Please enter the search related information in the fields below. Partial information works, e.g. "SP-21
" in the "tdoc" field lists all TSG SA documents from 2021. Regular expressions mostly work in all fields (e.g. "2[34].501
" in the "Spec" field lists all documents related to 23.501 and 24.501. Capitalization is disregarded, i.e. "3GPP
" gives the same results as "3gpp
".
Download results in JSON format
tdoc | Title | Type / Revs | Source | Spec / CR | S/WID | Release | Meeting | Status | Links |
---|---|---|---|---|---|---|---|---|---|
S3-191806 | Evaluation of Solution Solution #18 | pCR | Futurewei | 33.861 1.1.0 | FS_CIoT_sec_5G | Rel-16 |
S3-95 AI: 8.6 |
merged | [WTS] [JSN] |
S3-191810 | Update of Solution Solution #4 | pCR | Futurewei | 33.861 1.1.0 | FS_CIoT_sec_5G | Rel-16 |
S3-95 AI: 8.6 |
approved | [WTS] [JSN] |
S3-191811 | Evaluation of Solution #4 | pCR | Futurewei | 33.861 1.1.0 | FS_CIoT_sec_5G | Rel-16 |
S3-95 AI: 8.6 |
noted | [WTS] [JSN] |
S3-191812 | Conclusion for KI#2 for RRC based solutions | pCR | Futurewei | 33.861 1.1.0 | FS_CIoT_sec_5G | Rel-16 |
S3-95 AI: 8.6 |
noted | [WTS] [JSN] |
S3-191813 | Conclusion for KI#3 for RRC signaling based solutions | pCR | Futurewei | 33.861 1.1.0 | FS_CIoT_sec_5G | Rel-16 |
S3-95 AI: 8.6 |
noted | [WTS] [JSN] |
S3-191835 | LS on RRC Connection Re-Establishment for CP for NB-IoT connected to 5GC |
LS in LS reply in S3-192394, S3-192394 |
R2-1908264 |
S3-95 AI: 8.6 |
replied to | [WTS] [JSN] | |||
S3-191870 | Conclusion to KI #5 | pCR | Huawei, HiSilicon | 33.861 1.1.0 | FS_CIoT_sec_5G | Rel-16 |
S3-95 AI: 8.6 |
noted | [WTS] [JSN] |
S3-191871 | Mitigate DDoS Attacks on RAN based on RAN coordination | pCR | Huawei, HiSilicon | 33.861 1.1.0 | FS_CIoT_sec_5G | Rel-16 |
S3-95 AI: 8.6 |
noted | [WTS] [JSN] |
S3-191872 | New KI: Sleep deprivation attacks to CIOT terminals | pCR | Huawei, HiSilicon | 33.861 1.1.0 | FS_CIoT_sec_5G | Rel-16 |
S3-95 AI: 8.6 |
noted | [WTS] [JSN] |
S3-191873 | A solution to protect CIOT terminals from sleep deprivation attacks | pCR | Huawei, HiSilicon | 33.861 1.1.0 | FS_CIoT_sec_5G | Rel-16 |
S3-95 AI: 8.6 |
noted | [WTS] [JSN] |
S3-191876 | Update of Solution #6 - Use of UE Configuration Update | pCR | KPN | 33.861 1.1.0 | FS_CIoT_sec_5G | Rel-16 |
S3-95 AI: 8.6 |
approved | [WTS] [JSN] |
S3-191879 | Proposal for editor's note in FS_CIoT_sec_5G solution #15 |
pCR revised to S3-192398 |
Philips International B.V. | 33.861 1.1.0 | FS_CIoT_sec_5G | Rel-16 |
S3-95 AI: 8.6 |
revised | [WTS] [JSN] |
S3-191893 | Editorial correction of TR 33.861 | pCR | NEC Europe Ltd | 33.861 1.1.0 | FS_CIoT_sec_5G | Rel-16 |
S3-95 AI: 8.6 |
approved | [WTS] [JSN] |
S3-191909 | Evaluation of the integrity protection provided by EDT solutions #4 and #18 | pCR | Qualcomm Incorporated | 33.861 1.1.0 | FS_CIoT_sec_5G | Rel-16 |
S3-95 AI: 8.6 |
noted | [WTS] [JSN] |
S3-191920 | Solution for integrity protection of EDT | pCR | Qualcomm Incorporated | 33.861 1.1.0 | FS_CIoT_sec_5G | Rel-16 |
S3-95 AI: 8.6 |
noted | [WTS] [JSN] |
S3-191943 | Nokia comments on R2-1908264 LS on RRC Connection Re-establishment | discussion | Nokia, Nokia Shanghai Bell |
S3-95 AI: 8.6 |
noted | [WTS] [JSN] | |||
S3-191951 | Security solution for UL small data transfer in RRC Suspend and Resume with early data transmission (EDT) with legacy fall back |
