Please enter the search related information in the fields below. Partial information works, e.g. "SP-21" in the "tdoc" field lists all TSG SA documents from 2021. Regular expressions mostly work in all fields (e.g. "2[34].501" in the "Spec" field lists all documents related to 23.501 and 24.501. Capitalization is disregarded, i.e. "3GPP" gives the same results as "3gpp".

Download results in JSON format

tdoc Title Type / Revs Source Spec / CR S/WID Release Meeting Status Links
R2-166089 Discussion on RRC Architecture for LTE-NR Tight Interworking discussion CATT FS_NR_newRAT Rel-14 R2-95

AI: 9.2.2.3

available [WTS] [JSN]
R2-166090 Discussion on RRC Diversity for LTE-NR Tight Interworking discussion CATT FS_NR_newRAT Rel-14 R2-95

AI: 9.2.2.3

available [WTS] [JSN]
R2-166096 Principles for LTE-NR Tight Interworking in CU/DU Architecture discussion Beijing Xiaomi Mobile Software FS_NR_newRAT Rel-14 R2-95

AI: 9.2.2.3

withdrawn [WTS] [JSN]
R2-166097 Principles for LTE-NR Tight Interworking in CU/DU Architecture discussion Beijing Xiaomi Mobile Software FS_NR_newRAT Rel-14 R2-95

AI: 9.2.2.3

withdrawn [WTS] [JSN]
R2-166098 UE capability coordination for LTE and NR interworking discussion CATT FS_NR_newRAT Rel-14 R2-95

AI: 9.2.2.3

available [WTS] [JSN]
R2-166099 CP procedures for LTE and NR interworking discussion CATT FS_NR_newRAT Rel-14 R2-95

AI: 9.2.2.3

available [WTS] [JSN]
R2-166105 Principles for LTE-NR Tight Interworking in CU/DU Architecture discussion Beijing Xiaomi Mobile Software FS_NR_newRAT Rel-14 R2-95

AI: 9.2.2.3

available [WTS] [JSN]
R2-166235 Discussion on Connectionless discussion Nokia, Alcatel-Lucent Shanghai Bell FS_NR_newRAT Rel-14 R2-95

AI: 9.2.2.3

withdrawn [WTS] [JSN]
R2-166243 On UE capability and network node coordination aspects in LTE-NR tight interworking discussion Nokia, Alcatel-Lucent Shanghai Bell FS_NR_newRAT Rel-14 R2-95

AI: 9.2.2.3

noted [WTS] [JSN]
R2-166340 Consideration on the transmission of NR RRC Message in LTE/NR tight interworking discussion ZTE, ZTE Microelectronics FS_NR_newRAT Rel-14 R2-95

AI: 9.2.2.3

available [WTS] [JSN]
R2-166349 Consideration on the capability coordination in LTE NR tight interworking discussion ZTE, ZTE Microelectronics FS_NR_newRAT Rel-14 R2-95

AI: 9.2.2.3

available [WTS] [JSN]
R2-166352 Clarification on the scenarios of LTE/NR tight interworking with NR as master discussion ZTE, ZTE Microelectronics FS_NR_newRAT Rel-14 R2-95

AI: 9.2.2.3

available [WTS] [JSN]
R2-166494 RRC message related issues for LTE-NR tight interworking discussion ITRI FS_NR_newRAT Rel-14 R2-95

AI: 9.2.2.3

available [WTS] [JSN]
R2-166516 Management of secondary node for LTE-NR tight interworking discussion Huawei, HiSilicon FS_NR_newRAT Rel-14 R2-95

AI: 9.2.2.3

available [WTS] [JSN]
R2-166519 Control plane aspects for LTE-NR tight interworking discussion Huawei, HiSilicon FS_NR_newRAT Rel-14 R2-95

AI: 9.2.2.3

available [WTS] [JSN]
R2-166520 UE capability coordination in LTE-NR tight interworking discussion Huawei, HiSilicon FS_NR_newRAT Rel-14 R2-95

AI: 9.2.2.3

available [WTS] [JSN]
R2-166615 Discussion on Control plane aspects for LTE-NR tight interworking discussion KT Corporation FS_NR_newRAT Rel-14 R2-95

AI: 9.2.2.3

available [WTS] [JSN]
R2-166660 UE capability coordination in case of IRAT DC discussion Samsung Telecommunications FS_NR_newRAT Rel-14 R2-95

AI: 9.2.2.3

available [WTS] [JSN]
R2-166661 Use of RRM measurements in IRAT DC discussion Samsung Telecommunications FS_NR_newRAT Rel-14 R2-95

AI: 9.2.2.3

available [WTS] [JSN]
R2-166738 Discussion on Multi-connectivity discussion Samsung R&D Institute UK FS_NR_newRAT Rel-14 R2-95

AI: 9.2.2.3

available [WTS] [JSN]
R2-166739 SCG (split) bearer and SCG change in tight interworking discussion Sony FS_NR_newRAT Rel-14 R2-95

AI: 9.2.2.3

available [WTS] [JSN]
R2-166775 RRC configuration in LTE-NR tight interworking discussion Ericsson FS_NR_newRAT Rel-14 R2-95

AI: 9.2.2.3

available [WTS] [JSN]
R2-166776 RRC diversity discussion Ericsson FS_NR_newRAT Rel-14 R2-95

AI: 9.2.2.3

available [WTS] [JSN]
R2-166777 RRM and related control plane aspects for LTE-NR tight-interworking discussion Ericsson FS_NR_newRAT Rel-14 R2-95

AI: 9.2.2.3

available [WTS] [JSN]
R2-166778 Scenarios for inter-RAT inter-working discussion Ericsson FS_NR_newRAT Rel-14 R2-95

AI: 9.2.2.3

available [WTS] [JSN]
R2-166779 UE capability coordination for tight interworking discussion Ericsson FS_NR_newRAT Rel-14 R2-95

AI: 9.2.2.3

available [WTS] [JSN]
R2-166856 Control Plane Functions and transport mechanism for Interworking between NR and LTE discussion InterDigital Communications FS_NR_newRAT Rel-14 R2-95

AI: 9.2.2.3

available [WTS] [JSN]
R2-166891 LTE and NR configuration interaction for tight interworking discussion Intel Corporation FS_NR_newRAT Rel-14 R2-95

AI: 9.2.2.3

available [WTS] [JSN]
R2-166896 Discussion on NR SeNB configuration discussion Intel Corporation FS_NR_newRAT Rel-14 R2-95

AI: 9.2.2.3

available [WTS] [JSN]
R2-167049 NR capability fetch for tight interworking scenario discussion LG Electronics Inc. FS_NR_newRAT Rel-14 R2-95

AI: 9.2.2.3

available [WTS] [JSN]
R2-167065 Report of e-mail discussion [95#30] Capability coordination for NR and LTE discussion Qualcomm Incorporated FS_NR_newRAT Rel-14 R2-95

AI: 9.2.2.3

noted [WTS] [JSN]
R2-167068 Considerations on UE capability reporting discussion Qualcomm Incorporated FS_NR_newRAT Rel-14 R2-95

AI: 9.2.2.3

available [WTS] [JSN]
R2-167109 UE Capability and Radio Configuration Coordination for NR-LTE tight interworking discussion NTT DOCOMO INC. FS_NR_newRAT Rel-14 R2-95

AI: 9.2.2.3

available [WTS] [JSN]
R2-167144 RRC entity in LTE-NR tight interworking discussion NEC Corporation FS_NR_newRAT Rel-14 R2-95

AI: 9.2.2.3

available [WTS] [JSN]

34 documents (0.3133749961853 seconds)