Please enter the search related information in the fields below. Partial information works, e.g. "SP-21
" in the "tdoc" field lists all TSG SA documents from 2021. Regular expressions mostly work in all fields (e.g. "2[34].501
" in the "Spec" field lists all documents related to 23.501 and 24.501. Capitalization is disregarded, i.e. "3GPP
" gives the same results as "3gpp
".
Download results in JSON format
tdoc | Title | Type / Revs | Source | Spec / CR | S/WID | Release | Meeting | Status | Links |
---|---|---|---|---|---|---|---|---|---|
R1-1608661 | Summary of [86-20] email discussion on MIMO calibration for NR | other | ZTE, ZTE Microelectronics |
R1-86 AI: 8.1.4.5 |
noted | [WTS] [JSN] | |||
R1-1608662 | Phase 1 calibration results for NR MIMO | other | ZTE, ZTE Microelectronics |
R1-86 AI: 8.1.4.5 |
available | [WTS] [JSN] | |||
R1-1608663 | Calibration and evaluation assumptions for NR MIMO | other | ZTE, ZTE Microelectronics |
R1-86 AI: 8.1.4.5 |
available | [WTS] [JSN] | |||
R1-1608782 | Phase1 calibration for NR MIMO | discussion | CATT | Rel-14 |
R1-86 AI: 8.1.4.5 |
withdrawn | [WTS] [JSN] | ||
R1-1608821 | UL power control for NR MIMO | other | Huawei, HiSilicon |
R1-86 AI: 8.1.4.5 |
available | [WTS] [JSN] | |||
R1-1609099 | MIMO LLS calibration results for NR on 4GHz frequency band | discussion | Samsung |
R1-86 AI: 8.1.4.5 |
available | [WTS] [JSN] | |||
R1-1609166 | MIMO SLS calibration results for NR on 30GHz frequency band | other | Samsung Electronics Co., Ltd |
R1-86 AI: 8.1.4.5 |
available | [WTS] [JSN] | |||
R1-1609262 | Phase 1 system level calibration results for NR MIMO | discussion | LG Electronics |
R1-86 AI: 8.1.4.5 |
available | [WTS] [JSN] | |||
R1-1609263 | Phase 1 link level calibration results for NR MIMO |
discussion revised to R1-1610939 |
LG Electronics |
R1-86 AI: 8.1.4.5 |
revised | [WTS] [JSN] | |||
R1-1609288 | MIMO LLS calibration results for NR on 30GHz frequency band |
other revised to R1-1610443 |
Samsung Electronics Co., Ltd |
R1-86 AI: 8.1.4.5 |
revised | [WTS] [JSN] | |||
R1-1609445 | Discussion on MIMO calibration | other | Huawei, HiSilicon |
R1-86 AI: 8.1.4.5 |
available | [WTS] [JSN] | |||
R1-1609530 | Evaluation results of NR below 6GHz | discussion | Intel Corporation |
R1-86 AI: 8.1.4.5 |
available | [WTS] [JSN] | |||
R1-1609531 | Discussion on UL Power Control | discussion | Intel Corporation |
R1-86 AI: 8.1.4.5 |
available | [WTS] [JSN] | |||
R1-1609532 | Evaluation results of NR above 6GHz | discussion | Intel Corporation |
R1-86 AI: 8.1.4.5 |
available | [WTS] [JSN] | |||
R1-1609725 | Over The Air Calibration For Reciprocity Based MIMO | discussion | National Instruments Corp. |
R1-86 AI: 8.1.4.5 |
available | [WTS] [JSN] | |||
R1-1610071 | Initial investigation of the impact of UE movement | discussion | NTT DOCOMO, INC. |
R1-86 AI: 8.1.4.5 |
available | [WTS] [JSN] | |||
R1-1610072 | Phase-1 MIMO calibration results | discussion | NTT DOCOMO, INC. |
R1-86 AI: 8.1.4.5 |
available | [WTS] [JSN] | |||
R1-1610103 | Initial NR MIMO Calibration Results |
discussion revision of R1-1609696 |
Beijing Xinwei Telecom Techn. |
R1-86 AI: 8.1.4.5 |
available | [WTS] [JSN] | |||
R1-1610154 | Phase 1 calibration results for sub6GHz and Phase 2 calibration assumptions | discussion | Qualcomm Incorporated |