pCR revised to S3-192328 |
Intel China Ltd. | 33.861 1.1.0 | FS_CIoT_sec_5G | Rel-16 |
S3-95 AI: 8.6 |
revised | [WTS] [JSN] |
S3-191952 | Evaluation to Security solution 4 for UL small data transfer in RRC Suspend and Resume with early data transmission (EDT) | pCR | Intel China Ltd. | 33.861 1.1.0 | FS_CIoT_sec_5G | Rel-16 |
S3-95 AI: 8.6 |
noted | [WTS] [JSN] |
S3-191953 | Evaluation to Security solution 18 for UL small data transfer in RRC Suspend and Resume with early data transmission (EDT) | pCR | Intel China Ltd. | 33.861 1.1.0 | FS_CIoT_sec_5G | Rel-16 |
S3-95 AI: 8.6 |
merged | [WTS] [JSN] |
S3-191980 | Conclusion on Key Issue #7 | pCR | Lenovo, Motorola Mobility | 33.861 1.1.0 | FS_CIoT_sec_5G | Rel-16 |
S3-95 AI: 8.6 |
noted | [WTS] [JSN] |
S3-192013 | CIoT: Update to Solution #18 |
pCR revised to S3-192400 |
Ericsson | 33.861 1.1.0 | FS_CIoT_sec_5G | Rel-16 |
S3-95 AI: 8.6 |
revised | [WTS] [JSN] |
S3-192014 | CIoT: Evaluation to Solution #18 |
pCR revised to S3-192401 |
Ericsson | 33.861 1.1.0 | FS_CIoT_sec_5G | Rel-16 |
S3-95 AI: 8.6 |
revised | [WTS] [JSN] |
S3-192015 | CIoT: Conclusion to KI#2 and KI#3 | pCR | Ericsson | 33.861 1.1.0 | FS_CIoT_sec_5G | Rel-16 |
S3-95 AI: 8.6 |
noted | [WTS] [JSN] |
S3-192016 | CIOT: add evaluation to solution #4 | pCR | Ericsson | 33.861 1.1.0 | FS_CIoT_sec_5G | Rel-16 |
S3-95 AI: 8.6 |
noted | [WTS] [JSN] |
S3-192017 | CIOT: Optional support of RRC Inactive in eMTC connected to 5GC | pCR | Ericsson | 33.861 1.1.0 | FS_CIoT_sec_5G | Rel-16 |
S3-95 AI: 8.6 |
noted | [WTS] [JSN] |
S3-192018 | CIOT: New solution for UP IP in PDCP to protect UL EDT data in Msg3 | pCR | Ericsson | 33.861 1.1.0 | FS_CIoT_sec_5G | Rel-16 |
S3-95 AI: 8.6 |
noted | [WTS] [JSN] |
S3-192019 | DDoS protection based on NWDAF and Overload Control | pCR | Ericsson | 33.861 1.1.0 | FS_CIoT_sec_5G | Rel-16 |
S3-95 AI: 8.6 |
noted | [WTS] [JSN] |
S3-192020 | Conslusion for KI#5 | pCR | Ericsson | 33.861 1.1.0 | FS_CIoT_sec_5G | Rel-16 |
S3-95 AI: 8.6 |
noted | [WTS] [JSN] |
S3-192021 | Conslusion for KI#4 | pCR | Ericsson | 33.861 1.1.0 | FS_CIoT_sec_5G | Rel-16 |
S3-95 AI: 8.6 |
noted | [WTS] [JSN] |
S3-192071 | Delete EN in solution12 | pCR | Huawei, Hisilicon | 33.861 1.1.0 | FS_CIoT_sec_5G | Rel-16 |
S3-95 AI: 8.6 |
approved | [WTS] [JSN] |
S3-192105 | Address EN in solution 17 | pCR | Huawei, Hisilicon | 33.861 1.1.0 | FS_CIoT_sec_5G | Rel-16 |
S3-95 AI: 8.6 |
approved | [WTS] [JSN] |
S3-192106 | Update Solution 17 to Supplement Missing Part When Merging with S3-191389 | pCR | Huawei, Hisilicon | 33.861 1.1.0 | FS_CIoT_sec_5G | Rel-16 |
S3-95 AI: 8.6 |
approved | [WTS] [JSN] |
S3-192107 | Add Evaluation for Solution 17 |
pCR revised to S3-192399 |
Huawei, Hisilicon | 33.861 1.1.0 | FS_CIoT_sec_5G | Rel-16 |
S3-95 AI: 8.6 |
revised | [WTS] [JSN] |
S3-192108 | Add Details and Evaluation for Solution 19 |
pCR revised to S3-192402 |
Huawei, Hisilicon | 33.861 1.1.0 | FS_CIoT_sec_5G | Rel-16 |
S3-95 AI: 8.6 |
revised | [WTS] [JSN] |
S3-192109 | Discussion Paper for Mitigation of DDoS Attack | discussion | Huawei, Hisilicon | Rel-16 |
S3-95 AI: 8.6 |
noted | [WTS] [JSN] | ||
S3-192110 | conclusion for KI#4 | pCR | Huawei, Hisilicon | 33.861 1.1.0 | FS_CIoT_sec_5G | Rel-16 |
S3-95 AI: 8.6 |
noted | [WTS] [JSN] |
S3-192111 | Key Issue for RRC Connection Re-Establishment for the control plane for NB-IoT connected to 5GC |
