Please enter the search related information in the fields below. Partial information works, e.g. "SP-21
" in the "tdoc" field lists all TSG SA documents from 2021. Regular expressions mostly work in all fields (e.g. "2[34].501
" in the "Spec" field lists all documents related to 23.501 and 24.501. Capitalization is disregarded, i.e. "3GPP
" gives the same results as "3gpp
".
Download results in JSON format
tdoc | Title | Type / Revs | Source | Spec / CR | S/WID | Release | Meeting | Status | Links |
---|---|---|---|---|---|---|---|---|---|
R4-2311850 | CR on HST Requirements for SSB based BFD |
draftCR revised to R4-2314285 |
Xiaomi | NR_HST_FR2_enh | Rel-18 |
R4-108 AI: 8.12.4.1 |
revised | [WTS] [JSN] | |
R4-2312188 | On Simultaneous Multi-Panel Reception in HST FR2 Enhanced | discussion | Nokia, Nokia Shanghai Bell | NR_HST_FR2_enh-Core | Rel-18 |
R4-108 AI: 8.12.4.1 |
noted | [WTS] [JSN] | |
R4-2312189 | Updated Simulation Results for RRM Performance with Simultaneous L1 Measurements in HST FR2 | other | Nokia, Nokia Shanghai Bell | NR_HST_FR2_enh-Core | Rel-18 |
R4-108 AI: 8.12.4.1 |
noted | [WTS] [JSN] | |
R4-2312341 | draftCR on MRTD requirements for HST FR2 multi-panel Rx UE-s |
draftCR revised to R4-2314286 |
Intel Corporation | NR_HST_FR2_enh | Rel-18 |
R4-108 AI: 8.12.4.1 |
revised | [WTS] [JSN] | |
R4-2312359 | Simultaneous multi-panel operation for train roof-mounted FR2 high power devices | discussion | Ericsson | NR_HST_FR2_enh-Core | Rel-18 |
R4-108 AI: 8.12.4.1 |
noted | [WTS] [JSN] | |
R4-2312871 | Discussion on multi-panel simultaneous reception in FR2 eHST | discussion | Huawei, HiSilicon | NR_HST_FR2_enh-Core | Rel-18 |
R4-108 AI: 8.12.4.1 |
noted | [WTS] [JSN] | |
R4-2312872 | DraftCR on L1-RSRP requirements for R18 FR2 HST |
draftCR revised to R4-2314287 |
Huawei, HiSilicon | NR_HST_FR2_enh-Core | Rel-18 |
R4-108 AI: 8.12.4.1 |
revised | [WTS] [JSN] | |
R4-2313542 | Discussion on simultaneous multi-panel operation for train roof-mounted FR2 high power devices | discussion | Samsung | NR_HST_FR2_enh-Core | Rel-18 |
R4-108 AI: 8.12.4.1 |
noted | [WTS] [JSN] | |
R4-2313543 | Draft CR on scheduling availability of UE during L1-RSRP measurement for FR2 HST |
draftCR revised to R4-2314288 |
Samsung | NR_HST_FR2_enh-Core | Rel-18 |
R4-108 AI: 8.12.4.1 |
revised | [WTS] [JSN] | |
R4-2313707 | RRM aspects for simultaneous multi-panel reception for FR2 HST | discussion | Qualcomm Incorporated | NR_HST_FR2_enh-Core | Rel-18 |
R4-108 AI: 8.12.4.1 |
noted | [WTS] [JSN] | |
R4-2314285 | CR on HST Requirements for SSB based BFD |
draftCR revision of R4-2311850 |
Xiaomi | NR_HST_FR2_enh | Rel-18 |
R4-108 AI: 8.12.4.1 |
endorsed | [WTS] [JSN] | |
R4-2314286 | draftCR on MRTD requirements for HST FR2 multi-panel Rx UE-s |
draftCR revision of R4-2312341 |
Intel Corporation | NR_HST_FR2_enh | Rel-18 |
R4-108 AI: 8.12.4.1 |
endorsed | [WTS] [JSN] | |
R4-2314287 | DraftCR on L1-RSRP requirements for R18 FR2 HST |
draftCR revision of R4-2312872 revised to R4-2314459 |
Huawei, HiSilicon | NR_HST_FR2_enh-Core | Rel-18 |
R4-108 AI: 8.12.4.1 |
revised | [WTS] [JSN] | |
R4-2314288 | Draft CR on scheduling availability of UE during L1-RSRP measurement for FR2 HST |
draftCR revision of R4-2313543 |
Samsung | NR_HST_FR2_enh-Core | Rel-18 |
R4-108 AI: 8.12.4.1 |
withdrawn | [WTS] [JSN] | |
R4-2314459 | DraftCR on L1-RSRP requirements for R18 FR2 HST |
draftCR revision of R4-2314287 |
Huawei, HiSilicon | NR_HST_FR2_enh-Core | Rel-18 |
R4-108 AI: 8.12.4.1 |
endorsed | [WTS] [JSN] |
15 documents (0.34355211257935 seconds)