Please enter the search related information in the fields below. Partial information works, e.g. "SP-21" in the "tdoc" field lists all TSG SA documents from 2021. Regular expressions mostly work in all fields (e.g. "2[34].501" in the "Spec" field lists all documents related to 23.501 and 24.501. Capitalization is disregarded, i.e. "3GPP" gives the same results as "3gpp".
Download results in JSON format
| tdoc | Title | Type / Revs | Source | Spec / CR | S/WID | Release | Meeting | Status | Links |
|---|---|---|---|---|---|---|---|---|---|
| RP-172307 | Status report of SI on separation of CP and UP for split option 2 of NR; rapporteur: Ericsson | WI status report | RAN3 | FS_NR_CPUP_Split | Rel-15 |
RP-78 AI: 9.3.8 |
noted | [WTS] [JSN] | |
| RP-172308 | Reflections on the outcome of the SI on CP-UP separation | discussion | Ericsson, Vodafone, AT&T, KT, Nokia, Intel, Charter Communications | FS_NR_CPUP_Split | Rel-15 |
RP-78 AI: 9.3.8 |
noted | [WTS] [JSN] | |
| RP-172466 | TR 38.806 v1.0.0 Study of separation of NR Control Plane (CP) and User Plane (UP) for split option 2; for approval | draft TR | Ericsson | FS_NR_CPUP_Split | Rel-15 |
RP-78 AI: 9.3.8 |
approved | [WTS] [JSN] |
3 documents (0.36404299736023 seconds)