Please enter the search related information in the fields below. Partial information works, e.g. "SP-21" in the "tdoc" field lists all TSG SA documents from 2021. Regular expressions mostly work in all fields (e.g. "2[34].501" in the "Spec" field lists all documents related to 23.501 and 24.501. Capitalization is disregarded, i.e. "3GPP" gives the same results as "3gpp".

Download results in JSON format

tdoc Title Type / Revs Source Spec / CR S/WID Release Meeting Status Links
S2-2202102 KI#1: New Solution for UE-to-UE relay discovery. pCR

revised to S2-2203132

Ericsson 23.700-33 0.1.1 FS_5G_ProSe_Ph2 Rel-18 S2-150-e

AI: 9.26

revised [WTS] [JSN]
S2-2202103 Resolving EN for terms for UE-to-UE Relaying. pCR Ericsson 23.700-33 0.1.1 FS_5G_ProSe_Ph2 Rel-18 S2-150-e

AI: 9.26

not treated [WTS] [JSN]
S2-2202291 Solution for KI# 4: path switching for Layer-2 UE-to-Network Relay with session continuity. pCR

revised to S2-2203144

OPPO 23.700-33 0.1.1 FS_5G_ProSe_Ph2 Rel-18 S2-150-e

AI: 9.26

revised [WTS] [JSN]
S2-2202323 Moving UE-to-UE Relay solutions from TR 23.752 into TR 23.700-33. pCR CATT, OPPO, Intel, Huawei, HiSilicon 23.700-33 0.1.1 FS_5G_ProSe_Ph2 Rel-18 S2-150-e

AI: 9.26

approved [WTS] [JSN]
S2-2202324 Solution for Layer-3 UE-to-UE Relay. pCR

revised to S2-2203135

CATT 23.700-33 0.1.1 FS_5G_ProSe_Ph2 Rel-18 S2-150-e

AI: 9.26

revised [WTS] [JSN]
S2-2202325 Solution for Layer-2 UE-to-UE Relay. pCR CATT 23.700-33 0.1.1 FS_5G_ProSe_Ph2 Rel-18 S2-150-e

AI: 9.26

noted [WTS] [JSN]
S2-2202326 New solution on direct communication path switching between PC5 and Uu reference points. pCR CATT 23.700-33 0.1.1 FS_5G_ProSe_Ph2 Rel-18 S2-150-e

AI: 9.26

approved [WTS] [JSN]
S2-2202333 Consolidated solution for UE-to-UE Relay discovery and selection based on Model A and Model B discovery. pCR

revision of S2-2200624

revised to S2-2203133

OPPO, Ericsson 23.700-33 0.1.1 FS_5G_ProSe_Ph2 Rel-18 S2-150-e

AI: 9.26

revised [WTS] [JSN]
S2-2202335 Consolidated solution for L3 UE-to-UE Relay communication setup after Model A and Model B discovery. pCR

revision of S2-2200625

revised to S2-2203134

OPPO, Ericsson 23.700-33 0.1.1 FS_5G_ProSe_Ph2 Rel-18 S2-150-e

AI: 9.26

revised [WTS] [JSN]
S2-2202416 KI#3, New Solution: Provisioning consistent URSP to UE across 5GS and EPS for Single PCF Deployment pCR Intel 23.700-85 0.1.0 FS_eUEPO Rel-18 S2-150-e

AI: 9.26

approved [WTS] [JSN]
S2-2202463 KI#6 Update: Addition of path switching policy. pCR Huawei, HiSilicon 23.700-33 0.1.0 FS_5G_ProSe_Ph2 Rel-18 S2-150-e

AI: 9.26

approved [WTS] [JSN]
S2-2202464 KI#1 Solution: Determination of U2U Relay type using RSC and Policy. pCR Huawei, HiSilicon 23.700-33 0.1.0 FS_5G_ProSe_Ph2 Rel-18 S2-150-e

