Please enter the search related information in the fields below. Partial information works, e.g. "SP-21" in the "tdoc" field lists all TSG SA documents from 2021. Regular expressions mostly work in all fields (e.g. "2[34].501" in the "Spec" field lists all documents related to 23.501 and 24.501. Capitalization is disregarded, i.e. "3GPP" gives the same results as "3gpp".

Download results in JSON format

tdoc Title Type / Revs Source Spec / CR S/WID Release Meeting Status Links
S1-162119 Correction on mobility support requirements CR

revised to S1-162256

Intel Corporation 22.864 14.0.0 CR#1 catD FS_SMARTER-NEO Rel-14 S1-75

AI: 9.1

revised [WTS] [JSN]
S1-162121 Missing requirements from NEO Consolidation CR

revised to S1-162255

Intel Corporation 22.864 14.0.0 CR#2 catD FS_SMARTER-NEO Rel-14 S1-75

AI: 9.1

revised [WTS] [JSN]
S1-162155 Interworking between 5G and non-3GPP access CR China Telecom 22.864 14.0.0 CR#3 catC FS_SMARTER-NEO Rel-14 S1-75

AI: 9.1

noted [WTS] [JSN]
S1-162156 Consideration on loose interworking between 5G and UTRAN/GERAN access CR China Telecom 22.864 14.0.0 CR#4 catC FS_SMARTER-NEO Rel-14 S1-75

AI: 9.1

noted [WTS] [JSN]
S1-162174 The impact of a new flexible mobile RAT operating in frequency bands 6-100 GHz on 5G use cases: the vision of the mmMAGIC project discussion

revised to S1-162253

Intel Corporation (UK) Ltd SMARTER S1-75

AI: 9.1

revised [WTS] [JSN]
S1-162175 network capability exposure for NEO TR CR

revised to S1-162339

Qualcomm Incorporated 22.864 14.0.0 CR#5 catF FS_SMARTER-NEO Rel-14 S1-75

AI: 9.1

revised [WTS] [JSN]
S1-162187 NEO cleanup comments CR

revised to S1-162340

Qualcomm Incorporated 22.864 14.0.0 CR#6 catF FS_SMARTER-NEO Rel-14 S1-75

AI: 9.1

revised [WTS] [JSN]
S1-162188 Service Slicing CR

revised to S1-162341

Qualcomm Incorporated 22.864 14.0.0 CR#7 catF FS_SMARTER-NEO Rel-14 S1-75

AI: 9.1

revised [WTS] [JSN]
S1-162193 Introducing service roaming requirements from GSMA Liaison CR

revised to S1-162338

KPN 22.864 14.0.0 CR#8 catB FS_SMARTER Rel-14 S1-75

AI: 9.1

revised [WTS] [JSN]
S1-162253 The impact of a new flexible mobile RAT operating in frequency bands 6-100 GHz on 5G use cases: the vision of the mmMAGIC project discussion

revision of S1-162174

Intel Corporation (UK) Ltd SMARTER S1-75

AI: 9.1

noted [WTS] [JSN]
S1-162255 Missing requirements from NEO Consolidation CR

revision of S1-162121

revised to S1-162337

Intel Corporation 22.864 14.0.0 CR#21 catD FS_SMARTER-NEO Rel-14 S1-75

AI: 9.1

revised [WTS] [JSN]
S1-162256 Correction on mobility support requirements CR

revision of S1-162119

revised to S1-162336

Intel Corporation 22.864 14.0.0 CR#11 catD FS_SMARTER-NEO Rel-14 S1-75

AI: 9.1

revised [WTS] [JSN]
S1-162336 Correction on mobility support requirements CR

revision of S1-162256

Intel Corporation 22.864 14.0.0 CR#12 catF FS_SMARTER-NEO Rel-14 S1-75

AI: 9.1

agreed [WTS] [JSN]
S1-162337 Missing requirements from NEO Consolidation CR

revision of S1-162255

revised to S1-162475

Intel Corporation 22.864 14.0.0 CR#22 catF FS_SMARTER-NEO Rel-14 S1-75

AI: 9.1

revised [WTS] [JSN]
S1-162338 Introducing service roaming requirements from GSMA Liaison CR

revision of S1-162193

revised to S1-162476

KPN 22.864 14.0.0 CR#81 catB FS_SMARTER Rel-14 S1-75

AI: 9.1

revised [WTS] [JSN]
S1-162339 network capability exposure for NEO TR CR

revision of S1-162175

revised to S1-162477

Huawei Technologies 22.864 14.0.0 CR#5-1 catF FS_SMARTER-NEO Rel-14 S1-75

AI: 9.1

revised [WTS] [JSN]
S1-162340 NEO cleanup comments CR

revision of S1-162187

Qualcomm Incorporated 22.864 14.0.0 CR#61 catF FS_SMARTER-NEO Rel-14 S1-75

AI: 9.1

agreed [WTS] [JSN]
S1-162341 3rd party service authorization CR

revision of S1-162188

revised to S1-162478

Qualcomm Incorporated 22.864 14.0.0 CR#7 catF FS_SMARTER-NEO Rel-15 S1-75

AI: 9.1

revised [WTS] [JSN]
S1-162475 Missing requirements from NEO Consolidation CR

revision of S1-162337

revised to S1-162515

Intel Corporation 22.864 14.0.0 CR#23 catF FS_SMARTER-NEO Rel-14 S1-75

AI: 9.1

revised [WTS] [JSN]
S1-162476 Introducing service roaming requirements from GSMA Liaison CR

revision of S1-162338

KPN 22.864 14.0.0 CR#82 catB FS_SMARTER-NEO Rel-14 S1-75

AI: 9.1

agreed [WTS] [JSN]
S1-162477 network capability exposure for NEO TR CR

revision of S1-162339

Huawei Technologies 22.864 14.0.0 CR#52 catF FS_SMARTER-NEO Rel-14 S1-75

AI: 9.1

agreed [WTS] [JSN]
S1-162478 3rd party service authorization CR

revision of S1-162341

revised to S1-162545

Qualcomm Incorporated 22.864 14.0.0 CR#7 catF FS_SMARTER-NEO Rel-15 S1-75

AI: 9.1

revised [WTS] [JSN]
S1-162515 Missing requirements from NEO Consolidation CR

revision of S1-162475

Intel Corporation 22.864 14.0.0 CR#24 catF FS_SMARTER-NEO Rel-14 S1-75

AI: 9.1

agreed [WTS] [JSN]
S1-162545 3rd party service authorization CR

revision of S1-162478

Qualcomm Incorporated 22.864 14.0.0 CR#73 catF FS_SMARTER-NEO Rel-15 S1-75

AI: 9.1

agreed [WTS] [JSN]

24 documents (0.32343602180481 seconds)