Please enter the search related information in the fields below. Partial information works, e.g. "SP-21" in the "tdoc" field lists all TSG SA documents from 2021. Regular expressions mostly work in all fields (e.g. "2[34].501" in the "Spec" field lists all documents related to 23.501 and 24.501. Capitalization is disregarded, i.e. "3GPP" gives the same results as "3gpp".

Download results in JSON format

tdoc Title Type / Revs Source Spec / CR S/WID Release Meeting Status Links
R4-2300175 TP for TR 37.718-11-21 to include DC_1_n40-n77 pCR SK Telecom, Murata Manufacturing Co. Ltd 37.718-11-21 0.3.0 DC_R18_xBLTE_2BNR_yDL2UL-Core Rel-18 R4-106

AI: 8.6.2

approved [WTS] [JSN]
R4-2300176 TP for TR 37.718-11-21 to include DC_3_n40-n77 pCR SK Telecom, Murata Manufacturing Co. Ltd 37.718-11-21 0.3.0 DC_R18_xBLTE_2BNR_yDL2UL-Core Rel-18 R4-106

AI: 8.6.2

approved [WTS] [JSN]
R4-2300177 TP for TR 37.718-11-21 to include DC_5_n40-n77 pCR SK Telecom, Murata Manufacturing Co. Ltd 37.718-11-21 0.3.0 DC_R18_xBLTE_2BNR_yDL2UL-Core Rel-18 R4-106

AI: 8.6.2

approved [WTS] [JSN]
R4-2300178 TP for TR 37.718-11-21 to include DC_7_n40-n77 pCR SK Telecom, Murata Manufacturing Co. Ltd 37.718-11-21 0.3.0 DC_R18_xBLTE_2BNR_yDL2UL-Core Rel-18 R4-106

AI: 8.6.2

approved [WTS] [JSN]
R4-2300179 TP for TR 37.718-11-21 to include DC_5_n40-n78 pCR SK Telecom, Murata Manufacturing Co. Ltd 37.718-11-21 0.3.0 DC_R18_xBLTE_2BNR_yDL2UL-Core Rel-18 R4-106

AI: 8.6.2

approved [WTS] [JSN]
R4-2300181 Draft CR on TS 38.101-3: Support of n78C in DC_1_n40-n78, DC_3_n40-n78, and DC_7_n40-n78 draftCR SK Telecom, Murata Manufacturing Co. Ltd DC_R18_xBLTE_2BNR_yDL2UL-Core Rel-18 R4-106

AI: 8.6.2

endorsed [WTS] [JSN]
R4-2300534 TP for 37.718-11-21 to include DC_7_n1-n28 pCR Ericsson, BT 37.718-11-21 0.3.0 DC_R18_xBLTE_2BNR_yDL2UL Rel-18 R4-106

AI: 8.6.2

approved [WTS] [JSN]
R4-2300535 Draft CR 38.101-3 to add DC_1A/7A/7C_n1A/n3A-n78(2A), DC_1A/3A/3C-7A/7C_n3A-n78(2A), DC_3A/3C-7A/7C_n1A-n28A and DC_20A-(n)3AA-n67A draftCR

revised to R4-2303612

Ericsson, BT DC_R18_xBLTE_2BNR_yDL2UL Rel-18 R4-106

AI: 8.6.2

revised [WTS] [JSN]
R4-2300536 TP for TR 37.718-11-21: DC_(n)3AA-n78A and DC_(n)3AA-n78(2A) pCR

revised to R4-2303613

Ericsson, BT 37.718-11-21 0.3.0 DC_R18_xBLTE_2BNR_yDL2UL Rel-18 R4-106

AI: 8.6.2

revised [WTS] [JSN]
R4-2300957 Draft CR for 38.101-3 to add DC_3C-7A-32A_n1A-n78A draftCR Huawei, Hisilicon DC_R18_xBLTE_2BNR_yDL2UL Rel-18 R4-106

AI: 8.6.2

endorsed [WTS] [JSN]
R4-2301066 draft CR 38.101-3 for corrections EN-DC xLTE + 2NR draftCR Ericsson DC_R18_xBLTE_2BNR_yDL2UL Rel-18 R4-106

AI: 8.6.2

endorsed [WTS] [JSN]
R4-2301087 TP for 37.718-11-21 to include DC_(n)3-n7 pCR

revised to R4-2303614

Ericsson, BT plc 37.718-11-21 0.2.0 DC_R18_xBLTE_2BNR_yDL2UL Rel-18 R4-106

AI: 8.6.2

revised [WTS] [JSN]
R4-2301088 TP for 37.718-11-21 to include DC_(n)3-n28 pCR

revised to R4-2303615

Ericsson, BT plc 37.718-11-21 0.2.0 DC_R18_xBLTE_2BNR_yDL2UL Rel-18 R4-106

AI: 8.6.2

revised [WTS] [JSN]
R4-2301089 TP for 37.718-11-21 to include DC_(n)3-n67 pCR

revised to R4-2303616

Ericsson, BT plc 37.718-11-21 0.2.0 DC_R18_xBLTE_2BNR_yDL2UL Rel-18 R4-106

AI: 8.6.2

revised [WTS] [JSN]
R4-2301090 TP for 37.718-11-21 to include DC_66_n71-n77 pCR Ericsson 37.718-11-21 0.2.0 DC_R18_xBLTE_2BNR_yDL2UL Rel-18 R4-106

