Please enter the search related information in the fields below. Partial information works, e.g. "SP-21" in the "tdoc" field lists all TSG SA documents from 2021. Regular expressions mostly work in all fields (e.g. "2[34].501" in the "Spec" field lists all documents related to 23.501 and 24.501. Capitalization is disregarded, i.e. "3GPP" gives the same results as "3gpp".
Download results in JSON format
| tdoc | Title | Type / Revs | Source | Spec / CR | S/WID | Release | Meeting | Status | Links |
|---|---|---|---|---|---|---|---|---|---|
| R4-2318613 | Discussion on network B requirements of R18 MUSIM | discussion | Apple | NR_DualTxRx_MUSIM-Core |
R4-109 AI: 8.25.2.4 |
noted | [WTS] [JSN] | ||
| R4-2318614 | CR for NW B inactive state requirements |
draftCR revised to R4-2321414 |
Apple | NR_DualTxRx_MUSIM-Core | Rel-18 |
R4-109 AI: 8.25.2.4 |
revised | [WTS] [JSN] | |
| R4-2318869 | Discussion on network B requirements | discussion | Xiaomi | NR_DualTxRx_MUSIM | Rel-18 |
R4-109 AI: 8.25.2.4 |
noted | [WTS] [JSN] | |
| R4-2319034 | Discussion on network B requirements for MUSIM gaps | discussion | China Telecom | NR_DualTxRx_MUSIM-Core | Rel-18 |
R4-109 AI: 8.25.2.4 |
noted | [WTS] [JSN] | |
| R4-2319102 | Discussion on network B requirements for MUSIM gaps | discussion | CMCC |
R4-109 AI: 8.25.2.4 |
noted | [WTS] [JSN] | |||
| R4-2319139 | Discussions on NW-B’s requirement in MUSIM gaps | discussion | Ericsson | NR_DualTxRx_MUSIM-Core | Rel-18 |
R4-109 AI: 8.25.2.4 |
noted | [WTS] [JSN] | |
| R4-2319242 | On remaining issues for network B RRM requirements of MUSIM gaps | discussion | vivo | NR_DualTxRx_MUSIM-Core |
R4-109 AI: 8.25.2.4 |
noted | [WTS] [JSN] | ||
| R4-2319492 | Discussion on network B requirements | other | OPPO | NR_DualTxRx_MUSIM-Core | Rel-18 |
R4-109 AI: 8.25.2.4 |
noted | [WTS] [JSN] | |
| R4-2319988 | Discussion on NW B requirements with MUSIM gaps | discussion | Huawei, HiSilicon | NR_DualTxRx_MUSIM-Core | Rel-18 |
R4-109 AI: 8.25.2.4 |
noted | [WTS] [JSN] | |
| R4-2320296 | Network B requirements | discussion | Nokia, Nokia Shanghai Bell | NR_DualTxRx_MUSIM-Core | Rel-18 |
R4-109 AI: 8.25.2.4 |
noted | [WTS] [JSN] | |
| R4-2320908 | On requirements for Rel-17 MUSIM gaps - Network B requirements | other | Qualcomm Incorporated | NR_DualTxRx_MUSIM-Core | Rel-18 |
R4-109 AI: 8.25.2.4 |
noted | [WTS] [JSN] | |
| R4-2321010 | Discussion on NW B RRM requirements for MUSIM | discussion | MediaTek inc. | NR_DualTxRx_MUSIM-Core | Rel-18 |
R4-109 AI: 8.25.2.4 |
noted | [WTS] [JSN] | |
| R4-2321414 | CR for NW B inactive state requirements |
draftCR revision of R4-2318614 |
Apple | NR_DualTxRx_MUSIM-Core | Rel-18 |
R4-109 AI: 8.25.2.4 |
withdrawn | [WTS] [JSN] |
13 documents (0.39727902412415 seconds)