Please enter the search related information in the fields below. Partial information works, e.g. "SP-21" in the "tdoc" field lists all TSG SA documents from 2021. Regular expressions mostly work in all fields (e.g. "2[34].501" in the "Spec" field lists all documents related to 23.501 and 24.501. Capitalization is disregarded, i.e. "3GPP" gives the same results as "3gpp".

Download results in JSON format

tdoc Title Type / Revs Source Spec / CR S/WID Release Meeting Status Links
R4-1905383 Discussion on SAR requirement for EN-DC PC2 UE discussion CATT Rel-16 R4-91

AI: 9.20.3

noted [WTS] [JSN]
R4-1905384 Draft CR for introduction of SAR requirement for EN-DC PC2 UE draftCR CATT ENDC_UE_PC2_TDD_TDD-Core Rel-16 R4-91

AI: 9.20.3

postponed [WTS] [JSN]
R4-1905385 TP for TR37.825 for SAR requirements pCR CATT 37.825 0.0.1 ENDC_UE_PC2_TDD_TDD-Core Rel-16 R4-91

AI: 9.20.3

noted [WTS] [JSN]
R4-1905404 Proposal on PC2 inter-band EN-DC (TDD+TDD) UE behaviour discussion CMCC ENDC_UE_PC2_TDD_TDD Rel-16 R4-91

AI: 9.20.3

noted [WTS] [JSN]
R4-1905405 TP for TR37.825 for SAR requirement pCR

revised to R4-1907452

CMCC 37.825 0.1.0 ENDC_UE_PC2_TDD_TDD Rel-16 R4-91

AI: 9.20.3

revised [WTS] [JSN]
R4-1905406 LS on UE capability of maxUplinkDutyCycle for PC2 inter-band EN-DC (LTE TDD PC3+NR TDD PC3) LS out

LS To: RAN2

revised to R4-1907451

CMCC ENDC_UE_PC2_TDD_TDD Rel-16 R4-91

AI: 9.20.3

revised [WTS] [JSN]
R4-1905502 Further discussion on maximum duty cycle for TDD EN-DC HPUE discussion vivo ENDC_UE_PC2_TDD_TDD-Core R4-91

AI: 9.20.3

noted [WTS] [JSN]
R4-1906380 on TDD-TDD PC2 EN-DC SAR other Huawei, HiSilicon NR_newRAT-Core R4-91

AI: 9.20.3

noted [WTS] [JSN]
R4-1907119 SAR mitigation for PC2 TDD-TDD EN-DC discussion Qualcomm Incorporated R4-91

AI: 9.20.3

noted [WTS] [JSN]
R4-1907451 LS on UE capability of maxUplinkDutyCycle for PC2 inter-band EN-DC (LTE TDD PC3+NR TDD PC3) LS out

LS To: RAN2

revision of R4-1905406

revised to R4-1907479

CMCC ENDC_UE_PC2_TDD_TDD Rel-16 R4-91

AI: 9.20.3

revised [WTS] [JSN]
R4-1907452 TP for TR37.825 for SAR requirement pCR

revision of R4-1905405

CMCC 37.825 0.1.0 ENDC_UE_PC2_TDD_TDD Rel-16 R4-91

AI: 9.20.3

approved [WTS] [JSN]
R4-1907479 LS on UE capability of maxUplinkDutyCycle for PC2 inter-band EN-DC (LTE TDD PC3+NR TDD PC3) LS out

LS To: RAN2

revision of R4-1907451

CMCC ENDC_UE_PC2_TDD_TDD Rel-16 R4-91

AI: 9.20.3

approved [WTS] [JSN]

12 documents (0.2952709197998 seconds)