Please enter the search related information in the fields below. Partial information works, e.g. "SP-21
" in the "tdoc" field lists all TSG SA documents from 2021. Regular expressions mostly work in all fields (e.g. "2[34].501
" in the "Spec" field lists all documents related to 23.501 and 24.501. Capitalization is disregarded, i.e. "3GPP
" gives the same results as "3gpp
".
Download results in JSON format
tdoc | Title | Type / Revs | Source | Spec / CR | S/WID | Release | Meeting | Status | Links |
---|---|---|---|---|---|---|---|---|---|
R2-2200038 | Work planning for R17 SL relay | Work Plan | OPPO, CMCC | NR_SL_relay-Core | Rel-17 |
R2-116-bis-e AI: 8.7.1 |
noted | [WTS] [JSN] | |
R2-2200062 | LS on the indication of discovery message and PC5-S signalling to ProSe layer (C1-217167; contact: CATT) |
LS in source LS: C1-217167 LS To: RAN2 LS reply in R2-2201696, R2-2201781 |
CT1 | 5G_ProSe | Rel-17 |
R2-116-bis-e AI: 8.7.1 |
noted | [WTS] [JSN] | |
R2-2200165 | Indication of Discovery Message and PC5-S Signalling to ProSe Layer | discussion | CATT | NR_SL_relay-Core | Rel-17 |
R2-116-bis-e AI: 8.7.1 |
noted | [WTS] [JSN] | |
R2-2200178 | Initial consideration on UE capability of sidelink relay | discussion | Qualcomm Incorporated | NR_SL_relay-Core |
R2-116-bis-e AI: 8.7.1 |
available | [WTS] [JSN] | ||
R2-2200364 | Running CR for TS 38.351 |
draft TS revised to R2-2201996 |
OPPO | NR_SL_relay-Core | Rel-17 |
R2-116-bis-e AI: 8.7.1 |
revised | [WTS] [JSN] | |
R2-2200365 | Remaining open issues for R17 SL relay | discussion | OPPO | NR_SL_relay-Core | Rel-17 |
R2-116-bis-e AI: 8.7.1 |
noted | [WTS] [JSN] | |
R2-2200366 | Discussion on C1-217167 | discussion | OPPO | NR_SL_relay-Core | Rel-17 |
R2-116-bis-e AI: 8.7.1 |
noted | [WTS] [JSN] | |
R2-2200658 | Running CR of 38.322 for SL Relay |
draftCR revised to R2-2201726 |
Samsung | NR_SL_relay-Core | Rel-17 |
R2-116-bis-e AI: 8.7.1 |
revised | [WTS] [JSN] | |
R2-2200659 | Running CR of 38.323 for SL Relay |
draftCR revised to R2-2201727 |
Samsung | NR_SL_relay-Core | Rel-17 |
R2-116-bis-e AI: 8.7.1 |
revised | [WTS] [JSN] | |
R2-2200789 | Stage 2 Running CR on Introduction of R17 SL Relay |
draftCR revised to R2-2201725 |
MediaTek Inc. | NR_SL_relay-Core | Rel-17 |
R2-116-bis-e AI: 8.7.1 |
revised | [WTS] [JSN] | |
R2-2200944 | Stage 2 corrections for SL Relay | draftCR | Nokia, Nokia Shanghai Bell, Ericsson | NR_SL_relay-Core | Rel-17 |
R2-116-bis-e AI: 8.7.1 |
noted | [WTS] [JSN] | |
R2-2200945 | RRC corrections for SL Relay | draftCR | Nokia, Nokia Shanghai Bell, Ericsson | NR_SL_relay-Core | Rel-17 |
R2-116-bis-e AI: 8.7.1 |
noted | [WTS] [JSN] | |
R2-2201160 | Running CR of 38.304 for SL relay |
draftCR revised to R2-2201728 |
Ericsson | NR_SL_relay-Core | Rel-17 |
R2-116-bis-e AI: 8.7.1 |
revised | [WTS] [JSN] | |
