Please enter the search related information in the fields below. Partial information works, e.g. "SP-21" in the "tdoc" field lists all TSG SA documents from 2021. Regular expressions mostly work in all fields (e.g. "2[34].501" in the "Spec" field lists all documents related to 23.501 and 24.501. Capitalization is disregarded, i.e. "3GPP" gives the same results as "3gpp".

Download results in JSON format

tdoc Title Type / Revs Source Spec / CR S/WID Release Meeting Status Links
R1-1608711 Common signal/information allocation for initial access and mobility discussion Mitsubishi Electric Corp R1-86

AI: 8.1.5.1

available [WTS] [JSN]
R1-1608783 NR Numerology Agnostic Synchronization Channel Design discussion CATT Rel-14 R1-86

AI: 8.1.5.1

available [WTS] [JSN]
R1-1608784 NR System Bandwidth Agnostic Synchronization Channel Design discussion CATT Rel-14 R1-86

AI: 8.1.5.1

available [WTS] [JSN]
R1-1608785 NR Multi-stage Synchronization Channel Design discussion CATT Rel-14 R1-86

AI: 8.1.5.1

available [WTS] [JSN]
R1-1608786 QCL assumption of NR Synchronization Signals and DM RS of Broadcast Channel discussion CATT Rel-14 R1-86

AI: 8.1.5.1

available [WTS] [JSN]
R1-1608812 Discussion on initial access in NR other Fujitsu R1-86

AI: 8.1.5.1

available [WTS] [JSN]
R1-1608846 Synchronization signal design in NR other Huawei, HiSilicon R1-86

AI: 8.1.5.1

available [WTS] [JSN]
R1-1608847 Channel raster and synchronization signal locations other Huawei, HiSilicon R1-86

AI: 8.1.5.1

available [WTS] [JSN]
R1-1608906 Discussion on multi-beam based synchronization signal and DL broadcast channel for NR discussion Guangdong OPPO Mobile Telecom. R1-86

AI: 8.1.5.1

available [WTS] [JSN]
R1-1608924 Discussion on Synchronization signal design discussion Spreadtrum Communications Rel-14 R1-86

AI: 8.1.5.1

noted [WTS] [JSN]
R1-1608944 Consideration on NR synchronization signal design other Sony R1-86

AI: 8.1.5.1

available [WTS] [JSN]
R1-1608951 Sub-carrier spacing considerations for NR DL Synchronization other Sony R1-86

AI: 8.1.5.1

available [WTS] [JSN]
R1-1608966 Considerations on sweeping time interval in NR discussion ZTE R1-86

AI: 8.1.5.1

available [WTS] [JSN]
R1-1608967 Frequency and Channel Raster Issue in NR discussion ZTE R1-86

AI: 8.1.5.1

available [WTS] [JSN]
R1-1609105 Overview on system information delivery and beam alignment/association other Samsung R1-86

AI: 8.1.5.1

available [WTS] [JSN]
R1-1609106 Discussion on minimum bandwidth for NR other Samsung R1-86

AI: 8.1.5.1

available [WTS] [JSN]
R1-1609107 Discussion on beam sweeping for initial access signals other Samsung R1-86

AI: 8.1.5.1

available [WTS] [JSN]
R1-1609108 Time domain mapping of initial access signals for the multi-beam case other Samsung R1-86

AI: 8.1.5.1

available [WTS] [JSN]
R1-1609109 Discussion on SI delivery for multi-beam before RACH other Samsung R1-86

AI: 8.1.5.1

available [WTS] [JSN]
R1-1609110 Initial access design consideration for unified framework other Samsung R1-86

AI: 8.1.5.1

available [WTS] [JSN]
R1-1609111 Multiplexing of synchronization signals and system information delivery channels for below 6 GHz and above 6 GHz other Samsung R1-86

AI: 8.1.5.1

available [WTS] [JSN]
R1-1609112 Numerology for synchronization signal other Samsung R1-86

AI: 8.1.5.1

available [WTS] [JSN]
R1-1609113 Overview on issues on NR downlink synchronization other Samsung R1-86

AI: 8.1.5.1

available [WTS] [JSN]
R1-1609114 Carrier raster and synchronization signal transmission other Samsung R1-86

AI: 8.1.5.1

available [WTS] [JSN]
R1-1609115 Discussion on NR paging design other Samsung R1-86

AI: 8.1.5.1

available [WTS] [JSN]
R1-1609146 Discussion on numerology of synchronisation signals discussion NEC FS_NR_newRAT Rel-15 R1-86

AI: 8.1.5.1

available [WTS] [JSN]
R1-1609147 Discussion on NR synchronization signal and essential system information mapping discussion NEC FS_NR_newRAT Rel-15 R1-86

