Please enter the search related information in the fields below. Partial information works, e.g. "SP-21
" in the "tdoc" field lists all TSG SA documents from 2021. Regular expressions mostly work in all fields (e.g. "2[34].501
" in the "Spec" field lists all documents related to 23.501 and 24.501. Capitalization is disregarded, i.e. "3GPP
" gives the same results as "3gpp
".
Download results in JSON format
tdoc | Title | Type / Revs | Source | Spec / CR | S/WID | Release | Meeting | Status | Links |
---|---|---|---|---|---|---|---|---|---|
S1-192231 | Common MPS Voice, Video and Data updates based on TR 22.854, MPS Phase 2 Feasibility Study |
CR revised to S1-192630 |
Perspecta Labs, CISA ECD,Verizon, AT&T, T-Mobile USA | 22.153 15.0.0 CR#41 catB | MPS2 | Rel-17 |
S1-87 AI: 8.3 |
revised | [WTS] [JSN] |
S1-192236 | MPS service specific updates based on TR 22.854, MPS Phase 2 Feasibility Study |
CR revised to S1-192631 |
Perspecta Labs, CISA ECD, Verizon, AT&T, T-Mobile USA | 22.153 15.0.0 CR#42 catB | MPS2 | Rel-17 |
S1-87 AI: 8.3 |
revised | [WTS] [JSN] |
S1-192248 | Normative work to update TS 22.153 based on the conclusions of TR 22.854, MPS Phase 2 Feasibility Study | discussion | Perspecta Labs, CISA ECD, Verizon, AT&T, T-Mobile USA | FS_MPS2, MPS2 |
S1-87 AI: 8.3 |
noted | [WTS] [JSN] | ||
S1-192630 | Common MPS Voice, Video and Data updates based on TR 22.854, MPS Phase 2 Feasibility Study |
CR revision of S1-192231 revised to S1-192730 |
Perspecta Labs, CISA ECD,Verizon, AT&T, T-Mobile USA | 22.153 15.0.0 CR#411 catB | MPS2 | Rel-17 |
S1-87 AI: 8.3 |
revised | [WTS] [JSN] |
S1-192631 | MPS service specific updates based on TR 22.854, MPS Phase 2 Feasibility Study |
CR revision of S1-192236 revised to S1-192731 |
Perspecta Labs, CISA ECD, Verizon, AT&T, T-Mobile USA | 22.153 15.0.0 CR#421 catB | MPS2 | Rel-17 |
S1-87 AI: 8.3 |
revised | [WTS] [JSN] |
S1-192730 | Common MPS Voice, Video and Data updates based on TR 22.854, MPS Phase 2 Feasibility Study |
CR revision of S1-192630 |
Perspecta Labs, CISA ECD,Verizon, AT&T, T-Mobile USA | 22.153 15.0.0 CR#412 catB | MPS2 | Rel-17 |
S1-87 AI: 8.3 |
agreed | [WTS] [JSN] |
S1-192731 | MPS service specific updates based on TR 22.854, MPS Phase 2 Feasibility Study |
CR revision of S1-192631 |
Perspecta Labs, CISA ECD, Verizon, AT&T, T-Mobile USA | 22.153 15.0.0 CR#422 catB | MPS2 | Rel-17 |
S1-87 AI: 8.3 |
agreed | [WTS] [JSN] |
7 documents (0.33068203926086 seconds)