Please enter the search related information in the fields below. Partial information works, e.g. "SP-21
" in the "tdoc" field lists all TSG SA documents from 2021. Regular expressions mostly work in all fields (e.g. "2[34].501
" in the "Spec" field lists all documents related to 23.501 and 24.501. Capitalization is disregarded, i.e. "3GPP
" gives the same results as "3gpp
".
Download results in JSON format
tdoc | Title | Type / Revs | Source | Spec / CR | S/WID | Release | Meeting | Status | Links |
---|---|---|---|---|---|---|---|---|---|
R2-163465 | RRC/RRM for LTE-NR interworking | discussion | CATT | FS_NR_newRAT |
R2-94 AI: 9.4.3.1 |
available | [WTS] [JSN] | ||
R2-163467 | Control plane for support of tight interworking between NR and LTE | discussion | CATT | FS_NR_newRAT |
R2-94 AI: 9.4.3.1 |
available | [WTS] [JSN] | ||
R2-163510 | Definition of Single and multiple RRC connections | discussion | Nokia, Alcatel-Lucent Shanghai Bell | Rel-14 |
R2-94 AI: 9.4.3.1 |
noted | [WTS] [JSN] | ||
R2-163511 | Control plane options for RRC in LTE NR tight interworking | discussion | Nokia, Alcatel-Lucent Shanghai Bell | Rel-14 |
R2-94 AI: 9.4.3.1 |
noted | [WTS] [JSN] | ||
R2-163587 | RRC aspects for LTE-NR interworking | discussion | Intel corporation | FS_NR_newRAT | Rel-14 |
R2-94 AI: 9.4.3.1 |
available | [WTS] [JSN] | |
R2-163696 | Initial considerations on C-plane Protocol Design for LTE-NR Tight Interworking | discussion | Shenzhen Coolpad Technologies | Rel-14 |
R2-94 AI: 9.4.3.1 |
available | [WTS] [JSN] | ||
R2-163708 | Considerations on control plane for LTE-NR dual connectivity | discussion | CMCC | FS_NR_newRAT | Rel-14 |
R2-94 AI: 9.4.3.1 |
available | [WTS] [JSN] | |
R2-163739 | Consideration on the Dual RRC for LTE NR tight interworking | discussion | ZTE Corporation | FS_NR_newRAT | Rel-14 |
R2-94 AI: 9.4.3.1 |
available | [WTS] [JSN] | |
R2-163741 | Discussion on control plane for the DC based LTE NR tight interworking | discussion | ZTE Corporation | FS_NR_newRAT | Rel-14 |
R2-94 AI: 9.4.3.1 |
available | [WTS] [JSN] | |
R2-163791 | UE Capabilities Issues for tight interworking between NR and LTE | discussion | ITRI | FS_NR_newRAT | Rel-14 |
R2-94 AI: 9.4.3.1 |
available | [WTS] [JSN] | |
R2-163794 | Control plane architecture for tight interworking between NR and LTE | discussion | ITRI | FS_NR_newRAT | Rel-14 |
R2-94 AI: 9.4.3.1 |
available | [WTS] [JSN] | |
R2-163845 | Consideration on control plane for tight interworking between NR and LTE | discussion | KT Corporation |
R2-94 AI: 9.4.3.1 |
available | [WTS] [JSN] | |||
R2-163940 | RRC states for LTE-NR tight integration | discussion | Sony | FS_NR_newRAT | Rel-14 |
R2-94 AI: 9.4.3.1 |
available | [WTS] [JSN] | |
R2-163974 | System Information handling for LTE-NR tight interworking | discussion | NTT DOCOMO, INC. | FS_NR_newRAT | Rel-14 |
R2-94 AI: 9.4.3.1 |
available | [WTS] [JSN] | |
R2-164069 | NR Control Plane Latency and Deployment Scenarios | discussion | Convida Wireless | FS_NR_newRAT |
R2-94 AI: 9.4.3.1 |
available | [WTS] [JSN] | ||
R2-164091 | Control Plane Architecture for Interworking between NR and LTE | discussion | INTERDIGITAL COMMUNICATIONS | FS_NR_newRAT | Rel-14 |
R2-94 AI: 9.4.3.1 |
available | [WTS] [JSN] | |
R2-164093 | Control Plane Functions for Interworking between NR and LTE | discussion | INTERDIGITAL COMMUNICATIONS | FS_NR_newRAT | Rel-14 |
R2-94 AI: 9.4.3.1 |
available | [WTS] [JSN] | |
R2-164211 | CP architecture in tight interworking | discussion | NEC | FS_NR_newRAT | Rel-14 |
R2-94 AI: 9.4.3.1 |
available | [WTS] [JSN] | |
R2-164231 | Partial UE-centric Mobility in NR-LTE interworking scenario | discussion | LG Electronics Inc. | Rel-14 |
R2-94 AI: 9.4.3.1 |
available | [WTS] [JSN] | ||
R2-164268 | LTE-NR tight interworking control plane | discussion | Huawei, HiSilicon | FS_NR_newRAT | Rel-14 |
R2-94 AI: 9.4.3.1 |
available | [WTS] [JSN] |
20 documents (0.32648086547852 seconds)