI on XR Enhancements for NR | Work Plan | Nokia, Qualcomm (Rapporteurs), Ericsson (RAN1 FL) | NR_XR_enh-Core | Rel-18 |
R1-112-bis-e AI: 9.8 |
not treated | [WTS] [JSN] | |
R1-2304041 | Moderator Summary#1 - PDCCH monitoring resume after UL NACK | discussion | Moderator (Ericsson) | NR_XR_enh-Core | Rel-18 |
R1-112-bis-e AI: 9.8 |
noted | [WTS] [JSN] | |
R1-2304042 | Moderator Summary#2 - PDCCH monitoring resume after UL NACK | discussion | Moderator (Ericsson) | NR_XR_enh-Core | Rel-18 |
R1-112-bis-e AI: 9.8 |
noted | [WTS] [JSN] | |
R1-2304043 | Moderator Summary#3 - PDCCH monitoring resume after UL NACK | discussion | Moderator (Ericsson) | NR_XR_enh-Core | Rel-18 |
R1-112-bis-e AI: 9.8 |
noted | [WTS] [JSN] |
9 documents (0.3211088180542 seconds)