Please enter the search related information in the fields below. Partial information works, e.g. "SP-21
" in the "tdoc" field lists all TSG SA documents from 2021. Regular expressions mostly work in all fields (e.g. "2[34].501
" in the "Spec" field lists all documents related to 23.501 and 24.501. Capitalization is disregarded, i.e. "3GPP
" gives the same results as "3gpp
".
Download results in JSON format
tdoc | Title | Type / Revs | Source | Spec / CR | S/WID | Release | Meeting | Status | Links |
---|---|---|---|---|---|---|---|---|---|
R1-1704232 | Beam management across multiple carriers | other | Huawei, HiSilicon |
R1-88 AI: 8.1.2.6 |
available | [WTS] [JSN] | |||
R1-1704246 | Discussion on phase2 system-level calibration for NR-MIMO | other | Huawei, HiSilicon |
R1-88 AI: 8.1.2.6 |
available | [WTS] [JSN] | |||
R1-1704419 | Further Clarifications on Phase 3 NR MIMO calibration | other | ZTE, ZTE Microelectronics |
R1-88 AI: 8.1.2.6 |
available | [WTS] [JSN] | |||
R1-1704420 | Calibration results for Phase 1 NR MIMO system level calibration |
other revised to R1-1706846 |
ZTE, ZTE Microelectronics |
R1-88 AI: 8.1.2.6 |
revised | [WTS] [JSN] | |||
R1-1704421 | Calibration results for Phase 2 NR MIMO link level calibration |
other revised to R1-1706847 |
ZTE, ZTE Microelectronics |
R1-88 AI: 8.1.2.6 |
revised | [WTS] [JSN] | |||
R1-1704422 | Calibration results for Phase 2 NR MIMO system level calibration |
other revised to R1-1706848 |
ZTE, ZTE Microelectronics |
R1-88 AI: 8.1.2.6 |
revised | [WTS] [JSN] | |||
R1-1704492 | NR-MIMO calibration results | discussion | vivo |
R1-88 AI: 8.1.2.6 |
withdrawn | [WTS] [JSN] | |||
R1-1704568 | System level calibration results for NR MIMO | discussion | CATT |
R1-88 AI: 8.1.2.6 |
withdrawn | [WTS] [JSN] | |||
R1-1704569 | Link level calibration results for NR MIMO | discussion | CATT |
R1-88 AI: 8.1.2.6 |
withdrawn | [WTS] [JSN] | |||
R1-1704667 | NR MIMO System Level Phase 3 Calibration Results | discussion | Beijing Xinwei Telecom Techn. |
R1-88 AI: 8.1.2.6 |
available | [WTS] [JSN] | |||
R1-1704896 | Phase 2 SLS Calibration Results for NR MIMO | discussion | LG Electronics | Rel-15 |
R1-88 AI: 8.1.2.6 |
available | [WTS] [JSN] | ||
R1-1704897 | Phase 2 LLS Calibration Results for NR MIMO | discussion | LG Electronics | Rel-15 |
R1-88 AI: 8.1.2.6 |
available | [WTS] [JSN] | ||
R1-1705082 | Discussion on phase3 system-level calibration for NR-MIMO | other | Huawei, HiSilicon |
R1-88 AI: 8.1.2.6 |
available | [WTS] [JSN] | |||
R1-1705083 | Discussion on link-level calibration for NR-MIMO | other | Huawei, HiSilicon |
R1-88 AI: 8.1.2.6 |
available | [WTS] [JSN] | |||
R1-1705152 | Link and System level Phase II MIMO calibration results | discussion | Spreadtrum Communications | Rel-15 |
R1-88 AI: 8.1.2.6 |
available | [WTS] [JSN] | ||
R1-1705364 | MIMO Phase-2 SLS calibration results on 30GHz frequency band | discussion | Samsung |
R1-88 AI: 8.1.2.6 |
available | [WTS] [JSN] | |||
R1-1705365 | MIMO Phase-2 LLS calibration results on 30GHz frequency band | discussion | Samsung |
R1-88 AI: 8.1.2.6 |
available | [WTS] [JSN] | |||
R1-1705366 | Evaluation results for dense urban single layer scenario on 30GHz frequency band | discussion | Samsung |
R1-88 AI: 8.1.2.6 |
available | [WTS] [JSN] | |||
