Please enter the search related information in the fields below. Partial information works, e.g. "SP-21" in the "tdoc" field lists all TSG SA documents from 2021. Regular expressions mostly work in all fields (e.g. "2[34].501" in the "Spec" field lists all documents related to 23.501 and 24.501. Capitalization is disregarded, i.e. "3GPP" gives the same results as "3gpp".

Download results in JSON format

tdoc Title Type / Revs Source Spec / CR S/WID Release Meeting Status Links
S4-210722 Conclusions and next steps for Key Issue #1 draftCR

revision of S4aI211187

revised to S4-210901

BBC FS_5GMS_Multicast Rel-17 S4-114-e

AI: 8.6

revised [WTS] [JSN]
S4-210729 Draft TR 26.802 v1.2.8 draft TR TELUS FS_5GMS_Multicast Rel-17 S4-114-e

AI: 8.6

agreed [WTS] [JSN]
S4-210778 [FS_5GMS_Multicast] Updated time and work plan Work Plan

revised to S4-210916

TELUS S4-114-e

AI: 8.6

revised [WTS] [JSN]
S4-210779 [FS_5GMS_Multicast] pCR to TR 26.802 on conclusions pCR TELUS 26.802 1.2.8 FS_5GMS_Multicast Rel-17 S4-114-e

AI: 8.6

revised [WTS] [JSN]
S4-210802 [FS_5GMS_Multicast] General Updates pCR Qualcomm Incorporated 26.802 1.2.0 FS_5GMS_Multicast Rel-17 S4-114-e

AI: 8.6

noted [WTS] [JSN]
S4-210803 [FS_5GMS_Multicast] Key issue on re-use of MBMS service layer pCR

revised to S4-210906

Qualcomm Incorporated 26.802 1.2.0 FS_5GMS_Multicast Rel-17 S4-114-e

AI: 8.6

revised [WTS] [JSN]
S4-210804 [FS_5GMS_Multicast] Hybrid Services pCR

revised to S4-210922

Qualcomm Incorporated 26.802 1.2.0 FS_5GMS_Multicast Rel-17 S4-114-e

AI: 8.6

revised [WTS] [JSN]
S4-210805 [FS_5GMS_Multicast] Interworking pCR

revised to S4-210907

Qualcomm Incorporated 26.802 1.2.0 FS_5GMS_Multicast Rel-17 S4-114-e

AI: 8.6

revised [WTS] [JSN]
S4-210821 Handling of InBand Fragments on Nmb2 (former Nx2) pCR

revised to S4-210905

Ericsson LM 26.802 1.2.8 FS_5GMS_Multicast Rel-17 S4-114-e

AI: 8.6

revised [WTS] [JSN]
S4-210896 Correction on Dynamic Policy parameters (Rel-16) CR

revision of S4-210820

revised to S4-210904

Ericsson LM 26.512 16.2.1 CR#12 catF 5GMS3 Rel-16 S4-114-e

AI: 8.6

revised [WTS] [JSN]
S4-210901 Conclusions and next steps for Key Issue #1 discussion

revision of S4-210722

BBC FS_5GMS_Multicast Rel-17 S4-114-e

AI: 8.6

agreed [WTS] [JSN]
S4-210905 Handling of InBand Fragments on Nmb2 (former Nx2) pCR

revision of S4-210821

Ericsson LM 26.802 1.2.8 FS_5GMS_Multicast Rel-17 S4-114-e

AI: 8.6

agreed [WTS] [JSN]
S4-210906 [FS_5GMS_Multicast] Key issue on re-use of MBMS service layer pCR

revision of S4-210803

Qualcomm Incorporated 26.802 1.2.0 FS_5GMS_Multicast Rel-17 S4-114-e

AI: 8.6

agreed [WTS] [JSN]
S4-210907 [FS_5GMS_Multicast] Interworking pCR

revision of S4-210805

Qualcomm Incorporated 26.802 1.2.0 FS_5GMS_Multicast Rel-17 S4-114-e

AI: 8.6

agreed [WTS] [JSN]
S4-210922 [FS_5GMS_Multicast] Hybrid Services discussion

revision of S4-210804

Qualcomm Incorporated FS_5GMS_Multicast Rel-17 S4-114-e

AI: 8.6

agreed [WTS] [JSN]

15 documents (0.33285808563232 seconds)