Please enter the search related information in the fields below. Partial information works, e.g. "SP-21" in the "tdoc" field lists all TSG SA documents from 2021. Regular expressions mostly work in all fields (e.g. "2[34].501" in the "Spec" field lists all documents related to 23.501 and 24.501. Capitalization is disregarded, i.e. "3GPP" gives the same results as "3gpp".

Download results in JSON format

tdoc Title Type / Revs Source Spec / CR S/WID Release Meeting Status Links
S2-2004839 Selection of CN node by NG-RAN node providing satellite access across multiple countries draftCR Vodafone 5GSAT_ARCH Rel-17 S2-140-e

AI: 8.11

postponed [WTS] [JSN]
S2-2004840 Intra NG-RAN handover via CN for NR satellite access draftCR Vodafone 5GSAT_ARCH Rel-17 S2-140-e

AI: 8.11

noted [WTS] [JSN]
S2-2005052 Addition of new values to RAT type IE draftCR TNO, THALES 5GSAT_ARCH Rel-16 S2-140-e

AI: 8.11

noted [WTS] [JSN]
S2-2005054 Impact of NR(LEO), NR(MEO, NR(GEO) and NR(OTHERSAT) on 5GS procedures draftCR

revised to S2-2006590

TNO, THALES 5GSAT_ARCH Rel-16 S2-140-e

AI: 8.11

revised [WTS] [JSN]
S2-2005055 Procedures of utilizing backhaul related information during the PDU session establishment procedure draftCR TNO 5GSAT_ARCH Rel-16 S2-140-e

AI: 8.11

noted [WTS] [JSN]
S2-2005063 Procedures of utilizing backhaul information during the PDU session modification procedure draftCR TNO 5GSAT_ARCH Rel-16 S2-140-e

AI: 8.11

noted [WTS] [JSN]
S2-2005190 General description for NR based on satellite constellations draftCR

revised to S2-2006591

XiaoMi 5GSAT_ARCH Rel-17 S2-140-e

AI: 8.11

revised [WTS] [JSN]
S2-2005191 Access restrictions for NR RAT for Satellite Access draftCR XiaoMi 5GSAT_ARCH Rel-17 S2-140-e

AI: 8.11

noted [WTS] [JSN]
S2-2005228 Support of new RATs in 5GS integrating satellite access draftCR

revised to S2-2006592

CATT 5GSAT_ARCH Rel-17 S2-140-e

AI: 8.11

revised [WTS] [JSN]
S2-2005229 Support of using satellite to provide backhaul connection draftCR CATT 5GSAT_ARCH Rel-17 S2-140-e

AI: 8.11

postponed [WTS] [JSN]
S2-2005230 QoS control based on the backhaul information draftCR CATT 5GSAT_ARCH Rel-17 S2-140-e

AI: 8.11

postponed [WTS] [JSN]
S2-2005336 Descriptions for satellite backhaul connected UPF selection draftCR Samsung 5GSAT_ARCH Rel-17 S2-140-e

AI: 8.11

noted [WTS] [JSN]
S2-2005338 Procedures for satellite backhaul connected UPF selection draftCR Samsung 5GSAT_ARCH Rel-17 S2-140-e

AI: 8.11

noted [WTS] [JSN]
S2-2005476 N4 Node Level procedures for satellite backhaul connection draftCR Samsung 5GSAT_ARCH Rel-17 S2-140-e

AI: 8.11

noted [WTS] [JSN]
S2-2005494 Introduction of 5GSAT_ARCH solution #13 to NAS procedure draftCR Nokia, Nokia Shanghai Bell 5GSAT_ARCH Rel-17 S2-140-e

AI: 8.11

noted [WTS] [JSN]
S2-2005656 [DRAFT] LS on new NR RAT types for SAT coding LS out

LS To: CT WG4

THALES 5GSAT_ARCH S2-140-e

AI: 8.11

withdrawn [WTS] [JSN]
S2-2005759 NAS timer for GEO draftCR OPPO 5GSAT_ARCH Rel-17 S2-140-e

AI: 8.11

noted [WTS] [JSN]
S2-2006590 Impact of NR(LEO), NR(MEO, NR(GEO) and NR(OTHERSAT) on 5GS procedures draftCR

revision of S2-2005054

TNO, THALES 5GSAT_ARCH Rel-17 S2-140-e

AI: 8.11

approved [WTS] [JSN]
S2-2006591 Access restrictions for NR RAT for Satellite Access draftCR

revision of S2-2005190

XiaoMi 5GSAT_ARCH Rel-17 S2-140-e

AI: 8.11

approved [WTS] [JSN]
S2-2006592 Support of new RATs in 5GS integrating satellite access draftCR

revision of S2-2005228

CATT, Nokia, Nokia Shanghai Bell 5GSAT_ARCH Rel-17 S2-140-e

AI: 8.11

approved [WTS] [JSN]

20 documents (0.3369300365448 seconds)