Please enter the search related information in the fields below. Partial information works, e.g. "SP-21
" in the "tdoc" field lists all TSG SA documents from 2021. Regular expressions mostly work in all fields (e.g. "2[34].501
" in the "Spec" field lists all documents related to 23.501 and 24.501. Capitalization is disregarded, i.e. "3GPP
" gives the same results as "3gpp
".
Download results in JSON format
tdoc | Title | Type / Revs | Source | Spec / CR | S/WID | Release | Meeting | Status | Links |
---|---|---|---|---|---|---|---|---|---|
R4-1905383 | Discussion on SAR requirement for EN-DC PC2 UE | discussion | CATT | Rel-16 |
R4-91 AI: 9.20.3 |
noted | [WTS] [JSN] | ||
R4-1905384 | Draft CR for introduction of SAR requirement for EN-DC PC2 UE | draftCR | CATT | ENDC_UE_PC2_TDD_TDD-Core | Rel-16 |
R4-91 AI: 9.20.3 |
postponed | [WTS] [JSN] | |
R4-1905385 | TP for TR37.825 for SAR requirements | pCR | CATT | 37.825 0.0.1 | ENDC_UE_PC2_TDD_TDD-Core | Rel-16 |
R4-91 AI: 9.20.3 |
noted | [WTS] [JSN] |
R4-1905404 | Proposal on PC2 inter-band EN-DC (TDD+TDD) UE behaviour | discussion | CMCC | ENDC_UE_PC2_TDD_TDD | Rel-16 |
R4-91 AI: 9.20.3 |
noted | [WTS] [JSN] | |
R4-1905405 | TP for TR37.825 for SAR requirement |
pCR revised to R4-1907452 |
CMCC | 37.825 0.1.0 | ENDC_UE_PC2_TDD_TDD | Rel-16 |
R4-91 AI: 9.20.3 |
revised | [WTS] [JSN] |
R4-1905406 | LS on UE capability of maxUplinkDutyCycle for PC2 inter-band EN-DC (LTE TDD PC3+NR TDD PC3) |
LS out LS To: RAN2 revised to R4-1907451 |
CMCC | ENDC_UE_PC2_TDD_TDD | Rel-16 |
R4-91 AI: 9.20.3 |
revised | [WTS] [JSN] | |
R4-1905502 | Further discussion on maximum duty cycle for TDD EN-DC HPUE | discussion | vivo | ENDC_UE_PC2_TDD_TDD-Core |
R4-91 AI: 9.20.3 |
noted | [WTS] [JSN] | ||
R4-1906380 | on TDD-TDD PC2 EN-DC SAR | other | Huawei, HiSilicon | NR_newRAT-Core |
R4-91 AI: 9.20.3 |
noted | [WTS] [JSN] | ||
R4-1907119 | SAR mitigation for PC2 TDD-TDD EN-DC | discussion | Qualcomm Incorporated |
R4-91 AI: 9.20.3 |
noted | [WTS] [JSN] | |||
R4-1907451 | LS on UE capability of maxUplinkDutyCycle for PC2 inter-band EN-DC (LTE TDD PC3+NR TDD PC3) |
LS out LS To: RAN2 revision of R4-1905406 revised to R4-1907479 |
CMCC | ENDC_UE_PC2_TDD_TDD | Rel-16 |
R4-91 AI: 9.20.3 |
revised | [WTS] [JSN] | |
R4-1907452 | TP for TR37.825 for SAR requirement |
pCR revision of R4-1905405 |
CMCC | 37.825 0.1.0 | ENDC_UE_PC2_TDD_TDD | Rel-16 |
R4-91 AI: 9.20.3 |
approved | [WTS] [JSN] |
R4-1907479 | LS on UE capability of maxUplinkDutyCycle for PC2 inter-band EN-DC (LTE TDD PC3+NR TDD PC3) |
LS out LS To: RAN2 revision of R4-1907451 |
CMCC | ENDC_UE_PC2_TDD_TDD | Rel-16 |
R4-91 AI: 9.20.3 |
approved | [WTS] [JSN] |
12 documents (0.2952709197998 seconds)