Please enter the search related information in the fields below. Partial information works, e.g. "SP-21
" in the "tdoc" field lists all TSG SA documents from 2021. Regular expressions mostly work in all fields (e.g. "2[34].501
" in the "Spec" field lists all documents related to 23.501 and 24.501. Capitalization is disregarded, i.e. "3GPP
" gives the same results as "3gpp
".
Download results in JSON format
tdoc | Title | Type / Revs | Source | Spec / CR | S/WID | Release | Meeting | Status | Links |
---|---|---|---|---|---|---|---|---|---|
RP-201423 | LS on Invitation to update the information in the IMT2020 roadmap (ITU-T JCA-IMT2020-LS08; to: CT, RAN, SA, All ITU-T Study Groups, ITU-R SG5, ITU-D SG2, BBF, ETSI ISG MEC, ETSI ISG NFV, ETSI Millimetre Wave Transmission, GSMA, IEEE 802.1, IEEE Future Networks Initiative, IEEE 1914, IETF, MEF Forum, NGNM, OASIS, oneM2M, ONF, ONAP, OSSDN, SCF, TM Forum, TTA, TSDSI; cc: -; contact: Ericsson) |
LS in source LS: ITU-T JCA-IMT2020-LS08 LS To: CT, RAN, SA, All ITU-T Study Groups, ITU-R SG5, ITU-D SG2, BBF, ETSI ISG MEC, ETSI ISG NFV, ETSI Millimetre Wave Transmission, GSMA, IEEE 802.1, IEEE Future Networks Initiative, IEEE 1914, IETF, MEF Forum, NGNM, OASIS, oneM2M, ONF, ONAP, OSSDN, SCF, |
ITU-T JCA IMT2020 |
RP-89-e AI: 8.2 |
noted | [WTS] [JSN] | |||
RP-201424 | LS on initiation of new work item Q.IMT2020-SAO “Requirement, framework and protocols for signalling network analyses and optimization in IMT-2020” (ITU-T SG11-LS147; to: RAN, CT, ETSI, GSMA; cc: -; contact: CAICT) |
LS in source LS: ITU-T SG11-LS147 LS To: RAN, CT, ETSI, GSMA |
ITU-T SG11 |
RP-89-e AI: 8.2 |
noted | [WTS] [JSN] | |||
RP-201427 | LS to RIT/SRIT proponents on the completion and conclusionsof steps 5 to 7 of the IMT-2020 process for the first release of the new Recommendation ITU-R M.[IMT-2020.SPECS] (ITU-R WP5D_TEMP_159; to: RAN, CT, SA, 3GPP Proponent, (collectively ARIB, ATIS, CCSA, ETSI, TSDSI, TTA, TTC), Korea (Republic of) Proponent, China (People’s Republic of) Proponent, ETSI (TC DECT) and DECT Forum Proponent, Nufront Proponent, TSDSI Proponent; cc: -; contact: Chief ITU-R SGD) |
LS in source LS: ITU-R WP5D_TEMP_159 LS To: RAN, CT, SA, 3GPP Proponent, (collectively ARIB, ATIS, CCSA, ETSI, TSDSI, TTA, TTC), Korea (Republic of) Proponent, China (People’s Republic of) Proponent, ETSI (TC DECT) and DECT Forum Proponent, Nufront Proponent, TSDSI Proponent LS reply in RP-202058 |
ITU-R WP5D |
RP-89-e AI: 8.2 |
replied to | [WTS] [JSN] | |||
RP-201428 | LS to transposing organizations on the completion of step 8 of IMT-2020 process for the first release of new Recommendation ITU-R M.[IMT-2020.SPECS] (ITU-R WP5D_TEMP_163(Rev.1); to: ETSI, TSDSI, ARIB, ATIS, CCSA, TTA, TTC; cc: RAN, KOREA (REPUBLIC OF), CHINA (PEOPLE’S REPUBLIC OF), TSDSI; contact: Chief ITU-R SGD) |
LS in source LS: ITU-R WP5D_TEMP_163(Rev.1) LS To: ETSI, TSDSI, ARIB, ATIS, CCSA, TTA, TTC |
ITU-R WP5D |
RP-89-e AI: 8.2 |
noted | [WTS] [JSN] | |||
RP-201433 | Draft reply LTI to ITU_WRC_LS_200428 = RP-200547 on 3GPP’s activities related to WRC-19 Resolutions (RT-200037; to: RAN, SA; cc: -; contact: Ericsson) |
LS in LS is reply to ITU_WRC_LS_200428 = RP-200547 source LS: RT-200037 LS To: RAN, SA |
3GPP ITU-R AH |
RP-89-e AI: 8.2 |
noted | [WTS] [JSN] | |||
RP-201439 | Draft reply LTI to ITU-R WP5D_TEMP_159 = RP-201427 on LS to RIT/SRIT Proponents on the completion and conclusions of steps 5 to 7 of the IMT-2020 process for the first release of new Recommendation ITU-R M.[IMT-2020.SPECS] (RT-200042; to: RAN, SA; cc: -; contact: ZTE) |
LS in LS is reply to ITU-R WP5D_TEMP_159 = RP-201427 source LS: RT-200042 LS To: RAN, SA |
3GPP ITU-R AH |
RP-89-e AI: 8.2 |
noted | [WTS] [JSN] | |||
RP-202054 | Draft reply LTI to ITU_WRC_LS_200428 = RP-200547 on 3GPP’s activities related to WRC-19 Resolutions (to: PCG; cc: SA; contact: Ericsson) |
LS out LS is reply to ITU_WRC_LS_200428 = RP-200547 LS To: PCG |
RAN |
RP-89-e AI: 8.2 |
agreed | [WTS] [JSN] | |||
RP-202058 | Draft reply LTI to ITU-R WP5D_TEMP_159 = RP-201427 on LS to RIT/SRIT Proponents on the completion and conclusions of steps 5 to 7 of the IMT-2020 process for the first release of new Recommendation ITU-R M.[IMT-2020.SPECS] (to: SA; cc: -; contact: ZTE) |
LS out LS is reply to ITU-R WP5D_TEMP_159 = RP-201427 LS To: SA |
RAN |
RP-89-e AI: 8.2 |
agreed | [WTS] [JSN] |
8 documents (0.32591199874878 seconds)