Please enter the search related information in the fields below. Partial information works, e.g. "SP-21" in the "tdoc" field lists all TSG SA documents from 2021. Regular expressions mostly work in all fields (e.g. "2[34].501" in the "Spec" field lists all documents related to 23.501 and 24.501. Capitalization is disregarded, i.e. "3GPP" gives the same results as "3gpp".

Download results in JSON format

tdoc Title Type / Revs Source Spec / CR S/WID Release Meeting Status Links
S2-2403876 LS from CT WG1: LS on providing unavailability configuration during initial registration (attach) procedure LS in

source LS: C1-241849

LS To: SA WG2

CT WG1 Rel-18 S2-162

AI: 9.2.2

noted [WTS] [JSN]
S2-2404192 Corrections on Estimated Maximum Wait Time for Discontinuous Coverage for Satellite Access CR

revised to S2-2405065

NEC, Samsung 23.401 18.5.0 CR#3771 catF 5GSAT_Ph2 Rel-18 S2-162

AI: 9.2.2

revised [WTS] [JSN]
S2-2404310 [DRAFT] Reply LS on providing unavailability configuration during initial registration (attach) procedures LS out

LS To: CT WG1

OPPO 5GSAT_Ph2 Rel-18 S2-162

AI: 9.2.2

not treated [WTS] [JSN]
S2-2404311 Unavailability configuration during attach CR

revised to S2-2405063

OPPO 23.401 18.5.0 CR#3772 catF 5GSAT_Ph2 Rel-18 S2-162

AI: 9.2.2

revised [WTS] [JSN]
S2-2404421 Unavailability period during initial Registration procedure CR

revised to S2-2405062

Qualcomm Incorporated 23.501 18.5.0 CR#5372 catF 5GSAT_Ph2 Rel-18 S2-162

AI: 9.2.2

revised [WTS] [JSN]
S2-2404429 Unavailability type in UE-initiated de-registration CR MediaTek Inc. 23.501 18.5.0 CR#5374 catF 5GSAT_Ph2 Rel-18 S2-162

AI: 9.2.2

postponed [WTS] [JSN]
S2-2404430 Unavailability period during initial Attach procedure CR Qualcomm Incorporated 23.401 18.5.0 CR#3775 catF 5GSAT_Ph2 Rel-18 S2-162

AI: 9.2.2

not treated [WTS] [JSN]
S2-2404523 Clarification on Discontinuous coverage for satellite access CR

revised to S2-2405066

Google 23.501 18.5.0 CR#5379 catF 5GSAT_Ph2 Rel-18 S2-162

AI: 9.2.2

revised [WTS] [JSN]
S2-2404524 Clarification on Discontinous coverage for satellite access CR

revised to S2-2405067

Google 23.401 18.5.0 CR#3776 catF 5GSAT_Ph2 Rel-18 S2-162

AI: 9.2.2

revised [WTS] [JSN]
S2-2404584 [DRAFT] LS Reply on providing unavailability configuration during initial registration (attach) procedure LS out

LS To: CT WG1

revised to S2-2405064

LG Electronics 5GSAT_Ph2 Rel-18 S2-162

AI: 9.2.2

revised [WTS] [JSN]
S2-2404585 Unavailability Period provided by the AMF during initial registration CR LG Electronics 23.501 18.5.0 CR#5382 catF 5GSAT_Ph2 Rel-18 S2-162

AI: 9.2.2

not treated [WTS] [JSN]
S2-2404587 Unavailability Period provided by the MME during initial attach CR LG Electronics 23.401 18.5.0 CR#3777 catF 5GSAT_Ph2 Rel-18 S2-162

AI: 9.2.2

not treated [WTS] [JSN]
S2-2404618 Handling when there is conflict in UE and network indicated Unavailability values CR Samsung 23.501 18.5.0 CR#5384 catF 5GSAT_Ph2 Rel-18 S2-162