AI: 8.1.5.1

available [WTS] [JSN]
R1-1609152 Proposals for beamformed synchronization signals discussion NEC FS_NR_newRAT Rel-15 R1-86

AI: 8.1.5.1

available [WTS] [JSN]
R1-1609264 Issues on NR Initial Access discussion LG Electronics R1-86

AI: 8.1.5.1

available [WTS] [JSN]
R1-1609265 Numerology for NR Synchronization Signal discussion LG Electronics R1-86

AI: 8.1.5.1

available [WTS] [JSN]
R1-1609308 Beam Sweeping using Multi-width Beams other CMCC R1-86

AI: 8.1.5.1

available [WTS] [JSN]
R1-1609314 Initial timing and beam acquisition for multi-beam based approach discussion KT Corp. R1-86

AI: 8.1.5.1

available [WTS] [JSN]
R1-1609328 Definition of a Downlink Basic Beacon Unit in the Unified Framework for NR Initial Access discussion MediaTek Inc. R1-86

AI: 8.1.5.1

available [WTS] [JSN]
R1-1609329 Synchronization Signal Design in CP-OFDM Based on Time-Frequency Hopping Patterns discussion MediaTek Inc. R1-86

AI: 8.1.5.1

available [WTS] [JSN]
R1-1609330 Link level simulation results for NR initial synchronization and cell search discussion

revised to R1-1610435

MediaTek Inc. R1-86

AI: 8.1.5.1

revised [WTS] [JSN]
R1-1609331 System level simulation results for NR initial synchronization and cell search discussion MediaTek Inc. R1-86

AI: 8.1.5.1

withdrawn [WTS] [JSN]
R1-1609394 Design of synchronization signal for supporting different numerologies in NR discussion ETRI R1-86

AI: 8.1.5.1

available [WTS] [JSN]
R1-1609436 Support of multiple numerologies in synchronization signal design other Huawei, HiSilicon R1-86

AI: 8.1.5.1

noted [WTS] [JSN]
R1-1609438 Initial evaluation results for initial access other Huawei, HiSilicon R1-86

AI: 8.1.5.1

available [WTS] [JSN]
R1-1609562 Consideration on narrowband anchor based access discussion MediaTek Inc. R1-86

AI: 8.1.5.1

available [WTS] [JSN]
R1-1609668 NR Synchronization signals for idle and connected mode mobility discussion Ericsson R1-86

AI: 8.1.5.1

available [WTS] [JSN]
R1-1609669 Overview of synchronization signal design for NR initial access discussion Ericsson R1-86

AI: 8.1.5.1

available [WTS] [JSN]
R1-1609697 Discussion of NR Initial Access discussion Beijing Xinwei Telecom Techn. R1-86

AI: 8.1.5.1

available [WTS] [JSN]
R1-1609701 NR synchronization signal and DL broadcast signal discussion

revised to R1-1612229

Panasonic Corporation R1-86

AI: 8.1.5.1

available [WTS] [JSN]
R1-1609818 NR PSS Design for Wideband and Narrowband UEs discussion Sierra Wireless, S.A. Rel-14 R1-86

AI: 8.1.5.1

available [WTS] [JSN]
R1-1609875 Numerology for DL synchronization in NR other Sharp R1-86

AI: 8.1.5.1

available [WTS] [JSN]
R1-1609879 Discussion on the design for synchronization signal other Shenzhen Coolpad Technologies R1-86

AI: 8.1.5.1

available [WTS] [JSN]
R1-1609917 Synchronisation signal in NR other Motorola Mobility R1-86

AI: 8.1.5.1

available [WTS] [JSN]
R1-1609920 Considerations for Initial Synchronization in NR discussion InterDigital Communications Rel-14 R1-86

AI: 8.1.5.1

available [WTS] [JSN]
R1-1610073 Discussion on initial access design for NR discussion NTT DOCOMO, INC. R1-86

AI: 8.1.5.1

available [WTS] [JSN]
R1-1610074 Performance evaluation results on NR synchronization signals discussion

revised to R1-1610499

NTT DOCOMO, INC. R1-86

AI: 8.1.5.1

revised [WTS] [JSN]
R1-1610156 Single beam SYNC design discussion Qualcomm Incorporated R1-86

AI: 8.1.5.1

noted [WTS] [JSN]
R1-1610157 Single beam PBCH design discussion Qualcomm Incorporated R1-86

AI: 8.1.5.1

available [WTS] [JSN]
R1-1610158 Revised simulation assumptions and metrics for SYNC evaluatoin discussion Qualcomm Incorporated R1-86

