Please enter the search related information in the fields below. Partial information works, e.g. "SP-21" in the "tdoc" field lists all TSG SA documents from 2021. Regular expressions mostly work in all fields (e.g. "2[34].501" in the "Spec" field lists all documents related to 23.501 and 24.501. Capitalization is disregarded, i.e. "3GPP" gives the same results as "3gpp".

Download results in JSON format

tdoc Title Type / Revs Source Spec / CR S/WID Release Meeting Status Links
S3-191806 Evaluation of Solution Solution #18 pCR Futurewei 33.861 1.1.0 FS_CIoT_sec_5G Rel-16 S3-95

AI: 8.6

merged [WTS] [JSN]
S3-191810 Update of Solution Solution #4 pCR Futurewei 33.861 1.1.0 FS_CIoT_sec_5G Rel-16 S3-95

AI: 8.6

approved [WTS] [JSN]
S3-191811 Evaluation of Solution #4 pCR Futurewei 33.861 1.1.0 FS_CIoT_sec_5G Rel-16 S3-95

AI: 8.6

noted [WTS] [JSN]
S3-191812 Conclusion for KI#2 for RRC based solutions pCR Futurewei 33.861 1.1.0 FS_CIoT_sec_5G Rel-16 S3-95

AI: 8.6

noted [WTS] [JSN]
S3-191813 Conclusion for KI#3 for RRC signaling based solutions pCR Futurewei 33.861 1.1.0 FS_CIoT_sec_5G Rel-16 S3-95

AI: 8.6

noted [WTS] [JSN]
S3-191835 LS on RRC Connection Re-Establishment for CP for NB-IoT connected to 5GC LS in

LS reply in S3-192394, S3-192394

R2-1908264 S3-95

AI: 8.6

replied to [WTS] [JSN]
S3-191870 Conclusion to KI #5 pCR Huawei, HiSilicon 33.861 1.1.0 FS_CIoT_sec_5G Rel-16 S3-95

AI: 8.6

noted [WTS] [JSN]
S3-191871 Mitigate DDoS Attacks on RAN based on RAN coordination pCR Huawei, HiSilicon 33.861 1.1.0 FS_CIoT_sec_5G Rel-16 S3-95

AI: 8.6

noted [WTS] [JSN]
S3-191872 New KI: Sleep deprivation attacks to CIOT terminals pCR Huawei, HiSilicon 33.861 1.1.0 FS_CIoT_sec_5G Rel-16 S3-95

AI: 8.6

noted [WTS] [JSN]
S3-191873 A solution to protect CIOT terminals from sleep deprivation attacks pCR Huawei, HiSilicon 33.861 1.1.0 FS_CIoT_sec_5G Rel-16 S3-95

AI: 8.6

noted [WTS] [JSN]
S3-191876 Update of Solution #6 - Use of UE Configuration Update pCR KPN 33.861 1.1.0 FS_CIoT_sec_5G Rel-16 S3-95

AI: 8.6

approved [WTS] [JSN]
S3-191879 Proposal for editor's note in FS_CIoT_sec_5G solution #15 pCR

revised to S3-192398

Philips International B.V. 33.861 1.1.0 FS_CIoT_sec_5G Rel-16 S3-95

AI: 8.6

revised [WTS] [JSN]
S3-191893 Editorial correction of TR 33.861 pCR NEC Europe Ltd 33.861 1.1.0 FS_CIoT_sec_5G Rel-16 S3-95

AI: 8.6

approved [WTS] [JSN]
S3-191909 Evaluation of the integrity protection provided by EDT solutions #4 and #18 pCR Qualcomm Incorporated 33.861 1.1.0 FS_CIoT_sec_5G Rel-16 S3-95

AI: 8.6

noted [WTS] [JSN]
S3-191920 Solution for integrity protection of EDT pCR Qualcomm Incorporated 33.861 1.1.0 FS_CIoT_sec_5G Rel-16 S3-95

AI: 8.6

noted [WTS] [JSN]
S3-191943 Nokia comments on R2-1908264 LS on RRC Connection Re-establishment discussion Nokia, Nokia Shanghai Bell S3-95

AI: 8.6

noted [WTS] [JSN]
S3-191951 Security solution for UL small data transfer in RRC Suspend and Resume with early data transmission (EDT) with legacy fall back pCR

revised to S3-192328

Intel China Ltd. 33.861 1.1.0 FS_CIoT_sec_5G Rel-16 S3-95

AI: 8.6

revised [WTS] [JSN]
S3-191952 Evaluation to Security solution 4 for UL small data transfer in RRC Suspend and Resume with early data transmission (EDT) pCR Intel China Ltd. 33.861 1.1.0 FS_CIoT_sec_5G Rel-16 S3-95