AI: 9.26

not treated [WTS] [JSN]
S2-2202465 KI#3 Solution: Path switching from PC5 path to Uu path. pCR

revision of S2-2200934

revised to S2-2203138

Huawei, HiSilicon 23.700-33 0.1.0 FS_5G_ProSe_Ph2 Rel-18 S2-150-e

AI: 9.26

revised [WTS] [JSN]
S2-2202466 KI#5 Solution: Multi-path transmission via Layer-2 U2N Relay. pCR

revised to S2-2203146

Huawei, HiSilicon 23.700-33 0.1.0 FS_5G_ProSe_Ph2 Rel-18 S2-150-e

AI: 9.26

revised [WTS] [JSN]
S2-2202484 TR 23.700-33: New solution for UE Negotiation-based path switching from PC5 to Uu. pCR

revised to S2-2203139

Vivo 23.700-33 0.1.1 FS_5G_ProSe_Ph2 Rel-18 S2-150-e

AI: 9.26

revised [WTS] [JSN]
S2-2202485 TR 23.700-33: New solution for UE Negotiation-based path switching from Uu to PC5. pCR Vivo 23.700-33 0.1.1 FS_5G_ProSe_Ph2 Rel-18 S2-150-e

AI: 9.26

not treated [WTS] [JSN]
S2-2202486 TR 23.700-33: Criteria for two indirect network paths switching. pCR

revised to S2-2203136

Vivo 23.700-33 0.1.1 FS_5G_ProSe_Ph2 Rel-18 S2-150-e

AI: 9.26

revised [WTS] [JSN]
S2-2202487 TR 23.700-33: Solution for Multi-Path with Layer-3 relay without N3IWF. pCR

revised to S2-2203147

Vivo 23.700-33 0.1.1 FS_5G_ProSe_Ph2 Rel-18 S2-150-e

AI: 9.26

revised [WTS] [JSN]
S2-2202488 TR 23.700-33: New solution for emergency service support. pCR

revised to S2-2204230

Vivo 23.700-33 0.1.1 FS_5G_ProSe_Ph2 Rel-18 S2-150-e

AI: 9.26

not treated [WTS] [JSN]
S2-2202497 Solution for Path Switching between PC5 and Uu Based on Path Preference Policy. pCR

revised to S2-2203140

ZTE 23.700-33 0.1.1 FS_5G_ProSe_Ph2 Rel-18 S2-150-e

AI: 9.26

revised [WTS] [JSN]
S2-2202502 Solution for Multi-path transmission for Layer-2 UE-to-Network Relay. pCR

revised to S2-2204225

ZTE 23.700-33 0.1.1 FS_5G_ProSe_Ph2 Rel-18 S2-150-e

AI: 9.26

postponed [WTS] [JSN]
S2-2202504 New Solution for emergency services over U2N Relay. pCR

revised to S2-2203959

Apple 23.700-33 0.1.1 FS_5G_ProSe_Ph2 Rel-18 S2-150-e

AI: 9.26

not treated [WTS] [JSN]
S2-2202505 Solution for supporting emergency services for 5G ProSe Layer-3 UE-to-Network Relay. pCR

revised to S2-2204226

ZTE 23.700-33 0.1.1 FS_5G_ProSe_Ph2 Rel-18 S2-150-e

AI: 9.26

not treated [WTS] [JSN]
S2-2202550 KI#3, New Sol: Switching back to PC5 path. pCR

revised to S2-2203141

LG Electronics 23.700-33 0.1.1 FS_5G_ProSe_Ph2 Rel-18 S2-150-e

AI: 9.26

revised [WTS] [JSN]
S2-2202592 Solution for switching between two indirect L3 UE-to-Network Relay paths using N3IWF. pCR

revision of S2-2201007

Nokia, Nokia Shanghai Bell 23.700-33 0.1.1 FS_5G_ProSe_Ph2 Rel-18 S2-150-e

AI: 9.26

not treated [WTS] [JSN]
S2-2202599 New solution: Emergency call via 5G ProSe Layer-3 UE-to-Network Relay. pCR Nokia, Nokia Shanghai Bell 23.700-33 0.1.1 FS_5G_ProSe_Ph2 Rel-18 S2-150-e