R1-86 AI: 8.1.4.5 |
available | [WTS] [JSN] | |||
R1-1610155 | Phase 1 calibration results for above 6GHz and Phase 2 calibration assumptions | discussion | Qualcomm Incorporated |
R1-86 AI: 8.1.4.5 |
available | [WTS] [JSN] | |||
R1-1610231 | Initial results for Phase 1 link level MIMO calibration for NR | discussion | Mitsubishi Electric Co. |
R1-86 AI: 8.1.4.5 |
available | [WTS] [JSN] | |||
R1-1610232 | UL power control in multi-beam based approaches | discussion | ASUSTEK COMPUTER (SHANGHAI) |
R1-86 AI: 8.1.4.5 |
available | [WTS] [JSN] | |||
R1-1610278 | On-demand power boost and cell muting for URLLC in the 5G New Radio | discussion | Nokia, Alcatel-Lucent Shanghai Bell |
R1-86 AI: 8.1.4.5 |
available | [WTS] [JSN] | |||
R1-1610279 | Latency assumptions for network-based coordination studies | discussion | Nokia, Alcatel-Lucent Shanghai Bell |
R1-86 AI: 8.1.4.5 |
available | [WTS] [JSN] | |||
R1-1610280 | Interference Aware Inter Cell Rank Coordination | discussion | Nokia, Alcatel-Lucent Shanghai Bell |
R1-86 AI: 8.1.4.5 |
available | [WTS] [JSN] | |||
R1-1610281 | UL Interference Coordination and Power Control | discussion | Nokia, Alcatel-Lucent Shanghai Bell |
R1-86 AI: 8.1.4.5 |
available | [WTS] [JSN] | |||
R1-1610282 | Dynamic TDD DL-to-UL Interference Cancellation using Packet Exchange in NR | discussion | Nokia, Alcatel-Lucent Shanghai Bell |
R1-86 AI: 8.1.4.5 |
available | [WTS] [JSN] | |||
R1-1610283 | Power control for MIMO | discussion | Nokia, Alcatel-Lucent Shanghai Bell |
R1-86 AI: 8.1.4.5 |
available | [WTS] [JSN] | |||
R1-1610284 | MIMO link level calibration results | discussion | Nokia, Alcatel-Lucent Shanghai Bell |
R1-86 AI: 8.1.4.5 |
available | [WTS] [JSN] | |||
R1-1610285 | MIMO system level calibration results | discussion | Nokia, Alcatel-Lucent Shanghai Bell |
R1-86 AI: 8.1.4.5 |
available | [WTS] [JSN] | |||
R1-1610443 | MIMO LLS calibration results for NR on 30GHz frequency band |
other revision of R1-1609288 |
Samsung Electronics Co., Ltd |
R1-86 AI: 8.1.4.5 |
available | [WTS] [JSN] | |||
R1-1610445 | MIMO calibration for NR – system level | discussion | InterDigital Communications |
R1-86 AI: 8.1.4.5 |
available | [WTS] [JSN] | |||
R1-1610888 | Way Forward on NR MIMO calibration | discussion | ZTE, ZTE Microelectronics, Nokia, ASB, CATT, MediaTek, Xinwei, Huawei, Hisilicon, Intel, Ericsson, Mitsubishi Electric, Samsung |
R1-86 AI: 8.1.4.5 |
agreed | [WTS] [JSN] | |||
R1-1610889 | Way Forward on Phase 1 link-level calibration for NR-MIMO with simplified antenna configuration | discussion | ZTE, ZTE Microelectronics, CATT, MediaTek, Xinwei, Huawei, Hisilicon, Intel, Ericsson, Nokia, ASB, Mitsubishi Electric, NTT DOCOMO, Samsung |
R1-86 AI: 8.1.4.5 |
agreed | [WTS] [JSN] | |||
R1-1610890 | Clarification on assumptions for Phase 1 link-level calibration for NR-MIMO | discussion | ZTE |
R1-86 AI: 8.1.4.5 |
noted | [WTS] [JSN] | |||
R1-1610939 | Phase 1 link level calibration results for NR MIMO |
discussion revision of R1-1609263 |
LG Electronics |
R1-86 AI: 8.1.4.5 |
available | [WTS] [JSN] | |||
R1-1610999 | WF on UL Power Control | discussion | Huawei, HiSilicon |
R1-86 AI: 8.1.4.5 |
noted | [WTS] [JSN] |
37 documents (0.32560014724731 seconds)