Please enter the search related information in the fields below. Partial information works, e.g. "SP-21
" in the "tdoc" field lists all TSG SA documents from 2021. Regular expressions mostly work in all fields (e.g. "2[34].501
" in the "Spec" field lists all documents related to 23.501 and 24.501. Capitalization is disregarded, i.e. "3GPP
" gives the same results as "3gpp
".
Download results in JSON format
tdoc | Title | Type / Revs | Source | Spec / CR | S/WID | Release | Meeting | Status | Links |
---|---|---|---|---|---|---|---|---|---|
S2-2202278 | KI 1, New Sol: Exposing UE provided unavailability period via Loss of Connectivity event subscription. |
pCR revised to S2-2203389 |
LG Electronics | 23.700-61 0.1.0 | FS_SUECR | Rel-18 |
S2-150-e AI: 9.27 |
revised | [WTS] [JSN] |
S2-2202365 | KI #1, New Solution: Usage of MICO mode for UE unavailability period management. | pCR | Nokia, Nokia Shanghai Bell | 23.700-61 0.1.0 | FS_SUECR | Rel-18 |
S2-150-e AI: 9.27 |
approved | [WTS] [JSN] |
S2-2202560 | FS_SUECR Solution for Determination of unavailability period in 5GS for a specific UE. |
pCR revised to S2-2203390 |
Vivo | 23.700-61 0.1.0 | FS_SUECR | Rel-18 |
S2-150-e AI: 9.27 |
revised | [WTS] [JSN] |
S2-2202885 | Solution to KI#1: UE provided Unavailability Period. | pCR | Qualcomm Inc | 23.700-61 0.1.0 | FS_SUECR | Rel-18 |
S2-150-e AI: 9.27 |
approved | [WTS] [JSN] |
S2-2202942 | 23.700-61: Solution for KI #1 Determination of unavailability period in 5GS. | pCR | Apple | 23.700-61 0.1.0 | FS_SUECR | Rel-18 |
S2-150-e AI: 9.27 |
approved | [WTS] [JSN] |
S2-2202944 | Determination of unavailability period in 5GS for a specific UE. |
pCR revised to S2-2203391 |
Samsung | 23.700-61 0.1.0 | FS_SUECR | Rel-18 |
S2-150-e AI: 9.27 |
revised | [WTS] [JSN] |
S2-2202946 | Solution for unavailability period using NAS MO. | pCR | Samsung | 23.700-61 0.1.0 | FS_SUECR | Rel-18 |
S2-150-e AI: 9.27 |
noted | [WTS] [JSN] |
S2-2203389 | KI 1, New Sol: Exposing UE provided unavailability period via Loss of Connectivity event subscription. |
pCR revision of S2-2202278 |
LG Electronics | 23.700-61 0.1.0 | FS_SUECR | Rel-18 |
S2-150-e AI: 9.27 |
approved | [WTS] [JSN] |
S2-2203390 | FS_SUECR Solution for Determination of unavailability period in 5GS for a specific UE. |
pCR revision of S2-2202560 |
Vivo | 23.700-61 0.1.0 | FS_SUECR | Rel-18 |
S2-150-e AI: 9.27 |
approved | [WTS] [JSN] |
S2-2203391 | Determination of unavailability period in 5GS for a specific UE. |
pCR revision of S2-2202944 |
Samsung | 23.700-61 0.1.0 | FS_SUECR | Rel-18 |
S2-150-e AI: 9.27 |
approved | [WTS] [JSN] |
10 documents (0.32892203330994 seconds)