AI: 9.26

not treated [WTS] [JSN]
S2-2202600 Solution for multi-path support in case of L3 U2N relay with N3IWF. pCR Nokia, Nokia Shanghai Bell 23.700-33 0.1.1 FS_5G_ProSe_Ph2 Rel-18 S2-150-e

AI: 9.26

merged [WTS] [JSN]
S2-2202618 KI#3, New Sol: Support direct communication path switching between PC5 and Uu. pCR

revised to S2-2203142

Samsung 23.700-33 0.1.1 FS_5G_ProSe_Ph2 Rel-18 S2-150-e

AI: 9.26

revised [WTS] [JSN]
S2-2202644 New Key Issue on Support of Emergency Services for UE to Network Relaying. pCR

revised to S2-2203131

Ericsson, AT&T, Apple, [vivo], Samsung, [Nokia, Nokia Shanghai Bell, OPPO] 23.700-33 0.1.1 FS_5G_ProSe_Ph2 Rel-18 S2-150-e

AI: 9.26

revised [WTS] [JSN]
S2-2202645 New solution to KI of Emergency Services for UE-to-Network Relaying. pCR Ericsson 23.700-33 0.1.1 FS_5G_ProSe_Ph2 Rel-18 S2-150-e

AI: 9.26

not treated [WTS] [JSN]
S2-2202703 New solution for KI#5 on multi-path to improve reliability or data rates. pCR China Telecom 23.700-33 0.1.1 FS_5G_ProSe_Ph2 Rel-18 S2-150-e

AI: 9.26

postponed [WTS] [JSN]
S2-2202772 TR 23.700-33: KI#2, new solutions for path switching between two indirect paths. pCR

revised to S2-2203137

Qualcomm Incorporated 23.700-33 0.1.1 FS_5G_ProSe_Ph2 Rel-18 S2-150-e

AI: 9.26

revised [WTS] [JSN]
S2-2202844 TR 23.700-33: KI#4, new solutions for path switching between direct and indirect paths. pCR

revised to S2-2203145

Qualcomm Incorporated 23.700-33 0.1.1 FS_5G_ProSe_Ph2 Rel-18 S2-150-e

AI: 9.26

revised [WTS] [JSN]
S2-2202849 TR 23.700-33: KI#5, new solution for multi-path transmission for UE-to-Network Relay. pCR

revised to S2-2203148

Qualcomm Incorporated 23.700-33 0.1.1 FS_5G_ProSe_Ph2 Rel-18 S2-150-e

AI: 9.26

revised [WTS] [JSN]
S2-2202868 New Sol: Emergency support via 5G ProSe Layer-3 UE-to-Network Relay. pCR

revised to S2-2204372

Samsung 23.700-33 0.1.1 FS_5G_ProSe_Ph2 Rel-18 S2-150-e

AI: 9.26

not treated [WTS] [JSN]
S2-2202894 Solution for KI#5 multi-path transmission for UE-to-Network Relay. pCR

revised to S2-2203149

Xiaomi 23.700-33 0.1.0 FS_5G_ProSe_Ph2 Rel-18 S2-150-e

AI: 9.26

revised [WTS] [JSN]
S2-2202953 Solution: UE-to-UE Relay Reselection. pCR Interdigital 23.700-33 0.1.0 FS_5G_ProSe_Ph2 Rel-18 S2-150-e

AI: 9.26

not treated [WTS] [JSN]
S2-2202954 Solution: Link Identifier Update procedure when using UE-to-UE Relay. pCR Interdigital 23.700-33 0.1.0 FS_5G_ProSe_Ph2 Rel-18 S2-150-e