R2-2201507 | RRC running CR for SL relay |
draftCR revision of R2-2111490 revised to R2-2201811 |
Huawei, HiSilicon | NR_SL_relay-Core | Rel-17 |
R2-116-bis-e AI: 8.7.1 |
revised | [WTS] [JSN] | |
R2-2201508 | Stage3 open issues in RRC running CR | discussion | Huawei, HiSilicon | NR_SL_relay-Core | Rel-17 |
R2-116-bis-e AI: 8.7.1 |
noted | [WTS] [JSN] | |
R2-2201695 | Summary [AT116bis-e][606][Relay] CT1 LS on discovery (CATT) | discussion | CATT | NR_SL_relay-Core | Rel-17 |
R2-116-bis-e AI: 8.7.1 |
noted | [WTS] [JSN] | |
R2-2201696 | LS reply on the indication of discovery message and PC5-S signalling to ProSe layer |
LS out LS is reply to R2-2200062 LS To: CT1 revised to R2-2201781 |
CATT | 5G_ProSe | Rel-17 |
R2-116-bis-e AI: 8.7.1 |
revised | [WTS] [JSN] | |
R2-2201721 | Remaining Open issue list of R17 Sidelink Relay WI | discussion | OPPO | NR_SL_relay-Core | Rel-17 |
R2-116-bis-e AI: 8.7.1 |
noted | [WTS] [JSN] | |
R2-2201725 | Stage 2 Running CR on Introduction of R17 SL Relay |
draftCR revision of R2-2200789 |
MediaTek Inc. | NR_SL_relay-Core | Rel-17 |
R2-116-bis-e AI: 8.7.1 |
noted | [WTS] [JSN] | |
R2-2201726 | Running CR of 38.322 for SL Relay |
draftCR revision of R2-2200658 |
Samsung | NR_SL_relay-Core | Rel-17 |
R2-116-bis-e AI: 8.7.1 |
noted | [WTS] [JSN] | |
R2-2201727 | Running CR of 38.323 for SL Relay |
draftCR revision of R2-2200659 |
Samsung | NR_SL_relay-Core | Rel-17 |
R2-116-bis-e AI: 8.7.1 |
noted | [WTS] [JSN] | |
R2-2201728 | Running CR of 38.304 for SL relay |
draftCR revision of R2-2201160 |
Ericsson | NR_SL_relay-Core | Rel-17 |
R2-116-bis-e AI: 8.7.1 |
noted | [WTS] [JSN] | |
R2-2201781 | LS reply on the indication of discovery message and PC5-S signalling to ProSe layer |
LS out LS is reply to R2-2200062 LS To: CT1 revision of R2-2201696 |
RAN2 | NR_SL_relay-Core | Rel-17 |
R2-116-bis-e AI: 8.7.1 |
approved | [WTS] [JSN] | |
R2-2201811 | Introduction of Rel-17 Sidelink Relay |
draftCR revision of R2-2201507 |
Huawei, HiSilicon | NR_SL_relay-Core | Rel-17 |
R2-116-bis-e AI: 8.7.1 |
noted | [WTS] [JSN] | |
R2-2201905 | Summary report of [AT116bis-e][607][Relay] Relay UE capabilities (Qualcomm) | discussion | Qualcomm Incorporated | NR_SL_relay-Core | Rel-17 |
R2-116-bis-e AI: 8.7.1 |
noted | [WTS] [JSN] | |
R2-2201906 | Draft 38.306 CR for sidelink relay UE capabilities |
draftCR revised to R2-2203519 |
Qualcomm Incorporated | NR_SL_relay-Core | Rel-17 |
R2-116-bis-e AI: 8.7.1 |
noted | [WTS] [JSN] | |
R2-2201956 | MAC running CR for SL relay |
draftCR revision of R2-2111644 |
Apple | NR_SL_relay-Core | Rel-17 |
R2-116-bis-e AI: 8.7.1 |
noted | [WTS] [JSN] | |
R2-2201996 | Running CR for TS 38.351 |
draft TS revision of R2-2200364 |
OPPO | NR_SL_relay-Core | Rel-17 |
R2-116-bis-e AI: 8.7.1 |
available | [WTS] [JSN] |
28 documents (0.32575106620789 seconds)