pCR revised to S3-192393 |
Huawei, Hisilicon | 33.861 1.1.0 | FS_CIoT_sec_5G | Rel-16 |
S3-95 AI: 8.6 |
revised | [WTS] [JSN] |
S3-192112 | Solution for RRC Connection Re-Establishment for the control plane for NB-IoT connected to 5GC |
pCR revised to S3-192452 |
Huawei, Hisilicon | 33.861 1.1.0 | FS_CIoT_sec_5G | Rel-16 |
S3-95 AI: 8.6 |
revised | [WTS] [JSN] |
S3-192113 | Reply LS on RRC Connection Reestablishment for CP for NB-IoT connected to 5GC |
LS out LS To: RAN2,CT4 revised to S3-192394 |
Huawei, Hisilicon | Rel-16 |
S3-95 AI: 8.6 |
revised | [WTS] [JSN] | ||
S3-192114 | Conclusion for KI#2 and KI#3 of frequent CIoT Ues | pCR | Huawei, Hisilicon | 33.861 1.1.0 | FS_CIoT_sec_5G | Rel-16 |
S3-95 AI: 8.6 |
noted | [WTS] [JSN] |
S3-192115 | Solution for Protection of NAS Redirection Message |
pCR revised to S3-192404 |
Huawei, Hisilicon | 33.861 1.1.0 | FS_CIoT_sec_5G | Rel-16 |
S3-95 AI: 8.6 |
revised | [WTS] [JSN] |
S3-192328 | Security solution for UL small data transfer in RRC Suspend and Resume with early data transmission (EDT) with legacy fall back |
pCR revision of S3-191951 |
Intel China Ltd. | 33.861 1.1.0 | FS_CIoT_sec_5G | Rel-16 |
S3-95 AI: 8.6 |
noted | [WTS] [JSN] |
S3-192392 | Draft TR 33.861 | draft TR | Ericsson | FS_CIoT_sec_5G | Rel-16 |
S3-95 AI: 8.6 |
approved | [WTS] [JSN] | |
S3-192393 | Key Issue for RRC Connection Re-Establishment for the control plane for NB-IoT connected to 5GC |
pCR revision of S3-192111 |
Huawei, Hisilicon | 33.861 1.1.0 | FS_CIoT_sec_5G | Rel-16 |
S3-95 AI: 8.6 |
approved | [WTS] [JSN] |
S3-192394 | Reply LS on RRC Connection Reestablishment for CP for NB-IoT connected to 5GC |
LS out LS is reply to S3-191835 LS To: RAN2,SA2 revision of S3-192113 |
Huawei | Rel-16 |
S3-95 AI: 8.6 |
approved | [WTS] [JSN] | ||
S3-192397 | Evaluation of Solution #4 | pCR | Futurewei | 33.861 1.1.0 | FS_CIoT_sec_5G | Rel-16 |
S3-95 AI: 8.6 |
withdrawn | [WTS] [JSN] |
S3-192398 | Proposal for editor's note in FS_CIoT_sec_5G solution #15 |
pCR revision of S3-191879 |
Philips International B.V. | 33.861 1.1.0 | FS_CIoT_sec_5G | Rel-16 |
S3-95 AI: 8.6 |
approved | [WTS] [JSN] |
S3-192399 | Add Evaluation for Solution 17 |
pCR revision of S3-192107 |
Huawei, Hisilicon | 33.861 1.1.0 | FS_CIoT_sec_5G | Rel-16 |
S3-95 AI: 8.6 |
approved | [WTS] [JSN] |
S3-192400 | CIoT: Update to Solution #18 |
pCR revision of S3-192013 |
Ericsson | 33.861 1.1.0 | FS_CIoT_sec_5G | Rel-16 |
S3-95 AI: 8.6 |
approved | [WTS] [JSN] |
S3-192401 | CIoT: Evaluation to Solution #18 |
pCR revision of S3-192014 |
Ericsson,Futurewei,Intel | 33.861 1.1.0 | FS_CIoT_sec_5G | Rel-16 |
S3-95 AI: 8.6 |
approved | [WTS] [JSN] |
S3-192402 | Add Details and Evaluation for Solution 19 |
pCR revision of S3-192108 |
Huawei, Hisilicon | 33.861 1.1.0 | FS_CIoT_sec_5G | Rel-16 |
S3-95 AI: 8.6 |
approved | [WTS] [JSN] |
S3-192404 | Solution for Protection of NAS Redirection Message |
pCR revision of S3-192115 |
Huawei, Hisilicon | 33.861 1.1.0 | FS_CIoT_sec_5G | Rel-16 |
S3-95 AI: 8.6 |
approved | [WTS] [JSN] |
S3-192452 | Solution for RRC Connection Re-Establishment for the control plane for NB-IoT connected to 5GC |
pCR revision of S3-192112 |
Huawei, Hisilicon | 33.861 1.1.0 | FS_CIoT_sec_5G | Rel-16 |
S3-95 AI: 8.6 |
approved | [WTS] [JSN] |
53 documents (0.32577896118164 seconds)