Please enter the search related information in the fields below. Partial information works, e.g. "SP-21
" in the "tdoc" field lists all TSG SA documents from 2021. Regular expressions mostly work in all fields (e.g. "2[34].501
" in the "Spec" field lists all documents related to 23.501 and 24.501. Capitalization is disregarded, i.e. "3GPP
" gives the same results as "3gpp
".
Download results in JSON format
tdoc | Title | Type / Revs | Source | Spec / CR | S/WID | Release | Meeting | Status | Links |
---|---|---|---|---|---|---|---|---|---|
RP-190187 | Use-cases for FS_NR_beyond_52GHz | discussion | Charter Communications, Inc | FS_NR_beyond_52GHz | Rel-16 |
RP-83 AI: 9.3.12 |
not treated | [WTS] [JSN] | |
RP-190207 | Discussions on potential use cases and deployment scenarios beyond 52.6GHz | discussion | ZTE, Sanechips | FS_NR_beyond_52GHz | Rel-16 |
RP-83 AI: 9.3.12 |
not treated | [WTS] [JSN] | |
RP-190208 | Review Draft TP to TR 38.807 - Operational requirements: spectrum availability and regulatory requirements |
pCR revised to RP-190571 |
ZTE, Sanechips | 38.807 0.0.4 | FS_NR_beyond_52GHz | Rel-16 |
RP-83 AI: 9.3.12 |
revised | [WTS] [JSN] |
RP-190239 | Use cases and deployment scenarios for NR>52.6 | discussion | Qualcomm India Pvt Ltd | FS_NR_beyond_52GHz | Rel-16 |
RP-83 AI: 9.3.12 |
not treated | [WTS] [JSN] | |
RP-190281 | Use case and design requirements for NR beyond 52.6 GHz | discussion | vivo | FS_NR_beyond_52GHz | Rel-16 |
RP-83 AI: 9.3.12 |
not treated | [WTS] [JSN] | |
RP-190327 | Use Case and Deployment Scenarios for spectrum above 52.6GHz | discussion | Intel Corporation | FS_NR_beyond_52GHz | Rel-16 |
RP-83 AI: 9.3.12 |
not treated | [WTS] [JSN] | |
RP-190329 | Status report for SI: Study on NR beyond 52.6 GHz; rapporteur: Intel | WI status report | Intel Corporation | FS_NR_beyond_52GHz | Rel-16 |
RP-83 AI: 9.3.12 |
noted | [WTS] [JSN] | |
RP-190330 | TR 38.807 v0.0.5: Study on requirements for NR beyond 52.6 GHz |
draft TR revised to RP-190697 |
Intel Corporation | FS_NR_beyond_52GHz | Rel-16 |
RP-83 AI: 9.3.12 |
revised | [WTS] [JSN] | |
RP-190331 | Draft TP to TR 38.807 – Use Cases and Deployment Scenarios |
pCR revised to RP-190698 |
Intel Corporation | 38.807 0.0.4 | FS_NR_beyond_52GHz | Rel-16 |
RP-83 AI: 9.3.12 |
revised | [WTS] [JSN] |
RP-190345 | NR use cases and scenarios in frequencies above 52.6 GHz | discussion | Huawei, HiSilicon | FS_NR_beyond_52GHz | Rel-16 |
RP-83 AI: 9.3.12 |
not treated | [WTS] [JSN] | |
RP-190357 | Survey on Japanese spectrum usage and regulatory requirements in the frequency band above 52.6GHz | discussion | NTT DOCOMO, INC., KDDI | FS_NR_beyond_52GHz | Rel-16 |
RP-83 AI: 9.3.12 |
withdrawn | [WTS] [JSN] | |
RP-190359 | Survey on Japanese spectrum usage and regulatory requirements in the frequency band above 52.6GHz | discussion | NTT DOCOMO INC., KDDI, Softbank | FS_NR_beyond_52GHz | Rel-16 |
RP-83 AI: 9.3.12 |
not treated | [WTS] [JSN] | |
RP-190470 | Design requirements for NR beyond 52.6 GHz | discussion | Ericsson | FS_NR_beyond_52GHz |
RP-83 AI: 9.3.12 |
not treated | [WTS] [JSN] | ||
RP-190471 | Use Cases and Deployments for Beyond 52.6 GHz | discussion | Ericsson | FS_NR_beyond_52GHz | Rel-16 |
RP-83 AI: 9.3.12 |
not treated | [WTS] [JSN] | |
RP-190472 | TP for TR 38.807: Updates on the Global and CEPT spectrum availability and regulatory requirements for bands beyond 52.6GHz | pCR | Ericsson | 38.807 0.0.4 | FS_NR_beyond_52GHz | Rel-16 |
RP-83 AI: 9.3.12 |
not treated | [WTS] [JSN] |
RP-190492 | NR beyond 52.6GHz – Potential use cases and deployment scenarios | discussion | Nokia, Nokia Shanghai Bell | FS_NR_beyond_52GHz | Rel-16 |
RP-83 AI: 9.3.12 |
not treated | [WTS] [JSN] | |
RP-190495 | NR beyond 52.6GHz – Design requirements and considerations | discussion | Nokia, Nokia Shanghai Bell | Rel-16 |
RP-83 AI: 9.3.12 |
not treated | [WTS] [JSN] | ||
RP-190568 | pCR to TR 38.807 v0.0.4 on Operational Requirements |
pCR revised to RP-190614 |
Intel | 38.807 0.0.4 | FS_NR_beyond_52GHz | Rel-16 |
RP-83 AI: 9.3.12 |
revised | [WTS] [JSN] |
RP-190571 | pCR to TR 38.807 regarding Operational requirements: spectrum availability and regulatory requirements |
pCR revision of RP-190208 |
ZTE, Sanechips | 38.807 0.0.4 | FS_NR_beyond_52GHz | Rel-16 |
RP-83 AI: 9.3.12 |
not treated | [WTS] [JSN] |
RP-190614 | pCR to TR 38.807 v0.0.4 on Operational Requirements |
pCR revision of RP-190568 revised to RP-190694 |
Intel | 38.807 0.0.4 | FS_NR_beyond_52GHz | Rel-16 |
RP-83 AI: 9.3.12 |
revised | [WTS] [JSN] |
RP-190694 | pCR to TR 38.807 v0.0.4 on Operational Requirements |
pCR revision of RP-190614 |
Intel | 38.807 0.0.4 | FS_NR_beyond_52GHz | Rel-16 |
RP-83 AI: 9.3.12 |
approved | [WTS] [JSN] |
RP-190695 | Revised SID on Study on NR beyond 52.6 GHz | SID revised | Intel | FS_NR_beyond_52GHz | Rel-16 |
RP-83 AI: 9.3.12 |
rejected | [WTS] [JSN] | |
RP-190697 | TR 38.807 v0.1.0: Study on requirements for NR beyond 52.6 GHz |
draft TR revision of RP-190330 |
Intel Corporation | FS_NR_beyond_52GHz | Rel-16 |
RP-83 AI: 9.3.12 |
agreed | [WTS] [JSN] | |
RP-190698 | Draft TP to TR 38.807 – Use Cases and Deployment Scenarios |
pCR revision of RP-190331 |
Intel Corporation | 38.807 0.0.4 | FS_NR_beyond_52GHz | Rel-16 |
RP-83 AI: 9.3.12 |
postponed | [WTS] [JSN] |
24 documents (0.31276297569275 seconds)