Please enter the search related information in the fields below. Partial information works, e.g. "SP-21" in the "tdoc" field lists all TSG SA documents from 2021. Regular expressions mostly work in all fields (e.g. "2[34].501" in the "Spec" field lists all documents related to 23.501 and 24.501. Capitalization is disregarded, i.e. "3GPP" gives the same results as "3gpp".
Download results in JSON format
| tdoc | Title | Type / Revs | Source | Spec / CR | S/WID | Release | Meeting | Status | Links |
|---|---|---|---|---|---|---|---|---|---|
| RP-211808 | Input to network coverage scenario for V2X and PS Positioning | discussion | OPPO | FS_NR_pos_cov | Rel-17 |
RP-93-e AI: 9.2.2 |
noted | [WTS] [JSN] | |
| RP-212004 | Input to conclusions for study on scenarios and requirements for NR positioning use cases | discussion | Intel Corporation | FS_NR_pos_cov | Rel-17 |
RP-93-e AI: 9.2.2 |
noted | [WTS] [JSN] | |
| RP-212022 | Discussion of scenarios and requirements of in-coverage, partial coverage, and out-of-coverage NR positioning use cases | discussion | vivo | FS_NR_pos_cov | Rel-17 |
RP-93-e AI: 9.2.2 |
noted | [WTS] [JSN] | |
| RP-212035 | Status report of WI: Study on scenarios and requirements of in-coverage, partial coverage, and out-of-coverage NR positioning use cases; rapporteur: LG Electronics | WI status report | LG Electronics | FS_NR_pos_cov | Rel-17 |
RP-93-e AI: 9.2.2 |
noted | [WTS] [JSN] | |
| RP-212036 | Discussion and proposed changes for positioning for V2X and public safety | discussion | LG Electronics | FS_NR_pos_cov | Rel-17 |
RP-93-e AI: 9.2.2 |
noted | [WTS] [JSN] | |
| RP-212037 | pCR to TR 38.845: Positioning scenarios and requirements for V2X and public safety | pCR | LG Electronics | 38.845 1.0.1 | FS_NR_pos_cov | Rel-17 |
RP-93-e AI: 9.2.2 |
approved | [WTS] [JSN] |
| RP-212038 | TR 38.845 v2.0.0 on Study on scenarios and requirements of in-coverage, partial coverage, and out-of-coverage NR positioning use cases | draft TR | LG Electronics | FS_NR_pos_cov | Rel-17 |
RP-93-e AI: 9.2.2 |
approved | [WTS] [JSN] | |
| RP-212105 | Input to conclusions for in-coverage, partial-coverage, and out-of-coverage NR positioning use cases | discussion | Qualcomm Incorporated | Rel-17 |
RP-93-e AI: 9.2.2 |
noted | [WTS] [JSN] | ||
| RP-212131 | Discussion on scenarios and requirements of in-coverage, partial coverage, and out-of-coverage positioning use cases | discussion | Huawei, HiSilicon | FS_NR_pos_cov | Rel-17 |
RP-93-e AI: 9.2.2 |
noted | [WTS] [JSN] | |
| RP-212132 | pCR to TR 38.845 for SL positioning | pCR | Huawei, HiSilicon | 38.845 1.0.1 | FS_NR_pos_cov | Rel-17 |
RP-93-e AI: 9.2.2 |
not pursued | [WTS] [JSN] |
| RP-212410 | Further Discussion on scenarios and requirements of in-coverage, partial coverage, and out-of-coverage NR positioning use cases | discussion | ZTE, Sanechips | FS_NR_pos_cov | Rel-17 |
RP-93-e AI: 9.2.2 |
noted | [WTS] [JSN] | |
| RP-212460 | Remaining issues on deployment and operational scenarios | discussion | Lenovo (Beijing) Ltd, Motorola Mobility | FS_NR_pos_cov | Rel-17 |
RP-93-e AI: 9.2.2 |
noted | [WTS] [JSN] | |
| RP-212498 | Remaining issues for SI the scenarios and requirements for in-coverage, partial coverage, and out-of-coverage NR positioning use cases | discussion | Ericsson | FS_NR_pos_cov | Rel-17 |
RP-93-e AI: 9.2.2 |
noted | [WTS] [JSN] | |
| RP-212550 | Moderator's summary for discussion [93e-10-SL-Positioning-TR] | report | LG Electronics | FS_NR_pos_cov | Rel-17 |
RP-93-e AI: 9.2.2 |
noted | [WTS] [JSN] | |
| RP-212584 | [Draft] LS on 3GPP RAN study on scenarios and requirements of in-coverage, partial coverage, and out-of-coverage positioning use cases (to: 5GAA WG4, SAE Advanced Application Technical Committee; cc: -; contact: LG Electronics) |
LS out LS To: 5GAA WG4, SAE Advanced Application Technical Committee revised to RP-212626 |
LG Electronics | FS_NR_pos_cov | Rel-17 |
RP-93-e AI: 9.2.2 |
revised | [WTS] [JSN] | |
| RP-212626 | LS on 3GPP RAN study on scenarios and requirements of in-coverage, partial coverage, and out-of-coverage positioning use cases (to: 5GAA WG4, SAE Advanced Application Technical Committee; cc: -; contact: LG Electronics) |
LS out LS To: 5GAA WG4, SAE Advanced Application Technical Committee revision of RP-212584 |
RAN | FS_NR_pos_cov | Rel-17 |
RP-93-e AI: 9.2.2 |
approved | [WTS] [JSN] |
16 documents (0.36148595809937 seconds)