AI: 9.26

postponed [WTS] [JSN]
S2-2202955 Solution: Link Establishment procedure via Layer-2 UE-to-UE Relay. pCR

revised to S2-2203150

Interdigital 23.700-33 0.1.0 FS_5G_ProSe_Ph2 Rel-18 S2-150-e

AI: 9.26

revised [WTS] [JSN]
S2-2202956 Solution: Layer-3 UE-to-UE Relay based on IP routing. pCR Interdigital 23.700-33 0.1.0 FS_5G_ProSe_Ph2 Rel-18 S2-150-e

AI: 9.26

noted [WTS] [JSN]
S2-2202957 Solution for KI#3: Direct Path Switching between PC5 and Uu (non- relay). pCR

revised to S2-2203143

Interdigital 23.700-33 0.1.0 FS_5G_ProSe_Ph2 Rel-18 S2-150-e

AI: 9.26

revised [WTS] [JSN]
S2-2202986 [DRAFT] LS out on service requirements for emergency service support over ProSe Relays LS out

LS To: SA WG1

revised to S2-2203130

Qualcomm S2-150-e

AI: 9.26

revised [WTS] [JSN]
S2-2203130 [DRAFT] LS out on service requirements for emergency service support over ProSe Relays LS out

LS To: SA WG1

LS reply in S1-221029

revision of S2-2202986

Qualcomm S2-150-e

AI: 9.26

approved [WTS] [JSN]
S2-2203131 New Key Issue on Support of Emergency Services for UE to Network Relaying. pCR

revision of S2-2202644

Ericsson, AT&T, Apple, [vivo], Samsung, [Nokia, Nokia Shanghai Bell, OPPO] 23.700-33 0.1.1 FS_5G_ProSe_Ph2 Rel-18 S2-150-e

AI: 9.26

approved [WTS] [JSN]
S2-2203132 KI#1: New Solution for UE-to-UE relay discovery. pCR

revision of S2-2202102

Ericsson 23.700-33 0.1.1 FS_5G_ProSe_Ph2 Rel-18 S2-150-e

AI: 9.26

approved [WTS] [JSN]
S2-2203133 Consolidated solution for UE-to-UE Relay discovery and selection based on Model A and Model B discovery. pCR

revision of S2-2202333

OPPO, Ericsson 23.700-33 0.1.1 FS_5G_ProSe_Ph2 Rel-18 S2-150-e

AI: 9.26

approved [WTS] [JSN]
S2-2203134 Consolidated solution for L3 UE-to-UE Relay communication setup after Model A and Model B discovery. pCR

revision of S2-2202335

OPPO, Ericsson 23.700-33 0.1.1 FS_5G_ProSe_Ph2 Rel-18 S2-150-e

AI: 9.26

approved [WTS] [JSN]
S2-2203135 Solution for Layer-3 UE-to-UE Relay. pCR

revision of S2-2202324

CATT 23.700-33 0.1.1 FS_5G_ProSe_Ph2 Rel-18 S2-150-e

AI: 9.26

approved [WTS] [JSN]
S2-2203136 TR 23.700-33: Criteria for two indirect network paths switching. pCR

revision of S2-2202486

Vivo 23.700-33 0.1.1 FS_5G_ProSe_Ph2 Rel-18 S2-150-e

AI: 9.26

approved [WTS] [JSN]
S2-2203137 TR 23.700-33: KI#2, new solutions for path switching between two indirect paths. pCR

revision of S2-2202772

Qualcomm Incorporated 23.700-33 0.1.1 FS_5G_ProSe_Ph2 Rel-18 S2-150-e

AI: 9.26

approved [WTS] [JSN]
S2-2203138 KI#3 Solution: Path switching from PC5 path to Uu path. pCR