AI: 8.1.5.1

available [WTS] [JSN]
R1-1610159 Multi-beam SYNC design discussion Qualcomm Incorporated R1-86

AI: 8.1.5.1

noted [WTS] [JSN]
R1-1610160 Multi-beam PBCH design discussion Qualcomm Incorporated R1-86

AI: 8.1.5.1

withdrawn [WTS] [JSN]
R1-1610161 Multi-beam SYNC evaluation discussion Qualcomm Incorporated R1-86

AI: 8.1.5.1

available [WTS] [JSN]
R1-1610162 System Information transmission considering different UE BWs discussion Qualcomm Incorporated R1-86

AI: 8.1.5.1

withdrawn [WTS] [JSN]
R1-1610203 Synchronization in NR considering beam sweeping discussion ASUSTEK COMPUTER (SHANGHAI) R1-86

AI: 8.1.5.1

available [WTS] [JSN]
R1-1610204 Impact of multiplexing multiple numerologies on initial access discussion ASUSTEK COMPUTER (SHANGHAI) R1-86

AI: 8.1.5.1

available [WTS] [JSN]
R1-1610207 Discussion on System Information Delivery in NR discussion III R1-86

AI: 8.1.5.1

available [WTS] [JSN]
R1-1610242 Frame structure support for DL and UL sweeping subframes discussion Nokia, Alcatel-Lucent Shanghai Bell R1-86

AI: 8.1.5.1

available [WTS] [JSN]
R1-1610286 Numerology for NR Synchronization Signals discussion Nokia, Alcatel-Lucent Shanghai Bell R1-86

AI: 8.1.5.1

available [WTS] [JSN]
R1-1610287 On the synchronization signal design principle in NR discussion Nokia, Alcatel-Lucent Shanghai Bell, Verizon Wireless R1-86

AI: 8.1.5.1

available [WTS] [JSN]
R1-1610288 Beam management in initial access discussion Nokia, Alcatel-Lucent Shanghai Bell R1-86

AI: 8.1.5.1

available [WTS] [JSN]
R1-1610289 Downlink Discovery Signal for NR discussion Nokia, Alcatel-Lucent Shanghai Bell, Verizon Wireless R1-86

AI: 8.1.5.1

available [WTS] [JSN]
R1-1610290 Initial Synch Signal Performance Results discussion Nokia, Alcatel-Lucent Shanghai Bell R1-86

AI: 8.1.5.1

available [WTS] [JSN]
R1-1610291 Physical Layer Cell Identity in Initial Access discussion Nokia, Alcatel-Lucent Shanghai Bell R1-86

AI: 8.1.5.1

available [WTS] [JSN]
R1-1610292 DL Signals for Mobility Measurements in NR discussion Nokia, Alcatel-Lucent Shanghai Bell R1-86

AI: 8.1.5.1

available [WTS] [JSN]
R1-1610293 Cell Identification in NR discussion Nokia, Alcatel-Lucent Shanghai Bell R1-86

AI: 8.1.5.1

available [WTS] [JSN]
R1-1610294 On scalable and band agnostic single-beam and multi-beam initial access discussion Nokia, Alcatel-Lucent Shanghai Bell R1-86

AI: 8.1.5.1

withdrawn [WTS] [JSN]
R1-1610318 Open Items in Synchronization Signal Design discussion Nokia, Alcatel-Lucent Shanghai Bell R1-86

AI: 8.1.5.1

available [WTS] [JSN]
R1-1610351 A framework for initial access for NR discussion

revised to R1-1612309

INTERDIGITAL COMMUNICATIONS FS_NR_newRAT Rel-14 R1-86

AI: 8.1.5.1

available [WTS] [JSN]
R1-1610353 Long Network DTX in NR discussion

revised to R1-1610628

Ericsson R1-86

AI: 8.1.5.1

revised [WTS] [JSN]
R1-1610354 System information acquisition principle for NR discussion Ericsson R1-86

AI: 8.1.5.1

available [WTS] [JSN]
R1-1610356 Considerations for DL Broadcast Channel discussion InterDigital Communications Rel-14 R1-86

AI: 8.1.5.1

available [WTS] [JSN]
R1-1610371 Discussion on Sync Signal Design for NR discussion Convida Wireless LLC R1-86

AI: 8.1.5.1

available [WTS] [JSN]
R1-1610372 Synchronization on Beamforming Initial Access Operations discussion Convida Wireless LLC R1-86

AI: 8.1.5.1

available [WTS] [JSN]
R1-1610378 Preliminary performance evaluation of different beamforming options for NR synchronization signals discussion Intel Corporation R1-86