AI: 9.2.2

not treated [WTS] [JSN]
S2-2404621 Handling when there is conflict in UE and network indicated Unavailability values CR Samsung 23.401 18.5.0 CR#3778 catF 5GSAT_Ph2 Rel-18 S2-162

AI: 9.2.2

not treated [WTS] [JSN]
S2-2404670 [DRAFT] Reply LS to LS on providing unavailability configuration during initial registration (attach) LS out

LS To: CT WG1

Huawei, HiSilicon 5GSAT_Ph2 Rel-18 S2-162

AI: 9.2.2

not treated [WTS] [JSN]
S2-2404671 Alignment with CT WG1 to support Unavailability Period CR Huawei, HiSilicon 23.501 18.5.0 CR#5387 catF 5GSAT_Ph2 Rel-18 S2-162

AI: 9.2.2

not treated [WTS] [JSN]
S2-2404672 Alignment with CT WG1 to support Unavailability Period CR

revised to S2-2405317

Huawei, HiSilicon 23.502 18.5.0 CR#4798 catF 5GSAT_Ph2 Rel-18 S2-162

AI: 9.2.2

revised [WTS] [JSN]
S2-2404673 Alignment with CT WG1 to support Unavailability Period CR Huawei, HiSilicon 23.401 18.5.0 CR#3780 catF 5GSAT_Ph2 Rel-18 S2-162

AI: 9.2.2

not treated [WTS] [JSN]
S2-2404690 Providing unavailability type during the de-registration procedure CR CATT 23.501 18.5.0 CR#5389 catF 5GSAT_Ph2 Rel-18 S2-162

AI: 9.2.2

not treated [WTS] [JSN]
S2-2404691 Update the unavailability type description for the satellite discontinuous coverage CR CATT 23.502 18.5.0 CR#4801 catF 5GSAT_Ph2 Rel-18 S2-162

AI: 9.2.2

not treated [WTS] [JSN]
S2-2404788 Applicability of unavailability period during initial registration procedure CR Samsung 23.501 18.5.0 CR#5392 catF 5GSAT_Ph2 Rel-18 S2-162

AI: 9.2.2

merged [WTS] [JSN]
S2-2404789 Applicability of unavailability period during Attach procedure CR Samsung 23.401 18.5.0 CR#3781 catF 5GSAT_Ph2 Rel-18 S2-162

AI: 9.2.2

not treated [WTS] [JSN]
S2-2404803 [DRAFT] Reply LS on providing unavailability configuration during initial registration (attach) procedure LS out

LS To: CT WG1

Samsung Rel-18 S2-162

AI: 9.2.2

not treated [WTS] [JSN]
S2-2404968 Handling of unavailability period in the initial registration procedure CR OPPO 23.502 18.5.0 CR#4804 catF 5GSAT_Ph2 Rel-18 S2-162

AI: 9.2.2

not treated [WTS] [JSN]
S2-2404969 Handling of unavailability period in the initial registration procedure CR OPPO 23.501 18.5.0 CR#5397 catF 5GSAT_Ph2 Rel-18 S2-162

AI: 9.2.2

not treated [WTS] [JSN]
S2-2405062 Unavailability period during initial Registration procedure CR

revision of S2-2404421

revised to S2-2405362

Qualcomm Incorporated 23.501 18.5.0 CR#53721 catF 5GSAT_Ph2 Rel-18 S2-162

AI: 9.2.2

revised [WTS] [JSN]
S2-2405063 Unavailability configuration during attach CR

revision of S2-2404311

revised to S2-2405363

OPPO 23.401 18.5.0 CR#37721 catF 5GSAT_Ph2 Rel-18 S2-162

AI: 9.2.2

revised [WTS] [JSN]
S2-2405064 [DRAFT] LS Reply on providing unavailability configuration during initial registration (attach) procedure LS out

