Please enter the search related information in the fields below. Partial information works, e.g. "SP-21
" in the "tdoc" field lists all TSG SA documents from 2021. Regular expressions mostly work in all fields (e.g. "2[34].501
" in the "Spec" field lists all documents related to 23.501 and 24.501. Capitalization is disregarded, i.e. "3GPP
" gives the same results as "3gpp
".
Download results in JSON format
tdoc | Title | Type / Revs | Source | Spec / CR | S/WID | Release | Meeting | Status | Links |
---|---|---|---|---|---|---|---|---|---|
RP-190162 | Revised SID: Feasibility Study on 6 GHz for LTE and NR in Licensed and Unlicensed Operations |
SID revised revised to RP-190681 |
Ericsson | FS_6GHz_LTE_NR | Rel-16 |
RP-83 AI: 9.3.3 |
revised | [WTS] [JSN] | |
RP-190163 | Status Report for SI Feasibility Study on 6 GHz for LTE and NR in Licensed and Unlicensed Operations; rapporteur: Ericsson | WI status report | Ericsson | FS_6GHz_LTE_NR | Rel-16 |
RP-83 AI: 9.3.3 |
noted | [WTS] [JSN] | |
RP-190164 | Regulatory updates on 5.925-7.125 GHz frequency range | discussion | Ericsson | FS_6GHz_LTE_NR | Rel-16 |
RP-83 AI: 9.3.3 |
noted | [WTS] [JSN] | |
RP-190681 | Revised SID: Feasibility Study on 6 GHz for LTE and NR in Licensed and Unlicensed Operations |
SID revised revision of RP-190162 |
Ericsson | FS_6GHz_LTE_NR | Rel-16 |
RP-83 AI: 9.3.3 |
approved | [WTS] [JSN] |
4 documents (0.31723594665527 seconds)