AI: 8.6

noted [WTS] [JSN]
S3-191953 Evaluation to Security solution 18 for UL small data transfer in RRC Suspend and Resume with early data transmission (EDT) pCR Intel China Ltd. 33.861 1.1.0 FS_CIoT_sec_5G Rel-16 S3-95

AI: 8.6

merged [WTS] [JSN]
S3-191980 Conclusion on Key Issue #7 pCR Lenovo, Motorola Mobility 33.861 1.1.0 FS_CIoT_sec_5G Rel-16 S3-95

AI: 8.6

noted [WTS] [JSN]
S3-192013 CIoT: Update to Solution #18 pCR

revised to S3-192400

Ericsson 33.861 1.1.0 FS_CIoT_sec_5G Rel-16 S3-95

AI: 8.6

revised [WTS] [JSN]
S3-192014 CIoT: Evaluation to Solution #18 pCR

revised to S3-192401

Ericsson 33.861 1.1.0 FS_CIoT_sec_5G Rel-16 S3-95

AI: 8.6

revised [WTS] [JSN]
S3-192015 CIoT: Conclusion to KI#2 and KI#3 pCR Ericsson 33.861 1.1.0 FS_CIoT_sec_5G Rel-16 S3-95

AI: 8.6

noted [WTS] [JSN]
S3-192016 CIOT: add evaluation to solution #4 pCR Ericsson 33.861 1.1.0 FS_CIoT_sec_5G Rel-16 S3-95

AI: 8.6

noted [WTS] [JSN]
S3-192017 CIOT: Optional support of RRC Inactive in eMTC connected to 5GC pCR Ericsson 33.861 1.1.0 FS_CIoT_sec_5G Rel-16 S3-95

AI: 8.6

noted [WTS] [JSN]
S3-192018 CIOT: New solution for UP IP in PDCP to protect UL EDT data in Msg3 pCR Ericsson 33.861 1.1.0 FS_CIoT_sec_5G Rel-16 S3-95

AI: 8.6

noted [WTS] [JSN]
S3-192019 DDoS protection based on NWDAF and Overload Control pCR Ericsson 33.861 1.1.0 FS_CIoT_sec_5G Rel-16 S3-95

AI: 8.6

noted [WTS] [JSN]
S3-192020 Conslusion for KI#5 pCR Ericsson 33.861 1.1.0 FS_CIoT_sec_5G Rel-16 S3-95

AI: 8.6

noted [WTS] [JSN]
S3-192021 Conslusion for KI#4 pCR Ericsson 33.861 1.1.0 FS_CIoT_sec_5G Rel-16 S3-95

AI: 8.6

noted [WTS] [JSN]
S3-192071 Delete EN in solution12 pCR Huawei, Hisilicon 33.861 1.1.0 FS_CIoT_sec_5G Rel-16 S3-95

AI: 8.6

approved [WTS] [JSN]
S3-192105 Address EN in solution 17 pCR Huawei, Hisilicon 33.861 1.1.0 FS_CIoT_sec_5G Rel-16 S3-95

AI: 8.6

approved [WTS] [JSN]
S3-192106 Update Solution 17 to Supplement Missing Part When Merging with S3-191389 pCR Huawei, Hisilicon 33.861 1.1.0 FS_CIoT_sec_5G Rel-16 S3-95

AI: 8.6

approved [WTS] [JSN]
S3-192107 Add Evaluation for Solution 17 pCR

revised to S3-192399

Huawei, Hisilicon 33.861 1.1.0 FS_CIoT_sec_5G Rel-16 S3-95

AI: 8.6

revised [WTS] [JSN]
S3-192108 Add Details and Evaluation for Solution 19 pCR

revised to S3-192402

Huawei, Hisilicon 33.861 1.1.0 FS_CIoT_sec_5G Rel-16 S3-95

AI: 8.6

revised [WTS] [JSN]
S3-192109 Discussion Paper for Mitigation of DDoS Attack discussion Huawei, Hisilicon Rel-16 S3-95

AI: 8.6

noted [WTS] [JSN]
S3-192110 conclusion for KI#4 pCR Huawei, Hisilicon 33.861 1.1.0 FS_CIoT_sec_5G Rel-16 S3-95

