Please enter the search related information in the fields below. Partial information works, e.g. "SP-21
" in the "tdoc" field lists all TSG SA documents from 2021. Regular expressions mostly work in all fields (e.g. "2[34].501
" in the "Spec" field lists all documents related to 23.501 and 24.501. Capitalization is disregarded, i.e. "3GPP
" gives the same results as "3gpp
".
Download results in JSON format
tdoc | Title | Type / Revs | Source | Spec / CR | S/WID | Release | Meeting | Status | Links |
---|---|---|---|---|---|---|---|---|---|
S2-2004839 | Selection of CN node by NG-RAN node providing satellite access across multiple countries | draftCR | Vodafone | 5GSAT_ARCH | Rel-17 |
S2-140-e AI: 8.11 |
postponed | [WTS] [JSN] | |
S2-2004840 | Intra NG-RAN handover via CN for NR satellite access | draftCR | Vodafone | 5GSAT_ARCH | Rel-17 |
S2-140-e AI: 8.11 |
noted | [WTS] [JSN] | |
S2-2005052 | Addition of new values to RAT type IE | draftCR | TNO, THALES | 5GSAT_ARCH | Rel-16 |
S2-140-e AI: 8.11 |
noted | [WTS] [JSN] | |
S2-2005054 | Impact of NR(LEO), NR(MEO, NR(GEO) and NR(OTHERSAT) on 5GS procedures |
draftCR revised to S2-2006590 |
TNO, THALES | 5GSAT_ARCH | Rel-16 |
S2-140-e AI: 8.11 |
revised | [WTS] [JSN] | |
S2-2005055 | Procedures of utilizing backhaul related information during the PDU session establishment procedure | draftCR | TNO | 5GSAT_ARCH | Rel-16 |
S2-140-e AI: 8.11 |
noted | [WTS] [JSN] | |
S2-2005063 | Procedures of utilizing backhaul information during the PDU session modification procedure | draftCR | TNO | 5GSAT_ARCH | Rel-16 |
S2-140-e AI: 8.11 |
noted | [WTS] [JSN] | |
S2-2005190 | General description for NR based on satellite constellations |
draftCR revised to S2-2006591 |
XiaoMi | 5GSAT_ARCH | Rel-17 |
S2-140-e AI: 8.11 |
revised | [WTS] [JSN] | |
S2-2005191 | Access restrictions for NR RAT for Satellite Access | draftCR | XiaoMi | 5GSAT_ARCH | Rel-17 |
S2-140-e AI: 8.11 |
noted | [WTS] [JSN] | |
S2-2005228 | Support of new RATs in 5GS integrating satellite access |
draftCR revised to S2-2006592 |
CATT | 5GSAT_ARCH | Rel-17 |
S2-140-e AI: 8.11 |
revised | [WTS] [JSN] | |
S2-2005229 | Support of using satellite to provide backhaul connection | draftCR | CATT | 5GSAT_ARCH | Rel-17 |
S2-140-e AI: 8.11 |
postponed | [WTS] [JSN] | |
S2-2005230 | QoS control based on the backhaul information | draftCR | CATT | 5GSAT_ARCH | Rel-17 |
S2-140-e AI: 8.11 |
postponed | [WTS] [JSN] | |
S2-2005336 | Descriptions for satellite backhaul connected UPF selection | draftCR | Samsung | 5GSAT_ARCH | Rel-17 |
S2-140-e AI: 8.11 |
noted | [WTS] [JSN] | |
S2-2005338 | Procedures for satellite backhaul connected UPF selection | draftCR | Samsung | 5GSAT_ARCH | Rel-17 |
S2-140-e AI: 8.11 |
noted | [WTS] [JSN] | |
S2-2005476 | N4 Node Level procedures for satellite backhaul connection | draftCR | Samsung | 5GSAT_ARCH | Rel-17 |
S2-140-e AI: 8.11 |
noted | [WTS] [JSN] | |
S2-2005494 | Introduction of 5GSAT_ARCH solution #13 to NAS procedure | draftCR | Nokia, Nokia Shanghai Bell | 5GSAT_ARCH | Rel-17 |
S2-140-e AI: 8.11 |
noted | [WTS] [JSN] | |
S2-2005656 | [DRAFT] LS on new NR RAT types for SAT coding |
LS out LS To: CT WG4 |
THALES | 5GSAT_ARCH |
S2-140-e AI: 8.11 |
withdrawn | [WTS] [JSN] | ||
S2-2005759 | NAS timer for GEO | draftCR | OPPO | 5GSAT_ARCH | Rel-17 |
S2-140-e AI: 8.11 |
noted | [WTS] [JSN] | |
S2-2006590 | Impact of NR(LEO), NR(MEO, NR(GEO) and NR(OTHERSAT) on 5GS procedures |
draftCR revision of S2-2005054 |
TNO, THALES | 5GSAT_ARCH | Rel-17 |
S2-140-e AI: 8.11 |
approved | [WTS] [JSN] | |
S2-2006591 | Access restrictions for NR RAT for Satellite Access |
draftCR revision of S2-2005190 |
XiaoMi | 5GSAT_ARCH | Rel-17 |
S2-140-e AI: 8.11 |
approved | [WTS] [JSN] | |
S2-2006592 | Support of new RATs in 5GS integrating satellite access |
draftCR revision of S2-2005228 |
CATT, Nokia, Nokia Shanghai Bell | 5GSAT_ARCH | Rel-17 |
S2-140-e AI: 8.11 |
approved | [WTS] [JSN] |
20 documents (0.3369300365448 seconds)