Please enter the search related information in the fields below. Partial information works, e.g. "SP-21
" in the "tdoc" field lists all TSG SA documents from 2021. Regular expressions mostly work in all fields (e.g. "2[34].501
" in the "Spec" field lists all documents related to 23.501 and 24.501. Capitalization is disregarded, i.e. "3GPP
" gives the same results as "3gpp
".
Download results in JSON format
tdoc | Title | Type / Revs | Source | Spec / CR | S/WID | Release | Meeting | Status | Links |
---|---|---|---|---|---|---|---|---|---|
S2-2200266 | New Key Issue: Network Information exposure from 5G system to DetNet controller. | pCR | Huawei, HiSilicon | 23.700-46 0.0.0 | FS_DetNet | Rel-18 |
S2-149-e AI: 9.6 |
not treated | [WTS] [JSN] |
S2-2200267 | New Key Issue: Parameter mapping between DetNet controller and 5G system. |
pCR revised to S2-2201757 |
Huawei, HiSilicon | 23.700-46 0.0.0 | FS_DetNet | Rel-18 |
S2-149-e AI: 9.6 |
revised | [WTS] [JSN] |
S2-2200291 | Architecture assumption for DetNet . |
pCR revised to S2-2201756 |
Nokia, Nokia Shanghai Bell | 23.700-46 0.0.0 | FS_DetNet | Rel-18 |
S2-149-e AI: 9.6 |
revised | [WTS] [JSN] |
S2-2200292 | Key Issue for DetNet controller to 5GS interface. | pCR | Nokia, Nokia Shanghai Bell | 23.700-46 0.0.0 | FS_DetNet | Rel-18 |
S2-149-e AI: 9.6 |
merged | [WTS] [JSN] |
S2-2200304 | TR 23.700-46: Study on 5GS DetNet interworking | pCR | Ericsson | 23.700-46 0.0.0 | FS_DetNet | Rel-18 |
S2-149-e AI: 9.6 |
approved | [WTS] [JSN] |
S2-2200305 | Scope and Assumptions for the DetNet study. |
pCR revised to S2-2201754 |
Ericsson | 23.700-46 0.0.0 | FS_DetNet | Rel-18 |
S2-149-e AI: 9.6 |
revised | [WTS] [JSN] |
S2-2200306 | Key issues for the DetNet study. | pCR | Ericsson | 23.700-46 0.0.0 | FS_DetNet | Rel-18 |
S2-149-e AI: 9.6 |
not treated | [WTS] [JSN] |
S2-2200307 | Clarifying assumptions for the DetNet study. |
pCR revised to S2-2201755 |
Ericsson | 23.700-46 0.0.0 | FS_DetNet | Rel-18 |
S2-149-e AI: 9.6 |
revised | [WTS] [JSN] |
S2-2200356 | Adding architecture assumption and reference architecture. | pCR | ZTE | 23.700-46 0.0.0 | FS_DetNet | Rel-18 |
S2-149-e AI: 9.6 |
not treated | [WTS] [JSN] |
S2-2200357 | Adding Key issue on DetNet node capability reporting. |
pCR revised to S2-2201758 |
ZTE | 23.700-46 0.0.0 | FS_DetNet | Rel-18 |
S2-149-e AI: 9.6 |
revised | [WTS] [JSN] |
S2-2200358 | Adding Key issue on DetNet configuration mapping. | pCR | ZTE | 23.700-46 0.0.0 | FS_DetNet | Rel-18 |
S2-149-e AI: 9.6 |
not treated | [WTS] [JSN] |
S2-2200948 | New Key Issue on Exposure of QoS Information to the DetNet Controller. | pCR | Xiaomi, | 23.700-46 0.0.0 | FS_DetNet | Rel-18 |
S2-149-e AI: 9.6 |
not treated | [WTS] [JSN] |
S2-2200956 | New key issues for DetNet traffic management. | pCR | ETRI | 23.700-46 0.0.0 | FS_DetNet | Rel-18 |
S2-149-e AI: 9.6 |
merged | [WTS] [JSN] |
S2-2200962 | Key issues for the DetNet study. | pCR | NTT DOCOMO | 23.700-46 0.0.0 | FS_DetNet | Rel-18 |
S2-149-e AI: 9.6 |
merged | [WTS] [JSN] |
S2-2201754 | Scope and Assumptions for the DetNet study. |
pCR revision of S2-2200305 |
Ericsson | 23.700-46 0.0.0 | FS_DetNet | Rel-18 |
S2-149-e AI: 9.6 |
approved | [WTS] [JSN] |
S2-2201755 | Clarifying assumptions for the DetNet study. |
pCR revision of S2-2200307 |
Ericsson | 23.700-46 0.0.0 | FS_DetNet | Rel-18 |
S2-149-e AI: 9.6 |
approved | [WTS] [JSN] |
S2-2201756 | Architecture assumption for DetNet . |
pCR revision of S2-2200291 |
Nokia, Nokia Shanghai Bell, Ericsson | 23.700-46 0.0.0 | FS_DetNet | Rel-18 |
S2-149-e AI: 9.6 |
approved | [WTS] [JSN] |
S2-2201757 | New Key Issue: Parameter mapping between DetNet controller and 5G system. |
pCR revision of S2-2200267 |
Huawei, HiSilicon | 23.700-46 0.0.0 | FS_DetNet | Rel-18 |
S2-149-e AI: 9.6 |
approved | [WTS] [JSN] |
S2-2201758 | Adding Key issue on DetNet node capability reporting. |
pCR revision of S2-2200357 |
ZTE | 23.700-46 0.0.0 | FS_DetNet | Rel-18 |
S2-149-e AI: 9.6 |
approved | [WTS] [JSN] |
19 documents (0.3306360244751 seconds)