AI: 8.1.5.1

available [WTS] [JSN]
R1-1610400 On NR DL synchronization discussion Intel Corporation R1-86

AI: 8.1.5.1

available [WTS] [JSN]
R1-1610435 Link level simulation results for NR initial synchronization and cell search discussion

revision of R1-1609330

MediaTek Inc. R1-86

AI: 8.1.5.1

noted [WTS] [JSN]
R1-1610498 Way Forward on NR initial access sgnals/channels discussion NTT DOCOMO, Intel Corporation, Ericsson, Qualcomm, InterDigital R1-86

AI: 8.1.5.1

noted [WTS] [JSN]
R1-1610499 Performance evaluation results on NR synchronization signals discussion

revision of R1-1610074

NTT DOCOMO, INC. R1-86

AI: 8.1.5.1

available [WTS] [JSN]
R1-1610522 Way Forward on unified structure of DL sync signal discussion Intel Corporation, NTT DOCOMO, ZTE, ZTE Microelectronics, ETRI, InterDigital R1-86

AI: 8.1.5.1

noted [WTS] [JSN]
R1-1610538 Way forward on SYNC periodicity discussion

revised to R1-1610722

Qualcomm Incorporated R1-86

AI: 8.1.5.1

noted [WTS] [JSN]
R1-1610550 Way Forward on multiplexing of Sync and Broadcast signals discussion Qualcomm Incorporated, CATT R1-86

AI: 8.1.5.1

noted [WTS] [JSN]
R1-1610558 Way Forward on Synchronization signal for NR initial access discussion Huawei, HiSilicon R1-86

AI: 8.1.5.1

noted [WTS] [JSN]
R1-1610567 Way Forward on multiplexing of sync signal discussion Samsung R1-86

AI: 8.1.5.1

noted [WTS] [JSN]
R1-1610628 Long Network DTX in NR discussion

revision of R1-1610353

Ericsson R1-86

AI: 8.1.5.1

available [WTS] [JSN]
R1-1610722 Way forward on SYNC periodicity discussion

revision of R1-1610538

Qualcomm Incorporated R1-86

AI: 8.1.5.1

noted [WTS] [JSN]
R1-1610751 Way Forward on Symbol Index indication in NR-SS discussion Samsung R1-86

AI: 8.1.5.1

withdrawn [WTS] [JSN]
R1-1610839 Way Forward on Updated Link Level Evaluation Assumptions for Initial Access in NR discussion Qualcomm R1-86

AI: 8.1.5.1

noted [WTS] [JSN]
R1-1610840 Way Forward on Multiplexing of SYNC and Broadcast Signals discussion Qualcomm R1-86

AI: 8.1.5.1

available [WTS] [JSN]
R1-1610844 Offline discussion summary of initial access for NR discussion NTT DOCOMO R1-86

AI: 8.1.5.1

noted [WTS] [JSN]
R1-1610954 WF on synchronization and carrier rasters discussion

revised to R1-1611035

Huawei, HiSilicon, Ericsson, NTT Docomo, Fujitsu R1-86

AI: 8.1.5.1

revised [WTS] [JSN]
R1-1610959 WF on Updated Link Level Evaluation Assumptions for Initial Access in NR discussion

revised to R1-1610987

Qualcomm, NTT DOCOMO, Samsung, Intel R1-86

AI: 8.1.5.1

revised [WTS] [JSN]
R1-1610987 WF on Updated Link Level Evaluation Assumptions for Initial Access in NR discussion

revision of R1-1610959

Qualcomm, NTT DOCOMO, Samsung, Intel R1-86

AI: 8.1.5.1

agreed [WTS] [JSN]
R1-1610991 WF on Updated System Level Evaluation Assumptions for Initial Access in NR discussion

revised to R1-1611038

Qualcomm R1-86

AI: 8.1.5.1

revised [WTS] [JSN]
R1-1611015 WF on Assumptions for Comparing Different SYNC Multiplexing Techniques discussion Qualcomm R1-86

AI: 8.1.5.1

noted [WTS] [JSN]
R1-1611024 Offline Thursday discussion summary of initial access for NR discussion NTT DOCOMO R1-86

AI: 8.1.5.1

noted [WTS] [JSN]
R1-1611035 WF on synchronization and carrier rasters discussion

revision of R1-1610954

Huawei, HiSilicon R1-86

AI: 8.1.5.1

noted [WTS] [JSN]
R1-1611038 WF on Updated System Level Evaluation Assumptions for Initial Access in NR discussion

revision of R1-1610991

Qualcomm R1-86

AI: 8.1.5.1

agreed [WTS] [JSN]

102 documents (0.29216003417969 seconds)