Please enter the search related information in the fields below. Partial information works, e.g. "SP-21" in the "tdoc" field lists all TSG SA documents from 2021. Regular expressions mostly work in all fields (e.g. "2[34].501" in the "Spec" field lists all documents related to 23.501 and 24.501. Capitalization is disregarded, i.e. "3GPP" gives the same results as "3gpp".

Download results in JSON format

tdoc Title Type / Revs Source Spec / CR S/WID Release Meeting Status Links
R4-2300033 Discussion on mmWave multi-band BS massive MIMO antenna systems discussion IIT Delhi Rel-18 R4-106

AI: 9.4.2

withdrawn [WTS] [JSN]
R4-2300192 TP to TR 38.877: DPD in FR2 multiband BS pCR

revised to R4-2302896

Nokia, Nokia Shanghai Bell 38.877 0.2.0 FS_NR_BS_RF_evo Rel-18 R4-106

AI: 9.4.2

revised [WTS] [JSN]
R4-2300614 Discussion on antenna elements separation for fully steerable array discussion IIT JODHPUR Rel-18 R4-106

AI: 9.4.2

withdrawn [WTS] [JSN]
R4-2300636 Discussion on antenna elements separation for fully steerable array discussion IIT JODHPUR, IIT DELHI R4-106

AI: 9.4.2

noted [WTS] [JSN]
R4-2300637 Discussion on mmWave multi-band BS massive MIMO antenna systems discussion IIT Delhi, IIT Jodhpur Rel-18 R4-106

AI: 9.4.2

noted [WTS] [JSN]
R4-2301420 Further discussion of mmWave multi-band BS feasibility other Huawei, HiSilicon R4-106

AI: 9.4.2

noted [WTS] [JSN]
R4-2301421 TP on RF front end capability pCR

revised to R4-2302898

Huawei, HiSilicon 38.877 0.1.0 FS_NR_BS_RF_evo Rel-18 R4-106

AI: 9.4.2

revised [WTS] [JSN]
R4-2301422 TP on Antenna array capability pCR

revised to R4-2302897

Huawei, HiSilicon 38.877 0.1.0 FS_NR_BS_RF_evo Rel-18 R4-106

AI: 9.4.2

revised [WTS] [JSN]
R4-2301423 On general section 5.1 discussion Huawei, HiSilicon R4-106

AI: 9.4.2

noted [WTS] [JSN]
R4-2301424 DPD for multi-band FR2 BS discussion Huawei, HiSilicon R4-106

AI: 9.4.2

noted [WTS] [JSN]
R4-2301740 TP to TR 38.877: phase shifter in FR2 multiband BS pCR

revised to R4-2302899

ZTE Corporation 38.877 0.1.0 FS_NR_BS_RF_evo Rel-18 R4-106

AI: 9.4.2

revised [WTS] [JSN]
R4-2301881 TP to TR 38.877: General paragraph for feasibility aspects pCR

revised to R4-2302895

Ericsson 38.877 0.1.0 FS_NR_BS_RF_evo Rel-18 R4-106

AI: 9.4.2

revised [WTS] [JSN]
R4-2301882 TP to TR 38.877: Other feasibility aspects pCR

revised to R4-2302900

Ericsson 38.877 0.1.0 FS_NR_BS_RF_evo Rel-18 R4-106

AI: 9.4.2

revised [WTS] [JSN]
R4-2302895 TP to TR 38.877: General paragraph for feasibility aspects pCR

revision of R4-2301881

Ericsson 38.877 0.1.0 FS_NR_BS_RF_evo Rel-18 R4-106

AI: 9.4.2

approved [WTS] [JSN]
R4-2302896 TP to TR 38.877: DPD in FR2 multiband BS pCR

revision of R4-2300192

Nokia, Nokia Shanghai Bell 38.877 0.2.0 FS_NR_BS_RF_evo Rel-18 R4-106

AI: 9.4.2

approved [WTS] [JSN]
R4-2302897 TP on Antenna array capability pCR

revision of R4-2301422

Huawei, HiSilicon, IIT Jodhpur, IIT Delhi 38.877 0.1.0 FS_NR_BS_RF_evo Rel-18 R4-106

AI: 9.4.2

approved [WTS] [JSN]
R4-2302898 TP on RF front end capability pCR

revision of R4-2301421

Huawei, HiSilicon 38.877 0.1.0 FS_NR_BS_RF_evo Rel-18 R4-106

AI: 9.4.2

approved [WTS] [JSN]
R4-2302899 TP to TR 38.877: phase shifter in FR2 multiband BS pCR

revision of R4-2301740

ZTE Corporation 38.877 0.1.0 FS_NR_BS_RF_evo Rel-18 R4-106

AI: 9.4.2

approved [WTS] [JSN]
R4-2302900 TP to TR 38.877: Other feasibility aspects pCR

revision of R4-2301882

Ericsson 38.877 0.1.0 FS_NR_BS_RF_evo Rel-18 R4-106

AI: 9.4.2

approved [WTS] [JSN]

19 documents (0.31378698348999 seconds)