R1-1705367 | Evaluation results for indoor hotspot scenario on 30GHz frequency band | discussion | Samsung |
R1-88 AI: 8.1.2.6 |
available | [WTS] [JSN] | |||
R1-1705368 | Evaluation results for dense urban dual layer on 30GHz frequency band | discussion | Samsung |
R1-88 AI: 8.1.2.6 |
available | [WTS] [JSN] | |||
R1-1705369 | Evaluation assumptions for beam management | discussion | Samsung |
R1-88 AI: 8.1.2.6 |
available | [WTS] [JSN] | |||
R1-1705370 | Link level evaluation results for beam management | discussion | Samsung |
R1-88 AI: 8.1.2.6 |
available | [WTS] [JSN] | |||
R1-1705371 | System level evaluation results for beam management | discussion | Samsung |
R1-88 AI: 8.1.2.6 |
available | [WTS] [JSN] | |||
R1-1705372 | Discussions on channel and interference measurements for NR |
discussion revised to R1-1706852 |
Samsung |
R1-88 AI: 8.1.2.6 |
revised | [WTS] [JSN] | |||
R1-1705373 | Discussions on service specific CSI for NR | discussion | Samsung |
R1-88 AI: 8.1.2.6 |
available | [WTS] [JSN] | |||
R1-1705599 | MIMO calibration results for above 6GHz | discussion | Qualcomm Incorporated | Rel-15 |
R1-88 AI: 8.1.2.6 |
withdrawn | [WTS] [JSN] | ||
R1-1705668 | MIMO calibration results for sub6GHz | discussion | Qualcomm Incorporated | Rel-15 |
R1-88 AI: 8.1.2.6 |
available | [WTS] [JSN] | ||
R1-1705728 | Phase-2 LLS MIMO calibration results | discussion | NTT DOCOMO, INC. |
R1-88 AI: 8.1.2.6 |
available | [WTS] [JSN] | |||
R1-1705729 | Phase-2 SLS MIMO calibration results | discussion | NTT DOCOMO, INC. |
R1-88 AI: 8.1.2.6 |
available | [WTS] [JSN] | |||
R1-1705730 | Phase-3 SLS MIMO calibration results | discussion | NTT DOCOMO, INC. |
R1-88 AI: 8.1.2.6 |
available | [WTS] [JSN] | |||
R1-1705775 | Calibration Results of NR MIMO | discussion | CATR |
R1-88 AI: 8.1.2.6 |
available | [WTS] [JSN] | |||
R1-1705816 | MU-MIMO performance evaluation of nonlinear precoding schemes | discussion | Mitsubishi Electric Co. |
R1-88 AI: 8.1.2.6 |
available | [WTS] [JSN] | |||
R1-1705817 | Summary of analysis of nonlinear precoding schemes for NR | discussion | Mitsubishi Electric Co. |
R1-88 AI: 8.1.2.6 |
available | [WTS] [JSN] | |||
R1-1705917 | Relation between radio link failure and beam failure | discussion | Ericsson |
R1-88 AI: 8.1.2.6 |
available | [WTS] [JSN] | |||
R1-1705918 | NR CSI Computation Capability | discussion | Ericsson |
R1-88 AI: 8.1.2.6 |
available | [WTS] [JSN] | |||
R1-1705919 | On Dynamic Triggering for CSI Reports and CSI-RS | discussion | Ericsson |
R1-88 AI: 8.1.2.6 |
available | [WTS] [JSN] | |||
R1-1705920 | On CSI reporting for short PUCCH | discussion | Ericsson |
R1-88 AI: 8.1.2.6 |
available | [WTS] [JSN] | |||
R1-1705921 | Updated NR MIMO Phase 1 SLS calibration results at 4 GHz | discussion | Ericsson |
R1-88 AI: 8.1.2.6 |
available | [WTS] [JSN] | |||
R1-1705922 | Updated NR MIMO Phase 1 SLS calibration results at 30 GHz | discussion | Ericsson |
R1-88 AI: 8.1.2.6 |
available | [WTS] [JSN] | |||
R1-1705923 | On the dense urban micro scenario | discussion | Ericsson |
R1-88 AI: 8.1.2.6 |
available | [WTS] [JSN] | |||
R1-1705924 | Phase 2 LLS calibration at 4 GHz | discussion | Ericsson |
R1-88 AI: 8.1.2.6 |
available | [WTS] [JSN] | |||
R1-1705925 | Phase 2 LLS calibration at 30 GHz | discussion | Ericsson |
