Please enter the search related information in the fields below. Partial information works, e.g. "SP-21
" in the "tdoc" field lists all TSG SA documents from 2021. Regular expressions mostly work in all fields (e.g. "2[34].501
" in the "Spec" field lists all documents related to 23.501 and 24.501. Capitalization is disregarded, i.e. "3GPP
" gives the same results as "3gpp
".
Download results in JSON format
tdoc | Title | Type / Revs | Source | Spec / CR | S/WID | Release | Meeting | Status | Links |
---|---|---|---|---|---|---|---|---|---|
RP-170034 | LS on interworking and migration for 5GS and EPS (including Option 3) (S2-171591; to: SA, RAN; cc: RAN2, RAN3, CT; contact: NTT DOCOMO) |
LS in source LS: S2-171591 LS To: SA, RAN |
SA2 | 5GS_Ph1 | Rel-15 |
RP-75 AI: 9 |
noted | [WTS] [JSN] | |
RP-170196 | On the overall 5G-NR workplan |
discussion revised to RP-170531 |
Qualcomm | Rel-15 |
RP-75 AI: 9 |
revised | [WTS] [JSN] | ||
RP-170208 | On NR forward compatibility | discussion | QUALCOMM CDMA Technologies | Rel-15 |
RP-75 AI: 9 |
noted | [WTS] [JSN] | ||
RP-170226 | NR planning | discussion | Nokia | Rel-15 |
RP-75 AI: 9 |
noted | [WTS] [JSN] | ||
RP-170230 | Confirming the Date for Milestone Box 4 | discussion | AT&T | FS_NR_newRAT | Rel-15 |
RP-75 AI: 9 |
noted | [WTS] [JSN] | |
RP-170320 | Principles for harmonizing specification of NSA and SA | discussion | China Mobile Com. Corporation | FS_NR_newRAT | Rel-14 |
RP-75 AI: 9 |
noted | [WTS] [JSN] | |
RP-170334 | Principle for_x00B_NR Phase-1 Work Plan | discussion | Samsung | Rel-15 |
RP-75 AI: 9 |
withdrawn | [WTS] [JSN] | ||
RP-170360 | Scope of Rel-15 work on NR | discussion | Huawei, HiSilicon | Rel-15 |
RP-75 AI: 9 |
noted | [WTS] [JSN] | ||
RP-170384 | Discussion on NR WI and time line |
discussion revised to RP-170670 |
ZTE Corporation | Rel-15 |
RP-75 AI: 9 |
revised | [WTS] [JSN] | ||
RP-170385 | Discussion on overall WI and SI of R15 |
discussion revised to RP-170669 |
ZTE Corporation | Rel-15 |
RP-75 AI: 9 |
revised | [WTS] [JSN] | ||
RP-170391 | Principle for Planning NR SIs | discussion | Samsung |
RP-75 AI: 9 |
noted | [WTS] [JSN] | |||
RP-170412 | SK Telecom's view on 5G NR acceleration | discussion | SK Telecom | FS_NR_newRAT | Rel-15 |
RP-75 AI: 9 |
noted | [WTS] [JSN] | |
RP-170453 | Additional rationale for NR acceleration | discussion | VODAFONE Group Plc | Rel-15 |
RP-75 AI: 9 |
withdrawn | [WTS] [JSN] | ||
RP-170472 | 5G NR Phase 1 Scope | discussion | MediaTek Inc. |
RP-75 AI: 9 |
noted | [WTS] [JSN] | |||
RP-170473 | TU Allocation for Rel-15 NR Works | discussion | MediaTek Inc. |
RP-75 AI: 9 |
noted | [WTS] [JSN] | |||
RP-170476 | Essential aspects on NR acceleration | discussion | KT Corporation |
RP-75 AI: 9 |
noted | [WTS] [JSN] | |||
RP-170491 | Two-step RRC ASN.1 freezing for Rel-15 5G New Radio | discussion | Nokia, Alcatel-Lucent Shanghai Bell | Rel-15 |
RP-75 AI: 9 |
noted | [WTS] [JSN] | ||
RP-170531 | On the overall 5G-NR workplan |
discussion revision of RP-170196 |
Qualcomm | Rel-15 |
RP-75 AI: 9 |
noted | [WTS] [JSN] | ||
RP-170666 | Way Forward on the overall 5G NR workplan |
discussion revised to RP-170710 |
Alcatel-Lucent Shanghai-Bell, Alibaba, Apple, AT&T, British Telecom, Broadcom, Convida Wireless, Deutsche Telekom, DOCOMO, Ericsson, Etisalat, Huawei, Intel, KDDI, KT, LG Electronics, LGU+, NEC, Nokia, Ooredoo, Qualcomm, Samsung, Sierra Wireless, SK Telec | Rel-15 |
RP-75 AI: 9 |
revised | [WTS] [JSN] | ||
RP-170669 | Discussion on overall WI and SI of R15 |
discussion revision of RP-170385 |
ZTE Corporation | Rel-15 |
RP-75 AI: 9 |
noted | [WTS] [JSN] | ||
RP-170670 | Discussion on NR WI and time line |
discussion revision of RP-170384 |
ZTE Corporation | Rel-15 |
RP-75 AI: 9 |
noted | [WTS] [JSN] | ||
RP-170675 | Way Forward on 5G Time Plan | discussion | MediaTek Inc. | Rel-15 |
RP-75 AI: 9 |
noted | [WTS] [JSN] | ||
RP-170710 | Way Forward on the overall 5G NR workplan |
discussion revision of RP-170666 revised to RP-170741 |
Alcatel-Lucent Shanghai-Bell, Alibaba, Apple, AT&T, British Telecom, Broadcom, Convida Wireless, Deutsche Telekom, DOCOMO, Ericsson, Etisalat, Huawei, Intel, KDDI, KT, LG Electronics, LGU+, NEC, Nokia, Ooredoo, Qualcomm, Samsung, Sierra Wireless, SK Telec | Rel-15 |
RP-75 AI: 9 |
revised | [WTS] [JSN] | ||
RP-170741 | Way Forward on the overall 5G NR workplan |
discussion revision of RP-170710 |
Alcatel-Lucent Shanghai-Bell, Alibaba, Apple, AT&T, British Telecom, Broadcom, Convida Wireless, Deutsche Telekom, DOCOMO, Ericsson, Etisalat, Huawei, Intel, KDDI, KT, LG Electronics, LGU+, NEC, Nokia, Ooredoo, Qualcomm, Samsung, Sierra Wireless, SK Telec | Rel-15 |
RP-75 AI: 9 |
endorsed | [WTS] [JSN] | ||
RP-170790 | Way Forward on 5G NR TU Allocation | discussion | MediaTek | Rel-15 |
RP-75 AI: 9 |
withdrawn | [WTS] [JSN] |
25 documents (0.43845915794373 seconds)