Please enter the search related information in the fields below. Partial information works, e.g. "SP-21
" in the "tdoc" field lists all TSG SA documents from 2021. Regular expressions mostly work in all fields (e.g. "2[34].501
" in the "Spec" field lists all documents related to 23.501 and 24.501. Capitalization is disregarded, i.e. "3GPP
" gives the same results as "3gpp
".
Download results in JSON format
tdoc | Title | Type / Revs | Source | Spec / CR | S/WID | Release | Meeting | Status | Links |
---|---|---|---|---|---|---|---|---|---|
R4-2301478 | CR to TS 38.174: Addition of band n105 |
CR revised to R4-2303475 |
Ericsson | 38.174 17.2.0 CR#41 catB | NR_600MHz_APT-Core | Rel-18 |
R4-106 AI: 8.30.2 |
agreed | [WTS] [JSN] |
R4-2301479 | CR to TS 37.176-1: Introduction of NR band n105 |
CR revised to R4-2303476 |
Ericsson | 38.176-1 17.3.0 CR#17 catB | NR_600MHz_APT-Perf | Rel-18 |
R4-106 AI: 8.30.2 |
agreed | [WTS] [JSN] |
R4-2301480 | CR to TS 38.176-2: Introduction of NR band n105 |
CR revised to R4-2303477 |
Ericsson | 38.176-2 17.3.0 CR#19 catB | NR_600MHz_APT-Perf | Rel-18 |
R4-106 AI: 8.30.2 |
agreed | [WTS] [JSN] |
R4-2301724 | Discussion on the impact of APT60MHz on TS38.115-2 | discussion | ZTE Corporation |
R4-106 AI: 8.30.2 |
noted | [WTS] [JSN] | |||
R4-2301725 | CR to TS38.115-1 the introduction of APT600MHz |
CR revised to R4-2303478 |
ZTE | 38.115-1 17.0.0 CR#4 catB | NR_600MHz_APT-Perf | Rel-18 |
R4-106 AI: 8.30.2 |
agreed | [WTS] [JSN] |
R4-2301726 | CR to TS38.106 the introduction of APT600MHz |
CR revised to R4-2303479 |
ZTE | 38.106 17.3.0 CR#32 catB | NR_600MHz_APT-Core | Rel-18 |
R4-106 AI: 8.30.2 |
agreed | [WTS] [JSN] |
R4-2302458 | TP to TR 38.892: BS RF requirements (section 7.2) | pCR | Huawei, HiSilicon | 38.892 0.5.0 | NR_600MHz_APT-Core | Rel-18 |
R4-106 AI: 8.30.2 |
approved | [WTS] [JSN] |
R4-2302459 | CR to TS 36.104: Introduction of NR band n105, Rel-18 |
CR revised to R4-2303480 |
Huawei, HiSilicon | 36.104 18.0.0 CR#4967 catB | NR_600MHz_APT-Core | Rel-18 |
R4-106 AI: 8.30.2 |
agreed | [WTS] [JSN] |
R4-2302460 | CR to TS 36.141: Introduction of NR band n105, Rel-18 |
CR revised to R4-2303481 |
Huawei, HiSilicon | 36.141 18.0.0 CR#1352 catB | NR_600MHz_APT-Perf | Rel-18 |
R4-106 AI: 8.30.2 |
agreed | [WTS] [JSN] |
R4-2303475 | CR to TS 38.174: Addition of band n105 |
CR revision of R4-2301478 |
Ericsson | 38.133 18.0.0 CR#29031 catB | NR_TDD_n54-Core | Rel-18 |
R4-106 AI: 8.30.2 |
withdrawn | [WTS] [JSN] |
R4-2303476 | CR to TS 37.176-1: Introduction of NR band n105 |
CR revision of R4-2301479 |
Ericsson | 38.176-1 17.3.0 CR#171 catB | NR_600MHz_APT-Perf | Rel-18 |
R4-106 AI: 8.30.2 |
withdrawn | [WTS] [JSN] |
R4-2303477 | CR to TS 38.176-2: Introduction of NR band n105 |
CR revision of R4-2301480 |
Ericsson | 38.176-2 17.3.0 CR#191 catB | NR_600MHz_APT-Perf | Rel-18 |
R4-106 AI: 8.30.2 |
withdrawn | [WTS] [JSN] |
R4-2303478 | CR to TS38.115-1 the introduction of APT600MHz |
CR revision of R4-2301725 |
ZTE | 38.115-1 17.0.0 CR#41 catB | NR_600MHz_APT-Perf | Rel-18 |
R4-106 AI: 8.30.2 |
withdrawn | [WTS] [JSN] |
R4-2303479 | CR to TS38.106 the introduction of APT600MHz |
CR revision of R4-2301726 |
ZTE | 38.106 17.3.0 CR#321 catB | NR_600MHz_APT-Core | Rel-18 |
R4-106 AI: 8.30.2 |
withdrawn | [WTS] [JSN] |
R4-2303480 | CR to TS 36.104: Introduction of NR band n105, Rel-18 |
CR revision of R4-2302459 |
Huawei, HiSilicon | 36.104 18.0.0 CR#49671 catB | NR_600MHz_APT-Core | Rel-18 |
R4-106 AI: 8.30.2 |
withdrawn | [WTS] [JSN] |
R4-2303481 | CR to TS 36.141: Introduction of NR band n105, Rel-18 |
CR revision of R4-2302460 |
Huawei, HiSilicon | 36.141 18.0.0 CR#13521 catB | NR_600MHz_APT-Perf | Rel-18 |
R4-106 AI: 8.30.2 |
withdrawn | [WTS] [JSN] |
16 documents (0.33300614356995 seconds)