R1-88 AI: 8.1.2.6 |
available | [WTS] [JSN] | |||
R1-1705926 | On basis design for Type I and Type II codebooks | discussion | Ericsson |
R1-88 AI: 8.1.2.6 |
noted | [WTS] [JSN] | |||
R1-1705927 | Frequency parametrization for Type II CSI codebook | discussion | Ericsson |
R1-88 AI: 8.1.2.6 |
available | [WTS] [JSN] | |||
R1-1705928 | Type II CSI for beamformed CSI-RS and hybrid operation | discussion | Ericsson |
R1-88 AI: 8.1.2.6 |
available | [WTS] [JSN] | |||
R1-1705929 | UCI content for multi-antenna | discussion | Ericsson |
R1-88 AI: 8.1.2.6 |
withdrawn | [WTS] [JSN] | |||
R1-1705930 | Further details of measurement restriction configuration | discussion | Ericsson |
R1-88 AI: 8.1.2.6 |
available | [WTS] [JSN] | |||
R1-1705931 | Commonality between beam management and CSI frameworks | discussion | Ericsson |
R1-88 AI: 8.1.2.6 |
available | [WTS] [JSN] | |||
R1-1705979 | On frequency domain interleaving | discussion | Nokia, Alcatel-Lucent Shanghai Bell |
R1-88 AI: 8.1.2.6 |
available | [WTS] [JSN] | |||
R1-1705980 | Non-codebook based UL-MIMO transmission | discussion | Nokia, Alcatel-Lucent Shanghai Bell |
R1-88 AI: 8.1.2.6 |
available | [WTS] [JSN] | |||
R1-1705981 | On the utilization of multi-panel arrays at the UE in UMa 30GHz | discussion | Nokia, Alcatel-Lucent Shanghai Bell |
R1-88 AI: 8.1.2.6 |
available | [WTS] [JSN] | |||
R1-1705982 | Performance Evaluation of DPS CoMP scheme for NR | discussion | Nokia, Alcatel-Lucent Shanghai Bell |
R1-88 AI: 8.1.2.6 |
available | [WTS] [JSN] | |||
R1-1705983 | Impact of Antenna Panel Array Structures in UMa 30GHz | discussion | Nokia, Alcatel-Lucent Shanghai Bell |
R1-88 AI: 8.1.2.6 |
available | [WTS] [JSN] | |||
R1-1705984 | On beam grouping reporting in NR | discussion | Nokia, Alcatel-Lucent Shanghai Bell |
R1-88 AI: 8.1.2.6 |
withdrawn | [WTS] [JSN] | |||
R1-1705985 | Multi-beam control channel transmission | discussion | Nokia, Alcatel-Lucent Shanghai Bell |
R1-88 AI: 8.1.2.6 |
available | [WTS] [JSN] | |||
R1-1705986 | Beam Measurements and TX/RX Beam Correspondence | discussion | Nokia, Alcatel-Lucent Shanghai Bell |
R1-88 AI: 8.1.2.6 |
available | [WTS] [JSN] | |||
R1-1705987 | Beam management - QCL association between DL RS and DMRS for NR-PDCCH | discussion | Nokia, Alcatel-Lucent Shanghai Bell |
R1-88 AI: 8.1.2.6 |
available | [WTS] [JSN] | |||
R1-1705988 | Discussion on the impact of number of UE panels | discussion | Nokia, Alcatel-Lucent Shanghai Bell |
R1-88 AI: 8.1.2.6 |
available | [WTS] [JSN] | |||
R1-1705989 | Initial results on number of beams to be mantained | discussion | Nokia, Alcatel-Lucent Shanghai Bell |
R1-88 AI: 8.1.2.6 |
available | [WTS] [JSN] | |||
R1-1705990 | Beam management procedures for UL | discussion | Nokia, Alcatel-Lucent Shanghai Bell |
R1-88 AI: 8.1.2.6 |
available | [WTS] [JSN] | |||
R1-1705991 | On the CRI definition and usability in NR | discussion | Nokia, Alcatel-Lucent Shanghai Bell |
R1-88 AI: 8.1.2.6 |
available | [WTS] [JSN] | |||
R1-1705992 | On the CSI timing relationhips | discussion | Nokia, Alcatel-Lucent Shanghai Bell |
R1-88 AI: 8.1.2.6 |
available | [WTS] [JSN] | |||
R1-1705993 | On hybrid CSI report: from LTE MIMO to NR MIMO | discussion | Nokia, Alcatel-Lucent Shanghai Bell |
R1-88 AI: 8.1.2.6 |