AI: 8.6.2

approved [WTS] [JSN]
R4-2301091 TP for 37.718-11-21 to include DC_2_n71-n77 pCR

revised to R4-2303629

Ericsson 37.718-11-21 0.2.0 DC_R18_xBLTE_2BNR_yDL2UL Rel-18 R4-106

AI: 8.6.2

revised [WTS] [JSN]
R4-2301120 Draft CR for 38.101-3 to introduce new configurations for ENDC combos with 2 NR bands draftCR Samsung, Spark DC_R18_xBLTE_2BNR_yDL2UL-Core Rel-18 R4-106

AI: 8.6.2

endorsed [WTS] [JSN]
R4-2301121 TP for TR 37.718-11-21 DC_1A_n5A-n40A pCR Samsung, Spark 37.718-11-21 0.3.0 DC_R18_xBLTE_2BNR_yDL2UL-Core Rel-18 R4-106

AI: 8.6.2

approved [WTS] [JSN]
R4-2301122 TP for TR 37.718-11-21 DC_7A_n5A-n40A pCR Samsung, Spark 37.718-11-21 0.3.0 DC_R18_xBLTE_2BNR_yDL2UL-Core Rel-18 R4-106

AI: 8.6.2

approved [WTS] [JSN]
R4-2301123 TP for TR 37.718-11-21 DC_28A_n5A-n40A pCR Samsung, Spark 37.718-11-21 0.3.0 DC_R18_xBLTE_2BNR_yDL2UL-Core Rel-18 R4-106

AI: 8.6.2

approved [WTS] [JSN]
R4-2301268 TP for TR 37.718-11-21 DC_3A_n8A-n41A pCR

revised to R4-2303617

ZTE Corporation 37.718-11-21 0.3.0 DC_R18_xBLTE_2BNR_yDL2UL-Core Rel-18 R4-106

AI: 8.6.2

revised [WTS] [JSN]
R4-2303612 Draft CR 38.101-3 to add DC_1A/7A/7C_n1A/n3A-n78(2A), DC_1A/3A/3C-7A/7C_n3A-n78(2A), DC_3A/3C-7A/7C_n1A-n28A and DC_20A-(n)3AA-n67A draftCR

revision of R4-2300535

Ericsson, BT DC_R18_xBLTE_2BNR_yDL2UL Rel-18 R4-106

AI: 8.6.2

endorsed [WTS] [JSN]
R4-2303613 TP for TR 37.718-11-21: DC_(n)3AA-n78A and DC_(n)3AA-n78(2A) pCR

revision of R4-2300536

Ericsson, BT 37.718-11-21 0.2.0 DC_R18_xBLTE_2BNR_yDL2UL Rel-18 R4-106

AI: 8.6.2

approved [WTS] [JSN]
R4-2303614 TP for 37.718-11-21 to include DC_(n)3-n78.6.2 pCR

revision of R4-2301087

Ericsson, BT plc 37.718-11-21 0.2.0 DC_R18_xBLTE_2BNR_yDL2UL Rel-18 R4-106

AI: 8.6.2

approved [WTS] [JSN]
R4-2303615 TP for 37.718-11-21 to include DC_(n)3-n28 pCR

revision of R4-2301088

Ericsson, BT plc 37.718-11-21 0.2.0 DC_R18_xBLTE_2BNR_yDL2UL Rel-18 R4-106

AI: 8.6.2

approved [WTS] [JSN]
R4-2303616 TP for 37.718-11-21 to include DC_(n)3-n67 pCR

revision of R4-2301089

Ericsson, BT plc 37.718-11-21 0.2.0 DC_R18_xBLTE_2BNR_yDL2UL Rel-18 R4-106

AI: 8.6.2

approved [WTS] [JSN]
R4-2303617 TP for TR 37.718-11-21 DC_3A_n8A-n41A pCR

revision of R4-2301268

ZTE Corporation 37.718-11-21 0.3.0 DC_R18_xBLTE_2BNR_yDL2UL-Core Rel-18 R4-106

AI: 8.6.2

approved [WTS] [JSN]
R4-2303629 TP for 37.718-11-21 to include DC_2_n71-n77 pCR

revision of R4-2301091

Ericsson 37.718-11-21 0.2.0 DC_R18_xBLTE_2BNR_yDL2UL Rel-18 R4-106

AI: 8.6.2

approved [WTS] [JSN]

28 documents (0.37307190895081 seconds)