revision of S2-2202465

Huawei, HiSilicon 23.700-33 0.1.0 FS_5G_ProSe_Ph2 Rel-18 S2-150-e

AI: 9.26

approved [WTS] [JSN]
S2-2203139 TR 23.700-33: New solution for UE Negotiation-based path switching from PC5 to Uu. pCR

revision of S2-2202484

Vivo 23.700-33 0.1.1 FS_5G_ProSe_Ph2 Rel-18 S2-150-e

AI: 9.26

approved [WTS] [JSN]
S2-2203140 Solution for Path Switching between PC5 and Uu Based on Path Preference Policy. pCR

revision of S2-2202497

ZTE 23.700-33 0.1.1 FS_5G_ProSe_Ph2 Rel-18 S2-150-e

AI: 9.26

approved [WTS] [JSN]
S2-2203141 KI#3, New Sol: Switching back to PC5 path. pCR

revision of S2-2202550

LG Electronics 23.700-33 0.1.1 FS_5G_ProSe_Ph2 Rel-18 S2-150-e

AI: 9.26

approved [WTS] [JSN]
S2-2203142 KI#3, New Sol: Support direct communication path switching between PC5 and Uu. pCR

revision of S2-2202618

Samsung 23.700-33 0.1.1 FS_5G_ProSe_Ph2 Rel-18 S2-150-e

AI: 9.26

approved [WTS] [JSN]
S2-2203143 Solution for KI#3: Direct Path Switching between PC5 and Uu (non- relay). pCR

revision of S2-2202957

Interdigital 23.700-33 0.1.0 FS_5G_ProSe_Ph2 Rel-18 S2-150-e

AI: 9.26

approved [WTS] [JSN]
S2-2203144 Solution for KI# 4: path switching for Layer-2 UE-to-Network Relay with session continuity. pCR

revision of S2-2202291

OPPO 23.700-33 0.1.1 FS_5G_ProSe_Ph2 Rel-18 S2-150-e

AI: 9.26

approved [WTS] [JSN]
S2-2203145 TR 23.700-33: KI#4, new solutions for path switching between direct and indirect paths. pCR

revision of S2-2202844

Qualcomm Incorporated 23.700-33 0.1.1 FS_5G_ProSe_Ph2 Rel-18 S2-150-e

AI: 9.26

approved [WTS] [JSN]
S2-2203146 KI#5 Solution: Multi-path transmission via Layer-2 U2N Relay. pCR

revision of S2-2202466

Huawei, HiSilicon 23.700-33 0.1.0 FS_5G_ProSe_Ph2 Rel-18 S2-150-e

AI: 9.26

approved [WTS] [JSN]
S2-2203147 TR 23.700-33: Solution for Multi-Path with Layer-3 relay without N3IWF. pCR

revision of S2-2202487

Vivo 23.700-33 0.1.1 FS_5G_ProSe_Ph2 Rel-18 S2-150-e

AI: 9.26

approved [WTS] [JSN]
S2-2203148 TR 23.700-33: KI#5, new solution for multi-path transmission for UE-to-Network Relay. pCR

revision of S2-2202849

Qualcomm Incorporated 23.700-33 0.1.1 FS_5G_ProSe_Ph2 Rel-18 S2-150-e

AI: 9.26

approved [WTS] [JSN]
S2-2203149 Solution for KI#5 multi-path transmission for UE-to-Network Relay. pCR

revision of S2-2202894

Xiaomi 23.700-33 0.1.0 FS_5G_ProSe_Ph2 Rel-18 S2-150-e

AI: 9.26

approved [WTS] [JSN]
S2-2203150 Solution: Link Establishment procedure via Layer-2 UE-to-UE Relay. pCR

revision of S2-2202955

Interdigital 23.700-33 0.1.0 FS_5G_ProSe_Ph2 Rel-18 S2-150-e

AI: 9.26

approved [WTS] [JSN]

63 documents (0.32552313804626 seconds)