AI: 8.6

noted [WTS] [JSN]
S3-192111 Key Issue for RRC Connection Re-Establishment for the control plane for NB-IoT connected to 5GC pCR

revised to S3-192393

Huawei, Hisilicon 33.861 1.1.0 FS_CIoT_sec_5G Rel-16 S3-95

AI: 8.6

revised [WTS] [JSN]
S3-192112 Solution for RRC Connection Re-Establishment for the control plane for NB-IoT connected to 5GC pCR

revised to S3-192452

Huawei, Hisilicon 33.861 1.1.0 FS_CIoT_sec_5G Rel-16 S3-95

AI: 8.6

revised [WTS] [JSN]
S3-192113 Reply LS on RRC Connection Reestablishment for CP for NB-IoT connected to 5GC LS out

LS To: RAN2,CT4

revised to S3-192394

Huawei, Hisilicon Rel-16 S3-95

AI: 8.6

revised [WTS] [JSN]
S3-192114 Conclusion for KI#2 and KI#3 of frequent CIoT Ues pCR Huawei, Hisilicon 33.861 1.1.0 FS_CIoT_sec_5G Rel-16 S3-95

AI: 8.6

noted [WTS] [JSN]
S3-192115 Solution for Protection of NAS Redirection Message pCR

revised to S3-192404

Huawei, Hisilicon 33.861 1.1.0 FS_CIoT_sec_5G Rel-16 S3-95

AI: 8.6

revised [WTS] [JSN]
S3-192328 Security solution for UL small data transfer in RRC Suspend and Resume with early data transmission (EDT) with legacy fall back pCR

revision of S3-191951

Intel China Ltd. 33.861 1.1.0 FS_CIoT_sec_5G Rel-16 S3-95

AI: 8.6

noted [WTS] [JSN]
S3-192392 Draft TR 33.861 draft TR Ericsson FS_CIoT_sec_5G Rel-16 S3-95

AI: 8.6

approved [WTS] [JSN]
S3-192393 Key Issue for RRC Connection Re-Establishment for the control plane for NB-IoT connected to 5GC pCR

revision of S3-192111

Huawei, Hisilicon 33.861 1.1.0 FS_CIoT_sec_5G Rel-16 S3-95

AI: 8.6

approved [WTS] [JSN]
S3-192394 Reply LS on RRC Connection Reestablishment for CP for NB-IoT connected to 5GC LS out

LS is reply to S3-191835

LS To: RAN2,SA2

revision of S3-192113

Huawei Rel-16 S3-95

AI: 8.6

approved [WTS] [JSN]
S3-192397 Evaluation of Solution #4 pCR Futurewei 33.861 1.1.0 FS_CIoT_sec_5G Rel-16 S3-95

AI: 8.6

withdrawn [WTS] [JSN]
S3-192398 Proposal for editor's note in FS_CIoT_sec_5G solution #15 pCR

revision of S3-191879

Philips International B.V. 33.861 1.1.0 FS_CIoT_sec_5G Rel-16 S3-95

AI: 8.6

approved [WTS] [JSN]
S3-192399 Add Evaluation for Solution 17 pCR

revision of S3-192107

Huawei, Hisilicon 33.861 1.1.0 FS_CIoT_sec_5G Rel-16 S3-95

AI: 8.6

approved [WTS] [JSN]
S3-192400 CIoT: Update to Solution #18 pCR

revision of S3-192013

Ericsson 33.861 1.1.0 FS_CIoT_sec_5G Rel-16 S3-95

AI: 8.6

approved [WTS] [JSN]
S3-192401 CIoT: Evaluation to Solution #18 pCR

revision of S3-192014

Ericsson,Futurewei,Intel 33.861 1.1.0 FS_CIoT_sec_5G Rel-16 S3-95

AI: 8.6

approved [WTS] [JSN]
S3-192402 Add Details and Evaluation for Solution 19 pCR

revision of S3-192108

Huawei, Hisilicon 33.861 1.1.0 FS_CIoT_sec_5G Rel-16 S3-95

AI: 8.6

approved [WTS] [JSN]
S3-192404 Solution for Protection of NAS Redirection Message pCR

revision of S3-192115

Huawei, Hisilicon 33.861 1.1.0 FS_CIoT_sec_5G Rel-16 S3-95

AI: 8.6

approved [WTS] [JSN]
S3-192452 Solution for RRC Connection Re-Establishment for the control plane for NB-IoT connected to 5GC pCR

revision of S3-192112

Huawei, Hisilicon 33.861 1.1.0 FS_CIoT_sec_5G Rel-16 S3-95

AI: 8.6

approved [WTS] [JSN]

53 documents (0.32577896118164 seconds)