Please enter the search related information in the fields below. Partial information works, e.g. "SP-21" in the "tdoc" field lists all TSG SA documents from 2021. Regular expressions mostly work in all fields (e.g. "2[34].501" in the "Spec" field lists all documents related to 23.501 and 24.501. Capitalization is disregarded, i.e. "3GPP" gives the same results as "3gpp".

Download results in JSON format

tdoc Title Type / Revs Source Spec / CR S/WID Release Meeting Status Links
R4-2400109 Discussion on maintenance issues for inter-RAT measurement without gaps discussion CATT NR_MG_enh2-Core Rel-18 R4-110

AI: 8.5.2.2

noted [WTS] [JSN]
R4-2400380 Discussion on R18 inter-RAT measurement without gap discussion Apple NR_MG_enh2-Core R4-110

AI: 8.5.2.2

noted [WTS] [JSN]
R4-2400381 CR for measurement delay for nogap-noncsg draftCR Apple NR_MG_enh2-Core Rel-18 R4-110

AI: 8.5.2.2

merged [WTS] [JSN]
R4-2400492 (NR_MG_enh2-Core) CR on UE Scheduling availability for inter-RAT NR measurement without gap CR Apple 36.133 18.4.0 CR#7278 catF NR_MG_enh2-Core Rel-18 R4-110

AI: 8.5.2.2

postponed [WTS] [JSN]
R4-2400875 On maintenance issues for inter-RAT measurement without gap requirements discussion vivo NR_MG_enh2-Core R4-110

AI: 8.5.2.2

noted [WTS] [JSN]
R4-2400970 Remaining issues on Inter-RAT measurement without gap discussion Ericsson NR_MG_enh2-Core Rel-18 R4-110

AI: 8.5.2.2

noted [WTS] [JSN]
R4-2401023 (NR_MG_enh2-Core) Discussion on UE capabilities for measurements without gap discussion CMCC R4-110

AI: 8.5.2.2

noted [WTS] [JSN]
R4-2401187 draftCR on introduction of interruprion requirements for inter-RAT NR measurement without gap (case a-1) draftCR

revised to R4-2403265

xiaomi NR_MG_enh2-Core Rel-18 R4-110

AI: 8.5.2.2

revised [WTS] [JSN]
R4-2401426 Maintenance CR on interruption requirements for measurements without gap CR

revised to R4-2403262

Intel Corporation 38.133 18.4.0 CR#4129 catF NR_MG_enh2-Core Rel-18 R4-110

AI: 8.5.2.2

revised [WTS] [JSN]
R4-2402015 Draft CR interruption requirements for interRAT measurements without gaps draftCR Nokia, Nokia Shanghai Bell NR_MG_enh2-Core Rel-18 R4-110

AI: 8.5.2.2

merged [WTS] [JSN]
R4-2402168 Discussion on remaining issues for inter-RAT MG-less measurement discussion Huawei, HiSilicon NR_MG_enh2-Core Rel-18 R4-110

AI: 8.5.2.2

noted [WTS] [JSN]
R4-2402169 draftCR on requirements for inter-RAT LTE measurement without gap draftCR

revised to R4-2403264

Huawei, HiSilicon NR_MG_enh2-Core Rel-18 R4-110

AI: 8.5.2.2

revised [WTS] [JSN]
R4-2402436 Discussion on interRAT measurements without gaps discussion Nokia, Nokia Shanghai Bell, BT Plc., Vodafone, Charter Communications Inc., Deutsche Telekom, TELECOM ITALIA S.p.A., Verizon NR_MG_enh2-Core Rel-18 R4-110

AI: 8.5.2.2

noted [WTS] [JSN]
R4-2402886 Discussion on inter-RAT measurements discussion MediaTek inc. NR_MG_enh2-Core Rel-18 R4-110

AI: 8.5.2.2

noted [WTS] [JSN]
R4-2403262 Maintenance CR on interruption requirements for measurements without gap CR

revision of R4-2401426

Intel Corporation 38.133 18.4.0 CR#41291 catF NR_MG_enh2-Core Rel-18 R4-110

AI: 8.5.2.2

endorsed [WTS] [JSN]
R4-2403264 draftCR on requirements for inter-RAT LTE measurement without gap draftCR

revision of R4-2402169

Huawei, HiSilicon NR_MG_enh2-Core Rel-18 R4-110

AI: 8.5.2.2

endorsed [WTS] [JSN]
R4-2403265 draftCR on introduction of interruprion requirements for inter-RAT NR measurement without gap (case a-1) draftCR

revision of R4-2401187

xiaomi NR_MG_enh2-Core Rel-18 R4-110

AI: 8.5.2.2

endorsed [WTS] [JSN]

17 documents (0.32116079330444 seconds)