LS To: CT WG1

revision of S2-2404584

LG Electronics 5GSAT_Ph2 Rel-18 S2-162

AI: 9.2.2

noted [WTS] [JSN]
S2-2405065 Corrections on Estimated Maximum Wait Time for Discontinuous Coverage for Satellite Access CR

revision of S2-2404192

revised to S2-2405617

NEC, Samsung 23.401 18.5.0 CR#37711 catF 5GSAT_Ph2 Rel-18 S2-162

AI: 9.2.2

revised [WTS] [JSN]
S2-2405066 Clarification on Discontinuous coverage for satellite access CR

revision of S2-2404523

revised to S2-2405618

Google, Tencent, DISH Network, Samsung 23.501 18.5.0 CR#53791 catF 5GSAT_Ph2 Rel-18 S2-162

AI: 9.2.2

revised [WTS] [JSN]
S2-2405067 Clarification on Discontinous coverage for satellite access CR

revision of S2-2404524

revised to S2-2405619

Google, Tencent, DISH Network 23.401 18.5.0 CR#37761 catF 5GSAT_Ph2 Rel-18 S2-162

AI: 9.2.2

revised [WTS] [JSN]
S2-2405317 Alignment with CT WG1 to support Unavailability Period CR

revision of S2-2404672

revised to S2-2405364

Huawei, HiSilicon 23.502 18.5.0 CR#47981 catF 5GSAT_Ph2 Rel-18 S2-162

AI: 9.2.2

revised [WTS] [JSN]
S2-2405362 Unavailability period during initial Registration procedure CR

revision of S2-2405062

revised to S2-2405615

Qualcomm Incorporated, Samsung 23.501 18.5.0 CR#53722 catF 5GSAT_Ph2 Rel-18 S2-162

AI: 9.2.2

revised [WTS] [JSN]
S2-2405363 Unavailability configuration during attach CR

revision of S2-2405063

revised to S2-2405616

OPPO, Samsung 23.401 18.5.0 CR#37722 catF 5GSAT_Ph2 Rel-18 S2-162

AI: 9.2.2

revised [WTS] [JSN]
S2-2405364 Alignment with CT WG1 to support Unavailability Period CR

revision of S2-2405317

Huawei, HiSilicon 23.502 18.5.0 CR#47982 catF 5GSAT_Ph2 Rel-18 S2-162

AI: 9.2.2

agreed [WTS] [JSN]
S2-2405615 Unavailability period during initial Registration procedure CR

revision of S2-2405362

Qualcomm Incorporated, Samsung 23.501 18.5.0 CR#53723 catF 5GSAT_Ph2 Rel-18 S2-162

AI: 9.2.2

agreed [WTS] [JSN]
S2-2405616 Unavailability configuration during attach CR

revision of S2-2405363

OPPO, Samsung, LG Electronics 23.401 18.5.0 CR#37723 catF 5GSAT_Ph2 Rel-18 S2-162

AI: 9.2.2

agreed [WTS] [JSN]
S2-2405617 Corrections on Estimated Maximum Wait Time for Discontinuous Coverage for Satellite Access CR

revision of S2-2405065

NEC, Samsung 23.401 18.5.0 CR#37712 catF 5GSAT_Ph2 Rel-18 S2-162

AI: 9.2.2

agreed [WTS] [JSN]
S2-2405618 Clarification on Discontinuous coverage for satellite access CR

revision of S2-2405066

Google, Tencent, DISH Network, Samsung 23.501 18.5.0 CR#53792 catF 5GSAT_Ph2 Rel-18 S2-162

AI: 9.2.2

agreed [WTS] [JSN]
S2-2405619 Clarification on Discontinous coverage for satellite access CR

revision of S2-2405067

Google, Tencent, DISH Network, Samsung 23.401 18.5.0 CR#37762 catF 5GSAT_Ph2 Rel-18 S2-162

AI: 9.2.2

agreed [WTS] [JSN]

40 documents (0.32351207733154 seconds)