Please enter the search related information in the fields below. Partial information works, e.g. "SP-21
" in the "tdoc" field lists all TSG SA documents from 2021. Regular expressions mostly work in all fields (e.g. "2[34].501
" in the "Spec" field lists all documents related to 23.501 and 24.501. Capitalization is disregarded, i.e. "3GPP
" gives the same results as "3gpp
".
Download results in JSON format
tdoc | Title | Type / Revs | Source | Spec / CR | S/WID | Release | Meeting | Status | Links |
---|---|---|---|---|---|---|---|---|---|
R4-152850 | Simulation assumptions for cell identification in high speed train scenarios up to 350km/h | other | Ericsson | FS_LTE_high_speed | Rel-13 |
R4-75 AI: 9.2.2 |
noted | [WTS] [JSN] | |
R4-152851 | Considerations on RRM for high speed train studies |
other revised to R4-153660 |
Ericsson | FS_LTE_high_speed | Rel-13 |
R4-75 AI: 9.2.2 |
revised | [WTS] [JSN] | |
R4-152921 | RRM simulation assumption on SFN scenario | other | Huawei,HiSilicon | Rel-13 |
R4-75 AI: 9.2.2 |
noted | [WTS] [JSN] | ||
R4-152922 | TP for TR 36.878: RRM simulation assumption on SFN scenario |
pCR revised to R4-153823 |
Huawei,HiSilicon | 36.133 | Rel-13 |
R4-75 AI: 9.2.2 |
revised | [WTS] [JSN] | |
R4-152926 | Further discussion on RRM requirements for high speed scenarios | other | Huawei,HiSilicon | Rel-13 |
R4-75 AI: 9.2.2 |
noted | [WTS] [JSN] | ||
R4-152927 | Way forward on RRM requirements for high speed scenarios |
other revised to R4-153825 |
Huawei,HiSilicon | Rel-13 |
R4-75 AI: 9.2.2 |
revised | [WTS] [JSN] | ||
R4-152928 | Simulation assumption under existing high speed scenarios | other | Huawei,HiSilicon | Rel-13 |
R4-75 AI: 9.2.2 |
noted | [WTS] [JSN] | ||
R4-152929 | TP for TR 36.878: RRM Simulation assumption under existing high speed scenarios |
pCR revised to R4-153857 |
Huawei,HiSilicon | 36.133 | Rel-13 |
R4-75 AI: 9.2.2 |
revised | [WTS] [JSN] | |
R4-152998 | Discussion of HST UE RRM Requirements | other | Alcatel-Lucent | FS_LTE_high_speed |
R4-75 AI: 9.2.2 |
noted | [WTS] [JSN] | ||
R4-153072 | RRM limitations in High Speed Scenarios | other | Qualcomm Incorporated |
R4-75 AI: 9.2.2 |
noted | [WTS] [JSN] | |||
R4-153660 | Considerations on RRM for high speed train studies |
other revision of R4-152851 |
Ericsson | FS_LTE_high_speed | Rel-13 |
R4-75 AI: 9.2.2 |
noted | [WTS] [JSN] | |
R4-153823 | TP for TR 36.878: RRM simulation assumption on SFN scenario |
pCR revision of R4-152922 |
Huawei,HiSilicon | Rel-13 |
R4-75 AI: 9.2.2 |
approved | [WTS] [JSN] | ||
R4-153825 | Way forward on RRM requirements for high speed scenarios |
other revision of R4-152927 |
Huawei,HiSilicon, DOCOMO, TIM, CATT, Intel, Nokia Networks, ALU, Ericsson, CMCC | Rel-13 |
R4-75 AI: 9.2.2 |
approved | [WTS] [JSN] | ||
R4-153853 | TP for 36.878: Cell search simulation assumptions | pCR | Ericsson, Huawei, HiSilicon | Rel-12 |
R4-75 AI: 9.2.2 |
approved | [WTS] [JSN] | ||
R4-153857 | TP for TR 36.878: RRM Simulation assumption under existing high speed scenarios |
pCR revision of R4-152929 |
Huawei,HiSilicon | Rel-13 |
R4-75 AI: 9.2.2 |
approved | [WTS] [JSN] |
15 documents (0.31840705871582 seconds)