available | [WTS] [JSN] | |||
R1-1705994 | SRS based UL CSI aquisition | discussion | Nokia, Alcatel-Lucent Shanghai Bell |
R1-88 AI: 8.1.2.6 |
available | [WTS] [JSN] | |||
R1-1705995 | Codebook design for multi-panel operation | discussion | Nokia, Alcatel-Lucent Shanghai Bell |
R1-88 AI: 8.1.2.6 |
available | [WTS] [JSN] | |||
R1-1705996 | Update on Phase 1 SLS NR MIMO calibration results | discussion | Nokia, Alcatel-Lucent Shanghai Bell |
R1-88 AI: 8.1.2.6 |
available | [WTS] [JSN] | |||
R1-1705997 | Update on Phase 1 LLS NR MIMO calibration results | discussion | Nokia, Alcatel-Lucent Shanghai Bell |
R1-88 AI: 8.1.2.6 |
available | [WTS] [JSN] | |||
R1-1705998 | Phase 2 LLS NR MIMO calibration results | discussion | Nokia, Alcatel-Lucent Shanghai Bell |
R1-88 AI: 8.1.2.6 |
available | [WTS] [JSN] | |||
R1-1705999 | Phase 2 SLS NR MIMO calibration results on 30 GHz | discussion | Nokia, Alcatel-Lucent Shanghai Bell |
R1-88 AI: 8.1.2.6 |
available | [WTS] [JSN] | |||
R1-1706000 | Phase 2 SLS NR MIMO calibration results on below 6 GHz | discussion | Nokia, Alcatel-Lucent Shanghai Bell |
R1-88 AI: 8.1.2.6 |
available | [WTS] [JSN] | |||
R1-1706001 | On the spatial consistency model for Phase 3 MIMO calibration | discussion | Nokia, Alcatel-Lucent Shanghai Bell |
R1-88 AI: 8.1.2.6 |
available | [WTS] [JSN] | |||
R1-1706094 | Multi-panel UL MIMO transmission | discussion | Nokia, Alcatel-Lucent Shanghai Bell |
R1-88 AI: 8.1.2.6 |
available | [WTS] [JSN] | |||
R1-1706113 | System level simulation assumptions for beam management | discussion | Samsung |
R1-88 AI: 8.1.2.6 |
available | [WTS] [JSN] | |||
R1-1706131 | MIMO Phase-1 LLS calibration results on 30GHz frequency band | discussion | Samsung |
R1-88 AI: 8.1.2.6 |
available | [WTS] [JSN] | |||
R1-1706132 | MIMO Phase-1 SLS calibration results on 30GHz frequency band | discussion | Samsung |
R1-88 AI: 8.1.2.6 |
available | [WTS] [JSN] | |||
R1-1706256 | Updated NR MIMO Phase 2 SLS calibration results at 4 GHz | other | Ericsson |
R1-88 AI: 8.1.2.6 |
available | [WTS] [JSN] | |||
R1-1706257 | Updated NR MIMO Phase 2 SLS calibration results at 30 GHz | other | Ericsson |
R1-88 AI: 8.1.2.6 |
available | [WTS] [JSN] | |||
R1-1706642 | WF on spatial consistency model for Phase 3 calibration | other | Nokia, ASB, Ericsson, Samsung |
R1-88 AI: 8.1.2.6 |
noted | [WTS] [JSN] | |||
R1-1706846 | Calibration results for Phase 1 NR MIMO system level calibration |
other revision of R1-1704420 |
ZTE, ZTE Microelectronics |
R1-88 AI: 8.1.2.6 |
noted | [WTS] [JSN] | |||
R1-1706847 | Calibration results for Phase 2 NR MIMO link level calibration |
other revision of R1-1704421 |
ZTE, ZTE Microelectronics |
R1-88 AI: 8.1.2.6 |
noted | [WTS] [JSN] | |||
R1-1706848 | Calibration results for Phase 2 NR MIMO system level calibration |
other revision of R1-1704422 |
ZTE, ZTE Microelectronics |
R1-88 AI: 8.1.2.6 |
noted | [WTS] [JSN] | |||
R1-1706852 | Discussions on channel and interference measurements for NR |
discussion revision of R1-1705372 |
Samsung |
R1-88 AI: 8.1.2.6 |
available | [WTS] [JSN] | |||
R1-1706853 | Calibration results for Phase 1 NR MIMO link level calibration | other | ZTE, ZTE Microelectronics |
R1-88 AI: 8.1.2.6 |
noted | [WTS] [JSN] |
83 documents (0.3320620059967 seconds)