Please enter the search related information in the fields below. Partial information works, e.g. "SP-21
" in the "tdoc" field lists all TSG SA documents from 2021. Regular expressions mostly work in all fields (e.g. "2[34].501
" in the "Spec" field lists all documents related to 23.501 and 24.501. Capitalization is disregarded, i.e. "3GPP
" gives the same results as "3gpp
".
Download results in JSON format
tdoc | Title | Type / Revs | Source | Spec / CR | S/WID | Release | Meeting | Status | Links |
---|---|---|---|---|---|---|---|---|---|
R2-166422 | Correction on RAN1 parameters for eLAA | draftCR | Huawei, HiSilicon | LTE_eLAA-Core | Rel-14 |
R2-95 AI: 8.1.3 |
merged | [WTS] [JSN] | |
R2-166425 | Correction on RAN1 parameters for eLAA | draftCR | Huawei, HiSilicon | LTE_eLAA-Core | Rel-14 |
R2-95 AI: 8.1.3 |
not pursued | [WTS] [JSN] | |
R2-166716 | Capabilities for two step scheduling |
draftCR revised to R2-167265 |
Ericsson | LTE_eLAA-Core | Rel-14 |
R2-95 AI: 8.1.3 |
revised | [WTS] [JSN] | |
R2-166717 | Capabilities for two step scheduling |
draftCR revised to R2-167198 |
Ericsson | LTE_eLAA-Core | Rel-14 |
R2-95 AI: 8.1.3 |
revised | [WTS] [JSN] | |
R2-167131 | Simultaneous transmission of PUSCH on LAA with PUCCH | CR | Qualcomm Incorporated | 36.306 14.0.0 CR#1355 catF | LTE_eLAA-Core | Rel-14 |
R2-95 AI: 8.1.3 |
withdrawn | [WTS] [JSN] |
R2-167147 | Simultaneous transmission of PUSCH on LAA with PUCCH | draftCR | Qualcomm Incorporated | LTE_eLAA-Core | Rel-14 |
R2-95 AI: 8.1.3 |
available | [WTS] [JSN] | |
R2-167198 | Capabilities for two step scheduling |
draftCR revision of R2-166717 |
Ericsson | LTE_eLAA-Core | Rel-14 |
R2-95 AI: 8.1.3 |
postponed | [WTS] [JSN] | |
R2-167265 | Capabilities for two step scheduling |
draftCR revision of R2-166716 |
Ericsson | LTE_eLAA-Core | Rel-14 |
R2-95 AI: 8.1.3 |
postponed | [WTS] [JSN] | |
R2-167303 | Draft LS to RAN1 on Capabilities for two step scheduling (to: RAN1; cc: -; contact: Ericsson) |
LS out revised to R2-167307 |
Ericsson | LTE_eLAA-Core | Rel-14 |
R2-95 AI: 8.1.3 |
revised | [WTS] [JSN] | |
R2-167307 | LS on capabilities for 2-step scheduling for eLAA (to: RAN1; cc: -; contact: Ericsson) |
LS out revision of R2-167303 |
RAN2 | LTE_eLAA-Core | Rel-14 |
R2-95 AI: 8.1.3 |
approved | [WTS] [JSN] |
10 documents (0.32700514793396 seconds)