Please enter the search related information in the fields below. Partial information works, e.g. "SP-21
" in the "tdoc" field lists all TSG SA documents from 2021. Regular expressions mostly work in all fields (e.g. "2[34].501
" in the "Spec" field lists all documents related to 23.501 and 24.501. Capitalization is disregarded, i.e. "3GPP
" gives the same results as "3gpp
".
Download results in JSON format
tdoc | Title | Type / Revs | Source | Spec / CR | S/WID | Release | Meeting | Status | Links |
---|---|---|---|---|---|---|---|---|---|
RP-160812 | Proposal for 5G-NR schedule adjustment and further definition |
discussion revised to RP-161154 |
VODAFONE Group Plc | Rel-14 |
RP-72 AI: 9 |
revised | [WTS] [JSN] | ||
RP-160893 | AT&T Views on Phase 1 Acceleration of Next Generation Systems | discussion | AT&T | FS_NG_SReq | Rel-14 |
RP-72 AI: 9 |
noted | [WTS] [JSN] | |
RP-160897 | Initial comparison of the standard work on essential functionalities of Standalone/Non-standalone 5G NR standardization in RAN side | discussion | China Mobile Com. Corporation | FS_NR_newRAT | Rel-14 |
RP-72 AI: 9 |
available | [WTS] [JSN] | |
RP-160898 | SA2 status and time plan on 5G New Core | discussion | China Mobile Com. Corporation | FS_NR_newRAT | Rel-14 |
RP-72 AI: 9 |
available | [WTS] [JSN] | |
RP-160916 | Discussion on work plan of NR | discussion | ZTE Corporation, ZTE Microelectronics, Spreadtrum | FS_NR_newRAT | Rel-14 |
RP-72 AI: 9 |
noted | [WTS] [JSN] | |
RP-160987 | Views on 5G schedule and phases | discussion | Huawei, HiSilicon | Rel-14 |
RP-72 AI: 9 |
withdrawn | [WTS] [JSN] | ||
RP-161011 | NR schedule |
discussion revised to RP-161190 |
Samsung | Rel-14 |
RP-72 AI: 9 |
revised | [WTS] [JSN] | ||
RP-161015 | Considerations on 5G-NR schedule | discussion | Orange, Telefonica, Telenor, Dish Networks, Swisscom | Rel-14 |
RP-72 AI: 9 |
noted | [WTS] [JSN] | ||
RP-161154 | Proposal for 5G-NR schedule adjustment and further definition |
discussion revision of RP-160812 |
Vodafone, AT&T, China Mobile, China Unicom, KDDI, NTT DOCOMO, SouthernLINC, Sprint, Telus, Acer, Ericsson, Hitachi, HTC, Huawei, Intel, ITRI, Mediatek, Mitsubishi Electric, Nokia, Qualcomm, Sony | Rel-14 |
RP-72 AI: 9 |
noted | [WTS] [JSN] | ||
RP-161166 | LS on 5G policy developments in Europe (EC_LS_160609; to: RAN; cc: -; contact: EC) |
LS in source LS: EC_LS_160609 |
EC | Rel-14 |
RP-72 AI: 9 |
noted | [WTS] [JSN] | ||
RP-161190 | NR schedule |
discussion revision of RP-161011 |
Samsung, Coolpad, Fiberhome, Oppo, Potevio, Xinwei, Xiaomi | Rel-14 |
RP-72 AI: 9 |
noted | [WTS] [JSN] | ||
RP-161192 | Wrap-up of NR session (Monday) |
discussion revised to RP-161193 |
RAN chair (Qualcomm) |
RP-72 AI: 9 |
revised | [WTS] [JSN] | |||
RP-161193 | Wrap-up of NR session (Monday) |
discussion revision of RP-161192 |
RAN chair (Qualcomm) |
RP-72 AI: 9 |
noted | [WTS] [JSN] | |||
RP-161198 | Way forward on NR URLLC timeline | discussion | CATR | Rel-14 |
RP-72 AI: 9 |
available | [WTS] [JSN] | ||
RP-161239 | NR schedule and phases |
discussion revised to RP-161253 |
Nokia | Rel-14 |
RP-72 AI: 9 |
revised | [WTS] [JSN] | ||
RP-161249 | Architecture configuration options for NR |
discussion revised to RP-161266 |
Deutsche Telekom | Rel-14 |
RP-72 AI: 9 |
revised | [WTS] [JSN] | ||
RP-161251 | Way forward on 5G NR Schedule | discussion | Verizon | Rel-14 |
RP-72 AI: 9 |
available | [WTS] [JSN] | ||
RP-161253 | NR schedule and phases |
discussion revision of RP-161239 |
RAN | Rel-14 |
RP-72 AI: 9 |
endorsed | [WTS] [JSN] | ||
RP-161266 | Architecture configuration options for NR |
discussion revision of RP-161249 |
Deutsche Telekom | Rel-14 |
RP-72 AI: 9 |
noted | [WTS] [JSN] | ||
RP-161268 | Snapshot of 5G activities | discussion | ETSI MCC | Rel-14 |
RP-72 AI: 9 |
available | [WTS] [JSN] | ||
RP-161269 | Tasks from joint RAN-SA session on 5G architecture options | report | RAN chair, SA chair | Rel-14 |
RP-72 AI: 9 |
endorsed | [WTS] [JSN] | ||
RP-161288 | Future RAN WG Planning for NR | discussion | RAN1 chairman,RAN2 chairman, RAN3 chairman, RAN4 chairman | Rel-14 |
RP-72 AI: 9 |
noted | [WTS] [JSN] | ||
RP-161310 | Combined NR and Next Generation time line | discussion | Nokia | Rel-14 |
RP-72 AI: 9 |
noted | [WTS] [JSN] |
23 documents (0.42006516456604 seconds)